NO
BL
Representation and assist for inspectiom to CIP with Damage Reactor thefollowing personel
smithbell corp.inspector
martin Bencher Agent
ABB Issuarance
Team of Electrical Engrs.
comments > Cargoes Total Damage of Reactor no resistance as actual checking and the opening of valves and the
cover manholes.
20 12-Jul-19 1,000.00
20 12-Jul-19 1,000.00
20 12-Jul-19 1,000.00
20 24-Jul-19 1,000.00
20 24-Jul-19 1,000.00
20 9-Aug-19 1,000.00
40 9-Aug-19 1,000.00
40 23-Aug-19 1,000.00
40 23-Aug-19 1,000.00
9,000.00
560.00