Professional Documents
Culture Documents
A COMMUNITY GATHERS
-an urban plaza on the north side
connects the library to the park
CONSISTENT CONNECTIONS
accross the street.
-the system for the ACM panels on the
audiotorium and the cement composite
panels on the rest of the library were the
same, making installation efficient.
-Elements were specifically tailored to Kenya with respect to social customs, local construction practices and environmental concerns. Key pieces
include a 170-bed hospital, outpatient clinics for women and children, an institute of learning, gender counseling centre and a family hostel.
•
• Leadership in Energy and Environmental Design (LEED) is a third-party
certification program. It is a nationally accepted organization for design,
construction and operation of high performance green buildings.
•
•
•
• Leadership in Energy and Environmental Design (LEED) es un pro-
grama de certificación de terceros. Es una organización nacionalmente
aceptado para el diseño, construcción y operación de alto rendimiento de
los edificios verdes.
BD+C
HEALTCARE
CERTIFIED SILVER GOLD PLATINUM
40-49 points 50-59 points 60-79 points 80+ points
BD+C
Credit Outdoor Water Use Reduction 1
Credit Indoor Water Use Reduction 7
0 0 0 Sitios Sustentables 9
HEALTCARE
Y ? N Credit Cooling Tower Water Use 2
Sí Prerreq
Credit
Prevención
Water de la Contaminación en la Construcción
Metering Obligatorio
1
Y Prereq Integrative Project Planning and Design Required
Sí Prerreq
Credit
Evaluación
Integrative Processdel Sitio
Ambiental Obligatorio
1
0 0 0 Crédito
Energy and Atmosphere
Evaluación del Sitio 1 35
Y Prereq
Crédito Fundamental
Desarrollo del Commissioning
Sitio - Protecciónand Verification del Hábitat
o Restauración Required
1
Y 0 0 0Prereq
Location
Crédito
and Transportation
Minimum Abiertos
Espacios Energy Performance Required
1
9
Y
Credit LEED for Neighborhood
Building-Level Energy Development Location
Metering Required9
Prereq
Crédito Manejo de Aguas Pluviales 2
Credit Sensitive
Fundamental Land Protection 1
Y Prereq
Crédito Reducción delRefrigerant Management
Efecto Isla de Calor Required
1
Credit High Priority Site
Enhanced Commissioning 2
Credit
Crédito Reducción de la Contaminación Lumínica 1 6
Credit Surrounding Density and Diverse Uses 1
Credit
Crédito Optimize
Zonas de Energy
Descanso Performance 1 20
Crédito
Credit
Credit Acceso
AccessDirecto
to Exterior
Quality
Advanced Energy MeteringTransit 1 1 2
Credit
Credit
Demand
BicycleResponse
Facilities 2 1
0 0 0 Credit
Uso Eficiente
Credit del Agua
Renewable
Reduced Energy
ParkingProduction
Footprint 11 3 1
Sí Prerreq
Credit
Credit Reducción
Enhanced del Consumo
Refrigerant
Green Vehicles de Agua en el Exterior
Management Obligatorio
1 1
Sí Prerreq
Credit Reducción del Consumo
Green Power and Carbon deOffsets
Agua en el Interior Obligatorio
2
Sí Prerreq Medición del Consumo de Agua por Edificio Obligatorio
0 0 0Crédito
Sustainable
ReducciónSites
del Consumo de Agua en el Exterior 1 9
Y Prereq
Crédito Construction Activity Pollution
Reducción del Consumo de Agua Prevention
en el Interior 7Required
Y Prereq
Crédito Consumo de Agua de la Torre
Environmental Site Assessment de Enfriamiento 2Required
Crédito
Credit
Medición del Consumo de Agua
Site Assessment 1 1
0 0 0 Energía
Credit y Atmósfera
Site Development - Protect or Restore Habitat 35 1
Sí Prerreq
Credit Comisionamiento
Open Space y Verificación Básicos Obligatorio
1
Sí Credit
Prerreq RainwaterEnergético
Desempeño Management Mínimo 2
Obligatorio
Sí Credit
Prerreq Heat Island
Medición Reduction
del Consumo de Energía por Edificio 1
Obligatorio
Sí Prerreq
Credit Gestión Básica deReduction
Light Pollution Refrigerantes Obligatorio
1
Crédito
Credit Comisionamiento Avanzado
Places of Respite 6 1
Crédito
Credit Optimización del Desempeño
Direct Exterior Access Energético 20 1
Crédito Medición de Energía Avanzada 1
0 0 0Crédito
Water Efficiency
Respuesta a la Demanda 2 11 C
Y Prereq
Crédito Outdoor Water
Producción Use Reduction
de la Energía Renovable 3Required
Y Prereq
Crédito Indoor Water Use Reduction
Gestión Avanzada de Refrigerantes 1Required
Y Prereq
Crédito Building-Level
Energía Water Metering de Carbono
Verde y Compensaciones 2Required
Credit Outdoor Water Use Reduction 1
Credit Indoor Water Use Reduction 7
Credit Cooling Tower Water Use 2
Credit Water Metering 1
Project Name:
Date: LEED v4 for BD+C: Healthcare
Project Checklist
BD+C
HEALTCARE
Y ? N
Y Prereq Integrative Project Planning and Design Required
0 0 0 Materials
Credit and Resources
Integrative Process 19 1
Y Prereq Storage and Collection of Recyclables Required
Y Prereq Construction and Demolition Waste Management Planning Required
Y0 0 0Prereq
Location and
PBT Transportation
Source Reduction- Mercury 9
Required
Credit
Credit LEED for
Building Neighborhood
Life-Cycle ImpactDevelopment
Reduction Location 5 9
Credit Sensitive Land Protection
Building Product Disclosure and Optimization - Environmental Product 1
Credit
High Priority Site 2 2
Credit Declarations
Credit
Credit Surrounding
Building Density
Product and Diverse
Disclosure Uses
and Optimization - Sourcing of Raw Materials 2 1
Credit
Credit Building
Access Product Disclosure
to Quality Transit and Optimization - Material Ingredients 2 2
Credit PBT Source Reduction- Mercury 1
Credit
Credit Bicycle
PBT Facilities
Source Reduction- Lead, Cadmium, and Copper 2 1
Nombre del proyecto:
Credit
Credit Reduced Parking
Furniture and MedicalFootprint
Furnishings 2 1
Credit Green Vehicles 1
Fecha: Credit Design for Flexibility 1
0 0 0Credit
Sustainable Sites and Demolition Waste Management
Construction 2 9
Y Prereq Construction Activity Pollution Prevention Required
0Y 0 0 Indoor
Prereq Environmental Quality
Environmental Site Assessment 16
Required
Y Prereq Minimum Indoor Air Quality Performance Required
Site Assessment
0Y 0 Credit
0 Materiales
Prereq yEnvironmental
Recursos Tobacco Smoke Control 191
Required
Sí Credit
Credit
Prerreq Site Development
Enhanced
Almacenamiento Indoor Air- Protect
deor
Quality
y Recolección Restore Reciclables
Strategies
Productos Habitat 2 1
Obligatorio
Sí Credit
Prerreq
Credit Open Space
Planificación
Low-Emittingde laMaterials
Gestión de los Desechos de Construcción y Demolición 3 1
Obligatorio
Sí Credit
Prerreq
Credit Rainwater
Reducción
Construction Management
de Fuentes
IndoordeAir
PBT - Mercurio
Quality Management Plan 1 2
Obligatorio
Crédito
Credit
Credit Reducción
Heat del Impacto
Island del
Reduction Ciclo
Indoor Air Quality Assessment de Vida del Edificio 25 1
Credit
Credit Light Pollution Reduction
Thermal Comfort 12 1
Crédito Transparencia y Optimización de los Productos de Construcción - Declaración Ambiental de Productos
Credit
Credit
PlacesLighting
Interior of Respite 1 1
Credit Direct Exterior Access
Daylight 2 1
Credit
Crédito Transparencia y Optimización de los Productos de Construcción - Fuentes de Materias Primas 2
Credit Quality Views 2
0 0 0Credit
CréditoWaterTransparencia
Efficiency
Acoustic Performance
y Optimización de los Productos de Construcción - Ingredientes de los Materiales 2211
Y Prereq Outdoor Water Use Reduction Required
Crédito Reducción
Indoor de Fuentes
Water Usede PBT - Mercurio
Reduction 1
Required
0Y 0 Prereq
0 Crédito
Innovation Reducción 62
Y Prereq Building-Level WaterPBT
de Fuentes de - Plomo, Cadmio y Cobre
Metering Required
Credit Innovation 5
Mobiliario
Outdoory Equipamiento
Water Use Médico
Reduction 2
1 1
CréditoCredit
Credit LEED Accredited Professional
CréditoCredit Indoor
Diseño paraWater Use Reduction
la Flexibilidad 17
Credit Cooling
Gestión
Tower Water Use
de los Desechos de Construcción y Demolición
2
0 0 0 Crédito
Regional
Credit
Priority
Water Metering 42 1
Credit Regional Priority: Specific Credit 1
Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials 2
Credit Building Product Disclosure and Optimization - Material Ingredients 2
LEED
Credit v4
PBT for BD+C:
Source Healthcare
Reduction- Mercury 1
Nombre del proyecto: PBT Source Reduction- Lead, Cadmium, and Copper 2
Project Checklist
Credit
Fecha:
BD+C
Credit Furniture and Medical Furnishings 2
Credit Design for Flexibility 1
HEALTCARE
Y ? N
Credit Construction and Demolition Waste Management 2
Y Prereq Integrative Project Planning and Design Required
Credit Integrative Process 1
0
0
0
0
0 Indoor Environmental Quality
0 Materiales y Recursos
1619
Y Prereq Minimum Indoor Air Quality Performance Required
Sí 0 0 0Prereq Almacenamiento
Location
Prerreq y Recolección de Productos Reciclables
and Transportation Obligatorio
9
Y Environmental Tobacco Smoke Control Required
Sí Prerreq Planificación de la Gestión de los Desechos de Construcción y Demolición Obligatorio
Credit
Credit LEED for Indoor
Enhanced Neighborhood Development
Air Quality Strategies Location 2 9
Sí Prerreq Reducción de Fuentes de PBT - Mercurio Obligatorio
Credit
Credit Sensitive
Low-Emitting Land Protection
Materials 3 51
Crédito Reducción del Impacto del Ciclo de Vida del Edificio
Credit
Credit High PriorityIndoor
Construction Site Air Quality Management Plan 1 2
Crédito
Credit
Credit Surrounding
Transparencia
Indoor Density andde
y Optimización
Air Quality Diverse
Assessment Uses de Construcción - Declaración Ambiental de Productos
los Productos 2 21
Credit
Credit Thermal
Access Comfort
to Quality Transit 1 2
Crédito
Credit Transparencia y Optimización de los Productos de Construcción - Fuentes de Materias Primas
Interior Lighting 1 2
Credit
Credit
Bicycle Facilities
Daylight 2 1
Credit
Crédito
Credit
Reduced
Transparencia
Quality Parking Footprint
y Optimización
Views de los Productos de Construcción - Ingredientes de los Materiales 2 21
Credit
Credit
Green Vehicles
AcousticdePerformance 2 1
Crédito Reducción Fuentes de PBT - Mercurio 1
Crédito Reducción de Fuentes de PBT - Plomo, Cadmio y Cobre 2
00 00 0 0Innovation
Sustainable
Crédito
Sites
Mobiliario y Equipamiento Médico 6 2
9
Y Prereq
Credit Construction Activity Pollution Prevention
Innovation Required
5 1
Crédito Diseño para la Flexibilidad
Credit LEED Accredited Professional 1
Y Prereq Environmental Site Assessment Required
Crédito Gestión de los Desechos de Construcción y Demolición 2
Credit Site Assessment 1
0 0 0 Regional
Credit Priority
Site Development - Protect or Restore Habitat 4 1
0 0 0 Calidad
Credit Ambiental
Regional InteriorSpecific Credit
Priority: 1 16
Sí Credit
Prerreq Open
Desempeño Space
Mínimo de la Calidad del Aire Interior 1
Obligatorio
Credit Regional Priority: Specific Credit 1
Sí Credit
Prerreq Rainwater
Control del HumoManagement
Ambiental del Tabaco 2
Obligatorio
Credit Regional Priority: Specific Credit 1
Credit
Crédito Heat Island
Estrategias Reduction
Avanzadas de Calidad del Aire Interior 21
Credit Regional Priority: Specific Credit 1
Credit
Crédito Light Pollution
Materiales Reduction
de Baja Emisión 31
Credit
Crédito PlanPlaces of Respite
de Gestión de la Calidad del Aire Interior en la Construcción 11
0 0 TOTALS
0 Crédito
Credit Evaluación de la Calidad
Direct Exterior Accessdel Aire Interior Possible Points: 11021
Certified:
Crédito 40 to Confort
49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110
Térmico 1
0 0 0 Water Iluminación
Crédito
Efficiency Interior 1
11
Y Crédito
Prereq Iluminación
OutdoorNatural
Water Use Reduction 2
Required
Y Crédito
Prereq Vistas de Calidad
Indoor Water Use Reduction 2
Required
Crédito Desempeño Acústico
Building-Level Water Metering 2
Required
Y Prereq
Credit Outdoor Water Use Reduction 1
0 0 0 Innovación
Credit Indoor Water Use Reduction 67
Crédito Innovación 5
Credit Cooling Tower Water Use 2
Crédito LEED Accredited Professional 1
Credit Water Metering 1
Sí Prerreq Planificación de la Gestión de los Desechos de Construcción y Demolición Obligatorio
Credit Low-Emitting Materials 3
Sí Prerreq Reducción de Fuentes de PBT - Mercurio Obligatorio
Construction Indoor Air Quality Management Plan 1
Crédito LEED v4 for BD+C: Healthcare
Credit
Reducción del Impacto del Ciclo de Vida del Edificio 5
Credit Indoor Air Quality Assessment 2
Crédito
CreditProject Checklist
Transparencia y Optimización de los Productos de Construcción - Declaración Ambiental de Productos
Thermal Comfort 12
Credit
Crédito
Credit
Interior Lighting
Transparencia
Daylight y Optimización de los Productos de Construcción - Fuentes de Materias Primas
BD+C1
22
HEALTCARE
Y ? N
Credit Quality Views 2
Y Crédito
Prereq
Credit
Integrative
Acoustic
Transparencia Project Planning
Performance
y Optimización and
de los Design de Construcción - Ingredientes de los Materiales
Productos Required
22
Credit Integrative Process 1
Crédito Reducción de Fuentes de PBT - Mercurio 1
0 0 0 Crédito
Innovation
Reducción de Fuentes de PBT - Plomo, Cadmio y Cobre 62
0 0 0 Location
Credit
Crédito Innovation
andy Transportation
Mobiliario Equipamiento Médico 5 29
Credit LEED
LEED Accredited Professional 1 9
CréditoCredit Diseño parafor
la Neighborhood
Flexibilidad Development Location 1
Credit Sensitive Land Protection 1
Crédito Gestión
HighdePriority
los Desechos
Site de Construcción y Demolición 22
0 0 0 Regional
Credit Priority 4
Credit
Credit Surrounding
Regional Density
Priority: and Credit
Specific Diverse Uses 1 1
0 0 0 Calidad
Credit Ambiental
RegionalInterior
Priority: Specific Credit 116
Credit Access to Quality Transit 2
Sí Prerreq
Credit Regional Mínimo
Desempeño Priority:deSpecific Credit
la Calidad del Aire Interior 1
Obligatorio
Sí PrerreqCredit
Credit Control del Humo Ambiental
Bicycle Facilities
Regional del Tabaco
Priority: Specific Credit Obligatorio
1 1
CréditoCredit Estrategias
Reduced Avanzadas de Calidad del Aire Interior
Parking Footprint 21
Crédito Materiales de Baja
Green Vehicles Emisión 3
0 0 0 TOTALSCredit
Crédito Plan de Gestión de la Calidad del Aire Interior en la Construcción
Possible Points: 1101
1
Certified:
Crédito 40 to 49 points,de Silver:
Evaluación 50 del
la Calidad to 59
Airepoints,
Interior Gold: 60 to 79 points, Platinum: 80 to 110 2
0 0 0
CréditoSustainable Sites
Confort Térmico 19
Y Prereq
Crédito Construction
Iluminación InteriorActivity Pollution Prevention Required
1
Y Crédito
Prereq Iluminación Natural Site Assessment
Environmental 2
Required
Crédito Vistas de Calidad 2
Credit
Crédito
Site Assessment
Desempeño Acústico 21
Credit Site Development - Protect or Restore Habitat 1
0 0 0 Innovación
Credit Open Space 61
CréditoCredit Rainwater Management
Innovación 52
CréditoCredit LEEDHeat Island Reduction
Accredited Professional 11
Credit Light Pollution Reduction 1
Credit Places of Respite 1
0 0 0 Prioridad Regional 4
Credit Direct Exterior Access 1
Crédito Prioridad Regional: Crédito Específico 1
Crédito Prioridad Regional: Crédito Específico 1
0 0 0 WaterPrioridad
Crédito Efficiency
Regional: Crédito Específico 111
Y Prereq
Crédito Prioridad Regional:
Outdoor WaterCrédito Específico
Use Reduction 1
Required
Y Indoor Water Use Reduction
Prereq Required
0Y 0 0 TOTALES
Prereq Building-Level Water Metering Puntos posibles: Required
110
Credit Outdoor
Certificado: de 40 a 49 puntos, Plata: Water
de 50 a 59Use Reduction
puntos, Oro: de 60 a 79 puntos, Platino: de 80 a 110 1
Credit Indoor Water Use Reduction 7
Credit Cooling Tower Water Use 2
Credit Water Metering 1
BD+C
BD+C
HEALTCARE
• INTERGRATIVE PROCESS
• proceso integracion
• LOCATION & TRANSPORTATION
• ubicacion y Transporte
• SUSTAINABLE SITES
• sitios sustenables
• WATER & EFFIECIENCY
• uso eficiente del agua
• ENERGY & ATMOSPHERE
• energia y atmosfera
• MATERIAL RESOURCES
• materiales y recorsos
• INDOOR ENVIRONMENTAL QUALITY
• calidad ambiental interior
• INNOVATION IN DESIGN
• innovación
• REGIONAL PRIORITY
• prioridad regional
B
ROCKSTAR
BD+C
HEALTCARE
BUILDINGS
LEED PLatinum Certified BD+C, Polkinghorn Group Architects Inc., Contractor: The Beck Group
SS
BD+C
HEALTCARE
INTENT: Reduce pollution from construction activities by controlling soil erosion, waterway sedimentation,
and airborne dust.
Create and implement an erosion and sedimentation control plan for all construction activities associated
witht the project.
Crear e implementar un plan de control de la erosión y sedimentación para todas las actividades de
construcción relacionadas con el proyecto.
Enviromental Site Assessment BD+C
[SS] Sustainable Sites - Healthcare [Required] HEALTCARE
INTENT: Protect the health and vulerable population by ensuring the site is assessed for environmental
contamination and that any environmental contamination has been remediated.
INTENT: To asses site conditions before design to evaluate sustainable option and inform related decisions
about the site design.
• TOPOGRAPHY
• HYDROLOGY
• CLIMATE
• VEGETATION
• SOILS
• HUMAN USE
• HUMAN HEALTH EFFECTS
• TOPOGRAFÍA
• HIDROLOGÍA
• CLIMA
• VEGETACIÓN
• SUELOS.
• EFECTOS EN LA SALUD HUMANA.
Rain Water Management BD+C
[SS] Sustainable Sites - Healthcare [1 Point] HEALTCARE
INTENT: Reduce runoff volume and improve water quality by replicating the natural hydrology and water bal-
ance of the site, based on historical conditions and undeveloped ecosystems in the region.
INTENT: Provide patients, staff, and visitors with the health benefits of the natural environment by creating
outdoor places of respite on the healthcare campus
• Provide places accessible to patients & visitors, equal to 5% of the net usable program area of the building.
• Provide additional dedicated places for staff, equal to 2% of the net usable program area of the building.
• Places must be outdoors, or 30% of the required area be located in interior atria, greenhouses, solaria, or conditioned spaces
if those spaces have a direct line of sight to unobstructed views of nature.
• Area must be accessible from the building or located within 200 ft (60m) of entrance or access point.
• Options for shade or indirect sun are provided, with one seat per 200sqft (18.5sqm) of each area, with one wheelchair space
per five seating spaces.
• A minimum of 25% of the outdoor area must be vegetated at ground plane or have overhead vegetated canopy.
Zonas de Descanso
[SS] Sitios Sustentables - Healthcare
PROPÓSITO: Ofrecer a pacientes, personal y visitantes los beneficios a la salud derivados del entorno natural creando
lugares exteriores de descanso dentro del complejo de salud
• Ofrecer lugares de descanso a pacientes y visitantes que supongan el 5% del área neta utilizable por el programa del edificio.
• Suministrar espacios adicionales dedicados al descanso para el personal equivalentes al 2% del área neta utilizable por el programa del
edificio.
• Los lugares de descanso deben estar en el exterior. Dichos espacios interiores pueden usar un máximo del 30% de la superficie requerida
si se pueden incluir tienen línea directa de visión a vistas libres de la naturaleza.
• La zona es accesible desde el edificio o se ubica a menos de 200 pies (60 metros) de una entrada o punto de acceso al edificio.
• Opción de sombra o sol indirecto, con un asientos por cada 200 sqft (18,5 sqm) de cada zona, con un espacio para silla de ruedas por cada
cinco asientos.
• Mínimo el 25% del total del espacio exterior debe contar con vegetación a nivel de suelo (el césped no cuenta como vegetación) o tener
follaje vegetal superior.
Places Of Respite BD+C
Courtyard View In Plan. Places must be outdoors, or 30% of the required area be located in interior atrium, HEALTCARE
greenhouses, solaria, or conditioned spaces if those spaces have a direct line of sight to unobstructed views of nature.
INTENT: Contribute to the comfort and well being of building occupants by establishing minimum standards
for indoor air quality (IAQ).
Ventilation
• Mechanically Ventilated Spaces: determine minimum outdoor air intake flow using ASHRAE Standard 170–
2008, Section 7; 2010 FGI Guidelines for Design & Construction of Health Care Facilities (Table 2.1–2).
• Naturally Ventilated Spaces: determine the minimum outdoor air opening and space configuration require-
ments using procedure of ASHRAE Standard 62.1–2010.
Monitoring
• Mechanical: Provide a direct outdoor airflow device to measure the minimum outdoor air intake flow.
• Natural Ventilation- Comply with at least one:
• Provide a direct exhaust airflow measurement device capable of measuring the exhaust airflow.
• Provide automatic indication devices on all natural ventilation openings
• Monitor carbon dioxide concentrations in each thermal zone, ASHRAE 62.1–2010, Appendix C.
INTENT: Prevent or minimize exposure of building occupants, indoor surfaces, and ventilation air distribution
systems to environmental tobacco smoke.
Prohibit smoking outside the building except in designated smoking areas located at least 25 feet (7.5
meters) from all entries, outdoor air intakes, and operable windows. Also prohibit smoking outside the
property line in spaces used for business purposes.
Prohibir fumar fuera del edificio excepto en zonas reservadas para fumadores ubicadas al menos a 25 pies (7,5
metros) de toda entrada, entrada de aire exterior y ventana operativa. Además, prohibir fumar fuera del límite
de la propiedad en espacios usados para fines de negocios.
Thermal Comfort BD+C
[EQ] Indoor Environmental Quality - Healthcare [1 Point] HEALTCARE
INTENT: To promote occupants’ productivity, comfort, and wellbeing by providing quality thermal comfort.
*Thermal comfort controls allow occupants to adjust at least one of the following in their local environment:
air temperature, radiant temperature, air speed, and humidity.
Confort Térmico
[EQ] Calidad Ambiental Interior - Healthcare
Propósito: Promover la productividad, el confort y el bienestar de los ocupantes ofreciendo un confort térmico de calidad.
*Los controles térmicos permiten que los ocupantes, ya sea en espacios individuales o compartidos, ajusten en su entorno
local al menos uno de los siguientes elementos: temperatura del aire, temperatura radiante, velocidad del aire y humedad.
Thermal Comfort BD+C
Interior Circulation Space HEALTCARE
INTENT: Connect building occupants with the outdoors, reinforce circadian rhythms, and reduce the use of
electrical lighting by introducing daylight into the space
Provide manual or automatic (with manual override) glare-control devices for all regularly occupied
spaces. Select one of the following three options:
Option 1. Simulation: Spatial Daylight Autonomy and Annual Sunlight Exposure (1-2 points Healthcare)
Option 2. Simulation: Illuminance Calculations (1–2 points)
Option 3. Measurement (1-2 points Healthcare)
Iluminación Natural
[EQ] Calidad Ambiental Interior - Healthcare
PROPÓSITO: Conectar a los ocupantes del edificio con el exterior, reforzar los ritmos circadianos y reducir el
uso de iluminación eléctrica mediante la presencia de iluminación natural en el espacio.
Opción 1. Simulación: Autonomía del Espacio con Iluminación Natural y Exposición a la Luz Solar Anual (1-2 pt)
Opción 2. Simulación: Cálculos de iluminancia (1-2 puntos)
Opción 3. Medición (1-2 puntos para Centros de Salud)
Daylight BD+C
First Hospital To Achieve A Leed Point For Daylighting. HEALTCARE
INTENT: Give building occupants a connection to the natural outdoor environment by providing quality views.
For inpatient units (IPUs), achieve direct line of sight to the outdoors via vision glazing for 75% of regularly occupied floor
area. View glazing in the contributing area must provide a clear image of the exterior. Also, 75% of all regularly occupied
floor area must have at least two of the following four kinds of views (1 point):
• multiple lines of sight to vision glazing in different directions at least 90 degrees apart;
• at least two views: (1) flora, fauna, or sky; (2) movement; (3) objects min 25 ft (7.5 m) from the exterior of the glazing
• unobstructed views located within the distance of three times the head height of the vision glazing; and
• views with a view factor of 3 or greater, as defined in “Windows and Offices; A Study of Office Worker Performance and
the Indoor Environment.”
For other areas, configure the building floor plates such that the floor area within 15 feet (4.5meters) of the perimeter ex-
ceeds the perimeter area requirement (Table 1), and meet the requirements above for the perimeter area (1 point).
Vistas de Calidad
[EQ] Calidad Ambiental Interior - Healthcare
PROPÓSITO: Ofrecer a los ocupantes del edificio una conexión con el entorno exterior natural mediante vistas de calidad
En unidades de pacientes hospitalizados (inpatient units, IPU), cumplir con los requisitos anteriores (1 punto).
En otras áreas, configurar las secciones de planta de tal modo que la superficie a 15 pies (4,5 metros) de perímetro exceda
el requisito para superficies de perímetro (Tabla 1) y cumplir con los requisitos anteriores para la superficie de perímetro (1
punto).
Quality Views
COURTYARDS provide quality views to: BD+C
(1) flora, fauna, or sky; (2) movement; (3) objects min 25 ft (7.5 m) from the exterior of the glazing. HEALTCARE
• VEGETATION
• HYDROLOGY
• TRANSIT
• PARKING
• BUILDING PERFORMANCE