SEQUENCE OF CONSTRUCTION:

1. Set back marking


2. Gridline marling
3. Footing marking
4. Excavation
5. P.c.c for footing
6. Marking of footing and column in p.c.c
7. Installation of reinforcement
8. Formwork for footing
9. Pouring of concrete for footing
10. Placing of rein.for column
11. Formwork for column upto plinth beam bottom
12. Pouring of concrete
13. Backfilling for foundation
14. Excavation for plinth beam ( if necessary ,it base on the NGL)
15. P.c.c for p.b
16. Marking of p.b
17. Placing of reinforcement
18. Formwork for p.b
19. Pouring of concrete
20. Placing of reinforcement from p.b top to roof slab bottom
21. Formwork for column
22. Pouring of concrete
23. Formwork for roof beam
24. Formwork fork of roof beam innerside
25. Formwork for roof slab
26. Form work for outersie
27. Placing of rein bottom and top
28. Pouring of concrete for slab
29. Brick work for the building
30. Plastering works
31. Joinry works
32. M.E.P works
33. Compound wall
34. Bitumen road for vehicle tracks
35. Landscaping works
>>HAND OVER TO CLIENT<<