OPERATION & MAINTENANCE MANUAL | 2017
‘C5.4Routine Maintenance
Frequency Of Maintenance
Mainienance Seope
1) The normal daly function of starting, operating and
stopping the equipment has to be included as part ofthe
Daily maintenance service,
ii) Example of Daily Checklist Gas Valve Form on page 33
i) The responsible person to be performed shall include
regular and systematic checking, cleaning and where
necessary adjustment or testing ofthe system.
ii) Example of Safety Inspection ReporvChecklist on page 29
&30
Monthly
C6) DOMESTIC & COMMERCIAL INSTALLATION EMERGENCY PROCEDURE,
Any Smell Of Gas Must Be Investigated Promptly
Strong Smell of Gas,
i) Tum off Main Valve(s), call licensed gas fitter to repair installation,
aint Smell of Gas
i) Check the system if ther is any indication of any gas leak such as hissing noise
or increase in smell of gas.
ii) Test with soapy water solution (or detergent) which will bubble at the point of gas
escape.
fil) Never use a match or flame to test.
ivy) On fixed installation turn off main valve and cal a licensed gas fitter to repair
PUSAT KECEMERLANGAN BADMINTON NEGARAOPERATION & MAINTENANCE MANUAL | 2017
PARAMOUNT ENERGY SDN BHD
- SAFETY INSPECTION REPORT/CHECKLIST-
‘DATE OF LAST INSPECTION
YES | NO | ‘COMMENTS
escRIPTiON
INTERNAL MAIN DISTRIBUTION PIPING
‘TOTENANT'S LOTS
‘Are pipe valves protected against physica damage?
Are pipe joins propery connected and gas igh?
‘Are there any sign of corrsion a the pie ints
along the pipe?
Labeling of Gas Piping
Arete following items in good working
Condon?
1) 2nd Stage Regulater.
i) Solenoid Valve
ii) Pressure Gauge.
DOKIM ENGINEERING SON BHD
Rear ernnn
Mer:OPERATION & MAINTENANCE MANUAL
PARAMOUNT ENERGY SDN BHD (723677-U)
O49, JALAN BP 5/7,BANDAR BUKIT PUCHONG
47100 PUCHONG SELANGOR DARUL EHSAN.
703-8051 4259 E : PARAMOUNTENERGY88@yehoo com
~____SAFETY INSPECTION REPORT (SIR )
so Toon LEE: Taspecton Hendy
Testa Ths Tnp a
Ter Toate
wows rc [1] Nara Gas
fenton Sty Inspec the uty lope of the Ga Sytem ae fallow:
Canon Ton ia amavis?
[oavane
renee Gust
Fag rake ag
Tee
Emergency Shut-OF Valve
1 Stage Re
2nd Stage Regulator
COMMENDATION / COMMENTS
rie By Witnesed By
Carbon Copy to
Bullding Maintenance Office
“Tenant
Time
KECEMERLANGAN BADNOPERATION & MAINTENANCE MANUAL | 2017
PARAMOUNT ENERGY SDN BHD
-DAILY CHECKLIST GAS VALVE-
Month | Time Signature [Time Signature
Gas Valve Open Gas Valve Close
PUSAT KECEMERLANGAN BADMINTON NEGARA aaa