CRESCENT AREA YY PROJECT- AZERBAIJAN 3A UPDATE 09-Aug-19 11:01

Activity ID Activity Name Activity % Original Start Finish 2011 2012 2013
Complete Duration Jun
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
CRESCENT AREA YY PROJECT- AZERBAIJAN 731 06-Nov-10 19-Sep-13

PROJECT PHASES 731 06-Nov-10 19-Sep-13

MOBILIZATION 110 14-Nov-10 22-Mar-11


Mobilization Start Completion Date - Mobilization
PROJECT MILESTONE 900 06-Nov-10 19-Sep-13
Contract
Release
Notice to
Award
Signing
Proceed
of DWG
Contract
Mobilization
documents
Document from
fromClient
Client Engineering
Earthworks
Procurement
Earthworks
Earthworks
- Dwgs for Construction Structural Structural Structural Architectural
Architectural
Electrical
SITE
Architectural
AMechanical
Architectural
ENGINEERING 832 14-Nov-10 10-Jul-13
CONSTRUCTION/ DWGS SUBMITTAL ANDAPPROVAL 200 14-Nov-10 04-Jul-11
ENG80 Startdate- Construction DWGs 0% 0 14-Nov-10 Startdate- Construction DWGs
ENG10 Submitt and Approve Earthworks Dwgs 0% 90 15-Nov-10 27-Feb-11 Submitt and Approve Earthworks Dwgs
ENG20 Submitt and Approve Architectural Bldg 0% 90 25-Dec-10 07-Apr-11 Submitt and Approve Architectural Bldg
ENG30 Submitt and Approve Structural Dwgs 0% 90 25-Dec-10 07-Apr-11 Submitt and Approve Structural Dwgs
ENG40 Submitt and Approve Electrical Dwgs 0% 90 25-Dec-10 07-Apr-11 Submitt and Approve Electrical Dwgs
ENG60 Submitt and Approve Mechanical Dwgs 0% 90 25-Dec-10 07-Apr-11 Submitt and Approve Mechanical Dwgs
ENG50 Submitt and Approve Conveyor System 0% 90 29-Jan-11 12-May-11 Submitt and Approve Conveyor System
ENG100Submitt and Approve Specialties DWGs 0% 90 10-Mar-11 22-Jun-11 Submitt and Approve Specialties DWGs
ENG70 Submitt and Approve Landscaping Dwgs 0% 90 22-Mar-11 04-Jul-11 Submitt and Approve Landscaping Dwgs
ENG110Completion Date 0% 0 04-Jul-11* Completion Date
ASBUILT/DWGS SUBMITTAL AND APPROVAL 675 16-May-11 10-Jul-13
PROCUREMENT 200 30-Nov-10 20-Jul-11
Submittal Completion Date Completion Date
CONSTRUCTION 682 20-Dec-10 21-Aug-13
BUILDING AREA1 608 20-Dec-10 07-May-13
LEVEL -1 BASEMENT 455 20-Dec-10 02-Jun-12
General Areas & E & M Rooms 455 20-Dec-10 02-Jun-12
Earthwork 176 20-Dec-10 12-Jul-11
Level -1 started 0% 0 20-Dec-10 Level -1 started
Excavation/Compaction Area 1 0% 45 20-Dec-10 09-Feb-11 Excavation/Compaction Area 1
Back Filling /Compaction- Level of Footing 0% 14 13-Apr-11 28-Apr-11 Back Filling /Compaction- Level of Footing
Backfilling and Compaction Grade Beam/Retaining Wall 0% 21 19-Jun-11 12-Jul-11 Backfilling and Compaction Grade Beam/Retaining Wall
Eartworks - Completion 0% 0 12-Jul-11 Eartworks - Completion
Substructure 185 10-Feb-11 13-Sep-11
Blinding Concrete 0% 18 10-Feb-11 02-Mar-11 Blinding Concrete
Proofing Works/Under Footing 0% 21 03-Mar-11 27-Mar-11 Proofing Works/Under Footing
R.Concrete - Foundation 0% 50 28-Mar-11 24-May-11 R.Concrete - Foundation
Water Proofing Works 0% 21 13-Apr-11 07-May-11 Water Proofing Works
R.C retaining wall 0% 30 13-Apr-11 17-May-11 R.C retaining wall
Columns Neck/ Grade Beam 0% 21 25-May-11 18-Jun-11 Columns Neck/ Grade Beam
R.C Basement Slab 0% 50 05-Jul-11 31-Aug-11 R.C Basement Slab
R.C Columns 0% 40 30-Jul-11 13-Sep-11 R.C Columns
Completion- Substructure 0% 0 13-Sep-11* Completion- Substructure
Electrical 327 18-May-11 02-Jun-12
Lighting System 82 07-Dec-11 11-Mar-12
Surface Conduits 0% 14 07-Dec-11 22-Dec-11 Surface Conduits
Wiring 0% 30 24-Dec-11 26-Jan-12 Wiring
Lighting Fixtures/Switches 0% 45 19-Jan-12 11-Mar-12 Lighting Fixtures/Switches
Completion Date 0% 0 11-Mar-12* Completion Date
Power System 90 22-Nov-11 05-Mar-12
Embedded Conduits/Wiring 0% 25 22-Nov-11 20-Dec-11 Embedded Conduits/Wiring
Surface Conduits/Wiring 0% 25 21-Dec-11 18-Jan-12 Surface Conduits/Wiring
Installation Devices 0% 40 19-Jan-12 05-Mar-12 Installation Devices
Completion Date 0% 0 05-Mar-12* Completion Date
Communication System 90 22-Nov-11 05-Mar-12
Conduiting/Wiring 0% 25 22-Nov-11 20-Dec-11 Conduiting/Wiring

Actual Work Critical Remaining Work Page 1 of 3 TASK filter: All Activities

Remaining Work Milestone © Oracle Corporation


CRESCENT AREA YY PROJECT- AZERBAIJAN 3A UPDATE 09-Aug-19 11:01

Activity ID Activity Name Activity % Original Start Finish 2011 2012 2013
Complete Duration Jun
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Devices 0% 45 21-Dec-11 11-Feb-12 Devices
Completion Date 0% 0 05-Mar-12* Completion Date
Lowvoltage System 95 13-Feb-12 02-Jun-12
Cabling 0% 30 13-Feb-12 18-Mar-12 Cabling
Installation for DB 0% 25 19-Mar-12 16-Apr-12 Installation for DB
Busduct 0% 40 17-Apr-12 02-Jun-12 Busduct
Completion Date 0% 0 02-Jun-12* Completion Date
Security/Audio Video System 100 22-Nov-11 17-Mar-12
Embedded Conduits 0% 25 22-Nov-11 20-Dec-11 Embedded Conduits
Wiring and Cabling 0% 35 21-Dec-11 30-Jan-12 Wiring and Cabling
Installation Devices 0% 40 31-Jan-12 17-Mar-12 Installation Devices
Completion Date 0% 0 17-Mar-12* Completion Date
Firealarm System 130 07-Dec-11 06-May-12
Embedded Conduits 0% 25 07-Dec-11 04-Jan-12 Embedded Conduits
Surface Conduits 0% 30 05-Jan-12 08-Feb-12 Surface Conduits
Wiring and Cabling 0% 45 09-Feb-12 01-Apr-12 Wiring and Cabling
Installation Devices 0% 30 02-Apr-12 06-May-12 Installation Devices
Completion Date 0% 0 06-May-12 Completion Date
Lightning/Earthing System 77 18-May-11 15-Aug-11
Cable Embedded 0% 14 18-May-11 02-Jun-11 Cable Embedded
Copper Tape 0% 14 04-Jun-11 19-Jun-11 Copper Tape
Electrode 0% 14 20-Jun-11 05-Jul-11 Electrode
Earthpit 0% 14 06-Jul-11 21-Jul-11 Earthpit
Bare Copper 0% 21 23-Jul-11 15-Aug-11 Bare Copper
Completion Date 0% 0 15-Aug-11* Completion Date
Containment System 99 11-Dec-11 03-Apr-12
Hanger and Support 0% 25 11-Dec-11 08-Jan-12 Hanger and Support
Cable Tray 0% 30 09-Jan-12 12-Feb-12 Cable Tray
Trunkling 0% 30 13-Feb-12 18-Mar-12 Trunkling
Completion Date 0% 0 03-Apr-12* Completion Date
Equipments 42 15-Feb-12 03-Apr-12
Generators 0% 14 15-Feb-12 01-Mar-12 Generators
LV Switchgear 0% 14 03-Mar-12 18-Mar-12 LV Switchgear
Battery - Set up 0% 14 03-Mar-12 18-Mar-12 Battery - Set up
Transformer 0% 14 19-Mar-12 03-Apr-12 Transformer
Mechanical 134 22-Nov-11 25-Apr-12 Elevator
SANITARY
FIREPROTECTION
Completion
HVAC-- Completion
Completion
PLUMBING
- Completion - Completion
Architectural 153 22-Sep-11 18-Mar-12 ACCESS
ACCESS
ACCESS
FORCOMPLETION
Completion
E FOR
&FOR
M Battery
Complete
WORKS
EE&&M
ofMWORKS
Room
DATE
Basement
Works
Set Complete
-Battery
Generator
Chiller Set
LEVEL 0 GROUNDFLOOR 385 06-Sep-11 10-Mar-13 Completion
Completion
Completion
Completion
HVAC-Completion
Completion
Date
Date
FIREPROTECTION
ELEVATOR
Date
Completion
Completion
ARCHITECTURAL
DateDate
SANITARY
Completion
Date
-Date
Plumbing
- Completion
CompletionCompletion
PLUMBING
SANITARY
FIREPROTECTION
HVAC Completion
ARCHITECTURAL
Completion
ELECTRICAL
- Completion
Completion
COMPLETION
Date
- Completion
LEVEL 1 FIRSTFLOOR 354 07-Nov-11 27-Mar-13 Completion
Completion
Completion
Completion
Completion
Date
Completion
Date
Date
Completion
Date
DateELEVATOR
Date
DateFIREPROTECTION
HVAC
PLUMBING
SANITARY
COMPLETION
Completion
PLUMBING
SANITARY
FIREPROTECTION
Completion
Completion
ARCHITECTURAL
ARCHITECTURAL
Completion
ELECTRICAL
Completion
HVAC
Completion
Completion
ELECTRICAL
Completion
Date
Completion
Completion
Date
Completion
Date
Completion
Completion
Date
COMPLETION
Completion
LEVEL 2 SECONDFLOOR 323 16-Jan-12 18-Apr-13 Completion
ELEVATOR
Completion
Completion
Date
Completion
Date
Date
Completion
FIREPROTECTION
ARCHITECTURAL
FIREPROTECTION
Completion
ELECTRICAL
HVAC
PLUMBING
SANITARY
Date
ARCHITECTURAL
Completion
Completion
Completion
Date
Completion
COMPLETION
Completion
Completion
COMPLETION
ROOF FLOOR 350 26-Mar-12 07-May-13 Roof Completion
BUILDING AREA2 616 10-Feb-11 10-Jul-13
LEVEL -1 BASEMENT 346 10-Feb-11 18-Jun-12 Level -1 started Eartworks - Completion-
Completion Substructure Elevator
SANITARY
FIREPROTECTION
ACCESS
Completion
Completion
Completion
-FOR
Completion
Completion
HVAC-
PLUMBING
Completion
Completion
Completion
EDate
Completion
&MCompletion
-Completion
Date
Completion
Date
of
Date
- Completion
Date
Basement
Date
Date
AHU-Date
ElectAll System
LEVEL 0 GROUNDFLOOR 308 03-Nov-11 20-Jan-13 Completion
Completion
Completion
Date
Completion
PLUMBING
SANITARY
FIREPROTECTION
Date
Completion
SANITARY
Date
HVAC-Completion
PLUMBING
FIREPROTECTION
ELEVATOR
ARCHITECTURAL
Completion
Date
- Completion
Completion
ELECTRICAL
HVAC
Completion
Date
ARCHITECTURAL
Completion
Completion
Completion
Date
Date
- Completion
COMPLETION
- Completion
DateCompletion
LEVEL 1 FIRSTFLOOR 329 16-Jan-12 28-Apr-13 Completion
ELEVATOR
Completion
Completion
HVAC
PLUMBING
SANITARY
FIREPROTECTION
Completion
Date
COMPLETION
Date
Completion
ELECTRICAL
PLUMBING
SANITARY
FIREPROTECTION
Completion
Completion
Completion
ARCHITECTURAL
Completion
HVAC
Date
Completion
Date
Completion
Date
Completion
Completion
Completion
Date
Completion
Completion
ELECTRICAL
Date
Completion
ARCHITECTURAL
Completion
Date
Completion
COMPLETIO
LEVEL 2 SECONDFLOOR 306 26-Mar-12 05-Jun-13 ELEVATOR
Completion
Completion
Completion
Completion
Completion
Completion
ELECTRICAL
HVAC
SANITARY
Completion
DateDate
Completion
Date
Date
Completion
ELECTRICAL
HVAC
PLUMBING
SANITARY
FIREPROTECTION
Date
Completion
PLUMBING
FIREPROTECTION
ARCHITECTURAL
Date
Completion
Completion
Completion
Date
Completion
Completion
Date
Completion
Completion
COMPLETIO
Completion
ROOF FLOOR 345 04-Jun-12 10-Jul-13
BUILDING AREA3 629 07-Mar-11 21-Aug-13
LEVEL -1 BASEMENT 357 07-Mar-11 29-Jul-12 Level -1 started Eartworks - Completion
Completion- Substructure Elevator
SANITARY
HVAC-
FIREPROTECTION
Completion
Completion
Completion
PLUMBING
-Completion
Completion
Completion
Completion
of
Completion
Completion
Basement
Date
--Completion
Completion
-Date
Date
Elect
Date
Date
Date
All System
Date
LEVEL 0 GROUNDFLOOR 298 20-Dec-11 19-Feb-13 Completion
Completion
Completion
Completion
Completion
PLUMBING
SANITARY
FIREPROTECTION
Completion
Date
HVAC
Date
SANITARY
HVAC-Completion
Date
Completion
Date
ARCHITECTURAL
Completion
ELECTRICAL
PLUMBING
Date
-Date
Completion
FIREPROTECTION
ELEVATOR
Completion
ELECTRICAL
Completion
ARCHITECTURAL
Date
Completion
- Completion
COMPLETION
Date
- Completion
- Completion
Completion
LEVEL 1 FIRSTFLOOR 264 05-Mar-12 17-Mar-13 ELEVATOR
Completion
Completion
PLUMBING
SANITARY
FIREPROTECTION
Completion
ELECTRICAL
HVAC
Completion
COMPLETION
Completion
PLUMBING
SANITARY
FIREPROTECTION
Completion
Date
Completion
Date
ELECTRICAL
ARCHITECTURAL
Completion
HVAC
Date
Completion
Completion
Date
ARCHITECTURAL
Completion
Date
Completion
Date
Completion
Completion
Date
Completion
Completion
Date
Completion
COMPLETION
LEVEL 2 SECONDFLOOR 291 19-May-12 11-Jul-13 ELEVATOR
Completion
Completion
Completion
Completion
Completion
Completion
HVAC
PLUMBING
SANITARY
FIREPROTECTION
HVAC
PLUMBING
SANITARY
FIREPROTECTION
Completion
Date
Date
Completion
Date
Completion
Date
Date
Date
Completion
Completion
Completion
Complet
Comple
ROOF FLOOR 321 13-Aug-12 21-Aug-13

Actual Work Critical Remaining Work Page 2 of 3 TASK filter: All Activities

Remaining Work Milestone © Oracle Corporation


CRESCENT AREA YY PROJECT- AZERBAIJAN 3A UPDATE 09-Aug-19 11:01

Activity ID Activity Name Activity % Original Start Finish 2011 2012 2013
Complete Duration Jun
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
SITE WORKS 208 17-Oct-12 16-Jun-13 SITE A Completion
PROJECT CLOSEOUT 60 13-Jul-13 19-Sep-13

Actual Work Critical Remaining Work Page 3 of 3 TASK filter: All Activities