You are on page 1of 17

Information Station

DIGITAL DOWNLOADS

Track plans for a


4 x 8-foot plywood
sheet
MRPDF048 www.ModelRailroader.com
Flexible 4x8: 1

4 x 8 feet
on the water
East and West Coast railroads in waterfront settings

By Iain Rice

Someday you hope to build a model such as Shays also work well. For the and raise it to final display level once
railroad empire that fills a spare room, two HO plans presented here I imagine it’s finished, use a step stool to work
garage, or basement, but for now you’d using Bachmann’s 70-ton Shay and on it at the final level, or – more radi-
settle for an interesting layout that fits Life-Like’s United States Railroad Admi- cally – design the layout so the track
on a 4 x 8-foot sheet of plywood. Sound nistration (USRA) 0-8-0. and scenery are tackled separately.
familiar? That is, finish and ballast the track,
That’s what I thought, so I chal- Practical considerations then lift the layout to the desired level.
lenged several hobbyists who enjoy A limiting factor of the traditional You can build the various scenic ele-
designing small layouts to meet that 4 x 8 is that you need a lot more space ments at the workbench on their own
need. In the next several pages, you’ll than that to build and operate it if you mini-bases of Styrofoam insulation
find plans of various scales and scopes. want access to three or four of its board, then install them like pieces of a
We hope one of them inspires you to sides. Allowing only a meager two-foot giant jigsaw puzzle.
start building a model railroad. – Tony aisle on all sides increases the area
Koester, editor requirements to 8 x 12 feet. A site of Harbor-based layouts
that size offers a whole range of mod- Crowded waterside locations typi-

S
o many of us like layouts with plenty eling possibilities, and sticking a 4 x 8 cal of older ports have a lot going for
of water. The life and sparkle from island layout in the center of it proba- them as subjects for a small layout.
the surface reflections make small bly isn’t the most efficient or exciting. The unavoidable tight curves are right
layouts, which all of mine are, seem If you’re content with access on in keeping with such prototypes, as are
more spacious. That’s why, when the only two sides and stick the 4 x 8 in a short spurs, short trains, and struc-
call came to explore the possibilities of corner, the required area drops to tures crammed closely together.
4 x 8 layout schemes, my thoughts about 6 x 10 feet. The two plans shown Harborsides have other advantages
turned to waterfront railroads. Dock- here could be built in that space. too. While they aren’t quite a “univer-
sides and harbors in a small space offer Moreover, if you build these layouts sal industry” like an interchange track,
a lot of modeling opportunities. reasonably high off the floor, say 45" to most car types can be loaded or
48" or even a tad more so you’re look- unloaded at a port. Switching opportu-
Think motive power first ing across and not down on them, it’s nities abound. And if you enjoy build-
On a 4 x 8-foot layout, chances are much easier to achieve the illusion of a ing atmosphere-laden structures and
you’re not going to have a lot of more spacious scene. It’s also harder ship models, you’ll have a field day.
engines. The one or two locomotives to judge the sharpness of a curve. Even There’s also variety in harbors, as
that can be accommodated need to be small structures placed in the fore- these two plans demonstrate. Save for
darn good models in both appearance ground can interrupt the view of pass- their 4 x 8 footprints, they differ in
and performance. You’ll need to focus ing trains, divide the scene, and give almost every way. One features the
on one key model, then design the rail- the impression of greater distance. wide-open airiness of a Pacific North-
road to make best use of that type of High-level layouts have other prac- west lumber port in the pre-Depression
engine and let it operate properly. tical advantages. There’s a lot of space era, the other the grittiness of a run-
This means careful attention to under them for storage and a work- down Eastern waterfront in the 1950s.
curve radius, overhangs, and clear- bench, for example – even a TV or bed
ances, not to mention switching leads, if the room has to serve other func- Plan 1:
engine tracks, turntables, and run- tions. The downside is that very high Loleta & Mad River
around tracks. Most four-axle diesels layouts can be pigs to work on. A rough, raw, storm-wracked har-
are quite flexible in this regard, and There are three ways around this: bor on the rocky coast of northern Cal-
steam switchers and geared steamers Build the layout at a convenient height ifornia – anything farther removed

© 2009 Kalmbach Publishing Co. This material may not be reproduced in any form
without permission from the publisher. www.ModelRailroader.com
from the cramped and grimy confines Bridgeville a few miles up the Mad store, and a couple of small ware-
of an East Coast coal port would be River valley east of Loleta. houses round out the scene. A light-
hard to imagine. And as such it offers a Model railroads based on the min- house guards the harbor entrance.
different set of modeling challenges ing and lumber industries have lots of
and operational opportunities. advantages for minimum-space lay- Practical features
Logging and mining are by nature outs. Grades and curves that would be The actual table top forms the har-
ephemeral, so very little of their infra- impractical for a mainline railroad are bor water level, and the rest of the lay-
structure was built to last. This is normal on logging and mining roads, out is elevated above this. I’d make the
reflected in the limited and crude facil- thanks to their short rolling stock and surface of the quay about 11⁄4" above
ities at Port Loleta. Grouped around a articulated or geared steam power. mean sea level, and the grades marked
narrow, rocky, deep-water inlet, the Features like the 270-degree curve on a on the plan are based on this reference
buildings are all shack-like affairs 4 percent grade that forms the exit elevation. This gives about a 5" or 36-
thrown up using the local product, from Port Loleta isn’t far-fetched in this scale-foot clearance beneath the high
rough-sawn softwood. context and will let the three-truck bridge – enough for the small boats
There are three main commercial Shay work for its keep. A Model Die that can get into the inner harbor.
activities at Port Loleta: fishing, min- Casting two-truck Shay or Rivarossi The slight curve along the front
ing, and lumber export. The fish, Heisler would also be at home here. edge both softens the look of the lay-
mostly Pacific salmon, goes through The harbor at Port Loleta is built out and provides better access to the
the cannery and winds up in tins for around the edges of the steep-sided rear areas, especially the hidden stag-
export. Some of this traffic reaches rocky inlet. Ore is loaded into ships or ing, which lurks behind a row of
Southern Pacific rails via its inter- barges by chute from a short spur off removable structures between the can-
change with the Loleta & Mad River, the high line, while lumber is handled nery and the harbor bridge. An extra
the railroad of our immediate interest. at a timber-faced quay (wharf) built on train can be stabled in this area.
The mines produce limited quantities pilings. The hefty timber derrick, Trains going off the layout actually
of a high-grade ore, “unobtainium” per- which could be pinched from the end up not in that staging track but in a
haps, which is loaded raw directly into Walthers Midstate Marble kit, hoists removable train “cassette” concealed
coastal steamers for transport to dis- the stacks of lumber onto a schooner. behind structures and rock outcrop-
tant smelters. The lumber is exported Other spurs serve the fish cannery pings at the right end of the layout. It’s
as boards, sawn and finished in the and a general merchandise pier. designed to slip in and out, drawer
Van Duren Lumber Co.’s mill at Sundry fishermen’s shacks, a general fashion, thus allowing trains to be

Model Railroad Planning 2002 17


Start of Ore bins Top of Wood
Salmon cannery 4 percent grade and chutes 4 percent grade truss bridge Firehouse

0"

1"
Fishing harbor 3.5"
Net store
and chandler

3"

Main harbor
Lighthouse
2"

Harbor
entrance
channel

Rock fill Office


Pole Engine
derrick house

PLAN 1: LOLETA Mine spur


& MAD RIVER
HO scale Mad River
Logging
PORT LOLETA

turned or for the cassette to be stored lumber would come cautiously down- looks as though it were drawn by a
beneath the layout and replaced with grade into the yard. Ore cars would be moonshine-swilling spider with a pen
another one holding a different train. cut out and shoved back up the grade on each leg, so I figured that one more
The variety of rolling stock is therefore to the loading chute, and loads of lum- railroad would go unnoticed.
only as limited as the space allotted to ber placed quayside for unloading. Enter, then, the imaginary but not
storing extra cassettes. Outbound traffic could include emp- too implausible Chesapeake Harbor
This layout is intended to form the ties plus coal and oil, general supplies, Belt Line, connecting these minor port
nucleus of a larger system that might logging and mining equipment, and installations with the major railroad
be built at a later date in a single-car some agricultural necessities. The yards and the main lines of the Norfolk
garage or spare room. The smaller dia- locomotive would typically be placed & Western, Chesapeake & Ohio, Nor-
gram above shows one possible on the downhill side of the train in folk Southern (the original one), the
scheme for expansion. both directions for increased safety. Virginian, and the Tidewater & West-
For an authentic logging layout, ern, plus indirect connections to the
handlaid track is preferred, but you Plan 2: many other railroads of that region.
can make flexible track look less uni- Chesapeake Harbor Belt Belt lines handle a good range of
form by removing every fourth tie or The town of Chesapeake, Va., is not traffic over short hauls and work in
so and respacing, at odd angles, those that important a place. It was the ports some very cramped locations. Many,
ties that are left. Micro Engineering nearby – Norfolk, Portsmouth, and such as the Indiana Harbor Belt, relied
code 55 track would be a good choice, Newport News – that grew to become entirely on hefty steam switchers such
but you’d still have to handlay the major export harbors for the mighty as the IHB’s well-known three-cylinder
turnouts. Code 70 is therefore more Appalachian coal fields. Modeling one 0-8-0s. The USRA 0-8-0 thus drops right
practical for those who don’t want to of these ports is an undertaking far into this scheme, or you could substi-
handlay, although many modelers find beyond the scope of a 4 x 8 layout. tute a diesel switcher of your choice.
it an enjoyable diversion. [But see page 52! – Ed.]
Coal piers aren’t the entire story of A cramped backwater location
Operation port activity around Hampton Roads, The layout represents one of the
In the pre-Depression era of the however. A number of smaller facilities many minor facilities the CHB serves,
teens or twenties, a place like Port were scattered around the estuary and a collection of run-down wharves and a
Loleta would have been quite busy – up the narrower reaches of the Eliza- small repair yard that maintains tugs,
bustling, even. Trains of ore and sawn beth River. A railroad map of the area lighters (barges), and other harbor

18 Model Railroad Planning 2002


craft. A compact engine terminal tends using Walthers code 83 flextrack for
to the one assigned switcher. most of the layout along with the Learning points
The format is the usual continuous matching turnouts: no. 5, no. 61⁄2
run with harbor operations arranged curved, and wye. Lighter rail would • You get two hobbies for the price
on each side of the waterway and a look nice, especially on the spurs. of one when a layout combines rail-
short staging siding on the “off-stage” Don’t overdo it on the ballast; cinders road and harbor facilities.
part of the circuit, hidden by a remov- would suffice. This ain’t the high iron! • Be sure you can acquire, and enjoy
able block of structures. If the layout is building or detailing and running,
built near eye level, these structures Ships and cranes the required type of motive power
don’t need to be overly large to con- Here’s where you get two hobbies for a given type of layout design.
ceal trains and tracks. for the price of one, thanks to some • A watercourse down the center of
To aid access and get away from nice kits that let even a novice enjoy a table-type layout divides the area
the boxy look that characterizes many the challenges of a little ship modeling. in half and can be used to create
4 x 8s, the front of the baseboard fol- Walthers’ tugboat is an obvious two or more distinct scenes.
lows a flowing line that produces a choice, but spend time looking at the • Building the layout closer to eye
concave curve in the center while los- model boat section of your favorite level adds to the illusion of depth
ing an angular corner. hobby shop and at ship model catalogs and helps disguise sharp curves.
The focal point is the central water- for other ideas.
way, crossed by the railroad on low I’ve featured a number of cranes,
timber trestles patterned on those of with Walthers’ chunky overhead trav- main challenge. The various industries
the N&W and VGN over the Elizabeth eling crane an ideal choice to serve the allow an interesting mix of car types:
River. At one end, a swing span allows shipyard. Piko’s neat little no. 61102 flats and mill gons for the steel fabrica-
small ships, tugs, and lighters to enter gantry would work fine for the steel tor and the ship repair yard, tank cars
the confines of this side creek of the yard. Check Model Power’s no. 424 to the oil depot, and boxcars to the
river. In addition to the small repair traveling crane or Walthers’ no. 933- warehouses. The repair yard also
yard with its slipway, gantry crane, and 3067 pier with crane for the main might get boxcars or flats carrying lum-
fabrication shops, there are two gen- wharf. That’s Alexander Scale Models’ ber. And the general wharf can accept
eral wharves, a bunker fuel dealer, a no. 7519 Brownhoist Little Hook a wide variety of car types. MRP
steel yard, and a warehouse. mounted on a gantry or tall pillar on
Walthers’ waterside-series struc- the lighterage quay across from the Iain Rice is a regular contributor to
tures, notably the Front Street Ware- foreground wharf. MRP and Model Railroader, and the
house, offer excellent opportunities for author of Small, Smart, and Practical
the kitbasher. And don’t overlook the Harbor Belt operation Track Plans from Kalmbach Books. His
potential of Design Preservation Mod- Switching and transfer runs are the flowing British-style layout plans stand
els modular kits. business of the Chesapeake Harbor in sharp contrast to the typically tight
The track is almost all curved with a Belt. Routing cars to their individual geometrical alignments conceived on
minimum radius of 20". I envisioned destinations within the complex is the this side of the Atlantic.

Bunker Brownhoist Fabrication Heavy


Warehouse Tug berth fuel depot “Little Hook” Office shed overhead crane

Shipyard

Swing
bridge

U. S.
Customs
office

Engine Diner
facility

Mobile Switchman’s Dockside


Gantry crane
crane shanty Yard office
crane
HO scale
PLAN 2: CHESAPEAKE HARBOR BELT 12" grid

Model Railroad Planning 2002 19


Flexible 4x8: 2

One plan,
three options
An oval, I-, or L-shaped HO layout using the same basic plan

By Linda Sand

L
et’s say you’re just dipping into platforms, must be curved to match. operational interest. You will need flat-
model railroading for the first time, Since these are tricky to build, I chose cars, stockcars, and gondolas as well
and you think you’d like to try this industries that don’t require trackside as ubiquitous boxcars.
“operation” that you’ve read people do buildings: a stockyard, scrap dealer, Two spurs are truncated “inter-
with their layouts. You might be look- and team track. The latter is a good change tracks” or connections with
ing for a simple, quick-starting “industry” to model in that it can hold other railroads. Almost any type of car
approach that would let you try build- a wide variety of cars. A ramp at one can be interchanged between railroads,
ing and running a layout to see how end of the track allows farm imple- making these “universal industries.”
you like it. Of course, your leisure time ments to be rolled off flatcars.
is all too short, so you don’t want to My choices for industries give the Expanding the empire
waste any effort on something that railroad little vertical height, which When a larger space becomes avail-
wouldn’t be expandable if the bug makes folding it up against a wall for able, you can easily convert this layout
really bites. If that sounds like you, storage easier. If you want to use taller into a single town on the new linear
you’ve come to the right place. structures, make them removable. railroad. Remove the curved tracks at
These industries also require a vari- either end, take out the backdrop, and
Planning for the future ety of cars, which extend its slot to cut the base in half.
You may have heard of modelers adds to the Placing the halves end-to-end will
who incorporated their first layout into visual create a 2 x 16-foot town, which might
later, and larger, model railroads. and fit along one long wall. It may be easier
Here’s a way you can do that: to find two shorter walls, in which case
Start by cutting a slot down the mid- an L-shape might be more advanta-
dle of a sheet of plywood, stopping 6" geous. I’ve added a new con-
from each end. Make the slot just wide necting piece in the
enough to slip in a length of 18"-high corner, and with its
hardboard to serve as a backdrop. two-foot sides it
Give the base a coat of brown paint makes the L-
and the backdrop a coat of sky blue to shaped 10 x 10-
seal the material and to give your new foot plan on page 22.
layout a finished look. Only minor track realign-
These plans are designed with Atlas ment is required for either
code 83 (the rail is .083" high) HO track of these adaptations.
in mind, though other brands and rail
heights would be just as good. The
drawings show no. 6 turnouts and 22"-
radius curves. For such tight curves, I’d
stick to short 40-foot cars and small
engines – an Alco, Baldwin, or Electro-
Motive diesel switcher would be ideal,
or you could go even smaller with a
General Electric 44- or 70-tonner.
Most of the tracks are curved,
which means the structures alongside
the sidings, or at least their loading Illustration by Rick Johnson

© 2009 Kalmbach Publishing Co. This material may not be reproduced in any form
20 Model Railroad Planning 2002 without permission from the publisher. www.ModelRailroader.com
A flexible 4 x 8
Scale: 1⁄2" = 1'-0"
12" grid
HO scale

East interchange – 2 cars Runaround track – 3 cars Beeville Yard West interchange – 2 cars

Road with ramp


Yard lead

Team track – 3 cars


Backdrop

Road and
loading ramp Stockyard – 4 cars

Team track – 3 cars Stockyard – 4 cars Runaround track – 4 cars Road Scrap dealer – 3 cars Austin
Austin
Road
Beginning operations to industries as well. You now have the
On the 4 x 8-foot plan, there is room railroad populated with enough cars to
at the industries for ten cars. If you make it seem as though some work
want to be able to deliver different cars actually gets done there.
at different times, use 20 cars: a mix of The next time you draw cards and
six flatcars and boxcars for the team move cars to the industries, pick up Scrap dealer – 3 cars
track, eight stockcars for the stockyard, cars already spotted there before you
and six gondolas for the scrapyard. Buy set out new cars. Move them to the
cars that are evenly divided for rail- small yard and later to the interchange
roads east and west, or north and tracks where you can remove them to
south, of where you’ve located your simulate off-line movement. Furniture factory – 2 cars
railroad geographically. This will help Any inbound cars that won’t fit in
simulate traffic movement across North already-filled industry tracks can be
America. held in the yard until you decide the
Using 3 x 5 index cards, make out outbound cars already at industries
one card for each car you own, as are ready to be picked up. The yard Fuel oil
shown on page 22. It needs to tell you can also be used to sort the in- and out- dealer – 3 cars
that it’s for a certain type of car (flat, bound and east- and westbound cars
box, and so forth), what its reporting before making switching moves or
marks (initials) and number are, such working the interchange tracks.
as “UP 45682,” and whether it heads
east or west to go back to home rails. Expanding operations Beeville
Divide the resulting stack of cards into When you rearrange the 4 x 8 into a
two piles, one for return-east, the other linear design, you may be able to build
for return-west. Then shuffle each an expanded yard and more inter-
stack so the car types are mixed up. change tracks elsewhere in the room.
Begin operating by drawing two This will allow you to convert the exist-
cards from each pile and placing the ing yard and interchange tracks into
cars they describe on the east and additional industrial tracks, thus pro-
west interchange tracks as though con- viding more destinations for cars.
necting railroads left them there for For these new industries I chose a
your railroad. (If you do this before a furniture factory, printing plant, fuel oil Food processing
session, it’s called “staging.” If you con- dealer, and food processing plant. plant – 3-4 cars
tinue to do this as the session pro- Choose businesses that reflect the
gresses, it’s called “fiddling.”) industrial base of the region your rail-
Now use a locomotive to pull the road depicts. Since there isn’t room to Printing
cars from both interchanges and model large industries on the short plant – 2 cars
deliver them to the industries. No need tracks, I depicted the furniture factory
to get fancy here with destination infor- and printing plant as “flats,” walls
mation on the cards, as you can tell placed against the backdrop to suggest
where they go by the car type. that the other walls are behind them.
Illustrations by Kellie Jaeger
Draw another set of cards and The food-processing plant area, how-
deliver those cars from interchanges ever, is large enough to allow a

Model Railroad Planning 2002 21


Road with ramp Stockyard – 4 cars Scrap dealer – 3 cars

Furniture
factory – 4 cars

Team track – 3 cars Runaround track – 4 cars Road


Austin

Fuel oil
dealer – 3 cars

Bills of lading and car cards


Bills of lading and car cards
Car card made from Two bills of lading can be quickly handmade or
3 x 5 index card made from one 3 x 5 card formatted on a personal computer.
Gondola Gondola Flatcar

Beeville
CNJ empty machinery
8000
Austin Austin
Scrap dealer Team track

Cut line Food processing


Top of plant – 3-4 cars
Empty pocket
Return West
Transparent pocket taped to Printing
card using 3M BookTape plant – 2 cars

Walthers Car Shops kit (don’t get hung car card. Combining the two makes the
up on a kit’s name) to be used as a ship- equivalent of a railroad’s waybill. A Learning points
ping/receiving building next to a Golden space in front of the destination makes
Valley Cannery processing plant. it easier to see where it’s going, just as • Start small, but smart, so your
having the town on a separate line original layout can become part of
Waybills from the industry makes it easier to an expanded empire later on.
With these new industries, you no look at just town names when sorting • Modest track realignment allows
longer have just one destination for cars into trains in a freight yard. this oval plan to be converted to a
each car type, so you need to expand Make the bills a little smaller than linear design as a stand-alone layout
your paperwork to suit your expanded the car cards, since you need to be or as part of a larger layout.
empire. This is where waybills come in. able to read the reporting marks and • Match industrial choices to car
Each bill of lading lists the type of com- road number of the car cards when the types to ensure visual and opera-
modity the car contains, the type of bills and cards are combined. tional variety, and choose them to fit
car that lading requires – it wouldn’t I recommend a selection of bills, the era and region you’re modeling.
do to load corn syrup in a stock- typically four for each industry spot.
car – and who gets the loaded car. A This means you can send four cars of
bill might therefore say “Gondola, one type, four different types, or some give your growing empire the prompt
empty, Austin, scrap dealer” or “Flat- combination thereof to each spot. rail service it deserves. MRP
car, machinery, Austin, team track.” More bills mean even more variety.
Just for labels I used town names Linda Sand is a frequent contributor
beginning with “A” and “B.” Have fun Start switching to MRP and an active member of both
choosing regionally descriptive names Now that you have bills of lading the Layout Design and Operations Spe-
for your towns and industries. and car cards, draw enough bills to cial Interest Groups of the National
I like the information in list format make up a train that doesn’t over- Model Railroad Association. More
with blank lines between the car type, whelm the railroad. Then dig out cars information on these SIGs is available
load/empty line, and destination lines. appropriate for those bills and place at www.nmra.org, or you can check out
Having the car type at the top makes it them on the interchange or staging/fid- the chat lists of each of these groups at
easier to match the bill of lading to a dle tracks so trains can be made up to www.yahoogroups.com.

22 Model Railroad Planning 2002


Flexible 4x8: 3

Houston’s Port
Terminal Railroad in N scale
An urban switching “association” that handles half a million cars a year

By Byron Henderson

A
4 x 8-foot layout, often a beginner’s ing power, it operates 24 MK1500D be thinner and easier to lift off the lay-
first foray into model railroading, locomotives delivered in 1996. For out for track maintenance or rerailing
offers opportunities for experi- more information, visit www.ptra.com. equipment. Curved turnouts increase
enced modelers as well. That’s true Squeezing a huge operation like this the usable length of the staging tracks.
even when you want to model an actual into the confines of a 4 x 8 may seem As the PTRA and SP emerge from
prototype railroad. Long mainline runs foolhardy, but it can be done by cap- staging into a visible scene in the
aren’t practical, even in the smaller turing the flavor of the line rather than lower-right corner of the plan, they
scales, but an industrial or switching modeling it scene by scene. I focused share a single track. The first industry
railroad in N scale is within reach. on a few miles of the PTRA’s “South they encounter is a massive Shell Oil
Side” where it runs over SP rails. It refinery. This facility is actually served
Four key characteristics leaves the Espee at Deer Park Junction by Shell Oil’s own crews, but we’ll let
Most successful model railroads (operated remotely by Centralized both PTRA and SP crews switch it on
share four important characteristics: Traffic Control or “CTC”) and passes this layout. Multi-track tank car racks
staging, major industries, interchange under the Jesse H. Jones Highway and a small spur for equipment deliv-
between railroads, and prototype inspi- bridge over Houston’s Ship Channel to eries are located here.
ration. Incorporating all of them into a serve a large industrial area near the Deer Park Junction is at the lower
4 x 8 space is challenging, but carefully Equity grain elevator. left. That the SP and PRTA diverge
selecting a prototype helps, which here is underscored by operating or
brings us to Houston’s Port Terminal Hidden staging even dummy CTC signals. The PTRA
Railroad Association, the PTRA. Staging is hidden behind and then serves the large Lubrizoil (STP)
The PTRA is a switching line formed beneath “backdrop boxes” made from plant in the foreground to the right of
in 1924 by a number of railroads that sheet styrene, thin plywood, or even the junction.
served the port area. In the 1980s, the foam core (see page 25). The boxes
era this plan depicts, member rail- support industry flats on their sides or Lubrizoil: “fascia flats”
roads included the Burlington North- on “air rights” above. Building the sup- Lubrizoil is represented by thin
ern; Atchison, Topeka & Santa Fe; ports as boxes with openings for the “fascia flats” – the fascia rises up to
Southern Pacific; and Union Pacific trains to pass through allows them to form the silhouette of the building. The
(including the former Missouri Pacific). modeled front of the building is
These roads provided locomotives inserted between the fascia and the
for use by the PTRA, and much of the Learning points siding. The flats are relatively low in N
140 miles it operated was over trackage scale, so reaching over them to uncou-
rights on its member roads, primarily • You can get more operation in a ple cars or clean track is no problem.
SP. The PTRA then handled about small space by focusing on an Chemicals arrive at Lubrizoil on one
500,000 cars annually to serve numer- industrial switching layout. track in tank cars and are then blended
ous grain elevators, docks, manufactur- • Structure flats and photographic into gas and oil treatments. Boxcars of
ing and chemical plants, and refineries. backdrops make it possible to model packaged products are shipped from
Today’s PTRA members include large industries in a small space. the other track.
Burlington Northern Santa Fe, Texas • Trackage rights and joint staging
Mexican RR (part of Kansas City South- allow two railroads to be modeled in Beyond the backdrop
ern), and UP. It serves about 150 indus- the space of one. To the left of the junction both rail-
tries and the public docks, has more • A 4 x 8-foot layout can be devel- roads pass under the highway bridge
than 350 employees, and handles half a oped beyond a beginner’s project. as they parallel the Houston Ship Chan-
million cars each year. Instead of leas- nel. The SP then disappears back into

© 2009 Kalmbach Publishing Co. This material may not be reproduced in any form
without permission from the publisher. www.ModelRailroader.com
HOUSTON'S PORT TERMINAL RR IN N SCALE
Scale: N (1:160) Rollins-Pearle (industrial flat)
10" minumum radius Rollins-Pearle track 1 (tank rack) Empak cleaning track (open air under awning) Track 2
5⁄8" = 1'-0"; 5⁄8" grid
Peco code 55 Empak repair track
medium-radius turnouts (open to aisle to
show interior and cars)
Rohm & Haas
interchange behind View blocks
chain-link fence (in blue)
and gate

Access road
Shell Oil
Storage tanks
and piping Tank car docks
Shed with dock
Equity Grain (built on
Houston “air rights” over staging)
Ship Channel

PTRA Deer Park Junction (with CTC signals) Lubrizoil loading dock (boxcars) Mirror
Jesse H. Jones Highway Bridge
Lubrizoil (STP) tank rack with “fascia flat”
Equipment delivery track Joint SP/PTRA Refinery pipe bridge (to staging)

staging, while the PTRA continues on


Cross sections
to serve another industrial area from a
small yard shown along the top of the
plan. This area represents the storage
yard at the Equity grain elevator, and Flat
Single-sided backdrops
building flats are used to depict the Double-sided backdrop
towering structures in this area.
Nearby industries include Empak, a
car cleaning and repair service for tank
cars and hoppers. One Empak track
represents an open-air cleaning area
under a high awning. Viewers can actu-
Tracks Tracks
ally look into the truncated repair
building served by the second track.
Rollins-Pearle, an environmental- Illustrations by Terri Field

services firm, receives tank cars and Building a backdrop box to support lightweight structures is an easy way to hide tracks. Attach building flats, tanks,
boxcars filled with 50-gallon drums of silos, and other background elements to the basic boxes. Additional view blocks or structures hide “portals” at the box
waste for treatment. It’s represented ends. The box can be easily removed to clean track or reach equipment.
by a tank rack and photographic back-
drop or thin flat. Nearby Rohm & Haas
does its own switching, so the PTRA while a dedicated switcher could work stock would include tank cars, box-
simply shoves cars onto R&H tracks Equity and other nearby industries. cars, and hoppers.
behind a chain-link fence. One challenge is that switching the By focusing on industrial switching
The giant Equity elevator can load refinery would usually require using a rather than a main line [an increasingly
300 cars a day, so our model of it staging track as a lead, but this seems popular approach, as Chuck Hitchcock
needs to convey a sense of size. This is like a reasonable trade-off. explains on page 68 – Ed.] we can get a
accomplished by positioning a small On the prototype, the Santa Fe and lot from the humble 4 x 8: an authentic
mirror in the lower right-hand corner Katy (Missouri-Kansas-Texas) had mix of liveries and equipment, large
of the layout to extend its apparent trackage rights to bring their grain industries, and varied operations. MRP
length. The large silos are modeled trains bound for Equity into nearby
over the staging tracks. Manchester Yard and to pick up emp- Byron Henderson has been “between
ties there. Transplanting this operation layouts” for 29 years but is working hard
Two-railroad operation to the storage yard seems reasonable. to rectify that. He, wife Marian, and
Both the SP and the Port Terminal This traffic could be staged on the stag- daughter Claire live in San Jose, Calif.,
RR serve the refinery, and each brings ing yard’s single-ended siding. where he works in marketing for a large
cars to the small yard from staging Equipment could be quite varied. In networking company. Byron recently
with some interchange between the the late 1980s PTRA locomotives served as the editor of the Layout Design
two railroads occurring there. A PTRA included units from all parent railroads SIG’s highly informative Journal (contact
road job would serve Lubrizol and and ranged from ’50s-era AT&SF and Bob Knoll, 7788 E. Whileaway Pl., Tuc-
some other industries from staging, SP GP7s and 9s to UP GP38-2s. Rolling son, AZ 85750).

Model Railroad Planning 2002 25


Flexible 4x8: 4

O scale railroading using


HO gauge track
Enjoy large-scale modeling in a small-scale area

By Chris Webster

R. H. Kindig

B
achmann’s introduction of afford- instead of 3⁄4" – isn’t much if it allows Colorado & Southern 2-8-0 no. 65 crosses the high bridge
able and highly detailed O scale you to get there from here painlessly. of the Georgetown Loop in May 1938, with a “4 x 8-size”
narrow gauge cars and locomotives Moreover, as baby boomers age train of short boxcars trailed by a four-wheel caboose.
built to run on HO gauge track rekin- they may begin to wonder if N or HO
dled my interest in narrow gauge mod- isn’t getting a bit too small. Then the same radius that an HO modeler would
eling. This scale/gauge combination, ability to model in O scale in the space use on a 4 x 8 layout.
designated On212⁄ , puts 1:48-proportion normally associated with an HO layout I designed the layout so it could be
models on track laid to HO gauge, with can be mighty appealing. split into two 2 x 8-foot sections. This
16.5mm (5⁄8") between the rails. That both ensures that it remains portable
allows a reasonably authentic model Setting priorities and provides an easy way to mount a
railroad to be built within a relatively My goals in designing this layout backdrop: Just wedge it between the
small space – even on a 4 x 8-foot sheet were multi-train operation, Colorado two halves.
of the building material of your choice. scenery, a continuous run, and a little
I say “reasonably authentic,” since bit of switching to keep things inter- For the beginner
the proper gauge for the Colorado pro- esting. To accommodate Bachmann’s Since this is unabashedly a begin-
totypes Bachmann offers is three feet. 2-6-0 Mogul and passenger cars, I used ner’s layout, the plan features Atlas HO
But a six-scale-inch compromise – 5⁄8" 18" minimum-radius curves – about the sectional track. Although Peco offers

© 2009 Kalmbach Publishing Co. This material may not be reproduced in any form
without permission from the publisher. www.ModelRailroader.com
Water Water Standard gauge hopper Coal prep plant
Depot column tower under prep plant (loads in/empties out)

22" R 6" LH 3" 22" R


22" R 1- ⁄ " 6"
12 ⁄ -18
13 6" 6" 22" R
RH RH
Team
⁄ -18
12 track

RH LH ⁄ -18
12
Road 13 ⁄ -18
overpass 1⁄ 3-18
Industry no. 2
2-1⁄ 2" Shed 6" 22" R
6" 3"
Road
Backdrop

⁄ -18
12
3" 6"
Industry no. 1 15
2-1⁄ 2"
RH
12 ⁄ -18
6" RH
Road 1"
3" RH
22" R
13 ⁄ -18 22" R
Creek LH
22" R 22" R
Scale: 3 ⁄4" = 1'-0" Road Loading Coal tipple Depot Water tower
12" grid overpass chute (empties in/loads out)
Unmarked track sections are 9" straights or 18" curves.
All turnouts are Custom-Line no. 4’s. Illustrations by Kellie Jaeger

Benchwork cross-section Track list


Atlas Model RR Co. Inc. HO track

Foam backdrop 510 9" straight, 16


511 15" radius, 1
512 18" radius, 10
Four pieces 513 22" radius, 9
of 2" foam 521 6" straight, 2
522 3" straight, 1
523 11⁄2" straight, 1
524 Snap-Track assortment, 1
533 1⁄2 18" radius curve, 4
534 1⁄3 18" radius curve, 4
543 manual Snap-Switch, right, 1
561 no. 4 Custom-Line turnout, left, 3
Bolt
562 no. 4 Custom-Line turnout,
right, 5
1 x 3s 1 x 3s

correctly scaled On21⁄2 flextrack and Operations tween a coal mine and a coal prepara-
turnouts, I believe a beginner is more Both passing sidings are long tion plant, thus eliminating the need to
likely to use HO sectional track for his enough to hold a passenger train con- load and unload gondolas. Despite my
first layout, perhaps burying the under- sisting of a 2-6-0, combine, and coach, intentions to have Rocky Mountain
sized ties under the ballast. or a freight train headed by the Mogul scenery, the mine/prep plant scheme
There are no grades, and all the with three freight cars and a caboose. has an East Broad Top (Pennsylvania)
turnouts are within a foot of the edge Two mainline operators can thus be flavor. If that bothers you, simply set
of the table. With the turnouts so kept busy running on the mainline the railroad in the Appalachians, but
accessible, it’s handy to use inexpen- loop, meeting each other at the sid- Colorado narrow gauge railroads also
sive and easy-to-install ground throws ings, and taking on water. Frankly, served coal mines.
to operate the switch points. however, this layout would do a better One town has a team track on
If a 4 x 8 space is not available, it’s job of keeping just one operator which boxcars and flatcars can be
possible to build only half of the lay- engaged switching the freight and mov- spotted for wagons drawn by teams of
out and replace the other half with a ing it out of the way of the occasional horses (hence the name) to load or
loop of track mounted on a drop-leaf passenger train. unload. Both towns have an “industry,”
section, so the layout could be shoved Switching opportunities include a perhaps a freight house or lumberyard,
back against a wall when not in use. loads-in/empties-out connection be- where cars can be spotted.

Model Railroad Planning 2002 27


Learning points
• On21⁄2 offers the size advantages
of O scale with the more modest
space needs of HO, an ideal combi-
nation for baby boomers giving
model railroading a try.
• Adding extensions to the basic
4 x 8 plan can accommodate a
yard, engine terminal, more indus-
tries, and staging to simulate the
rest of the rail network.
• A Colorado setting is logical, given
the choice of equipment, but model-
ing a three-footer in the Midwest or
on the East or West Coast is feasible.
• Adding a bit of standard gauge
track underscores the diminutive
size of the slim-gauge equipment.
Both photos by Jim Forbes

Comparison of standard HO track and Peco HO gauge track made for On21⁄2 shows the more realistic tie length and spacing. hoppers will be a visual highlight of
this layout.
Industries to consider are sug-
gested by the available freight cars: a
lumberyard that receives boxcars and
flats, a scrap-metal dealer loading gon-
dolas, a stock pen where cattle, hogs,
or sheep are loaded, or a place for tank
cars to deliver petroleum products.

Compromises
If you’re new to model railroading,
this is as good a time as any to dis-
cover that the hobby is all about mak-
ing choices and compromises. In this
case, there isn’t room to build scale-
size industries, the passing sidings and
spurs are short, and curves are tight. I
couldn’t even fit in a small yard or
engine terminal, although an extension
off one end of the layout would accom-
modate either or both.
Speaking of choices: The track into
“industry 1” could instead head into an
Here HO (1:87), left, and On21⁄2 (1:48 narrow gauge) steam engines show the size comparison between models made in enginehouse, with the engines being
different scales that nevertheless run on the same gauge of track. coaled right at the tipple loading chute.
Staging tracks could similarly be added
Construction and scenery also a short trestle over a creek, two to one side, perhaps on a roll-away or
This layout could be built on a sand- tunnel portals, and several opportuni- drop-down section, to provide a con-
wich of two pieces of 2" foam insula- ties for small, close-up scenes where nection with the outside world.
tion board. This sandwich would sit on detailers could go to town. As a starter layout, this one offers
a benchwork frame of 1 x 3 boards. For example, the small depot could just enough action to challenge a new-
This wood framing is required to keep be populated with folks waiting for the comer to the hobby. It can also let vet-
the joint between the two halves next train to the big city. Teams of eran modelers try their hand in a
aligned and to prevent longitudinal horses could be tied adjacent to the larger scale in a modest area. MRP
sagging. Cutting some of the foam team track awaiting the local freight.
away to allow for water courses won’t On the other side, a coal prepara- Chris Webster, a registered profes-
compromise the structure, thanks to tion plant, where raw or “cleaner” coal sional engineer who lives in Maryland,
the wood underpinnings. from the tipple is cleaned and sized, began modeling at age 13 when he was
Although the layout is only 4 x 8 provides a destination for loaded gon- welcomed into the Central New York
feet, there are several interesting dolas. Coal comes in over the narrow Division of the National Model Railroad
scenic highlights. On the mine side of gauge, is processed, and is then loaded Association. Although primarily an HO
the layout, the tipple itself is bound to in standard gauge hoppers for the trip modeler, Chris controls occasional out-
be an eye-catcher, and there are kits to market. The visual contrast between breaks of narrow gauge fever with 1:20.3
offered for Western mines. There are narrow and standard gauge gons and and On21⁄2 projects.

28 Model Railroad Planning 2002


REALISTIC TRACK PLANS

Illustrations by Theo Cobb

Three track plans for


one sheet of plywood
Cutting a 4 x 8 sheet into three pieces yields creative layouts in HO and N
By Steven Otte

M
any model railroaders base their scale, a plywood sheet restricts you to a together the odd shapes resulting from
first layouts on 4 x 8 sheets of few variations on an oval or figure our jigsaw-puzzle technique will re-
plywood, for obvious reasons. A eight. And being able to see your entire quire a bit more involved benchwork
flat tabletop is a lot easier to build than layout from a single vantage point lim- than a 4 x 8 table does, but it pays off in
L-girder benchwork, and almost any its the realism. much greater visual and operating in-
home has room for a 4 x 8 table at one But what happens if we cut that ply- terest. MR
side of a bedroom or den. wood into three pieces, and reassemble
Great things have been done on a them in a different shape? These three
single sheet of plywood. However, that track plans use a few cuts of a saber
shape does impose certain limitations. saw to open up the possibilities locked
Though the tighter curves usable in N in a 4 x 8, while keeping the benefits of
scale open up more possibilities, in HO compact size. Supporting and splicing
© 2009 Kalmbach Publishing Co. This material may not be reproduced in any form
46 Model Railroader • www.ModelRailroader.com
without permission from the publisher. www.ModelRailroader.com
Oklahoma & Western RR
The simplest of these three track
plans uses one straight and one
diagonal cut to add a branch line and Oil pumps
an interchange track to an HO scale
oval. The double-ended track allows
for runaround operations needed to
switch the three industrial sidings Oklahoma & Western RR Oil tanks
inside the loop, but it’s the eight-foot- Scale: HO (1:87.1)
long, tapered peninsula that breaks Size: 6 x 12 feet
this layout out of the box. Scale of plan: 1/2" = 1'-0", 12" grid
Oil loading
Wrapping the lead for the branch platform
line around the outside of the loop
maximizes its length, while a variety
of facing-point and trailing-point
turnouts makes switching challenging.
Note that the second track in front Cattle pens
of the O&W depot can’t be used as
a passing track for the loop without a
backing maneuver.
The track that crosses the main
and the branch represents the
Interchange track
Missouri-Kansas-Texas Ry., a real Cutting diagram
railroad with which the O&W inter- M-K-T main
changes. This doesn’t just add visual 45-degree
Interlocking tower
interest, but also allows the O&W to Okie Pride Meat crossing
ship any kind of car on and off the Packing No. 6 wye turnout
layout via the interchange track. Cars Diesel fueling 90-degree crossing
due for delivery to the O&W can be Global Tire
factory
staged in front of the M-K-T depot
O&W depot
before the operating session, and
shifted to the interchange for pickup
by a road switcher. Likewise, cars
from online industries slated for M-K-T depot
destinations off the layout can be Electricorp Supply
dropped off on the interchange track
to be picked up by the Katy. Mammoth Deep cut
The locale is the foothills of western Tool and Die
Oklahoma, represented on the model
Downtown
railroad by hills on two corners of the buildings
layout. The deep cut on the larger hill
also serves to visually break up the Hill with cut
main line, disguising the oval.
The major industries and resources Tom’s Diner 90-degree crossings
of the region – cattle, meatpacking,
tire manufacturing, and oil – are ▸▸ The track plan at a glance ▸▸ Suggested structures
represented, helping to reinforce the
layout’s sense of place. A couple
smaller industrial spurs branching off Name: Oklahoma & Western RR Okie Pride Meat Packing:
the main loop add options. Scale: HO (1:87.1) Atlas 721 Middlesex Manu-
Setting the railroad in the transition Size: 6 x 12 feet facturing Co.
era means that either early diesels or Prototype: freelanced Mammoth Tool & Die: Design
oil-fired steam locomotives would be Locale: Western Oklahoma Preservation Models 103
at home on this layout. A Vanderbilt- Era: 1950s Cutting’s Scissor Co.
tender 2-8-2 Mikado or an F unit could Style: tabletop with shelf Electricorp Supply: Wm. K.
handle motive power duties on the Mainline run: 29 feet Walthers 933-3611
O&W. For the M-K-T, an Alco RS-3 Minimum radius: 19" Tom’s Diner: City Classics 110
would be a good choice. Minimum turnout: no. 5 Route 22 Diner
If you wanted to expand this layout Maximum grade: none Global Tire factory: Wm. K.
later, the line at the end of the penin- Walthers 933-3172 Arm-
sula could be connected to a staging strong Electric Motors
yard, or maybe a big city like Tulsa. (background building) and
You could also extend the Katy track 933-3514 industrial tank set
into a new area.

o8/o8 • Model Railroader 47


Housatonic Valley Ry.
For this N scale plan, one straight Freight
and one S-shaped cut yields three Houses General store house Depot Concealed staging tracks
long pieces of plywood that assemble
into an 8 x 9-foot, U-shaped, walk-in
layout. Using 91 ⁄2" and 11" curves lets
us plan loops at the end of the two
Grain elevator Middleboro
peninsulas for a basic dogbone
design. Setting the railroad in the Housatonic River Gravel pit
rolling terrain of New England gives us Dam
a rationale to conceal the return track,
and even a couple of staging tracks, Hidden track
Covered bridge
under forested hills along the outer exposed between
edges of the layout. (If you build this buildings
layout along the walls, be sure to
make your hills removable for access.) Interchange Herbert
track Mills
Rather than attaching the track and Cutting diagram
roadbed directly to the plywood, this
45-degree
plan calls for a layer of rigid extruded Farm houses
foam insulation on top of the plywood.
crossing
Housatonic Station
The foam can then be cut away to Patriot Valley Ry.
model water features below the level Ironworks Scale: N (1:160)
of the track, like the Housatonic River Size: 8 x 9 feet Eastport
and the docks at Eastport. Scale of plan: 1/2" = 1'-0", 12" grid
This design is for a steam-era road
linking an industrial seaport to an
Depot
inland agricultural town. Using the
Sunnydale Creamery
hidden track, you can run the layout
as a continuous loop, or as a point-to- Norwick
point road with the staging represent-
Hotel
ing outside connections at both ends.
A cutoff connecting to a section of
track exposed between two tunnels Aardmore Coal & Lumber
stands in for an interchange track with Eastport
a second railroad. Just as on the Warehouse
Northern Stone Products Seagold Cannery
previous plan, this track lets the home
road ship in or out any kind of cars
desired. The cutoff can also be used
as a reversing loop to turn a consist.
As on the previous track plan, ▸▸ The track plan at a glance ▸▸ Suggested structures
industries on the Housatonic Valley
help to establish a sense of place. The
seaport in Eastport features a fishing Name: Housatonic Valley Ry. Fishing boat: Sea Port Model
boat docked at a cannery, a ware- Scale: N (1:160) Works H114N 83-foot sardine
house, and a team track. A linen mill, a Size: 8 x 9 feet carrier
gravel quarry, an iron foundry, and a Prototype: freelanced Seagold Cannery: GC Laser
creamery represent industries Locale: New England 507 Brennon Seed Co.
common to the area, while autumn Era: 1930s Eastport Warehouse: Ameri-
foliage, Cape Cod-style houses, and Style: walk-in can Model Builders 604
a covered bridge over the tracks near Mainline run: 43 feet transfer building
Middleboro evoke well-known New Minimum radius: 9.5" Herbert Mills: Wm. K. Walthers
England sights. Minimum turnout: no. 5 Modulars sets 933-3295 and
One corner of the layout includes Maximum grade: none 933-3283
another common New England Gravel tipple: Wm. K. Walthers
landmark, a small hydroelectric dam. 933-3241 Glacier Gravel Co.
The trick here is that the upper Covered bridge: GC Laser 418
reservoir’s water level is actually Patriot Ironworks: Model Power
above the hidden track. The easiest 1546 Holland Iron & Steel,
way to model this water would be with 1573 National Casket, and
commercial plastic water sheet. Just 2608 General Electric Co.
be sure to paint the bottom or back it Aardmore Coal & Lumber:
with opaque material, so your guests Branchline Trains 893 Valley
don’t see trains moving through Davy Fuel & Supply
Jones’ Locker!

48 Model Railroader • www.ModelRailroader.com


Indiana & Aurora RR
This layout represents a diesel-era
short line serving a Midwestern city Indiana & Aurora RR
and the surrounding farmlands. Scale: HO (1:87.1)
Sliding apart the sections on either Size: 6 x 7 feet
Scale of plan: 1⁄2" = 1'-0", 12" grid
side of the S-shaped cut yields a
layout table that is still compact but
has room for 24" curves needed by
larger, more modern equipment.
Although the cutoff track leading
past the grain elevator provides for
continuous running, the staging tracks
hidden behind the backdrop allow it to
be operated as a point-to-point. A Cutting diagram
train could originate either in the
staging yard (Chicago/Gary) or in the Seed and feed dealer Station
yard in front of the Rockland station. Apartment
As it travels around the layout to the building
other end, the train would pass backs
through the same urban scenery
twice, but since the track is not
Optional
connected at this point, for operating Gibson extra staging
purposes it can be treated as two Implements
separate cities. Waynesboro
While Rockland has a couple of Arrowsmith
Depot
industry spurs, three station tracks Rockland
Brewing
and a team track, Fort Garth’s two No. 6 wye
lineside industries share one double- Team track Fort Garth
ended siding. Switching these will No. 6 turnout Hoosier
require some careful planning by the Rockland Oil Mills
yardmaster. On the other side of the 30-degree crossing
layout, a farm, a couple of agricultural View block
industries, and the flag stop station at Farm field
Waynesboro represent Indiana’s rural
countryside. No. 8 curved turnout Chicago/Gary
Fort Garth’s flour mill and brewery, (staging)
both modeled as low-profile back-
ground buildings, and the businesses
on the agricultural side of the layout, a
grain elevator and a feed mill/farm
supply dealer, represent the line’s
agricultural theme. The industries in Grain elevator Downtown buildings
Rockland – a bulk oil dealer, a small
agricultural implement factory, and a
team track – provide operating variety.
Though there are two depots on ▸▸ The track plan at a glance ▸▸ Suggested structures
the layout, a line set in the 1970s like
this one would see little demand for
local passenger service. A short line Name: Indiana & Aurora RR Hoosier Mills: Wm. K. Walthers
like this might not have rated an Scale: HO (1:87.1) 933-3160 Centennial Mills
Amtrak route, but you can increase Size: 6 x 7 feet Arrowsmith Brewing:
operating interest by adding a coach Prototype: freelanced Wm. K. Walthers 933-3193
or combine to turn a daily local freight Locale: Northern Indiana Arrowhead Ale,
into a mixed train. Era: 1970s George A. Nickels Milling &
This layout is a natural for future Style: doughnut Feed: Branchline Trains 692
expansion. Simply cut the track plan Mainline run: 40 feet Waynesboro depot: Woodland
apart at the top and bottom of the Minimum radius: 24" Scenics 239 flag depot
D-shaped operating pit, pull the Minimum turnout: no. 5 Gibson Implements: Design
halves apart, and add new sections of Maximum grade: none Preservation Models 106
benchwork and track in between to Laube Linen Mill
extend the main line. The tracks Rockland station:
leading past the grain elevator and the Wm. K. Walthers 933-2841
seed and feed dealer could also be Clarkesville Depot
the connections for new branch lines.

o8/o8 • Model Railroader 49

You might also like