Motoran

No Description Power (KW) Ratio Qty dia. Shaft Key (mm)


(mm) P L T
1 incline fuel fibre scrapper conveyor 15 62,96 2 100 28,20 8,10
2 distributing fuel fibre scrapper conveyor 11 62,96 2 100 28,45 8,60
3 recycling fuel fibre screw conveyor no.1 7,5 60,44 2 80 22,10 5,35
4 recycling fuel fibre screw conveyor no.2 5,5 63,46 1 65 16,35 5,15
5 horizontal shell distributing screw conveyor 5,5 63,46 1 65 16,35 5,15
6 Shell elevator No.1 11 58,98 1 90 25,25 7,0
7 under shell bunker screw conveyor 11 62,96 1 100 28,45 8,6
8 shell elevator No.2 11 58,98 1 90 25,25 7,0
9 shell feeding screw conveyor 15 62,96 1 100 28,20 8,1
10 boiler feed tank
11 tangki air kotor
12 konstruksi mekanikal moving floor
13 shell bin
14 top shell bunker screw conveyor 11 58,98 1 90 25,25 7
15 boiler ash screw conveyor no.1 11 58,98 1 90 25,25 7
16 boiler ash screw conveyor no.2 2,2 65,14 1 42 12 3,85
17 boiler ash screw conveyor no.3 2,2 65,14 1 42 12 3,85
JUMLAH 16
Conveyor
Chain
key (mm) Qty
dia. shaft (mm) coupling
P L T
92 15,5 9,5
93 15,6 9,6
65 72 18,5 8,8 8018 2
65 72 18,5 8,8 6022 1
65 72 18,5 8,8 6022 1

65 72 18,5 8,8 8022 1

65 72 18,5 8,8 8022 1

65 72 18,5 8,8 8020 1

7
LIST PEMAKAIAN SHAFT

KEY (mm)
NO SPEK SHAFT
P L T
1 4" x 460 mm 75 19 16
tersedia = 6 75 19 16
dibutuhkan = 7 75 19 16
kekurangan = 1 75 19 16
75 19 16
75 19 16
75 19 16

2 75 x 1110 mm 92 15,5 9,5


tersedia = 4 93 15,6 9,6
dibutuhkan = 4

3 75 x 1398 mm ? ? ?
tersedia = 0 ? ? ?
dibutuhkan = 2
kekurangan = 2

4 4" x 375 mm
tersedia = 4
dibutuhkan = 7
kekurangan = 3

5 75 x 990 mm
tersedia = 6
dibutuhkan = 4
kelebihan = 2

6 75 x 1190 mm
tersedia = 0
dibutuhkan = 2
kekurangan = 2
LIST PEMAKAIAN SHAFT

LOKASI PENGGUNAAN QTY

1. horizontal shell hopper screw conveyor dia. 700x 14.000 mm 1


2. top shell bunker screw conveyor dia. 700 x 21.000 mm 1
3. under shell bunker screw conveyor dia. 700 x 21.000 mm 1
4. feeding shell screw conveyor dia. 700 x 31.500 mm 1
5. recycling fibre screw conveyor dia. 600 x 54.000 mm 1
6. dust boiler no.1 screw conveyor dia. 600 mm 1
7. dust boiler no.2 screw conveyor dia. 300 mm 1

1. inclined fuel fibre srapper conveyor 750 x 43.500 mm 2


2. disributing fuel fibre scrapper conveyor 750 x 43.500 mm 2

1. shell elevator no.1 1


2. shell elevator no.2 1

1. horizontal shell hopper screw conveyor dia. 700x 14.000 mm 1


2. top shell bunker screw conveyor dia. 700 x 21.000 mm 1
3. under shell bunker screw conveyor dia. 700 x 21.000 mm 1
4. feeding shell screw conveyor dia. 700 x 31.500 mm 1
5. recycling fibre screw conveyor dia. 600 x 54.000 mm 1
6. dust boiler no.1 screw conveyor dia. 600 mm 1
7. dust boiler no.2 screw conveyor dia. 300 mm 1

1. inclined fuel fibre srapper conveyor 750 x 43.500 mm 2


2. disributing fuel fibre scrapper conveyor 750 x 43.500 mm 2

1. shell elevator no.1 1


2. shell elevator no.2 1
KETERANGAN

terpasang
akan dibubut
akan dibubut
akan dibubut
akan dibubut
akan dibubut
akan dibubut

terpasang
belum terpasang

belum terpasang
belum terpasang

akan dibubut
akan dibubut
akan dibubut
terpasang
akan dibubut
akan dibubut
akan dibubut

belum terpasang
belum terpasang

belum terpasang
belum terpasang
KEY shaft
ukuran shaft conveyor (mm)
No Deskripsi
conveyor
P L T
1 inclined fuel fibre srapper conveyor 75 x 1110 mm 92 15,5 9,5
2 disributing fuel fibre scrapper conveyor 75 x 1110 mm 93 15,6 9,6
3 shell elevator no.1 75 x 1398 mm
4 shell elevator no.2 75 x 1398 mm
KEY shaft
dia. shaft motoran (mm) number of teeth (ansi 100 Qty
motoran double strand)
P L T
100 28,20 8,10 40 4
100 28,45 8,60 40 4
90 25,25 7,0 24 2
90 25,25 7,0 24 2
list pemakaian bearing
LIST MOTORAN
ST. BAHAN BAKAR
No Item Oty Daya (KW)
1 hidrolik moving floor no.1 1 15
2 hidrolik moving floor no.2 1 15
3 hidrolik moving floor no.3 1 15
4 fibre inclane scrapper conveyor no.1 1 15
5 fibre inclane scrapper conveyor no.2 1 15
6 fibre distributing scrapper conveyor no.1 1 11
7 fibre distributing scrapper conveyor no.2 1 11
8 fibre recycling screw conveyor no.1 1 7.5
9 fibre recycling screw conveyor no.2 1 5.5
10 shell horizontal screw conveyor 1 5.5
11 shell elevator no.1 1 11
12 top shell bunker screw conveyor 1 11
13 under shell bunker screw conveyor 1 11
14 shell elevator no.2 1 11
15 shell distributing screw conveyor 1 15
total 15 174.5

STASIUN BOILER
No Item Qty Daya (KW)
1 fuel feeding screw conveyor no.1 1 5.5
2 fuel feeding screw conveyor no.2 1 5.5
3 fuel feeding screw conveyor no.3 1 5.5
4 motoran pendulum no.1 1 1.5
5 motoran pendulum no.2 1 1.5
6 motoran pendulum no.3 1 1.5
7 motoran spreader no.1 1 1.5
8 motoran spreader no.2 1 1.5
9 motoran spreader no.3 1 1.5
10 feed water pump + spare 2 132
11 Induced Draft Fan (ID fan) 1 150
12 Force Draft Fan (FD fan) 1 30
13 Secondary FD Fan (SD Fan) 1 36
14 boiler ash screw conveyor no.1 1 11
15 boiler ash screw conveyor no.2 1 2.2
16 boier ash screw conveyor no.3 1 2.2
17 dust collector no.1 1 0.37
18 dust collector no.2 1 0.37
19 dust collector no.3 1 0.37
20 boiler waste screw conveyor 1 5.5
jumlah 21 395.51

STASIUN WATER TREATMENT PLANT


No Item Oty Daya (KW)
1 raw water pump
2 clarifier tank mixer
3
4
5
6
7
8
9
10
11
12 make up cooling tower pump
13 domestik pump
14 hydrant pump
15
16
17
18
19
20
jumlah 0 0

STASIUN TURBIN
No. item Qty Daya (KW)
1 Emergency Oil Pump 1 1.5
2 Auxiliary Oil Pump 1 15
3 Condensate pump + spare 2 7.5
4 Cooling water pump no.1 1 11
5 Cooling water pump no.2 1 11
6 Cooling water pump no.3 1 11
7 Cooling tower fan no.1 1 55
8 Cooling tower fan no.2 1 55
9 Cooling tower fan no.3 1 55
10 turning gear 1
11
12
jumlah 11 222
konsumsi daya motoran (sementara)
Ket st. bahan bakar st.boiler st. WTP st. turbin
174.5 395.51 0 222

belum tersedia

fix

Ket
fix

NT
Ket
belum tersedia
belum tersedia

belum tersedia
belum tersedia
belum tersedia

jumlah sementara

Ket
Belum tersedia
Belum tersedia
Belum tersedia

jumlah sementara
sementara)
jumlah (KW)
792.01
BOX PANEL AREA STASIUN BAHAN BAKAR + RO
No Item Daya (KW) Oty (A)
1 Hydrolic moving floor no.1 15 1
2 Hydrolic moving floor no.2 15 1
3 fibre inclane scrapper conveyor no.1 15 1
4 fibre inclane scrapper conveyor no.2 15 1
5 fibre distributing scrapper conveyor no.1 11 1
6 fibre distributing scrapper conveyor no.2 11 1
7 fibre recycling screw conveyor no.1 7.5 1
8 fibre recycling screw conveyor no.2 5.5 1
9 shell horizontal screw conveyor 5.5 1
10 shell elevator no.1 11 1
11 top shell bunker screw conveyor 11 1
12 under shell bunker screw conveyor 11 1
13 shell elevator no.2 11 1
14 shell distributing screw conveyor 15 1
15 active carbon filter pump + spare 11 2
16 booster pump RO 1 (20T/h) 22 1
17 cleaning pump RO 1 3 1
18 booster pump RO 2 (10T/h) 11 1
19 Booster pump RO 2 2.2 1
20 daerator pump + spare 11 2
21 feed tank pump + spare 1.5 2
22 mixed bed regenaration pump + spare 0.55 2
23 Transfer tank pump no.1 + spare 5.5 2
24 Transfer tank pump no.2 + spare 5.5 2
Total 232.75 30
BOX PANEL AREA RUMAH POMPA + DOSING PUM
No Item Daya (KW) Qty (A)
1 sand filter pump + spare 18.5 2
2 domestik pump + spare 7.5 2
3 hydrant pump 15 1
4 raw water pump + spare 30 2
5 circulating water pump no.1 110 1
6 circulating water pump no.2 110 1
7 cooling tower fan no.1 55 1
8 cooling tower fan no.2 55 1
9 cooling tower fan no.3 55 1
10 dosing pump no.1 0.5 1
11 dosing pump no.2 0.5 1
12 dosing pump no.3 0.5 1
13 dosing pump no.4 0.5 1
14 dosing pump no.5 0.5 1
15 dosing pump no.6 0.5 1
16 agitator no.1 1.1 1
17 agitator no.2 1.1 1
18 agitator no.3 1.1 1
19 agitator no.4 1.1 1
20 agitator no.5 1.1 1
21 agitator no.6 1.1 1
Total 465.6 24
BOX PANEL AREA WORKSHOP+GUDANG+LAB
No Item Qty Daya (KW)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
BAHAN BAKAR + RO
Future (B) total (A+B) Keterangan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2 4 Supply jalur power
1 2 Supply jalur power
1 2 Supply jalur power
1 2 Supply jalur power
1 2 Supply jalur power
2 4 Supply jalur power
2 4 Supply jalur power
2 4 Supply jalur power
2 4 Supply jalur power
2 4 Supply jalur power
16 46
OMPA + DOSING PUMP
Future (B) Total (A+B) Keterangan
2 4

supply power + box panel


area waduk
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
1 2 supply jalur power
19 38
AB
Keterangan
Rencana Perjalanan Dinas Dalam dan Luar Kota
Nama :
Periode:

Tgl Customer Lokasi


1

10
11

12

13

14

15

16

17

18

19

20

21

22

23
24

25

26

27

28

29

30

31
n Luar Kota
TIRTA KIMIA ENGINEERING
Water and Waste Treatment Engineering

Yang dijumpai
KIMIA ENGINEERING
Waste Treatment Engineering

Kegiatan

You might also like