HARGA SAT. JML.

HARGA
KODE URAIAN KOEF. SAT.

( Rp ) SAT. ( Rp )
2 3 4 5 6
STR- 177.00 1.00 Nos Pekerjaan Bored Pile

Bahan :
- Besi D22 1.00 kg 11,500.00 11,500.00
- Besi 10 kg
- Kawat Bendrat 0.02 kg 23,400.00 351.00
- Besi Las-lasan ls -
- Pipa Sonic 2'' pcs -
- Beton C40 T1 Underwater 1.00 m3 860,000.00 860,000.00

Tenaga :
- Pekerja 0.01 Oh -
- Tukang besi 0.01 Oh -
- Kepala tukang 0.00 Oh -
- Mandor 0.00 Oh -
- Operator Alat Berat

Sewa Alat
- Mobile Crane
- Drilling Machine
- Excavator

STR- 177.00 1.00 Nos Pekerjaan Pile Cap

Bahan
- Beton C40
- Beton C15
- Besi D13
- Besi D16
- Besi D25
- Besi D29
- Kawat Bendrat 1.00 kg 23,400.00
- Besi Las-lasan 1.00 dus 70,000.00
- Bekisting Besi 1.00 m2

Tenaga :
- Pekerja
- Tukang besi
- Tukang Bobok Boredpile
- Kepala tukang
- Mandor
- Operator Alat Berat

Sewa Alat
- Concrete Pump
- Mobile Crane
- Excavator
- Vibrator
STR- 177.00 1.00 Nos Pekerjaan Pier

Bahan
- Beton C45
- Besi 10
- Besi D13
- Besi D29
- Kawat Bendrat
- Besi Las-lasan
- Bekisting Besi

Tenaga :
- Pekerja
- Tukang besi
- Kepala tukang
- Mandor
- Operator Alat Berat
- Bekisting Besi

Sewa Alat
- Concrete Pump
- Mobile Crane
JML. KEUNTUN
JML. HARGA TOTAL GAN & JML. TOTAL
HARGA OVER
HEAD
( Rp ) ( Rp ) 0.10 HARGA ( Rp )
7 8 9.00 8
10,885.09 1,088.51 11,973.60

1,135.09

10,885.09 1,088.51 11,973.60


10,885.09 1,088.51 11,973.60