You are on page 1of 40

Prepared By: Alfredo Claro -Archi.

RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
TOILETS - change of the layout of the 5th, 6th
and 7th storey toilets due to clash with the
1 1 Toilet layout at L5, L6 and L7 47 C&S all completed C&S all completed
precast post tension strucutral elements (RFI-
ST-019)

2 1 AD no. 48 to 61 - C&S AD no. 48 to 61 - C&S 48-61 C&S all completed C&S all completed

Headroom shall not be less than 2.0. inspection completed:


3 1 Headrooms at Level 1 62 17/09/2019
17/09/2019

A handrail shall be provided on at least one


inspection completed:
4 1 Handrail at Level 1 side of the flight of staircase. 62 06/08/2019
06/08/2019

All steps shall be fitted with non-slip nosing inspection completed:


strip between 50mm and 65mm in width with 06/08/2019: furhter
5 1 steps at staircase 2 62 06/08/2019
permant contrasting comment: paint to touch
up

Accessible individual washrooms shall be


equipped with two coat hooks mounted on a
side wall at two different heights of about
inspection completed:
6 1 HDCP Toilet hooks 150mm and 1100mm from the floor. The 62 19/08/2019
19/08/2019
hooks shall not project more than 40mm from
the wall.

Signage at Handicapped toilets. inspection completed:


7 1 HDCP Toilet Signs 62 19/08/2019
19/08/2019

8 1 coordination with New Arts coordination with New Arts


Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

IRONMONGERY - M&E Riser besides Driveway inspection completed:


9 1 Ironmongery - door lock 115 30/08/2019
Door Lock damaged 30/08/2019

IRONMONGERY - M&E Riser Elect.


inspection completed:
10 1 Ironmongery - door lock Riser besides driveway door lock damaged to 115 30/08/2019
30/08/2019
immediately be replaced.

IRONMONGERY - M&E Riser TEL.


inspection completed:
11 1 Ironmongery - door lock Riser besides driveway door lock damaged to 115 30/08/2019
30/08/2019
immediately be replaced.

12 numbers of Tiles at Apron Slab just in fornt


of Main Entrance Glass Wall, 12 numbers inspection completed:
12 1 Level 1 Apron Slab Tiles 115 23/09/2019
oftiles chipped off Need to be replaced and 23/09/2019
make good.

inspection completed:
13 1 Level 1 Apron Slab Tiles Tile defect at Apron Slab need to be replaced. 115 23/09/2019
23/09/2019

Tiles at Apron Slab just in front of Main


inspection completed:
14 1 Level 1 Apron Slab Tiles Entrance Glass Wall, CORNER of tiles chipped 115 23/09/2019
23/09/2019
off need to be replaced and make good.

Tiles at Apron Slab just in front of Main


inspection completed:
15 1 Level 1 Apron Slab Tiles Entrance Glass Wall, CORNER of tiles chipped 115 23/09/2019
23/09/2019
off need to be replaced and make good.

Tiles at Apron Slab just in front of Main


inspection completed:
16 1 Level 1 Apron Slab Tiles Entrance Glass Wall, CORNER of tiles chipped 115 23/09/2019
23/09/2019
off. Need to be replaced and make good.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Big Gaps on drainage Grating at Kung Chong inspection completed :


17 1 Kung Chong Road - drainage gaps 115 18/09/2019
Road 18/09/2019

inspection completed:
At Building perimeter drainage not properly 26/08/2019
18 1 Level 1 - building perimeter drainage 115 26/08/2019
cleaned must have proper flow Furhter Comment: main
driveway need to clean

Draw Pit Cover - In front of DRAW PIT COVER RUSTY AT DRIVEWAY NEAR inspection completed:
19 1 115 10/09/2019
Substation ELECTRICAL SUBSTATION. 10/09/2019

DRAINAGE GRILL COVER WELDING POINT inspection completed :


20 1 Drainage Grill Cover 115 13/08/2019
RUSTY, CEMENT TO MAKE GOOD 13/08/2019

21 L1 - Driveway Tiles Oil stains on driveway tiles, need make good 115 preparing for inspection

inspection completed:
22 1 L1 - Driveway Tiles CRACKED ON BLACK COLOR DRIVEWAY TILES 115 23/09/2019
23/09/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

inspection completed:
23 1 L1 - Driveway Tiles CRACKED ON BLACK COLOR DRIVEWAY TILES 115 23/09/2019
23/09/2019

DEEP SPOTS ON FLOOR SLAB, TROWEL


MARKS, PAINT AND OIL STAINS ON FLOOR
24 Floor Slab 115
SLAB

PLASTER CRACKS NEAR HAND RAIL BASE inspection completed:


25 1 Plaster cracks near hand rail base 115 10/09/2019
NEAR SECURITY ROOM 10/09/2019

AT 1ST Floor Level FireFighting Lobby 2 Tile on inspection completed:


26 1 Level 1, Fire Fighiting Lobby 2 115 23/09/2019
Wall need to make good 23/09/2019

CRACKS ON PLASTERED WALL, WALL PAINT inspection completed:


27 1 Basement 115 30/08/2019
TO MAKE GOOD 30/08/2019

Fire Exit Door at Basement level, door jamb


28 Basement, Fire Fighting Lobby 2 need to rectify make good, joints start to get 115 preaparing for inspection
loose
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

At Fire Fighting Lobby 2 Basement Level, door


29 Basement, Fire Fighting Lobby 2 115 preaparing for inspection
jamb need to rectify make good

At 3rd floor fire fighting lobby 1, Fire Exit door inspection completed:
30 1 Level 3, Fire Fighting Lobby 1 115 09/10/2019
jamb need to rectify. 09/10/2019

At 4th floor fire fighting lobby 1, Fire Exit door inspection completed:
31 1 Level 4, Fire Fighting Lobby 1 115 09/10/2019
jamb need to rectify. 09/10/2019

At 5th floor fire fighting lobby 1, Fire Exit door inspection completed:
32 1 Level 5, Fire Fighting Lobby 1 115 09/10/2019
jamb need to rectify. 09/10/2019

At 6th floor fire fighting lobby 1, Fire Exit door inspection completed:
33 1 Level 6, Fire Fighting Lobby 1 115 09/10/2019
jamb need to rectify. 09/10/2019

At 7th floor fire fighting lobby 1, Fire Exit door inspection completed:
34 1 Level 7, Fire Fighting Lobby 1 115 09/10/2019
jamb need to rectify. 09/10/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

AT 4TH FLOOR FIRE EXIT DOOR LESS THAN 1 inspection completed :


35 1 Level 4 - Lobby 1 door 115 25/07/2019
METER ALLOWABLE CLEARANCE 25/07/2019

AT 6TH FLOOR FIRE EXIT DOOR LESS THAN 1 inspection completed :


36 1 Level 6 - Lobby 1 door 115 25/07/2019
METER ALLOWABLE CLEARANCE 25/07/2019

ARCHITECTURAL FINS HAVE BROWN inspection completed:


37 1 Architectural Fins at all floors 115 03/09/2019
COLOURED RUST ON ALL FLOOR LEVEL 03/09/2019

FAÇADE GLASS FROM 2ND FLOOR TO UPPER


inspection completed:
38 1 Façade Glasses at All floors ROOF LEVEL WALLS AND FRAMES NEED 115 12/10/2019
12/10/2019
THOROUGH CLEANING

inspection completed :
1 pc of Damaged decking at 4th floor sky
13/08/2019
terrace, Decking not properly cleaned all the
39 1 Level 4 - landscape area 115 13/08/2019 Further comment: to
way.
clean decks and the whole
walkway.

4th FLOOR SKY TERRACE, INSECTS MILLIPEDES


CRAWLING AT SKY TERRACE AND CRAWL UP
inspection completed:
40 1 Level 4 - landscape area TO 6TH FLOOR AND MILLIPEDES DOWN TO 115 23/09/2019
23/09/2019
3RD FLOOR
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Prime structues works at 4th floor level corner inspection completed :


41 1 Level 4 - Prime Structure Works 115 25/07/2019
have big gaps. 25/07/2019

Gap on glass wall and precast wall need to inspection completed :


42 1 Level 4 - Prime Structure Works 115 25/07/2019
make good 25/07/2019

inspection completed:
43 1 Level 2 & 3 - silver tapes Aluminium Tape on Façade wall to make good 115 30/08/2019
30/08/2019

inspection completed:
30/08/2019
Broken Glass at Level 1 (Hoy Fatt Broken façade glass on 1st floor high level further comment:
44 1 115 30/08/2019
Road) need to be replaced (Hoy Fatt Road) Installed glass deviates
from previously approved
color of Façade.

inspection completed:
30/08/2019
Broken Glass at Level 1 (Kung Chong Broken façade glass on 1st floor high level further comment:
45 1 115 30/08/2019
Road) need to be replaced (Kung Chong Road) Installed glass deviates
from previously approved
color of Façade.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

At 6th Floor Level painting at walls, ceiling inspection completd:


46 1 Level 6, Fire Fighting Lobby 1 115
works to make good 02/10/2019

At 5th floor level fire exist door, painting to


make good, seethru panel to be properly
47 Level 5, Fire Fighting Lobby 2 cleaned, door handle paint to be cleaned, 115 preparing for inspection
door jamb to be properly fixed, need to make
good

At 5th floor level fire fighting lobby 2 and at


other floors, floor and wall tiles to be cleaned
48 Level 5, Fire Fighting Lobby 2 115 preparing for inspection
of dirt, ceiling to make good, ceiling access
panel to be cleaned of dirt.

At 5th floor level fire fighting lobby 2, stains


49 Level 5, Fire Fighting Lobby 2 on floor to be cleaned, door jamb to be fixed 115 preparing for inspection
properly.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

At 5th floor level, fire fighting lobby 2, door


50 Level 5, Fire Fighting Lobby 2 115 preparing for inspection
hinges paint stains to make good

At 5th floor level fire fighting lobby 2, door


51 Level 5, Fire Fighting Lobby 2 115 preparing for inspection
jamb to make good

At 5th floor level fire fighting lobby 2, door


52 Level 5, Fire Fighting Lobby 2 jamb rusty color coming out at the base of 115 preparing for inspection
door jamb and at sides

At 5th floor level and at other floors, Fire Hose


Reel and M&E door jamb to make good gaps
53 Level 5, Fire Fighting Lobby 2 115 preparing for inspection
on dry wall and timber door jamb to be fixed
properly.

At 7th floor roof rusty color on pump room


54 Level 7 - Water Tank Room 115
gates/pump need to paint blue.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

At 6th floor level and at other floors fire


fighting lobby 1, gaps start to occur in dry wall inspection completed:
55 1 Level 6 - Lobby 1 door 115 09/10/2019
and door jambs, door to be fixed properly and 09/10/2019
make good

At 6th floor level and at other floors fire


fighting lobby 1, gaps start to occur in dry wall inspection completed:
56 1 Level 6 - Lobby 1 door 115 09/10/2019
and door jambs, door to be fixed properly and 09/10/2019
make good

At 4th floor level and at other floors fire


fighting lobby 1, gaps start to occur in dry wall
inspection completed:
57 1 Level 4 - Lobby 1 door and door jambs, doors to be fixed properly 115 09/10/2019
09/10/2019
and make good..

At 1st floor high ceiling need to make good


58 Level 1 - Ceiling 115

At FIRE FIGHTING LOBBY 1 and at other floors,


ceiling to make good, dirt on ceiling,
Ceilings M&E alignment - Fire
59 alignment to make good, metal screws to 115
Fighting Lobbies 1
match color of ceiling, to make good

Roof Foundation Plinths - plaster At roof level, plaster on foundation plinths inspection completed:
60 1 115 02/10/2019
spalling spalling 02/10/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

2nd to upper roof fin support cement mortars


Fin Support Cement Mortars - All inspection completed:
61 1 to be cleaned, color to match color of adjacent 115 03/09/2019
floors 03/09/2016
paint

Façade glass needs thorough cleaning, inspection completed:


62 1 Façade Glasses at All floors 115 12/10/2019
markings on frames need to clean on all floors 12/10/2019

At roof level, gaps on cladding support need inspection completed:


63 1 Roof - Prime Structure Works 115 17/09/2019
to do proper sealant. 17/09/2019

At external wall of lift motor room, visible


Lift Motor Room - cement plaster inspection completed:
64 1 cement plaster cracks facing west direction 115 02/10/2019
cracks 02/10/2019

At Fire Fighting Lobby 1 door, door jamb to be


inspection completed:
65 1 Basement, Fire Fighting Lobby 1 rectified almost all floors 115 09/10/2019
09/10/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Survey marking lineson, the floor need to


66 Floor to make good - Level 1, 2, 3 clean, paint splashed on floors need to clean 115 preparing for inspection
prior to hand over to owner

Platform and Railing constructed by prime


Furhter comment: 80%
Prime Structures Platforms - Kung structures, color to match on façade frame 1st inspection on
67 1 115 painting done. To remove
Chong Road color, safety latch on fins to put red triangular 06/08/2019
other paint color
sticker

At 3rd floor level wash bay area, floor screed


68 Washing Bay - Level 3 have many visible cracks might cause leak on 115 preparing for inspection
lower floor

Joints on driveway tiles and concrete ramp to


69 Concrete Ramp - driveway area 115 preparing for inspection
make good.

Metal on Drawpit rusty inspection completed:


70 1 Draw Pit Metal 115 10/09/2019
10/09/2019

Cracks on apron slab, west side of the building


71 Apron Slab 115 preparing for inspection
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

At 2nd floor level and at other floors, FIRE


FIGHTING LOBBY 1, gaps start to occur in dry inspection completed:
72 1 Fire Fighting Lobbies 1 115 09/10/2019
wall and door jambs, doors to be fixed 09/10/2019
properly and make good

At Level 4,5,6 Elect PVC pipes installed higher inspection completed:


73 1 Level 4,5,6 - PVC pipes installation 115 05/08/2019
than required slab level 05/08/2019

At 2nd floor level and at other floors, FIRE


FIGHTING LOBBY 1, gaps start to occur in dry inspection completed:
74 1 Fire Fighting Lobbies 1 115 09/10/2019
wall and door jambs, doors to be fixed 09/10/2019
properly and make good

Besides driveway area brickwall to concrete


inspection completed:
75 1 Level 1 - Driveway Area column joint crack lines visible need to make 115 18/09/2019
18/09/2019
good.

Prime structures to complete canopy glass


76 Canopy Glass 116
installation

Painting of Architectural Fin Supports should inspection completed:


77 1 Architectural Fins at all floors 116 30/08/2019
match adjacent color of Arch. Fins 30/08/2019

Painting of Architectural fin supports to match inspection completed:


78 1 Architectural Fins at all floors 116 30/08/2019
adjacent material colour 30/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Red Triangular sticker pointing arrow down to


be in placed at latch so that fireman knows inspection completed:
79 1 FMAP windows 116 05/08/2019
where to open the screen in case of 5/08/2019
emergency (2nd to 7th floor level)

At 6th floor level, broken glass need to be inspection completed:


80 1 Level 6 - Prime Structures Glass 116 03/09/2019
replaced at near gate 2 at Kung Chong Road 03/09/2019

inspection completed:
At 1st floor high level broken glass need to be 30/08/2019
replaced location near gate 2 at Kung Chong further comment:
81 1 Level 1 - Prime Strcutres Glass ` 116 30/08/2019
Road Installed glass deviates
from previously approved
color of Façade.

inspection completed:
30/08/2019
Broken glass to be replaced at 1st floor high
further comment:
82 1 Level 1 - Prime Strcutres Glass level near gate 1 Hoy Fatt Road 116 30/08/2019
Installed glass deviates
from previously approved
color of Façade.

1st insp:
Aluminium cladding interface with vertical fins 25/07/2019 inspection completed:
83 1 Vertical Fins 116
at external metal staircase to complete 2nd insp: 01/08/2019
01/08/2019

Cleaning /painting of steel hollow section at


inspection completed:
84 1 Level 7 - Steel Hollow Section 7th floor to match adjacent paint color matte 116
02/10/2019
grey

Cleaning /painting of steel hollow section at


inspection completed:
85 1 Level 7 - Steel Hollow Section 7th floor to match adjacent paint color matte 116
02/10/2019
grey
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Cleaning /painting of steel hollow section at


inspection completed:
86 1 Level 2 - Steel Hollow Section 2nd floor to match adjacent paint color matte 116 03/09/2019
03/09/2016
grey

Cleaning /painting of steel hollow section at


inspection completed:
87 1 Level 2 2nd floor to match adjacent paint color matte 116 03/09/2019
03/09/2016
grey

Cleaning /painting of steel hollow section at


inspection completed:
88 1 Level 2 2nd floor to match adjacent paint color matte 116 03/09/2019
03/09/2016
grey

Cleaning of brown colored spots on


Level 2 - cleaning of brown colored inspection completed:
89 1 Aluminium cladding at Architectural Fins and 116 03/09/2019
spots 03/09/2016
at base of Fins at 2nd floor level

Cleaning of brown colored spots on


Level 2 - cleaning of brown colored inspection completed:
90 1 Aluminium cladding at Architectural Fins and 116 03/09/2019
spots 03/09/2016
at base of Fins at 2nd floor level

Cleaning of brown colored spots on


Level 2 - cleaning of brown colored inspection completed:
91 1 Aluminium cladding at Architectural Fins and 116 03/09/2019
spots 03/09/2016
at base of Fins at 2nd floor level

Cleaning /painting of steel hollow section at


inspection completed:
92 1 Level 3 - hollow sections 3rd floor to match adjacent paint color matte 116 03/09/2019
03/09/2016
grey

Cleaning of brown colored spots on


inspection completed:
93 1 Level 3 - Architectural Fins Aluminium cladding at Architectural Fins and 116 03/09/2019
03/09/2016
at base of Fins at 3rd floor level
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Cleaning /painting of steel hollow section at


inspection completed:
94 1 Level 3 - Hollow sections 3rd floor to match adjacent paint color matte 116 03/09/2019
03/09/2016
grey

Cleaning /painting of steel hollow section at


inspection completed:
95 1 Level 4 - Hollow sections 4th floor to match adjacent paint color matte 116 03/09/2019
03/09/2016
grey

Cleaning of brown colored spots on


inspection completed:
96 1 Level 4 - Architectural Fins Aluminium cladding at Architectural Fins and 116 03/09/2019
03/09/2016
at base of Fins at 4th floor level

Cleaning /painting of steel hollow section at


inspection completed:
97 1 Level 5 - Steel Hollow section 5th floor to match adjacent paint color matte 116 03/09/2019
03/09/2016
grey

Cleaning of brown colored spots on


inspection completed:
98 1 Level 5 - Architectural Fins Aluminium cladding at Architectural Fins and 116 03/09/2019
03/09/2016
at base of Fins at 5th floor level

Cleaning /painting of steel hollow section at


inspection completed:
99 1 Level 6 - Hollow Sections 6th floor to match adjacent paint color matte 116 03/09/2019
03/09/2016
grey
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Cleaning of brown colored spots on


inspection completed:
100 1 Level 6 - Architectural Fins Aluminium cladding at Architectural Fins and 116 03/09/2019
03/09/2016
at base of Fins at 6th floor level

Cleaning /painting of steel hollow section at


inspection completed:
101 1 Level 7 - Hollow Sections 7th floor to match adjacent paint color matte 116 03/09/2019
03/09/2016
grey

Cleaning of brown colored spots on


inspection completed:
102 1 Level 7 - Architectural Fins Aluminium cladding at Architectural Fins and 116 03/09/2019
03/09/2016
at base of Fins at 7th floor level

End capping on cladding at 7th floor roof need


inspection completed:
103 1 End capping at 7th floor, roof to complete 116 17/09/2019
17/09/2019

inspection completed:
104 1 Gaps at 7th floor Sealant on gaps need to complete at 7th floor 116 17/09/2019
17/09/2019

End capping on cladding at 7th floor roof need inspection completed:


105 1 End capping at 7th floor, roof 116 17/09/2019
to complete 17/09/2019

Silver tape to be put in place properly inspection completed:


106 1 Silver Tapes at level 2 and level 3 116 30/08/2019
30/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Gap on glass wall and concrete precast wall inspection completed :


107 1 Gap at Level 4 116 25/07/2019
need to complete 25/07/2019

Gap on ceiling and glass wall at 4th floor level inspection completed :
108 1 Gap at Level 4 116 25/07/2019
sky terrace need to complete 25/07/2019

inspection completed:
109 1 Gap to have sealant Gap needs to have sealant 116 17/09/2019
17/09/2019

At 4th floor level, ceiling access panel need to


inspection completed :
110 1 Level 4 - Ceiling Access Panel be completed 116 25/07/2019
25/07/2019

gap on ceiling and glass wall at 4th floor level


inspection completed :
111 1 Level 4 - gap at sky terrace sky terrace need to complete 116 25/07/2019
25/07/2019

Gap on ceiling and glass wall/door not


installed at 4th floor level sky terrace need to inspection completed :
112 1 Level 4 - gap at sky terrace 116 25/07/2019
complete 25/07/2019

Doors at 4th floor sky terrace needs to be


inspection completed :
113 1 Level 4 - Doors at landscaping area completed 116 25/07/2019
25/07/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Gap on ceiling and door need to be completed inspection completed:


114 1 Level 4 - gap at sky terrace 116
02/10/2019

gap on ceiling and glass wall need to be


inspection completed :
115 1 Level 4 - gap completed at 4th floor 116 25/07/2019
25/07/2019

Exposed Structural Support


structural support of aluminium cladding need inspection completed :
116 1 Level 4 - exposed structural support 116 05/08/2019
to make good 05/08/2019

Gap on floor and aluminium cladding need to inspection completed :


117 1 Level 4 - gap 116 25/07/2019
make good 25/07/2019

Platform paint color not matched adjacent


Prime Structures Platforms - Kung 1st inspection on 80% painting done. To
118 1 matte grey colour, 2nd floor level to 7th floor 116
Chong Road 06/08/2019 remove other paint color
roof level

Gap on glass railing and concrete need to


make good, gap on glass façade and inspection completed :
119 1 Gap at Level 4 116 25/07/2019
aluminium cladding box up need to make 25/07/2019
good

All aluminium and glazing works defects to be


rectified by 27 March 2019, including missing
Prime Structures Platforms - Kung
120 1 links/items to complete the job between the 117 completed. completed.
Chong Road
structrual wall and the aluminium structures.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Skim coating to the underside of slabs to be


Skim-coating to the underside of inspection completed :
121 1 completed. 117 25/07/2019
slabs 25/07/2019

Floor unevenness to be rectified. inspection completed :


122 1 Floor uneveness 117 25/07/2019
25/07/2019

Removal of imported worms via soil at storey


4 planter areas and independent lab test of
the soil supplier by ZDC/landscape inspection completed:
123 1 L4 - landscaping area 117 23/09/2019
subcontractor. RTO to witness soil sample 23/09/2019
retrieval and subsequent removal from site by
the independent testing agency.

Installation of SOB boxes as per the M&E inspection completed :


124 1 Installation of SOB boxes 117 25/07/2019
consultant's approval. 25/07/2019

Level 7 missing screed for ZDC to check their inspection completed.


125 1 Level 7 - missing screed 117 12/10/2019
BQ to find out if they are to screed that area. 12/10/2019

Open channel on the floor for the SOB boxes


inspection completed :
126 1 Open Channel on the floor to be concreted back. 117 25/07/2019
25/07/2019

To advise the possible utilization of one of the


existing operational lifts to hoist ID materials Under M&E
127 1 M&E 117 Under M&E inspections
to the upper floor. Twice a week and each inspections
time 3 hours usage.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

inspection completed
128 1 Baement - Water Seepage Some earth pits waterlogged at basement 118 01/08/2019
01/08/2019.

Permanent power supply for ZDC basement Under M&E


129 1 M&E 119 Under M&E inspections
hacking work inspections

130 1 AD the same as AD no.62 AD the same as AD no.62 120 completed completed

Toilet
inspection completed:
131 1 Level 7 - Male Toilet Urinal too narrow from edge of urinal to 121 20/09/2019
20/09/2019
cubicle partition wall. Unacceptable.

Water Seepage at Level 7


Flooding due to clogged drain by scattered inspection completed:
132 1 Level 7 - Water Seepage 122 01/08/2019
Plastics, rain coming into a void besides the 01/08/2019
door.

inspection completed:
133 1 Level 7 - Water Seepage Water Ingress on void in front of door. 122 12/10/2019
12/10/2019

Level 7 - Unfinished floor outside the inspection completed:


134 1 Unfinished floor outside the door. 122 12/10/2019
door 12/10/2019

Many FMAP windows are open. inspection completed


135 1 FMAP windows 122 25/07/2019
25/07/2019.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Under M&E
136 1 M&E defects and works M&E defects and works 123 Under M&E inspections
inspections

To ensure proper and centered alignment of


137 M&E fix alignment 124
the M&E final fix at all the ceiling area.

Attendance at weekly meeting by ZDC top


138 1 Attendance 125
management

Attendance at sub-committee meeting in AAS


139 1 Attendance 126
centre

Drainage completed. (email dated:


140 1 Drainage Opening 127 10/07/2019
to widen from 900mm to 1200mm. 10/07/2019)

M&E
Under M&E
141 1 M&E coordinator to engage for the M&E site 128 Under M&E inspections
inspections
issues.

Skim coating to the underside of slabs to be


Skim-coating to the underside of inspection completed :
142 1 completed. 129 25/07/2019
slabs 25/07/2019

Open channel on the floor for the SOB boxes


inspection completed :
143 1 Open Channel on the floor to be concreted back. 129 25/07/2019
25/07/2019

Level 6 floor screed unable to use floor


conduits. To top up cement to those areas inspection completed :
144 1 Level 6 - Floor Screed 129 25/07/2019
affected. 25/07/2019

Prime Structures Works - Aluminium Aluminium works - boxed up to side window


145 129
Boxed up panels still outstanding.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

inspection completed:
146 1 Pest control - L4 landscape Pest control at level 4. 129 23/09/2019
23/09/2019

inspection completed :
147 1 Levelness of floor Levelness of floor to all level. 129 25/07/2019
25/07/2019

Leaking inspection completed :


148 1 Water Leaking - Level 6 to 5 129 06/08/2019
leaking from level 6 to level 5. 06/08/2019

Rainwater ingress - staircase 2 exit Rainwater Ingress inspection completed :


149 1 130 25/07/2019
doors @level 2-7 rainwater entering from exit doors 25/07/2019

Door
150 Door Jamb - Staircase 2 Exit doors visible brown spots and rusty color @staricase 130 preaparing for inspection
2 exit door jambs

FMAP Windows
inspection completed :
151 1 FMAP windows always open. Even rainy days. 130 25/07/2019
25/07/2019

Water Clog
Clogged drainage at level 7 due to scattered
inspection completed :
152 1 Water Clog at Level 7 cement paper bags, plastics and cigarrette 130 01/08/2019
01/08/2019
butts.

Water Seepage
at basement slab from CRACK on slab
inspection completed :
153 1 Basement Water Seepage @ earthpit 1, @ earthpit near firehosereel, @ 130 01/08/2019
01/08/2019
near Lift wall
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Attendance at weekly site meeting by


154 1 Meeting attendance 131
zhengda top management

Grid E-3 Near Fire Fighting lobby 1 door crack inspection completed :
155 1 Basement Water Seepage 132 01/08/2019
on slab 01/08/2019

Grid E-4 Outside firelift wall corner crack on inspection completed :


156 1 Basement Water Seepage 132 01/08/2019
slab 01/08/2019

inspection completed :
157 1 Basement Water Seepage Grid F-3 Earthpit near hosereel 132 01/08/2019
01/08/2019

inspection completed :
158 1 Basement Water Seepage Grid F-2 Ramp location of I-Beam Support 132 01/08/2019
01/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

inspection completed :
159 1 Basement Water Seepage Grid F-1 Earth Pit 132 01/08/2019
01/08/2019

inspection completed :
160 1 Basement Water Seepage Grid G-0 location of I-Beam Support 132 01/08/2019
01/08/2019

inspection completed :
161 1 Basement Water Seepage Grid E-1 Earthpit 132 01/08/2019
01/08/2019

inspection completed :
162 1 Basement Water Seepage Grid D-1 Earthpit 132 01/08/2019
01/08/2019

inspection completed :
163 1 Basement Water Seepage Grid B-1 Location of previous I-Beam Support 132 01/08/2019
01/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

inspection completed :
164 1 Basement Water Seepage Grid A-0 Crack on Slab 132 01/08/2019
01/08/2019

Landscaping inspection completed :


165 1 Gap at Level 4 133 25/07/2019
gap at L4 Terrace to complete. 25/07/2019

Gaps inspection completed :


166 1 Gap at Level 4 133 25/07/2019
on ceiling and glass wall 25/07/2019

inspection completed :
167 1 Gap at Level 4 L4 - lasndscapping area 133 25/07/2019
25/07/2019

inspection completed :
Landscaping
13/08/2019
Damaged deck/ Uncleaned Walkway Damaged deck. (no x 1pc)
168 1 133 13/08/2019 Further comment: to
at Landscaping area Unclean deck.
clean decks and the whole
walkway.

Fire Protection inspection completed :


169 1 Glass Canopy 133 01/08/2019
Sprinkler pipe to match glass canopy frame. 01/08/2019

1st insp:
Open End and Finisher
25/08/2019 inspection completed :
170 1 Open End Finisher open end at canopy 133
2nd insp: 01/08/2019
01/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Drainage inspection completed :


171 1 Drainage 133 13/08/2019
cut of drain. 13/08/2019

Newly cast basement slab have visible crack


on slab in front of consumer switch room at inspection completed :
172 1 Basement Water Seepage 134 01/08/2019
basement have water seepage ( at earthpit 01/08/2019
and at location of previous I-Beam Support)

Rectified door at 4th floor fire fighting lobby 2 inspection completed :


173 1 Level 4 - Fire Fighting lobby 2 134 01/08/2019
totally cannot close 01/08/2019

Rectified door at 6th floor fire fighting lobby 1 inspection completed.


174 1 Level 6 - Fire Fighting lobby 1 134 19/08/2019
totally cannot close 19/08/2019

FMAP Windows
inspection completed :
175 1 FMAP windows always open. Even rainy days. 134 25/07/2019
25/07/2019

Door handle missing at level 1 - handicapped inspection completed:


176 1 Level 1 - handicapped toilet 134
toilet 02/10/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Firestop damaged at fire hose reel inspection completed :


177 1 Fire-stop at level 3 134 24/09/2019
compartment 24/09/2019

At handicap toilets from 2nd floor to 7th floor


Handicapped Toilets - hooks not installed yet (@1.1/ 1,5 meters from floor inspection completed:
178 1 135 19/08/2019
installation finish) 19/08/2019

completed. (email dated:


179 1 Drainage Orifice Discharge drain rectified orifice not done yet 135 10/07/2019
10/07/2019)

At 7th floor male toilet WC Cubicle wall and inspection completed :


180 1 Level 7 - Male Toilet 135 20/09/2019
urinal, space E5 not acceptable too narrow 20/09/2019

Door Jamb at security door not installed inspection completed:


181 1 Security Room - door/ floor / Celing 135
properly floor and ceiling not done 19/08/2019

Painting of Architectural Fin Supports should inspection completed:


182 1 Architectural Fins at all floors 135 30/08/2019
match adjacent color of Arch. Fins 30/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

183 Ceiling at Level 4 - landscaping area At 4th floor level, ceiling to make good 135

inspection completed:
At 1st floor high level broken glass need to be 30/08/2019
Broken Glass at Level 1 - Kung Chong replaced location near gate 2 at Kung Chong further comment:
184 1 135 30/08/2019
Road Road Installed glass deviates
from previously approved
color of Façade.

inspection completed:
30/08/2019
Broken glass to be replaced at 1st floor high
Broken Glass at Level 1 - Hoy Fatt further comment:
185 1 level near gate 1 Hoy Fatt Road 135 30/08/2019
Road Installed glass deviates
from previously approved
color of Façade.

Broken glass to be replaced at 2nd floor level


Broken Glass at Level 2 - Hoy Fatt
186 near gate 1 Hoy Fatt Road 135
Road

Aluminium box up alignment 1pc sticking out


187 Aluminium Box-up alignment 135
from the rest

Respective finishing / signage/ at meter room


188 Meter Room Level 1 - door / signage 135 preparing inspection
door not yet completed

Gas Riser Room Level 1 - door / Respective finishing / signage/ at gas riser inspection completed :
189 1 135 01/08/2019
signage / finishing door not yet completed 01/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Metal Staircase 2 - discrepancies in


190 Metal Staircase #2 135
perforation

All fireman access panels need to install


properly, many damaged lock, water ingress
during water tightness test, take note that
191 1 FMAP windows 135 completed.
glass façade haven't tested for water tightness
test glass façade need to be thoroughly
cleaned prior to handover to owner

Cleaning of brown colored spots on


inspection completed:
192 1 Architectural Fins at all floors Aluminium cladding at Architectural Fins and 135 03/09/2019
03/09/2019
at base of Fins at level 2 to level 7

Cleaning /painting of steel hollow section at


inspection completed:
193 1 Hollow sections at all floors level 2 to level 7 adjacent paint color matte 135 03/09/2019
03/09/2019
grey

Gaps on Aluminium fins at Staircase inspection completed:


194 1 Gaps on Aluminium fins to make good/cover 135 22/08/2019
2 22/08/2019

Painting of Architectural fins supports to inspection completed:


195 1 Architectural Fins at all floors 135 22/08/2019
match adjacent material color 22/08/2019

Broken Glass at Level 6 - Kung Chong At 6th floor level broken glass need to be inspection completed:
196 1 135 03/09/2019
Road replaced near Gate 2 @ Kung Chong Road 03/09/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Water ingress on FMAP prime structures need


to have proper sealant to prevent water
ingress. Façade glass not yet totally done
197 1 FMAP windows 135 completed.
TEST, Water leak test, damaged lock need to
make good, previous test failed at 2nd floor
FMAP.

1st insp:
Vertical Fins - near staircase 2 Aluminium cladding interface with vertical fins 25/08/2019 inspection completed :
198 1 135
(outside of building) at external metal staircase to complete 2nd insp: 01/08/2019
01/08/2019

inspection completed :
199 1 135 01/08/2019
01/08/2019

At level 4 and level 6, fire door was finally


rectified (more than the minimum 1 meter
Staircase 1 exit doors - Level 4 and clearance from the edge of the door leaf to
Level 6 edge of hand railing) BUT painting not yet
completed and PSB sticker on fire door not yet
done

inspection completed :
200 1 135 01/08/2019
01/08/2019

201 LED lights in the toilets LED on toilet mirror not yet installed 135 preparing for inspection

Ingress of rainwater - ZDC to install aluminium


Water Ingress at Staircase 2 exit 75mm +300mm both sides to prevent any rain inspection completed :
202 1 135 25/07/2019
doors water ingress goes inside the fire fighting 25/07/2019
lobby
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Water seepage at Basement floor, earthpit


and kingpost, rectification not done yet, inspection completed :
203 1 Water Seepage at Basement 135 01/08/2019
method statement from ZDC needs approval 01/08/2019
prior to rectification

204 Water Tap Handle Missing Water tap missing handle at green buffer 135

At fire fighting lobby #2 missing LED lights,


supply power in there but LED not installed inspection completed:
205 1 Lobby 2 - LED lights 135
yet, ceiling finishing not the same as new art 02/10/2019
drawing

Permanent signage of fire escape plan and


206 Signage 135
structural loading plan all floors

Fire Damper to be installed on duct Fire-damper to be installed on duct Under M&E


207 1 137 Under M&E inspections
penetration through fire-rated wall penetration through fire rated wall inspections

208 1 Earthpits basement completion of earthpits 138 completed completed

inspection completed :
209 1 Basement Moisture reading at basement 138 06/08/2019
06/08/2019

inspection completed :
210 1 Basement Drying of basement 138 06/08/2019
06/08/2019

Marking of driveway and car parking lots inspection completed :


211 1 Basement 138 16/08/2019
16/08/2019

inspection completed:
212 1 Basement Final touch-up and handover 138
03/10/2019

213 1 Security Room Installation of false ceiling 138 completed.


Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Level 1 lift lobby 2- to remove marble wall inspection completed :


214 1 Level 1 - lift lobby wall 138 13/08/2019
cladding to expose lift door jamb 13/08/2019

Lights not install as per approved drawing. inspection completed:


215 1 Lift lobby 2 138
(lights to be fitted inside the cove) 02/10/2019

Timber threshold to be removed and to inspection completed :


216 1 Lift lobby 2 138 23/08/2019
perform water test on the alum edge. 23/08/2019

Steel staircase landing - inconsistence of


217 Staircase 2 138
perforation

inspection completed:
30/08/2019
Level 1 - external façade, cracked on curtain further comment:
218 1 Level 1 138 30/08/2019
wall glass. Installed glass deviates
from previously approved
color of Façade.

Ceiling at Basement
Ceiling is inconsistent with 3rd floor Ceiling inspection completed:
219 1 Ceiling at Basement 139 18/09/2019
Construction, Recessed Ceiling not 18/09/2019
constructed

Ceiling at 1st Floor


Ceiling is inconsistent with 3rd floor Ceiling inspection completed:
220 1 Ceiling at Level 1 139 18/09/2019
Construction, Recessed Ceiling not 18/09/2019
constructed

Ceiling at 2nd Floor


Ceiling is inconsistent with 3rd floor Ceiling inspection completed:
221 1 Ceiling at Level 2 139 18/09/2019
Construction, Recessed Ceiling not 18/09/2019
constructed
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Ceiling at 3rd Floor


Ceiling have recessed, down light not inspection completed:
222 1 Ceiling at Level 3 139 18/09/2019
installed, rows of light left side and right side 18/09/2019
of ceiling

Ceiling at 4th FLoor


Ceiling is inconsistent with 3rd floor Ceiling inspection completed:
223 1 Ceiling at Level 4 139 18/09/2019
Construction, Recessed Ceiling not 18/09/2019
constructed

Ceiling at 5th Floor


Ceiling is inconsistent with 3rd floor Ceiling inspection completed:
224 1 Ceiling at Level 5 139 18/09/2019
Construction, Recessed Ceiling not 18/09/2019
constructed

Ceiling at 6th Floor


Ceiling is inconsistent with 3rd floor Ceiling inspection completed:
225 1 Ceiling at Level 6 139 18/09/2019
Construction, Recessed Ceiling not 18/09/2019
constructed

Ceiling at 7th Floor


Ceiling is inconsistent with 3rd floor Ceiling inspection completed:
226 1 Ceiling at Level 7 139 18/09/2019
Construction, Recessed Ceiling not 18/09/2019
constructed

Ceiling at Security Room


227 1 Ceiling at Security Room ZDC doing but must comply to fire code 139 completed.
requirements

Column Guard not installed yet, materials for inspection completed:


228 1 Column Angle Guards at Basement 139 20/08/2019
approval not submitted 20/08/2019

EPS not installed yet at RUMP GOING UP TO


EPS systems at Rump going up and Under M&E
229 1 1ST FLOOR AND AT RUMP GOING DOWN TO 139 Under M&E inspections
going down inspections
BASEMENT FLOOR

Cat Ladder not installed yet, Location at upper


230 Cat Ladder at Upper Roof 139
roof near Car Lift Motor Room

At roof of Car Lift Motor Room, actual gondola


231 Gondola Supports at Upper Roof 139
support installed different from drawing
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Actual Gondola support constructed not the


232 Gondola Supports at Upper Roof 139
same as drawing

233 Platforms at Kung Chong Road Platform not same as drawing 139

Actual Gondola platform constructed not the


234 Gondola Supports at Upper Roof 139
same as drawing

At 7th floor roof end cap not installed,


Prime Structure Works - End Capping inspection completed:
235 1 possible water ingress going to below floor 139 17/09/2019
at Level 7 17/09/2019
level

Building banner light timer not properly in


function or no timer. Last upper rows of lights inspection completed :
236 1 Building Banner Light Timer 139 24/09/2019
is always on, 24 hours a day. 2nd row with 24/09/2019
lights but not powered.

Metal Staircase 2 - discrepancies in Perforated staircase, perforation inconsistent


237 139
perforation with adjacent perforation.

Plaster cracks on wall of ramp going down to inspection completed:


238 1 Plaseter Cracks at Basement Wall 139
basement 03/10/2019

Non-compliance to minimum 2.2m clear Under M&E


239 1 2.2m Clear Height in Basement 140 Under M&E inspections
height in basement car park area inspections

inspection completed:
240 1 Basement Basement moisture reading test to conduct 141 06/08/2019
06/08/2019

inspection completed:
241 1 Status of sty 4 soil replacement ZDC to resolve the infestation 141 23/09/2019
23/09/2019

Lift handover to AAS, ZDC to liaise with DC on


Under M&E
242 1 Lift Handover to AAS the full contractural requirements for the lift 141 Under M&E inspections
inspections
handing over.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Gondola brackets to comply with the


243 Gondola Brackets 141
approved ZDC shop-drawings

Under M&E
244 1 Operation of EPS barrier system To update the technicals of EPS barrier system 141 Under M&E inspections
inspections

Under M&E
245 1 Basement Basement 2.2m clear basement height check 141 Under M&E inspections
inspections

inspection completed:
246 1 Lift Lobby Lift Lobby ceiling and wall tiling at lift door 141 18/09/2019
18/09/2019

inspection completed:
247 1 M&E fix alignment Metal M&E final fix at the fireman lift lobby 141 18/09/2019
18/09/2019

To follow up on all observation


248 1 All observation reports and ADs to follow up 141
reports and ADs issued

249 Level 3 - Washing Bay Washing Bay to rectify 141

250 All outstanding works to complete all outstanding works to complete 141

To fabricate one pair of outriggers of each


dimension as indicated on approved shop-
251 Outriggers and gondola brackets drawing. 142
To install gondola brackets as per the
approved shop-drawings.

4 nos of broken glass not rectified yet


Prime Structure Works - Broken 1 no at 6th floor
252 143/144
Glasses 2 nos at 2nd floor
1 no at 1t floor.

At 1st floor level, ZDC subcon opened up the


Ceiling at Level 1 - infront of meter inspection completed:
253 1 ceiling. ZDC to reinstate the ceiling in good 143/144
room 03/10/2019
condition. Door of sub meter not installed yet.

At bin centre, ZDC subcon store their inspection completed :


254 1 Bin Centre at Level 1 143/144 24/09/2019
materials inside the Bin Centre 24/09/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

Damaged door locks at M&E risers, ZDC to


replace damaged door locks and to complete inspection completed:
255 1 Damaged Ironmongeries 143/144 30/08/2019
installation of missing door locks and handle 30/08/2019
doors at staircase 1 and at staircase 2.

7 nos of internal drain covers along the


Drain Covers without pins - along driveway are not properly installed, without inspection completed:
256 1 143/144 18/09/2019
driveway area PIN, may cause hazard to vehicles doing 18/09/2019
loading or unloading.

wheel guards installed.


At basement level, wheel guards and bicycle
257 Bicycle Racks at Basement 143/144 (inspection completed
rack not yet installed yet.
50%)

Exit Sign at Level 7 - outside of Lobby At 7th floor roof, Green coloured exit sign
258 143/144 preparing for inspection
2 turned into Blue color.

Earthpit covers at basement damaged,


inspection completed:
259 1 Earthpit covers at Basement cracked and chipped-off. Earthpit covers not 143/144 30/08/2019
30/08/2019
replaced yet.

At 3rd floor, washing bay rectification not


260 Level 3 - Washing Bay 143/144
done yet.

At M&E compartment, ZDC to clear all


M&E compartment - to clean prior to unwanted materials and clean all M&E
261 143/144 preparing for inspection
handing over compartment prior to handing over the
building to the owner.

At 6th floor, fire rated door installed by ZDC.


Door at Level 6 - internal metal Until now, no psb stickers, wall installed inspection completed :
262 1 143/144 24/09/2019
staircase adjacent to door jamb to rectify immediately 24/09/2019
and make good.

Staircase 1 - red stickers to remove Visible red stickers marked at staircase 1,


Straicase 1 & 2 - paint to make good painting to make good. Painting at hand rail at
263 143/144 preparing for inspection
Staricase 1 - handrail paints staricase 1, ZDC to touch up painting from
level 7 till basement level.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

chipped off corners of RC wll. RC kerb to inspection completed:


264 1 RC Kerb at drive way area 143/144 30/08/2019
make good. 30/08/2019

At level 7, fire extinguisher bracket or hook to


All fire-extinguishers - to place at make good. All fire extinguishers, ZDC subcon
265 143/144 preparing for inspection
proper location all fire extinguishers must be put back to its
proper location to all floor level.

At level 7 fire fighting lobby 1, visible holes on


Lobby 1 at Level 7 - visible holes on
266 RC wall besides fire alarm bell need painting 143/144 preparing for inspection
RC wall besides fire alarm bell
to make good

At 3rd floor level, slab surface to make good.


Level 3 Floor Slab - visible survey
All visible survey marking, all depressed areas,
267 markings, depressed areas, 143/144
protruding bars, floor surface to make good.
protruding bars, all to make good.

Level 2 Floor Slab - visible survey At 2nd floor level, slab surface to make good,
268 markings, depressed areas, all visible survey marking, all depressed areas, 143/144 preparing for inspection
protruding bars, all to make good. protruding bars, floor surface to make good.

Level 1 Floor Slab - visible survey At 1st floor level, slab surface to make good,
269 markings, depressed areas, all visible survey marking, all depressed areas, 143/144 preparing for inspection
protruding bars, all to make good. protruding bars, floor surface to make good.

2 wall tiles at bin center to install, neighbour's


Bin Centre - 2 wall tiles to install, Bin power cable already been shifted finishing to
270 143/144
containers to put back inside. make good inside and outside of Bin Centre, 2
Bin containers to put back inside

Doors at Lobby 1 and Lobby 2 - all Defects on all doors at fire fighting lobby 1 inspection completed:
271 1 143/144 09/10/2019
floors and at fire fighting lobby 2 not rectified yet 09/10/2019

Gaps to make good to all fire break glass panel


Lobby 1 and Lobby 2 - fire break glass
272 and lift panels at fire fighting lobby 1 and at 143/144 s preparing for inspection
panel and lift panels to make good.
fire fighting lobby 2.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)

At level 7 to basement level, gaps on fire


273 Level 1 to 7 - gaps at door 143/144 preparing for inspection
doors needs to be rectified.

Many places at basement floor level, have the


same case. Need rectification of basement
274 Basement Floor Surface 143/144
floor surface and epoxy floor finishing works.

Lobby 1 - lift doors, plastic At fire fighting lobby 1, door of lifts, plastic
inspection completed:
275 1 protection, door frames to be cleared protection, door frames to be cleared of paint 143/144 30/08/2019
30/08/2019
of paint stains at all floors stains, from level 7 to basement level.

Temporary signage still in placed at fire


276 Signage 143/144
fighting lobby 1 and at fire fighting lobby 2

Fire Doors - paint stains, silicone Fire door, paint stains, silicone stains, ZDC to inspection completed :
277 1 143/144 24/09/2019
stains ZDC to make good make good. 24/09/2019

Installation of lights and LED lights at


278 Level 4 - landscape area 145
landscape area

Green wall and other plants are turning brown


due to possible lack of watering.
279 Level 4 - landscape area Plants start to wither. 145
ZDC to ensure proper and regular
maintenance of the landscape works.

Water feature not yet complete.


280 Level 4 - landscape area Timer to water the plants malfunctioned. 145
ZDC to make good.

Under the conditions of contract,


M&E defects works to proceed immediately Under M&E
281 1 M&E defects, works and T&C 146 Under M&E inspections
M&E outstandings to proceed immediately inspections
M&E T&C to proceed immediately

Under M&E
282 1 M&E defects, works and T&C M&E 147 Under M&E inspections
inspections

283 Land Scape at Green buffer Poor landscaping at green buffer 148
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 5 October 2019 222÷ 285 = 77.895% Accomplished
Ref AD Mr. Alfredo Mr. David
S/N Zhengda Before Photos Description After Rectification Photo - comments Inspection Date Status
No. (acknowledgement) (acknowledgement)
All façade glasses must be the same as
284 Façade glasses deviation in color 149
approved color

ZDC to immediately rectify water leaking at


dog house - Level 7, leaking to level 6 staff
285 Level 7 dog house 150
area. Rectification procedures/MOS to
submit.