• Section 1 - Purpose
• Section 2 - Scope
• Section 3 - Definitions,
Definitions Abbreviations
Abbreviations, and Acronyms
• Section 4 - Administration and Enforcement
• Section 5 - Building Envelope
• Section 6 - Heating, Ventilating, and Air Conditioning
• New buildings
g and their
systems
• New systems
y and
equipment in existing
buildings (alterations)
10
11
12
13
• N
New bbuildings,
ildi additions
dditi tto existing
i ti b buildings,
ildi
and alterations to existing buildings
• Replacement of portions of existing buildings
• Changes in space conditioning
14
• Compliance documentation
• Construction documents
• Supplemental information
• Manuals
• Labeling of materials and equipment
– Fenestration, doors, insulation, mechanical equipment, and
packaged terminal air conditioners
• Inspections
15
16
Prescriptive
Envelope
Option
Mandatory
HVAC
Provisions Trade Off
Energy Code
(required for most Option C
Compliance
li
SWH compliance options)
Power Energy C
E Costt
Budget
Lighting
Simplified
Other
17
18
19
20
21
22
• H
Has a h
heating
ti system
t with
ith a capacity
it > 33.4
4 Bt
Btu/h.ft
/h ft2
(10 W/m2) of floor area but is not conditioned space
• Space is not cooled at all
23
24
• Zones based on
severall climatic
li ti
parameters
– Locations listed
in Appendix B on
county-by-county
basis for United
States
25
Prescriptive
Envelope
Option
Mandatory
HVAC
Provisions Trade Off
Energy Code
(required for most Option C
Compliance
li
SWH compliance options)
Power Energy C
E Costt
Budget
Lighting
Simplified
Other
26
27
• Building
g envelope
p sealing
g
• Fenestration and doors
• Loading dock weatherseals
• Vestibules
28
29
• NFRC 400
• Labeled and certified by
manufacturer
• Glazed swinging entrance doors
and revolving doors – not to
exceed 1.0 cfm/ft2
• All other
th products
d t – nott to
t exceed
d
0.4 cfm/ft2
• Exceptions
– Field-fabricated fenestration and doors
– Garage doors – ANSI/DASMA 105
30
31
• Required in
– Climate Zones 3 3-4
4 for entrances in >4
story buildings > 10,000 ft2
– Climate Zones 5-8 for entrances in
g
buildings
> 1000 ft2
• Vestibules must have:
– Self-closing doors
– Interior and exterior doors not open at the
same time
– Distance between interior and exterior
doors not
< 7 ft when in closed position (remember
ADA!)
32
• Non-entrance doors
• Building entrances with revolving doors
• All building entrances in climate zones 1 and 2 OR in
buildings < 4 stories and < 10,000 ft2 in climate
zones 3 and 4 OR in buildings < 1000 ft2 in climate
zones 5-8
• All doors that open from spaces < 3000 ft2 (separate
from building entrance) OR from dwelling units
33
Prescriptive
Envelope
Option
Mandatory
HVAC
Provisions Trade Off
Energy Code
(required for most Option C
Compliance
li
SWH compliance options)
Power Energy C
E Costt
Budget
Lighting
Simplified
Other
34
• Rules:
– WWR ≤ 40% of gross wall area
– Skylight-roof ratio ≤ 5% of roof area
– Each envelope component must separately meet requirements
• 8 criteria sets for different climate types
– Set = single page that summarizes all prescriptive requirements
• Insulation levels for roofs,, walls,, floors
• Fenestration criteria
35
• Compliance
– Meet or exceed minimum R-values in table
• Only R-value of insulation, not to include air films, etc
OR
– Meet maximum U-factor,
U factor, C-factor,
C factor, or F-factor
F factor for the entire
assembly
OR
– Perform area-weighted
area weighted average U-factor
U factor, C-factor
C factor, or
F-factor
• Only if there are multiple assemblies within a single class of
construction for a single
g space-conditioning
p g category
g y
36
37
38
39
40
41
42
43
44
45
46
47
Opaque Doors
Swinging U-0.700 U-0.700 U-0.700
Non-Swinging
Non Swinging U-1.450
U 1.450 U-1.450
U 1.450 U-1.450
U 1.450
48
49
50
51
• Vertical fenestration
– SHGC values < Table value for appropriate
total vertical fenestration area
• Skylights
– SHGC values < Table value for appropriate
total skylight area
• No SHGC requirements for
semiheated spaces
• No criteria for Visible Light
Transmittance in Prescriptive Building
Envelope Option, but there are
minimum
i i criteria
it i iin th
the T
Trade-Off
d Off
Option (Details in Appendix C)
• Exceptions
52
• The glazing
glazing’s
s effectiveness in rejecting solar heat gain
• NFRC 200
• Exceptions
– SC x 0.86 is acceptable for overall fenestration area (NFRC 300)
– SHGC of center-of-glass is acceptable (NFRC 300) for overall
fenestration area
– SHGC from
f A8.1
A8 1 for
f glazed
l d wallll systems
t in
i vertical
ti l fenestration
f t ti
and skylights
– SHGC from A8.2 for other vertical fenestration
53
54
55
56
Prescriptive
Envelope
Option
Mandatory
HVAC
Provisions Trade Off
Energy Code
(required for most Option C
Compliance
li
SWH compliance options)
Power Energy C
E Costt
Budget
Lighting
Simplified
Other
57
• Building
g complies
p if
– It satisfies the provisions of 5.1, 5.4, 5.7,
and 5.8
– Envelope performance factor (EPF) of
proposed building is ≤ EPF of budget
building
• EPF considers only the building envelope
components and is calculated using
procedures in Normative Appendix C
• Schedules of operation, lighting power,
equipment power, occupant density, and
mechanical systems to be the same for
both the proposed building and the budget
building
58
59
60
61
62
• Insulation Protection
– Cover exterior insulation
with protective material
• Sunlight
• Moisture
• Landscaping operations
• Equipment maintenance
• Wind
– Access to attics and
mechanical rooms without
damaging or compressing
insulation
– Insulation materials in ground
contact to have a water
absorption rate ≤ 0.3% (ASTM
C272)
63
• Roof Insulation
– Not installed on a suspended
ceiling with removable ceiling
p
panels
64
Prescriptive
Envelope
Option
Mandatory
HVAC
Provisions Trade Off
Energy Code
(required for most Option C
Compliance
li
SWH compliance options)
Energy C
E Costt
Power
Budget
Lighting
Simplified
Other
65
• Equipment
q p - New equipment
q p shall meet the minimum
efficiency requirements
• Cooling systems
– New cooling systems installed to serve previously uncooled
spaces shall
h ll complyl with
ith thi
this section
ti
– Alterations to existing cooling systems shall not decrease
economizer capacity (unless economizer tradeoff is used)
• Ductwork - New and replacement ductwork shall
comply with applicable requirements
• Piping - New and replacement piping shall comply with
applicable requirements
66
67
• Section 6.2
• You have to follow Sections
– 6.1 General,
– 6.7 Submittals, and
– 6.8
6 8 Minimum Equipment Efficiency,
Efficiency
• And then you can follow either
– Section 6.3 Simplified Approach OR
– Sections 6.4 Mandatory Provisions and 6.5 Prescriptive Path
Alternatively, you can follow Section 11 (ECB), in which
case Section 6 6.4
4 is mandatory
68
• Limited to…
– Buildings
B ildings with
ith 1 or 2 stories
– Buildings < 25,000 ft2
– Single-zone systems (unitary or split)
– Air-cooled or evaporatively cooled
69
70
71
72
73
• Equipment Covered
– Package air conditioners and condensing units
– Heat pumps (air, water, and ground source)
– Packaged terminal and room air conditioners
– Chillers including absorption chillers
– Furnaces and unit heaters
– Boilers
– Heat rejection equipment
74
75
76
77
78
79
80
81
• Automatic 7-day/week
y time clock with 10-hour batteryy
backup
– Exception: 2-day/week thermostat for residential applications
• Each
E h control
t l tto have
h
– Occupant sensor, OR
– Manually-operated timer with maximum two hour duration, OR
– Security system interlock
• Exception
– Residential occupancies allowed to operate with only 2 different
time schedules/wk
82
83
84
• Applies to
– Each floor in a multistory building
– Maximum 25,000
25 000 ft2 zone on one floor
• Requirements
– Isolation devices to shut off outdoor and exhaust
airflow
i fl when
h >5 5,000
000 cfm
f
– Central systems shall be capable of stable operation
with one isolation zone
Capable of separate time schedules for each isolation
zone
85
86
• Motorized dampers
p
– Can be automatically closed during normal building operation
– Interlocked to open as required by fire and smoke detection
systems
87
88
• Motori
Motorized
ed dampers for
outdoor air supply and
exhaust systems
• Ventilation outside air
dampers to be capable of
automatically shutting off
during
– Preoccupancy building warm
up, cool down, and setback
((Except
p when ventilation reduces
energy costs or when
ventilation must be supplied to
meet code requirements)
89
• Exceptions:
– Gravity dampers okay in buildings
• < 3 stories in height
• Of any height in climate zones 1-3
– Outdoor-air intake or exhaust < 300 cfm
• Table 6.4.3.3.4 provides maximum leakage rates for
outdoor air supply and exhaust dampers
90
• Where OA supply
pp y and exhaust air dampers
p are required
q
by Section 6.4.3.4
– They shall have a maximum leakage rate when tested in
accordance with AMCA Standard 500 as indicated in Table
6.4.3.4.4
91
92
• Controls to p
prevent supplementary
pp y heat when heat p
pump
p
can handle the load
• Exception
– Heat pumps
• With minimum efficiency regulated by
NAECA
• With HSPF rating
ti meeting
ti TTable
bl 66.8.1B
8 1B
(Includes all usage of internal electric resistance heating)
93
• A
Automatic
t ti valve
l to
t shut
h t off
ff preheat
h t when
h humidification
h idifi ti
isn’t required
94
95
• Automatic
A t ti controls
t l for
f
– Freeze protection systems
• outside air temperatures > 40°F or when conditions of protected
fluid will prevent freezing
– Snow- and ice-melting systems
• pavement temperature > 50°F and no precipitation is falling and
outdoor temperature > 40°F
96
97
Exceptions:
Systems with exhaust-air energy recovery complying with Section
6.5.6.1
Multiple
u p e zone
o e sys
systems
e s without
ou DDC C to
o the
e zone
o e level
e e
Systems with a design OA airflow <1,200 cfm
Spaces where supply-exhaust <1,200 cfm
98
99
100
101
• Table 6.8.3
• Exceptions
– Factory-installed
– Piping conveying fluids
• design operating temperature range between 60°F-105°F, inclusive
• that haven’t been heated or cooled through the use of
nonrenewable energy or where heat gain or heat loss will not
increase energy usage
– Hot water piping between shut off valve and coil, not > 4 ft in
length, when located in conditioned spaces
– Pipe
Pi unions
i iin h
heating
ti systems
t ((steam,
t steam
t condensate,
d t and d
hot water)
102
6.4.4.2
• Based on standard
industry practice
and definitions
103
• Designed
g > 3 in. w.c.
– Leak tested
– Representative sections
≥ 25% of the total installed
duct area shall be tested
– Ratings > 3 in. w.c. to be
identified on drawings
– Maximum
M i permitted
itt d duct
d t
leakage
• Lmax = CLP0.65
Where Lmax = maximum permitted
leakage in cfm/100 ft2 duct
surface area
104
105
prescriptive
requirements
(§6.5)
mandatory
provisions
(§6 4)
(§6.4)
Energy
Simplified
Cost
Budget
Approach
Method
Option
(ECB, §11)
(§6.3)
Simplified
proposed 90.1-compliant
Approach
HVAC design Option (§6.3) HVAC system
106
107
108
• Exceptions:
• Cooling capacity - Table 6.5.1
• Systems with gas phase air cleaning per Standard 62
• Where >25% of the air must be humidified >35°Fdp
• Systems with condenser heat recovery per 6.5.6.2
• Residential systems <5X limits in Table 6.5.1
• Systems with a balance point <=60°F
• Systems expected to operate < 20hrs/wk
• Systems serving zones with refrigerated casework
• Where cooling efficiency exceeds Table 6.3.2
109
110
111
112
113
114
115
116
Valve
Closes
water-to-water heat
Valve In
Evaporator
Out Primary
Cooling Out CHWP Secondary
either
ith CWP
2-Way
Typical
yp
Cooling
OR Coil
use With
Tertiary
Pump
CHWS CHWR
117
118
• Designed so economizer
operation doesn’t increase
the building heating energy
use during
d i normall operationti
• Exception
– Economizers on VAV systems
that cause zone level heating to
increase due to a reduction in
supply
pp y air temperature
p
119
120
121
122
123
124
125
126
127
• Systems
y with hydronic
y
cooling and Valve
Closes
In
designed to maintain
Evaporator
Out Primary
Cooling Out CHWP Secondary
Tower CHWP
Condenser With
Typical
6.5.1 Cooling
Coil
Co
With
Tertiary
Pump
CHWS CHWR
128
129
• Table 6.5.3.1
• Allowable fan system power may be adjusted if
– Air systems require air treatment or filtering systems with
pressure drops > 1 in. w.c. when filters are clean, or heat
recovery coils or devices
devices, or direct evaporative
humidifiers/coolers, or other devices to serve process loads in
the airstream
– design room temperature – supply air temp at cooling design
condition = > 20°F, allowable fan system power may be
adjusted
• Exceptions
130
131
132
133
134
135
136
Exceptions:
• Systems where
– Minimum flow is < minimum flow required by equipment
manufacturer for proper operation of equipment served by
the system
– Total pump system power ≤ 75 hp
• Systems that include ≤ 3 control valves
137
138
139
• For heat pump loops with total pump system power > 10
hp
– Two-position valves at each hydronic heat pump must be
provided
id d and
d interlocked
i t l k d tto shut
h t off
ff water
t flow
fl to
t the
th heat
h t pump
when the compressor is off
• This basically converts the system into a variable flow system. As
such these systems must also comply with 6
such, 6.3.4.1
341
140
141
142
Required if:
Supply air capacity ≥ 5,000 cfm
Minimum outdoor air ≥ 70%
Recovery system effectiveness ≥
50%
Exceptions (9)
Labs, toxic exhaust, etc.
Largest exhaust < 75% outdoor
airflow
143
144
145
146
147
148
≤ 240,000
, Btu/h
/ 50%
149
• Record drawings
g
• Operating and maintenance manuals
• System balancing
• System commissioning
150
151
• O
Operating
ti andd maintenance
i t manuals
l tto building
b ildi owner
within 90 days of system acceptance and include several
items
152
153
154
• C
Control
t l elements
l t are calibrated,
lib t d adjusted,
dj t d and
d iin proper
working condition
• > 50,000 ft2 conditioned area
– Except warehouses and semiheated spaces
– Requires commissioning instructions
155
Prescriptive
Envelope
Option
Mandatory
HVAC
Provisions Trade Off
Energy Code
(required for most Option C
Compliance
li
SWH compliance options)
Energy C
E Costt
Power
Budget
Lighting
Simplified
Other
156
157
• SWH equipment
q p installed as a direct replacement
p shall
meet these requirements unless there is not sufficient
space or access to meet these requirements
158
• Section 7.2
• You have to follow Sections
– 7.1,
– 74
7.4,
– 7.5,
– 7.7, and
– 78
7.8
• Alternatively, you can follow Section 11 (ECB), in which
case Section 7.4 is mandatory
159
160
• Section 77.4.2
4 2 refers to Table 7
7.8
8 for equipment
efficiencies
• Equipment not listed in Table 7.8 has no minimum
performance requirements
• Exception
– Water heaters and hot water supply boilers > 140 gal storage
capacity
it don’t
d ’t h
have tto meett standby
t db lloss requirements
i t when
h
• Tank surface is thermally insulated to R-12.5, and
• A standing pilot light isn’t installed, and
p or fan-assisted
• Gas- or oil-fired water heaters have a flue damper
combustion
161
162
• Temperature Controls
• Temperature Maintenance Controls
• Outlet Temperature
p Controls
• Circulating Pump Controls
163
164
165
• Controls provided
– To limit maximum temperature of water delivered from lavatory
faucets in public facility restrooms to 110°F
166
167
168
169
170
171
172
Prescriptive
Envelope
Option
Mandatory
HVAC
Provisions Trade Off
Energy Code
(required for most Option C
Compliance
li
SWH compliance options)
Power Energy C
E Costt
Budget
Lighting
Simplified
Other
173
• Voltage drop
• Submittals
174
175
176
Prescriptive
Envelope
Option
Mandatory
HVAC
Provisions Trade Off
Energy Code
(required for most Option C
Compliance
li
SWH compliance options)
Energy C
E Costt
Power
Budget
Lighting
Simplified
177
Additional Allowances
178
179
• Scope
– Interior spaces of buildings
– Exterior building features
– Exterior grounds lighting powered through
building
– Exceptions
• Emergency lilighting
E hti
• Lighting required by life safety statute
• Lighting within dwelling units of buildings
• Decorative gas lighting
• Lighting Alterations – New lighting and
lighting controls must comply with this
section, unless an alteration replaces
less than 50% of luminaires in a space
and that alteration does not increase
the installed lighting power
180
181
183
184
185
Example application:
– Strip mall – individual business unit
186
187
1. Compliance options:
Control lights on a scheduled basis
(
(automatici time
i switch)
i h)
• Time-of-day controller
• Controls ≤ 25,000 ft2 and not more than one
flfloor
2. Occupant sensor
• Turn lights off within 30 minutes of occupant
l
leaving
i ththe space
3. Signal from another control or alarm that
indicates the area is unoccupied
188
189
190
• Exceptions:
– Separated surface or pendant luminaires
– Recessed luminaires more than 10 ft apart
– Other luminaires
• With three-lamp ballasts
• On emergency lighting circuits
Eliminate use of single lamp, low-frequency ballast where possible
• With no available pair
• With one lamp, high frequency, electronic ballast
191
192
193
194
195
196
197
Tradable Surfaces
(Lighting Power Densities for open parking areas, building grounds, building entrances and exits, canopies and overhangs, and outdoor
sales areas may be traded)
Building Grounds
Walkways 10 feet wide or greater, Plaza areas and Special feature 0.2 W/ft2
areas
Stairways 1 0 W/ft2
1.0
198
Outdoor Sales
Street frontage for vehicle sales lots in addition to “open area” 20 W/linear foot
allowance
199
Building facades 0.2 W/ft2 for each illuminated wall or surface or 5.0 W/linear foot
for each illuminated wall or surface length
Automated teller machines & night depositories 270 W per location plus 90 watts per additional ATM per location
Entrances and gatehouse inspection stations at guarded 1.25 W/ft2 of uncovered area (covered areas are included in the
facilities Canopies and Overhangs section of Tradable Surfaces)
200
Non-Tradable Surfaces
Loading areas for law enforcement, fire, ambulance and 0.5 W/ft2 of uncovered area (covered areas are included in the
other emergency service vehicles Canopies and Overhangs section of Tradable Surfaces)
201
• Lots of exemptions
p
• Calculation methods
– Building area
– Space-by-space
– Trade-offs of interior lighting power allowance among portions
of the building for which a different calculation method has
been used is not permitted
202
203
204
205
206
207
208
209
Where:
Retail Area 1 = the floor area for all products not listed in Retail Area 2, 3 or 4.
Retail Area 2 = the floor area used for the sale of vehicles, sporting goods and
small electronics.
Retail Area 3 = the floor area used for the sale of furniture, clothing, cosmetics
and artwork.
Retail Area 4 = the floor area used for the sale of jewelry, crystal, and china.
210
• Th
There are no submittals
b itt l associated
i t d with
ith th
the lilighting
hti
requirements
211
Envelope Prescriptive
Option
HVAC Mandatory
Provisions Trade Off
Energy Code
SWH (required for most Option C
Compliance
li
compliance options)
Power
Energy C
E Costt
Budget
Lighting
Simplified
Other
212
213
214
215
216
• Developp yyour p
proposed
p building
g design
g and budget
g
building design in accordance with Table 11.3.1
– This table “locks down” a number of building design parameters
• Ch
Choose your bbudget
d tb building
ildi HVAC system
t ffrom Fi
Figure
11.3.2 and Table 11.3.2A
217
218
219
220
221
222
223
• Oth
Other useful
f l references
f that
th t are nott mandatory,
d t but
b t are
useful as examples for the user of Standard 90.1-2007
• In general, these are not consensus documents so
ASHRAE procedures do not allow them to be
mandatory references