Professional Documents
Culture Documents
Distribution
Oracle Inventory
Job Title*
Ownership
The Job Title [list@YourCompany.com?Subject=LABxxxxx] is responsible for ensuring that
this document is necessary and that it reflects actual practice.
Assumptions
You are skilled in Oracle navigation.
You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Create Items
Create an item using the template you created in the previous task. Create eight items using the
Finished Goods template with the following descriptions:
No Inventory Controls
Locator Control ON
Revision Control ON
Lot Control ON
Grade Control ON
What item attribute do you have to disable if an item if you create an item under dual unit of
measure control? _________________________________________________
Note: Use the following naming convention for your items, ##-Item##, and be sure to
enable your items in M1 Seattle and M2 Boston.
Create Items
5. (B) Apply.
6. (B) Done
14. Create your locator-controlled item. Enter the item name and description. Repeat steps 2-6
to copy the finished good template. Enable the following additional item attributes for your
locator-controlled item:
Name: ##-Item02
Description Team ## Locator Controlled Item
Locator Control: Prespecified
16. Repeat steps 8-10 to enable the item both M1 Seattle Manufacturing, and M2 Boston
Manufacturing.
20. Create your revision-controlled item. Enter the item name and description. Repeat steps 2-6
to copy the finished good template. Enable the following additional item attributes for your
revision-controlled item:
Name: ##-Item03
Description Team ## Revision Controlled Item
Revision Control: Selected
22. Repeat steps 8-10 to enable the item both M1 Seattle Manufacturing, and M2 Boston
Manufacturing.
26. Create your lot-controlled item. Enter the item name and description. Repeat steps 2-6 to
copy the finished good template. Enable the following additional item attributes for your lot-
controlled item:
Name: ##-Item04
Description Team ## Lot Controlled Item
Lot Control: Full Control
Starting Prefix: A
Starting Number: 001
Maturity Days: 10
Hold Days: 5
28. Repeat steps 8-10 to enable the item both M1 Seattle Manufacturing, and M2 Boston
Manufacturing.
32. Create your parent and child lot-controlled item. Enter the item name and description.
Repeat steps 2-6 to copy the finished good template. Enable the following additional item
attributes for your parent and child-lot-controlled item:
Name: ##-Item05
Description Team ## Child and Parent Lot Item
Lot Control: Full Control
Maturity Days: 10
Hold Days: 5
Child Lot Enabled: Selected
Child Generation: Parent+Child
Prefix: A
Starting Number: 001
34. Repeat steps 8-10 to enable the item both M1 Seattle Manufacturing, and M2 Boston
Manufacturing.
38. Create your grade-controlled item. Enter the item name and description. Repeat steps 2-6 to
copy the finished good template. Enable the following additional item attributes for your
grade-controlled item:
Name: ##-Item06
Description Team ## Grade controlled item
Lot Control: Full Control
Starting Prefix: A
Starting Number: 001
Maturity Days: 10
Hold Days: 5
Grade Controlled: Selected
Default Grade: A
40. Repeat steps 8-10 to enable the item both M1 Seattle Manufacturing, and M2 Boston
Manufacturing.
44. Create your serial-controlled item. Enter the item name and description. Repeat steps 2-6 to
copy the finished good template. Enable the following additional item attributes for your
serial-controlled item:
Name: ##-Item07
Description Team ## Serial Controlled Item
Generation: Predefined
Starting Prefix: A
Starting Number: 0000001
46. Repeat steps 8-10 to enable the item both M1 Seattle Manufacturing, and M2 Boston
Manufacturing.
50. Create your dual unit of measure and lot expiration-controlled item. Enter the item name and
description. Repeat steps 2-6 to copy the finished good template. Enable the following
additional item attributes to enable dual unit of measure control:
Primary: 00-Each
Tracking: Primary and Secondary
Pricing: Primary
Secondary: 00-Meter
Defaulting: No Default
Deviation + 0
Deviation - 0
54. Repeat steps 8-10 to enable the item both M1 Seattle Manufacturing, and M2 Boston
Manufacturing.
Create a Unit of Measure Conversion for your Dual UOM controlled item