These descriptions comprise a performance specification for the model.

A project team will need to agree on the intended u


model and modify this table as necessary - e.g., a team may agree that the model will be used for coordination and cost es
not for energy simulation.

This table is a work in progress - it is likely that project teams will identify uses not described here, and will add appropriate
table.

Level of Detail (LOD) Descriptions


100 200 300
Model Content
Design & Coordination~(function / Non-geometric data Generic elements Specific elements
shown in three Confirmed 3D Object
form / behavior) or line work, areas, dimensions Geometry
volumes zones, etc.
- maximum size - dimensions
- purpose - capacities
- connections

Authorized uses
4D Scheduling total project Time-scaled, ordered Time-scaled, ordered
construction duration appearance of major appearance of
activities detailed assemblies
phasing of major
elements

Cost Estimating Conceptual cost Estimated cost based Estimated cost based
allowance Example on measurement of on measurement of
$/sf of floor area, generic element. E.g., specific assembly.
$/hospital bed, generic interior wall. E.g., specific wall
$/parking stall, etc. type.

assumptions on future
content

Program Compliance Gross departmental Specific room FF&E, casework,


areas requirements utility connections
Sustainable Materials LEED strategies Approximate Precise quantities of
quantities of materials materials with
by LEED categories percentages of
recycled/locally
purchased materials

Environmental: Lighting, Energy use, Strategy and Conceptual design Approximate


performance criteria based on geometry simulation based on
air movement Analysis/Simulation based on volumes and assumed system specific building
and areas types assemblies and
engineered systems

Other uses may be identified and developed


Exiting and circulation
code compliance
Etc.
m will need to agree on the intended uses of the
be used for coordination and cost estimating, but

cribed here, and will add appropriate rows to the

ons
400 500

Shop drawing/ As-built


fabrication

- purchase - actual
- manufacture
- install
- specified

fabrication and
assembly detail
including construction
means and methods
(cranes, man-lifts,
shoring, etc.)

Committed purchase Record costs


price of specific
assembly at Buyout.

Specific manufacturer purchase


selections documentation

Precise simulation Commissioning and


based on specific recording of measured
manufacturer and performance
detailed system
components
The Model Progression Matrix (MPM) is intended to define the team members' roles and responsibilities on BIM-enabled
projects. Depending on the size and scope of the project, a custom MPM may be defined. When no custom MPM exists,
it is expected that the default table outlined below is followed.

See "Level of Detail Descriptions" on the Region 5 BIM Standards Site

Element (ASTM Uniformat II Classification)

A SUBSTRUCTURE A10 Foundations A1010


A1020
A1030
A20 Basement Construction A2010
A2020
B SHELL B10 Superstructure B1010
B1020
B20 Exterior Enclosure B2010
B2020
B2030
B30 Roofing B3010
B3020
C INTERIORS C10 Interior Construction C1010
C1020
C1030
C20 Stairs C2010
C2020
C30 Interior Finishes C3010
C3020
C3030
D SERVICES D10 Conveying D1010
D1020
D1030
D20 Plumbing D2010
D2020
D2030
D2040
D2090
D30 HVAC D3010
D3020
D3030
D3040
D3050
D3060
D3070
D3090
D40 Fire Protection D4010
D4020
D4030
D4090
D50 Electrical D5010
D5020
D5030
D5090
E EQUIPMENT & FURNISHINGS E10 Equipment E1010
E1020
E1030
E1090
E20 Furnishings E2010
E2020
F SPECIAL CONSTR. & DEMO F10 Special Construction F1010
F1020
F1030
F1040
F1050
F20 Selective Bldg Demo F2010
F2020
G BUILDING SITEWORK G10 Site Preparation G1010
G1020
G1030
G1040
G20 Site Improvements G2010
G2020
G2030
G2040
G2050
G30 Site Civil/Mech Utilities G3010
G3020
G3030
G3040
G3050
G3060
G3090
G40 Site Electrical Utilities G4010
G4020
G4030
G4090
G50 Other Site Construction G5010
G5090
members' roles and responsibilities on BIM-enabled A - Architect AE - Arch. / Eng. Team
MPM may be defined. When no custom MPM exists, M - Mechanical Engineer GC - General Contractor
P - Plumbing Engineer and/or trade partners
E - Electrical Engineer
s Site S - Structural Engineer SM - Scan & Modeling
Team

Level of Detail (LOD) and


II Classification) Model Component Author (MCA)
Design Design Construction Construction /
Concept Development Documents Fabrication
LOD MCA LOD MCA LOD MCA LOD MCA
Standard Foundations 100 AE 200 AE 300 GC 400 GC
Special Foundations 100 AE 100 AE 300 GC 400 GC
Slab on Grade 100 AE 200 AE 300 GC 400 GC
Basement Excavation 100 AE 200 AE 300 GC 300 GC
Basement Walls 100 AE 200 AE 300 GC 400 GC
Floor Construction 100 AE 200 AE 300 AE 300 GC
Roof Construction 100 AE 200 AE 300 AE 300 GC
Exterior Walls 100 AE 200 AE 300 GC 400 GC
Exterior Windows 100 AE 200 AE 300 GC 400 GC
Exterior Doors 100 AE 200 AE 300 GC 400 GC
Roof Coverings 100 AE 200 AE 300 GC 300 GC
Roof Openings 100 AE 200 AE 300 GC 300 GC
Partitions 100 AE 200 AE 300 AE 400 GC
Interior Doors 100 AE 200 AE 300 AE 400 GC
Fittings 100 AE 100 AE 300 AE 400 GC
Stair Construction 100 AE 200 AE 300 GC 400 GC
Stair Finishes 100 AE 100 AE 100 GC 100 GC
Wall Finishes 100 AE 100 AE 100 AE 100 GC
Floor Finishes 100 AE 100 AE 100 AE 100 GC
Ceiling Finishes 100 AE 100 AE 100 AE 100 GC
Elevators & Lifts 100 AE 200 AE 300 AE 400 GC
Escalators & Moving Walks 100 AE 200 AE 300 AE 400 GC
Other Conveying Systems 100 AE 200 AE 300 AE 400 GC
Plumbing Fixtures 100 AE 100 AE 300 GC 400 GC
Domestic Water Distribution 100 AE 100 AE 300 GC 400 GC
Sanitary Waste 100 AE 100 AE 300 GC 400 GC
Rain Water Drainage 100 AE 100 AE 300 GC 400 GC
Other Plumbing Systems 100 AE 100 AE 300 GC 400 GC
Energy Supply 100 AE 100 AE 300 GC 400 GC
Heat Generating Systems 100 AE 200 AE 300 GC 400 GC
Cooling Generating Systems 100 AE 200 AE 300 GC 400 GC
Distribution Systems 100 AE 100 AE 300 GC 400 GC
Terminal & Package Units 100 AE 100 AE 300 GC 400 GC
Controls & Instrumentation 100 AE 100 AE 100 GC 100 GC
Systems Testing & Balancing 100 AE 100 AE 100 GC 100 GC
Other HVAC Systems & Equipment 100 AE 100 AE 300 GC 400 GC
Sprinklers 100 AE 100 AE 300 GC 400 GC
Standpipes 100 AE 100 AE 300 GC 400 GC
Fire Protection Specialties 100 AE 100 AE 300 GC 400 GC
Other Fire Protection Systems 100 AE 100 AE 300 GC 400 GC
Electrical Service & Distribution 100 AE 100 AE 300 GC 400 GC
Lighting and Branch Wiring 100 AE 100 AE 300/100* GC 400/100* GC
Communications & Security 100 AE 100 AE 100 GC 100 GC
Other Electrical Systems 100 AE 100 AE 100 GC 100 GC
Commercial Equipment 100 AE 100 AE 300 GC 400 GC
Institutional Equipment 100 AE 100 AE 300 GC 400 GC
Vehicular Equipment 100 AE 100 AE 300 GC 400 GC
Other Equipment 100 AE 100 AE 300 GC 400 GC
Fixed Furnishings 100 AE 100 AE 300 AE 400 AE
Movable Furnishings 100 AE 100 AE 100 AE 100 AE
Special Structures 100 AE 200 AE 300 AE 400 AE
Integrated Construction 100 AE 100 AE 300 AE 400 AE
Special Construction Systems 100 AE 100 AE 300 AE 400 AE
Special Facilities 100 AE 100 AE 300 AE 400 AE
Special Controls & Instrumentation 100 AE 100 AE 100 AE 100 AE
Building Elements Demolition 100 AE 200 AE 300 AE 400 GC
Hazardous Components Abatement 100 AE 100 AE 100 AE 100 GC
Site Clearing 100 AE 100 AE 100 AE 100 GC
Site Demolition & Relocations 100 AE 200 AE 300 AE 300 GC
Site Earthwork 100 AE 200 AE 300 AE 300 GC
Hazardous Waste Remediation 100 AE 100 AE 100 AE 100 GC
Roadways 100 AE 200 AE 300 AE 300 GC
Parking Lots 100 AE 100 AE 300 AE 300 GC
Pedestrian Paving 100 AE 100 AE 300 AE 300 GC
Site Development 100 AE 100 AE 300 AE 300 GC
Landscaping 100 AE 100 AE 300 AE 300 GC
Water Supply & Distribution Systems 100 AE 100 AE 300 GC 400 GC
Sanitary Sewer Systems 100 AE 100 AE 300 GC 400 GC
Storm Sewer Systems 100 AE 100 AE 300 GC 400 GC
Heating Distribution 100 AE 100 AE 300 GC 400 GC
Cooling Distribution 100 AE 100 AE 300 GC 400 GC
Fuel Distribution 100 AE 100 AE 300 GC 400 GC
Other Civil/Mechanical Utilities 100 AE 100 AE 300 GC 400 GC
Electrical Distribution 100 AE 100 AE 300 GC 400 GC
Site Lighting 100 AE 100 AE 300 GC 400 GC
Site Communications & Security 100 AE 100 AE 300 GC 400 GC
Other Electrical Utilities 100 AE 100 AE 300 GC 400 GC
Service Tunnels 100 AE 100 AE 300 GC 400 GC
Other Site Systems & Equipment 100 AE 100 AE 300 GC 400 GC
List of Items List of Info