SCHEDULE OF FOOTING SCHEDULE OF

F-1 F-2 F-3 F-4 STEEL COLUMN


3000
2500
2000 1750
SC-1
3000

2500

2000

1750

2000
SC-2

SCHEDULE OF PEDESTAL
P-1 P-2 P-3 P-4
900 800 400 450
SC-3

1200
600

600

600

600

500
SCHEDULE OF BASE PLATE SC-4
BP-1 BP-2 BP-3 BP-4
750 700 300 350
150 150 150 150 150 75 150 150 150 75 88 125 88 100 150 100

2500
150 200 150
150 150 150
100 200 100
125 150 125

450
400

400

500
SC-5

SCHEDULE OF BEAMS
FTB-1 GB-1 LB-1
300 S-2 TYPICAL FOOTING ELEVATION
SCALE: NTS
150 SC-6 a
150
500

300

200

FOR CONSTRUCTION
CIVIL/STRUCTURAL ENGINEER REPUBLIC ACT No. 9266, SEC.33: PROJECT TITLE: DESIGN BY: PROJECT MANAGER: AVP & MANAGER: SHEET CONTENTS: SHEET NO.:
CAD BY: STS
" DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY PROPOSED SMILSI -SCHEDULE OF FOOTING
SIGNED, STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE CHECKED BY:

EVER PACIFIC STEEL INDUSTRIES INC.


191-193 Rizal Ave.Ext(Between 1st & 2nd Ave.)
ENGR. WILLIAM A.L.T. NG INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER
THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL
BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF
SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
MULTI-TEMPERATURE WAREHOUSE
PROJECT LOCATION:
APPROVED BY:
DATE:
BERNARD D. MARQUEZ
-SCHEDULE OF PEDESTAL
-SCHEDULE OF BASE PLATE S
EDUARDO M. AXALAN -SCHEDULE OF BEAMS
Grace Park Caloocan City
Tel.no.: 361-2040 * 367-4288 Telefax No.: 361-6844
PRC REG. NO.: 100656
PTR NO.: VC5873203
TIN NO.: 222-702-031
PLACE ISSUED: VALENZUELA CITY
DATE ISSUED: 01-04-2019
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE,
WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID
DOCUMENTS. "
ULAS, DAVAO REVISION:
DATE:
SIGNATURE SIGNATURE
-SCHEDULE OF STEEL COLUMN
-TYPICAL FOOTING ELEVATION
2

You might also like