Professional Documents
Culture Documents
Works with Project Team to define the life cycle based well completion designs (artificial lift,
sand face, upper completion)
Works with the Project Team for the preparation of the conceptual and detailed well
completion Basis of Designs and Well test Basis of Designs.
Works with the Project Team to:
Define different artificial lift methods applicable for new infill wells
Prepare artificial lift / well type matrix
Identify rig & rigless artificial lift optimization opportunities
Identify artificial lift intervention requirements for repair and / or optimization
Evaluate rigless vs. rig interventions
Define artificial lift operation and monitoring system
Identify best applicable performance monitoring devices
Evaluate operational practices applicable in Cendor 2
Estimate cost & added value of monitoring system
Discuss artificial lift types with equipment suppliers and Peer Review - Workshop
Start conceptual artificial lift design for each well type
Prepare artificial lift design in conjunction with equipment suppliers
“Design tubulars, auxiliary equipment, cables, pumps, motors, protectors, etc.”
Evaluate technical feasibility
Determine technical challenges and mechanical risks
Identify hazardous situations and risks involved
Estimate extra power & facility upgrade requirements
Perform economic & risk analysis.
Write report on artificial lift strategy
Reviews well/field performances with the advice of Reservoir Engineering and
Geoscientists for optimum ultimate recovery, to recommend required workovers for
production improvements.
Prepares all single well models (nodal analysis) and ensures all are validated and matched
with the actual well data.
Analyses individual well gas lift performances and proposes remedial activities.
Analyses production chemistry effects on well performance.
Reviews historical well stimulation activities and provides analysis.
Analyzes and defines the cause of well performance failures and generates candidates for
productivity enhancement.
Proposes & designs preventative and remedial activities.
Provides an assessment of safety and environmental impact for all recommendations.
Cost estimates and manages cost, schedule and quality of the respective production
enhancement services to be executed by service contractors.
Participate in HAZOP’s, risk assessments and other workshops as required for project
execution.
Provides key link between subsurface group, drilling & well construction, production
operations and other parties.
Interfaces between the various disciplines in the Project team.
Close-out project for document archiving.
Job
Subsurface Development
Primary Location
Malaysia-Kuala Lumpur
Organisation
Malaysia
Schedule
Full-time
Industry
Construction
Job Functions
Engineering
Information Technology