Project: Load Flow 2 ETAP Page: 1

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041381621098 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 2 4 7

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 3 0 0 4 0 0 7

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: English

Project Filename: Prak 2

Output Filename: E:\Data Kuliah\GUSTIRA\Documents\PDST\Load flow2 Sebelum\Load Flow 2.lfr


Project: Load Flow 2 ETAP Page: 2

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621098 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: Load Flow 2 ETAP Page: 3

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621098 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 20.000 1 100.0 0.0

Bus2 70.000 1 100.0 0.0

Bus3 70.000 1 100.0 0.0 19.000 6.245

Bus4 70.000 1 100.0 0.0 21.250 13.170

Bus5 20.000 1 100.0 0.0

Bus6 70.000 1 100.0 0.0 33.250 10.929

Bus7 20.000 1 100.0 0.0 34.000 21.071

Total Number of Buses: 7 0.000 0.000 107.500 51.415 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 20.000 Swing 1 100.0 0.0

Bus5 20.000 Voltage Control 1 100.0 0.0 0.000 0.000 0.000

Bus7 20.000 Voltage Control 1 100.0 0.0 0.000 0.000 0.000

0.000 0.000
Project: Load Flow 2 ETAP Page: 4

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621059 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

Line/Cable Input Data

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (C) R X Y

Line1 49212.6 0.0 1 75 0.030480 0.060960

Line2 65616.8 0.0 1 75 0.030480 0.060960

Line3 49212.6 0.0 1 75 0.030480 0.060960

Line4 49212.6 0.0 1 75 0.030480 0.060960

Line / Cable resistances are listed at the specified temperatures.


Project: Load Flow 2 ETAP Page: 5

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621059 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 100.000 20.000 70.000 12.50 45.00 0 0 0 -5.000 5.000 12.5000 YNd 0.000

T2 3-Phase 100.000 20.000 70.000 12.50 45.00 0 0 0 2.500 -2.500 12.5000 YNd 0.000

T3 3-Phase 80.000 20.000 70.000 12.50 45.00 0 0 0 2.500 -5.000 12.5000 YNd 0.000
Project: Load Flow 2 ETAP Page: 6

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621059 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus2 0.28 12.47 12.47

T2 2W XFMR Bus5 Bus4 0.28 12.49 12.49

T3 2W XFMR Bus7 Bus6 0.34 15.21 15.21

Line1 Line Bus2 Bus3 3.06 6.12 6.85

Line2 Line Bus3 Bus4 4.08 8.16 9.13

Line3 Line Bus2 Bus6 3.06 6.12 6.85

Line4 Line Bus3 Bus6 3.06 6.12 6.85


Project: Load Flow 2 ETAP Page: 7

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621059 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 20.000 100.000 0.0 107.955 78.260 0 0 Bus2 107.955 78.260 3849.1 81.0 -5.000

Bus2 70.000 101.340 -7.5 0 0 0 0 Bus3 48.872 26.136 451.1 88.2

Bus6 58.637 32.072 544.0 87.7

Bus1 -107.510 -58.208 995.0 87.9 5.000

Bus3 70.000 98.309 -8.8 0 0 18.363 6.036 Bus2 -47.957 -24.305 451.1 89.2

Bus4 19.997 12.720 198.8 84.4

Bus6 9.597 5.549 93.0 86.6

Bus4 70.000 96.429 -9.4 0 0 19.759 12.246 Bus3 -19.759 -12.246 198.8 85.0

Bus5 0.000 0.000 0.0 0.0 -2.500

Bus5 20.000 101.374 -9.4 0 0 0 0 Bus4 0.000 0.000 0.0 0.0 2.500

Bus6 70.000 97.665 -9.0 0 0 31.716 10.424 Bus2 -57.306 -29.409 544.0 89.0

Bus3 -9.558 -5.471 93.0 86.8

Bus7 35.149 24.456 361.6 82.1 -5.000

Bus7 20.000 101.588 -12.1 0 0 35.089 21.746 Bus6 -35.089 -21.746 1173.0 85.0 2.500

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: Load Flow 2 ETAP Page: 8

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621059 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent

ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 20.000 133.338 81.0 3849.1

Bus2 70.000 122.256 87.9 995.0

Bus3 70.000 6.036 53.764 89.2 451.1

Bus4 70.000 12.246 23.246 85.0 198.8

Bus5 20.000

Bus6 70.000 10.424 75.415 88.7 636.9

Bus7 20.000 21.746 41.281 85.0 1173.0

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: Load Flow 2 ETAP Page: 9

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621059 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

* T1 Transformer 100.000 133.338 133.3 122.256 122.3

T2 Transformer 100.000

T3 Transformer 80.000 42.820 53.5 41.281 51.6

* Indicates a branch with operating load exceeding the branch capability.


Project: Load Flow 2 ETAP Page: 10

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621059 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

T1 107.955 78.260 -107.510 -58.208 445.6 20052.0 100.0 101.3 1.34

Line1 48.872 26.136 -47.957 -24.305 915.6 1831.2 101.3 98.3 3.03

Line3 58.637 32.072 -57.306 -29.409 1331.5 2663.0 101.3 97.7 3.67

Line2 19.997 12.720 -19.759 -12.246 237.2 474.4 98.3 96.4 1.88

Line4 9.597 5.549 -9.558 -5.471 38.9 77.9 98.3 97.7 0.64

T2 0.000 0.000 0.000 0.000 96.4 101.4 4.95

T3 35.149 24.456 -35.089 -21.746 60.2 2710.0 97.7 101.6 3.92

3029.0 27808.4
Project: Load Flow 2 ETAP Page: 11

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621059 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Gen1 Generator Overload 50.000 MW 107.955 215.9 3-Phase

Gen2 Generator Under Excited 0.000 Mvar 0.00 0.0 3-Phase

Gen2 Generator Under Power 0.000 MW 0.00 0.0 3-Phase

Gen3 Generator Under Excited 0.000 Mvar 0.00 0.0 3-Phase

Gen3 Generator Under Power 0.000 MW 0.00 0.0 3-Phase

T1 Transformer Overload 100.000 MVA 133.34 133.3 3-Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus4 Bus Under Voltage 70.000 kV 67.500 96.4 3-Phase

Bus6 Bus Under Voltage 70.000 kV 68.37 97.7 3-Phase


Project: Load Flow 2 ETAP Page: 12

Location: Lab DSTL 16.0.0C Date: 09-07-2019

Contract: 03041281621059 SN: 4359168

Engineer: AmandaRestuliliani Revision: Base


Study Case: LF
Filename: Prak 2 Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 107.955 78.260 133.338 80.96 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 107.955 78.260 133.338 80.96 Lagging

Total Motor Load: 0.000 0.000 0.000

Total Static Load: 104.926 50.452 116.426 90.12 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 3.029 27.808

System Mismatch: 0.000 0.000

Number of Iterations: 4