Project Address:
Project Number:
Date:
Document No:
Date: April 2013
Revision: v2.0
Status: For review
Document Control Sheet
Rev. Status Page Nos. Amendment Date By
V2.0 For review Document Update to MR V1 document 15 April 2013 DC
Authored by:
Mervyn Richards MR1 Consulting Ltd
David Churcher Hitherwood Consulting Ltd
Paul Shillcock Operam
David Throssell Skanska Ltd
2013 © CPIc Incorporating Avanti, BS1192:2007, PAS1192-2:2013 and the Construction Project
Information Xchange Protocol (CPIx)
Copyright
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or
transmitted in any form or by any means, electronic, mechanical, photocopying, recording or
otherwise, without prior written permission of the author/publishers.
Preface
The pre-contract BEP is prepared by the supplier to demonstrate his proposed approach, and the
capability, capacity and competence of his firm and his supply chain to meet the Employers
Information Requirements. It will also list all agreed elements as outlined in the Brief, BS1192:2007,
PAS1192-2:2013, the CPIx Protocol and the contract documents.
This BEP is structured in accordance with PAS1192-2:2013.
Document Authority
This project plan has been agreed by the representatives of the project team as listed above with the
authority of their parent companies to accept this document for the stated project and use.
List of Tables
The supplier resource being proposed for the project can also be summarised as per the
example in Table 4.
Table 4 – Supplier resource summary
Supplier Discipline Resource Levels of Years of Names of
numbers competence Experience individuals
<<name 1>> Qualified Architect 2 RIBA, CAD/BIM,
Specification Author
Architectural 3 CIAT, CAD/BIM
Technologist (CIAT) Trained
Architectural 5 Certificate of CAD or
Technician Model Competence
<<name 2>> Qualified Structural 3 MIStructE,
Engineer
Etc
Only the major milestones are listed. A more detailed and co-ordinated Master Information
Delivery Plan and Project Plan must be developed and agreed with the stakeholders following
contract award and included in the post-contract award BEP.