You are on page 1of 2

Guided Demonstration - Setting up Lot Based Material

Requirements

Distribution
Oracle Advanced Supply Chain Planning

Job Title*

Ownership
The Job Title [list@YourCompany.com?Subject=LAB2C76Y] is responsible for ensuring that
this document is necessary and that it reflects actual practice.

Copyright © Oracle Corporation, 2003. All rights reserved.

Guided Demonstration - Setting up Lot Based Material Requirements


439925742.doc
Effective mm/dd/yy Page 1 of 2 Rev 1
Guided Demonstration - Setting up Lot Based Material
Requirements
Responsibility: Advanced Supply Chain Planner

Instance:Organization = TST:M1

1. Navigate to the Bills of Materials window.


 (N) Bills of Materials > Bills > Bills

2. In the Main tab of the Bills of Material window, select Lot for lot based calculation in the
Basis field.

Copyright © Oracle Corporation, 2003. All rights reserved.

Guided Demonstration - Setting up Lot Based Material Requirements


439925742.doc
Effective mm/dd/yy Page 2 of 2 Rev 1

You might also like