RECIENTES RESIDENCE
Ateneo Avenue, Naga City
ESTIMATED BILL OF MATERIALS
ITEM DESCRIPTION QTY UNIT
ESTIMATED DIRECT COST
MATERIAL
MATERIALS
NO. UNIT COST COST COST
(1) (2) (3) (4) (5) (14)
A ELECTRICAL ROUGH-IN WORKSCOPE
1 2.0 mm SQ. THHN Copper Stranded Wire 20 mtrs 21.00 420.00
###
2 1 Gang Plate 1 Pc. 136.00 136.00
###
3 Moldflex Pipe, 20mm dia. 8 mtrs 15.00 120.00
###
4 Electrical Tape (Big) 2 Pcs. 27.00 54.00
###
5 Metal Screw #6 10 Pcs. 4.00 40.00
###
7 Flat Chord #18 (Black) 2 mtrs 25.00 50.00
###
8 Chain 1 mtr. 180.00 180.00
###
9 Technical Labor, Tools and Equipment 1 Lot 5,000.00
TOTAL ESTIMATED PROJECT COST (PhP) 6,000.00
###