You are on page 1of 1

Technical Manual

Installation Procedure:

1, Carefully remove cabinet from packaging.


2, Carefully position cabinet into the required position.
3, Drill minimum 8mm holes into the required fixing position. Fixing positions can only be
where the cabinet is reinforced or in the feet of the cabinet. See technical drawings for
reinforcement positions. Do not drill into the sides of the cabinets less than 50mm from
the back.
4, Put fixing bolts through the cabinet, use a spreading washer on the bolt head, and on
the nut. A lock nut is required for security.

Operation:

1, Open door using handle. Take care that the wind does not catch the open door, as
harm could come to the operator and the cabinet.
2, Place contents in the correct positions.
3, Close door firmly and ensure it is properly shut.

Maintenance:

1, Clean periodically with mild soapy water.


2, Remove any debris from the door returns.
3, Check that all the cabinet fixings are in place and properly secured.

Spares:

1, There are no recommended spares neccesary for the initial 2 year period.

You might also like