You are on page 1of 5
DESIGN/CHECKING PROCEDURE FOUNDATION PLAN DRAWING PROJECT: _DMMWURE SusorpTion} SUBSTATION: REFERENCE MATERIAL {A Geotech Report/Soils Investigation, confirm use © Detail Design Calculations REFERENCE DRAWINGS © General Arrangement Drawing OF Electrical Assembly Plan Drawing GF Steel Structure Drawings © Control Building Drawing(s) Bl Foundation Design Drawing(s) CHECK ITEMS General: DATE: DESIGNER: CHECKER: Ball Here, Nore: VUicKeckep Boxss. AGE NOT APALICRE US TEMAS Site Preparation Drawing(s) Conduit Plan Drawing(s) Oil Containment Drawing(s) Grounding Plan Equipment Manufacture Drawings ooo0oo0 {@ Title Block (Drawing Title and Project Name) A Drawing Number 1 Drawing Revision and Issue Gi Reference Drawings OH, Legend 1B Notes 0D Drawing Layout CO Standards (by CAD Coordinator) Basic Layout: 1 Check Plan against General Arrangement & Electrical Assembly Plan, The Foundation Plan Drawing should be the same scale as the Electrical Assembly Plan, B Baselines ~ aw uve 7 Foundation centerlines @ Dimensions to scale. Check with assembly plan © Cable trench routing and clearance from foundations (arom, [AePROveD: ALDER. [mare Ys97 Trevi) TD Light table overlay with assembly plan 1B No dimensions to edge of foundations, center lines only. 1 Check conduit location with conduit plan Cheek ground grid locations with grounding plan (22-05 (67262009 7:24:00 AM Design/Check Procedures Foundation Plan Drawing Control building location Drive Ramps (for cable trenches) 1 Drive lanes Check foundation orientation and marker location. (compare to detail drawings) 1 Oil containment required? TF Check foundation designations (A1, BI, etc.) against Foundation Design Drawing ‘£1 Check foundation spacing against stee] structures (leg to leg and anchor bolt sizing and patterns) Check foundation locations against existing (abandoned) foundation locations) ‘T.0.C. datum, elevation benchmark description Verify that T.0.C. is above the finished grade elevation, Foundation elevations should be the same for all legs of one structure. Ie trench slope - should be away from control building 1” chamfer on exposed edges Structure foundation grouting Foundation tabulation table Spread footings are shown by a dashed line. Check for interference. Verify correct foundation type is specified and agrees with Foundation Design Drawing. Confirm with major equipment drawings that anchor bolts are correctly sized and located g@ gowosomeRo (022.05 (67262009 7:24:00 AM 2 CHECKING PROCEDURE FOUNDATION DETAILS DRAWE: PROJECT DATE: SUBSTATION: Dau ae DESIGNEK Wesenont CHECKER:_2y owe REFERENCE MATERIAL © Geotech Report/Soils Report O Steel Structure Design Calculations {@ Foundation Detail Design Calculations 1 Oil Containment Calculations 1 Concrete Section - Construction Spec. CE DRAWINGS @ Foundation Plan Drawing CO Steel Structure Drawings 1 Site Preparation Drawing Control Bldg. Manufacturer Drawings 1 Equipment Manufacture Drawings 1 Anchor Bolt Drawing/Tabulation 1 PET Control House (shows cable entrance) Drawing CHECK ITEMS, General EZ Title Block (Drawing Title and Project Name) (Drawing Number Drawing Revision and Issue Reference Drawings Legend Notes Drawing Layout Standards (by CAD Coordinator), oogs@o Calculations: Loading is developed from structure or equipment on foundation J Confirm loading criteria, seismic, wind, conductor tensions, ete (arom DER [OAT 357 TET] (& Computer run or hand calculations for foundation and rebar sizing Confirm computer run or hand calculations for baseplate and anchor bolt sizing (Check oil containment volume design calculations 022-06 (262009). ' Design/Check Procedures Foundation Design Drawing (1 Check oil containment loading calculations for installing transformer (cribbing, wall support?) Soils: 4 Geotech Report is available Soil parameters are present CO Adequate drainage is provided under stabs for non-porous soils (clay) Check for soil swelling due to expansive clays W Confirm frost depth CO Problem soils, fill area? Cheek rebar: Placement per Concrete Reinforcing Steel Institute Zonerete coverage -- 3” to soil, 2” 10 air No welding, wire ties only Adequate steel is provided for expansion Rebar hoops do not interfere with anchor bolt eage diameter Rebar is or is not grounded Bauged Check Anchor Bolts: Size and pattern agree with steel & major equipment drawings Development length is adequate Anchor bolts ate galvanized (minimum = projection + 4 inches) Quantities tabulated are correct (confirm anchor bolt qty’s vs. anchor bolt cages include leveling nuts, washers, baseplate, and top nut Nuts & washers are correct Foundation size is large enough for baseplate of structure or equipment with appropriate margin Note on drawing for Contractor furnished or steel supplier furnished anchor bolt templates a Seen Other: Concrete volumes are not on drawing. If volumes are on the drawing, confirm note for neatline volumes, and it is the Contractor's responsibility to determine actual volumes. TB Anchor bolts are ordered-> Rebar quantities are determined by the manufacturer Foundation Tabulation: [Check that all foundation types shown on foundation plan and represented by foundation design calc’s are accounted for Check quantities of each foundation type Cheek conerete quantities per foundation type Check anchor bolts, nuts, and washers for quantity material and designation Bi) ex. (Qty = 4; Material = A307; Designation 022.06 (262009))8 2 Design/Check Procedures TF Anchor bolt size and pattern match corresponding structures and equipment 622.06 2672009}, 3

You might also like