1) Name the major components of a drilling rig.

1.Derrick or mast and substructure 2.Hositing equipment

3. Pipe-handing equipment 4.Drilling fluid system

5. Well control equipment 6. Prime movers and power transmissions

7. Instrumentation

Marking:

2) The load capacity, the available power and the pressure rating of the equipment are primary
considerations governing the choice of a drilling rig. Name two other physical properties which are of over-
riding importance.

1. Well control equipment

2. the derrick and mast rating

Marking:

3) Given a choice of rigs which are similar with respect to the aspects mentioned in the previous question,
name one other important technical criterion which could be used?

The mobility of the land rig

Marking:

4) Name three other criteria that are used in making the choice of rig once the technical requirements are
satisfied ?

1.HSE record of the rig 2.crew familiarity of the operating area.

3. Staff development record

Marking:

5) Why, in principle, can a smaller location be used for a rig with a standard derrick than for a rig with a
mast?

A derrick stands four legs of its own, during the rig up, which occupy less space. A mast is placed on
substructure, which is required more space on ground during R/U and R/D..
Marking:

6) What is the advantage of a dual drainage system on a land location?

-1–
440687721.doc
Questions: S3P1 Sites, Rigs, Derricks & Mast.
Candidate (print name) Received by Name (print) Signature & date
mentor:
Chen zhiyong

The dual drainage system separates the flow of non-contaminated water from the contaminated water.
The fresh water could be disposed directly. This system could protect the operating area while
minimizing the wastewater storage pit.

Marking:

7) Give three reasons why a foundation is required for an onshore drilling rig

1.to provide a stable, level base for the rig-up. Including the mast erection

2.to support the derrick or mast under the most extreme conditions of high hook loads and the maximum
amount of pipe racked in the derrick

3.to provide support for heavy vibrating equipment.

Marking:

8) The basic purpose of the cellar is to lower the wellhead relative to ground level. Give three reasons why
that has practical advantages.

1. I f a high BOP stack is required it can be accommodated without having to use an abnormally high
sub-structure

2.During the production phase the Christmas tree is at a level which can easily be reached.

3. For workovers a low production hoist will fit over the wellhead.

Marking:

9) From the rig where you work at present find out the following and provide evidence of certification.

 Make & Max Rating Derrick. BAOJI JJ450/45-K5 Capacity:450MT


 Make & Max Rating Substructure Baoji/dz450/10.5-S4 450MT
 Make & Rating Crown block . Baoji/tc7-450 450MT
 Make & Rating Travelling block. BAOJI/YC-450 450MT
 Make & Rating Hook. LANSHI/DG450 450MT
 Make & Rating Swivel and its max WP. LANSHI450-11 53/35 MPa
 Max number lines which can be run . 12
 Maximum drilling line size., type and its Breaking Strength . 38.1 6  19 IPS IWRC
 Make & Max HP rating Draw works . BAIJI, CHINA/JC-70D4 1470KW
 Max Drilling Depth . 7000m
 Make & Max HP rating Mud pumps . BAOJI F-1600 800KW
 Active Tank and Reserve Tank capacities . 306M3
 If working on a land operation, Number of Rig move loads, specify heaviest load,
 widest load and the highest load.

-2–
440687721.doc
Questions: S3P1 Sites, Rigs, Derricks & Mast.
Candidate (print name) Received by Name (print) Signature & date
mentor:
Chen zhiyong

10) What is the Inspection Interval of above and when has the last Inspection taken place?
We can get all the answer from API 8C. API8B. API 16C

The average inspection frequency is about 1-4 years. According to the different equipment, they have
different requirement.

Drilling mast, rotary table, substructure: 4 years


Crown block, traveling block, drilling hook: 3 years
Swivels: 2 years
Mud pumps: 2 years

11) Give three strength and capacity considerations which have to be taken into account to avoid
overloading the derrick or mast.

1. Static hook load 2. Dynamic hook load

3. Shock load

Marking:

12) What is the static derrick load if the string weight is 100 kilodecaNewtons (kdaN), the weight of the
block is 15 kdaN and there are ten lines strung?

N 2 12
Static load=  hook load=  (15+100)=138 kdaN
N 10
Marking:

13) How can shock loads be minimised?

The inertial force should be reduced as far as possible when the rig is handling heavy loads by braking
and picking up the string with care.
Marking:

14) Why must telescopic masts always have guy lines installed?

Since the applied load is normally outside the base of a telescopic mast it must be used with guy lines.
Marking:

15) How do you know if the guy lines have been tensioned correctly?

Depending on the size and construction of the mast, a correct tension of the guy lines need to be fastened
can be found in the instruction manual.
Marking

16) What three things should a drilling crew never do to the structural members of a derrick or mast?

-3–
440687721.doc
Questions: S3P1 Sites, Rigs, Derricks & Mast.
Candidate (print name) Received by Name (print) Signature & date
mentor:
Chen zhiyong

1. omit any parts f the derrick 2. Improperly place any members

3. Force any member into place

Marking:

17) On a DC rig with 600 V - 520 kW (700 HP) generators the rotary ammeter reading is 385 A. How much
torque is applied by the rotary to the drill string if it is rotating at100 rpm?

600  385  9549


The torque applied to the string is= =22058 N.m
1000  100

Marking:

18) While pulling a drill string on the same rig as in the previous question the weight indicator reads 133.6
kdaN. What will be the maximum lifting speed, assuming. that other equipment is not in use and that the
overall efficiency is 90% ?

Units conversion: 133.6 kdaN=1336KN


The power=520KW
The lifting speed=520  0.98  60 /1336=21 m/min

Marking:

19) How much power must an engine supply to a mud pump if the pressure gauge indicates 20,000 kPa and
the circulating rate is 25 litres/sec? The volumetric pump efficiency = 95 %. and the mechanical efficiency
= 85 %.

25 1 1
Power=20000    =619.2 KW
1000 0.95 0.85
Marking:

20) On your present rig, what is the DFE?

10.5m
Marking:

21) What is the remaining length of the bell nipple when the full set of BOP's are installed on the THS?
Provide sketch with accurate dimensions of your stack up on graph paper.

2.7m, Please see attached picture

-4–
440687721.doc
Questions: S3P1 Sites, Rigs, Derricks & Mast.
Candidate (print name) Received by Name (print) Signature & date
mentor:
Chen zhiyong

Marking:

22) What is the exact length from DF to Tubing Hanger Hang-Off Point.

9.5m (see attached picture)

Marking:

Maximum score: 330


Total score :

-5–
440687721.doc
Questions: S3P1 Sites, Rigs, Derricks & Mast.
Candidate (print name) Received by Name (print) Signature & date
mentor:
Chen zhiyong

Minimum pass mark: 70%


Actual mark:

Fail / Pass for S3P2

Nomenclature of marking;

15 points. Fully understood question


10 points You are on the right track
5 points You made the effort, however lots of additional ground still to be covered
0 points Complete misunderstanding / nothing filled in

-6–
440687721.doc

You might also like