You are on page 1of 1

STA.

79+475
CL

66

64

62 27200
7200 800 7200
60 1500 3000 3600 3600 1500 1500 3600 3600 3000 1500
Shoulder Shoulder Shoulder Shoulder
58 500 500 Gali buang (90 Cm)
FG FG
56 -2% -2% -2% -2%

54

DS-4 DS-4
52

50

48

DATUM : 46

22.589 56.379

16.141 53.100

13.891 54.280

12.100 54.866

9.600 54.916

0.400 55.100
0.400 55.100

9.600 54.916

12.100 54.866

14.000 55.419 13.891 54.280

16.141 53.100

21.095 55.632
ELEVASI
RENCANA

JARAK
RENCANA

28.800 56.427

20.000 56.360

17.300 55.764

10.000 55.596

0.000 55.499

5.000 54.394

12.500 54.399

20.000 55.697

24.000 55.434

30.000 55.621
ELEVASI EXISTING

JARAK EXISTING

STA. 79+450
CL

66

64

27200
62
7200 800 7200
60 1500 3000 3600 3600 1500 1500 3600 3600 3000 1500
Shoulder Shoulder Shoulder Shoulder
500 500
58
FG FG Gali buang (90 Cm)
56 -2% -2% -2% -2%

54

DS-4 DS-4
52

50

48

DATUM : 46
20.543 55.431

12.100 54.941

9.600 54.991

9.600 54.991

12.100 54.941
16.141 53.175

13.891 54.355

0.400 55.175
0.400 55.175

13.891 54.355

16.141 53.175

19.621 54.970
ELEVASI
RENCANA

JARAK
RENCANA
26.100 55.683

20.000 55.406

10.000 55.299

0.000 55.017

10.000 55.114

20.000 54.964

30.000 54.724
ELEVASI EXISTING

JARAK EXISTING

OWNER PROJECT DESIGN SUPERVISION MAIN CONTRACTOR TITTLE

CROSS SECTION
PEMBANGUNAN JALAN TOL PT. WASKITA KARYA
STA. 79+450 ~ STA. 79+475
TRANS SUMATERA RUAS REV.
TERBANGGI BESAR - DRAWING NO.
PEMATANG PANGGANG SD / WK.HK2 / CR / 157 1:40
PT. HUTAMA KARYA (Persero)
DIVISI JALAN TOL
STATUS DATE SCALE
STA. 0+000 ~ STA. 3+650
&
STA. 71+650 ~ STA. 100+200
CAD FILE
A3
GENERAL NOTES REV. DATE DESCRIPTION REVIEW CHECKED APPROVED Project Manager Kasi. Teknik Drafter ORIG. SIZE SHEET
APPROVED SIGN APPROVED SIGN

You might also like