SCHEDULE FOR PROJECT

Design of Residential Building


MS Project

(3.00 5.00 p.m.)

Communication skills
(10.00 a.m. 2.00 p.m. including site visits)
o Introduction

15 Hours
15 Hours
40 Hours

o Demand for Houses


o Classification of building based on occupancy
o Selection of Plot & Study
o Survey of site for proposed building
o Residential buildings
o Limitations of built-up area
o Minimum floor area & height of rooms
o Building Bye Laws & Regulations
o Arrangement of Rooms
DESIGNS (3.00 5.00 p.m.)
o Design of Slab

12 Hours

o Design of Beam
o Design of Column
o Design of Footing
DRAWINGS (3.00 5.00 p.m.)

08 Hours

SCHEDULE FOR PROJECT


Design of Water Tank
MS Project

(3.00 5.00 p.m.)

15 Hours

Communication skills

15 Hours

(10.00 a.m. 2.00 p.m. including site visits)


Objective

40 Hours

Design Requirement of Concrete


Joints in Liquid Retaining Structures
General Design Requirements
Flexible Base Circular Water Tank
Rigid Base Water Tank
Underground Water Tank
Programs
Results & Discussions
DESIGNS (3.00 5.00 p.m.)

12 Hours

Design of Circular Tank


Design of Underground Water Tank
DRAWINGS (3.00 5.00 p.m.)

08 Hours

SCHEDULE FOR PROJECT


ROLE OF FLY ASH IN CONSTRUCTION
MS Project

(3.00 5.00 p.m.)

15 Hours

Communication skills

15 Hours

(10.00 a.m. 2.00 p.m. including site visits)


Use, Effects & Scope of Work

40 Hours

Characteristics of fly ash


Physical Properties Of Fly Ash
Chemical Compositions Of Fly Ash
Morphology Of Fly Ash
Mineralogy of Fly Ash
High content of fly ash in concrete
Role of water in concrete
Influence of Fly Ash on Water Content
High range water-reducers
Composition
Mechanism of Action
Effects Fresh State
Fresh concrete
Hardened State
Volume Change
DESIGN OF CONCRETE MIX

12 Hours

Material selection
Cement
Fly-Ash
Sand
Coarse Aggregate
DRAWINGS (3.00 5.00 p.m.)

08 Hours

SCHEDULE FOR PROJECT


STUDY OF READY MIX CONCRETE
MS Project

(3.00 5.00 p.m.)

15 Hours

Communication skills

15 Hours

(10.00 a.m. 2.00 p.m. including site visits)


Introduction

40 Hours

History
Scope of Ready Mix Concrete
Material Required for R. M. C.
Equipment Required in R. M. C.
Mixing Process
Test Carried on R. M. C.
Merits & Demerits of R. M. C.
Estimate
DESIGN OF READY MIX CONCRETE

12 Hours

DRAWINGS (3.00 5.00 p.m.)

08 Hours

SCHEDULE FOR PROJECT


ROLE OF QUANTITY SURVEYING IN CONSTRUCTION
MS Project

(3.00 5.00 p.m.)

15 Hours

Communication skills

15 Hours

(10.00 a.m. 2.00 p.m. including site visits)

52 Hours

INTRODUCTION
Background
Limitations
METHOD
Inquiry
Theoretical framework
Expected result
VARIATION ORDER
Introduction
Types of Variation
The nature of the variation
Identity of the initiator
Effect of variation
Factors Influencing the Variation
Strategy action on minimizing variation order
BILLS OF QUANTITIES
Definition
Creation
Contingency sum
Criticism

CONSTRUCTION WASTE MANAGEMENT


Introduction
Construction material waste
Site waste management progress report
Site waste management plan
Checking
Safety
DRAWINGS (3.00 5.00 p.m.)

08 Hours

SCHEDULE FOR PROJECT


DEWATERING SOIL FOR USE AS AN EMERGENCY
CONSTRUCTION MATERIAL FOR DISASTER RECOVERY
MS Project

(3.00 5.00 p.m.)

15 Hours

Communication skills

15 Hours

(10.00 a.m. 2.00 p.m. including site visits)

52 Hours

LITERATURE AND PRACTICE REVIEW


Overview of Literature and Practice Review
Dewatering Techniques
Geotextile Tube Dewatering
Clarifiers
Laboratory Sedimentation and Dewatering Testing
Effect of Polymers on Portland Cement
Summary of Literature and Practice Review
EXPERIMENTAL PROGRAM
General Information
Materials Tested
Soils Tested
Geotextiles and Fabrics Tested
Polymers Tested
Dispersants Tested
Portland Cements Tested
Test Methods

CONSTRUCTION PROCEDURES
General Construction Information
Use of Polymers in Construction
Use of Geotextile Tubes in Construction
Use of Clarifiers and Similar Equipment in Construction
Estimated Construction Parameters
DRAWINGS (3.00 5.00 p.m.)

08 Hours