You are on page 1of 3
Br BINA TAMSHAH SDN BHD (208035-D) METHOD STATEMENT FOR DEMOLITION WORK OF EXISTING BUILDING STRUCTURE IN KLR342 & KLR301 PEMBINAAN LOJI RAWATAN KUMBAHAN SERANTAU BATU, JINJANG KEPONG, KUALA LUMPUR. NO. KONTRAK: KeTTHA/JPP/BATU STP/GKL/RL/15/K10 REF NO: BTSB/JPP/MSAF-SF/DEBS/049 SCOPE OF WORK ‘he mead statement shall be weed for demotion wat of existng buling stuctra In R342 8 KLRSO1 coves 2. RESPONSIBILITY a. Proectanager bEnginooe © Ste Siperiser 4. Gane Ware 3. PLANT, MACHINERY AND EQUIPMENT ‘The deployment of mechineres wi ba aranged pending avait f te te and base on ‘vealprogtes sched. The proposed machines ae sed Figure 2: No. [tems Unit ‘Quantity Remarks | 1. | Hammer Breer set a 2 | excavator Set 2 3_|bumptorry Set 4 4 | Eauipment supp ned igre 94 Machinery Plane 4, PREPARATORY WORKS ‘Oban the ania pectieaton tocar out he constuction, ‘5, DEMOLITION WORK a. Hacking Hacking even btn by machinery. >. Dispos unis spose t designated and approval rea by fry. 6. SAFETY AND ENVIRONMENT MEASURES [the te wok must flow the Occupation! Safety and Heath At 1296, Factory and Machines Act 1987 snd Entonmeatl Quay Act 1976

You might also like