Professional Documents
Culture Documents
79+475
CL
66
64
62 27200
7200 800 7200
60 1500 3000 3600 3600 1500 1500 3600 3600 3000 1500
Shoulder Shoulder Shoulder Shoulder
58 500 500 Gali buang (90 Cm)
FG FG
56 -2% -2% -2% -2%
54
DS-4 DS-4
52
50
48
DATUM : 46
22.589 56.379
16.141 53.100
13.891 54.280
12.100 54.866
9.600 54.916
0.400 55.100
0.400 55.100
9.600 54.916
12.100 54.866
16.141 53.100
21.095 55.632
ELEVASI
RENCANA
JARAK
RENCANA
28.800 56.427
20.000 56.360
17.300 55.764
10.000 55.596
0.000 55.499
5.000 54.394
12.500 54.399
20.000 55.697
24.000 55.434
30.000 55.621
ELEVASI EXISTING
JARAK EXISTING
STA. 79+450
CL
66
64
27200
62
7200 800 7200
60 1500 3000 3600 3600 1500 1500 3600 3600 3000 1500
Shoulder Shoulder Shoulder Shoulder
500 500
58
FG FG Gali buang (90 Cm)
56 -2% -2% -2% -2%
54
DS-4 DS-4
52
50
48
DATUM : 46
20.543 55.431
12.100 54.941
9.600 54.991
9.600 54.991
12.100 54.941
16.141 53.175
13.891 54.355
0.400 55.175
0.400 55.175
13.891 54.355
16.141 53.175
19.621 54.970
ELEVASI
RENCANA
JARAK
RENCANA
26.100 55.683
20.000 55.406
10.000 55.299
0.000 55.017
10.000 55.114
20.000 54.964
30.000 54.724
ELEVASI EXISTING
JARAK EXISTING
CROSS SECTION
PEMBANGUNAN JALAN TOL PT. WASKITA KARYA
STA. 79+450 ~ STA. 79+475
TRANS SUMATERA RUAS REV.
TERBANGGI BESAR - DRAWING NO.
PEMATANG PANGGANG SD / WK.HK2 / CR / 157 1:40
PT. HUTAMA KARYA (Persero)
DIVISI JALAN TOL
STATUS DATE SCALE
STA. 0+000 ~ STA. 3+650
&
STA. 71+650 ~ STA. 100+200
CAD FILE
A3
GENERAL NOTES REV. DATE DESCRIPTION REVIEW CHECKED APPROVED Project Manager Kasi. Teknik Drafter ORIG. SIZE SHEET
APPROVED SIGN APPROVED SIGN