Service Item Description

Nokia Solutions and Networks


Claro Colombia

Project Bundle 2014 – Construction Works


NI Services

Partner Document
13/February/2014
Table of Contents

1. Overview ........................................................................................... 4
2. Service Item Description ................................................................... 5
2.1 00035253 SA for one existing site / all types / Evaluation .............................................. 5
2.2 00001221 Site Design, new macro site ........................................................................ 7
2.3 00002905 Ground investigation ................................................................................... 8
2.4 00068639 GF site preparations and finishes ................................................................ 9
2.5 00033336 S Pedestrian gate, GF site .......................................................................... 10
2.6 00038497 M Pedestrian gate, GF site ....................................................................... 11
2.7 00069336 S Pedestrian metallic door, GF site ............................................................. 12
2.8 00069436 M Pedestrian metallic door, GF site .......................................................... 13
2.9 00069337 S Vehicle metallic door, GF site .................................................................. 14
2.10 00069437 M Vehicle metallic door, GF site................................................................ 15
2.11 00068566 S Site fencing, GF site .............................................................................. 16
2.12 00068629 M Site fencing, GF site .............................................................................. 17
2.13 00068621 M Masonry wall, GF site............................................................................ 18
2.14 00068589 S Masonry wall, GF site ............................................................................ 19
2.15 00072377 CW Transport, long distance, high vol. ...................................................... 20
2.16 00001270 S Lattice tower on gnd 35m - 40m, S-SP .................................................... 21
2.17 00038430 M Lattice tower on gnd 35m - 40m, S-SP .................................................. 22
2.18 00001273 S Lattice tower on gnd 60m - 65m, S-SP .................................................... 23
2.19 00038435 M Lattice tower on gnd 60m - 65m, S-SP .................................................. 24
2.20 00068573 S Raft foundation for GF tower.................................................................. 25
2.21 00068618 M Raft foundation for GF tower ................................................................. 26
2.22 00049089 S Mains pwr to OD GF site, contractor ........................................................ 27
2.23 00049088 M Mains pwr to OD GF site, contractor ..................................................... 28
2.24 00002954 S Earth electrode, GF site ........................................................................... 29
2.25 00038388 M Earth electrode, GF site ........................................................................ 30
2.26 00068571 S Equipment earthing, GF site .................................................................. 31
2.27 00068615 M Equipment earthing, GF, small .............................................................. 32
2.28 00040825 S Shelf and pole for FlexiBTS ..................................................................... 33
2.29 00040827 M Shelf and pole for FlexiBTS................................................................... 34
2.30 00068646 S Structural concrete ................................................................................ 35
2.31 00068649 M Structural concrete ................................................................................ 36
2.32 00068561 S OD cable tray, narrow ............................................................................ 37
2.33 00068601 M OD cable tray, narrow ........................................................................... 38
2.34 00038285 I floor mount 19-23 cab ............................................................................... 39
2.35 00007509 M floor mount 19-23 cab ............................................................................. 40
2.36 00044997 Existing building structure test .................................................................... 41
2.37 00033890 RT site preparations and finishes ................................................................ 42
2.38 00002955 S Access ladder to RT site .......................................................................... 43
2.39 00068598 M Access ladder to RT site ....................................................................... 44
2.40 00002953 S Earth electrode, RT site ........................................................................... 45
2.41 00038389 M Earth electrode, RT site ........................................................................ 46
2.42 00001315 S Mains pwr to RT site, contractor .............................................................. 47
2.43 00038451 M Mains pwr to RT site, contractor ............................................................ 48
2.44 00068570 S Equipment earthing, RT site .................................................................. 49
2.45 00068616 M Equipment earthing, RT, small .............................................................. 50
2.46 00002941 S Roof fixed antenna support 5m - 7m ........................................................ 51
2.47 00038510 M Roof fixed antenna support 3m - 5m ..................................................... 52
Copyright 2014. Service Item Description Page 2 of 62
Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.48 00001301 S Free standing antenna support 5m - 7m .................................................. 53
2.49 00038404 M Free standing antenna support 5m - 7m................................................ 54
2.50 00064028 S Bracket for RRH/RF modules and RF Antennas support ....................... 55
2.51 00064030 M Bracket for RRH/RF modules and RF antennas support ....................... 56
2.52 00068584 S Cable tray on tower, narrow ................................................................... 57
2.53 00068602 M Cable tray on tower, narrow .................................................................. 58
2.54 00072370 S GF site surface finish ............................................................................. 59
2.55 00001222 Site Design, existing site ........................................................................... 60
2.56 00045000 Existing lattice tower strength analysis ........................................................ 61
2.57 00072366 Existing RT Tower strength analysis ......................................................... 62

Copyright 2014. Service Item Description Page 3 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


1. Overview
The current document specifies the scope of service for each item included in the service packages
created for the New Greenfield or New Rooftop Sites, and for CW adaptations for LTE in Colombia,
using a simplified site design.

The Service Supplier (Partner) must consider all the task and materials needed to successfully
complete the service, according to the Service Description document, even if some of them were
not indicated in the present document.

All the services must be performed according to the current standards and specifications provided
by Nokia Solutions and Networks and/or Claro Colombia. These specifications are included in the
Service Description. If some specifications are not included, the partner must consider the current
specification indicated by CLARO.

The service includes all tasks needed to obtain the Final Acceptance document signed by the
customer, and the delivery of the document to Nokia Solutions and Networks.

The service includes, if required, the upload of the scanned documents to IPM and the update of all
the dates included in the tool for control and tracking of the project.

The service includes the cleaning of the work area and the residual management of all the packing
material included with the delivered equipment, according to local standards and applicable laws.

Copyright 2014. Service Item Description Page 4 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2. Service Item Description

2.1 00035253 SA for one existing site / all types / Evaluation


Evaluation for one existing site / all types

Includes
 To obtain, review and organize existing Site documentation from customer
 Pre-evaluation survey with Network planning (NWP)
 1 Site Evaluation Report (SER) per site (if needed)
 Review if Ownership documentation it’s Updated and complete
 Validated existing site candidate

Excludes
 Site Design work (e.g. AutoCAD or equivalent work)
 Site Engineering Works
 Arrange, coordinate and take part in the Technical Site Survey (TSS)

Special cases and other requirements


 Site Acquisition Management
 An ultimate effort to each site has to be set. After that the work is considered as
consultancy.

Detailed Service item description


"All work to be completed in accordance with Project Procedures and guidelines"

 To obtain, review and organize existing Site documentation from customer, including
leasing contracts, construction licenses and permits required to start the construction of the
site.
 Arrange Pre-evaluation survey with Network planning (NWP).
 Complete site evaluation in accordance with Project acquisition process. In general one Site
Evaluation Report (SER) per existing site.
 The content of SER is defined in the project document SER and could not be necessary the
generation of this report. The Site Acquisition agent is responsible that the SER report is
properly filled. The following information can be considered as main items to be filled to
SER
 Site location (coordinates, address, access description) to confirm
 Photos of the site
 Name and contacts of the owner and representative
 Rental fee and existing contract confirmed
 Evaluation of additional re-negotiations, rental fee and terms of contract
 Ownership documentation confirmed and updated
Copyright 2014. Service Item Description Page 5 of 62
Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


 Type of owner
 Sketch drawing
 Permit type
 Meet with site candidate evaluation team to take part in final validation of the existing
candidate.
 The Site Evaluation work includes all needed traveling, negotiations, taxes and tools
necessary, to evaluate the existing candidate.
 Enter all relevant data into project data management tools and Quality checklist (if
applicable).

Deliverables
 One filled SER report per candidate both in paper and electronic forms (if required).
 Validated that documentation of existing candidate is complete and updated.
 All relevant data entered into project data management tool and Quality checklist (if
applicable).

Copyright 2014. Service Item Description Page 6 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.2 00001221 Site Design, new macro site
Site Design for a new indoor or outdoor Greenfield site

Service
 Detailed construction works design including construction details, power supply,
mechanical, electrical and topographic design with bill of quantities of materials
 Participation in Technical Site Survey and preparation of Technical Site Survey Report
 Preparation of permitting designs and documents if needed
 Preparation of as-built drawings after completion of all site works
 Topographic survey and positioning
 Preparation of construction detailed descriptions and Electrical & Grounding systems
calculation

Excludes
 Telecom installation planning
 Ground investigation
 Electrical board design (if applicable)

Special cases and other requirements


 Check that this SI is in line with "Telecom installation planning" SI
 Electrical board design will be made only once by Nokia Solutions and Networks that will
approve it with the client. The approved drawings will become a template that should be
attached to the drawings site by site
 Remove topographic survey in case of separate SI

Copyright 2014. Service Item Description Page 7 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.3 00002905 Ground investigation
Ground investigation for a Greenfield site

Service
 Site activities including transportation of testing equipment
 Investigation of the necessary test sample for the center of the monopole/tower base
 Preparation of investigation report including foundation proposal to enable foundation
design in accordance with local codes and regulations

Copyright 2014. Service Item Description Page 8 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.4 00068639 GF site preparations and finishes
Greenfield site area clearance, preparation, finishes

Service
 Cleaning of site area.
 Removal and disposal of trees and undergrowth from the site according local regulation and
to approval
 Top soil removal from the site and transportation to an agreed dumping area
 Finishing the site area according to the specifications and site specific detailed design with
gravel and Geotextile fabric material.
 Removal and disposal of all waste material arising from construction and final site cleaning
 Site supervision and the project management

Material
 Gravel
 Geotextile fabric material

Excludes
 Foundation works
 Access road and vehicle turn around area

Special cases and other requirements


 NOTE: in some countries the disposal of materials from site might need special license or
permissions from authorities. When localizing this generic item check the country specific
legislation
 Check that this SI is in line with foundation Sis

Bill of Quantities
Component description Occ. Qnt Unit
Gravel (10 cm depth) 100 % 1 M2
Geotextile fabric material 100 % 1 M2

Copyright 2014. Service Item Description Page 9 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.5 00033336 S Pedestrian gate, GF site
Installation of gate built together with the site fence for accessing the site without car

Service
 Installation on site
 Pedestrian gate system
 Foundation of poles including excavation, formwork, reinforcement, concrete
 Lock
 Key holder
 Site supervision and project management

Excludes

Special cases and other requirements

Copyright 2014. Service Item Description Page 10 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.6 00038497 M Pedestrian gate, GF site
Material for gate built together with the site fence for accessing the site without car

Material
 Supply of:
 Pedestrian gate system
 Formwork material
 Reinforcement
 Concrete
 Lock
 Key holder

Excludes
 Fence

Bill of Quantities
Component description Occ. Qnt Unit
Gate system 100 % 1 lot
Formwork material 100 % 1 lot
Concrete reinforcement 100 % 1 lot
Structural concrete 100 % 1 m3
Lock 100 % 1 pcs
Key holder 100 % 1 pcs

Copyright 2014. Service Item Description Page 11 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.7 00069336 S Pedestrian metallic door, GF site
Installation of metallic door for accessing the site without car

Service
 Installation on site
 Pedestrian metallic door
 Construction of concrete frame, including excavation, formwork, reinforcement, concrete
 Lock
 Key holder
 Site supervision and project management

Excludes

Special cases and other requirements

Copyright 2014. Service Item Description Page 12 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.8 00069436 M Pedestrian metallic door, GF site
Material for metallic door for accessing the site without car

Material
Supply of:
 Pedestrian metallic door according to the project specifications
 Formwork material
 Reinforcement
 Concrete
 Lock
 Key holder

Excludes
 Masonry wall

Bill of Quantities
Component description Occ. Qnt Unit
Metallic door 100 % 1 lot
Formwork material 100 % 1 lot
Concrete reinforcement 100 % 1 lot
Structural concrete 100 % 1 m3
Lock 100 % 1 pcs
Key holder 100 % 1 pcs

Copyright 2014. Service Item Description Page 13 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.9 00069337 S Vehicle metallic door, GF site
Installation of metallic door for accessing the site with car

Service
 Installation on site
 Vehicle metallic door
 Construction of concrete frame, including excavation, formwork, reinforcement, concrete
 Lock
 Key holder
 Site supervision and project management

Excludes

Special cases and other requirements

Copyright 2014. Service Item Description Page 14 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.10 00069437 M Vehicle metallic door, GF site
Material for metallic door for accessing the site with car

Material
Supply of:
 Vehicle metallic door according to the project specifications
 Formwork material
 Reinforcement
 Concrete
 Lock
 Key holder

Excludes
 Masonry wall

Bill of Quantities
Component description Occ. Qnt Unit
Vehicle Metallic door 100 % 1 lot
Formwork material 100 % 1 lot
Concrete reinforcement 100 % 1 lot
Structural concrete 100 % 1 m3
Lock 100 % 1 pcs
Key holder 100 % 1 pcs

Copyright 2014. Service Item Description Page 15 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.11 00068566 S Site fencing, GF site
Constructing a fence around a Greenfield site

Service
 Installation on site
 Poles
 Mesh
 Frames
 Fixing bolts
 Connection to site main grounding
 Foundation for poles including, excavation, formwork, reinforcement, concrete, backfilling
 Site supervision and project management

Excludes
 Gates and locks
 Key holder

Copyright 2014. Service Item Description Page 16 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.12 00068629 M Site fencing, GF site
Material for a fence around a Greenfield site

Material
 Supply of:
 Poles
 Mesh
 Frames
 Fixing bolts
 Grounding material to connect the fence to site main grounding system
 Formwork material, reinforcement and concrete pole foundation

Excludes
 Gates and locks
 Key holder

Bill of Quantities
Component description Occ. Qnt Unit
Pole 100 % 1 pcs
Mesh 100 % 1 m2
Frames 100 % 1 Lot
Grounding wire incl. accessories 100 % 1 lot
Fixing bolts 100 % 1 lot
Formwork material 100 % 1 lot
Reinforcement material 100 % 1 lot
Concrete 100 % 1 m3

Copyright 2014. Service Item Description Page 17 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.13 00068621 M Masonry wall, GF site
Material for brickwall built around a site

Material
Supply of:
 Bricks
 Masonry mortar
 Formwork material
 Reinforcement
 Concrete

Excludes
 Gates, plaster
 Key holder

Bill of Quantities
Component description Occ. Qnt Unit
Bricks 100 % 1 Lot
Masonry mortar 100 % 1 Lot
Formwork material 100 % 1 Lot
Concrete reinforcement 100 % 1 Lot
Structural concrete 100 % 1 Lot

Copyright 2014. Service Item Description Page 18 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.14 00068589 S Masonry wall, GF site
Construction of brickwall built around a site

Service
 Construction and installation on site
 Masonry wall in brick (visible - no plaster)
 Filled joints
 Foundation including excavation, formwork, reinforcement, concrete

Excludes
 Gates, plaster
 Key holder

Copyright 2014. Service Item Description Page 19 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.15 00072377 CW Transport, long distance, high vol.
Transportation of high volume cargo for long distance

Service
 Loading of the cargo onto the truck/lorry at the storage as described below.
 Over 300 km transportation of Materials in a truck/lorry from the storage area to site.
 Carrying or moving the cargo from the vehicle into the equipment room, battery room,
rooftop or other designated area at the site.
 Accommodation of the passengers and secure parking of the vehicle if overnight stay is
needed.
 Insurance of the persons, vehicles, tools, Materials and equipment within the scope of this
service Item.

Excludes
 Transportation by helicopter or any other special vehicle different than truck/lorry.
 Hoisting of the cargo by crane.
 Travel of personnel other than the driver and the aids for cargo loading and unloading.

Special cases and other requirements


 Volume size to be defined as per case specific needs

Copyright 2014. Service Item Description Page 20 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.16 00001270 S Lattice tower on gnd 35m - 40m, S-SP
Erection of a lattice tower on ground 35m - 40m, standard / standard plus

Service
 The site supervision and the project management
 Detailed structural design for a new tower including foundation design (High: 36m / Wind
Speed 120 Km/hr / Base dimension to be considered 1.0 x 1.0 m / Load: As indicated in the
Service Description)
 Bill of quantities
 Workshop drawings
 Structural calculations
 Transportation to the site.
 Vertical alignment test and generation of results report.

Installation on site:

 Galvanized steel self-supporting lattice tower including working platforms and antenna
mounting parts as detailed in the specification and drawings.
 Pre-installed ladder system including cable ladder, climbing ladder and safety system
 Crane if needed for erection of tower and moving the crane to the tower location
 Painting
 Lightning protection and equipment earthling
 Aviation warning lights system for towers up to 36m, includes Controller and Photoelectric
cell.
 Includes cabling installation for power and grounding.
 Alarm connection
 Testing and commissioning the lights system
 Lights System test report (if required by the operator)

Excludes
 Foundation works including installation of the anchor bolts for tower
 Earth electrode
 Horizontal cable bridge
 Actual site design for a site
 Ground investigation

Special cases and other requirements

Copyright 2014. Service Item Description Page 21 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.17 00038430 M Lattice tower on gnd 35m - 40m, S-SP
Material for a lattice tower on ground 35m - 40m, standard / standard plus

Material
Supply of:
 Galvanized steel self-supporting lattice tower including working platforms, equipment
platform, and antenna mounting parts as detailed in the specification and drawings. (For 9
RF antennas and for 2 MW antennas up to 1.2m diameter) (High: 36m / Wind Speed 120
Km/hr / Base dimension to be considered 1.0 x 1.0 m / Load: As indicated in the Service
Description)
 Anchor bolts
 Pre-installed ladder system including cable ladder, climbing ladder and safety system
 Standard Aviation warning light system for towers up to 36m including controller system,
photoelectric cell and cabling.
 Paint according to local standard.
 Lightning protection and equipment earthling (includes up to 3 galvanized grounding bar).

Excludes
 Earth electrode
 Foundation
 Horizontal cable bridge
 Solar Aviation Warning Light

Special cases and other requirements

Bill of Quantities
Component description Occ. Qnt Unit
Galvanized steel self supporting lattice tower and accessories 100 % 1 pcs
Working platform and Equipment Platform (according to tower design) 100 % 1 Lot
Climbing safety system for Ladder 100 % 1 Lot
Ladder for tower 100 % 1 Lot
Cable ladder system 100 % 1 lot
Anchor bolts 100 % 1 lot
Antenna mounting systems (6 supports for 2 RF antennas & RF Modules, 3 are 100 % 1 lot
“H” type and 3 “Diversidad” type, and 2 supports for up to 1.2 m diameter MW
antennas)
Aviation Warning Light system up to 45m (incl. Controller system, Photoelectric 100 % 1 lot
cell and cabling)
Paint 100 % 1 lot

Copyright 2014. Service Item Description Page 22 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.18 00001273 S Lattice tower on gnd 60m - 65m, S-SP
Erection of a lattice tower on ground 60m - 65m, standard / standard plus

Service
 The site supervision and the project management
 Detailed structural design for a new tower including foundation design (High: 60m / Wind
Speed 190 Km/hr / Load: As indicated in the Service Description)
 Bill of quantities
 Workshop drawings
 Structural calculations
 Transportation to the site.
 Vertical alignment test and generation of results report.

Installation on site:

 Galvanized steel self-supporting lattice tower including working platforms and antenna
mounting parts as detailed in the specification and drawings.
 Pre-installed ladder system including cable ladder, climbing ladder and safety system
 Crane if needed for erection of tower and moving the crane to the tower location
 Painting
 Lightning protection and equipment earthling
 Aviation warning lights system for towers up to 60 m, includes Controller and Photoelectric
cell.
 Includes cabling installation for power and grounding.
 Alarm connection
 Testing and commissioning the lights system
 Lights System test report (if required by the operator)

Excludes
 Foundation works including installation of the anchor bolts for tower
 Earth electrode
 Horizontal cable bridge
 Actual site design for a site
 Ground investigation

Special cases and other requirements

Copyright 2014. Service Item Description Page 23 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.19 00038435 M Lattice tower on gnd 60m - 65m, S-SP
Material for a lattice tower on ground 60m - 65m, standard / standard plus

Material
Supply of:
 Galvanized steel self-supporting lattice tower including working platforms, equipment
platform, and antenna mounting parts as detailed in the specification and drawings. (For 9
RF antennas and for 2 MW antennas up to 1.2m diameter) (High: 60 m / Wind Speed 190
Km/hr / Load: As indicated in the Service Description)
 Anchor bolts
 Pre-installed ladder system including cable ladder, climbing ladder and safety system
 Standard Aviation warning light system for towers up to 60 m including controller system,
photoelectric cell and cabling.
 Paint according to local standard.
 Lightning protection and equipment earthling (includes up to 3 galvanized grounding bar).

Excludes
 Earth electrode
 Foundation
 Horizontal cable bridge
 Solar Aviation Warning Light

Special cases and other requirements

Bill of Quantities
Component description Occ. Qnt Unit
Galvanized steel self supporting lattice tower and accessories 100 % 1 pcs
Working platform and Equipment Platform (according to tower design) 100 % 1 Lot
Climbing safety system for Ladder 100 % 1 Lot
Ladder for tower 100 % 1 Lot
Cable ladder system 100 % 1 lot
Anchor bolts 100 % 1 lot
Antenna mounting systems (6 “H” mount for 2 RF antennas and 2 RF Modules 100 % 1 lot
& 2 MW antenna mount for up to 1.2 m diameter)
Aviation Warning Light system up to 60m (incl. Controller system) 100 % 1 lot
Paint (if needed) 100 % 1 lot

Copyright 2014. Service Item Description Page 24 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.20 00068573 S Raft foundation for GF tower
Installation of reinforced concrete raft foundation for GF tower

Service
 Work done on site
 Installation of the concrete reinforcement
 Erection of the formwork and removal after work is done
 Installation of the anchor bolts
 Casting the structural concrete
 Excavation and backfilling
 Testing and concrete finishes
 Site supervision and the project management

Excludes
 Remove of leftover excavated material from the site
 Rock excavation
 Use of explosives
 Structural material backfilling

Special cases and other requirements


 Check that anchor bolts supply is covered by tower SIs
 Check that this SI is in line with grounding Sis
 The use of a concrete bomb is included in the scope if required.
 Dewatering is included only if it’s because of rain.

Copyright 2014. Service Item Description Page 25 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.21 00068618 M Raft foundation for GF tower
Material for reinforced concrete raft foundation for GF tower

Material
 Supply of:
 Concrete reinforcement
 Formwork material
 Structural concrete

Excludes
 Supply of the anchor bolts

Special cases and other requirements


 Check that anchor bolts supply is covered by tower SIs
 Check that this SI is in line with grounding SIs

Bill of Quantities
Component description Occ. Qnt Unit
Concrete reinforcement 100 % 1 lot
Formwork material 100 % 1 lot
Structural concrete 100 % 1 m3

Copyright 2014. Service Item Description Page 26 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.22 00049089 S Mains pwr to OD GF site, contractor
Connecting mains power from the utility company delivery point to the Greenfield site
distribution board

Service
Work done on site

 Excavation and backfilling of trenches to perform the pipelines and the manholes
 Installation of AC main distribution board
 Installation of main switch
 Installation of power line and all needed accessories to connect the main distribution power
board to the delivery point of the utility company
 All the procedure in the utility company, testing, commissioning and completion of
necessary certification
 Construction of concrete or block KW-Meter/Main switch housing (Size: 2.4m x 1.6 m x 1 m)
includes metallic doors and security locks.
 Installation of Equipment area lamp including fixing accessories and cabling.
 Installation of AC outlet for outdoor.
 All needed accessories
 Site supervision and project management

Excludes
 Managing the paperwork for hiring Electric Service

Special cases and other requirements


 Check that this SI is in line with other site power supply SIs
 Check if AC distribution board is covered by shelter or equipment base Sis

Copyright 2014. Service Item Description Page 27 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.23 00049088 M Mains pwr to OD GF site, contractor
Material for connecting mains power from the utility company delivery point to the Greenfield
site distribution board

Material
 Supply of:
 Ducts and manholes
 AC main distribution board (18 circuits, 70A, OD type) + Thermo magnetic Breakers (1 pcs
3x65A + 3 pcs 2x30A + 4 pcs 1x10A). According to operator specifications.
 Main switch (Thermo magnetic – 3 phases)
 KW-Meter (3F + N) Plug-in base
 Power line and all needed accessories to connect the main distribution power board to the
delivery point of the utility company (3F + N)
 Material for construction of concrete or block KW-Meter/Main switch housing (Size: 2.4m x
1.6 m x 1 m) includes metallic doors and security locks.
 AC outlet for outdoor.
 Underground connection cable
 Equipment area lamp, including fixing accessories and cabling.
 All needed accessories

Special cases and other requirements


 Check that this SI is in line with other site power supply SIs
 Check if AC distribution board is covered by shelter or equipment base SIs

Bill of Quantities
Component description Occ. Qnt Unit
Ducts (PVC) size according to electrical calculations 100 % 1 lot
Manholes 100 % 1 lot
AC main distribution board (18 circuits, 70A, OD type) + Thermo 100 % 1 pcs
magnetic Breakers (1 pcs 3x65A + 3 pcs 2x30A + 4 pcs 1x10A)
Main switch (Thermo Magnetic – 3 phases) 100 % 1 pcs
KW Meter plug-in base 100 % 1 pcs
Power line (3F+N) – Cable size according to electrical calculations 100 % 30 m
KW-Meter / Main Switch housing (Concrete or Block) 100 % 1 lot
Underground connection cable 100 % 1 lot
Equipment area lamp (incl. fixing accessories and cabling) 100 % 1 lot
Accessories 100 % 1 lot
AC Outlet for Outdoor 100 % 1 lot

Copyright 2014. Service Item Description Page 28 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.24 00002954 S Earth electrode, GF site
Ground level earthing system for greenfield site
Service
Installation on site
 Underground earthing ring
 Grounding rods
 Grounding inspection boxes
 All needed accessories
 Exothermical welding independent of the number of each of these items
 Test of earthing conductivity with report
 Site supervision and project management

Excludes
 Chemical grounding rods or any other grounding system different to the indicated as
included.

Special cases and other requirements


 Check that this SI is in line with grounding SIs

Copyright 2014. Service Item Description Page 29 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.25 00038388 M Earth electrode, GF site
Material for ground level earthing system for greenfield site

Material
Supply of:
 Underground earthing ring
 Grounding rods
 Grounding inspection boxes
 All needed accessories

Excludes
 Chemical grounding rods or any other grounding system different to the indicated as
included.

Special cases and other requirements


 Check that this SI is in line with grounding SIs

Bill of Quantities
Component description Occ. Qnt Unit
Underground earthing ring 100 % 1 lot
Grounding rods 100 % 5 pcs
Grounding inspection boxes 100 % 5 pcs
Accessories 100 % 1 lot

Copyright 2014. Service Item Description Page 30 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.26 00068571 S Equipment earthing, GF site
Equipment earthing system for Greenfield site

Service
 Installation on site
 Connection of Main Grounding Bar to main grounding system
 Down conductor from earthing points to the earth electrode
 All needed accessories

Excludes
 Earthing bars for antennas are included in structural modules (e.g. tower, mast, etc.)
 Earth electrode

Special cases and other requirements


 Check that this SI is in line with grounding SIs and structural modules

Copyright 2014. Service Item Description Page 31 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.27 00068615 M Equipment earthing, GF, small
Material for equipment earthing system for Greenfield site

Material
Supply of:
 Down conductor from earthing points to the earth electrode
 Main Grounding Bar for Equipments
 All needed accessories

Excludes
 Earthing bars for antennas are included in structural modules (e.g. tower, mast, etc.)
 Earth electrode

Special cases and other requirements


 Check that this SI is in line with grounding SIs and structural modules

Bill of Quantities
Component description Occ. Qnt Unit
Down conductor (min 50mm2) 100 % 3 m
Main Grounding Bar 100 % 1 lot
Accessories 100 % 1 lot

Copyright 2014. Service Item Description Page 32 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.28 00040825 S Shelf and pole for FlexiBTS
Installation of steel shelf for Flexi BTS modules and Power System and 3”x 2 m pole for
System Modules.

Service
Installation on site

 Steel shelf for Flexi BTS modules and Power system according to operator specifications.
 Steel Pole 3” x 2m installation. Includes construction of concrete base.
 Site supervision and the project management

Excludes

Special cases and other requirements

Copyright 2014. Service Item Description Page 33 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.29 00040827 M Shelf and pole for FlexiBTS
Steel shelf for FlexiBTS modules and Power System

Material
Supply of:
 Steel shelf for FlexiBTS modules and Power System (According to operator specifications)
 Steel Pole 3” x 2m Material. Includes Material for construction of concrete base and fixing
materials.
 Fixing accessories

Bill of Quantities
Component description Occ. Qnt Unit
Steel shelf for FlexiBTS modules and Power System 100 % 1 pcs
Steel Pole 3” x 2m with plate base (Includes Material for construction 100 % 1 lot
of concrete base and fixing materials)
Fixing accessories 100 % 1 lot

Copyright 2014. Service Item Description Page 34 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.30 00068646 S Structural concrete
Installation of reinforced concrete structure on site

Service
 Work done on site
 Installation of the concrete reinforcement
 Erection of the formwork
 Installation of possible anchoring accessories
 Casting the structural concrete
 Site supervision and the project management

Excludes

Copyright 2014. Service Item Description Page 35 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.31 00068649 M Structural concrete
Material for reinforced concrete structure

Material
 Supply of:
 Concrete reinforcement
 Formwork material
 Structural concrete

Excludes
 Supply of possible anchoring accessories for connecting structures

Special cases and other requirements


 Check that possible anchoring accessories supply is covered by SIs of connecting
structures

Bill of Quantities
Component description Occ. Qnt Unit
Concrete reinforcement 100 % 1 lot
Formwork material 100 % 1 lot
Structural concrete 100 % 1 m3

Copyright 2014. Service Item Description Page 36 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.32 00068561 S OD cable tray, narrow
Installation of cable tray system

Service
 Installation on site
 Cable tray system
 Substructure system such as concrete blocks with fixing accessories and rubber sheets to
protect rooftop surface
 Site supervision and the project management

Excludes
 Lifting to rooftop using crane
 Supporting pole in case of cable bridge

Copyright 2014. Service Item Description Page 37 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.33 00068601 M OD cable tray, narrow
Material for outdoor cable tray system

Material
Supply of:
 Cable tray system up to 40 cm wide
 Substructure system such as concrete blocks with fixing accessories and rubber sheets to
protect rooftop surface

Bill of Quantities
Component description Occ. Qnt Unit
Cable tray system up to 40 cm wide 100 % 1 m
Substructure system incl. fixing accessories, concrete blocks and rubber sheets 100 % 1 lot

Copyright 2014. Service Item Description Page 38 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.34 00038285 I floor mount 19-23 cab
Installation of floor mount 19-23 inch cabinet (for Transmision)

Service
 Installation of a floor-standing 19 or 23 inch cabinet with floor fixing material and label.
 Installation of AC power cable with fixing material and labels up to the defined length.
 Installation labels for AC power breaker and ground termination point (bus bar port).
 Installation of the grounding cable up to the defined length including labeling of the ground
termination point
 Transportation of cabinet from operator warehouse to the site.

Material

Excludes
 Installation of DC power distribution frame.
 Installation of DC power cable with fixing material, labels and connectors (lugs) up to the
defined length.
 Transportation using other vehicle different than Truck.
 Configuration and commissioning of Air Conditioned, if attached to the cabinet.

Special cases and other requirements

Bill of Quantities
Pos Category Occurrence Qnt Unit Component Remark

19-23 inch Cabinet


1 100% 1 pcs DNxxx Floor-standing
Installation

2 Grounding Cable Installation 100% 7 m DNxxx Incl. labeling & testing

3 AC Power Cable Installation 100% 7 m DNxxx Incl. labeling & testing

Copyright 2014. Service Item Description Page 39 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.35 00007509 M floor mount 19-23 cab
Material for floor mount 19-23 inch cabinet (for Transmision)

Material
 Supply of a floor-standing 19 or 23 inch cabinet with floor fixing material and label.
 Supply of AC power cable with fixing material and labels up to the defined length.
 Supply labels for AC power breaker and ground termination point (bus bar port).
 Supply of the grounding cable up to the defined length including labeling of the ground
termination point.

Excludes
 Supply of DC power distribution frame.
 Supply of DC power cable with fixing material, labels and connectors (lugs) up to the
defined length.

Special cases and other requirements

Bill of Quantities
Pos Category Occurrence Qnt Unit Component Remark

1 19-23 inch Cabinet 100% 1 pcs CS75054.50 Floor-standing

2 19-23 inch Cabinet Fixing 100% 4 pcs CSxxx Bolt

100% 4 pcs CSxxx Washer

100% 4 pcs CSxxx Anchor

3 Power Cable Complete 100% 7 m CSxxx AC power cable

100% 0.1 m CS73327.12 Shrink sleeve

100% 1 pcs CSxxx AC plug

100% 0.28 pcs CS73320.01 Cable tie, 100pcs

4 Ground Cable Complete 100% 7 m CSxxx Grounding cable max. 3m

Copyright 2014. Service Item Description Page 40 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.36 00044997 Existing building structure test
Tests for clarifying structural strenght of existing structures

Service
 Obtaining all needed information
 Carring out tests on site for clarifying material strength for an existing structure in
accordance with local codes and regulations including all test equipment
 Perform calculation and analysis of Building structure
 Laboratory tests if applicable
 Preparation of a report
 Structural strengthening design
 The scope includes only the analysis of the building structures related or affected by the
new elements that are planned to be installed and not for the complete building, unless it’s
necessary.

Excludes
 Actual site design for an existing site

Special cases and other requirements

Copyright 2014. Service Item Description Page 41 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.37 00033890 RT site preparations and finishes
Rooftop site area clearance, preparation, finishes
Service
 Removal of any in TSSR mentioned obstacles from the site area
 Finishing the site area according to the specifications and site specific detailed design,
including the task of waterproofing the rooftop site area that result affected during the
implementation.
 Removal and disposal of all waste material arising from construction and site cleaning
 Site supervision and the project management

Excludes

Special cases and other requirements


 NOTE : in some countries the disposal of materials from site might need special license or
permissions from authorities. When localising this generic item check the country specific
legislation

Copyright 2014. Service Item Description Page 42 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.38 00002955 S Access ladder to RT site
Installation of access ladder to rooftop site
Service
Installation on site:

 Access ladder to rooftop including all fixing accessories in accordance with site specific
design for building and rooftop.
 Site supervision and the project management services.

Excludes

Special cases and other requirements


 Check that access ladder design is agreed with building owner.

Copyright 2014. Service Item Description Page 43 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.39 00068598 M Access ladder to RT site
Material for access ladder to rooftop site

Material
Supply of:
 Access ladder to rooftop including all fixing accessories in accordance with site specific
design for building and rooftop

Special cases and other requirements


 Check that access ladder design is agreed with building owner

Bill of Quantities
Component description Occ. Qnt Unit
Access ladder 100 % 1 pcs
Accessories 100 % 1 lot

Copyright 2014. Service Item Description Page 44 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.40 00002953 S Earth electrode, RT site
Ground level earthing system for rooftop site

Service
Installation on site

 Underground earthing ring (if needed)


 Grounding rods
 Grounding cable and connectors
 Grounding inspection boxes
 All needed accessories
 Exothermical welding independent of the number of each of these items
 Test of earthing conductivity with report
 Site supervision and project management

Excludes
 Chemical grounding rods or any other grounding system different to the indicated as
included.

Special cases and other requirements


 Check that this SI is in line with grounding SIs

Copyright 2014. Service Item Description Page 45 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.41 00038389 M Earth electrode, RT site
Material for ground level earthing system for rooftop site

Material
Supply of:
 Underground earthing ring (if needed)
 Grounding cable and connectors
 Grounding rods
 Grounding inspection boxes
 All needed accessories

Excludes
 Chemical grounding rods or any other grounding system different to the indicated as
included.

Special cases and other requirements


 Check that this SI is in line with grounding SIs

Bill of Quantities
Component description Occ. Qnt Unit
Underground earthing ring 100 % 1 lot
Grounding rods 100 % 5 pcs
Grounding inspection boxes 100 % 2 pcs
Accessories 100 % 1 lot
Grounding cable and connectors (min 50mm2) 100% 30 m

Copyright 2014. Service Item Description Page 46 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.42 00001315 S Mains pwr to RT site, contractor
Connecting mains power from the utility company delivery point to the rooftop site
distribution board

Service
Work done on site

 Excavation and backfilling of trenches to perform the pipelines and the manholes (if
needed)
 Installation of AC main distribution board
 Installation of main switch
 Installation of power line and all needed accessories to connect the main distribution power
board to the delivery point of the utility company
 All the procedure in the utility company, testing, commissioning and completion of
necessary certification
 Installation of metal enclosure for KW-Meter/Main switch protection (Size: 0.50 m x 0.80 m
x 0.30 m) includes security locks.
 Installation of Equipment area lamp including fixing accessories and cabling.
 Installation of AC outlet for outdoor.
 All needed accessories
 Site supervision and project management

Excludes
 Managing the paperwork for hiring Electric Service

Special cases and other requirements


 Check that this SI is in line with other site power supply SIs
 Check if AC distribution board is covered by shelter or equipment base SIs

Copyright 2014. Service Item Description Page 47 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.43 00038451 M Mains pwr to RT site, contractor
Material for connecting mains power from the utility company delivery point to the rooftop
site distribution board

Material
Supply of:
 Ducts and manholes.
 AC main distribution board (18 circuits, 70A, OD type) + Thermo magnetic Breakers (1 pcs
3x65A + 3 pcs 2x30A + 4 pcs 1x10A). According to operator specifications.
 Main switch (Thermo magnetic – 3 phases)
 KW-Meter (3F + N) Plug-in base & Equipment.
 Power line and all needed accessories to connect the main distribution power board to the
delivery point of the utility company (3F + N)
 Metal enclosure for KW-Meter/Main switch protection (Size: 0.50 m x 0.80 m x 0.30 m)
includes security locks.
 AC Outlet for Outdoor
 Underground or aerial connection cable
 Equipment area lamp, including fixing accessories and cabling.
 All needed accessories

Special cases and other requirements


 Check that this SI is in line with site power supply SIs
 Check if AC distribution board is covered by shelter or equipment base SIs

Bill of Quantities
Component description Occ. Qnt Unit
Ducts (PVC or PGG) size according to electrical calculations 100 % 1 lot
Manholes (if needed) 100 % 1 lot
AC main distribution board (18 circuits, 70A, OD type) + Thermo 100 % 1 pcs
magnetic Breakers (1 pcs 3x65A + 3 pcs 2x30A + 4 pcs 1x10A)
Main switch (Thermo Magnetic – 3 phases – 100 A) 100 % 1 pcs
KW Meter plug-in base 100 % 1 pcs
Power line (3F+N) – Cable size according to CLARO specification 100 % 30 m
KW-Meter / Main Switch Metal enclosure (Size: 0.80 x 0.80 x 0.30 100 % 1 lot
mts)
Underground and / or aerial connection cable 100 % 1 lot
Equipment area lamp (incl. fixing accessories and cabling) 100 % 1 lot
Accessories 100 % 1 lot
AC Outlet for Outdoor

Copyright 2014. Service Item Description Page 48 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.44 00068570 S Equipment earthing, RT site
Equipment earthing system for rooftop site

Service
Installation on site
 Connection of all equipment (shelter, generator etc.) to main grounding system
 Down conductor from earthing points to the earth electrode
 All needed accessories

Excludes
 Earthing bars for antennas are included in structural modules (e.g. tower, mast, etc.)
 Earth electrode

Special cases and other requirements


 Check that this SI is in line with grounding SIs and structural modules

Copyright 2014. Service Item Description Page 49 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.45 00068616 M Equipment earthing, RT, small
Material for equipment earthing system for rooftop site

Material
Supply of:
 Down conductor from earthing points to the earth electrode (incl. connectors)
 Main Grounding Bar for Equipments
 All needed accessories

Excludes
 Earthing bars for antennas are included in structural modules (e.g. tower, mast, etc.)
 Earth electrode

Special cases and other requirements


 Check that this SI is in line with grounding SIs and structural modules

Bill of Quantities
Component description Occ. Qnt Unit
Down conductor and connectors 100 % 10 m
Accessories 100 % 1 lot
Main Grounding Bar 100 % 1 lot

Copyright 2014. Service Item Description Page 50 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.46 00002941 S Roof fixed antenna support 5m - 7m
Installation of roof fixed antenna support
Service
 The site supervision and the project management
 Detailed structural design for a new pole including foundation design (High: 5m / Wind
Speed 120 Km/hr / Load: As indicated in the Service Description)
 Bill of quantities
 Workshop drawings
 Structural calculations
 Transportation to the site.
 Lifting of the pole to the rooftop manually.
 Vertical alignment test and generation of results report.

Installation on site

 Antenna pole, including RF antenna mounting system or MW antennas supports.


 Cable mounting system
 Access steps
 Climbing safety system
 Earthing and lightning protection systems installation and connection to existing systems
 Open and close the local waterproofing, insulation and rooftiles, needed for the installation
of the poles.
 Pole anchoring system
 Painting (only if required)

Excludes
 Lifting of the pole to the rooftop using crane
 Aviation warning lights system.

Special cases and other requirements

Copyright 2014. Service Item Description Page 51 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.47 00038510 M Roof fixed antenna support 3m - 5m
Material for roof fixed antenna support

Material
Supply of:
 Antenna pole, including RF antenna mounting system or MW antenna supports.
 Cable mounting system
 Access steps
 Climbing safety system
 Earthing system
 Lightning protection system
 Pole fixing system (includes grout supply)
 Painting (only if required)

Excludes
 Lifting of the pole to the rooftop using crane
 Aviation warning lights system.

Bill of Quantities
Component description Occ. Qnt Unit
Earthing bar 100 % 1 pcs
Lightning protection wire with accessories 100 % 7 m
5m Roof fixed pole system (includes 1 “H” 100 % 1 pcs
support for RF or 2 MW Antenna supports)
Access steps 100 % 1 lot
Climbing safety system 100 % 1 lot
Fixing accessories 100 % 1 lot
Cable mounting system 100 % 1 lot
Lightning arrestor 100 % 1 pcs
Paint (only if required) 50 % 1 pcs

Copyright 2014. Service Item Description Page 52 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.48 00001301 S Free standing antenna support 5m - 7m
Installation of free standing antenna support, not fixed on roof or wall
Service
 The site supervision and the project management
 Detailed structural design for a new pole including calculation of number of concrete
flagstones needed as ballast (High: 5m / Wind Speed 120 Km/hr / Load: As indicated in the
Service Description)
 Bill of quantities
 Workshop drawings
 Structural calculations
 Transportation to the site.
 Lifting of the pole to the rooftop manually.

Installation on site

 Antenna pole including antenna mounting system for up to 3 RF antennas.


 Concrete flagstones as ballast
 Cable mounting system
 Access steps
 Climbing safety system
 Earthing and lightning protection system connected to existing systems
 Painting (only if required)

Excludes
 Lifting of the pole to the rooftop using crane
 Aviation warning lights system.

Special cases and other requirements

Copyright 2014. Service Item Description Page 53 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.49 00038404 M Free standing antenna support 5m - 7m
Material for free standing antenna support, not fixed on roof or wall

Material
Supply of:
 Antenna pole including antenna mounting system
 Concrete flagstones as ballast
 Cable mounting system
 Access steps
 Climbing safety system
 Earthing system and lightning protection system
 Painting (only if required)

Excludes
 Lifting of the pole to the rooftop using crane
 Aviation warning lights system.

Bill of Quantities
Component description Occ. Qnt Unit
Earthing bar 100 % 1 pcs
Lightning protection wire with accessories 100 % 5 m
5m Ballast roof pole system (includes 100 % 1 pcs
antenna mounting system for 3 RF
antennas)
Access steps 100 % 1 lot
Climbing safety system 100 % 1 lot
Cable mounting system 100 % 1 lot
Lightning arrestor 100 % 1 pcs
Paint (only if required) 50 % 1 pcs

Copyright 2014. Service Item Description Page 54 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.50 00064028 S Bracket for RRH/RF modules and RF Antennas
support
Installation of mounting system for RRH/RF modules and RF Antennas support

Service
 Installation of mounting system (“H” antenna support + brackets) for RRH modules and RF
Antennas on existing tower, monopole or rooftop pole.
 The site supervision and the project management

Excludes
 Painting of mounting system

Special cases and other requirements

Copyright 2014. Service Item Description Page 55 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.51 00064030 M Bracket for RRH/RF modules and RF antennas
support
Material for mounting system for RRH/RF modules and RF Antennas support

Material
Supply of:
 Mounting system (“H” antenna support pole + brackets) on existing tower, pole or building

Excludes
 Painting of bracket system

Special cases and other requirements


 The supply support pole length is according to site requirements. Minimum free length
requirement for FPKA kit installation is 70cm.

Bill of Quantities
Component description Occ. Qnt Unit
“H” Antenna support + Pole Support for FPKA. 100 % 1 lot
Fixing accessories 100 % 1 lot
Brackets according to site design for existing tower/pole 100 % 1 lot

Copyright 2014. Service Item Description Page 56 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.52 00068584 S Cable tray on tower, narrow
Installation of vertical cable tray system on an existing tower

Service
 Installation on site
 Cable tray system on an existing tower
 Site supervision and the project management

Excludes
 Existing tower structure survey , tower strenth analysis and design for installing new cable
tray

Copyright 2014. Service Item Description Page 57 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.53 00068602 M Cable tray on tower, narrow
Material for vertical cable tray system on existing tower

Material
 Supply of:
 Vertical cable tray system (30 cm wide)
 Fixing accessories

Bill of Quantities
Component description Occ. Qnt Unit
Vertical cable tray system (30 cm wide) 100 % 1 m
Fixing accessories 100 % 1 lot

Copyright 2014. Service Item Description Page 58 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.54 00072370 S GF site surface finish
Greenfield site surface finishes

Service
 Finishing the site area according to the specifications and site specific detailed design
 This service covers all works and Material related to surface finishing and final cleaning
 Site supervision and the project management

Excludes
 Access road and vehicle turn around area

Special cases and other requirements

Copyright 2014. Service Item Description Page 59 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.55 00001222 Site Design, existing site
Site Design for an existing indoor or an outdoor greenfield site

Service
 Finding and gathering of information and existing design documents of the existing tower
 Detailed construction works design including construction details, power supply,
mechanical, electrical, foundation and topographic design with bill of quantities of materials
 Participation in Technical Site Survey and preparation of Technical Site Survey Report
 Preparation of permitting designs and documents if needed
 Preparation of as-built drawings after completion of all site works

Excludes
 Electrical board design
 Telecom installation planning
 Strength analysis for existing tower
 Tower member size measurements
 Ground investigation
 Strengthening design of the existing tower structures
 Design of an eventual reinforce of existing tower foundation

Special cases and other requirements


 Check that this SI is in line with "Telecom installation planning", "Strength analysis for
existing tower" and "Tower member size measurements" SIs
 Electrical board design will be made only once by Nokia Siemens Networks that will
approve it with the client. The approved drawings will become a template that should be
attached to the drawings site by site

Copyright 2014. Service Item Description Page 60 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.56 00045000 Existing lattice tower strength analysis
Structural analysis for existing lattice tower
Service
 Obtaining all needed information
 Finding and gathering of information and existing design documents of the existing tower (if
applicable)
 Measuring of an existing tower members on site required for further clarification of tower
strength in accordance with local codes and regulations including all measurement
equipment
 Carring out structural calculations for an existing tower in accordance with local codes and
regulations
 Preparation of a report
 Structural strengthening design

Excludes
 Actual site design for an existing tower site

Special cases and other requirements

Copyright 2014. Service Item Description Page 61 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014


2.57 00072366 Existing RT Tower strength analysis
Structural analysis for existing rooftop tower

Service
 Obtaining all needed information
 Finding and gathering of information and existing design documents of the existing tower (if
applicable)
 Measuring of an existing tower members on site required for further clarification of tower
strength in accordance with local codes and regulations including all measurement
equipment
 Carring out structural calculations for an existing tower in accordance with local codes and
regulations
 Preparation of a report
 Structural strengthening design

Excludes
 Actual site design for an existing tower site

Special cases and other requirements

Copyright 2014. Service Item Description Page 62 of 62


Nokia Solutions and Networks.

All rights reserved. Version 1.0 Status: 13-Feb-2014