Detailed Method Statement for Stay Cable adjustment
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
CConsunrmey Sekuces ron ConSTRUCTION SUPERVIION OF He NEW BivBGE
ACROSS RIVER ILE AINA
@ & be
Theor ven Cretlzmstrt a
{eh pan nga Cosas ad
"natn grainy Coho
Dae: 20" Apt, 2018
Ret No. OCIV-Con-298
To: Zenitaka-yundai Joint Venture
ot 6 Kyemba Clee, Nakenye
Mpurde’ Kinala Division,
sin Manly = Ue
Attention: Me. ML Lhitawa, Project Manager
{LOAN NO. UD-P4: CONSTRUCTION OF A NEW BRIDGE ACROSS RIVER NILE ATJINIA
INAL STAY CABLE NT
“The Conc etation is ean to Special Spesftions 8033 whee tne Contactar is equed wo
sbi il eis nd procedures eral fina cal disiments tothe Engine fr eve and poral,
The Spies sea reqie tt these dtl shuld nce al elaine an dts ncesary to
sccompish fil nse, sal equipment el device pepo fre,
‘The Contacto’ teat i als nn tothe Monthly Meng 47 be on 1° Mich, 2018 where he
Engine erated he Contact onl abs method sare fo Fil Stn Cable Aimer
work the flowing: Teasinn Fase of Stuy Cable before and ws dimen Calton for
Maxima Teasion Face of Stay Cable considering Live Load jut afr bide completion,
Caleltios for Maxinum Tension Fore of Say Cables consceiag Live Lod fr 120 yen ater
‘completion; Camber and eror of camber bear ad ar adpstsen; mace sea ier ant
pylon consdeiag Live Lead, and sequcee of ating work for cash sy cable ual is tage
‘erioning force ring austen work,
Given tain the most cet esky esting eld on 18" Api, 218 the Contractor reported tht he
Ines to commence sy ete aestnent work co 9 May, 2D18, the Eaplaerharey request the
Contractor to mae is subnsion as oan os posible alow the Egor adegune ine o eview
‘Your prompt ponte inthis mater wl be realy sores
Yours aint.
at
Telos Van res Cnt C,
Eohclpn agong Covel
Peet Eagicstng Conan
TFROJECT OFFICE: en Nie Proje Oe Pat Kye Gv Nee (0'00en,
'MPUMUODERIVAKA DIVISION. N/A MUNICIPALITY“ UGANDA
EADQUARTERS- 121, Honma! heme Shite, eyo 15-07. gee
Sees Facvebaatr aio Boa inguinalston amen fr fe nso New ne es
1 £6035 Shap ane Working Drivingt
i ‘Tae Contactor sball submit fo the Eagioeer for seview and approval complete
eal shop and working deawings wi applicable schedles and ble for all,
] ‘segments: Dimensions and complete descriptions of all devices such as shesth guide
pie, necesey insets and exchorge not specified or detailed on the Drawings shall
| te indated,
‘The Contractor shill submit to the Engines for sevew and approval 2 complete
1 rethedsttement for te feriestion,eonsirieson and eretoa al of the main box
fice segmental work The method statement shal aclde, bat not neernry be
United te folowing:
a © Coneacaes denis of proponed manuietae, stage, amper, rston and
| (i), Sequence of report open
(Gi) Ceomeric contol proces, Indaing eupme! (0 be wed mes ed eins
(onetie conve! docsmenainn tncasng ching Sony eeieg cave ft ond
() Sermo ceasing systems ad vial
| (9) Fomine, inning stn and ati,
(0) Posteig of seat te be conse by fm tae oo akework (ing into
cou th cheved aes alignments) 50 fo pods the eed sige pn
| sonpletn.
(ip summery ofl clean lant esunpionsinling eles of hegre
‘amber ng ine econ! ie fe af exp aolage an empete
(iF denile ane calelaione fo empoay sates ining eeton res ad
fepecry basa
- (2) roped method fr be cliente jacking frst denen fr the stay
©) A sep hate cotimain ofthe trey ad serviablity ofthe sucte at each
stage const
| (4) Joint ination rovers and materi, nclaing jens beeen ede of he pi
tse the sanoing ng
(i) Pl dais ofepot eke fr temporary certacton
(anv vat oe fe econ st ee en peg pt
(G0) Consierion oon sed efoto sal be ego
oon Cube Test onus Pro to The Main Box Ger Segent Stesing
‘The sontctor sal subi he Engines for nforestion snd comment lle
coe” concrete fest ess a8 used for tabbing the cerimencemen af pre L
Stessing operons. The pe-seesing opens wall not peed wheat the JV
Engineers prove.
eres 6 000477Method Statement for Final Stay Cable Adjustment
(Required information)
Tension force of stay-cable before adjustment
‘This estimate value is not mentioned in the offcial "Geometric Control
Documents", We received unofficially i. Anyway actual tension force is
different from estimate force. So please submit the tension force of stay-cable
before adjustment
Tension force of stay-cable after adjustment (tension determined by
design)
This estimate value is not mentioned In the offcial “Geometric Control
Documents". Even ifit is mentioned in the documents, itis the most impcrtant
‘matter in Final Stay cable Adjustment Work. Please mention this mattor in the
‘method statement
Maximum tension force of stay-cable considering the live load at
the just after bridge completion,
‘The authority and responsibilty forthe selection and decision of the
‘construction method are in the contractor. Since the foree of stay-cable ard
‘stress of pylon and girder after completion bridge is changed depending on
‘construction method and construction speed for this type bridge. The stress
States in this bridge after completion according contractor's construction
‘method vill be change from DD.
Therefore, the contractor needs to determine the final [Link] adjustment
{force under the confirming that Stay-cable and Pylon and Girders stresses at
the most severe situation after completion.
‘Therefore, we also ask for submission ofthis matter from the contractor
Maximum tension force of stay-cable considering the live load after
120 years from completion
‘As same as 3.‘Camber and error of camber before adjustment
Please mention the result
Expected camber and error of camber after adjustment,
It has already deviated from the target pre-camber value (Compared with
Unofficial received Table). Please use the result of 5, and indicate that the
‘expected camber error after adjustment and confiem is within the allowable
value.
Even if the target force of the final adjustment is as same as your unofficial
submitted table, the final adjustment amount wil be different. (Tension force of
slay-cable before adjustment willbe changed)
Maximum stress at the girder and pylon considering the live load
‘As same as 3.
‘Sequence of adjusting work for each cables and target tensioning
force during adjustment work
‘The before adjusted cable tension is influenced by the cable adjustment
afterwards and the tension will be changed. For this reason, Individual
adjustment force is not (2.-1.). (Individual target forces are diferent from 3.)
In the method of statement, Please describe the target value (adjustment
amount) for each cable.
Ityou take other measures, please indicate it
6 March 2018
Furukawa7
‘48 Construction Plan
‘Abutment AI, Pylon Pl and P2 are founded on the cstnsitu bored ples whereas Abutment A2 is
iret founded onthe ground
‘oiedpat Eger Cons
Eee Sey
‘The temporary jetty between Al and PI shall be provided forthe access te PI and the temporary
staging is equired fo the constuction of te piles in PL
‘The main pide shal be consueted bythe balanced cantilever consrcton at both sides of PI and
the main span side of P2 whereas it shall be contracted onthe faleweek atthe side span side of P2
andthe end span near Abutment AL.
‘These procedures are shown bebw.
“Fas Deon pei Page BESTDifference fom DD
‘Temporary stay onble ie used forthe actual consteustion
‘A sido fll staging construction longth is changed. (3.5m to 225m)
Influence ofercep and dey shrinkage duo to diferent conoteuction progr
Difference of stay cable ansisn. diffrence of adjustment tension)PROCEDURE OF P1 CANTILEVER ERECTIONTABLE 2 ~ STAY CABLE DATA 2
~ Stay CABLE ONT 1
TBE
DETAL OF ABLE STRAND=e [sre t=T=