Professional Documents
Culture Documents
HR Department
JAN, 2016
Articles of Association
HR Employment Reg. / Employee Admin. / Remuneration
Regulations
& Policies HR Policy making (Detailed procedures, processes, etc.)
T&E of Manager(Gwangyang/Cilegon)
-2-
I. Background
○ Production preparation part should take responsibility for the ISM operation plan with specific R&R
(recruiting & training, technical/operation standards, preparing spare parts & operation material, etc.)
ORGANIZATION CHART 1
President Director
-4-
Jul. 1, 2011(Main Construction preparation): 5 Divisions / 7 Departments, 36 Teams
President Director
TBD Division
Tech. & Business Production Ironmaking Steelmaking Plate Rolling Facility Tech. Environment
Dept. & Quality Dept. Dept. Dept. Dept. Dept. & Energy Dept.
*Sr. Chief Specialist *Sr. Chief Specialist *Sr. Chief Specialist *Sr. Chief Specialist
• Tech. Dev. T. • Production • IM Operation • SM Operation • PR Operation •Facility Mgt. T. • Resource Recycling T.
• Business Dev. T. Management T. Mgt. T. Mgt. T. Mgt. T. • Mechanical • Environment &
• Production Control • BF & Sintering • SM Technology T. • PR Technology T. Tech. T. Safety Mgt. T.
T. Technology T. • Refractory T. • PR Plant • EIC Tech. T. • Health Mgt. T.
• Logistics Mgt. T. • Cokemaking Tech T.
• SM Plant • Energy Tech. T.
• BF Plant
• Quality Control T. • CC Plant • Electric Power Supply T.
• Raw Materials &
• Physical Testing T. • Utility Supply T.
Sintering Plant
• Chemical Testing T. • Energy Analysis &
• Coke Plant 6
Saving T.
E&C Division: 5 Dept. 16 Teams
Auxiliary Facility Team is added to catch up the receiving and distributing the power
To support the increasing requests related to the personnel and general affairs by the
other organization, HR & GA will be set up in advance the schedule
● Marketing Dept.
. Marketing Strategy Team: Plan and develop marketing strategy and price policy
. Sales & Service Team: Product sales and quality assurance (supported by production & technology dept.)
● Sales/Production Planning Dept.
. Sales & Production Mgt. Team: Planning, Sales/Production matching, Scheduling, Process Mgt. etc.
. Information Technology Planning Team: ERP, SCM, MES, Server Mgt., Info Security, Comm., EP, Admin. Etc.
● Facility and Material Procurement Dept.
. Fac/Service Procurement Team: Supporting the other organization for purchasing facility and materials
. Vendor/Customes Mgt. and Warehouse Mgt. Team: Vendor mgt. and customs clearance, and warehouse Mgt.
● Raw Materials Procurement Dept.
. RM Procurement Planning Team: Plan and develop Rm procurement strategy
. IM & SM RM Procurement Team: Management of purchasing RM (Iron Ore, Coal, Scrap, Fe-Mn, etc.)
. RM Transportation Team: Management of RM Logistics (Dedicated, Charted)
Commercial
To monitor the standardized operating procedure and laws, regulations, the Company
needs to establish the auditing organization directly responsible to the President Director.
→ legal consulting, financial review and contract review, etc.
(Internal audit report will be shared among BOD members regularly)
President Director
E&C Div. TBD Div. Finance Div. HR & GA Div. Commercial Div.
(Director) (Director) (Director) (Director)
*Deputy Director
*Chief Dept. Head
IM Eng. Dept. Tech. Development Dept. Plate Rolling Dept. Mgt. Planning Dept. HR Dept. Marketing Dept.
•Raw Material Treatment T. •Tech. Dev. T. •PR Operation Support T. •Performance Analysis T •HR Management T. •Marketing Strategy T.
•Coke T. •Business Dev. T. •PR Technology T. •Cost Accounting & Fin. •Organizatiob Dev. T •Sales & Service T.
•Blast Furnace & Sinter T. Production & QualityDept. •Plate Rolling Plant System T. •HR Development T.
•Training & Education T.
SM & PM Eng. Dept. •Production Technology T. Facility Tech. Dept. Sales & Prod.
•Prod Control & Scheduling T. Planning Dept.
•Steelmaking T. •Facility Mgt. T. Finance Mgt. Dept. GA Dept.
•Logistic Mgt. T •Sales & Prod Plan. T.
•Continuous Casting T. •Mechanical Technology T. •General Affairs & •Information Tech.
•Quality Mgt. T. •Finance Planning T.
•Plate Mill T. •EIC Technology T. CSR Team Panning T..
•Physical Testing T. •General Accounting T
•Chemical Testing T. •Tax & Insurance . T. •Corporate Secretary &
Con. Mgt. Dept. Environ. & Energy Dept. Facility & Material
Legal T.
Iron Making Dept. •Resource Recycling T. Proc . Dept.
•Con. Planning T. •Building & Outstanding
•Facility Manufacturing T. •IM Operation Mgt. T •Envi. & Safety Mgt. T. Mgt. T. •Facilty & Service
•General Con. T. •BF & Sintering Technology T. •Health Mgt. T •Security Management T. Procurement T.
•Cokemaking Technology T. •Energy Technology T. •Vendor & Custom
BF & SM Con. Dept. •Blast Furnace Plant •Electric Power Supply T. Management T.
•RM/Sintering Plant • Utility Supply T. •Warehouse Mgt.. T.
•Blast Furnace & Sinter Con T.
•Steelmaking Con. T.
•Coke Plant •Energy Analysis T.
RM Proc.. Dept.
•Auxiliary Con. T. Steelmaking Dept.
•SM Operation Mgt. T. •RM Proc. Plan T.
PM & Coke Con. Dept. •SM Technology T. •IM RM Proc. T.
• Design Mgt. T. •Refractory T. •SM RM Proc. T.
• Plate Mill & Utility Con. T. •Steel Making Plant •RM Transportation T.
11
• Coke & RM Con. T. •Continuous Casting Plant
II. Organization Change 3
Production Division
The current 6 production-related departments will be relocated to the newly eastablished Production
division
- Production & Quality, Ironmaking, Steelmaking, Plate Rolling, Facility Technology, Environment & Energy Depts.
Considering the scope and charateristics of works, Production & Quality Department needs to be separated.
- Production & Quality Department → Production Technology Dept. / Quality Technology Dept.
Ironmaking Eng. Steelmaking & Construction BF&Steelmaking Plate Mill & Coke
Dept. PM Eng. Dept. Mgt. Dept. Con. Dept. Con. Dept.
*Sr. Chief Spec.
• Raw Material • Steelmaking • Construction • BF & Sinter • Design Mgt.
Treatment • Continuous Planning Construction • PM & Utility
• Coke Casting • Facility • Steelmaking Construction
• Plate Mill Manufacturing Construction • Coke & RM
• BF & Sinter • Auxiliary
• Auxiliary • General Construction
Facility Construction Constuction
Until the issuance of FAC, which is scheduled in Jun., 2014, E&C will be relocated as E&C unit under
President Director’s control by Jun. 2014.
(The organization will be terminated in joint with personnel reassignment)
- Engineering part: Preparation of FAC issuance, Follwing up the facility contract, 2 nd Phase Discussion, etc…
- Construction part: Asset transfer, Following up the construction contract, Finalizing the construction, etc…
Employees in E&C will be reassigned to other organizations
- POSCO Expatriates: Most of them will be back to POSCO by the end of Jun. 2014
- PTKS Expatriates: They will be back to PTKS or reassigned to other departments
- PTKP Employees: They will be reassigned to other departments considering their experiences and
competencies
- POSCO A&C CMs: They will be back to Korea by the end of Feb. 2014
Production Division
Mgt. Planning Dept. Finance Mgt. Dept. Mgt. Planning Dept. Finance Mgt. Dept.
Budgeting * Sr. Chief Specilist Accounting
• Performance • Finance Planning Financing • Finance Planning • General Accounting
Analysis • General Accounting • Performance Managing Cash • Treasury
• Cost Accounting • Tax & Insurance Analysis • Tax & Insurance
& Fin. System • Cost Accounting
• Asset Mgt. & Fin. System • Finance Planning
HR & GA Division
[Current Org.] [New Org.]
HR & GA Division 2 Dept. / 8 Team) HR & GA Division (3 Dept. / 10 Team)
Mtce Dept
• IM Mtce T.
• SM Mtce T.
• PR Mtce T.