Student 1

Observation and analysis

Lab. 7

In this fieldwork, My role in this activity is to hold the pole temporarily and putting the tape on the point we need. In this
activity getting the elevations is important whether if it got slope or it just been putting in a higher place than the transit.
In this activity. I observed that in order to get the elavation we need to put points in considerable distance in order to
gather data for this Fieldwork.

Lab. 8

In the second fieldwork, We used profile leveling. for this activity we determine differences in elevation between points
at designated short measured intervals along an established line. By using transit and poles and rods we can determine
elevation of two points where we put the distance that was given to us

Lab. 3

I learn in this last activity, We I stand to the higher ground than the place where the transit place the poles and rods
should be 60 to 90 meters apart established on the ground so that we could get the most accurate result in our fieldwork.
By using this Two peg test, we could get the data easily because of this method that was perfectly for gathering data
in elevation when the rods and poles had been place to higher ground.