DETAILED PROJECT
REPORT
DPR & PMC SERVICES FOR WATER 2019
TRANSIT FROM AMLESHWAR BRANCH
CANAL TO NEW PROPOSED HEADWORKS
AT MATARIYA LAKE, BHARUCH
The ownership of this document rests with HRP & hence this document or any part thereof cannot be used by any person without express permission of HRP. Any person making use
of this document is doing so at his risk & HRP is fully indemnified for any consequences thereof. This document is based on some data or information supplied by other parties. HRP
accepts no liability on account of loss or damage suffered by client to the extent of reliance placed by HRP on data supplied by other parties.
INDEX
1.1 DISTRICT PROFILE .............................................................................................................................. 2
1.2 TOWN PROFILE............................................................................................................................ 3
1.3 DEMOGRAPHICS ......................................................................................................................... 4
1.4 GEOGRAPHY ................................................................................................................................ 4
1.5 RAINFALL ..................................................................................................................................... 4
1.6 CONNECTIVITY/LINKAGES ......................................................................................................... 4
1.7 HISTORY AND CULTURE OF BHARUCH ................................................................................... 5
1.8 CITY MAP .............................................................................................................................................. 8
1
DISTRICT PROFILE
The Bharuch district is part of South Gujarat, it is bounded by Vadodara district and
Kheda district in the North, Narmada district in the East, the Gulf of Khambat in the
West and Surat in the South. City is situated on the banks of river Narmada. Bharuch
is situated 182 kms. from Ahmedabad and 210 k ms. away from state capital of
Gandhinagar. Bharuch is located at 21.7° N 72.97° E. It has an average elevation of
15 meters (49 feet). It is Class-I town as per census 2001 with a t otal size of
population 167117. Bharuch city has high potential for growth and development as
revels made available by the census 2001. Bharuch city has shown moderate growth
of population from 1971 till the year 2001 w ith growth rate operation wearing from
20.20% to 25.27%. Bharuch city has all 100% urban population with no r ural
population. The population density of district has grown from 176 persons per sq.km.
in 1991 to 210 persons per sq.km. in 2001.
The decadal growth rate of the district was 19.37 for 1991-2001, which is below the
decadal population growth rate of the Gujarat state (22.48). The urban population of
the district accounts for 25.74% of the total population of the district. The urban
population is spread over 10 towns whereas the rural population is spread over 1178
villages. Owing to its prime location between Ahmedabad and Surat districts and the
location of the
industrial township
of Ankleshwar,
Bharuch has immense
potential for economic development.
2
BharuchTown
Bharuch town is the headquarters of Bharuch district and one of the historical towns
in Gujarat state and is as District Head Quarter. This very old town was mentioned in
historical records nearly 2000 y ears ago. The industrial activity in the town dates
back to the 17th century when the English and Dutch established factories here. In
fact Bharuch is one of the oldest cities in India and was a flourishing port in earlier
times. The oldest dockyard in the country was developed in this town for import and
export of precious stones available in the region.
Bharuch was once but a small village on t he banks of the Narmada River but that
rivers inland access to central and northern India and with a location in the sheltered
Gulf of Khambat in the era of coastal sea travel grew and pr ospered as a trading
transshipment centre and s hip building port. Until very modern times the only
effective way to move goods was by water transport, and Bharuch had s heltered
waters in a er a without weather forecasting, compasses, and when shipping was
necessarily limited to coastal navigation, and the general East-West course of the
Narmada gave access to the rich in land empires at the upper reaches of the
Narmada, including easy caravan access to the Ganges valley and Delhi plain,
3
1.3 DEMOGRAPHICS
Bharuch city has population of 167117 as per the census 2001 having an ar ea
of17.35 sq.km. Highest decadal growth rate was recorded in 1961-1971 to be
25.27% and next highest growth rate 23.55% has been shown during 1981-1991.
Presently the city is facing a dec reasing growth rate and t he growth rate has
decreased from 23.55% to 20.20% which is less than that of State as 22.66% Sex
ratio which on av erage is 932 as compared to state level average which is 919.
Literacy rate of Bharuch is 78.01% The concentration of population was
approximately 175 persons/ha. The female literacy rate in the city of Bharuch is 83%.
1.4 GEOGRAPHY
Topographic Map of India, clearly showing the rare West to East access given to the
North and C entral river line valleys by the Narmada River from Bharuch. The
Narmada River outlets into the Gulf of Khambat through its lands and that shipping
artery gave inland access to the kingdoms and empires located in the central and
northern parts of the subcontinent of India. Level of difference of the city is from 33 m
to 5 m in city.
1.5 RAINFALL
The district has a history of highly erratic rainfall although it receives a f airly good
quantity of rains annually. The rainfall data for the district as recorded at Bharuch
centeris summarized below:
1.6 CONNECTIVITY/LINKAGES
4
Vagara, Amod are located within the city. Bharuch is connected with Mumbai and
Ahmedabad by broad-gage railway line, National Highway as well as state transport
service. It is connected with JambusarKavi village by narrow-gauge railway line.
Bharuch has good network of roads including state and national highways that
connect the city with other parts of the state and the country. The state highway
passes through the city and pr ovides high degree of connectivity of the city with
surrounding settlements. Another major road, from Mojampur to Dhorikui Market and
Palej-Nandeva road, also carries lot of importance in terms of connectivity of the
town with other areas. The under pass constructed near railway station (which was
in a very bad condition earlier has now been repaired with the help of ONGC / GNFC
organizations) has improved the movement of goods traffic movements within and
outside the city
This Bharuch is one of the historical towns in Gujarat state and is as District Head
Quarter. This very old town was mentioned in historical records nearly 2000 y ears
ago. The industrial activity in the town dates back to the 17th Century when the
English and D utch established factories here. In fact Bharuch is one o f the oldest
cities in India and was a flourishing port in earlier times. The oldest dockyard in the
country was developed in this town for import and export of precious stones
available in the region. Bharuch was also very important to the sultans and other
Muslim rulers who ruled Gujarat. There is an ancient mosque called Masjid-U-Jani in
Bharuch. It is an i mportant monument to study Islamic Architecture in Gujarat.
Shukaltirth and K abirvad are two important picnic spots which are located at a
5
distance of 16 and 18 Kms. respectively from Bharuch. On Janmastami, huge fairs
are organized here. At present, there is a temple of Lord Shiva located near the
Sardar Bridge built on river Narmada near Jhadeshwar on t he eastern part of
Bharuch. It is an important place of pilgrimage. Devotees flock this place during the
month of Shravan. The Golden bridge constructed by British ruler, is famous
engineering structure of Bharuch. The first British colony was established in Bharuch
in 1616 and then in 1617, the Dutch colony was established. Thereafter, Aurangzeb
built a strong protective wall around the city and g ave it the name Shukabad. In
1772, it came under the British Rule.
Bharuch has been situated at Narmada river so it has nos. of religious place within it
including temples, churches, mosques, Jain shrines &ParsiAgiyari. Temples like
KotilingeshwarMahadev, Kapileshwarmahadev, MotaBaliyadev, these temples are
not very old. In Dandia bazaar Swaminarayan temple was built in V.S. 1891 (A.D.
1835), it was built up in memory of Sahjanand Swami. In the middle of the town there
is a temple of BhruguBhargeshwar which is known as Nava Dera, houses Vaishnav
Haveli of Narayan Dev. In Ali area, famous temple of Sindhavai Mata is situated.
Behind Sewashram there is an ancient temple of NilkanthMahadev and it is believed
that it was constructed in 19th century. Near PakhaliOvara area, a famous temple of
KamnathMahadev and here nine planets‟ statues are there, so it is also famous as a
“Nine planets temple”
Besides above places mention, the other heritage monuments which exist in
Bharuch city are:
6
In Bharuch city the Jain shrines of Kavi, Gandhar and Zagia are situated. Bharuch
city Jama Masjid which was founded in 1326 AD is still in existence and near civil
hospital there is mosque founded by Murtazkhan in the year 1609 A D is also in
existing with good wooden columns and the windows having wooden carvings. In
Bharuch city, Parsi people have noticeable population and for their prayer and
worship purpose there are seven Agiyaris in the town. Among all seven Agiyaris,
Pestanji'sagiyari is the oldest.
In the year 1814, Roman Catholic Church scent was founded, called “Our lady of
Health”, this was destroyed in the year 1860 and the same Church was
reconstructed in the year 1887. In the year 1856, Protestant people had founded
their church.
ValandaKothi: This former Dutch factory was taken over by the British and t hen
made into the Union High School. Today it is a shambles, but an old sundial on the
premises is still intact and serves as one of the timekeepers of Bharuch. Sun clock is
located nearer to Kansara wad. It constructed during 17th century by Dutch people.
It is with beautiful wooden carving. In past, it was used as clock relay on movement
of the sun
Jama Masjid: This pre-Sultanate mosque from the turn of the 14th century is one of
the earliest examples of an Islamic building in Gujarat that used recycled material
from earlier monuments, and yet, conformed to the conventional design of this type
of structure. Its interior demonstrates the beginning use of local forms for
7
ornamentation, which evolved to a m uch higher degree of excellence in the
Sultanate period a century later
8
2.0 EXISTING WATER SUPPLY ARRANGEMENT OF BHARUCH TOWN
At present average daily water supply is 40 MLD in Bharuch nagarpalika Out of this
total water supply Bharuch supply 1.5 MLD to Outgrowth areas.
The daily water requirement of town is worked out as below :
(A) Present population in 2019 40.00 MLD
Drinking water is being supplied by Gujarat Narmada Fertilizer Corporation (GNFC),
since 1983. GNFC supplies water tapped from Narmada river canal at Zanor near
Amleshwar village for Bharuch city which is having undulating terrain with steep
slopes area and city is having small stretches of plain areas. This poses a uni que
challenge for the water distribution system and network system as many households
have to undergo either with non-availability of water or at very low pressures despite
of the fact that they have the properties have water connections.
9
As per the report, the Bharuch nagarpalika is taking care to make the drinking water
potable for the consumption of population. The treatment by Chlorination and the
alum are the main tools used for treatment of water. There are 2 nos. of water filter
plant existing in Bharuch with capacity 9 M LD and 13 MLD respectively. These
treatment plants are 30 and 20 years old which have expired there useful life of 15
years.
Water which is supplied from these bore wells are fitted with pumps connected to the
local distribution system. The bore well at Maktampur is discharging the clear water
directly to the sump. There are two conventional type of treatment plants having 9.0
MLD and 13.5 MLD capacities constructed by GWSSB were commissioned in year
1981 and 1 990 respectively. The treatment plants consists of circular type pre-
settlement tank, pump house, channels for mixing Alum, clariflocculators, rapid sand
filter beds, chlorination house and clear water sump. The tube well (ground water)
system of water is not acceptable by the municipal authority as the quality of water is
not potable and hence these tube wells are not in use presently. Also the pumps are
very old and poorly maintain which has affected their efficiency.
10
2.3 FREQUENCY OF WATER SUPPLY
As per the information made available by the nagarpalika, the frequency of water
supply is normally 2 to 11 hours a day, out of which 2 to 6 hours are in the morning
and 2 to 5 hours in the evening time. However, most of the consumers get water for
less numbers of hours due to their location at tail end or at higher levels. Inequitable
distribution is a common problem particularly faced by the residents in old town due
to steep slopes and ineffective valves operations.
Design period
Sr.No. Water Supply Components
in years
1 Storage by dams 50
2 Infiltration Works 30
3 Pumping
i. Pump house (civil works) 30
11
The intent of this document is to record all the relevant assumptions and technical
criteria for the structural analysis and design of the building. The object is to achieve
flexibility, durability and economy without sacrificing safety.
C. Design of Foundations
IS 2911 Indian Standard Code of practice for design & Construction pile foundations:
(Part- I) Concrete piles
IS 1904 Indian Standard Code of practice for design & construction foundations in
Soil: General Requirements
IS 2950 Indian Standard Code of practice for design & Construction of raft
foundation - (Part -1)
12
IMPORTANT NOTE:
The SBC for intake well and bridge has been assumed to be 40T/m2 and depth
of foundation is 5m. The contractor to whom the work will be allotted through
tender has to without fail get the SBC reports done and re-design the entire
structures of intake well and bridge. The design provided with this DPR is for
estimate purpose only.
b. Imposed Loads
13
The electrical equipment and complete installation offered shall comply with the
relevant Indian Standards / Codes of Practices, this specification, statutory
regulations and sound engineering practices. The complete system shall conform to
the latest revisions of the following:
The Indian Electricity Act & Rules
The Indian Electricity (Supply) Act, 1948
Regulations laid down by local statutory authorities and CEA / Electrical
Inspectorate. The requirement of Gujarat State Electricity Board.
Fire advisory Committee Insurance Act / Fire Insurance Regulations Indian
Petroleum rules and any other regulations laid down by the Chief Controller of
Explosives. The factory act and any other regulations laid down by factory
inspectorate Wherever Indian Standards do not exist, the relevant IEC, British or
German (VDE) / IEEE / NEMA standards shall apply. Any other Standard which is
considered equivalent to or superior than applicable Indian Standards may also be
acceptable. The bidder however, shall have to substantiate equivalence or
superiority.
14
Existing situation :-
It is the basic aim to reaffirm and promote all people's right to safe drinking water.
With a focus on developing partnerships with all the communities throughout the city
of Bharuch, we as consultants intend to effect change at the municipal, provincial,
and federal levels as well as within civil society and industries involved in the
protection and production of public water supplies. Our vision of this project is such
that has structural, sustainable access to clean water and good sanitation. Our
mission is to enable people to indeed gain access to safe water and good sanitation,
necessities for a better future. Our focus lies with the people of the Bharuch at the
Base of the Pyramid: those who most often lack that access in some other cities.
15
4.2 Proposed Components of project
16
Proposed Gravity main of DI K-7 - 1200 mm dia
17
4.3 Purpose of this Report
This Detail Project Report (DPR) is prepared by HRP Infra Consultants Pvt. Ltd.
after detail study which includes the site visit, study of past report, discussion with
Bharuch official. The main objective of this proposal is to provide effective and
convenient Water Supply for Bharuch nagarpalika in all manner.
Name of project :- DPR & PMC services for Water transit from Amleshwar
branch canal to New proposed headworks at Matariya lake, Bharuch
Recapitulation sheet
Sr. No. Description of work Amount (Rs.)
18
Hydraulic Statement of RAW water Gravity main from Amleshwar Branch canal to Matariya lake
Name of Project :- DPR & PMC services for Water transit from Amleshwar branch canal to New proposed headworks at Matariya lake, Bharuch
1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20
Amleshwar branch
1 Matariya lake 55555.56 5000 1157.15 1200 1200 0.43 2.31 97.200 94.890 95.190 0.30 5.200 5.20 DI K7 0.82
canal
19
RISING MAIN FROM NEW INTAKE WELL TO EXISTING RISING MAIN
PROBLEM :
Design an economic size of 444.4 TO 898.0 INPUT DATA
pumping main for the given data : ======= ======= ===== ====== ====== ======== ======== ========
20
2nd '15
1st 15 years
SOLUTION : years
1 444 10.28 19.88 2.51 3.58 6.17 0.62 21.78 11.93 1.19 28.12
2 495 6.05 11.71 2.02 2.88 3.63 0.36 19.00 7.03 0.70 22.73
3 597 2.43 4.71 1.39 1.98 1.46 0.15 16.61 2.82 0.28 18.11
4 697 1.15 2.22 1.02 1.46 0.69 0.07 15.76 1.33 0.13 16.47
5 799 0.59 1.14 0.78 1.11 0.35 0.04 15.39 0.69 0.07 15.75
6 898 0.33 0.65 0.61 0.88 0.20 0.02 15.22 0.39 0.04 15.43
21
TABLE 2 - KILOWATTS, COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
22
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL STRUCTURE OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
1st stage flow 28.00 mld 2nd stage flow 40.00 mld
----- ---------- --------- --------- --------- --------- ------------- --------- --------- Grand
Initial Total
invstmts of
Cost Annual Capital Capital Cost Annual Capital for pumps Capital Pipe
of Energy -ised -ised of Energy -ised and -ised Dia
pump Cost Energy Total pump Cost Energy Annual cost meter
sets Cost Cost sets Cost Energy for in
SR in in in in in in in Cost 30 yrs (mm)
No. THS THS THS THS THS THS THS in THS in
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
1 2725 4469 36020 41581 5025 5944 47909 14533 56114 444
2 2376 3897 31412 36945 4062 4804 38725 11747 48692 495
3 2077 3407 27460 33336 3236 3827 30848 9357 42693 597
4 1971 3233 26059 33023 2943 3481 28057 8511 41534 697
5 1925 3157 25450 33091 2816 3330 26842 8142 41233 799
6 1904 3122 25169 34314 2757 3261 26283 7973 42287 898
23
Name of project :- DPR & PMC services for Water transit from Amleshwar branch canal to New
proposed headworks at Matariya lake, Bharuch
DESIGN OF PUMPING MACHINERY AT INTAKE WELL - BHARUCH
1) Pumping hours & Flow data
DESIGN
4) Frictional headloss
i) Rate of friction 1.14
ii) Frictional head 1.71 m
iii) Losses due to bends etc. 10% 0.17 m
iv) Total frictional head 1.88 m
7) BHP Required
i) Efficiency of pump 0.70 70%
ii) Total BkW required 149.79 BkW
24
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 237
====================================================
IS 456 - 2000 B E A M D E S I G N R E S U L T S
====================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1385 D E S I G N R E S U L T S
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1386 D E S I G N R E S U L T S
25
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 237 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 238
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1387 D E S I G N R E S U L T S
26
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 238 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 239
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1388 D E S I G N R E S U L T S
============================================================================
27
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 239 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 240
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1389 D E S I G N R E S U L T S
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1390 D E S I G N R E S U L T S
28
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 240 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 241
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1391 D E S I G N R E S U L T S
============================================================================
29
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 241 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 242
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1392 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1401 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1401 D E S I G N R E S U L T S
30
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 242 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 243
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1402 D E S I G N R E S U L T S
31
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 243 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 244
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1403 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1403 D E S I G N R E S U L T S
============================================================================
32
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 244 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 245
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1404 D E S I G N R E S U L T S
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1405 D E S I G N R E S U L T S
33
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 245 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 246
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1406 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1406 D E S I G N R E S U L T S
============================================================================
34
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 246 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 247
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1407 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1408 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1408 D E S I G N R E S U L T S
35
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 247 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 248
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1409 D E S I G N R E S U L T S
36
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 248 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 249
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1410 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1411 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
37
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 249 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 250
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1411 D E S I G N R E S U L T S
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1412 D E S I G N R E S U L T S
38
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 250 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 251
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1413 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1414 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
39
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 251 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 252
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1414 D E S I G N R E S U L T S
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1415 D E S I G N R E S U L T S
40
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 252 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 253
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1416 D E S I G N R E S U L T S
============================================================================
41
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 253 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 254
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1425 D E S I G N R E S U L T S
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1426 D E S I G N R E S U L T S
42
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 254 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 255
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1427 D E S I G N R E S U L T S
============================================================================
43
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 255 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 256
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1428 D E S I G N R E S U L T S
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1429 D E S I G N R E S U L T S
44
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 256 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 257
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1430 D E S I G N R E S U L T S
============================================================================
45
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 257 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 258
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1431 D E S I G N R E S U L T S
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1432 D E S I G N R E S U L T S
46
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 258 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 259
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1433 D E S I G N R E S U L T S
SHEAR DESIGN RESULTS AT DISTANCE d (EFFECTIVE DEPTH) FROM FACE OF THE SUPPORT
-----------------------------------------------------------------------------
47
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 259 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 260
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1434 D E S I G N R E S U L T S
SHEAR DESIGN RESULTS AT DISTANCE d (EFFECTIVE DEPTH) FROM FACE OF THE SUPPORT
-----------------------------------------------------------------------------
============================================================================
48
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 260 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 261
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1435 D E S I G N R E S U L T S
SHEAR DESIGN RESULTS AT DISTANCE d (EFFECTIVE DEPTH) FROM FACE OF THE SUPPORT
-----------------------------------------------------------------------------
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1436 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
49
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 261 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 262
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1436 D E S I G N R E S U L T S
SHEAR DESIGN RESULTS AT DISTANCE d (EFFECTIVE DEPTH) FROM FACE OF THE SUPPORT
-----------------------------------------------------------------------------
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1437 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
50
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 262 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 263
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1437 D E S I G N R E S U L T S
SHEAR DESIGN RESULTS AT DISTANCE d (EFFECTIVE DEPTH) FROM FACE OF THE SUPPORT
-----------------------------------------------------------------------------
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1438 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
51
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 263 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 264
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1438 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1439 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1439 D E S I G N R E S U L T S
52
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 264 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 265
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1440 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1440 D E S I G N R E S U L T S
53
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 265 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 266
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1441 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1441 D E S I G N R E S U L T S
============================================================================
54
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 266 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 267
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1442 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1442 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1443 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
55
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 267 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 268
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1443 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1444 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1444 D E S I G N R E S U L T S
56
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 268 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 269
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1445 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1445 D E S I G N R E S U L T S
57
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 269 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 270
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1446 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1446 D E S I G N R E S U L T S
============================================================================
58
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 270 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 271
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1447 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1447 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1448 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
59
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 271 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 272
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1448 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1449 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1449 D E S I G N R E S U L T S
60
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 272 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 273
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1450 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1450 D E S I G N R E S U L T S
61
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 273 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 274
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1451 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1451 D E S I G N R E S U L T S
============================================================================
62
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 274 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 275
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1452 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1452 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1453 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
63
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 275 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 276
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1453 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1454 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1454 D E S I G N R E S U L T S
64
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 276 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 277
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1455 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1455 D E S I G N R E S U L T S
65
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 277 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 278
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1456 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1456 D E S I G N R E S U L T S
============================================================================
66
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 278 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 279
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1457 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1457 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1458 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
67
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 279 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 280
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1458 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1459 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1459 D E S I G N R E S U L T S
68
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 280 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 281
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1460 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1460 D E S I G N R E S U L T S
69
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 281 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 282
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1461 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1461 D E S I G N R E S U L T S
============================================================================
70
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 282 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 283
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1582 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1582 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1583 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
71
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 283 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 284
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1583 D E S I G N R E S U L T S
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1584 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1584 D E S I G N R E S U L T S
72
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 284 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 285
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1585 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1585 D E S I G N R E S U L T S
73
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 285 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 286
============================================================================
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1586 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1586 D E S I G N R E S U L T S
============================================================================
74
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 286 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 287
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 1587 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
============================================================================
IS-456 L I M I T S T A T E D E S I G N
B E A M N O. 1587 D E S I G N R E S U L T S
============================================================================
75
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 287 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 288
=========================================================
IS 456 - 2000 C O L U M N D E S I G N R E S U L T S
=========================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1369 D E S I G N R E S U L T S
76
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 288 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 289
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1370 D E S I G N R E S U L T S
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1371 D E S I G N R E S U L T S
77
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 289 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 290
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1372 D E S I G N R E S U L T S
78
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 290 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 291
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1373 D E S I G N R E S U L T S
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1374 D E S I G N R E S U L T S
79
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 291 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 292
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1375 D E S I G N R E S U L T S
80
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 292 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 293
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1376 D E S I G N R E S U L T S
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1417 D E S I G N R E S U L T S
81
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 293 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 294
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1418 D E S I G N R E S U L T S
82
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 294 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 295
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1419 D E S I G N R E S U L T S
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1420 D E S I G N R E S U L T S
83
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 295 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 296
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1421 D E S I G N R E S U L T S
84
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 296 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 297
============================================================================
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1422 D E S I G N R E S U L T S
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1423 D E S I G N R E S U L T S
85
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 297 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 298
============================================================================
IS-456 L I M I T S T A T E D E S I G N
C O L U M N N O. 1424 D E S I G N R E S U L T S
86
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 298 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 299
============================================================================
87
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 299 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 300
88
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 300 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 301
89
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 301 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 302
90
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 302 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 303
91
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 303 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 304
92
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 304 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 305
93
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 305 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 306
94
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 306 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 307
95
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 307 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 308
96
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 308 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 309
97
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 309 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 310
98
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 310 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 311
99
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 311 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 312
100
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 312 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 313
101
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 313 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 314
102
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 314 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 315
103
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 315 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 316
104
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 316 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 317
105
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 317 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 318
106
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 318 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 319
107
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 319 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 320
108
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 320 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 321
109
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 321 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 322
110
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 322 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 323
111
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 323 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 324
112
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 324 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 325
113
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 325 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 326
114
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 326 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 327
115
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 327 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 328
116
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 328 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 329
117
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 329 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 330
118
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 330 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 331
119
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 331 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 332
120
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 332 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 333
121
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 333 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 334
122
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 334 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 335
123
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 335 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 336
124
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 336 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 337
125
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 337 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 338
126
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 338 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 339
127
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 339 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 340
128
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 340 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 341
129
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 341 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 342
130
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 342 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 343
131
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 343 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 344
132
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 344 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 345
133
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 345 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 346
134
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 346 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 347
135
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 347 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 348
136
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 348 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 349
137
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 349 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 350
138
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 350 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 351
139
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 351 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 352
140
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 352 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 353
141
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 353 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 354
142
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 354 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 355
143
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 355 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 356
144
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 356 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 357
145
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 357 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 358
146
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 358 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 359
147
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 359 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 360
148
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 360 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 361
149
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 361 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 362
150
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 362 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 363
151
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 363 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 364
152
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 364 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 365
153
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 365 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 366
154
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 366 of 367
Tuesday, May 28, 2019, 03:26 PM
STAAD SPACE -- PAGE NO. 367
************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://selectservices.bentley.com/en-US/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help->Technical Support *
* *
* Copyright (c) 1997-2016 Bentley Systems, Inc. *
* http://www.bentley.com *
************************************************************
155
Y:\HRP PROJECTS\209_ Bharuch WS\GENERAL WORKING\BHARUCH INTAKE STAAD\BHARUCH_INTAKE.anl Page 367 of 367
Name of project :- DPR & PMC services for Water transit from Amleshwar branch canal to New
proposed headworks at Matariya lake, Bharuch
Recapitulation sheet
Sr. No. Description of work Amount (Rs.)
1.0 Construction of DI K-7 gravity main 194996844.97
Construction of New Intake well of dia 6.0m and depth 16.0m including pump house
3.0
and approach bridge
3.1 Construction of Intake well and pump house 4139830.00
156
Abstract:-Gravity Main
Name of project :- DPR & PMC services for Water transit from Amleshwar branch canal to
New proposed headworks at Matariya lake, Bharuch
ABSTRACT
157
Abstract:-Gravity Main
158
Abstract:-Gravity Main
159
Mesurement:--Gravity Main
MEASUREMENT
Part- 1 Material
1 Providing and supplying D. I. K-7 grade pipes
for following nominal bore diameter with
internal cement mortar lining including all
taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading,
unloading, conveyance to departmental
stores, stacking etc. complete. (IS - 8329 /
2000) Rate for DI Pipe based on Wholesale
Price Index of Pig Iron as 147.1 for the Month
of March - 2014.
(1200 MM Dia) with 2% wastage 5000.00 5100.00 5100.00 RMT
2 Manufacture, Supply & Delivery of Ductile Iron
Flange socket spigot bends, tees, reducers or
any other specials as per BS-EN-545/1995
Class-A series K12 suitable for use with D.I.
Pipes manufactured as per
IS:8329/1994delivery of specials is to be
made to GWSSB store or site of works any
where in Gujarat including all taxes, loading,
unloading, carting, stacking, insurance,
inspection charges, octroi etc. complete.
With external bitumen & zink coating &
internal cement mortar lining.
28026 28026 28026 Kg
3 Providing and supplying ISI mark CI D/F
Sluice Valves , Butterfly Valves & Reflux
Valves of following class and diameter
including all taxes, insurance, transportation,
freight charges, octroi, inspection charges,
loading, unloading, conveyance to
departmental stores, stacking etc. complete.
A3) PN-1 With hand/wheel cap operated (Alt-1
type long body)
800 mm Dia 2.00 2.00 Nos
4 Providing and supplying C. I. Air valves of
approved make & quality of following class
and diameter including all taxes, insurance,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to departmental stores, stacking
etc. complete.
Air valves double acting (DS2)
200 mm 10.00 10.00 No
160
Mesurement:--Gravity Main
161
Mesurement:--Gravity Main
162
EXCAVATION FOR GRAVITY PIPE
1 2 3 4 5 6 7 8 9 10 11 12
0 TO 1.5M 1.5 TO 3M 0 TO 1.5M 1.5 TO 3M
1 0 96.210 95.210 1.26 2.255
2 30 96.580 94.773 1.26 3.062 2.66 1.86 1.86 2.46 30 83.48 74.89
3 60 95.120 94.337 1.26 2.038 2.55 1.86 1.86 2.46 30 83.48 67.88
4 90 94.900 93.900 1.26 2.255 2.15 1.86 1.86 2.46 30 83.48 41.81
5 120 94.840 93.790 1.26 2.305 2.28 1.86 1.86 2.46 30 83.48 50.43
6 150 94.950 93.680 1.26 2.525 2.42 1.86 1.86 2.46 30 83.48 59.16
7 180 94.270 93.570 1.26 1.955 2.24 1.86 1.86 2.46 30 83.48 47.84
8 210 94.240 93.460 1.26 2.035 2.00 1.86 1.86 2.46 30 83.48 32.00
9 240 94.190 93.350 1.26 2.095 2.07 1.86 1.86 2.46 30 83.48 36.53
10 270 94.030 93.240 1.26 2.045 2.07 1.86 1.86 2.46 30 83.48 36.85
11 300 94.170 93.130 1.26 2.295 2.17 1.86 1.86 2.46 30 83.48 43.32
12 330 94.290 93.020 1.26 2.525 2.41 1.86 1.86 2.46 30 83.48 58.84
13 360 93.870 92.910 1.26 2.215 2.37 1.86 1.86 2.46 30 83.48 56.25
14 390 93.800 92.800 1.26 2.255 2.24 1.86 1.86 2.46 30 83.48 47.52
15 420 94.310 92.788 1.26 2.777 2.52 1.86 1.86 2.46 30 83.48 65.67
16 450 94.480 92.777 1.26 2.958 2.87 1.86 1.86 2.46 30 83.48 88.41
17 480 94.160 92.765 1.26 2.650 2.80 1.86 1.86 2.46 30 83.48 84.31
18 510 94.530 92.753 1.26 3.032 2.84 1.86 1.86 2.46 30 83.48 86.69
19 540 94.790 92.742 1.26 3.303 3.17 1.86 1.86 2.46 30 83.48 107.80
20 570 94.690 92.730 1.26 3.215 3.26 1.86 1.86 2.46 30 83.48 113.73
21 600 94.210 92.718 1.26 2.747 2.98 1.86 1.86 2.46 30 83.48 95.74
22 630 93.930 92.707 1.26 2.478 2.61 1.86 1.86 2.46 30 83.48 71.92
23 660 94.610 92.695 1.26 3.170 2.82 1.86 1.86 2.46 30 83.48 85.61
24 690 94.020 92.683 1.26 2.592 2.88 1.86 1.86 2.46 30 83.48 89.27
25 720 94.260 92.672 1.26 2.843 2.72 1.86 1.86 2.46 30 83.48 78.71
26 750 94.280 92.660 1.26 2.875 2.86 1.86 1.86 2.46 30 83.48 87.87
27 780 94.270 92.648 1.26 2.877 2.88 1.86 1.86 2.46 30 83.48 88.95
28 810 94.110 92.637 1.26 2.728 2.80 1.86 1.86 2.46 30 83.48 84.21
29 840 94.180 92.625 1.26 2.810 2.77 1.86 1.86 2.46 30 83.48 82.05
30 870 94.190 92.613 1.26 2.832 2.82 1.86 1.86 2.46 30 83.48 85.40
31 900 93.670 92.602 1.26 2.323 2.58 1.86 1.86 2.46 30 83.48 69.66
32 930 94.260 92.590 1.26 2.925 2.62 1.86 1.86 2.46 30 83.48 72.68
33 960 94.380 92.578 1.26 3.057 2.99 1.86 1.86 2.46 30 83.48 96.39
34 990 94.510 92.567 1.26 3.198 3.13 1.86 1.86 2.46 30 83.48 105.22
35 1020 94.360 92.555 1.26 3.060 3.13 1.86 1.86 2.46 30 83.48 105.33
36 1050 94.400 92.543 1.26 3.112 3.09 1.86 1.86 2.46 30 83.48 102.53
37 1080 93.560 92.532 1.26 2.283 2.70 1.86 1.86 2.46 30 83.48 77.42
38 1110 93.620 92.520 1.26 2.355 2.32 1.86 1.86 2.46 30 83.48 52.96
39 1140 94.350 92.508 1.26 3.097 2.73 1.86 1.86 2.46 30 83.48 79.26
40 1170 94.140 92.497 1.26 2.898 3.00 1.86 1.86 2.46 30 83.48 96.82
41 1200 94.250 92.485 1.26 3.020 2.96 1.86 1.86 2.46 30 83.48 94.34
42 1230 93.500 92.473 1.26 2.282 2.65 1.86 1.86 2.46 30 83.48 74.41
43 1260 94.260 92.462 1.26 3.053 2.67 1.86 1.86 2.46 30 83.48 75.49
44 1290 94.030 92.450 1.26 2.835 2.94 1.86 1.86 2.46 30 83.48 93.37
45 1320 94.520 92.438 1.26 3.337 3.09 1.86 1.86 2.46 30 83.48 102.53
163
DEPTH OF AVG BOTTOM
LENGTH
TOP RL CUTTING(D)= DEPTH WIDTH OF TOP WIDTH OF
GL DIA OF OF QUANTITY OF
SN CH (m) OF PIPE (G.L.-TOP R.L. OF CUTTING CUTTING
(m) PIPE (m) CUTTING CUTTING (Cum)
(m) OF PIPE+DIA OF CUTTING (m)=(DIA OF (m)=(BOTTOM WIDTH)
(m)
PIPE) (m) (m) PIPE+0.6)
1 2 3 4 5 6 7 8 9 10 11 12
0 TO 1.5M 1.5 TO 3M 0 TO 1.5M 1.5 TO 3M
46 1350 94.000 92.427 1.26 2.828 3.08 1.86 1.86 2.46 30 83.48 102.32
47 1380 94.230 92.415 1.26 3.070 2.95 1.86 1.86 2.46 30 83.48 93.70
48 1410 94.140 92.403 1.26 2.992 3.03 1.86 1.86 2.46 30 83.48 98.98
49 1440 94.070 92.392 1.26 2.933 2.96 1.86 1.86 2.46 30 83.48 94.56
50 1470 94.100 92.380 1.26 2.975 2.95 1.86 1.86 2.46 30 83.48 94.02
51 1500 93.910 92.368 1.26 2.797 2.89 1.86 1.86 2.46 30 83.48 89.60
52 1530 93.880 92.357 1.26 2.778 2.79 1.86 1.86 2.46 30 83.48 83.24
53 1560 93.770 92.345 1.26 2.680 2.73 1.86 1.86 2.46 30 83.48 79.47
54 1590 93.850 92.333 1.26 2.772 2.73 1.86 1.86 2.46 30 83.48 79.26
55 1620 93.930 92.322 1.26 2.863 2.82 1.86 1.86 2.46 30 83.48 85.19
56 1650 94.020 92.310 1.26 2.965 2.91 1.86 1.86 2.46 30 83.48 91.43
57 1680 93.950 92.298 1.26 2.907 2.94 1.86 1.86 2.46 30 83.48 92.84
58 1710 93.870 92.287 1.26 2.838 2.87 1.86 1.86 2.46 30 83.48 88.74
59 1740 93.790 92.275 1.26 2.770 2.80 1.86 1.86 2.46 30 83.48 84.32
60 1770 93.680 92.263 1.26 2.672 2.72 1.86 1.86 2.46 30 83.48 78.94
61 1800 93.890 92.252 1.26 2.893 2.78 1.86 1.86 2.46 30 83.48 82.92
62 1830 93.430 92.240 1.26 2.445 2.67 1.86 1.86 2.46 30 83.48 75.60
63 1860 93.310 92.228 1.26 2.337 2.39 1.86 1.86 2.46 30 83.48 57.60
64 1890 93.520 92.217 1.26 2.558 2.45 1.86 1.86 2.46 30 83.48 61.27
65 1920 92.960 92.205 1.26 2.010 2.28 1.86 1.86 2.46 30 83.48 50.71
66 1950 94.120 92.193 1.26 3.182 2.60 1.86 1.86 2.46 30 83.48 70.86
67 1980 94.220 92.181 1.26 3.294 3.24 1.86 1.86 2.46 30 83.48 112.34
68 2010 94.030 92.170 1.26 3.115 3.20 1.86 1.86 2.46 30 83.48 110.19
69 2040 93.710 92.158 1.26 2.807 2.96 1.86 1.86 2.46 30 83.48 94.45
70 2070 93.740 92.146 1.26 2.849 2.83 1.86 1.86 2.46 30 83.48 85.83
71 2100 93.630 92.135 1.26 2.750 2.80 1.86 1.86 2.46 30 83.48 84.00
72 2130 93.560 92.123 1.26 2.692 2.72 1.86 1.86 2.46 30 83.48 78.94
73 2160 93.490 92.111 1.26 2.634 2.66 1.86 1.86 2.46 30 83.48 75.17
74 2190 93.380 92.100 1.26 2.535 2.58 1.86 1.86 2.46 30 83.48 70.10
75 2220 93.300 92.088 1.26 2.467 2.50 1.86 1.86 2.46 30 83.48 64.72
76 2250 93.230 92.076 1.26 2.409 2.44 1.86 1.86 2.46 30 83.48 60.62
77 2280 93.120 92.065 1.26 2.310 2.36 1.86 1.86 2.46 30 83.48 55.56
78 2310 93.500 92.053 1.26 2.702 2.51 1.86 1.86 2.46 30 83.48 65.04
79 2340 93.980 92.041 1.26 3.194 2.95 1.86 1.86 2.46 30 83.48 93.59
80 2370 93.030 92.030 1.26 2.255 2.72 1.86 1.86 2.46 30 83.48 79.15
81 2400 93.700 92.029 1.26 2.926 2.59 1.86 1.86 2.46 30 83.48 70.52
82 2430 93.650 92.027 1.26 2.878 2.90 1.86 1.86 2.46 30 83.48 90.65
83 2460 93.340 92.026 1.26 2.569 2.72 1.86 1.86 2.46 30 83.48 79.11
84 2490 93.480 92.024 1.26 2.711 2.64 1.86 1.86 2.46 30 83.48 73.71
85 2520 93.430 92.023 1.26 2.662 2.69 1.86 1.86 2.46 30 83.48 76.71
86 2550 93.390 92.021 1.26 2.624 2.64 1.86 1.86 2.46 30 83.48 73.90
87 2580 93.090 92.020 1.26 2.325 2.47 1.86 1.86 2.46 30 83.48 63.00
88 2610 92.650 92.018 1.26 1.887 2.11 1.86 1.86 2.46 30 83.48 39.18
89 2640 92.780 92.017 1.26 2.018 1.95 1.86 1.86 2.46 30 83.48 29.25
90 2670 92.900 92.015 1.26 2.140 2.08 1.86 1.86 2.46 30 83.48 37.43
91 2700 92.850 92.014 1.26 2.091 2.12 1.86 1.86 2.46 30 83.48 39.79
92 2730 92.990 92.012 1.26 2.233 2.16 1.86 1.86 2.46 30 83.48 42.79
164
DEPTH OF AVG BOTTOM
LENGTH
TOP RL CUTTING(D)= DEPTH WIDTH OF TOP WIDTH OF
GL DIA OF OF QUANTITY OF
SN CH (m) OF PIPE (G.L.-TOP R.L. OF CUTTING CUTTING
(m) PIPE (m) CUTTING CUTTING (Cum)
(m) OF PIPE+DIA OF CUTTING (m)=(DIA OF (m)=(BOTTOM WIDTH)
(m)
PIPE) (m) (m) PIPE+0.6)
1 2 3 4 5 6 7 8 9 10 11 12
0 TO 1.5M 1.5 TO 3M 0 TO 1.5M 1.5 TO 3M
93 2760 93.010 92.011 1.26 2.254 2.24 1.86 1.86 2.46 30 83.48 48.06
94 2790 93.040 92.009 1.26 2.286 2.27 1.86 1.86 2.46 30 83.48 49.77
95 2820 93.170 92.008 1.26 2.417 2.35 1.86 1.86 2.46 30 83.48 55.04
96 2850 93.290 92.006 1.26 2.539 2.48 1.86 1.86 2.46 30 83.48 63.21
97 2880 93.510 92.005 1.26 2.760 2.65 1.86 1.86 2.46 30 83.48 74.30
98 2910 93.380 92.004 1.26 2.631 2.70 1.86 1.86 2.46 30 83.48 77.30
99 2940 93.370 92.002 1.26 2.623 2.63 1.86 1.86 2.46 30 83.48 72.87
100 2970 93.380 92.001 1.26 2.634 2.63 1.86 1.86 2.46 30 83.48 72.97
101 3000 93.390 91.999 1.26 2.646 2.64 1.86 1.86 2.46 30 83.48 73.71
102 3030 93.500 91.998 1.26 2.757 2.70 1.86 1.86 2.46 30 83.48 77.68
103 3060 93.620 91.996 1.26 2.879 2.82 1.86 1.86 2.46 30 83.48 85.21
104 3090 93.720 91.995 1.26 2.980 2.93 1.86 1.86 2.46 30 83.48 92.42
105 3120 93.810 91.993 1.26 3.072 3.03 1.86 1.86 2.46 30 83.48 98.66
106 3150 93.340 91.992 1.26 2.603 2.84 1.86 1.86 2.46 30 83.48 86.47
107 3180 93.070 91.990 1.26 2.335 2.47 1.86 1.86 2.46 30 83.48 62.64
108 3210 93.520 91.989 1.26 2.786 2.56 1.86 1.86 2.46 30 83.48 68.56
109 3240 94.180 91.987 1.26 3.448 3.12 1.86 1.86 2.46 30 83.48 104.53
110 3270 93.180 91.986 1.26 2.449 2.95 1.86 1.86 2.46 30 83.48 93.64
111 3300 92.910 91.984 1.26 2.181 2.31 1.86 1.86 2.46 30 83.48 52.68
112 3330 93.060 91.983 1.26 2.332 2.26 1.86 1.86 2.46 30 83.48 48.90
113 3360 92.840 91.981 1.26 2.114 2.22 1.86 1.86 2.46 30 83.48 46.73
114 3390 92.680 91.980 1.26 1.955 2.03 1.86 1.86 2.46 30 83.48 34.54
115 3420 92.920 91.979 1.26 2.196 2.08 1.86 1.86 2.46 30 83.48 37.22
116 3450 93.010 91.977 1.26 2.288 2.24 1.86 1.86 2.46 30 83.48 47.98
117 3480 93.310 91.976 1.26 2.589 2.44 1.86 1.86 2.46 30 83.48 60.68
118 3510 93.450 91.974 1.26 2.731 2.66 1.86 1.86 2.46 30 83.48 75.00
119 3540 93.270 91.973 1.26 2.552 2.64 1.86 1.86 2.46 30 83.48 73.80
120 3570 93.090 91.971 1.26 2.374 2.46 1.86 1.86 2.46 30 83.48 62.26
121 3600 93.150 91.970 1.26 2.435 2.40 1.86 1.86 2.46 30 83.48 58.48
122 3630 92.900 91.968 1.26 2.187 2.31 1.86 1.86 2.46 30 83.48 52.43
123 3660 93.130 91.967 1.26 2.418 2.30 1.86 1.86 2.46 30 83.48 51.88
124 3690 93.320 91.965 1.26 2.610 2.51 1.86 1.86 2.46 30 83.48 65.55
125 3720 93.200 91.964 1.26 2.491 2.55 1.86 1.86 2.46 30 83.48 67.91
126 3750 93.170 91.962 1.26 2.463 2.48 1.86 1.86 2.46 30 83.48 63.16
127 3780 93.090 91.961 1.26 2.384 2.42 1.86 1.86 2.46 30 83.48 59.69
128 3810 93.060 91.959 1.26 2.356 2.37 1.86 1.86 2.46 30 83.48 56.23
129 3840 93.270 91.958 1.26 2.567 2.46 1.86 1.86 2.46 30 83.48 62.15
130 3870 93.490 91.957 1.26 2.788 2.68 1.86 1.86 2.46 30 83.48 76.14
131 3900 93.440 91.955 1.26 2.740 2.76 1.86 1.86 2.46 30 83.48 81.73
132 3930 93.530 91.954 1.26 2.831 2.79 1.86 1.86 2.46 30 83.48 83.12
133 3960 93.760 91.952 1.26 3.063 2.95 1.86 1.86 2.46 30 83.48 93.56
134 3990 93.590 91.951 1.26 2.894 2.98 1.86 1.86 2.46 30 83.48 95.59
135 4020 93.610 91.949 1.26 2.916 2.91 1.86 1.86 2.46 30 83.48 90.84
136 4050 93.530 91.948 1.26 2.837 2.88 1.86 1.86 2.46 30 83.48 89.00
137 4080 93.260 91.946 1.26 2.569 2.70 1.86 1.86 2.46 30 83.48 77.78
138 4110 93.400 91.945 1.26 2.710 2.64 1.86 1.86 2.46 30 83.48 73.67
139 4140 93.320 91.943 1.26 2.632 2.67 1.86 1.86 2.46 30 83.48 75.70
165
DEPTH OF AVG BOTTOM
LENGTH
TOP RL CUTTING(D)= DEPTH WIDTH OF TOP WIDTH OF
GL DIA OF OF QUANTITY OF
SN CH (m) OF PIPE (G.L.-TOP R.L. OF CUTTING CUTTING
(m) PIPE (m) CUTTING CUTTING (Cum)
(m) OF PIPE+DIA OF CUTTING (m)=(DIA OF (m)=(BOTTOM WIDTH)
(m)
PIPE) (m) (m) PIPE+0.6)
1 2 3 4 5 6 7 8 9 10 11 12
0 TO 1.5M 1.5 TO 3M 0 TO 1.5M 1.5 TO 3M
140 4170 93.610 91.942 1.26 2.923 2.78 1.86 1.86 2.46 30 83.48 82.59
141 4200 93.190 91.940 1.26 2.505 2.71 1.86 1.86 2.46 30 83.48 78.48
142 4230 93.130 91.939 1.26 2.446 2.48 1.86 1.86 2.46 30 83.48 63.06
143 4260 93.200 91.937 1.26 2.518 2.48 1.86 1.86 2.46 30 83.48 63.48
144 4290 93.320 91.936 1.26 2.639 2.58 1.86 1.86 2.46 30 83.48 69.72
145 4320 93.440 91.934 1.26 2.761 2.70 1.86 1.86 2.46 30 83.48 77.57
146 4350 93.290 91.933 1.26 2.612 2.69 1.86 1.86 2.46 30 83.48 76.69
147 4380 93.200 91.932 1.26 2.523 2.57 1.86 1.86 2.46 30 83.48 69.03
148 4410 93.140 91.930 1.26 2.465 2.49 1.86 1.86 2.46 30 83.48 64.28
149 4440 93.060 91.929 1.26 2.386 2.43 1.86 1.86 2.46 30 83.48 59.85
150 4470 93.040 91.927 1.26 2.368 2.38 1.86 1.86 2.46 30 83.48 56.71
151 4500 93.020 91.926 1.26 2.349 2.36 1.86 1.86 2.46 30 83.48 55.51
152 4530 92.860 91.924 1.26 2.191 2.27 1.86 1.86 2.46 30 83.48 49.79
153 4560 93.250 91.923 1.26 2.582 2.39 1.86 1.86 2.46 30 83.48 57.32
154 4590 93.170 91.921 1.26 2.504 2.54 1.86 1.86 2.46 30 83.48 67.43
155 4620 92.920 91.920 1.26 2.255 2.38 1.86 1.86 2.46 30 83.48 56.85
156 4650 93.420 91.997 1.26 2.678 2.47 1.86 1.86 2.46 30 83.48 62.47
157 4680 92.960 92.075 1.26 2.140 2.41 1.86 1.86 2.46 30 83.48 58.76
158 4710 93.220 92.152 1.26 2.323 2.23 1.86 1.86 2.46 30 83.48 47.30
159 4740 93.440 92.229 1.26 2.466 2.39 1.86 1.86 2.46 30 83.48 57.81
160 4770 93.640 92.307 1.26 2.588 2.53 1.86 1.86 2.46 30 83.48 66.38
161 4800 93.700 92.384 1.26 2.571 2.58 1.86 1.86 2.46 30 83.48 69.79
162 4830 93.620 92.462 1.26 2.413 2.49 1.86 1.86 2.46 30 83.48 64.14
163 4860 93.870 92.539 1.26 2.586 2.50 1.86 1.86 2.46 30 83.48 64.63
164 4890 94.250 92.616 1.26 2.889 2.74 1.86 1.86 2.46 30 83.48 80.00
165 4920 94.590 92.694 1.26 3.151 3.02 1.86 1.86 2.46 30 83.48 98.27
166 4950 94.980 92.771 1.26 3.464 3.31 1.86 1.86 2.46 30 83.48 116.86
167 4980 95.250 92.848 1.26 3.657 3.56 1.86 1.86 2.46 30 83.48 133.19
168 5100 95.190 92.900 1.26 3.545 3.60 1.86 1.86 2.46 120 333.90 543.26
166
Abstract:-Rising Main
Name of project :- DPR & PMC services for Water transit from Amleshwar branch canal
to New proposed headworks at Matariya lake, Bharuch
ABSTRACT
Sr
Discription Unit Quantity Rate (Rs.) Amount (Rs.)
no
Part- 1 Material
1 Manufacture, Supply & Delivery of Submerged Arc
welded M.S.Pipe outside coated with best quality
bituminous paint having bevelled ends plate or coil
conforming to IS-3589-2001 or its latest revision/
amendment for following thickness outside diameter at
GWSSB store or site anywhere in Gujarat State including
all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading
conveyance to Departmental stores, stacking,
contractor's Overhead charges & profit and labour cess
(1%) etc. complete. (Rate for MS Pipe) I/S epoxy Painting
(100 Micron) & O/S Gunniting (25 mm)
(813 MM Dia) with 2 % wastage Rmt 612.00 10957.00 6705684.00
GWSSB SOR 2014-15, Sec-A/item no.-3(B),(I)./p-8
2 M.S.Specials : M. S. Specials plain & socket ends
Above 300 mm. dia. Kg 1047.76 70.00 73343.42
GWSSB SOR 2014-15, Sec-A/item no.-15 /p-29
3 Providing and supplying ISI mark CI D/F Sluice Valves ,
Butterfly Valves & Reflux Valves of following class and
diameter including all taxes, insurance, transportation,
freight charges, octroi, inspection charges, loading,
unloading, conveyance to departmental stores, stacking
etc. complete.
A3) PN-1 With hand/wheel cap operated (PD type short
body)
600 mm Dia No. 1.00 114600.00 114600.00
GWSSB SOR 2014-15, Sec-C/item no.-8,A1) /p-127
3A Providing and supplying C. I. Air valves of approved
make & quality of following class and diameter including
all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc.
complete.
Air valves double acting (DS2)
150 mm No 2.00 13870.00 27740.00
GWSSB SOR 2014-15, Sec-C/item no.-9,c) /p-132
Part- 2 Labour
4 Excavation for pipes line trenches incl. all safety
provisions using sites rails and stacking excavated stuff
up to a lead of 90 mts. Cleaning the site etc complete for
lifts and strata as specified.
In all sorts of soil and soft murrum
0 to 1.5 mt depth.
In all sorts of soil and soft murrum Cu.Mt. 1294.38 88.00 113905.44
1.5 to 3.0 mt depth
In all sorts of soil and soft murrum Cu.Mt. 301.03 97.00 29199.77
GWSSB SOR 2014-15, Sec-B / item no.- 8 /p-40
167
Abstract:-Rising Main
Sr
Discription Unit Quantity Rate (Rs.) Amount (Rs.)
no
5 Lowering & laying in position to correct line & level M.S.
Pipe with outer side 3 LPE coating & inside solvent free
liquid epoxy lining on pedestal or chairs upon prepared
formation or prepared bedding in trenches the rates
include conveyance from store to site of work loading,
unloading, joint plastering, hydro testing etc.complete
(813 MM Dia) with 2 % wastage RMT 612.00 723.00 442476.00
GWSSB SOR 2014-15, Sec-B/item no.-1 A,p-36
6 Lowering, laying and jointing in position following C. I. /
D/F Reflux valves, Butterfly valves, Sluice valves and Air
valves including cost of all labour, jointing material,
including nut bolts and giving satisfactory hydraulic
testing, etc. complete.
A3) PN-1 With hand/wheel cap operated (PD type short
body)
600 mm Dia No. 1.00 4231.00 4231.00
Air valves double ball Flanged
150 mm No 2.00 645.00 1290.00
GWSSB SOR 2014-15,Sec-D/item no.-6a/p-138
7 Refilling the pipeline trenches incl. ramming, watering,
consolidating disposal of surplus stuff as directed within a
radius of 3 km Cu.M 1115.00 23.00 25645.00
GWSSB SOR 2014-15,Sec-B/item no.-10/p-41
8 Providing and laying controlled cement concrete M150
and exposed work with curing etc. complete including the
cost of form work but excluding cost of reinforcement for
RCC work
Thrust block Cum 235.00 6205.00 1458175.00
R&B SOR 2015-16,Ch.5, It. No. 5029A, p-19
9 Providing TMT Bar FE 500/500D reinforcement for
R.C.C. work including bending, binding and placing in kg 23500.00 45.00 1057500.00
position complete upto 10ton
R&B SOR 2015-16,Ch.5, It. No. 5.4.11, p-13
Total Amount Rs. 10053789.63
Say Rs. 10053790.00
Say Rs. in Lacs 100.54
168
Mesurement:--Rising Main
MEASUREMENT
Part- 1 Material
1 Manufacture, Supply & Delivery of Submerged
Arc welded M.S.Pipe outside coated with best
quality bituminous paint having bevelled ends
plate or coil conforming to IS-3589-2001 or its
latest revision/ amendment for following
thickness outside diameter at GWSSB store
or site anywhere in Gujarat State including all
taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading,
unloading conveyance to Departmental
stores, stacking, contractor's Overhead
charges & profit and labour cess (1%) etc.
complete. (Rate for MS Pipe) I/S epoxy
Painting (100 Micron) & O/S Gunniting (25
mm)
(813 MM Dia) with 2 % wastage 600.00 612.00 612.00 Rmt
2 M.S.Specials : M. S. Specials plain & socket
ends
Above 300 mm. dia. 1047.76 1047.76 1048.00 kg
3 Providing and supplying ISI mark CI D/F
Sluice Valves , Butterfly Valves & Reflux
Valves of following class and diameter
including all taxes, insurance, transportation,
freight charges, octroi, inspection charges,
loading, unloading, conveyance to
departmental stores, stacking etc. complete.
A3) PN-1 With hand/wheel cap operated (PD
type short body)
600 mm Dia 1.00 1.00 Nos
3A Providing and supplying C. I. Air valves of
approved make & quality of following class
and diameter including all taxes, insurance,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to departmental stores, stacking
etc. complete.
Air valves double acting (DS2)
150 mm 2.00 2.00 Nos
169
Mesurement:--Rising Main
Part- 2 Labour
4 Excavation for pipes line trenches incl. all
safety provisions using sites rails and
stacking excavated stuff up to a lead of 90
mts. Cleaning the site etc complete for lifts
and strata as specified.
In all sorts of soil and soft murrum
0 to 1.5 mt depth. 1.00 1294.38 1294.38 Cum
1.5 to 3.0 mt depth 1.00 301.03 301.03 Cum
Total 1595.41 Cum
5 Lowering & laying in position to correct line &
level M.S. Pipe with outer side 3 LPE coating
& inside solvent free liquid epoxy lining on
pedestal or chairs upon prepared formation or
prepared bedding in trenches the rates
include conveyance from store to site of work
loading, unloading, joint plastering, hydro
testing etc.complete
(813 MM Dia) with 2 % wastage 612.00 612.00 612.00 Rmt
6 Lowering, laying and jointing in position
following C. I. / D/F Reflux valves, Butterfly
valves, Sluice valves and Air valves including
cost of all labour, jointing material, including
nut bolts and giving satisfactory hydraulic
testing, etc. complete.
A3) PN-1 With hand/wheel cap operated (PD
type short body)
600 mm Dia 1.00 1.00 1.00 No.
Air valves double ball Flanged
150 mm 2.00 2.00 2.00 No.
7 Refilling the pipeline trenches incl. ramming,
watering, consolidating disposal of surplus
stuff as directed within a radius of 3 km
170
EXCAVATION FOR RISING MAIN
1 2 3 4 5 6 7 8 9 10 11 12
0 TO 1.5M 1.5 TO 3M
1 0 95.890 94.890 0.81 1.810
2 30 95.890 94.890 0.81 1.810 1.81 1.41 1.41 30 63.45 13.11
3 60 95.890 94.890 0.81 1.810 1.81 1.41 1.41 30 63.45 13.11
4 90 95.890 94.890 0.81 1.810 1.81 1.41 1.41 30 63.45 13.11
5 120 95.890 94.890 0.81 1.810 1.81 1.41 1.41 30 63.45 13.11
6 150 95.680 94.625 0.81 1.865 1.84 1.41 1.41 30 63.45 14.28
7 180 95.540 94.360 0.81 1.990 1.93 1.41 1.41 30 63.45 18.08
8 210 95.350 94.095 0.81 2.065 2.03 1.41 1.41 30 63.45 22.31
9 240 94.890 93.830 0.81 1.870 1.97 1.41 1.41 30 63.45 19.77
10 270 94.670 93.565 0.81 1.915 1.89 1.41 1.41 30 63.45 16.60
11 300 94.300 93.300 0.81 1.810 1.86 1.41 1.41 30 63.45 15.33
12 330 94.890 93.570 0.81 2.130 1.97 1.41 1.41 30 63.45 19.88
13 360 95.000 93.840 0.81 1.970 2.05 1.41 1.41 30 63.45 23.27
14 390 95.120 94.110 0.81 1.820 1.90 1.41 1.41 30 63.45 16.71
15 420 95.380 94.380 0.81 1.810 1.82 1.41 1.41 30 63.45 13.32
16 450 95.240 94.367 0.81 1.683 1.75 1.41 1.41 30 63.45 10.43
17 480 95.200 94.353 0.81 1.657 1.67 1.41 1.41 30 63.45 7.19
18 500 95.300 94.344 0.81 1.766 1.71 1.41 1.41 20 42.30 5.95
19 612 95.300 94.300 0.81 1.810 1.79 1.41 1.41 112 236.88 45.44
171
Name of project :- DPR & PMC services for Water transit from Amleshwar branch canal to New
proposed headworks at Matariya lake, Bharuch
Taluka : Bharuch DIST : Bharuch
Estimate for New Intake well 6.0 mt. dia. & 16.0 mt. depth with pump house at Matariya Tank
ABSTRACT
Qty Unit Item Rate Amount
Providing and laying cement concrete 1:2:4 for
foundation with brick bats of well burnt bricks as
Item No.1 coarse aggregate ramming curing. etc.
complete.
10.00 M3 Bharuch R&B SOR 2015-16, Pg10 1270.00 12700.00
Providing and casting in situ C.C. in grade M-
250 (approx.corresp. to prop. 1:1.5:3) using
granite, quartzite trap metal of size 6 mm to 20
mm for RCC work, incl. scaffolding centering,
form work, needle vibrated consolidation, curing
comp. upto 6 metre depth or height (excl. cost of
reinforcement and neat finishing) with centering
& shuttering etc. comp. for structure other than
water retainging.
76.00 M3 Item No.2 :- (A) Flat bottom slab(without centering) 5915.00 449540.00
6.00 M2 (B) Ring Beam 5915.00 35490.00
6.00 M3 (C) Pump supporting beams 5915.00 35490.00
2.00 M3 (D) Lintel level beams 5915.00 11830.00
3.00 M3 (E) Gantry level beams 5915.00 17745.00
8.00 M3 (F) Roof level beams 5915.00 47320.00
1.00 M3 (G) Chajjas 5915.00 5915.00
71.00 M3 (H) Vertical well 6634.00 471014.00
6.00 M3 (I) Column 6634.00 39804.00
(Bharuch R&B SOR 2015-16, Pg22)
Providing TMT Bar FE 500/500D reinforcement
for RCC work including bending, binding &
Item No.3 :- placing in position complete.
21.00 M.T. Total Steel Quantity 45000.00 945000.00
(Bharuch R&B SOR 2015-16, Pg13)
Brick work using common burnt clay bricks 3308.00 58897.39
having crushing strength not less than
35kg/Sq.Cm in foundation & plinth in cement
Item No.4 :- mortar 1:6 (upto 10 ton). Extra for brick work in
super structure above plinth level upto two level
Conventional
17.80 M3 (Bharuch R&B SOR 2015-16, Pg27 & Pg29)
Cement plaster 20 mm thick cement plaster in 151.00 68856.00
single coat on single or half brick walls for
Item No.5 :- interior plasting upto floor two level and finished
even and smooth cement mortar
456.00 M2 (Bharuch R&B SOR 2015-16, Pg92)
Providing and fixing 35 mm. thick shutters for 3075.00 62730.00
doors window and clear story windows including
anodised alluminium butt hinges with necessary
Item No.6 :-
screws. Indian teak wood & fully panelled upto
10 Ton
20.40 M2 (Bharuch R&B SOR 2015-16, Pg47)
172
Qty Unit Item Rate Amount
Providing & fixing M.S. grill of required pattem to 54.00 22032.00
wooden frames window etc. with M.S. Flats at
required spacing and frame alround square or
Item No.7 :- round bars with round headed bolts and nuts or
by screws
408.00 kg (R & B. SOR. P. 44 It. No.25)
20 mm. thick Cement plastering in cm 1:3 to
stone or brick masonary including racking out
the joints and niru or cement finishing etc.
Item No.8 :-
complete.
197.00 M2 In CM 1:3 151.00 29747.00
(Bharuch R&B SOR 2015-16, Pg92)
Cement Concrete flooring 1:2:4 with using Black 178.00 11125.00
Stone crush metal of 12 to 20 mm. size incl.
Item No.9 :- Finishing curing etc. comp. 40 mm. thick.
173
Qty Unit Item Rate Amount
Sinking single circular well of internal diameter
and thickness of steining as specified upto the
level as specified in all sorts of soil including had
murrum, boulders and all strsta type & strata
upto the level as per drawing by dredging,
dewatering,drop chiselling wlth necessary
kentledge and with machlanlcal means as may
bg necesssry for thls type of work lncludlng all
Item No. 15 labour, plant machinary etc, complete.zero level
to be considered from cutilng edge level.
lncluding all labour charges with tles{tering but
Excloding cost ol Cutting Edge-& Well Staining
1.00 No 10m Dia 815311.81 815311.81
174
Estimate for New Intake well 6.0 mt. dia. & 16.0 mt. depth with pump house at Matariya Tank
MEASUREMENT
Particulars No L B D/H Qty.
Item No.1 Providing and laying cement concrete 1:2:4 for foundation with brick bats of well burnt bricks as
coarse aggregate ramming curing. etc. complete.
Item No.3 Providing TMT Bar FE 500/500D reinforcement for RCC work including bending, binding &
placing in position complete.
Item No.5 Cement plaster 20 mm thick cement plaster in single coat on single or half brick walls for
interior plasting upto floor two level and finished even and smooth cement mortar
Inner face 3.14 x 6.02 x x 11.00 = 207.93 m2
Outer face 3.14 x 6.35 x x 11.00 = 219.33 m2
Bottom slab (Middle) 3.14 x 3.000 x 3.00 x = 28.26 m2
Say = 455.52 m2
Total = 456.00 m2
Item No.6 Providing and fixing 35 mm. thick shutters for doors window and clear story windows including
anodised alluminium butt hinges with necessary screws. Indian teak wood & fully panelled upto
10 Ton
Item No.7 Providing & fixing M.S. grill of required pattem to wooden frames window etc. with M.S. Flats at
required spacing and frame alround square or round bars with round headed bolts and nuts or
by screws
--do-- Omamental grill
Window 7.00 x 1.20 x x 1.20 = 10.08 m2
Ventilators 8.00 x 1.20 x x 0.45 = 4.32 m2
Shutter 1.00 x 2.00 x x 3.00 = 6.00 m2
= 20.40
Omamental grill @ 20 kg/smt
20.40 x 20.00 = 408.00 kg
Say 408.00 kg
Item No.8 20 mm. thick Cement plastering in cm 1:3 to stone or brick masonary including racking out the
joints and niru or cement finishing etc. complete.
Deduction
Window 7.00 x 1.20 x x 1.20 = 10.08 m2
Ventilators 8.00 x 1.20 x x 0.45 = 4.32 m2
Shutter 1.00 x 2.00 x x 3.00 = 6.00 m2
Item No.10 Providing & fixing M.S. Steel Gate incl. All necessary finishing arrangement as per design and
plants or rate two coats of approved oil paint and one coat or anticorresive oil etc. comp.
Item No.11 Providing & applying white wash or colour wash of approved quality and shape of surface incl.
Scaffolding brushing and borrowing etc as directed in two coats.
1 x 1 x 1 x 0.004 = 0.004 m3
Density = 6950.00 kg/m3
Weight = 27.8 Kg
With Frame = 55.60 Kg
Item No.13 Providing and fixing copper lightening arrestor incl. copper strip and car thing plate etc.
complete (Incl. cost of excavation for ear thing plate etc. reate per kgs of copper)
Item No. 15 Sinking single circular well of internal diameter and thickness of steining as specified upto the
level as specified in all sorts of soil including had murrum, boulders and all strsta type & strata
upto the level as per drawing by dredging, dewatering,drop chiselling wlth necessary kentledge
and with machlanlcal means as may bg necesssry for thls type of work lncludlng all labour,
plant machinary etc, complete.zero level to be considered from cutilng edge level. lncluding all
labour charges with tles{tering but Excloding cost ol Cutting Edge-& Well Staining
Item No. 16 Providing and erecting single girder type fully electrically operated hoist, class 2 duty, geared
travelling trolley with seven meter lift cimpletely with long travel track (40mm sq. bar), moving or
cross girder, all three motions electrically operated by suitable rating motor IP 54, control
pannel & down pendant control block, brake, saftey device, cables from motor to started pannel
& other required assessories & tested with 50% overload
177
Name of project :- DPR & PMC services for Water transit from Amleshwar branch canal to New proposed
headworks at Matariya lake, Bharuch
Taluka : Bharuch DIST : Bharuch
Estimate for Approach Bridge of new Intake well
ABSTRACT
Qty Unit Item Rate Amount
Excavation including removing and spreading the
excavated stuff as directed with lead upto 90 m in all
soils including hard murrum.
Item No.1 :-
499.62 M3 For depth 0.00 mt to 1.50 mt 40.00 19984.80
503.92 M3 For 1.50 mt. 3.00 mt. depth 54.00 27211.68
(B. SOR. P. 98 It. No.1)
Extra for dewatering for excavation in wet condition in all
soil including soft murrum.
Item No.2 :-
499.62 M3 (1) 0.0 mt. to 1.50 mt. 9.90 4946.24
503.92 M3 (2) 1.50 mt. to 3.00 mt. 13.20 6651.74
40.00 M3 Providing and laying brickbat cement concrete for 50800.00
foundation with brick bats of well burnt bricks as coarse
Item No.3 :- aggregate ramming curing. etc. complete.
178
ABSTRACT
Qty Unit Item Rate Amount
Sinking single circular well of internal diameter and
thickness of steining as specified upto the level as
specified in all sorts of soil including had murrum,
boulders and all strsta type & strata upto the level as per
drawing by dredging, dewatering,drop chiselling wlth
necessary kentledge and with machlanlcal means as
24.00 Nos may bg necesssry for thls type of work lncludlng all 89895.00 2157480.00
Item No. 8 labour, plant machinary etc, complete.zero level to be
considered from cutilng edge level. lncluding all labour
charges with tles{tering but Excloding cost ol Cutting
Edge-& Well Staining
6m Dia
GWSSB SOR 2015-16, Pg71
Total Cost (Rs.) 6255465.35
Say (Rs.) 6255470.00
179
Name of project :- DPR & PMC services for Water transit from Amleshwar branch canal to New proposed
headworks at Matariya lake, Bharuch
Estimate for Approach Bridge of new Intake well
MEASUREMENT
Particulars No L B D/H Qty.
Item No.1 Excavation including removing and spreading the excavated stuff as directed with lead
upto 90 m in all soils including hard murrum.
Item No.2 Extra for dewatering for excavation in wet condition in all soil including soft murrum.
180
Particulars No L B D/H Qty.
12 x 4.00 x 0.30 x 0.45 = 6.48 m3
Crash Barrier 2 x 120.00 x 0.15 x 0.40 = 14.40 m3
Abutment 1 x 4.20 x 4.20 x 3.50 = 61.74 m3
Total = 508.46 m3
Say 509.00 m3
Item No.5 Supplying cutting, bending, binding and placing in position steel as per plan and design and
as per ISS 2502 including cost of steel and binding wire for reservoirs only incl. lift upto 6
mt. height.
Assuming 120kg of steel per m3
Total Steel Quantity 509.00 120.00 Say 61080.00 Kg
Total 61.08 MT
Say 62.00 MT
Item No. 6 Providing and fixing metal expansion joints as per drawings. Details of exoansion joints
50x50x6mm sized of 2 IS & 100x6mm MS plate with 6x20x25mm long hold fast @ 50mm
c/c on both the sides
Item No. 7 Providing and fiximg post and pipe railing as per detailed drawing including three coats of
painting to steel complete work.
Item No. 8 Sinking single circular well of internal diameter and thickness of steining as specified upto
the level as specified in all sorts of soil including had murrum, boulders and all strsta type &
strata upto the level as per drawing by dredging, dewatering,drop chiselling wlth necessary
kentledge and with machlanlcal means as may bg necesssry for thls type of work lncludlng
all labour, plant machinary etc, complete.zero level to be considered from cutilng edge
level. lncluding all labour charges with tles{tering but Excloding cost ol Cutting Edge-& Well
Staining
181
Name of work :- DPR & PMC services for Water transit from Amleshwar branch canal to New proposed headworks at Matariya lake, Bharuch
GWS&SB Civil SOR 2014-2015 Section H Item No. 1 page No. 159.
182
SR.N
DESCRIPTION QTY. UNIT RATE AMOUNT
O.
Design, Engineering, procurement, Installation, Testing and commissioning of approved
make Energy Efficient 500 KVA rating with No Load voltage Ration 11 KV / 0.433 KV, contineous rated for 3 Phase , 50 HZ oil
immersed naturally ONAN cooled, copper double wound , core type indoor / outdoor vector group DYn 11 HT Delta connected
and LT Star connected oil immersed winding with temprature rise in oil / winding 50/55 Deg. C above ambient temprature with
neutral brought out connected to provide seperate earthing including terminal arrangement Cable box on HT side and cable box
2 on LT side suitable for cable box or Bus Duct with following acceptable valuse of no load / load losses @ 75 deg. C and Impedance ( 1 No. 843978 843978
Without any Tolerances) completed with first fill of oil along with following accessories including routine test @ factory as per IS
and Its latest ammendements as per data sheet and detailed specifications complete with necessary radiator first filling of new
transformer oil & standard fitting as below complying with I.S. 1180 - Level - 2 and Its latest ammendment standards. Off load tap
changing range + 5 % to -15 % in steps 2.5% to 5% on H.V and L.V. for variation should be provided.
The transformer should have cable-end boxes on H.T. side suitable for up to 3 core 240 sq.mm. XLPE cable & on L.T. side suitable
for busduct or cables as per requirement complete with test certificates from manufacturers .1. Oil conservator with filling Hole &
Cap / Drain plug and prismatic oil sight gauge - One No. 2. Thermometer pocket with 6"
dial type thermometer switch alarm & trip contacts- Two nos. 3. Silica-gel dehydrating breather charges with silica gel One No. 4.
Plain oil level gauge - One No. 5. Drain / Sampling valve with plug & Filter valve- One No. 6. Top Filter Valve - One No. 7. Explosion
vent with Diaphragm - One No. 8. Rating & Diagram plate - One No. 9. Additional neutral bushing for earthing - One No. 10. Bi
directional Roller - Four Nos. 11. Earthing terminals - Two Nos.12. Lifting lugs - Two Nos.13. Air release plug. - One No.14. Double
float buchholz relay with Alarm and trip contacts. [As per ECBC code criteria] (d)500 KVA Max. allowable loses as per CBIP manual.
No load losses @75 deg (KW) 0.65 KW/ Full load losses @75 deg (KW) 3.50 KW / Impedence 4.00 %
GWS&SB Civil SOR 2014-2015 Section H Item No. 2 b 1.1(F) page No. 162+ 2.1(F) Page No. 162
183
SR.N
DESCRIPTION QTY. UNIT RATE AMOUNT
O.
Design, Engineering, procurement, Installation, Testing and commissioning of Power Motor Control Centre @ New Intake Well of
630 A, 415 V TPN cubical having depth not less than 550 mm throghout the required length & detachable, fabricated from 2 mm
CRCA sheet steel, free standing, floor mounted, compartmentalized, extensible,dust and vermin proof enclosure, duly painted
provided with required rating switch gears and shall be complete with (a) required size of TPN Electrolyte 400 A Aluminium bus
bar having cross section not less than 1.6 Amp per 1.0 Sq. MM. Following Out going Feeders shall be required to be accomodate in
the PMCC panel - The Panel Depth shall be 550 mm depth.
(1) 3 Nos. of 320 Amp / suitable rating 4 Pole MCCB having facility of microprocessor based release MCCB and 90 KW 3 Nos. Soft
Starter having facility of Motor protection relay with RS 485 computer interface suitable to rated kW of motor of pump set with
micro processor based motor protection relay having facility of all type of motor protection like locked rotor, U/v, O/v, E/F, O/A,
U/A, Single phasing, Over heating facility and all other required protection etc., complete,Local push buttons stations provided for
all motors feeder for emergency start / stop, indicating and recording meter.
(2) 1 No. of 10 Amp / suitable rating ( One Size Higher ) 3 Pole MPCB and 3.7 KW 1 No. DOL Starter having facility of Motor
protection relay with RS 485 computer interface suitable to rated kW of motor of pump set with micro processor based motor
3 protection relay having facility of all type of motor protection like locked rotor, U/v, O/v, E/F, O/A, U/A, Single phasing, Over 1 No. 603853 603853
heating facility and all other required protection etc., complete,Local push buttons stations provided for all motors feeder for
emergency start / stop, indicating and recording meter.
(4) 2 Nos. 32 Amp 4 pole MCB 415 V Feeders (for EOT Crane1 No + Lighting Load 1 No.)
(5)1 Nos. 125 Amp 4 Pole MCCB 415 V Feeders (for APFC Panel)
(6) Capacitor feeder having facility of 75 KVAR App type capacitor Bank with suitable rating capacitor duty capacitor. The wiring
shall be done with Auto / Manual Provision with Pump operation .
(7) All feeder having Ampere Selector Switch and Voltage Selector Switch, Ampere meter , Voltmeter facility. Power Control Centre
(PMCC) totally enclosed type as per IS 2147 and IS-8623, operation on 3 phase 415 V (+/-10 % ), 50 Hz (+/- 5 %) neutral effectively
grounded, IP 54 with Instrument compartments indicating lamps, control contactors as per IS 13947, relays and control fuse air
insulated as per tender SLD , tender specification and data sheet The switchgear as per approved vendor list and Cat- III Only shall
be used and only manufactures at CPRI approved factory and shall be certified by the company whose switchgear are used after
fabrication for beneficial use with panel depth minimum 750 mm throughout. MCCB should be 4 pole and earth fault module with
Aux contacts MCCB ICU=ICS.
GWSSB MECHANICAL SOR 2012-2013 It. No. 3-4-2,4,5,6, 3-8-1 (e),3-10-4,5 (A),4-1-5,6,Sr. No.-20 (F) , Page no.133
4 HT Cables
Design, Engineering, procurement, Installation, Testing and commissioning Power
and control cables 11 kV grade aluminium conductors, UE, XLPE insulated PVC sheatherd
a 50 Mtr 2125 106250
armoured cable etc. 11 KV, 3C x 150 sq.mm. In transformer yard & switch yard cables shall
be laid in cable trays in RCC trenches with RCC covers.make as per annexure.
R&B Electrical SOR Item NO. 10-2-15B page NO. 199.
184
SR.N
DESCRIPTION QTY. UNIT RATE AMOUNT
O.
Design, Engineering, procurement, Installation, Testing and commissioning Suitable size
Heat shrinkable cable end termination kit for 11 KV, 3C cable with weather proof double
b 2 Nos. 9443.5 18887
comprission cable glands, crimping type lugs, joints supporting structure etc.Indoor Type
150 Sq.mm as per cable size.
R&B Electrical SOR Item NO. 10-2-17(B) page NO. 199
c Outdoor type 150sq.mm 2 Nos. 17240.7 34481.4
R&B Electrical SOR Item NO. 10-2-17(A) page NO. 199
LT Cable: S.I.T.C. of XLPE (IS 7098) (I)-88 ISI marked armoured cable multistrand alluminium conductor for 1100V to be
5 laid on wall with necessory clamps or in existing cable trench/pipe at road crossing or floor of following size of cable etc.
complete as per site requirement.
a 3.5 C X 400 sqmm Aluminium Armoured Cable 600 Mtr 1530 918000
b 4C x 95 sqmm Aluminium Armoured Cable 100 Mtr 428 42800
c 4C X 4 sqmm Aluminium Armoured Cable 20 Mtr 81 1620
GWSSB MECHANICAL SOR 2012-2013 It. No. 22 (K), It. No. 23 (A),(I) , Page no.134 & 135
6 Cable Termination
SITC of heavy duty double flange type brass cable glands with rubber ring for suitable size cable complete with out going tails,
insulating tape etc. for following size of cables and crimping type aluminium/copper lugs conforming to IS suitable for cable as
below evenly crimped with high pressure tool and connected to switch gear terminal wiyh brass/cadmium plated nut bolted
nut bolts in an approved manner.
a 3.5 C X 400 sqmm Aluminium Armoured Cable 2 Set 675 1350
b 4C x 90 sqmm Aluminium Armoured Cable 6 Set 243 1458
c 4C X 4 sqmm Aluminium Armoured Cable 2 Set 55 110
GWSSB MECHANICAL SOR 2012-2013 It. No. 28 (a),(g),(m), It. No. 29 (b),(p),(v), Page no.136 to 138
185
SR.N
DESCRIPTION QTY. UNIT RATE AMOUNT
O.
7 Cable Tray & Accessories
Supply, Installation, fabrication, testing & comissioning of G.I perforated type cable tray with G.I coupler plate & nut bolt, tray
a 150 Mtr 632 94800
cover etc. of 150 mm wide (channel size 75x15x2 mm & runner size 35x15x2 mm)
Supply, Installation, fabrication, testing & comissioning of G.I perforated type cable tray with G.I coupler plate & nut bolt, tray
b 200 Mtr 932 186400
cover etc. of 300 mm wide (channel size 75x15x2 mm & runner size 35x15x2 mm)
8 EARTHING & LIGHTNING PROTECTION SYSTEM
Supplying & erecting 600 mm x 600 mm x 3.15 mm thk. Copper earth plate earthing burried in specifically prepared earth pit 3
mtr. below ground with 40 Kg. Charcoal and 40 Kg. salt with alternate layers of charcoal & salt, 38 mm dia Medium Class G. I. Pipe
with funnel with a wire mesh for watering & bricks massanary block, C. I. cover complete as per para 7.3 of IS : 3043 with
a 2 No. 9292 18584
necessary length of double 8 SWG copper earth wire - bolted to the plate and covered in 38 mm dia. G. I. pipe - 2.5 mtr. long
complete connected to the nearest switch gears with end socket as per direction & duly tested by earth tester confirming to ISS &
as per drawing .
R&B Electrical SOR 2012-2013 It. No. 3-14-12© page no.78
b 50 Kg 409 20450
Providing and Erecting required size of Copper strip for earthing of electrical equipment i.e. , Transformer,lighting Arrestor.
GWSSB MECHANICAL SOR 2012-2013 It. No. 3-15-3 , Page no.100
S.I.T.C. of earth pit of minimum bore dia 150 mm size aproved make Safe Earthing Electrode consisting pipe-in pipe Technology as
per IS 3043-1987 made of corrosion free GI Pipe having outer pipe dia of 50 mm having 80- 200 Micron galvanising, Inner pipe
b dia of 25 mm having 200-250 Micron galvanising connection terminal dia. of 12 mm with constant ohmic value 4 No. 10350 41400
surrounded by highly conductive compound with high charge dissipation suitable for following type of applications.:
For Electrical installation covering PMCC Panel i.e. independent earthing in normal soil with Length of Pipe 3.00 mtr. &
Back filling compound 2 No. Bag of 25Kg
GWSSB MECHANICAL SOR 2012-2013 It. No. 3-15-9 , Page no.101
Providing and Erecting required size of GI strip for earthing of electrical equipment i.e. , Transformer,Lightning Arrestor, LT
c 200 Kg 61 12200
panels, DB's, Cable trays etc.
d 50 Kg 68 3400
Providing & erecting Hot dip Galvanising strip iron wire 8 to 16 SWG for Aux. DB, Outdoor Lighting Poles & LPBS etc.
GWSSB MECHANICAL SOR 2012-2013 It. No. 3-15-1 & 2 , Page no.100
Exhaust Fan: (For Pump House)
9 Supply, fixing and commissioning of 350mm dia Exhaust fans including bird louvers, frame works and other civil works like 2 No. 3068 6136
chipping and making the surface good etc.
186
SR.N
DESCRIPTION QTY. UNIT RATE AMOUNT
O.
Point wiring for Individual Plug with & earthwire of 1.5 sq.mm (Green) both are of ISI marked 1.1 KV grade FRLS PVC
insulated multistrand copper wires, in following type of to be erected concealed in / on surface of wall / ceiling complete with
10 Modular type switch & 5 pin Plug erected on PVC / Metallic box covered with appropriate front plate modules erected on /
in wall / ceiling as per pipe erected with following type of accessories.
(a) with medium class Rigid PVC pipe and accessories
single mounting base frame Textured/metallic frount plates. Cat.III 20 Pt. 424.5 8490
R&B Electrical SOR Item No. 1-2-1(a). / page No: 4
187
SR.N
DESCRIPTION QTY. UNIT RATE AMOUNT
O.
Point wiring for Looped Plug with 6A Modular type switch & 5 pin socket erected on PVC / Metallic box, single
11 mounting base frame covered with textured / metallic front plate modules erected on / in wall / ceiling with following type
accessories
single mounting base frame Textured/metallic frount plates. Cat.III 10 Pt. 240 2400
R&B Electrical SOR Item NO. 1-2-4 /Page No:8
Conduits & Pipes
Provinding and erecting 1.5 mm thick FIA approved and ISI mark (embossrd) RIGID PVC pipes of following size
12 complete erected with necessary PVC fitting and junction boxes fixed with adhesive solution and clamps with following type of 300 Mtr 28 8400
erection.
1) For Open execution with clamps erecting on wall/ceiling of following size of Diameter. 25 mm
GWSSB MECHANICAL SOR 2012-2013 Sr. No. 1-4-2 (b) , Page no.49
Providing & erecting PVC corrugated Flexible Conduit with required nos of coupling,PVC buses,check-nuts etc,completeof
13 following sizes. 50 Mtr 20 1000
25 mm Size
GWSSB MECHANICAL SOR 2012-2013 Sr. No. 1-4-4 (3) , Page no.50
Mains with 1.1 KV graded FR PVC insulated ISI marked standard Copper conductor wire in existing pipe erected with 1.5 Sqmm
14 copper conductor FR PVC insulated standard wire of Green colour for earth continuity of following size:
188
SR.N
DESCRIPTION QTY. UNIT RATE AMOUNT
O.
Miniature circuit breaker single pole 6A to 32 Amp suitable to operate on 240 V AC system and having overload and short
18 circuit tripping elements and breaking capacity 10 KA to be erected in existing M.S box conforming to IS 8828/1996 with ISI mark. 12 No. 162 1944
Cat.III
GWSSB MECHANICAL SOR 2012-2013 Sr. No. 3-10-1 , Page no.94
19 Miniature circuit breaker Four pole 63 Amp suitable to operate on 240 V AC system and having overload and short circuit 1 No. 998 998
tripping elements and breaking capacity 10 KA to be erected in existing M.S box conforming to IS 8828/1996 with ISI mark. Cat.III
GWSSB MECHANICAL SOR 2012-2013 Sr. No. 3-10-5 , Page no.95
Indoor Lighting Fixtures:
Supplying and Erecting LED indoor fitting with LED of wattage 0.2W to 0.5W assembled on single MCPCB with housing used as a
heat sink shall be made of thick sheet steel conforming to IS:513/CRCA polyester powder coated and high U.V & corrosion
20 resistance with diffuser and/or polycarbonate optics with company mark/name 120 to 300V, Power factor more than 0.9, THD 10 No. 1400 14000
<10%, CCT 4000K to 6500K, Uniformity ratio > 0.7, Luminarie efficiency > 85 lumens/watt, LED driver efficiency > 85% (Each Fitting
required LM-79 & LM-80 certificates)
36Watts, Surge -4KV , IP-20 , 4Feet (Cat.II)
External Lighting:
Providing and fixing approved make Octagonal poles. Made from CR sheet steel. The pole should be made as per IS.
21 and shall be coated with hot dip galvanizing as per IS 2629/4759. with required base plate suitable suspend local wind 15 Nos. 13900 208500
speed to be erected on existing foundation.
(G) 8 Mtr. Long 70 mm Top X 155 mm bottom dia, 3 mm thickness
R&B Sor-2012-13, Chapter 6 Sr. No. 6-1-4 (G)
Providing street light pole bracket consisting of Light Class MS.pipe of 4.2 cms. outside dia. complete with suitable M.S.
sleeve tubing of approximate 45 cms. and length suitable for 76.5 mm / 80mm. / require size pole top having sufficient
fastners for fixing the brackets and having spread of 1 mtr. length with suitable rise as per site condition & suitable welded
22 15 Nos. 600 9000
stiffener reducer and nipple with check nut complete painted with one coat of Red oxide / PU base primer and two coats of
Aluminium / PU paint. paint with following nos of arms.
[A] Single Arm bracket 1 Mtr
R&B Sor-2012-13, Chapter 6 Sr. No. 6-5-3(A)
Supplying and Erecting LED street liight / food light fitting with High power white LED wattage of 1Watt and above assembled
on single MCPCB, efficiency more than 130lm/w and corrossion free high pressure die cast aluminum housing with
smooth finish powder coated and heat sink extruded aluminum with diffuser and Poly carbonate optics/ lenses with
23 15 Nos. 17500 262500
company mark/name engraved or embossed 120 to 300V , Power factor more than 0.95, THD < 10%, CCT 5000K to 5700K,
Unifornity ratio >0.45, Luminary efficiency > 85 luman/watt, LED driver efficiency > 85% (Each fitting required LM-79 & LM-80
certificates )
189
SR.N
DESCRIPTION QTY. UNIT RATE AMOUNT
O.
120 Watt
R&B Sor-2012-13, Chapter 6 Sr. No. 6-5-3(A)
24 FIRE & SAFETY EQUIPMENTS
Providing printed Instruction Chart both in English and Gujarati and duly framed with front glasses for treatment of
a 2 No. 170 340
person suffering from electric shock.
b Supply 6.00 mm thick Rubber Mat for LT of required length and breadth. 4 No. 611 2444
c Supply of standard First Aid Box with all the standard contents. 2 No. 340 680
GWSSB Elect.-Mech. SOR 2012-13, Section-D, Section 5-2, Item No. 5-
2-5, Pg No. 109)
Supply of CO2 type 4.5 kgs. Fire extinguishers as per ISI & CCE approved and specifications and ISO 9002 certified company of
d 4 No. 5939 23756
approved make like Minimax, Firex, Bharat, Safex with complete accessories.
R&B SOR Gujarat, Item No. 293, Pg. No. 35
Total (Rs.) 6830344
Note:- 11 KV Main Power Supply From GEB to Two Pole Structure cost is in Contractor Scope.
190
191
192
193
194
195
196
197
198
LIGHTNING ARRESTER
6.0 m
TOP LEVEL OF PH
2.0 MT CRANE GIRDER
5.0 m
120.0 m
FFL
HFL.
TIE BEAM TIE BEAM
11.0 m
SILT
FL PIT
DETAIL OF RIVER CROSS SECTION
199
5500 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 8500
1.0m WIDE WALK WAY
120.0 m
M
HO AN
LE
RALING
1m
x1
m
R3000
4000
3000
4.0m WIDE APPROACH BRIDGE 4.0m WIDE APPROACH BRIDGE
00
10