ZXP1009 #3 242 Hi #4)
HODEL ZXP1009 CONTROL BOX FOR TURNING GEAR
{56 FA Tt RAB
OPERATING INSTRUCTIONS
yi
>
say), ROO
2014. 07
FERRARA
QINGDAO JIENENG STEAM TURBINE CO.,LTDSERB TRAGERE, (URE EAAE.
This control box is used to control the tuning gear device for its manual start-up and stop
1. Petal AA
Body of the control box
PARR, ATRRATHAPOMS HT. MIRTSRERTRFRBRE, (52
UBD BH PARA. DP SARIPS2. ASIROMUR AURAL 7032, HARE.
The body is made of hard-wrought ste! plate, inside which are fixed terminal blocks and various logical
clements, Overall dimensions and mounting sizes ae shown inthe following figures. Both the holding
‘wires and cables are led into the lower part of the box.
450
2-911.5
+|
g 300
eee
g &\klg
ti
& _ Ba7e
#
ao ase o
2-85.75. Tang gar slp Turing geor stat
; 80_, 145 SG
a ti
roe ae 0 80
Hr 6-32
300 ewan
ote Side
Front
2, Femi
Panel of the control box
ACIS EES, BUTT L AS RPL, eR, — Pe. IF
AER: TOURS, (FOE. TUPLE, Ba Poe RN. AE
TER ASIA E AME, FURERE LRA AIRES BRE LE, RE
HSHAR AMA ERE. — Mia NESE R IR. bi Pein.
Hi R AGK Page tThe control box is operated through the medium of the panel, on which are three operating buttons,
‘two indicator lamps and one ammeter. ON button is used to start the turning gear; and OFF button to
stop the tuming gear at the site. AUTOMATIC/ MANUAL button is used for a choice between
automatic and manual operating modes. The turning gear will be started or stopped atthe site or in
control room by an operator in manual mode, or by the control system automatically in automatic
mode. The four indicator lamps are forthe indication of the tum gear start and turn gear stop. And,
the ammeter is for the indication of the current of turning gear motor,
. ROT RBA
Connecting terminals and wiring diagram
EMEA RRMASRRP ER, WTR LATER, FBT.
Cables in and out the control box are connected through the connecting terminals, as shown in the
Wiring diagram. The terminals are described as following.
HTH ERTIES
‘Terminal block for control circuit: Terminal bock for mein circuit:
13
w
Description
+
jon smorks
ozi-t fort |SPahml ane | stay
AEBAEHATCAUEE, by] Abn cl on
21-2 D222 | non string the ting gc
‘SPLABSEPEDCS a)
21-3 |022-3 | Stn sed Teg cai na
ea,
[D214 | 022—4 hep sy fsa he ae
21-5 [072-5 [eae aid vie | BORD
LY ener
Se in at fp ap fr he nt
2) eae
1 he att cable of poner supy_ for the tor
021-6 022-6 |B sag
021-7 |022-7 eee ctl
ozi-8 |pz2-8 ere 1: HP: DZ1AHRL. DZ24NE-.
ani 22: Sea BHERORARU TENE, ARWERSIERE
021-9 [072-9 | ytAPa rr SeaR ER SENDER
= SFRBOKEE 40204 | StH an 4: MEPESEI OSE. MEELILBAETRANDCSHRLABSE,
021-10; DZ2—10 lo tere gr mcr
HIN AER — Page 2am
Ou uit isin pedi ped
%_H_Iniroducton SF NOEL ee
C,
SAT | cot alent i rn a
Bt
$81 oc it TAPE at
$82 an fs
tet | ASPB se aa |
uc ee Des pry
[eee
KAT [Contactor ata et
ort | Reer Jaan ih
ore | Star sea ee
aHTR
OFS | sitch Be ary
a rm
my Thermorelay JE est
eas
TAD current transformer rsdn
eae
PAI | Curent tronsiter signet ange
KIRKEN PagesRAH, PAREGLTA, Hine ATS:
Terminal block and logic pattern are shown as following, in which the digits are the number of
terminal block:
Ciel Hester ore eer
ove SHR rip ila ah id
a ry
Contactor Mutual-inductor tt
we "1 zt
Thermarely
023 o2aff
sane pea
Terminal block for min circuit Terminal block for contro circuit
4. BED
Operating instructions
‘ALATEST OAL) BER AR ASS Me.
ARPT LAE HA ALE LAE, EARP a EA OL,
Tie Ke, SLR BTK.
Before the operation, carefully inspect the connecting cable. The cable for local signals and
Power supply are to be connected acording tothe steam turbine maker as well as tothe wiring
diagram of terminal box. The control box is capable to control over motors ranging refer model
cof contol box, which can be chosen through the knob ofa thermally protective relay.
Fae
Manual turning gear:
Rh: SORTA O BT FAME, AAT Ta Faas otis
RARER O , RAILS. WR, BLN EBAR CO OAT.
Local: Set the switeh on the panel to MANUAL position, Once the turbine rotor stops rotation,
force the tooth of tuming gear to mesh in, And then, push the knob to start the turning gear motor.
To stop the turing gear, push the stop knob on the panel.
HE: HHRLROTA O BT AME, AMETATEE, ERMSHRE RA
SBA, (ACER PLAS). HRT STE, ACEP LL. ZERMATT LETT
K (SB2) BFL, (AEA FL.
Control room: Set the switch on the panel to position. Once the turbine rotor stops rotation, And
then, inthe control room, put into service the switch to start the turing gear motor, break the
switeh to stop the turning gear motor. Set the switch on the panel to stop the turning gear motor.
HAT ROK PagesNotice:
CD) SULA, TAMARA, MAREE, Be
HERE aR ELH.
Itis forbidden to put the tuming gear into service and start the tuming gear motor through
control circuit in the case thatthe turbine lubricating ol pressure i low, jacking oil pressure
has not been built up and the turbine rotor speed is high.
(2) SEERA, AMOR RRP St, OTR LMM.
In case of an excess current of turning gear motor, a thermal protection relay will function
for protection, which can be reset by pushing a small bution on the relay.
GQ) MAPA GS, EMSRS CH.
In case of no signal for jacking oil pressure, the signal C will cancel.
G) SHREFRPR, ERAN, AAEM, DARE OR,
TRABRE, AU, EAM.
If hand-wheel cleading of turning gear is equiped, when switch in turning
gear and the gears are bited up, shut hand-wheel cleading before starting
turning gear,or the turning gear can’t be started,
5. eal S
Model of control boxes:
DP100-Z HE)
ACER RAD EIADC, 110V00, 220V0C, 220vKC
A:Pover supaly 24VDC 110¥DC 220V0C 220¥KCfor solenoid valves for lubrication
BASRA. SKN, 3. SKN, 6.5K, 7. SKIN, T1KN, 13K,
B:The power of motors for 1.5K, 3 KM, 6.5K, 7. SKM, 1IKM, 13KH
2 §1:ZP1009-24VD0-7. 5K
AGH B20 A ALIN. SKY
Exenpe:ZXP1009-24V00-7. SKN
Poner supply 24VDC for solenoid valves for turning gear and lubrication
The power of motors for 7. SKI
HSE KG Pagesgag 2 o
i il 3g talents) 022-3 022-6 12-7 012-9 022-8 022-10
t \ HD 7-0)
4 =
L yt
wt | Ee
TABI rr)
022-1 fe Fhct
Von
‘SAI SAT
i ‘a mm ry ami ae o
eal 4-5-1 Jenny
I ‘Dosw e
1) fie tas
it Ltd
02-2
x|sI4I ey
3-7
alate y se
7 zr
a a} 1S
ore IKMT
\ +L] |-CND.
OZI-3 021-6 DZI-7 D2Z1-9 DZI-8 OZ1-10
BT] OT Blloalltoaaltind yaaa
cam] ave onattsne| ab | dil th x Sang | Fah em
Maer [omelet | obec] Ses AWREERE Wei ct can
: wo [or
8B -—-— al ‘A: WEMIHEGA Tam oar stops ot low bvcatng oi press, & a
| lene es | 8: AEREIAGE Sti signal of tring geo ASAI fi Blige
ae a Tt 0: AARIUREFEIGHE Ttine spends p CMRREAR EM) Eiess of sch (st) HE}
cy ee pb el O: AWA Bui-p of ain ol es (EAE WHE) Le z
Lae = E: APPERPHERA Th sl of turing hand is dosed (AEP, mR) re
HOM RGR