ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
TOILETS - change of the layout of the 5th, 6th
and 7th storey toilets due to clash with the
1 1 Toilet layout at L5, L6 and L7 47 C&S all completed C&S all completed
precast post tension strucutral elements (RFI-
ST-019)
2 1 AD no. 48 to 61 - C&S AD no. 48 to 61 - C&S 48-61 C&S all completed C&S all completed
inspection completed:
13 1 Level 1 Apron Slab Tiles Tile defect at Apron Slab need to be replaced. 115 23/09/2019
23/09/2019
inspection completed:
At Building perimeter drainage not properly 26/08/2019
18 1 Level 1 - building perimeter drainage 115 26/08/2019
cleaned must have proper flow Furhter Comment: main
driveway need to clean
Draw Pit Cover - In front of DRAW PIT COVER RUSTY AT DRIVEWAY NEAR inspection completed:
19 1 115 10/09/2019
Substation ELECTRICAL SUBSTATION. 10/09/2019
21 L1 - Driveway Tiles Oil stains on driveway tiles, need make good 115 preparing for inspection
inspection completed:
22 1 L1 - Driveway Tiles CRACKED ON BLACK COLOR DRIVEWAY TILES 115 23/09/2019
23/09/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
inspection completed:
23 1 L1 - Driveway Tiles CRACKED ON BLACK COLOR DRIVEWAY TILES 115 23/09/2019
23/09/2019
At 3rd floor fire fighting lobby 1, Fire Exit door inspection completed:
30 1 Level 3, Fire Fighting Lobby 1 115 09/10/2019
jamb need to rectify. 09/10/2019
At 4th floor fire fighting lobby 1, Fire Exit door inspection completed:
31 1 Level 4, Fire Fighting Lobby 1 115 09/10/2019
jamb need to rectify. 09/10/2019
At 5th floor fire fighting lobby 1, Fire Exit door inspection completed:
32 1 Level 5, Fire Fighting Lobby 1 115 09/10/2019
jamb need to rectify. 09/10/2019
At 6th floor fire fighting lobby 1, Fire Exit door inspection completed:
33 1 Level 6, Fire Fighting Lobby 1 115 09/10/2019
jamb need to rectify. 09/10/2019
At 7th floor fire fighting lobby 1, Fire Exit door inspection completed:
34 1 Level 7, Fire Fighting Lobby 1 115 09/10/2019
jamb need to rectify. 09/10/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
inspection completed :
1 pc of Damaged decking at 4th floor sky
13/08/2019
terrace, Decking not properly cleaned all the
39 1 Level 4 - landscape area 115 13/08/2019 Further comment: to
way.
clean decks and the whole
walkway.
inspection completed:
43 1 Level 2 & 3 - silver tapes Aluminium Tape on Façade wall to make good 115 30/08/2019
30/08/2019
inspection completed:
30/08/2019
Broken Glass at Level 1 (Hoy Fatt Broken façade glass on 1st floor high level further comment:
44 1 115 30/08/2019
Road) need to be replaced (Hoy Fatt Road) Installed glass deviates
from previously approved
color of Façade.
inspection completed:
30/08/2019
Broken Glass at Level 1 (Kung Chong Broken façade glass on 1st floor high level further comment:
45 1 115 30/08/2019
Road) need to be replaced (Kung Chong Road) Installed glass deviates
from previously approved
color of Façade.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
Roof Foundation Plinths - plaster At roof level, plaster on foundation plinths inspection completed:
60 1 115 02/10/2019
spalling spalling 02/10/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
inspection completed:
At 1st floor high level broken glass need to be 30/08/2019
replaced location near gate 2 at Kung Chong further comment:
81 1 Level 1 - Prime Strcutres Glass ` 116 30/08/2019
Road Installed glass deviates
from previously approved
color of Façade.
inspection completed:
30/08/2019
Broken glass to be replaced at 1st floor high
further comment:
82 1 Level 1 - Prime Strcutres Glass level near gate 1 Hoy Fatt Road 116 30/08/2019
Installed glass deviates
from previously approved
color of Façade.
1st insp:
Aluminium cladding interface with vertical fins 25/07/2019 inspection completed:
83 1 Vertical Fins 116
at external metal staircase to complete 2nd insp: 01/08/2019
01/08/2019
inspection completed:
104 1 Gaps at 7th floor Sealant on gaps need to complete at 7th floor 116 17/09/2019
17/09/2019
Gap on ceiling and glass wall at 4th floor level inspection completed :
108 1 Gap at Level 4 116 25/07/2019
sky terrace need to complete 25/07/2019
inspection completed:
109 1 Gap to have sealant Gap needs to have sealant 116 17/09/2019
17/09/2019
inspection completed
128 1 Baement - Water Seepage Some earth pits waterlogged at basement 118 01/08/2019
01/08/2019.
130 1 AD the same as AD no.62 AD the same as AD no.62 120 completed completed
Toilet
inspection completed:
131 1 Level 7 - Male Toilet Urinal too narrow from edge of urinal to 121 20/09/2019
20/09/2019
cubicle partition wall. Unacceptable.
inspection completed:
133 1 Level 7 - Water Seepage Water Ingress on void in front of door. 122 12/10/2019
12/10/2019
Under M&E
136 1 M&E defects and works M&E defects and works 123 Under M&E inspections
inspections
M&E
Under M&E
141 1 M&E coordinator to engage for the M&E site 128 Under M&E inspections
inspections
issues.
inspection completed:
146 1 Pest control - L4 landscape Pest control at level 4. 129 23/09/2019
23/09/2019
inspection completed :
147 1 Levelness of floor Levelness of floor to all level. 129 25/07/2019
25/07/2019
Door
150 Door Jamb - Staircase 2 Exit doors visible brown spots and rusty color @staricase 130 preaparing for inspection
2 exit door jambs
FMAP Windows
inspection completed :
151 1 FMAP windows always open. Even rainy days. 130 25/07/2019
25/07/2019
Water Clog
Clogged drainage at level 7 due to scattered
inspection completed :
152 1 Water Clog at Level 7 cement paper bags, plastics and cigarrette 130 01/08/2019
01/08/2019
butts.
Water Seepage
at basement slab from CRACK on slab
inspection completed :
153 1 Basement Water Seepage @ earthpit 1, @ earthpit near firehosereel, @ 130 01/08/2019
01/08/2019
near Lift wall
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
Grid E-3 Near Fire Fighting lobby 1 door crack inspection completed :
155 1 Basement Water Seepage 132 01/08/2019
on slab 01/08/2019
inspection completed :
157 1 Basement Water Seepage Grid F-3 Earthpit near hosereel 132 01/08/2019
01/08/2019
inspection completed :
158 1 Basement Water Seepage Grid F-2 Ramp location of I-Beam Support 132 01/08/2019
01/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
inspection completed :
159 1 Basement Water Seepage Grid F-1 Earth Pit 132 01/08/2019
01/08/2019
inspection completed :
160 1 Basement Water Seepage Grid G-0 location of I-Beam Support 132 01/08/2019
01/08/2019
inspection completed :
161 1 Basement Water Seepage Grid E-1 Earthpit 132 01/08/2019
01/08/2019
inspection completed :
162 1 Basement Water Seepage Grid D-1 Earthpit 132 01/08/2019
01/08/2019
inspection completed :
163 1 Basement Water Seepage Grid B-1 Location of previous I-Beam Support 132 01/08/2019
01/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
inspection completed :
164 1 Basement Water Seepage Grid A-0 Crack on Slab 132 01/08/2019
01/08/2019
inspection completed :
167 1 Gap at Level 4 L4 - lasndscapping area 133 25/07/2019
25/07/2019
inspection completed :
Landscaping
13/08/2019
Damaged deck/ Uncleaned Walkway Damaged deck. (no x 1pc)
168 1 133 13/08/2019 Further comment: to
at Landscaping area Unclean deck.
clean decks and the whole
walkway.
1st insp:
Open End and Finisher
25/08/2019 inspection completed :
170 1 Open End Finisher open end at canopy 133
2nd insp: 01/08/2019
01/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
FMAP Windows
inspection completed :
175 1 FMAP windows always open. Even rainy days. 134 25/07/2019
25/07/2019
183 Ceiling at Level 4 - landscaping area At 4th floor level, ceiling to make good 135
inspection completed:
At 1st floor high level broken glass need to be 30/08/2019
Broken Glass at Level 1 - Kung Chong replaced location near gate 2 at Kung Chong further comment:
184 1 135 30/08/2019
Road Road Installed glass deviates
from previously approved
color of Façade.
inspection completed:
30/08/2019
Broken glass to be replaced at 1st floor high
Broken Glass at Level 1 - Hoy Fatt further comment:
185 1 level near gate 1 Hoy Fatt Road 135 30/08/2019
Road Installed glass deviates
from previously approved
color of Façade.
Gas Riser Room Level 1 - door / Respective finishing / signage/ at gas riser inspection completed :
189 1 135 01/08/2019
signage / finishing door not yet completed 01/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
Broken Glass at Level 6 - Kung Chong At 6th floor level broken glass need to be inspection completed:
196 1 135 03/09/2019
Road replaced near Gate 2 @ Kung Chong Road 03/09/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
1st insp:
Vertical Fins - near staircase 2 Aluminium cladding interface with vertical fins 25/08/2019 inspection completed :
198 1 135
(outside of building) at external metal staircase to complete 2nd insp: 01/08/2019
01/08/2019
inspection completed :
199 1 135 01/08/2019
01/08/2019
inspection completed :
200 1 135 01/08/2019
01/08/2019
201 LED lights in the toilets LED on toilet mirror not yet installed 135 preparing for inspection
204 Water Tap Handle Missing Water tap missing handle at green buffer 135
inspection completed :
209 1 Basement Moisture reading at basement 138 06/08/2019
06/08/2019
inspection completed :
210 1 Basement Drying of basement 138 06/08/2019
06/08/2019
inspection completed:
212 1 Basement Final touch-up and handover 138
03/10/2019
inspection completed:
30/08/2019
Level 1 - external façade, cracked on curtain further comment:
218 1 Level 1 138 30/08/2019
wall glass. Installed glass deviates
from previously approved
color of Façade.
Ceiling at Basement
Ceiling is inconsistent with 3rd floor Ceiling inspection completed:
219 1 Ceiling at Basement 139 18/09/2019
Construction, Recessed Ceiling not 18/09/2019
constructed
233 Platforms at Kung Chong Road Platform not same as drawing 139
inspection completed:
240 1 Basement Basement moisture reading test to conduct 141 06/08/2019
06/08/2019
inspection completed:
241 1 Status of sty 4 soil replacement ZDC to resolve the infestation 141 23/09/2019
23/09/2019
Under M&E
244 1 Operation of EPS barrier system To update the technicals of EPS barrier system 141 Under M&E inspections
inspections
Under M&E
245 1 Basement Basement 2.2m clear basement height check 141 Under M&E inspections
inspections
inspection completed:
246 1 Lift Lobby Lift Lobby ceiling and wall tiling at lift door 141 18/09/2019
18/09/2019
inspection completed:
247 1 M&E fix alignment Metal M&E final fix at the fireman lift lobby 141 18/09/2019
18/09/2019
250 All outstanding works to complete all outstanding works to complete 141
Exit Sign at Level 7 - outside of Lobby At 7th floor roof, Green coloured exit sign
258 143/144 preparing for inspection
2 turned into Blue color.
Level 2 Floor Slab - visible survey At 2nd floor level, slab surface to make good,
268 markings, depressed areas, all visible survey marking, all depressed areas, 143/144 preparing for inspection
protruding bars, all to make good. protruding bars, floor surface to make good.
Level 1 Floor Slab - visible survey At 1st floor level, slab surface to make good,
269 markings, depressed areas, all visible survey marking, all depressed areas, 143/144 preparing for inspection
protruding bars, all to make good. protruding bars, floor surface to make good.
Doors at Lobby 1 and Lobby 2 - all Defects on all doors at fire fighting lobby 1 inspection completed:
271 1 143/144 09/10/2019
floors and at fire fighting lobby 2 not rectified yet 09/10/2019
Lobby 1 - lift doors, plastic At fire fighting lobby 1, door of lifts, plastic
inspection completed:
275 1 protection, door frames to be cleared protection, door frames to be cleared of paint 143/144 30/08/2019
30/08/2019
of paint stains at all floors stains, from level 7 to basement level.
Fire Doors - paint stains, silicone Fire door, paint stains, silicone stains, ZDC to inspection completed :
277 1 143/144 24/09/2019
stains ZDC to make good make good. 24/09/2019
Under M&E
282 1 M&E defects, works and T&C M&E 147 Under M&E inspections
inspections
283 Land Scape at Green buffer Poor landscaping at green buffer 148
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
All façade glasses must be the same as
284 Façade glasses deviation in color 149
approved color