Cooling Tower Make-up Water Demad (Option 1)

Cooling capacity = 25,845 TR (Calculated value for the project)


Condenser water flow rate = 293,496 L/min ( Flow rate = 3GPM per tonnage)
Evaporation Loss = 0.83 % As per the manufacturer data (Kingsun)
Drift Loss = 0.002 % As per the manufacturer data (Kingsun)
Cooling Tower Makeup Water = 2,441.89 L/min
demad
Cooling Tower Operating Hours = 10.00 hr
= 1,465,131 L/day

Total Water Demand = 1,465 m3/day (Evaporation loss may vary depend on RH)

Cooling Tower Make-up Water Demad (Option 2)

Cooling Tower Makeup Water Evaporation


= + Drift loss + Blow down
demad loss

circulation flow = 17,610 m3/h


Drift loss = 0.20 %
No of Cycles = 4

Evaporation loss = (0.85*(1/100)*ΔT)/(5.56)*circulation flow


= 0.00153*ΔT*circulation flow
= 134.715 m3/h

Drifft loss = Drift loss *circulation flow


= 35.219 m3/h

Blow down = Evaporation loss/(cycles of concentration-1)


= 44.905 m3/h

Cooling Tower Makeup Water = 169.934 m3/h Not considering the blow down

Assumed operation hour = 10 h

Cooling Tower Makeup Water =


1699 m3 /day

By Considering 2 option Take maximum value


So ,
Cooling Tower Makeup Water =
demad 1699 m3 /day
ata (Kingsun)
ata (Kingsun)

y depend on RH)

Blow down
1
No of out patients = 50 2
Daily Water consumption for out patients = 10 Litres 3
Diversity Factor = 0.8 4
Daily Water Demand for out patients = 0.4 m3 5
6
No of in patients = 20 7
Daily Water consumption per in patients = 50 Litres 8
Diversity Factor = 0.8
Daily Water Demand for customers = 1 m3

No of Staff members in the building = 30


Daily Water consumption for Staff members = 50 Litres
Diversity Factor = 0.8
Daily Water Demand for Staff members = 1.2 m3

For Lab Facilities = 3 m3

For Restaurant = 1 m3

Total Water Demand = 6 m3


180
420
460
450
430
430
430
430
3230