Professional Documents
Culture Documents
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Total Number of Buses: 7 0.000 0.000 107.500 51.415 0.000 0.000 0.000 0.000
0.000 0.000
Project: Load Flow 2 ETAP Page: 4
Line/Cable Length
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
T1 3-Phase 100.000 20.000 70.000 12.50 45.00 0 0 0 -5.000 5.000 12.5000 YNd 0.000
T2 3-Phase 100.000 20.000 70.000 12.50 45.00 0 0 0 2.500 -2.500 12.5000 YNd 0.000
T3 3-Phase 80.000 20.000 70.000 12.50 45.00 0 0 0 2.500 -5.000 12.5000 YNd 0.000
Project: Load Flow 2 ETAP Page: 6
Branch Connections
* Bus1 20.000 100.000 0.0 107.955 78.260 0 0 Bus2 107.955 78.260 3849.1 81.0 -5.000
Bus3 70.000 98.309 -8.8 0 0 18.363 6.036 Bus2 -47.957 -24.305 451.1 89.2
Bus4 70.000 96.429 -9.4 0 0 19.759 12.246 Bus3 -19.759 -12.246 198.8 85.0
Bus5 20.000 101.374 -9.4 0 0 0 0 Bus4 0.000 0.000 0.0 0.0 2.500
Bus6 70.000 97.665 -9.0 0 0 31.716 10.424 Bus2 -57.306 -29.409 544.0 89.0
Bus7 20.000 101.588 -12.1 0 0 35.089 21.746 Bus6 -35.089 -21.746 1173.0 85.0 2.500
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: Load Flow 2 ETAP Page: 8
Bus5 20.000
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: Load Flow 2 ETAP Page: 9
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
T2 Transformer 100.000
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Line1 48.872 26.136 -47.957 -24.305 915.6 1831.2 101.3 98.3 3.03
Line3 58.637 32.072 -57.306 -29.409 1331.5 2663.0 101.3 97.7 3.67
Line2 19.997 12.720 -19.759 -12.246 237.2 474.4 98.3 96.4 1.88
Line4 9.597 5.549 -9.558 -5.471 38.9 77.9 98.3 97.7 0.64
3029.0 27808.4
Project: Load Flow 2 ETAP Page: 11
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Critical Report
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 4