You are on page 1of 1

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

KEYPLAN PLOT NORTH

A GEOGRAPHIC A
NORTH

11

IMPZ.SS.06
ROAD 21.50M
TRUE
NORTH

B 60000 B

4 Sets 2x4 200Ø uPVC DUCTS


6 Nos. FOR 132kV POWER CABLES,
2x10Nos.150Ø uPVC DUCTS PERSONAL
BOUNDARY WALL
1 No. FOR F.O CABLE & ACCESS ROAD GATE 5270
FOR 11kV OUTGOING CABLES 1 No. SPARE FOR EACH CIRCUIT MAIN GATE
6M WIDE
6M WIDE SLIDING GATE
3000 2000

3030
SECURITY TOILET

3000

3000
ROOM
3730

INTERLOCK

3955
3600
DRIVE WAY
CABLE 1. ALL DIMENSIONS ARE IN MM AND ALL LEVELS ARE IN M UNLESS OTHERWISE SPECIFIED.

5940
C 1000 STAIRCASE-4
PULLING PIT
C
HOLDING TANK 2. HEIGHT OF THE BUILDING SHALL BE GOVERNED BY THE REQUIREMENT OF THE EQUIPMENT TO BE HOUSED

1420
3. THE WALLS AROUND THE TRANSFORMER/REACTOR SHALL BE FIRE PROOF.

5100
2940 2855 4355
6590
4. THE GROUND WATER TANK & TRANSFER PUMPS WILL BE INDICATED TENTATIVELY SUBJECT TO

1200
CHANGE IN DETAILED DESIGN.

3000
7375 IDT DELUGE
2690

5. THE CAPACITY OF FIRE WATER TANK WILL BE INDICATED AFTER THE FINALIZATION OF HYDRAULIC CALCULATIONS.
STAIRCASE-1 132kV CABLE

2900
TRENCH 6. FOR CIVIL DEATILS, PLEASE REFER RELEVANT CIVIL ARCHITECTURAL DRAWINGS.
IDT-2 ROOM OWMH-1 DIESEL 7. GROUND WATER TANK WILL BE LOCATED ON ROOF OF SECURITY ROOM.

1930
35/50MVA-132/12kV 1500x1500
TANK
6600 6600 8. THE TRANSFORMER ROOF SHALL BE OF STEEL STRUCTURE. PROCEDURE FOR ERECTION AND DISMANTLING
1W 1V 1U
FOR 11kV OUTGOING CABLES

4000
OFF LOADING OF ROOF TRUSSES, SHEETING AND LOUVERS FOR TRANSFORMER TO BE SUBMITTED FOR APPROVAL
2x10Nos.150Ø uPVC DUCTS

2000

2000
10000
3000

PLATFORM
3200

9. ALL BLOCK WALLS AND THERMAL INSULATED EXTERNAL WALLS ARE SHOWN WITH
INCLUDING PLASTERING THICKNESS

2745
D 1540 2060 3000 INTERLOCK D
3000 1710 1890 4500 10. NO OF CABLE DUCTS LOCATION FOR THE INTERNAL CABLING OF THE SUB STATION SHALL BE
CABLE
2W DRIVE WAY AS PER REQUIREMENTS AND DEWA APPROVAL

AIR LOCK

5218
CL PULLING PIT

11000
ROLLING SHUTTER 2V
835 800 800 800 800 800 800 800 800 800 800 1000 800 800 800 800 800 800 800 800 800 800 800 800 1000 1000 800 800 800 800 800 800 800 800 800 800 800 1035

11kV CABLE
2000

ROOM
835 800 800 800 800 800 800 800 800 800 800 1000 800 800 800 800 800 800 800 800 800 800 800 1000 1000 800 800 800 800 800 800 800 800 800 800 835

TRENCH
2U 11. OPEN AREA INSIDE THE COMPOUND SHALL BE PAVED WITH 800mm THICK INTERLOCK PAVING.

1500
2000
CABLE FIRE PUMP ROOM 12. FIRE BARRIERS SHALL BE DESIGNED / INSTALLED GIVING DUE CONSIDERATION FOR
RISER -1 (FIRE WATER TANK ABOVE) EASY OPERATION AND MAINTENANCE OF EQUIPMENTS

2745
CRANE MAINTENANCE PLATFORM AND

4000
MOTOR MAINTENANCE PLATFORM
900x530 WALL OPENING

13. COLUMNS ARE SHOWN TENTATIVE ONLY


CAGE LADDER 1970 LEGEND
FOR BUSDUCT

CL 14. SCMS PANELS, DMZ PANELS, OPERATOR CONTROL DESKS, SCMS PRINTER & SCMS CUPBOARD

1927
11kV BUSDUCT

ACCESS LADDER
SHALL BE PROVIDED WITH RAISED FLOOR.
200 800 2000 7586 2664 SYMBOL DESCRIPTION
1222 9028 1000
THERMAL

2920
LV CABLE TRENCH
4737

INSULATED PAVEMENT TILES 80mm THK.


EXTERNAL WALL
CABLE 7000
E 132kV CABLE
TRENCH PULLING PIT PAVEMENT TILES 60mm THK.
E
IDT-2 ROOM

1930
FIRE ESCAPE 35/50MVA-132/12kV
HATCH WITH GRATING
1W 1V 1U
LADDER

2580
IDT-1

COBBLE STONE ABOVE GRATING(300mm)


E02
5830
KNLG

E03 GRATING
CABLE

800
2W PULLING PIT ET DELUGE

5218
CL
2V

11kV CABLE
DUNE SAND WITH ROOF TILES

TRENCH
2U
IDT-2

E04

1485
CAST IN SITU SLAB
RYDA

FIRE ESCAPE E05 ET ROOM-1

UTILITY CORRIDOR
HATCH WITH
F LADDER F

4900
REMOVABLE PRECAST COVER
11000

17000

CL

1927
UTILITY CORRIDOR

26360

1000 500kVA 11 /0.4 kV 1320 CHAIN LINK FENCE


E06 1222 9028 1000
BC

1515
EARTHING
LV CABLE TRENCH
TRANSFORMER 290mm THK.
THERMO BLOCK WALL
50000

29470
36000

132kV CABLE
E07
SPCB

TRENCH 240mm THK.


IDT-2 ROOM
31270

OWMH-3 LOCATION FOR STAMP

1485
1500x1500 SOLID BLOCK WALL

1930
35/50MVA-132/12kV
IDT-3

ET ROOM-2 240mm THK.

4900
1V 1U
11kV SWITCHGEAR ROOM-1

1W
E08 HOLLOW BLOCK WALL
SPARE

E09
11kV SWITCHGEAR ROOM-2

REINFORCED CEMENT CONCRETE


FIRE ESCAPE
G HATCH WITH
CABLE 1000 500kVA 11 /0.4 kV 1320 470 THK. WALL (300 THK RC WALL + 50 THK
G
LADDER

1515
2W PULLING PIT EARTHING CAVITY WITH APPROVED INSULATION +100 THK

5218
CL TRANSFORMER SOLID BLOCK WALL + 20 THK PLASTER )
2V
11kV CABLE
TRENCH

2U
COLUMN STOPPING AT GROUND FLOOR LEVEL

1485
FIRE ESCAPE 914mmx914mm FIRE ESCAPE
HATCH WITH

REFERENCE DRAWINGS
HATCH WITH LADDER
LADDER
CABLE
ET ROOM-3
13250 CL
PULLING PIT
CAGE LADDER

4900
1927
8380

1222 9028 1000 HANDRAIL


1000 500kVA 11 /0.4 kV 1320
132kV GIS ROOM LV CABLE TRENCH

1515
EARTHING
FOR 11kV OUTGOING CABLES

5360

10210 TRANSFORMER 1000 R0 --


2x10Nos.150Ø uPVC DUCTS

TPD / 132kV / FAY ROAD / SLD / 01 132kV SINGLE LINE DIAGRAM (TENDER DRAWING)
H 7750 ABBREVIATIONS: H
IDT INTER DISTRIBUTION TRANSFORMER R0 TPD / 11kV / FAY ROAD / SLD / 01 11kV SINGLE LINE DIAGRAM (TENDER DRAWING) --
2650

ET EARTHING TRANSFORMER
O/W OIL WATER COLLECTION AREA R0 DEWA/132kV-SS/FAYROAD/001/2017 AL FAY ROAD 132/11kV SUBSTATION (TENDER DRAWING) --
STAIRCASE-2 300mm COBBLE STONE
ABOVE GRATING REV DRAWING NUMBER DRAWING TITLE STATUS
CABLE CABLE RCC REINFORCED CEMENT CONCRETE No.
PULLING PIT PULLING PIT
FT FLOOR TRAP
4950 4950 4950 CL CENTER LINE
1300

1300

1300

OWMH OIL / WATER MANHOLE


FWMH FOUL WATER MANHOLE
2000

UNDER GROUND SWMH STORM WATER MANHOLE


OIL/WATER

REVISIONS
INTERLOCK
4700

4700

4700
FOR 11kV OUTGOING CABLES

CAPACITOR CAPACITOR CAPACITOR COLLECTION TANK


CAPACITOR ROOM-1

CAPACITOR ROOM-2

CAPACITOR ROOM-3
2x10Nos.150Ø uPVC DUCTS

BANK-2 BANK-4 BANK-6 DRIVE WAY


3000 1710 1890 1855 1500 1855 1500 1855 1500
I I
1100

1100

1100

CHAIN LINK BYR CHAIN LINK BYR CHAIN LINK BYR


0 FOR DISCUSSION PR 03.11.18 SMK/DK 03.11.18 -
FENCE FENCE FENCE 1500
3330

NAME DATE NAME DATE


REV

14800
1890 1710 3000 4950 4950 4950 DETAILS
1300

1300

1300

No. PREPARED CHECKED STATUS


1730

CONCRETE
PLATFORM 2000 12715 CLIENT

CABLE 7540
4700

4700

4700

CAPACITOR CAPACITOR CAPACITOR


RISER-2
SLOPE
RAMP

1800 BANK-1 BANK-3 BANK-5


2970

2900

1855 1500 1800 1855 1500 1855 1500 GOVERNMENT OF DUBAI Dubai Electricity & Water Authority
STAIRCASE-3 1800 Transmission power Division
2940
1100

1100

1100

5540 BYR BYR BYR P.O.BOX : 564, DUBAI - U.A.E


TEL : +(971) 4 3072222
INTERLOCK FAX : +(971) 4 3248111
J ACCESS DRIVE WAY J
1500

THERMAL INSULATED PROJECT


LADDER LOADING PLATFORM
EXTERNAL WALL
3000

2500

132/11kV AL FAY ROAD SUBSTATION, DUBAI, UAE.


1500

MAIN CONTRACTOR CONTRACT NO.

NATIONAL CONTRACTING CO.LTD


PO-3091800048

SCALE 1 : 125 STANDARD : A1 SUBSTATION NAME


K UTILITY CORRIDOR K
DATE NAME SIGNATURE
132/11kV AL FAY ROAD SUBSTATION
PREPARED 03.11.2018 PR
DRAWING NO.
CHECKED 03.11.2018 SMK
PO/3091800048/FAYROAD/EC/15/479-01
APPROVED 03.11.2018 HAB/KS

GROUND FLOOR PLAN CONSULTANT / SUBCONTRACTOR

------------------------------------
DRAWING TITLE
OVERALL EQUIPMENT LAYOUT
GROUND FLOOR PLAN L
L
SUB CONTRACTOR REF. CAD REF. REV SHEET LAST SHEET QTY OF SHEET
------------------------------------ XXXXXX
0 1 -- 2
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

You might also like