You are on page 1of 33

Salalah LPG Project Project Rev : 0

Page: 2 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

1. Feed Deliverable Index – Set of FEED Dossier (Final Revisions)

2. General/ Project Management:


Drg. / Doc. No. Description Rev.
F9-000-G-1-0D-1001-4 Correspondence and Communication Procedure A
F9-000-G-1-0D-1002-4 Project Quality Plan A
F9-000-G-1-0D-1003-4 Project Control Plan A
F9-000-G-1-0D-1004-4 Codes & Standards A
F9-000-G-1-0D-1005-4 Equipment & System Tag Numbering Philosophy A
F9-000-G-1-0D-1006-4 Project Execution Plan A
F9-000-G-1-0D-1007-3 FEED Level-3 Schedule A
F9-000-G-1-0D-1008-4 Document Control Procedure B
F9-000-G-1-0D-1009-3 Technical Document Register 1
F9-000-G-1-0D-1010-3 Risk Register 3
F9-000-G-1-0D-1011-3 Interface Register A
F9-000-G-1-0D-1023-4 Project Reviews Plan A
F9-000-G-1-0M-1001-4 Minutes of Meeting - Project Kick-off Meeting 0
F9-000-G-1-0M-1002-4 Steering Committee Meeting MOM No. 1 0
F9-000-G-1-0M-1003-4 Weekly Meeting MOM No. 1 0
F9-000-G-1-0M-1004-4 Weekly Meeting MOM No. 2 0
F9-000-G-1-0M-1005-4 Weekly Meeting MOM No. 3 0
F9-000-G-1-0M-1006-4 Weekly Meeting MOM No. 4 0
F9-000-G-1-0M-1007-4 Weekly Meeting MOM No. 5 0
F9-000-G-1-0M-1008-4 Weekly Meeting MOM No. 6 0
F9-000-G-1-0M-1009-4 Steering Committee Meeting MOM No. 2 0
F9-000-G-1-0M-1010-4 Weekly Meeting MOM No. 7 0
F9-000-G-1-0M-1011-4 Steering Committee Meeting MOM No. 3 0
Meeting on Major Issues Impacting Progress -
F9-000-G-1-0M-1012-4 1
MOM No. 1
Minutes of Meeting on Process Related Issues -
F9-000-G-1-0M-1013-4 0
MOM-9
F9-000-G-1-0M-1014-4 Weekly Progress Meeting - MOM No. 10 0
F9-000-G-1-0M-1015-4 Weekly Progress Meeting - MOM No. 11 1
Project Value Engineering Workshop - MOM
F9-000-G-1-0M-1016-4 0
No.12
Recorded Notes of Meeting Rotating Equipment
F9-000-G-1-0M-1017-4 0
CRS Close Out - MOM No. 13
3. Process:
Drg. / Doc. No. Description Rev.
Process Design Basis for LPG Plant & Storage
F9-000-P-1-0D-1001-4 C
Area
F9-000-P-1-0D-1002-4 Process Design Criteria B
F9-000-P-1-0D-1003-4 Process Control and Operating Philosophy A
F9-000-P-1-0D-1004-4 Sparing Philosophy A
Salalah LPG Project Project Rev : 0
Page: 3 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-000-P-1-0D-1005-4 Overpressure Protection Philosophy A
F9-000-P-1-0D-1006-4 Isolation Philosophy B
F9-000-P-1-0D-1007-4 ESD Philosophy A
F9-000-P-1-0D-1008-4 Relief and Blowdown Philosophy A
F9-000-P-1-0D-1009-4 Start-up & Shutdown Philosophy A
F9-000-P-1-0D-1010-3 Cause and Effect Diagrams A
F9-000-P-1-0D-1012-4 Process Description B
F9-000-P-1-0D-1013-4 Process Simulation Report B
F9-000-P-1-0D-1014-3 Heat & Material Balance A
F9-000-P-1-0D-1015-4 Hydrate Study Report A
Pipeline Steady State & Transient Analysis
F9-000-P-1-0D-1016-4 A
Report
F9-000-P-1-0D-1017-4 Relief and Blowdown Report A
F9-000-P-1-0D-1019-4 Design Review Report A
F9-000-P-1-0D-1020-3 Design Review Close Out Report 0
F9-000-P-1-0D-1021-3 Equipment List A
F9-000-P-1-0D-1022-3 Line list 1
F9-000-P-1-0D-1023-3 Tie-in List A
F9-000-P-1-0D-1024-4 Utility Summary A
F9-000-P-1-0D-1025-4 Chemical Consumption Summary A
F9-000-P-1-0D-1026-4 Effluent Summary A
F9-000-P-1-0D-1027-4 Vent and Drain Philosophy B
Technical Note on FEED Pressure Finalization for
F9-000-P-1-0D-1028-4 A
Salalah LPG Extraction Plant
Technical Note Review Requirement of Propane
F9-000-P-1-0D-1029-4 A
& Butane Bullets at Storage Facilities
F9-000-P-1-0D-1030-4 Technical Note for Deletion of Hot Oil Heater 0
F9-000-P-1-0D-1031-4 Design Review Terms of Reference A
Technical Note for Deletion of Regeneration Gas
F9-000-P-1-0D-1032-4 0
Compressor
F9-000-P-1-0D-1101-4 Process Safeguarding Memorandum A
Basic Engineering Package (BEP) For LPG
F9-111-P-1-0D-1001-4 A
Extraction
F9-000-P-1-0P-1001-1 Piping and Instrument Diagram - P&ID Index 1
F9-000-P-1-0P-1002-1 Piping and Instrument Diagram - P&ID Index 1
F9-000-P-1-0P-1003-1 PID Legend & Symbol A
F9-000-P-1-0P-1004-1 PID Legend & Symbol A
F9-000-P-1-0P-1005-1 PID Legend & Symbol A
F9-000-P-1-0P-1006-1 PID Legend & Symbol A
F9-000-P-1-0P-1007-1 PID Sample Connection Details A
F9-000-P-1-0P-1009-1 PID Legend & Symbol A
F9-111-P-1-0P-1001-1 PFD - Inlet Separation and Mercury removal B
F9-111-P-1-0P-1002-1 PFD - Dehydration Unit B
F9-111-P-1-0P-1003-1 PFD - NGL Extraction Unit & Residual Gas Export B
F9-111-P-1-0P-1004-1 PID Inlet Gas Separator Feed A
F9-111-P-1-0P-1005-1 PID Inlet Gas Filter and Inlet Gas Metering Skid A
F9-111-P-1-0P-1006-1 PID Inlet Filter Coalescer X
F9-111-P-1-0P-1007-1 PID Mercury Removal bed A
Salalah LPG Project Project Rev : 0
Page: 4 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-111-P-1-0P-1008-1 PID Mercury Removal Bed Filter A
F9-111-P-1-0P-1010-1 PID Molecular Sieve Dryer A A
F9-111-P-1-0P-1011-1 PID Molecular Sieve Dryer B A
F9-111-P-1-0P-1012-1 PID Molecular Sieve Dryer C A
F9-111-P-1-0P-1013-1 PID Dry Gas Filter A
F9-111-P-1-0P-1014-1 PID Dryers Regeneration Gas Compressor X
F9-111-P-1-0P-1015-1 PID Regeneration Gas Heat Exchanger A
F9-111-P-1-0P-1016-1 PID Regeneration Gas Cooler A
F9-111-P-1-0P-1017-1 PID Regeneration Gas K.O. drum A
F9-111-P-1-0P-1018-1 PID Gas/Gas/Liquid Exchanger A
F9-111-P-1-0P-1021-1 PID De-ethanizer Reflux Condenser A
F9-111-P-1-0P-1022-1 PID Cold Separator A
F9-111-P-1-0P-1023-1 PID Feed Gas Expander A A
F9-111-P-1-0P-1024-1 PID Recompressor A A
F9-111-P-1-0P-1025-1 PID Deethanizer Column A
F9-111-P-1-0P-1026-1 PID Deethanizer Reflux Drum A
F9-111-P-1-0P-1027-1 PID Deethanizer Overhead Pumps A
F9-111-P-1-0P-1028-1 PID Deethanizer Reboiler A
F9-111-P-1-0P-1029-1 PID Recompressor Cooler A
PID Residual Gas Compressor and Residual Gas
F9-111-P-1-0P-1030-1 A
Cooler Train A
PID Residual Gas Compressor and Residual Gas
F9-111-P-1-0P-1031-1 A
Cooler Train B
F9-111-P-1-0P-1032-1 PID Residual Gas Metering Skid A
F9-111-P-1-0P-1033-1 PID Deethanizer Bottom Pumps A
F9-111-P-1-0P-1034-1 PID Waste Heat Recovery Unit (111-X-001A) A
F9-111-P-1-0P-1035-1 PID Waste Heat Recovery Unit (111-X-001B) A
Piping and Instrument Diagram Feed Gas
F9-111-P-1-0P-1037-1 X
Expander - B
F9-111-P-1-0P-1038-1 Piping and Instrument Diagram Recompressor - B X
F9-121-P-1-0P-1001-1 PFD - NGL Fractionation Unit B
F9-121-P-1-0P-1002-1 PFD - Gasoline Stabilisation & Export B
F9-121-P-1-0P-1004-1 PID Depropanizer Column A
F9-121-P-1-0P-1005-1 PID Depropanizer Reboiler A
F9-121-P-1-0P-1006-1 PID Depropanizer Overhead Cooler A
F9-121-P-1-0P-1007-1 PID Depropanizer Reflux Drum A
F9-121-P-1-0P-1008-1 PID Depropanizer Overhead Pumps A
F9-121-P-1-0P-1009-1 PID Debutanizer Column A
F9-121-P-1-0P-1010-1 PID Debutanizer Reboiler A
F9-121-P-1-0P-1011-1 PID Debutanizer Overhead Cooler A
F9-121-P-1-0P-1012-1 PID Debutanizer Reflux Drum A
F9-121-P-1-0P-1013-1 PID Debutanizer Overhead Pumps A
F9-121-P-1-0P-1014-1 PID Condensate Re-injection Pumps A
F9-121-P-1-0P-1016-1 PID Condensate Stabilizer Column A
F9-121-P-1-0P-1017-1 PID Stabilizer Reboiler A
F9-121-P-1-0P-1018-1 PID Stabilizer Overhead Cooler A
F9-121-P-1-0P-1019-1 PID Stabilizer Reflux Drum A
F9-121-P-1-0P-1020-1 PID Stabilizer Overhead Pumps A
Salalah LPG Project Project Rev : 0
Page: 5 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-121-P-1-0P-1021-1 PID Condensate Cooler A
F9-121-P-1-0P-1022-1 PID Condensate Stabilizer Bottom Pumps A
F9-132-P-1-0P-1001-1 UFD - Flare System B
F9-132-P-1-0P-1002-1 PID HP Flare Header A
F9-132-P-1-0P-1003-1 PID HP Flare KO Drum and Heater A
F9-132-P-1-0P-1004-1 PID HP Flare Package A
F9-132-P-1-0P-1005-1 PID LP Flare Header A
F9-132-P-1-0P-1006-1 PID LP Flare KO Drum A
F9-132-P-1-0P-1007-1 PID LP Flare Package A
F9-132-P-1-0P-1008-1 PID - HP Flare KO Drum Pumps A
F9-132-P-1-0P-1009-1 PID - LP Flare KO Drum Pumps A
UFD - Emergency Diesel Generator Package &
F9-133-P-1-0P-1001-1 B
Main Generator
F9-133-P-1-0P-1002-1 PID Power Plant Unit "A" A
F9-133-P-1-0P-1006-1 PID Emergency Diesel Generator Package A
F9-133-P-1-0P-1007-1 PID Power Plant Unit "B" A
F9-133-P-1-0P-1008-1 PID Waste Heat Recovery Unit (133-X-001A) X
F9-133-P-1-0P-1009-1 PID Waste Heat Recovery Unit (133-X-001B) X
F9-134-P-1-0P-1001-1 UFD - Service Water System B
F9-134-P-1-0P-1002-1 PID Service Water Tank A
F9-134-P-1-0P-1003-1 PID Service Water Pumps & Distribution A
F9-135-P-1-0P-1001-1 UFD - Closed Drain System B
F9-135-P-1-0P-1002-1 UFD - Open Drainage System B
F9-135-P-1-0P-1003-1 UFD - Waste Water Collection B
F9-135-P-1-0P-1004-1 PID Closed Drain Header A
F9-135-P-1-0P-1005-1 PID Closed Drain Drum A
F9-135-P-1-0P-1006-1 PID Open Drain Header A
F9-135-P-1-0P-1007-1 PID Open Drain Sump A
F9-135-P-1-0P-1008-1 PID Degassing Vessel A
F9-135-P-1-0P-1009-1 PID Slop Pump A
F9-135-P-1-0P-1010-1 PID Slop Tank A
F9-136-P-1-0P-1001-1 UFD - Instrument Air and Plant Air System B
F9-136-P-1-0P-1002-1 UFD - Nitrogen System B
F9-136-P-1-0P-1003-1 PID Air Compressor Package A
F9-136-P-1-0P-1004-1 PID Wet Air Receiver A
F9-136-P-1-0P-1005-1 PID Wet Air Distribution A
F9-136-P-1-0P-1006-1 PID Air Dryer Package A
F9-136-P-1-0P-1007-1 PID Instrument Air Receiver A
F9-136-P-1-0P-1008-1 PID Instrument Air Distribution A
F9-136-P-1-0P-1009-1 PID Nitrogen Generation Package A
F9-136-P-1-0P-1010-1 PID Nitrogen Receiver A
F9-136-P-1-0P-1011-1 PID Nitrogen Distribution A
F9-137-P-1-0P-1001-1 UFD - Fuel Gas System B
F9-137-P-1-0P-1002-1 PID -HP Fuel Gas Inlet KO Drum A
F9-137-P-1-0P-1003-1 PID - HP Fuel Gas Filter A
F9-137-P-1-0P-1004-1 PID - HP Fuel Gas Heaters A
F9-137-P-1-0P-1005-1 PID - LP Fuel Gas KO Drum A
F9-138-P-1-0P-1001-1 UFD - Hot Oil System B
Salalah LPG Project Project Rev : 0
Page: 6 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-138-P-1-0P-1002-1 PID Hot Oil Expansion Drum A
F9-138-P-1-0P-1003-1 PID Hot Oil Recirculation Pumps A
F9-138-P-1-0P-1004-1 PID Hot Oil Filters A
F9-138-P-1-0P-1005-1 PID Hot Oil Bypass Cooler A
F9-138-P-1-0P-1006-1 PID Hot Oil Make-up /Drain Drum A
F9-138-P-1-0P-1008-1 PID Hot Oil Heater Package X
F9-139-P-1-0P-1001-1 UFD - Chemical Injection System B
F9-139-P-1-0P-1002-1 PID Propane bullet A
F9-139-P-1-0P-1003-1 PID Propane Transfer pumps A
F9-139-P-1-0P-1004-1 PID Butane bullet A
F9-139-P-1-0P-1005-1 PID Butane Transfer pumps A
F9-139-P-1-0P-1006-1 PID Condensate Storage vessel A
F9-139-P-1-0P-1007-1 PID Condensate Transfer Pumps A
F9-139-P-1-0P-1008-1 PID Off-Spec Propane Bullet A
F9-139-P-1-0P-1009-1 PID Off-Spec Butane Bullet A
F9-139-P-1-0P-1010-1 PID Off-Spec Propane/Butane Pumps A
F9-139-P-1-0P-1011-1 PID Off-Spec Condensate Storage vessel A
F9-139-P-1-0P-1012-1 PID Off-Spec Condensate Storage Pumps A
F9-139-P-1-0P-1013-1 PID LPG Blending Unit A
F9-139-P-1-0P-1014-1 PID LPG Loading Package A
F9-139-P-1-0P-1015-1 PID Odorant and Methanol Injection Package A
PFD- Storage - Propane Storage and Loading
F9-211-P-1-0P-1001-1 B
System
PFD- Storage - Butane Storage and Loading
F9-211-P-1-0P-1002-1 B
System
F9-211-P-1-0P-1003-1 PID Propane Refrigerated Tank A
F9-211-P-1-0P-1004-1 PID Propane Refrigerated Tank A
F9-211-P-1-0P-1006-1 PID Storage - Propane Chiller A
PID Storage - Boil-Off Propane Compressor
F9-212-P-1-0P-1001-1 A
Suction Scrubber
F9-212-P-1-0P-1002-1 PID Storage - Boil-Off Propane Compressor A/B A
F9-212-P-1-0P-1003-1 PID Storage - Boil-Off Propane Condenser A
PID Storage - Boil-Off Propane Recovery
F9-212-P-1-0P-1004-1 A
accumulator
PID Storage - Boil-Off Butane Compressor
F9-212-P-1-0P-1005-1 A
Suction Scrubber
F9-212-P-1-0P-1006-1 PID Storage - Boil-Off Butane Compressor A/B A
F9-212-P-1-0P-1007-1 PID Storage - Boil-Off Butane Air Cooler A
PID Storage - Boil-Off Butane Recovery
F9-212-P-1-0P-1008-1 A
accumulator
F9-212-P-1-0P-1009-1 PID Storage - Propane Vaporizer A
F9-212-P-1-0P-1014-1 PID Storage - Butane Vaporizer A
PFD- Storage - Condensate Storage and Loading
F9-213-P-1-0P-1001-1 B
System
F9-213-P-1-0P-1002-1 PID Storage - Condensate Storage Tank A
F9-213-P-1-0P-1003-1 PID Storage - Condensate Ship Loading Pumps A
F9-214-P-1-0P-1001-1 PFD- Storage - Propane Refrigeration B
F9-214-P-1-0P-1002-1 PID Storage - Propane Refrigeration package A
Salalah LPG Project Project Rev : 0
Page: 7 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-215-P-1-0P-1001-1 PFD - Chemical Injection Package B
F9-221-P-1-0P-1001-1 PID Propane Loading Package A
F9-221-P-1-0P-1002-1 PID Butane Loading Package A
F9-221-P-1-0P-1003-1 PID Condensate Loading Package A
F9-221-P-1-0P-1004-1 PID Storage - Propane Vapour Return Blower A
F9-221-P-1-0P-1006-1 PID Storage - Butane Vapour Return Blower A
F9-232-P-1-0P-1001-1 UFD - Storage - Flare System B
F9-232-P-1-0P-1002-1 PID Storage - LP Flare Header A
F9-232-P-1-0P-1003-1 PID Storage - LP Flare KO Drum A
F9-232-P-1-0P-1004-1 PID Storage - LP Flare Package A
UFD - Storage - Emergency Diesel Generator
F9-233-P-1-0P-1001-1 B
Package
PID Storage - Emergency Diesel Generator
F9-233-P-1-0P-1002-1 A
Package
F9-234-P-1-0P-1001-1 UFD - Storage - Service Water System B
F9-234-P-1-0P-1002-1 PID Storage-Service/Potable Water Tank A
UFD - Storage - Instrument Air and Plant Air
F9-236-P-1-0P-1001-1 B
System
F9-236-P-1-0P-1002-1 PID Storage - Air Compressor Package A
F9-236-P-1-0P-1003-1 PID Storage - Wet Air Receiver & Distribution A
F9-236-P-1-0P-1004-1 PID Storage - Air Dryer Package A
PID Storage - Instrument Air Receiver &
F9-236-P-1-0P-1005-1 A
Distribution
F9-236-P-1-0P-1006-1 PID Storage - Nitrogen Generation Package A
F9-236-P-1-0P-1007-1 PID Storage - Nitrogen Receiver A
F9-236-P-1-0P-1008-1 UFD – Storage – Nitrogen System A
F9-311-P-1-0P-1001-1 PID Feed Gas Tie-in at SGSS A
F9-311-P-1-0P-1002-1 PID Feed Gas Pig Launcher at SGSS X
F9-311-P-1-0P-1003-1 PID Feed Gas Pig Receiver at LPG Plant A
F9-312-P-1-0P-1001-1 PID Residual Gas Pig Launcher at LPG Plant A
F9-312-P-1-0P-1002-1 PID Residual Gas Pig Receiver at SGSS X
F9-312-P-1-0P-1003-1 PID Residual Gas Tie-in at SGSS X
F9-312-P-1-0P-1004-1 PID Mirbat Gas Pig Launcher at SGSS A
F9-312-P-1-0P-1005-1 PID MIRBAT Gas pipeline Block Valve Station-1 A
F9-312-P-1-0P-1006-1 PID MIRBAT Gas Pipeline Block Valve Station-2 A
F9-312-P-1-0P-1007-1 PID Mirbat Gas Pig Receiver A
F9-312-P-1-0P-1008-1 PID MIRBAT Gas Tie-in A
F9-321-P-1-0P-1001-1 PID Propane transfer line to Storage A
F9-321-P-1-0P-1003-1 PID Butane transfer line to Storage A
F9-321-P-1-0P-1005-1 PID Condensate transfer line to Storage A
F9-111-P-1-0R-1001-4 LPG Extraction Unit Purchase Requisition 0
F9-111-P-1-0S-1001-4 Duty Specification for Mercury Removal Unit A
Duty Specification for Molecular Sieve Drier
F9-111-P-1-0S-1002-4 A
Package
F9-111-P-1-0S-1003-4 Process Datasheet of Inlet Gas Separator A
F9-111-P-1-0S-1004-4 Process Datasheet of Inlet Gas Filter A
F9-111-P-1-0S-1005-4 Process Datasheet of Inlet Filter Coalescer X
F9-111-P-1-0S-1006-4 Process Datasheet of Mercury Removal Bed A
Salalah LPG Project Project Rev : 0
Page: 8 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Filter
F9-111-P-1-0S-1008-4 Process Datasheet of Dry Gas Filter A
Process Datasheet of Dryers Regen. Compressor
F9-111-P-1-0S-1009-4 A
Package
Process Datasheet of Regeneration Gas Heater
F9-111-P-1-0S-1010-4 A
Heat Exchanger
F9-111-P-1-0S-1011-4 Process Datasheet of Regen Gas Cooler A
F9-111-P-1-0S-1012-4 Process Datasheet of Regen Gas KO drum A
Process Datasheet of Gas/ Gas & Gas/ Liquid
F9-111-P-1-0S-1013-4 A
Exchnager
Process Datasheet of De-ethanizer Reflux
F9-111-P-1-0S-1014-4 A
Condenser
Process Datasheet of Low Temperature
Separator
F9-111-P-1-0S-1015-4 A
Cold Separator
Process Datasheet of Feed Gas Expander & Re-
F9-111-P-1-0S-1016-4 A
Compressor
F9-111-P-1-0S-1017-4 Process Datasheet of De-Ethaniser Column A
F9-111-P-1-0S-1018-4 Process Datasheet of Deethaniser Reflux Drum A
Process Datasheet of Deethaniser Overhead
F9-111-P-1-0S-1019-4 A
Pumps
F9-111-P-1-0S-1020-4 Process Datasheet of De-Ethaniser Reboiler A
F9-111-P-1-0S-1021-4 Process Datasheet of Recompressor Cooler A
F9-111-P-1-0S-1022-4 Process Datasheet of Residual Gas Compressor A
F9-111-P-1-0S-1023-4 Process Datasheet of Residual Gas Cooler A
F9-111-P-1-0S-1024-4 Process Datasheet of Residue Gas Metering Skid B
F9-111-P-1-0S-1025-4 Process Datasheet of Deethaniser Bottom Pump B
Process Data Sheet of Waste Heat Recovery Unit
F9-111-P-1-0S-1026-4 A
- Residual Gas Compressor
F9-111-P-1-0S-1027-4 Process Datasheet - Feed Gas Metering Skid B
F9-121-P-1-0S-1001-4 Process Datasheet of Depropaniser Column B
F9-121-P-1-0S-1002-4 Process Datasheet of Depropaniser Reboiler A
Process Datasheet of Depropaniser Overhead
F9-121-P-1-0S-1003-4 B
Cooler
F9-121-P-1-0S-1004-4 Process Datasheet of Depropaniser Reflux Drum B
Process Datasheet of Depropaniser Overhead
F9-121-P-1-0S-1005-4 A
Pumps
F9-121-P-1-0S-1006-4 Process Datasheet of Debutaniser Column B
F9-121-P-1-0S-1007-4 Process Datasheet of Debutaniser Reboiler A
Process Datasheet of Debutaniser Overhead
F9-121-P-1-0S-1008-4 B
Cooler
F9-121-P-1-0S-1009-4 Process Datasheet of Debutaniser Reflux Drum B
Process Datasheet of Debutaniser Overhead
F9-121-P-1-0S-1010-4 B
Pumps
Process Datasheet of Condensate Re-injection
F9-121-P-1-0S-1011-4 B
Pump
F9-121-P-1-0S-1013-4 Process Datasheet of Stabilizer Column A
Salalah LPG Project Project Rev : 0
Page: 9 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-121-P-1-0S-1014-4 Process Datasheet of Stabilizer Reboiler A
F9-121-P-1-0S-1015-4 Process Datasheet of Stabilizer Overhead Cooler A
F9-121-P-1-0S-1016-4 Process Datasheet of Stabilizer Reflux Drum A
F9-121-P-1-0S-1017-4 Process Datasheet of Stabilizer Overhead Pumps A
F9-121-P-1-0S-1018-4 Process Datasheet of Gasoline Cooler A
Process Datasheet of Condensate Stabilizer
F9-121-P-1-0S-1019-4 A
Bottom Pumps
F9-132-P-1-0S-1001-4 Process Datasheet of HP Flare KO Drum A
F9-132-P-1-0S-1002-4 Process Datasheet of HP Flare KO Drum Heater A
F9-132-P-1-0S-1003-4 Process Datasheet of HP Flare Package A
F9-132-P-1-0S-1004-4 Process Datasheet of LP Flare KO Drum B
F9-132-P-1-0S-1005-4 Process Datasheet of LP Flare Package B
F9-132-P-1-0S-1006-4 Process Datasheet of HP Flare KO Drum Pumps B
F9-132-P-1-0S-1007-4 Process Datasheet of LP Flare Drum Pumps B
Process Data Sheet of Waste Heat Recovery Unit
F9-133-P-1-0S-1001-4 X
- Gas Turbine Generator
Process Datasheet of Service / Portable Water
F9-134-P-1-0S-1001-4 A
Tank
Process Datasheet of Service / Potable Water
F9-134-P-1-0S-1002-4 A
Pumps
F9-135-P-1-0S-1001-4 Process Datasheet of Closed Drain Drum A
F9-135-P-1-0S-1002-4 Process Datasheet of Closed Drain pump A
F9-135-P-1-0S-1003-4 Process Datasheet of Slop Pumps A
F9-135-P-1-0S-1005-4 Process Datasheet of Degassing Vessel A
F9-135-P-1-0S-1007-4 Process Datasheet of Slop Tank A
F9-136-P-1-0S-1001-4 Process Datasheet of Air Compressor Package B
F9-136-P-1-0S-1002-4 Process Datasheet of Air Receiver A
F9-136-P-1-0S-1003-4 Process Datasheet of Air Dryer Package B
F9-136-P-1-0S-1004-4 Process Datasheet of Instrument Air Receiver A
Process Datasheet of Nitrogen Generation
F9-136-P-1-0S-1005-4 B
Package
F9-136-P-1-0S-1006-4 Process Datasheet of Nitrogen Receiver A
F9-137-P-1-0S-1001-4 Process Datasheet of HP Fuel Gas KO Drum A
F9-137-P-1-0S-1002-4 Process Datasheet of HP Fuel Gas Filters A
F9-137-P-1-0S-1003-4 Process Datasheet of HP Fuel Gas Heaters B
F9-137-P-1-0S-1004-4 Process Datasheet of LP Fuel Gas KO Drum A
F9-138-P-1-0S-1001-4 Process Datasheet of Hot Oil Expansion Drum A
Process Datasheet of Hot Oil Recirculation
F9-138-P-1-0S-1002-4 B
Pumps
F9-138-P-1-0S-1003-4 Process Datasheet of Hot Oil Filters A
F9-138-P-1-0S-1004-4 Process Datasheet of Hot Oil Bypass Cooler A
F9-138-P-1-0S-1005-4 Process Datasheet of Hot Oil Drain Drum A
F9-138-P-1-0S-1006-4 Process Datasheet of Hot Oil Drain Pumps A
F9-138-P-1-0S-1007-4 Process Datasheet of Hot Oil Heater A
F9-138-P-1-0S-1008-4 Process Data Sheet of Hot Oil Start Up Pump X
F9-138-P-1-0S-1009-4 Process Datasheet of Hot Oil Storage Tank 0
F9-138-P-1-0S-1010-4 Process Datasheet of Hot Oil Storage Pump 0
F9-139-P-1-0S-1001-4 Process Datasheet of Propane bullet A
Salalah LPG Project Project Rev : 0
Page: 10 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-139-P-1-0S-1002-4 Process Datasheet of Propane Transfer pump A
F9-139-P-1-0S-1003-4 Process Datasheet of Butane bullet B
F9-139-P-1-0S-1004-4 Process Datasheet of Butane Transfer pump A
F9-139-P-1-0S-1005-4 Process Datasheet of Condensate Storage Vessel A
Process Datasheet of Condensate Transfer
F9-139-P-1-0S-1006-4 A
Pumps
F9-139-P-1-0S-1007-4 Process Datasheet of Off-Spec Propane Bullet A
Process Datasheet of Off-Spec Condensate
F9-139-P-1-0S-1008-4 B
Pumps
Process Datasheet of Off-Spec Propane/Butane
F9-139-P-1-0S-1009-4 A
Pump
Process Datasheet of Off-Spec Condensate
F9-139-P-1-0S-1010-4 A
Vessel
Process Datasheet of Methanol Injection
F9-139-P-1-0S-1011-4 A
Package
Process Datasheet of LPG Loading Arm Package
F9-139-P-1-0S-1012-4 A
(139-Z-002)
F9-139-P-1-0S-1013-4 Process Datasheet of Off-Spec Butane Bullet B
Process Datasheet of LPG Odorant Injection
F9-139-P-1-0S-1014-4 A
Package
F9-211-P-1-0S-1001-4 Process Datasheet of Propane Chiller - Storage A
F9-211-P-1-0S-1002-4 Process Datasheet of Propane Refrigerated Tank B
Process Datasheet of Propane Ship Loading
F9-211-P-1-0S-1003-4 B
Pump
F9-211-P-1-0S-1005-4 Process Datasheet of Butane Ship Loading Pump B
F9-211-P-1-0S-1007-4 Process Datasheet of Butane Refrigerated Tank B
Process Datasheet of Boil-Off Propane
F9-212-P-1-0S-1001-4 A
Compressor Suction Scrubber
Process Datasheet of Propane Boil Off Gas
F9-212-P-1-0S-1002-4 A
Compressor - Storage
Process Datasheet of Propane Condenser -
F9-212-P-1-0S-1003-4 A
Storage
Process Datasheet of Propane Recovery
F9-212-P-1-0S-1004-4 A
accumulator - Storage
Process Datasheet of Boil-Off Butane
F9-212-P-1-0S-1005-4 A
Compressor Suction Scrubber
Process Datasheet of Butane Boil Off Gas
F9-212-P-1-0S-1006-4 A
Compressor - Storage
F9-212-P-1-0S-1007-4 Process Datasheet of Boil-Off Butane Cooler A
Process Datasheet of Butane Recovery
F9-212-P-1-0S-1008-4 A
accumulator - Storage
F9-212-P-1-0S-1009-4 Process Datasheet of Propane Vaporizer A
F9-212-P-1-0S-1010-4 Process Datasheet of Butane Vaporizer A
F9-213-P-1-0S-1001-4 Process Datasheet of Condensate Storage Tank B
Process Datasheet of Condensate Ship Loading
F9-213-P-1-0S-1002-4 B
Pumps
Process Specification of Propane Refrigeration
F9-214-P-1-0S-1001-4 A
Package
F9-214-P-1-0S-1003-4 Process Datasheet of Propane Condenser X
Salalah LPG Project Project Rev : 0
Page: 11 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-215-P-1-0S-1003-4 Process Datasheet of LPG Blending Unit A
F9-221-P-1-0S-1001-4 Process Datasheet of Propane Loading Package B
Process Datasheet of Butane Loading Arm
F9-221-P-1-0S-1002-4 B
Package
Process Datasheet of Condensate Loading
F9-221-P-1-0S-1003-4 B
Package
Process Datasheet of Propane / Butane Vapor
F9-221-P-1-0S-1004-4 A
Return Blowers
Process Datasheet of Condensate Drainage
F9-221-P-1-0S-1005-4 A
Vessel
Process Datasheet of LP Flare KO Drum -
F9-232-P-1-0S-1001-4 A
Storage
F9-232-P-1-0S-1002-4 Process Datasheet of LP Flare Package - Storage A
Process Datasheet for LP Flare KO Drum Heater
F9-232-P-1-0S-1003-4 A
- Storage
F9-233-P-1-0S-1001-4 Process Datasheet Diesel Storage Tank A
F9-233-P-1-0S-1002-4 Process Datasheet of Diesel Transfer Pump X
Process Datasheet of Service / Potable Water
F9-234-P-1-0S-1002-4 A
Tank
Process Datasheet of Air Compressor Package -
F9-236-P-1-0S-1001-4 A
Storage
F9-236-P-1-0S-1002-4 Process Datasheet of Air Receiver A
Process Datasheet of Air Dryer Package -
F9-236-P-1-0S-1003-4 A
Storage
F9-236-P-1-0S-1004-4 Process Datasheet of Instrument Air Receiver A
Process Datasheet of Nitrogen Generation
F9-236-P-1-0S-1005-4 A
Package
F9-236-P-1-0S-1006-4 Process Datasheet of Nitrogen Receiver A
F9-311-P-1-0S-1001-4 Process Datasheet of Feed Gas Pig Launcher X
F9-311-P-1-0S-1002-4 Process Datasheet of Feed Gas Pig Receiver B
F9-312-P-1-0S-1001-4 Process Datasheet of Residual Gas Pig Launcher B
F9-312-P-1-0S-1002-4 Process Datasheet of Residual Gas Pig Receiver X
Process Datasheet of Mirbat Gas Export Pig
F9-312-P-1-0S-1003-4 B
Launcher at SGSS
Process Datasheet of Mirbat Gas Export Pig
F9-312-P-1-0S-1004-4 B
Receiver
F9-321-P-1-0S-1001-4 Process Datasheet of Temporary Pig Launcher A
F9-321-P-1-0S-1002-4 Process Datasheet of Temporary Pig Receiver A
4. HSE:
Drg. / Doc. No. Description Rev.
Firewater Demand calculation(LPG plant &
F9-000-H-1-0C-1004-4 A
storage Facility)
F9-000-H-1-0D-1001-4 HSE Design Philosophy A
F9-000-H-1-0D-1002-4 Flare & Vent Radiation and Dispersion Study A
Passive Fire Protection Schedule & Report(LPG
F9-000-H-1-0D-1003-4 A
plant & storage Facility)
F9-000-H-1-0D-1004-4 Hazardous Area Classification Schedule C
F9-000-H-1-0D-2001-4 HAZID /ENVID Report A
Salalah LPG Project Project Rev : 0
Page: 12 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-000-H-1-0D-2002-4 HAZOP Study Report A
F9-000-H-1-0D-2003-4 SIL Assessment Report A
F9-000-H-1-0D-2004-4 Terms of Reference for HAZOP / SIL A
Reliability, Availability & Maintainability (RAM)
F9-000-H-1-0D-2005-4 A
Study - Assumption Register
F9-000-H-1-0D-2006-4 Fire Explosion Risk Assessment(FERA) Report A
F9-000-H-1-0D-2011-3 HSE Action Tracking Register 0
Hazardous Area Classification for Tie-In Salalah
F9-000-H-1-0P-1001-1 0
gas Supply Station
Hazardous Area Classification for Mirbat - Hot
F9-000-H-1-0P-1002-1 0
Tap Location
Hazardous Area Classification for Block Valve
F9-000-H-1-0P-1003-1 0
Stations
P&ID Fire Water Storage and Jockeys pumps -
F9-134-H-1-0P-1001-1 B
LPG plant
F9-134-H-1-0P-1002-1 P&ID Diesel Firewater Pumps -LPG plant B
F9-134-H-1-0P-1003-1 P&ID Fire Water Distribution LPG plant B
F9-134-H-1-0P-1004-1 P&ID Fire Water Distribution LPG plant B
F9-134-H-1-0P-1005-1 P&ID Fire Water Distribution LPG plant B
F9-134-H-1-0P-1006-1 P&ID for Deluge spray system B
F9-134-H-1-0P-1011-0 Firewater Network Layout- E&F Area B
F9-134-H-1-0P-1021-1 Hazardous Area Classification LPG Plant B
F9-134-H-1-0P-1022-1 Hazardous Area Classification Typical Detail A
F9-134-H-1-0P-1031-1 Passive Fire Protection Zone Layouts -LPG Plant A
P&ID Fire Water Storage and Jockeys pumps
F9-234-H-1-0P-1001-1 A
Storage Facility
F9-234-H-1-0P-1002-1 P&ID Diesel Firewater Pumps Storage Facility A
P&ID Fire Water Distribution Storage Storage
F9-234-H-1-0P-1003-1 A
Area sheet 1 of 2
P&ID Fire Water Distribution Storage Area
F9-234-H-1-0P-1004-1 A
Sheet 2 of 2
P&ID Fire Water Distribution(Monitor, Deluge &
F9-234-H-1-0P-1005-1 A
Hydrants) Storage Facility sheet 3 of 3
F9-234-H-1-0P-1006-1 P&ID Deluge Spray System Storage Area A
F9-234-H-1-0P-1007-1 P&ID Foam System Storage Facility A
Piping and Instrument Diagram Diesel Firewater
F9-234-H-1-0P-1008-1 A
Pump storage Facility
F9-234-H-1-0P-1011-1 Fire Water Network Layout Storage Area A
F9-234-H-1-0P-1021-1 Hazardous Area Classification Storage Area A
F9-234-H-1-0P-1022-1 Hazardous Area Classification Typical Detail A
F9-234-H-1-0P-1023-1 Hazardous Area Classification for Jetty Area A
Passive Fire Protection Zone Layouts -Storage
F9-234-H-1-0P-1031-1 0
Facility
F9-000-H-1-0R-1001-4 Inquiry Requisition for QRA Study 0
F9-000-H-1-0R-1002-4 Inquiry Requisition for RAM Study 0
Fire Fighting, Safety Equipment and Safety Signs
F9-000-H-1-0S-1001-4 A
Specification
F9-134-H-1-0S-1001-4 Process Datasheet for Fire Water Tank LPG A
Salalah LPG Project Project Rev : 0
Page: 13 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


plant
Process Datasheet for Diesel Fire Water Pump
F9-134-H-1-0S-1002-4 A
LPG plant
Process Datasheet for Jockey Fire Water Pump
F9-134-H-1-0S-1003-4 A
LPG plant
Process Datasheet for Fire Water Tank- Storage
F9-234-H-1-0S-1001-4 A
Facility
Process Datasheet for Diesel Fire Water Pump -
F9-234-H-1-0S-1002-4 A
Storage Facility
Process Datasheet for Jockey Fire Water Pump-
F9-234-H-1-0S-1003-4 A
Storage Facility
5. Metallurgy & Corrosion:
Drg. / Doc. No. Description Rev.
F9-000-X-1-0D-1001-4 Material Selection Philosophy & Report A
F9-000-X-1-0D-1002-4 Corrosion management philosophy A
Technical Note Review of NACE MR0175 / ISO
F9-000-X-1-0D-1101-4 A
15156 Sour Service Material Requirements
Material Selection Diagram for Inlet Separator &
F9-111-X-1-0P-1001-3 A
Mercury removal
F9-111-X-1-0P-1002-3 Material Selection Diagram for Dehydration Unit A
Material Selection Diagram for LPG Extraction
F9-111-X-1-0P-1003-3 A
Unit
Material Selection Diagram for Fractionation
F9-121-X-1-0P-1001-3 A
Unit
Material Selection Diagram for Condensate
F9-121-X-1-0P-1002-3 A
Stabilization and Export
F9-132-X-1-0P-1001-3 Material Selection Diagram for Flare System A
Material Selection Diagram for Emergency Diesel
F9-133-X-1-0P-1001-3 A
Generator Package
Material Selection Diagram for Service Water
F9-134-X-1-0P-1001-3 A
System
Material Selection Diagram for Closed Drain
F9-135-X-1-0P-1001-3 A
System
Material Selection Diagram for Open Drainage
F9-135-X-1-0P-1002-3 A
System
Material Selection Diagram for Waste Water
F9-135-X-1-0P-1003-3 A
Treatment Package
Material Selection Diagram for Instrument and
F9-136-X-1-0P-1001-3 A
Plant Air System
F9-136-X-1-0P-1002-3 Material Selection Diagram for Nitrogen System A
F9-137-X-1-0P-1001-3 Material Selection Diagram for Fuel Gas System A
F9-138-X-1-0P-1001-3 Material Selection Diagram for Hot Oil System A
Material Selection Diagram for Chemical
F9-139-X-1-0P-1001-3 A
Injection System
Material Selection Diagram for Storage - Propane
F9-211-X-1-0P-1001-3 A
Storage and Loading System
Material Selection Diagram for Storage - Butane
F9-211-X-1-0P-1002-3 A
Storage and Loading System
Salalah LPG Project Project Rev : 0
Page: 14 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Material Selection Diagram for Storage -
F9-213-X-1-0P-1001-3 A
Condensate Storage and Loading System
Material Selection Diagram for Storage - Propane
F9-214-X-1-0P-1001-3 A
Refrigeration System
Material Selection Diagram for Propane & Butane
F9-215-X-1-0P-1001-3 A
Storage Bullets and LPG Blending Unit
Material Selection Diagram for Storage - Flare
F9-232-X-1-0P-1001-3 A
System
Material Selection Diagram for Storage –
F9-233-X-1-0P-1001-3 1
Emergency Diesel Generator Package
Material Selection Diagram for Storage - Service
F9-234-X-1-0P-1001-3 1
Water System
Material Selection Diagram for Storage -
F9-236-X-1-0P-1001-3 A
Instrument Air & Plant Air
F9-000-X-1-0S-1101-4 Specification for Painting & Internal Lining B
F9-000-X-1-0S-1102-4 Passive Fireproofing Material Specification A
F9-000-X-1-0S-1103-4 Thermal Insulation Specification A
F9-000-X-1-0S-1201-4 Specification for External Coating of Linepipe A
6. Cathodic Protection:
Drg. / Doc. No. Description Rev
F9-000-F-1-0S-1001-4 Specification for Cathodic Protection A
7. Civil & Structural & Architectural:
Drg. / Doc. No. Description Rev.
Civil & Structural Design Basis For LPG Plant &
F9-000-S-1-0D-1001-4 B
Storage Area
F9-000-S-1-0P-1001-1 Structural Steel General Notes C
Structural Drawing- Miscellaneous
F9-000-S-1-0P-1002-1 A
Crossover/Platform Details Sheet 1 of 2
F9-000-S-1-0P-1003-1 General Notes - Civil Works Sht. 01 of 02 A
F9-000-S-1-0P-1004-1 General Notes - Civil Works Sht. 02 of 02 A
F9-000-S-1-0P-1005-1 Standard Drawing Cable Duct Bank Details A
Structural Drawing- Miscellaneous
F9-000-S-1-0P-1006-1 A
Crossover/Platform Details Sheet 2 of 2
F9-000-S-1-0P-1007-1 Typical Details For Stair 1
F9-000-S-1-0P-1009-1 Typical Details For Ladder Sht. 01 of 02 2
F9-000-S-1-0P-1010-1 Typical Details For Ladder Sht. 02 of 02 2
F9-000-S-1-0P-1011-1 Typical Details For Handrail & Crash Barrier 1
F9-000-S-1-0P-1012-1 Typical Details of Grating 1
F9-000-S-1-0P-1013-1 Typical Details - Concrete Protection 0
F9-000-S-1-0P-1014-1 Anchor Bolt Details 1
F9-000-S-1-0P-1015-1 Typical Details of Fence Gate - Sht. 01 of 02 0
F9-000-S-1-0P-1016-1 Typical Details of Fence Gate - Sht. 02 of 02 0
F9-000-S-1-0P-1017-1 Typical Details For Road 1
Typical Details For Vertical/Horizontal Vessel
F9-000-S-1-0P-1019-1 0
Foundation - 2 Sheets
F9-000-S-1-0P-1020-1 Typical Details of Paving - Sht. 01 of 02 1
Salalah LPG Project Project Rev : 0
Page: 15 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-000-S-1-0P-1021-1 Typical Details of Paving - Sht. 02 0f 02 1
Typical Details of Piperack Sections - Sht. 01 of
F9-000-S-1-0P-1023-1 0
02
F9-000-S-1-0P-1025-1 Typical Details of Sleeper 0
Typical Tank Foundation with Crushed Stone Ring
F9-000-S-1-0P-1026-1 0
Wall
F9-000-S-1-0P-1027-1 Typical Details of Manhole 0
F9-000-S-1-0P-1028-1 Typical Details of Catchbasin 0
F9-000-S-1-0P-1029-1 Typical Details of Valve Pit 0
F9-000-S-1-0P-1030-1 Typical Details For Concrete Trench 0
F9-000-S-1-0P-1031-1 Typical Tank Foundation with Concrete Ring Wall 0
F9-000-S-1-0P-1032-1 Guard House Plan Elevation Section And Schedule A
Security Building Plan Elevation Section And
F9-000-S-1-0P-1033-1 A
Schedule
Conceptual Plan - Typical Compressor Shelter at
F9-100-S-1-0P-1034-1 A
Extraction & Fraction Unit
Conceptual Elevation And Section - Typical
F9-100-S-1-0P-1035-1 A
Compressor Shelter at Extraction & Fraction Unit
Conceptual Elevations - Typical Compressor
F9-100-S-1-0P-1036-1 A
Shelter at Extraction & Fraction Unit
Conceptual Plan And Section - Nitrogen Shelter at
F9-100-S-1-0P-1037-1 A
Extraction & Fraction Unit
Conceptual Elevation - Nitrogen Shelter at
F9-100-S-1-0P-1038-1 A
Extraction & Fraction Unit
Conceptual Plan & Section - Fire Water Pump
F9-100-S-1-0P-1039-1 A
Shelter at Extraction & Fraction Unit
General Arrangement Drawing For Paving, Roads,
F9-100-S-1-0P-1070-1 Fence & Structure Marking - Sht. 01 at Extraction A
& Fraction Unit
General Arrangement Drawing For Paving, Roads,
F9-100-S-1-0P-1071-1 Fence & Structure Marking - Sht. 02 at Extraction A
& Fraction Unit
General Arrangement Drawing For Paving, Roads,
F9-100-S-1-0P-1072-1 Fence & Structure Marking - Sht. 03 at Extraction A
& Fraction Unit
General Arrangement Drawing For Paving, Roads,
F9-100-S-1-0P-1073-1 Fence & Structure Marking - Sht. 04 at Extraction A
& Fraction Unit
General Arrangement Drawing For Paving, Roads,
F9-100-S-1-0P-1074-1 Fence & Structure Marking - Sht. 05 at Extraction A
& Fraction Unit
General Arrangement Drawing For Paving, Roads,
F9-100-S-1-0P-1075-1 Fence & Structure Marking - Sht. 06 at Extraction A
& Fraction Unit
Layout Drawing For U/G Drawing, Trenches &
F9-100-S-1-0P-1076-1 Foundation Marking - Sht. 01 at Extraction & A
Fraction Unit
Layout Drawing For U/G Drawing, Trenches &
F9-100-S-1-0P-1077-1 A
Foundation Marking - Sht. 02 at Extraction &
Salalah LPG Project Project Rev : 0
Page: 16 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Fraction Unit
Layout Drawing For U/G Drawing, Trenches &
F9-100-S-1-0P-1078-1 Foundation Marking - Sht. 03 at Extraction & A
Fraction Unit
Layout Drawing For U/G Drawing, Trenches &
F9-100-S-1-0P-1079-1 Foundation Marking - Sht. 04 at Extraction & A
Fraction Unit
Layout Drawing For U/G Drawing, Trenches &
F9-100-S-1-0P-1080-1 Foundation Marking - Sht. 05 at Extraction & A
Fraction Unit
Layout Drawing For U/G Drawing, Trenches &
F9-100-S-1-0P-1081-1 Foundation Marking - Sht. 06 at Extraction & A
Fraction Unit
Ground Floor Plan of office Building at Extraction
F9-141-S-1-0P-1002-1 B
& Fraction Unit
First Floor Plan of office Building at Extraction &
F9-141-S-1-0P-1003-1 A
Fraction Unit
Roof Plan of office Building at Extraction &
F9-141-S-1-0P-1004-1 A
Fraction Unit
Elevation of office Building at Extraction &
F9-141-S-1-0P-1005-1 A
Fraction Unit
Sections & Misc. Details of office Building at
F9-141-S-1-0P-1006-1 A
Extraction & Fraction Unit
Ground Floor Plan of Control Room Building at
F9-142-S-1-0P-1024-1 A
Extraction & Fraction Unit
Roof Plan of Control Room Building at Extraction
F9-142-S-1-0P-1025-1 A
& Fraction
Unit Elevation of Control Room Building at
F9-142-S-1-0P-1026-1 A
Extraction & Fraction Unit
Sections & Misc. Details of Control Room Building
F9-142-S-1-0P-1027-1 A
at Extraction & Fraction Unit
Doors, Windows & Finishes Schedule of Control
F9-142-S-1-0P-1028-1 A
Room Building at Extraction & Fraction Unit
First Floor Plan of MCC Building at Extraction &
F9-143-S-1-0P-1029-1 A
Fraction Unit - Sht. 01 of 02
First Floor Plan of MCC Building at Extraction &
F9-143-S-1-0P-1029-1 A
Fraction Unit - Sht. 02 of 02
Roof Plan of MCC Building at Extraction &
F9-143-S-1-0P-1030-1 A
Fraction Unit
Elevation of MCC Building at Extraction & Fraction
F9-143-S-1-0P-1031-1 A
Unit
Sections & Misc. Details of MCC Building at
F9-143-S-1-0P-1032-1 A
Extraction & Fraction Unit
Doors, Windows & Finishes Schedule of MCC
F9-143-S-1-0P-1033-1 A
Building at Extraction & Fraction Unit
Ground Floor Plan of Fire Building at Extraction &
F9-145-S-1-0P-1008-1 A
Fraction Unit
Roof Plan of Fire Building at Extraction & Fraction
F9-145-S-1-0P-1009-1 A
Unit
Salalah LPG Project Project Rev : 0
Page: 17 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Elevations Fire Building at Extraction & Fraction
F9-145-S-1-0P-1010-1 A
Unit
Sections Fire Building at Extraction & Fraction
F9-145-S-1-0P-1011-1 A
Unit
Doors, Windows & Finishes Schedule of Fire
F9-145-S-1-0P-1012-1 A
Building at Extraction & Fraction Unit
Ground Floor Plan of Workshop & Warehouse
F9-146-S-1-0P-1014-1 A
Building at Extraction & Fraction Unit
Mezzanine Floor Plan of Workshop & Warehouse
F9-146-S-1-0P-1015-1 A
Building at Extraction & Fraction Unit
Elevations Workshop & Warehouse Building at
F9-146-S-1-0P-1016-1 0
Extraction & Fraction Unit - Sht. 1 of 2
Elevations Workshop & Warehouse Building at
F9-146-S-1-0P-1016-1 0
Extraction & Fraction Unit - Sht. 2 of 2
Sections Workshop & Warehouse Building at
F9-146-S-1-0P-1017-1 0
Extraction & Fraction Unit - Sht. 1 of 2
Sections Workshop & Warehouse Building at
F9-146-S-1-0P-1017-1 0
Extraction & Fraction Unit - Sht. 2 of 2
Door, Window & Finish Schedule Workshop &
F9-146-S-1-0P-1018-1 0
Warehouse Building at Extraction & Fraction Unit
Plans of Laboratory Building at Extraction &
F9-147-S-1-0P-1020-1 A
Fraction Unit
Elevation of Laboratory Building at Extraction &
F9-147-S-1-0P-1021-1 A
Fraction Unit
Sections & Misc. Details of Laboratory Building at
F9-147-S-1-0P-1022-1 A
Extraction & Fraction Unit
Doors, Windows & Finishes Schedule of Laboratory
F9-147-S-1-0P-1023-1 A
Building at Extraction & Fraction Unit
Conceptual Plan & Sections - Fire Water Pump
F9-200-S-1-0P-1059-1 A
Shelter at Storage Unit
Conceptual Plan - Typical Butane & Propane
F9-200-S-1-0P-1060-1 A
Compressor Shelter at Storage Unit
Conceptual Plan - Typical Propane & Butane
F9-200-S-1-0P-1061-1 A
Compressor Shelter at Storage Unit
Conceptual Elevation & Section - Typical Propane
F9-200-S-1-0P-1062-1 A
& Butane Compressor Shelter at Storage Unit
Conceptual Elevations - Typical Propane & Butane
F9-200-S-1-0P-1063-1 A
Compressor Shelter at Storage Unit
General Arrangement Drawing For Paving, Roads,
F9-200-S-1-0P-1090-1 Fence & Structure Marking - Sht. 01 at Storage 0
Unit
General Arrangement Drawing For Paving, Roads,
F9-200-S-1-0P-1091-1 Fence & Structure Marking - Sht. 02 at Storage 0
Unit
General Arrangement Drawing For Paving, Roads,
F9-200-S-1-0P-1092-1 Fence & Structure Marking - Sht. 03 at Storage 0
Unit
General Arrangement Drawing For Paving, Roads,
F9-200-S-1-0P-1093-1 0
Fence & Structure Marking - Sht. 04 at Storage
Salalah LPG Project Project Rev : 0
Page: 18 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Unit
Layout Drawing For U/G Drawing, Trenches &
F9-200-S-1-0P-1094-1 0
Foundation Marking - Sht. 01 at Storage Unit
Layout Drawing For U/G Drawing, Trenches &
F9-200-S-1-0P-1095-1 0
Foundation Marking - Sht. 02 at Storage Unit
Layout Drawing For U/G Drawing, Trenches &
F9-200-S-1-0P-1096-1 0
Foundation Marking - Sht. 03 at Storage Unit
Layout Drawing For U/G Drawing, Trenches &
F9-200-S-1-0P-1097-1 0
Foundation Marking - Sht. 04 at Storage Unit
Ground Floor Plan of Control Room Building at
F9-242-S-1-0P-1046-1 A
Storage Unit - Sht. 1 of 2
First Floor Plan of Control Room Building at
F9-242-S-1-0P-1046-1 A
Storage Unit - Sht. 2 of 2
Roof Plan of Control Room Building at Storage
F9-242-S-1-0P-1047-1 A
Unit
Elevation of Control Room Building at Storage
F9-242-S-1-0P-1048-1 A
Unit
Sections & Misc. Details of Control Room Building
F9-242-S-1-0P-1049-1 A
at Storage Unit
Doors, Windows & Finishes Schedule of Control
F9-242-S-1-0P-1050-1 A
Room Building at Storage Unit
Specification For Buildings & Shelters-Materials &
F9-000-S-1-0S-1004-4 A
Construction
Specification For Drainage Work-Materials &
F9-000-S-1-0S-1005-4 A
Construction
F9-000-S-1-0S-1006-4 Specification For Roads And Paving A
F9-000-S-1-0S-1007-4 Specification For Fence And Gates A
Specification For Site Preparation And Earth
F9-000-S-1-0S-1008-4 0
Works
Specification For Steel Material, Fabrication And
F9-000-S-1-0S-1009-4 2
Construction
Specification For Concrete Material &
F9-000-S-1-0S-1010-4 B
Construction
8. Static:
Drg. / Doc. No. Description Rev.
Mechanical Design Basis for Static Equipments &
F9-000-M-1-0D-1001-4 A
Packages
F9-000-M-1-0R-1001-4 Inquiry Requisition for Column 0
Inquiry Requisition for Brazed Aluminium
F9-000-M-1-0R-1005-4 0
Exchanger
F9-000-M-1-0R-1008-4 Inquiry Requisition for Fired Heater 0
F9-000-M-1-0R-1009-4 Inquiry Requisition for Mounded Storage Vessels 0
F9-000-M-1-0S-2001-4 Specification for Pressure Vessels A
F9-000-M-1-0S-2002-4 Specification for Shell & Tube Heat Exchangers A
F9-000-M-1-0S-2003-4 Specification for Air Cooled Heat Exchangers A
Specification for Brazed Aluminium Heat
F9-000-M-1-0S-2004-4 A
Exchanger
F9-000-M-1-0S-2005-4 Specification for Fired Heater Package A
Salalah LPG Project Project Rev : 0
Page: 19 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-000-M-1-0S-2006-4 Specification for Flare Package A
F9-000-M-1-0S-2007-4 Specification for Storage tanks A
Specification for Double wall storage tanks for
F9-000-M-1-0S-2008-4 A
low temperature service
Supplementary Requirement for Mounded
F9-000-M-1-0S-2009-4 A
Bullets
F9-111-M-1-0S-3005-4 Mechanical Datasheet of De-Ethaniser Column A
Mechanical Datasheet of Regeneration Gas
F9-111-M-1-0S-3012-4 A
Cooler
F9-111-M-1-0S-3013-4 Mechanical Datasheet of Recompressor Cooler A
Mechanical Datasheet of Residual Gas
F9-111-M-1-0S-3014-4 A
Compressor Interstage cooler
F9-111-M-1-0S-3019-4 Mechanical Datasheet of Inlet Gas Separator A
F9-111-M-1-0S-3020-4 Mechanical Datasheet of Inlet Gas Filter A
F9-111-M-1-0S-3021-4 Mechanical Datasheet of Inlet Filter Coalescer X
Mechanical Datasheet of Mercury Removal
F9-111-M-1-0S-3022-4 A
Guard Bed Filter
F9-111-M-1-0S-3024-4 Mechanical Datasheet of Dry Gas Filter A
Mechanical Datasheet of Regeneration Gas Heat
F9-111-M-1-0S-3025-4 A
Exchanger(STHE)
Mechanical Datasheet of Regeneration Gas KO
F9-111-M-1-0S-3026-4 A
drum
Mechanical Datasheet of Gas/ Gas & Gas/
F9-111-M-1-0S-3027-4 A
Liquid Exchnager (BAHE)
Mechanical Datasheet of De-ethanizer Reflux
F9-111-M-1-0S-3028-4 A
Condenser (BAHE)
F9-111-M-1-0S-3029-4 Mechanical Datasheet of Cold Separator A
F9-111-M-1-0S-3030-4 Mechanical Datasheet of De-Ethaniser Reboiler A
Mechanical Datasheet of De-Ethanizer Reflux
F9-111-M-1-0S-3031-4 A
Drum
F9-121-M-1-0S-3006-4 Mechanical Datasheet of Depropaniser Column A
F9-121-M-1-0S-3007-4 Mechanical Datasheet of Debutaniser Column A
F9-121-M-1-0S-3008-4 Mechanical Datasheet of Stabilizer Column A
Mechanical Datasheet of Depropaniser Overhead
F9-121-M-1-0S-3015-4 A
Cooler (ACHE)
Mechanical Datasheet of Debutaniser Overhead
F9-121-M-1-0S-3016-4 A
Cooler (ACHE)
Mechanical Datasheet of Stabilizer Overhead
F9-121-M-1-0S-3017-4 A
Cooler (ACHE)
Mechanical Datasheet of Condensate Cooler
F9-121-M-1-0S-3018-4 A
(ACHE)
F9-121-M-1-0S-3031-4 Mechanical Datasheet of Depropaniser Reboiler A
Mechanical Datasheet of Depropaniser Reflux
F9-121-M-1-0S-3032-4 A
Drum
F9-121-M-1-0S-3033-4 Mechanical Datasheet of Debutaniser Reboiler A
F9-121-M-1-0S-3036-4 Mechanical Datasheet of Stabilizer Reboiler A
F9-121-M-1-0S-3037-4 Mechanical Datasheet of Stabilizer Reflux Drum A
F9-121-M-1-0S-3038-4 Mechanical Datasheet of De-Butanizer Reflux A
Salalah LPG Project Project Rev : 0
Page: 20 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Drum
F9-132-M-1-0S-3010-4 Mechanical Datasheet of HP Flare Package A
F9-132-M-1-0S-3011-4 Mechanical Datasheet of LP Flare Package A
F9-132-M-1-0S-3058-4 Mechanical Datasheet of HP Flare KO Drum 0
Mechanical Datasheet of HP Flare KO Drum
F9-132-M-1-0S-3059-4 0
Heater
F9-132-M-1-0S-3060-4 Mechanical Datasheet of LP Flare KO Drum 0
F9-134-M-1-0S-3054-4 Mechanical Datasheet of Service Water Tank 0
F9-134-M-1-0S-3056-4 Mechanical Datasheet of Fire Water Tank 0
F9-135-M-1-0S-3055-4 Mechanical Datasheet of Closed Drain Drum 0
Mechanical Datasheet of Degassing Vessel - Shts.
F9-135-M-1-0S-3056-4 0
1 to 8
F9-135-M-1-0S-3057-4 Mechanical Datasheet of SLOP Tank 0
F9-136-M-1-0S-3051-4 Mechanical Datasheet of Air Receiver 1
F9-136-M-1-0S-3052-4 Mechanical Datasheet of Instrument Air Receiver 1
F9-136-M-1-0S-3053-4 Mechanical Datasheet of Nitrogen Receiver 1
Mechanical Datasheet of HP Fuel Gas Inlet KO
F9-137-M-1-0S-3042-4 A
Drum
F9-137-M-1-0S-3043-4 Mechanical Datasheet of HP Fuel Gas Filters 1
F9-137-M-1-0S-3044-4 Mechanical Datasheet of HP Fuel Gas Heaters 0
F9-137-M-1-0S-3045-4 Mechanical Datasheet of LP Fuel Gas KO Drum 0
F9-138-M-1-0S-3009-4 Mechanical Datasheet of Hot Oil Heater Package A
F9-138-M-1-0S-3048-4 Mechanical Datasheet of Hot Oil Accumulator A
F9-138-M-1-0S-3049-4 Mechanical Datasheet of Hot Oil Filters 1
Mechanical Datasheet of Hot Oil Make-up /Drain
F9-138-M-1-0S-3050-4 0
Drum
F9-138-M-1-0S-3051-4 Mechanical Datasheet of Hot Oil By Pass Cooler 0
F9-139-M-1-0S-3034-4 Mechanical Datasheet of Propane bullet A
F9-139-M-1-0S-3035-4 Mechanical Datasheet of Butane bullet A
Mechanical Datasheet of Condensate Storage
F9-139-M-1-0S-3038-4 A
Vessel
Mechanical Datasheet of Off-Spec Propane
F9-139-M-1-0S-3039-4 A
Bullet
F9-139-M-1-0S-3040-4 Mechanical Datasheet of Off-Spec Butane Bullet A
Mechanical Datasheet of Off-Spec Condensate
F9-139-M-1-0S-3041-4 A
Storage vessel
F9-211-M-1-0S-3066-4 Mechanical Datasheet of Propane Chiller A
Mechanical Datasheet of Boil-off Butane Air
F9-212-M-1-0S-3063-4 A
Cooler
Mechanical Datasheet of Boil-off Propane
F9-212-M-1-0S-3064-4 A
Condenser
Mechanical Datasheet of Boil-off Propane
F9-212-M-1-0S-3068-4 A
Compressor Suction Scrubber
Mechanical Datasheet of Boil off Propane
F9-212-M-1-0S-3069-4 A
Recovery accumulator
Mechanical Datasheet of Propane Vaporizer
F9-212-M-1-0S-3070-4 0
Heater (212-E-003)
F9-212-M-1-0S-3071-4 Mechanical Datasheet of Butane Vaporizer 0
Salalah LPG Project Project Rev : 0
Page: 21 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Heater (212-E-004)
Mechanical Datasheet of Boil-off Butane
F9-212-M-1-0S-3072-4 A
compressor suction scrubber
Mechanical Datasheet of Boil off Butane
F9-212-M-1-0S-3073-4 A
Recovery accumulator
Mechanical Datasheet of Propane Refrigerated
F9-213-M-1-0S-3067-4 B
Tank
Mechanical Datasheet of Butane Refrigerated
F9-213-M-1-0S-3071-4 B
Tank
Mechanical Datasheet of Condensate Storage -
F9-213-M-1-0S-3074-4 B
Storage
Mechanical Datasheet of Propane Condenser
F9-214-M-1-0S-3079-4 X
(214-E-001)
Mechanical Datasheet of Condensate Drainage
F9-221-M-1-0S-3089-4 0
Vessel
Mechanical Datasheet of LP Flare Package -
F9-232-M-1-0S-3061-4 A
Storage
Mechanical Datasheet of LP Flare KO Drum -
F9-232-M-1-0S-3078-4 0
Storage
Mechanical Datasheet of LP Flare KO Drum
F9-232-M-1-0S-3088-4 0
Heater
Mechanical Datasheet of Diesel Storage Tank -
F9-233-M-1-0S-3084-4 0
Storage
Mechanical Datasheet of Fire Water Tank -
F9-234-M-1-0S-3087-4 0
Storage Facility (234-T-002 A/B)
Mechanical Datasheet of Service / Potable
F9-234-M-1-0S-3088-4 0
Water Tank
Mechanical Datasheet of Air Receiver Storage -
F9-236-M-1-0S-3075-4 1
Storage
Mechanical Datasheet of Instrument Air
F9-236-M-1-0S-3076-4 1
Receiver
F9-236-M-1-0S-3077-4 Mechanical Datasheet of Nitrogen Receiver 0
F9-311-M-1-0S-3001-4 Mechanical Datasheet of Feed Gas Pig Launcher X
F9-311-M-1-0S-3002-4 Mechanical Datasheet of Feed Gas Pig Receiver A
Mechanical Datasheet of Residual Gas Pig
F9-312-M-1-0S-3003-4 A
Launcher
Mechanical Datasheet of Residual Gas Pig
F9-312-M-1-0S-3004-4 X
Receiver
Mechanical Datasheet of Mirbat Gas Export Pig
F9-312-M-1-0S-3005-4 A
Launcher at SGSS
Mechanical Datasheet of Mirbat Gas Export Pig
F9-312-M-1-0S-3006-4 A
Receiver
Mechanical Datasheet of Temporary Pig
F9-321-M-1-0S-3007-4 A
Receiver
Mechanical Datasheet of Temporary Pig
F9-321-M-1-0S-3008-4 A
Launcher

9. Rotating:
Salalah LPG Project Project Rev : 0
Page: 22 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Mechanical Design Basis - Rotating and Package
F9-000-R-1-0D-1001-4 A
Equipment
F9-000-R-1-0D-1002-4 Mechanical Handling Philosophy (FEED Stage) 0
F9-000-R-1-0D-1018-4 HVAC Design Basis and Specification A
F9-000-R-1-0D-1019-4 Mechanical Data Sheet for Diesel Engine A
Mechanical Datasheet of Dryers Regen.
F9-111-R-1-0D-1001-4 X
Compressor Package
Mechanical Datasheet of Residual Gas
F9-111-R-1-0D-1002-4 A
Compressor
Mechanical Datasheet of Feed Gas Expander &
F9-111-R-1-0D-1003-4 A
Re-Compressor
Mechanical Datasheet of Deethaniser Bottom
F9-111-R-1-0D-1004-4 A
Pump
Mechanical Datasheet of Deethaniser Overhead
F9-111-R-1-0D-1007-4 A
Pump
Configuration Selection Report for Feed Gas
F9-111-R-1-0D-1008-4 0
Expander & Re-Compressor
Mechanical Datasheet of Depropaniser Overhead
F9-121-R-1-0D-1001-4 A
Pumps
Mechanical Datasheet of Condensate Re-injection
F9-121-R-1-0D-1002-4 A
Pump (Positive displacement)
Mechanical Datasheet of Debutanizer Bottom
F9-121-R-1-0D-1003-4 A
Pumps
Mechanical Datasheet of Condensate Stabilizer
F9-121-R-1-0D-1004-4 A
Overhead Pumps
Mechanical Datasheet of Condensate Stabilizer
F9-121-R-1-0D-1005-4 A
Bottom Pumps
F9-132-R-1-0D-1001-4 Mechanical Datasheet of LP Flare Drum Pumps 0
F9-132-R-1-0D-1002-4 Mechanical Datasheet of HP Flare KO Drum Pump 0
Gas Turbine Generator (GTG) and Waste Heat
F9-133-R-1-0D-1001-4 B
Recovery Unit (WHRU) Package
Mechanical Datasheet of Service / Potable Water
F9-134-R-1-0D-1001-4 0
Pumps (134-P-001 A/B)
F9-134-R-1-0D-1002-4 Mechanical Data sheet of Fire water pumps - A
Mechanical Data sheet of Fire water Jockey
F9-134-R-1-0D-1003-4 A
pumps
Mechanical Datasheet of Closed Drain Drum
F9-135-R-1-0D-1001-4 0
Pump (135-P-001 A/B)
F9-135-R-1-0D-1002-4 Mechanical Datasheet of Slop Pump 0
Mechanical Datasheet of Instrument Air
F9-136-R-1-0D-1001-4 A
Compressor Package
Mechanical Datasheet of Nitrogen Generation
F9-136-R-1-0D-1003-4 A
Package
Mechanical Datasheet of Hot Oil Recirculation
F9-138-R-1-0D-1001-4 B
Pumps
Mechanical Data sheet of Hot Oil Drain
F9-138-R-1-0D-1002-4 A
Pump(138-P-003A/B)
F9-138-R-1-0D-1003-4 Mechanical Datasheet Hot Oil Start Up Pump B
F9-139-R-1-0D-1001-4 Mechanical Datasheet of Propane Transfer pump B
Salalah LPG Project Project Rev : 0
Page: 23 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-139-R-1-0D-1002-4 Mechanical Datasheet of Butane Transfer pump B
Mechanical Datasheet of Condensate (Gasoline)
F9-139-R-1-0D-1003-4 A
Transfer Pump
Mechanical Datasheet of Off-Spec
F9-139-R-1-0D-1004-4 A
Propane/Butane Pump
Mechanical Datasheet of Off-Spec Condensate
F9-139-R-1-0D-1005-4 A
(Gasoline) Storage Pump
Mechanical Datasheet of Odorant Injection
F9-139-R-1-0D-1006-4 0
Package
Mechanical Datasheet of Methanol Injection
F9-139-R-1-0D-1007-4 0
Package
Mechanical Datasheet of Propane Loading Pump -
F9-211-R-1-0D-1001-4 A
Storage
Mechanical Datasheet of Butane Loading Pump -
F9-211-R-1-0D-1003-4 A
Storage
F9-211-R-1-0D-1005-4 Mechanical Datasheet of Propane Chiller Package A
Mechanical Datasheet of Propane Boil Off Gas
F9-212-R-1-0D-1001-4 A
Compressor - Storage
Mechanical Datasheet of Butane Boil Off Gas
F9-212-R-1-0D-1002-4 A
Compressor - Storage
Mechanical Datasheet of Condensate Ship
F9-213-R-1-0D-1001-4 A
Loading Pumps - (213-P-001- A/B)
Mechanical Data sheet of LPG Truck Loading Arm
F9-215-R-1-0D-1001-4 A
Package
Mechanical Datasheet of Propane Loading
F9-221-R-1-0D-1001-4 A
Package (221-Z-002)
Mechanical Datasheet of Condensate Loading
F9-221-R-1-0D-1002-4 A
Package (221-Z-001)
Mechanical Datasheet of Butane Loading Package
F9-221-R-1-0D-1003-4 A
(221-Z-003)
Mechanical Datasheet of Propane & Butane Vapor
F9-221-R-1-0D-1004-4 0
Return Blowers
Mechanical Data sheet of Fire water pumps -
F9-234-R-1-0D-1001-4 A
Storage
Mechanical Data sheet of Fire water Jockey
F9-234-R-1-0D-1002-4 A
pumps- Storage
Mechanical Datasheet of Instrument Air
F9-236-R-1-0D-1001-4 A
Compressor & Dryer Package - Storage
Mechanical Datasheet of Nitrogen Generation
F9-236-R-1-0D-2001-4 A
Package - Storage
F9-000-R-1-0P-1021-1 HVAC Legends, Notes & Abbreviation 0
F9-140-R-1-0P-1025-1 HVAC Schematic Diagram for Security Building 0
F9-141-R-1-0P-1021-1 HVAC Schematic Diagram for Office Building 0
F9-141-R-1-0P-1022-1 HVAC Schematic Diagram for Guard House 0
HVAC Schematic Diagram for Control Room
F9-142-R-1-0P-1021-1 0
Building
HVAC Schematic Diagram for MCC Building
F9-143-R-1-0P-1021-1 0
(Electrical Substation)
F9-145-R-1-0P-1021-1 HVAC Schematic Diagram for Fire Building 0
Salalah LPG Project Project Rev : 0
Page: 24 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


HVAC Schematic Diagram for Workshop &
F9-146-R-1-0P-1021-1 0
Warehouse Building - Sht. 1 of 2
HVAC Schematic Diagram for Workshop &
F9-146-R-1-0P-1021-1 0
Warehouse Building - Sht. 2 of 2
F9-147-R-1-0P-1021-1 HVAC Schematic Diagram for Laboratory Building 0
F9-240-R-1-0P-1021-1 HVAC Schematic Diagram for Security Building 0
HVAC Schematic Diagram for Control Room
F9-242-R-1-0P-1021-1 0
Building /MCC building
F9-000-R-1-0R-1001-4 Inquiry Requisition for Residual Gas Compressor 0
Inquiry Requisition for Feed Gas Expander and
F9-000-R-1-0R-1002-4 0
Recompressor
Inquiry Requisition for Gas Turbine Generator
F9-000-R-1-0R-1003-4 0
(GTG)
Inquiry Requisition for Oil Free Screw
F9-000-R-1-0R-1004-4 0
Compressors
Specification for Instrument Air Compressor and
F9-000-R-1-0S-1002-4 A
Dryer Package
Specification for Feed Gas Expander &
F9-000-R-1-0S-1003-4 A
Recompressor
F9-000-R-1-0S-1004-4 Specification for Residual Gas Compressor A
F9-000-R-1-0S-1006-4 Specification for Oil Free Screw Compressor A
F9-000-R-1-0S-1007-4 Specification for Centrifugal Pumps A
F9-000-R-1-0S-1008-4 Specification for Firewater Pumps A
F9-000-R-1-0S-1009-4 Specification for Reciprocating Pumps A
F9-000-R-1-0S-1010-4 Specification for Loading Arms A
F9-000-R-1-0S-1011-4 Specification for Chemical Injection Package A
F9-000-R-1-0S-1012-4 Specification for Cryogenic Pumps A
F9-000-R-1-0S-1014-4 Specification for Nitrogen Generation Package A
Specification for Gas Turbine Generator (GTG)
F9-000-R-1-0S-1015-4 A
and Waste Heat Recovery Unit (WHRU)
F9-000-R-1-0S-1016-4 Specification for Propane Chiller Package A
10. Piping:
Drg. / Doc. No. Description Rev.
F9-000-L-1-0D-1001-4 Plant Layout and Piping Design Basis A
F9-000-L-1-0D-1002-4 Stress Design Basis B
F9-000-L-1-0D-1003-4 Pipe Wall Thickness Calculation A
F9-000-L-1-0D-1004-4 Plot Plan Review Report 0
F9-000-L-1-0D-1006-3 Stress Critical Line List 0
F9-000-L-1-0P-1001-1 Combined Overall Plot Plan A
F9-100-L-1-0P-1001-1 Overall Plot Plan - E & F A
F9-100-L-1-0P-1002-1 Key Plan for Unit Plot Plan - E&F Area 0
F9-100-L-1-0P-1003-1 Unit Plot Plan - Extraction and Condensate 0
Stabilization Unit - E&F - Sht. 1 of 2
F9-100-L-1-0P-1003-1 Unit Plot Plan - Extraction and Condensate 0
Stabilization - E&F Area - Sht. 2 of 2
Salalah LPG Project Project Rev : 0
Page: 25 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

F9-111-L-1-0P-1001-1 Unit Plot Plan - Dehydration and Inlet separation 0


Unit - E&F - Sht. 1 of 2
F9-111-L-1-0P-1001-1 Unit Plot Plan - Dehydration and Inlet separation 0
Unit - E&F - Sht. 2 of 2
F9-111-L-1-0P-1005-1 Unit Plot Plan - Residual Gas Compression Unit - 0
E&F
F9-111-L-1-0P-1008-1 Unit Plot Plan - PIG- Launcher / Receiver and 0
Metering Skid Area - E&F
F9-121-L-1-0P-1001-1 Unit Plot Plan - Fractionation Unit - E&F Area - 0
Sht. 1 of 2
F9-121-L-1-0P-1001-1 Unit Plot Plan - Fractionation Unit - E&F Area - 0
Sht. 2 of 2
F9-130-L-1-0P-1001-1 Unit Plot Plan - Hot Oil , Fuel Gas and GTG Area - 0
E&F
F9-132-L-1-0P-1001-1 Unit Plot Plan - Flare Area E&F 0
F9-134-L-1-0P-1001-1 Unit Plot Plan - Fire Water & Service Water Area 0
- E&F
F9-136-L-1-0P-1001-1 Unit Plot Plan - Plant & Instrument Air Unit & 0
Nitrogen Unit E&F
F9-139-L-1-0P-1001-1 Unit Plot Plan - Storage Area - E&F 0
F9-139-L-1-0P-1003-1 Unit Plot Plan -Truck Loading Area -Storage 0
Facility
F9-142-L-1-0P-1001-1 Unit Plot Plan - Control Room -E & F 0
F9-144-L-1-0P-1001-1 Unit Plot Plan - Substation/ MCC Area - E&F 0
F9-200-L-1-0P-1001-1 Overall Plot Plan -Storage Facilities X
F9-200-L-1-0P-1002-1 Overall Plot Plan -Jetty Area Loading Facilities A
F9-200-L-1-0P-1003-1 Key Plan - Unit Plot Plans Storage Area X
F9-200-L-1-0P-1004-1 Overall Plot Plan -Storage Area A
F9-200-L-1-0P-1005-1 Pipe Routing and Expansion Loop Details - Jetty A
Area Pipe Rack
F9-200-L-1-0P-1006-1 Service Corridor Pipe Routing and Expansion Loop A
Details - Phase-II (Pipe Rack)
F9-200-L-1-0P-1007-1 Key Plan - Unit Plot Plans Storage Area 0
F9-210-L-1-0P-1001-1 Unit Plot Plan -Boil Off and Refrigeration Unit - X
Storage Facility
F9-211-L-1-0P-1001-1 Unit Plot Plan -Propane , Butane Tank - Storage X
Facility
F9-211-L-1-0P-1002-1 Unit Plot Plan -Propane Storage Tank & Boil Off & 0
Refrigeration Unit - Storage Area
F9-211-L-1-0P-1003-1 Unit Plot Plan -Butane Storage Tank & Boil Off 0
Unit - Storage Area
F9-213-L-1-0P-1001-1 Unit Plot Plan - Gasoline Tank - Storage Facility X
F9-213-L-1-0P-1002-1 Unit Plot Plan - Gasoline Tank - Storage Facility 0
F9-232-L-1-0P-1002-1 Unit Plot Plan - Flare Area -Storage Facility X
F9-232-L-1-0P-1003-1 Unit Plot Plan - Flare Area -Storage Area 0
F9-236-L-1-0P-1001-1 Unit Plot Plan - Fire Water System & EDG Storage X
Area
Salalah LPG Project Project Rev : 0
Page: 26 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

F9-236-L-1-0P-1002-1 Unit Plot Plan - Plant & Instrument Air Unit - X


Storage Facility
F9-236-L-1-0P-1003-1 Unit Plot Plan - Fire Water System -Storage Area 0
F9-240-L-1-0P-1001-1 Unit Plot Plan - Substation/ MCC , Control Room X
and EDG Area -Storage Facility
F9-240-L-1-0P-1002-1 Unit Plot Plan - Substation ,Telecom, Control 0
Room, EDG,IA,PA& Nitrogen Area -Storage Area
F9-321-L-1-0P-1001-1 Unit Plot Plan - Temporary Pig Receiver Area - 0
Storage Area
F9-000-L-1-0S-1001-4 Piping Material Specification A
F9-000-L-1-0S-1002-4 Technical Specification for Valves 0
F9-000-L-1-0S-1003-4 Technical Specification for Pipes, Fittings and 0
Flanges
F9-000-L-1-0S-1004-4 Technical Specification for Gaskets and Bolting 0
11. Electrical:
Drg. / Doc. No. Description Rev.
F9-000-E-1-0D-1001-4 Electrical Design Basis A
Electrical Power System, Control, Monitoring &
F9-000-E-1-0D-1002-4 A
Operating Philosophy
F9-000-E-1-0D-1012-4 HV Cable Sizing Calculation A
F9-000-E-1-0D-1013-4 Earthing Calculation A
F9-000-E-1-0D-1015-4 LV Cable Sizing Calculation A
F9-000-E-1-0D-1016-4 Electrical Tie-In Schedule A
F9-000-E-1-0D-1021-4 SAFOP Study Report A
F9-000-E-1-0D-1022-4 Electrical Design Review Report 0
F9-100-E-1-0D-1011-4 Electrical Equipment List A
Input / Output (I/O) Schedule for ENMCS & FCS
F9-100-E-1-0D-1012-4 A
(E&F Area)
F9-100-E-1-0D-1013-3 Electrical Load Schedule A
F9-100-E-1-0D-1015-3 Electrical Cable Schedule 0
F9-100-E-1-0D-1018-4 Electrical System Studies- E&F Area A
F9-200-E-1-0D-1011-4 Electrical Equipment List - Storage Area A
Input / Output (I/O) Schedule for ENMCS & FCS
F9-200-E-1-0D-1012-4 A
(Storage Area)
F9-200-E-1-0D-1013-3 Electrical Load Schedule A
F9-200-E-1-0D-1015-4 Electrical Cable Schedule 0
F9-200-E-1-0D-1018-4 Electrical System Studies- Storage Area A
Electrical Standard Symbols, Legends &
F9-000-E-1-0P-1001-1 A
Abbreviations - 2 Sheets
F9-000-E-1-0P-1002-1 Electrical Standard Installation Detail-Power A
Elect. Standard Installation Detail- Earthing &
F9-000-E-1-0P-1003-1 A
Lightning
F9-000-E-1-0P-1004-1 Elect. Standard Installation Detail-Lighting A
F9-100-E-1-0P-1001-1 Key Single Line Diagram - E&F Area A
F9-100-E-1-0P-1002-1 Single Line Diagrams-HV Switchgear-Sheet 1 of 2 A
F9-100-E-1-0P-1002-1 Single Line Diagrams-HV Switchgear- Sheet 2 of 2 A
Single Line Diagrams-LV Switchgear/ MCC E & F
F9-100-E-1-0P-1003-1 A
Area – 143-SW-002 & 143-SW-003 - Sht. 1 of 3
Salalah LPG Project Project Rev : 0
Page: 27 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Single Line Diagrams-LV Switchgear/ MCC E & F
F9-100-E-1-0P-1003-1 A
Area – 143-SW-002 & 143-SW-003 - Sht. 2 of 3
Single Line Diagrams-LV Switchgear/ MCC E & F
F9-100-E-1-0P-1003-1 A
Area – 143-SW-002 & 143-SW-003 - Sht. 3 of 3
F9-100-E-1-0P-1004-1 Single Line Diagrams - AC Ups - 2 Sheets A
F9-100-E-1-0P-1005-1 Single Line Diagrams - DC UPS A
Single Line Diagrams-Lighting And Small Power -
F9-100-E-1-0P-1006-1 A
Sht. 1 of 2
Single Line Diagrams-Lighting And Small Power -
F9-100-E-1-0P-1006-1 A
Sht. 2 of 2
F9-100-E-1-0P-1011-1 Block Diagram - ENMCS System A
F9-100-E-1-0P-1021-1 Overall Cable Routing Layout - E & F Area A
Overall Lighting & Small Power Layout - E & F
F9-100-E-1-0P-1031-1 A
Area
F9-100-E-1-0P-1040-1 Overall Earthing Layout - E & F Area A
Substation - Electrical Equipment Layout - Sht. 1
F9-100-E-1-0P-1051-1 A
of 2
Substation - Electrical Equipment Layout - Sht. 2
F9-100-E-1-0P-1051-1 A
of 2
F9-200-E-1-0P-1001-1 Key Single Line Diagram - Storage Area A
F9-200-E-1-0P-1002-1 Single Line Diagrams - HV Switchgear - 3 Sheets A
F9-200-E-1-0P-1003-1 Single Line Diagrams - LV Switchgear - 2 Sheets A
F9-200-E-1-0P-1004-1 Single Line Diagrams - AC UPS - 2 Sheets A
F9-200-E-1-0P-1005-1 Single Line Diagrams - DC UPS A
F9-200-E-1-0P-1006-1 Single Line Diagrams-Lighting And Small Power A
F9-200-E-1-0P-1011-1 Block Diagram – ENMCS System - Storage Area 0
F9-200-E-1-0P-1021-1 Overall Cable Routing Layout - Storage Area A
Overall Lighting & Small Power Layout - Storage
F9-200-E-1-0P-1031-1 A
Area
F9-200-E-1-0P-1040-1 Overall Earthing Layout - Storage Area A
Substation - Electrical Equipment Layout - Sht 1
F9-200-E-1-0P-1051-1 A
of 2
Substation - Electrical Equipment Layout - Sht 2
F9-200-E-1-0P-1051-1 A
of 2
Technical Specification - Emergency Diesel
F9-000-E-1-0S-1001-4 A
Generator
Technical Specification - HV Switchgear /
F9-000-E-1-0S-1002-4 A
Controlgear
F9-000-E-1-0S-1003-4 Technical Specification - LV Switchgear / MCC A
F9-000-E-1-0S-1004-4 Technical Specification - AC UPS A
F9-000-E-1-0S-1005-4 Technical Specification - DC UPS A
Technical Specification - Power & Distribution
F9-000-E-1-0S-1006-4 A
Transformer
Technical Specification - Neutral Earthing
F9-000-E-1-0S-1007-4 A
Resistor
Technical Specification Electrical Network
F9-000-E-1-0S-1008-4 A
Monitoring And Control System
F9-000-E-1-0S-1009-4 Technical Specification - HV & LV Cables A
Salalah LPG Project Project Rev : 0
Page: 28 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Technical Specification - Package Units Electrical
F9-000-E-1-0S-1010-4 A
Requirements
Technical Specification - AC Synchronous
F9-000-E-1-0S-1011-4 A
Generator
Technical Specification - HV & LV Induction
F9-000-E-1-0S-1012-4 A
Motors
F9-000-E-1-0S-1021-4 Data Sheet - AC Synchronous Generator A
Data Sheet - Emergency Diesel Generator
F9-000-E-1-0S-1022-4 A
Package
F9-000-E-1-0S-1023-4 Data Sheet - HV Switchgear A
F9-000-E-1-0S-1024-4 Data Sheet - LV Switchgear A
F9-000-E-1-0S-1025-4 Data Sheet - AC Ups A
F9-000-E-1-0S-1026-4 Data Sheet - DC Ups A
F9-000-E-1-0S-1027-4 Data Sheet - Power & Distribution Transformer A
F9-000-E-1-0S-1028-4 Data Sheet - Neutral Earthing System A
Data Sheet - Electrical Network Monitoring And
F9-000-E-1-0S-1029-4 A
Control System
F9-000-E-1-0S-1030-4 Datasheet For HV Induction Motor A
F9-000-E-1-0S-1031-4 Datasheet For LV Induction Motor A
12. Instrumentation:
Drg. / Doc. No. Description Rev.
F9-000-I-1-0D-1001-4 Basis of Design - Instrumentation A
Selection Basis & Report for Field Instruments &
F9-000-I-1-0D-1003-4 A
Analyzers
F9-000-I-1-0D-1004-4 SIL Closeout Report 0
F9-000-I-1-0D-1501-3 Piping Instrument Interface Diagrams 0
F9-000-I-1-0D-1502-3 Instrument Electrical Interface Drawings 0
F9-000-I-1-0D-1503-4 SPI Procedure 0
F9-000-I-1-0D-2001-3 Overall System Architecture Drawing - 4 Sheets A
F9-000-I-1-0D-2002-3 F&G Cause & Effect Diagrams A
F9-000-I-1-0D-2003-1 Control Room Layout (E&F Area) A
Main Control Building Equipment Layout - Storage
F9-000-I-1-0D-2004-1 A
Area
Conceptual Cable Routing layouts - E&F Area - 2
F9-000-I-1-0D-2005-1 0
Sheets
Conceptual Cable Routing layouts - Storage &
F9-000-I-1-0D-2006-1 0
Jetty Area - 2 Sheets
F9-000-I-1-0D-2008-3 F&G Layouts - E&F Area A
F9-000-I-1-0D-2009-3 F&G Layouts - Storage & Jetty Area - 5 Sheets A
F9-000-I-1-0D-2011-3 Typical Instrument Installation Drawings 0
F9-000-I-1-0D-3001-3 Instrument Index A
F9-000-I-1-0S-1001-4 Specification of General Instruments A
F9-000-I-1-0S-1002-4 Specification of Control Valve A
F9-000-I-1-0S-1003-4 Specification of Actuated On-Off Valves A
F9-000-I-1-0S-1004-4 Specification of Pressure Relieving Devices A
F9-000-I-1-0S-1005-4 Specification of F&G Detectors A
F9-000-I-1-0S-1006-4 Specification of Analyser & Shelters A
Salalah LPG Project Project Rev : 0
Page: 29 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-000-I-1-0S-1007-4 Specification of Custody Transfer Metering Skids A
F9-000-I-1-0S-1008-4 Specification of Fieldbus Control System (FCS) A
F9-000-I-1-0S-1009-4 Specification of IPS A
F9-000-I-1-0S-1010-4 Specification of FGS A
F9-000-I-1-0S-1011-4 Specification of Condition Monitoring Systems A
F9-000-I-1-0S-1012-4 Specification of Package Unit Instrumentation A
Datasheets for special Flowmeters (USM, Coriolis
F9-000-I-1-0S-2001-4 0
etc)
F9-000-I-1-0S-2002-4 Datasheets for Control valve 0
F9-000-I-1-0S-2003-4 Datasheets for Actuated On / Off Valve 0
F9-000-I-1-0S-2004-4 Datasheets for Pressure Safety Valves 0
F9-000-I-1-0S-2005-4 Datasheets for F&G Detectors 0
F9-000-I-1-0S-2006-4 Datasheets for Analysers A
F9-000-I-1-0S-2007-4 Datasheets for Custody Transfer Metering Skids A
F9-000-I-1-0S-2008-4 Data Sheets for Rising Stem Valves 0
F9-000-I-1-0S-2009-4 Data Sheets for Pipeline Block Valves 0
13. Telecom:
Drg. / Doc. No. Description Rev.
F9-000-T-1-0C-1001-4 Telecommunication Power Consumption 0
F9-000-T-1-0D-1001-4 Telecommunication Philosophy A
F9-000-T-1-0D-1002-3 Telecom Equipment List - Telecom Systems 0
Telecommunication Systems Block Diagram -
F9-000-T-1-0P-1001-3 A
Data Network (LAN / WAN)
Telecommunication Systems Block Diagram -
F9-000-T-1-0P-1002-3 A
CCTV System
Telecommunication Systems Block Diagram -
F9-000-T-1-0P-1003-3 A
PAGA System
Telecommunication Systems Block Diagram-
F9-000-T-1-0P-1004-3 A
Access Control System
Telecommunication Systems Block Diagram - IP
F9-000-T-1-0P-1005-3 A
Pabx System
Telecommunication Systems Block Diagram -
F9-000-T-1-0P-1006-3 Perimeter Surveillance & Intrusion Detection A
System
Telecommunication Systems Block Diagram –
F9-000-T-1-0P-1007-3 A
Tetra Radio
Telecommunication Systems Block Diagram –
F9-000-T-1-0P-1008-3 A
Weather Monitoring System
Telecommunication Systems Block Diagram -
F9-000-T-1-0P-1009-3 A
Fiber Optic Cable Architecture
Telecommunication Systems Overall Block
F9-000-T-1-0P-1010-3 A
Diagram
F9-000-T-1-0P-1011-1 Telecom Equipment Layout - Guard House A
Telecom Equipment Layout - Security Guard
F9-000-T-1-0P-1012-1 A
House Building
F9-100-T-1-0P-1001-1 Telecom Conceptual Layout - LPG Plant A
F9-141-T-1-0P-1001-1 Telecom Equipment Layout - Office Building A
Salalah LPG Project Project Rev : 0
Page: 30 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Telecom Equipment Layout -Main Control Room
F9-142-T-1-0P-1001-1 A
Building
F9-143-T-1-0P-1001-1 Telecom Equipment Layout -MCC Building A
F9-145-T-1-0P-1001-1 Telecom Equipment Layout - Fire Man Building A
Telecom Equipment Layout - Workshop &
F9-146-T-1-0P-1001-1 A
Warehouse Building - Sht. 1 of 2
Telecom Equipment Layout – Workshop &
F9-146-T-1-0P-1001-1 A
Warehouse Building - Sht. 2 of 2
F9-147-T-1-0P-1001-1 Telecom Equipment Layout - Laboratory Building A
F9-200-T-1-0P-1001-1 Telecom Conceptual Layout - Storage & Export A
Telecom Equipment Layout - Storage Control
F9-242-T-1-0P-1001-1 0
Room Building
Telecommunication Specification - Data
F9-000-T-1-0S-1001-4 A
Network (LAN)
Telecommunication Specification - CCTV
F9-000-T-1-0S-1002-4 A
System
F9-000-T-1-0S-1003-4 Telecommunication Specification – PAGA System A
Telecommunication Specification - Access
F9-000-T-1-0S-1004-4 A
Control System
Telecommunication Specification - IP-PABX
F9-000-T-1-0S-1005-4 A
System
Telecommunication Specification - Perimeter
F9-000-T-1-0S-1006-4 A
Surveillance And Intrusion Detection System
F9-000-T-1-0S-1007-4 Telecommunication Specification - Tetra Radio A
Telecommunication specification - Weather
F9-000-T-1-0S-1008-4 A
Monitoring System
Telecommunication Specification - Fiber Optic
F9-000-T-1-0S-1009-4 A
Cables
Telecommunication Specification - Telecom
F9-000-T-1-0S-1010-4 A
Copper Cables
14. Pipelines:
Drg. / Doc. No. Description Rev.
F9-000-Y-1-0C-1001-4 Pipeline Wall Thickness Calculation 0
F9-000-Y-1-0C-1002-4 Road Crossing Calculation 0
F9-000-Y-1-0D-1001-4 Pipeline Design Basis A
F9-000-Y-1-0D-1004-4 Pipeline Crossing Schedule 0
Typical ROW And Working Strip Details - Rich Gas
F9-000-Y-1-0P-1101-1 B
& Residual Gas (24")
Typical ROW And Working Strip Details - Residual
F9-000-Y-1-0P-1102-1 B
Gas (16")
Typical ROW And Working Strip Details - Propane,
F9-000-Y-1-0P-1103-1 B
Butane & Condensate
Typical Regular And Reduced Working Strip
F9-000-Y-1-0P-1104-1 A
Parallel to Existing 3rd Party Pipeline
F9-000-Y-1-0P-1105-1 Typical Trench Detail (Normal/Sandy/Rocky) B
F9-000-Y-1-0P-1106-1 Typical Construction Working Area 1
F9-000-Y-1-0P-1107-1 Typical Pipeline Cross Berm Details A
F9-000-Y-1-0P-1108-1 Typical Track Road Crossing Detail A
Salalah LPG Project Project Rev : 0
Page: 31 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-000-Y-1-0P-1109-1 Typical Wadi Crossing Detail - Type C A
Typical Uncased Major Road Crossing Detail -
F9-000-Y-1-0P-1111-1 A
Trenchless
Typical Uncased Major Road Crossing Detail -
F9-000-Y-1-0P-1112-1 A
Open Cut
F9-000-Y-1-0P-1113-1 Typical Track / Road Crossing Access Barrier A
F9-000-Y-1-0P-1114-1 Typical Wadi Crossing Detail - Type A A
F9-000-Y-1-0P-1115-1 Typical Wadi Crossing Detail - Type B A
F9-000-Y-1-0P-1116-1 Typical Pipeline Marker Detail - 2 Sheets A
F9-000-Y-1-0P-1117-1 Typical Pit Detail for Access Fittings 0
F9-000-Y-1-0P-1118-1 Typical Third Party Cable Crossing Detail A
F9-000-Y-1-0P-1119-1 Typical Third Party Pipeline Crossing Detail A
F9-000-Y-1-0P-1120-1 Typical Details Auger/Thrust Boaring 1
Typical Slope Breaker Detail With Water Drainage
F9-000-Y-1-0P-1121-1 A
Configuration
F9-000-Y-1-0P-1122-1 Typical Access Barrier at Pig Trap Station 0
F9-000-Y-1-0P-1123-1 Typical OHL Crossing Detail A
F9-000-Y-1-0P-1124-1 Typical Concrete Coating Detail 0
F9-000-Y-1-0P-1125-1 Typical Precast protection slab detail 0
F9-000-Y-1-0P-1126-1 Typical Concrete Saddle Detail 0
F9-000-Y-1-0P-1207-1 Rich & Residual Gas Pipelines Station Approach 0
F9-000-Y-1-0P-1210-1 Plot Plan - Tie-In Salalah Gas Supply Station X
F9-000-Y-1-0P-1211-1 Plot Plan - Mirbat - Hot Tap Location A
F9-000-Y-1-0P-1212-1 16" Residual Gas Pipeline - Plot Plan BVS 01 & 02 A
F9-000-Y-1-0P-1301-1 Overall Pipeline Route Map 0
F9-311-Y-1-0P-1201-1 Plot Plan - Raysut Hot Tap Location 0
F9-311-Y-1-0P-1401-1 Rich Gas Pipeline Alignment Sheet for Kp 0 to Kp 1 0
F9-311-Y-1-0P-1402-1 Rich Gas Pipeline Alignment Sheet for Kp 1 to Kp 2 0
F9-311-Y-1-0P-1403-1 Rich Gas Pipeline Alignment Sheet for Kp 2 to Kp 3 0
F9-311-Y-1-0P-1404-1 Rich Gas Pipeline Alignment Sheet for Kp 3 to Kp 4 0
F9-311-Y-1-0P-1405-1 Rich Gas Pipeline Alignment Sheet for Kp 4 to Kp 5 0
F9-311-Y-1-0P-1406-1 Rich Gas Pipeline Alignment Sheet for Kp 5 to Kp 6 0
Route Map - 24" Proposed Rich & Residual Gas
F9-312-Y-1-0P-1303-1 0
Pipelines from Raysut Hot tap area to E&F Plant
Route Map - 16" Proposed Residual Gas Pipeline
F9-312-Y-1-0P-1304-1 0
from Raysut Hot tap to Mirbat Hot tap
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1603-1 0
Kp 2 to Kp 3
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1604-1 0
Kp 3 to Kp 4
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1605-1 0
Kp 4 to Kp 5
Residual Gas (16") Pipeline Alignment Sheet for Kp
F9-312-Y-1-0P-1606-1 0
5 to Kp 6
Residual Gas (16") Pipeline Alignment Sheet for Kp
F9-312-Y-1-0P-1607-1 0
6 to Kp 7
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1608-1 0
Kp 7 to Kp 8
Salalah LPG Project Project Rev : 0
Page: 32 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1609-1 0
Kp 8 to Kp 9
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1610-1 0
Kp 9 to Kp 10
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1611-1 0
Kp 10 to Kp 11
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1612-1 0
Kp 11 to Kp 12
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1613-1 0
Kp 12 to Kp 13
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1614-1 0
Kp 13 to Kp 14
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1615-1 0
Kp 14 to Kp 15
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1616-1 0
Kp 15 to Kp 16
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1617-1 0
Kp 16 to Kp 17
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1618-1 0
Kp 17 to Kp 18
Residual Gas (16") Pipeline Alignment Sheet for
F9-312-Y-1-0P-1619-1 0
Kp 18 to Kp 19
Route Map - 4" Proposed Product Pipelines from
F9-321-Y-1-0P-1305-1 0
E&F Plant to Storage Area
Condensate Pipeline Alignment Sheet for Kp 0 to
F9-323-Y-1-0P-1901-1 0
Kp 1
Condensate Pipeline Alignment Sheet for Kp 1 to
F9-323-Y-1-0P-1902-1 0
Kp 2
Condensate Pipeline Alignment Sheet for Kp 2 to
F9-323-Y-1-0P-1903-1 0
Kp 3
Condensate Pipeline Alignment Sheet for Kp 3 to
F9-323-Y-1-0P-1904-1 0
Kp 4
Condensate Pipeline Alignment Sheet for Kp 4 to
F9-323-Y-1-0P-1905-1 0
Kp 5
Condensate Pipeline Alignment Sheet for Kp 5 to
F9-323-Y-1-0P-1906-1 0
Kp 6
F9-000-Y-1-0S-1005-4 Specification for Induction Bends A
F9-000-Y-1-0S-1101-4 Pipeline Material Specification A
F9-000-Y-1-0S-1102-4 Line Pipe Specification for Non-Sour Service A
F9-000-Y-1-0S-1103-4 Specification for Barred Tees A
F9-000-Y-1-0S-1104-4 Specification for Isolation Joints A
F9-000-Y-1-0S-1106-4 Specification for Pipeline Anchor Flange A
Specifications for Split Tees (Hot Tapping
F9-000-Y-1-0S-1107-4 A
Materials)
F9-000-Y-1-0S-1108-4 Specification for Pipeline Ball Valves A
F9-000-Y-1-0S-1109-4 Specification for Pipeline Construction 0
F9-000-Y-1-0S-1110-4 Specification for Concrete Coating A
F9-000-Y-1-0S-1112-4 Line Pipe Specification for Sour Service A
F9-000-Y-1-0S-1201-4 Line Pipe Data Sheet for Sour Service 1
Salalah LPG Project Project Rev : 0
Page: 33 of 33
Doc. No.: ____________

Title : Feed Deliverables Index

Drg. / Doc. No. Description Rev.


F9-000-Y-1-0S-1202-4 Line Pipe Data Sheet for Non Sour Service 0
F9-000-Y-1-0S-1203-4 Data Sheet for Barred Tees 0
F9-000-Y-1-0S-1204-4 Data Sheet for Isolation Joints 0
F9-000-Y-1-0S-1205-4 Data Sheet for Induction Bends 0
F9-000-Y-1-0S-1206-4 Datasheet for Pipeline Anchor Flange 0
Data Sheet for Pipeline Split Tee (Hot Tapping
F9-000-Y-1-0S-1207-4 0
Materials)
F9-000-Y-1-0S-1208-4 Datasheet for Pipeline Ball Valves for BVS 0
F9-000-Y-1-0S-1209-4 Data Sheet for Pig Signallers 0
F9-000-Y-1-0S-1210-4 Data Sheet for Access Fittings With CC & CP 0

You might also like