GREEN BRIDGE

Fact sheet

UNDER CONSTRUCTION
OCTOBER 2018 cityofgoldcoast.com.au/HOTAproject

Concept design of Green bridge (July 2018).

CHEVRON ISLAND PARKING AND ACCESS


The City of Gold Coast is delivering a cultural, Green Bridge to Chevron Island (2018-2019)
artistic and civic heart at Evandale – 16.9 hectares A pedestrian and cycle bridge spanning the Nerang River will
of land at Surfers Paradise known as HOTA, Home provide a vital connector between HOTA, Chevron Island, Surfers
of the Arts. Paradise, the light rail and beyond. The green bridge is central to
the success of HOTA.
HOTA will evolve over the next 10 years, as funding becomes
available. It will provide new and expanded facilities for performing The northern landing site connects to Mawarra Street, at the
and visual arts, cultural events, civic celebration, recreation and western gateway to Chevron Island’s business district, forming the
dining and entertainment experiences. start of an active cultural corridor from HOTA into central Surfers
Paradise.
The first of the construction phases began in 2015 with Stage 1a.
HOTA Outdoor Stage and concert lawn. It was completed in late Public transport options and water transport will also increase
2017 ahead of schedule and within budget. Work on the Stage 1b over time, providing more ways to access the evolving HOTA
HOTA Gallery and green bridge to Chevron Island will commence precinct.
soon with construction occurring concurrently. However, some parking changes will be needed to facilitate
While we are building our cultural future, events and activities will construction (See over page).
continue at HOTA. Construction work will occur mainly during the day, Monday to
Saturday between 6.30am and 6.30pm. Advance notice will be
MP2568

given if any works are required outside these hours.


GREEN BRIDGE UNDER CONSTRUCTION Barranb OCTOBER 2018
ali Stre
et

CHEVRON ISLAND PARKING AND ACCESS CHANGES

Thoma
s Drive
t
o Stree

t
ra Stree
Anemb

33 x 2 hour carparks
Karloo converted to all day parking

Mawar
Sta Street
nh
ill D
riv
e +

Street
+ Removal of +

treet
car parks

Parnoo
Burra S
Green bridge
construction
zone

Sta
nh
ill D
riv
e
Map of Chevron Island showing parking changes and construction zones.
Nerang River

Key dates
No public access on riverbank
Georgiou Brady (a joint venture between Georgiou Group, Brady Civil and Marine) has been appointed to deliver the green bridge. They
Pontoon access
will manage any traffic, parking and access arrangements during delivery.

Month Milestone Impacts


November 2018 Bridge construction commences.
Green bridge
January 2019 construction zone established.
Site compound 1. 33 x 2-hour car parks in Karloo Street temporarily converted
(Northern section of the all day to unrestricted parking.
carpark off Karloo Street). 2. 28 unrestricted parking spaces on Karloo Street temporarily
removed for site compound.
Children’s
January 2019 - March 2019 3. Temporary removal of 6-8 unrestricted car spaces along
BOOMGATE playground
Stanhill Drive to accommodate for bridge approach.
Evandale Lake 4. 4-5 unrestricted car parks returned. 3-4 unrestricted car
parks permanently removed due to reconfigured intersection.
A
October 2019 Bridge construction ends.
November 2019 Site compound removed. 5. 28 unrestricted car parks in Karloo Street returned.
6. 33 unrestricted car parks converted back to 2-hour parking.

Residents and businesses will be kept up to date and advised of any other impacts or changes which might occur during construction.

For more information


Georgiou Brady joint venture team
n Green Bridge
P 1800 842 103
E GreenBridgeGC@gbjv.com.au
W cityofgoldcoast.com.au/HOTAproject