Linde Job Safety Analysis - Template

Job Reference (as


Description of Job: Working at height
applicable):
Work System
(area, equipment, materials,
processes):
Principal contractor company Date the JSA was
name: prepared:

Principal Contractor or Representative: Linde responsible person:

Name Position Signature Date Name Position Signature Date

Confirmation
Item
of
Numb Work Activity Hazards Control Measures Persons Responsible
Implementat
er
ion
Break the job down into What could harm someone? What can be done to achieve an acceptable Who will make sure it Date and
steps risk level? happens? signof
1 Handling materials Sharp edges, Falling materials  Used proper tools. Shift Supervisor /
from height, Tools falling  Used proper PPE's Foreman (CCC)
from height, During lifting  Used a proper safety gloves
used proper way for lifting,
 Wearing a safety harness during work at
Using inspected power hand
height
tools
 Used proper way for lifting and
following safety procedure for lifting.
 And GFCI will be provided for used the
power hand tools.
 Handled the equipment carefully and to
be stored properly after work finishes.
 Tools and test equipment must keep in

1.0 December 2010 IMS-36-25-GROUP Copyright © The Linde Group – Distributed by a locally registered Linde company Page 1 of 4
tools box and tools box must placed at
proper safe place.
 Be careful during loading and unloading
of cable drums. And must be area
barricaded
2 Using of hand tools and power Improper handling of hand  Use of proper PPE's. Shift Supervisor /
tools tools.  Use of correct tools. Foreman (CCC)
 Workers to be briefed to appreciate
possible fire risk.
 Use of proper type of gloves by all
personnel involved in the work
 Personnel to be briefed to use the right
tool for the right job.
 Ensure hand tools are inspected free
from patent defects.
 All power tools must be inspected and
color code for this month.
 Not allowed to use hand made tools in
the work area.
 Using face shield during using of
grinder machine and cutting machine.
 Fire extinguisher must be located near
the work area.
 Cover cutting area by fire blanket
during using of grinder machine.

3 Working @ Height using Falling from heights,  PTW controls. Shift Supervisor /
man-basket Materials and tools falling  To ensure safe access ladder used for Foreman (CCC)
from heights climbing.
 Provide training for work at height
 Use full body harness with 100% tie off
 Barricading and signage in working
1.0 December 2010 IMS-36-25-GROUP Copyright © The Linde Group – Distributed by a locally registered Linde company Page 2 of 4
area.
 PPE shall be worn by all personnel
 Approved scaffolding to be used or man
lift.
 Verify ground condition level.
 To be sure the man-basket is inspected
and valid certificated.
 To be sure use double tag line for
control the man-basket
 Need to continue check the wind speed
all time to be sure the man-basket safe
to use.
 Only certified cranes operator allowed
operating the crane.
 To be sure certified riggers to control
the man-basket.
 Nobody allowed going out from the
man-basket while in lifting position.
 Barricade the below ground level to
avoid any falling any object.
 To be sure all time the door must be
close
 All slings which attached to man-basket
must be inspected and color coded.

4 Housekeeping Materials falling from height,  Regular inspection and corrective Shift Supervisor /
Combustible debris- risk of actions. Foreman (CCC)
fire.  Adequate stacking/ storage of material
at height.
 Cleaning of work site.
 Segregation storage for flammable
1.0 December 2010 IMS-36-25-GROUP Copyright © The Linde Group – Distributed by a locally registered Linde company Page 3 of 4
materials if have.

1.0 December 2010 IMS-36-25-GROUP Copyright © The Linde Group – Distributed by a locally registered Linde company Page 4 of 4