1. WELL NAME & 2. PROJECT NAME 3. BLOCK TARGETS 5. BOTTOM HOLE DEPTH 6.

OPERATION DATES
OD NUMBER
GACHETA M.D: 8,730 f MOBIL. SPUD DATE N/A Budget Cost ( KUSD )
WORKOVER , TESTING AND CANACABARE - 3 RIGLESS SERVICE ALCARAVAN FIRST
No. 1 (8.603' - 8.611') MD TVD: 7,833 f MOBIL. END DATE N/A Daily Cost ( KUSD )
COMPLETION REPORT
REPORT DATE 10. ORIGINAL RKB PBTD (MD): f COMPL. SPUD DATE 28/06/2019 17:00 CUM Cost (KUSD)
8. CONTRACTOR 9. RIG NAME & NUMBER 11. GROUND LEVEL ELEVATION
ELEVATION 12. OPERATION ESTIMATED TIME 13. DAYS OF OPERATION 14. WEATHER
28-Jun-2019
SETIP 26.5 f 514 3 Days 1.00 DAY: SUNNY NIGHT: RAIN

OPERATION CODE Hrs. CLEAN WELL W/ SLICK LINE, LOGS & PERFORATE GACHETA FORMATION 15. CASING INFORMATION 16. PUMPS INFORMATION
Rig up / Tear dn. 1 1.5 FROM TO ELAPSED CODE DESCRIPTION STRING Set @ OD [in] ID [in] Grade Weight PUMP No. TYPE MAX. SPM GPM MAX. PRESS.
Drill Cement Out 2 0.0 16:00 17:30 1.5 1 Performanced preoperational meeting, moved slick line unit, shut in well (45 Hz / 0 bfpd) & unconnected tree cap. SURF. 5052 f 9 5/8 8,9,21 N80 36
Milling 3 0.0 R/U SlickLine Unit, Pulleys, lubricator & BOP. INTERM 12980 f 7 6.184 P110 29.0
Perforating 4 0.0 PRODUC
Circ. Cond. 5 0.0 17:30 18:50 1.3 22 M/U basic string 1 3/4" (Rope socket + 10 f bar + Knucle joint + Hydrauil jar + Mechanical Jar) w/Pulling tool SB 3" to recover SV 2.81". RIH & found Obstruction @ 3.443 f 17. BOTTOM HOLE ASSEMBLY
Trips 6 6.9 S/L (W/U 150 lbs - W/S 125 lbs). Working string & RIH @ 3.450 f S/L. Working string without succes. POOH OD ID LENGTH CUM LGTH
TOOL DESCRIPTION Qtty REMARKS
Lubr. Rig 7 0.0 [in] [in] (f) [f]
Repair Rig 8 0.0 18:50 22:30 3.7 6 RIH basic string w/ Impression block 2.75" from surface to 3.506 f S/L. POOH & observed sand marks 0.0
Slip & Cut 9 0.0 RIH basic string w/ Impression block 2.5" from surface to 3.587 f S/L. POOH & observed sand marks
Elect. Logs 10 0.0
Repair Casing 11 0.0 22:30 0:00 1.5 6 RIH basic string w/ paraffin cutter 2.77" from surface to 3.587 f S/L. Working string from 3.587 f S/L to 6.061 f S/L. POOH
WOC 12 0.0
N/U & N/D BOP 13 0.2
Test 14 0.0
DST 15 0.0
PBU 16 0.0
Swabbing 17 0.0 REMARKS:
Natural Flow Test 18 0.0 Setip personnel & equipments arrived @ 14:00 - June 28th / 2019 to Canacabare 03 Well
Artifitia Flow Test 19 0.0 Sertecpet personnel arrived @ 09:00 - June 28th / 2019 to Canacabare 03 Well
Plug Back 20 0.0
Squeeze Cement 21 0.0 18. UPDATE (00:00 - 06:00)
Fishing 22 1.3
Kill Well 23 0.0 0:00 0:35 0.6 6 Continued POOH basic string w/ paraffin cutter 2.77" from 4.900 f S/L to surface.
SS Xmas 24 0:35 1:10 0.6 25 Waiting for Sand Bailer from Yopal
Others 25 1:10 1:20 0.2 13 Arrived set of Sand Bailer. M/U basic string 1 3/4" (Rope socket + 10 f bar + Knucle joint + Hydrauil jar + Mechanical Jar) w/ Sand Bailer 2.71" (Shoe)
Mob Rig / Moving 26
0.0 1:10 2:20 1.2 6 RIH basic string w/ Sand Bailer 2.71" from surface to 6.061 f S/L. Working string & RIH from 6.061 f S/L to 6.121 f S/L. Made sand recovery job 20 times w/ Sand bailer.
0.0 POOH.
0.0 Note: Recovered 0.5 f of Sand
17. PEOPLE ON BOARD
COMPANY QTTY 2:20 4:30 2.2 25 Stand by due to electric storm
SETIP 3
MAXIM FISHING 1 4:30 5:40 1.2 6 RIH basic string w/ Sand Bailer 2.71" from surface to 6.121 f S/L. Made sand recovery job 23 times w/ Sand bailer. POOH.
SERTECPET 1 Note: Recovered 0.5 f of Sand
CEDCO 1

19. SUMARY OF OPERATIONS 20. FORWARD OPERATIONS TOTAL LENGTH: 0.00 FEET
24. HSE INFORMATION
RIH Pulling tool 3" to recovery Standing Valve 2.81F Witout succes. RIH w/ impression block (2 ACTIVITY Qtty
Continue sand recovery job w/ Sand Bailer from 6.121 f S/L to 6.923 f (Sliding Sleeve)
times) & observed sand marks at different depths. Made sand recovery job w/ Sand Bailer 23. DIESEL CONTROL (GAL.) STOP CARDS
TOTAL / People 6 WEIGHT 8,5 ppg STOCK OF DIESEL YESTERDAY 0 PTW
21. PRODUCTION TESTS 22. COMPLETION FLUID CONCENTRAT. UNIT DIESEL RECEIVED TODAY 0 TOOL BOX
21.1. SWABBING SUMMARY TYPE Production Fluid DIESEL SUPPLIED TODAY AMOUNT CUM VOL. SAFETY MEETINGS
TIME No. Of Runs CUMM. FLUID CUMM. OIL CUMM. WATER BSW pH API ° Cl- [ppm] Sediment [%] Nitrates [ppm] REMARKS ADDITIVES FUNCTION COMPLETION RIG 0 OPERAT. MEETINGS
6:00 WELL TESTING COMPANY 0 JSA
14:00 FORK LIFT 0 25. TESTS DATE
23:59 OIL FIELD TRUCK 0 BOP`s (PRESS. & FUNCT.)
CO. MAN CAR 0 BOP CONTROL SYSTEM
TIME FLUID (BFPD) OIL (BOPD) WATER(BWPD) GAS (KSCFD) CUMM. OIL CUMM. WATER Sediment [%] Nitrates [ppm] BSW pH API ° Cl- [ppm] HELPERS BUS 0
26. COMPANIES REPRESENTIVES
6:00 STAFF BUS 0
14:00 RIG WATER TRUCK 0 COMPANY MAN
23:00 DISPOSABLE WATER TRUCK 0
21.3. MULTI RATE TEST SUMMARY SERVICES COMPANIES 0 Co. MAN ASSISTANT
FLOW OF INJECTION CUMMULATIVE LABORATORY ANALISYS MINI CAMP 0
BFPD BSW PRODCC. BOPD BWPD
THP (PSI) BIPD BSW OIL WATER Sediment [%] Nitrates [ppm] BSW pH API ° Cl- [ppm] RIG MANAGER
TOTAL DIESEL COMSUPTION TODAY 0
REPORTED TO
STOCK OF DIESEL TODAY 0
FORMATION TESTED INTERVALS LUIS ÑUSTES
1. WELL NAME & 2. PROJECT NAME 3. BLOCK TARGETS 5. BOTTOM HOLE DEPTH 6. OPERATION DATES
OD NUMBER
GACHETA M.D: 8,730 f MOBIL. SPUD DATE N/A Budget Cost ( KUSD )
WORKOVER , TESTING AND CANACABARE - 3 RIGLESS SERVICE ALCARAVAN FIRST
No. 2 (8.603' - 8.611') MD TVD: 7,833 f MOBIL. END DATE N/A Daily Cost ( KUSD )
COMPLETION REPORT
REPORT DATE 10. ORIGINAL RKB PBTD (MD): f COMPL. SPUD DATE 28/06/2019 17:00 CUM Cost (KUSD)
8. CONTRACTOR 9. RIG NAME & NUMBER 11. GROUND LEVEL ELEVATION
ELEVATION 12. OPERATION ESTIMATED TIME 13. DAYS OF OPERATION 14. WEATHER
29-Jun-2019
SETIP 26.5 f 514 3 Days 1.00 DAY: RAIN NIGHT: CLEAR

OPERATION CODE Hrs. CLEAN WELL W/ SLICK LINE, LOGS & PERFORATE GACHETA FORMATION 15. CASING INFORMATION 16. PUMPS INFORMATION
Rig up / Tear dn. 1 0.0 FROM TO ELAPSED CODE DESCRIPTION STRING Set @ OD [in] ID [in] Grade Weight PUMP No. TYPE MAX. SPM GPM MAX. PRESS.
Drill Cement Out 2 0.0 0:00 0:35 0.6 22 Continued POOH basic string w/ paraffin cutter 2.77" from 4.900 f S/L to surface. SURF. 5052 f 9 5/8 8,9,21 N80 36
Milling 3 0.0 0:35 1:10 0.6 25 Waiting for Sand Bailer from Yopal INTERM 12980 f 7 6.184 P110 29.0
Perforating 4 0.0 1:10 1:20 0.2 13 Arrived set of Sand Bailer. M/U basic string 1 3/4" (Rope socket + 10 f bar + Knucle joint + Hydrauil jar + Mechanical Jar) w/ Sand Bailer 2.71" (Shoe) PRODUC
Circ. Cond. 5 0.0 17. BOTTOM HOLE ASSEMBLY
Trips 6 26.7 1:10 2:20 1.2 6 RIH basic string w/ Sand Bailer 2.71" from surface to 6.061 f S/L. Working string & RIH from 6.061 f S/L to 6.121 f S/L. Made sand recovery job 20 times w/ Sand bailer. OD ID LENGTH CUM LGTH
TOOL DESCRIPTION Qtty REMARKS
Lubr. Rig 7 0.0 POOH. [in] [in] (f) [f]
Repair Rig 8 0.0 0.0
Slip & Cut 9 0.0 2:20 4:30 2.2 25 Stand by due to electric storm
Elect. Logs 10 0.0
Repair Casing 11 0.0 4:30 0:00 19.5 6 Made sand recovery job w/ Sand Bailer 2.71" (Shoe) as follow:
WOC 12 0.0
N/U & N/D BOP 13 0.2 3 times RIH basic string w/ Sand Bailer from surface to 6.121 f S/L, recovered sand & went down to 6.641 f S/L
Test 14 0.0 3 times RIH basic string w/ Sand Bailer from surface to 6.641 f S/L, recovered sand & went down to 6.650 f S/L
DST 15 0.0 4 times RIH basic string w/ Sand Bailer from surface to 6.650 f S/L, recovered sand & went down to 6.664 f S/L
PBU 16 0.0 1 times RIH basic string w/ Sand Bailer from surface to 6.664 f S/L, recovered sand & went down to 6.750 f S/L
Swabbing 17 0.0 2 times RIH basic string w/ Sand Bailer from surface to 6.750 f S/L, recovered sand without advance
Natural Flow Test 18 0.0
Artifitia Flow Test 19 0.0
Plug Back 20 0.0 Note: Total recovered 5.3 gal of sand / 14.5 f in tubing 3 1/2" EUE - 9.3#
Squeeze Cement 21 0.0 From 18:00 - 19:30 slip and cut cable & performanced maintenance to sand bailer.
Fishing 22 0.6
Kill Well 23 0.0
SS Xmas 24
Others 25
Mob Rig / Moving 26
0.0 REMARKS
0.0
0.0
17. PEOPLE ON BOARD 18. UPDATE (00:00 - 06:00)
COMPANY QTTY 0:00 6:00 6.0 6 Continued sand recovery job w/ Sand Bailer 2.71" (Shoe) as follow:
SETIP 3
MAXIM FISHING 1 3 times RIH basic string w/ Sand Bailer from surface to 6.750 f S/L, recovered sand & went down to 6.810 f S/L
SERTECPET 1 3 times RIH basic string w/ Sand Bailer from surface to 6.810 f S/L, recovered sand & went down to 6.840 f S/L
CEDCO 1 1 times RIH basic string w/ Sand Bailer from surface to 6.840 f S/L.

Note: Total recovered 9.3 gal of sand / 25.4 f in tubing 3 1/2" EUE - 9.3#

19. SUMARY OF OPERATIONS 20. FORWARD OPERATIONS TOTAL LENGTH: 0.00 FEET
24. HSE INFORMATION
Made sand recovery job w/ Sand Bailer 2.71" (Shoe) from 6.061 f S/L and broke sand bridges @ Continue sand recovery job w/ Sand Bailer from 6.840 f S/L to 6.923 f (Sliding Sleeve). Recovery Stanging Valve 2.81F, verify ACTIVITY Qtty
6.121 f - 6.641 f - 6.650 f - 6.664 f - 6.750 f & 6.810 f Sliding Sleeve closed, RIH Separation Sleeve & Start ESP 23. DIESEL CONTROL (GAL.) STOP CARDS
TOTAL / People 6 WEIGHT 8,5 ppg STOCK OF DIESEL YESTERDAY 0 PTW
21. PRODUCTION TESTS 22. COMPLETION FLUID CONCENTRAT. UNIT DIESEL RECEIVED TODAY 0 TOOL BOX
21.1. SWABBING SUMMARY TYPE Production Fluid DIESEL SUPPLIED TODAY AMOUNT CUM VOL. SAFETY MEETINGS
TIME No. Of Runs CUMM. FLUID CUMM. OIL CUMM. WATER BSW pH API ° Cl- [ppm] Sediment [%] Nitrates [ppm] REMARKS ADDITIVES FUNCTION COMPLETION RIG 0 OPERAT. MEETINGS
6:00 WELL TESTING COMPANY 0 JSA
14:00 FORK LIFT 0 25. TESTS DATE
23:59 OIL FIELD TRUCK 0 BOP`s (PRESS. & FUNCT.)
CO. MAN CAR 0 BOP CONTROL SYSTEM
TIME FLUID (BFPD) OIL (BOPD) WATER(BWPD) GAS (KSCFD) CUMM. OIL CUMM. WATER Sediment [%] Nitrates [ppm] BSW pH API ° Cl- [ppm] HELPERS BUS 0
26. COMPANIES REPRESENTIVES
6:00 STAFF BUS 0
14:00 RIG WATER TRUCK 0 COMPANY MAN
23:00 DISPOSABLE WATER TRUCK 0
21.3. MULTI RATE TEST SUMMARY SERVICES COMPANIES 0 Co. MAN ASSISTANT
FLOW OF INJECTION CUMMULATIVE LABORATORY ANALISYS MINI CAMP 0
BFPD BSW PRODCC. BOPD BWPD
THP (PSI) BIPD BSW OIL WATER Sediment [%] Nitrates [ppm] BSW pH API ° Cl- [ppm] RIG MANAGER
TOTAL DIESEL COMSUPTION TODAY 0
REPORTED TO
STOCK OF DIESEL TODAY 0
FORMATION TESTED INTERVALS LUIS ÑUSTES
1. WELL NAME & 2. PROJECT NAME 3. BLOCK TARGETS 5. BOTTOM HOLE DEPTH 6. OPERATION DATES
OD NUMBER
GACHETA M.D: 8,730 f MOBIL. SPUD DATE N/A Budget Cost ( KUSD )
WORKOVER , TESTING AND CANACABARE - 3 RIGLESS SERVICE ALCARAVAN FIRST
No. 3 (8.603' - 8.611') MD TVD: 7,833 f MOBIL. END DATE N/A Daily Cost ( KUSD )
COMPLETION REPORT
REPORT DATE 10. ORIGINAL RKB PBTD (MD): f COMPL. SPUD DATE 28/06/2019 17:00 CUM Cost (KUSD)
8. CONTRACTOR 9. RIG NAME & NUMBER 11. GROUND LEVEL ELEVATION
ELEVATION 12. OPERATION ESTIMATED TIME 13. DAYS OF OPERATION 14. WEATHER
30-Jun-2019
SETIP 26.5 f 514 3 Days 1.00 DAY: RAIN NIGHT: CLEAR

OPERATION CODE Hrs. CLEAN WELL W/ SLICK LINE, LOGS & PERFORATE GACHETA FORMATION 15. CASING INFORMATION 16. PUMPS INFORMATION
Rig up / Tear dn. 1 0.0 FROM TO ELAPSED CODE DESCRIPTION STRING Set @ OD [in] ID [in] Grade Weight PUMP No. TYPE MAX. SPM GPM MAX. PRESS.
Drill Cement Out 2 0.0 0:00 11:25 11.4 6 Continued sand recovery job w/ Sand Bailer 2.71" (Shoe) as follow: SURF. 5052 f 9 5/8 8,9,21 N80 36
Milling 3 0.0 INTERM 12980 f 7 6.184 P110 29.0
Perforating 4 0.0 3 times RIH basic string w/ Sand Bailer from surface to 6.750 f S/L, recovered sand & went down to 6.810 f S/L PRODUC
Circ. Cond. 5 0.0 3 times RIH basic string w/ Sand Bailer from surface to 6.810 f S/L, recovered sand & went down to 6.840 f S/L 17. BOTTOM HOLE ASSEMBLY
Trips 6 25.3 3 times RIH basic string w/ Sand Bailer from surface to 6.840 f S/L. recovered sand & went down to 6.888 f S/L OD ID LENGTH CUM LGTH
TOOL DESCRIPTION Qtty REMARKS
Lubr. Rig 7 0.0 RIH basic string w/ Sand Bailer from surface to 6.888 f S/L. recovered sand & went down to 6.892 f S/L [in] [in] (f) [f]
Repair Rig 8 0.0 0.0
Slip & Cut 9 0.6 11:25 13:20 1.9 25 Stand by due to electric storm
Elect. Logs 10 0.0
Repair Casing 11 0.0 13:20 18:35 5.3 6 Continued sand recovery job w/ Sand Bailer 2.71" (Shoe) as follow:
WOC 12 0.0 5 times RIH basic string w/ Sand Bailer from surface to 6.892 f S/L & recovered sand. POOH
N/U & N/D BOP 13 0.0 Notes:
Test 14 0.0 Afer 6.840 f. it observed in all run, density loss, but the string recovered weight.
DST 15 0.0 The sediment recovered is not compacted.
PBU 16 0.0
Swabbing 17 0.0 18:35 19:10 0.6 9 Slip & cut cable
Natural Flow Test 18 0.0
Artifitia Flow Test 19 0.0 19:10 0:00 4.8 6 Continued sand recovery job w/ Sand Bailer 2.71" (Shoe) as follow:
Plug Back 20 0.0
5 times RIH basic string w/ Sand Bailer from surface to 6.892 f S/L & recovered sand. Its observed the top fishing neck of Standing Valve 2.81F in bottom of sand bailer shoe
Squeeze Cement 21 0.0
Fishing 22 0.0
Kill Well 23 0.0 Note: Total recovered 21.1 gal of sand / 57.8 f in tubing 3 1/2" EUE - 9.3#
SS Xmas 24
Others 25
Mob Rig / Moving 26 18. UPDATE (00:00 - 06:00)
0.0 0:00 1:40 1.7 6 Continued sand recovery job w/ Sand Bailer 2.71" (Shoe) as follow:
0.0 2 times RIH basic string w/ Sand Bailer from surface to 6.892 f S/L & recovered sand. POOH
0.0
17. PEOPLE ON BOARD 1:40 3:50 2.2 6 Unconnected Sand Bailer, connect 3 f bar + centralizer 2.72" & RIH basic string w/ imprresion block. Performanced impression block job as follow:
COMPANY QTTY RIH basic string w/ impression block 2 1/2" from surface to 6.892 f S/L. Shows mark but is not clear
SETIP 3 RIH basic string w/ impression block 2 1/2" from surface to 6.892 f S/L. Didn't show mark
MAXIM FISHING 1
SERTECPET 1 3:50 5:40 1.8 6 Continued sand recovery job w/ Sand Bailer 2.71" (Shoe) as follow:
CEDCO 1 3 times RIH basic string w/ Sand Bailer from surface to 6.892 f S/L & recovered sand. POOH

5:40 6:00 0.3 6 RIH basic string w/ impression block 2 1/2" from surface to 5.100 f S/L.

Note: Total recovered 24.7 gal of sand / 67.7 f in tubing 3 1/2" EUE - 9.3#

19. SUMARY OF OPERATIONS 20. FORWARD OPERATIONS TOTAL LENGTH: 0.00 FEET
24. HSE INFORMATION
Made sand recovery job w/ Sand Bailer 2.71" (Shoe) from 6.750 f S/L to 6.892 f S/L (top fishing Continue sand recovery job w/ Sand Bailer on Standing Valve fishing neck. Recovery Stanging Valve 2.81F, verify Sliding Sleeve ACTIVITY Qtty
neck of S.V 2.81") and broke sand bridges @ 6.810 f & 6.840 f closed, RIH Separation Sleeve & Start ESP 23. DIESEL CONTROL (GAL.) STOP CARDS
TOTAL / People 6 WEIGHT 8,5 ppg STOCK OF DIESEL YESTERDAY 0 PTW
21. PRODUCTION TESTS 22. COMPLETION FLUID CONCENTRAT. UNIT DIESEL RECEIVED TODAY 0 TOOL BOX
21.1. SWABBING SUMMARY TYPE Production Fluid DIESEL SUPPLIED TODAY AMOUNT CUM VOL. SAFETY MEETINGS
TIME No. Of Runs CUMM. FLUID CUMM. OIL CUMM. WATER BSW pH API ° Cl- [ppm] Sediment [%] Nitrates [ppm] REMARKS ADDITIVES FUNCTION COMPLETION RIG 0 OPERAT. MEETINGS
6:00 WELL TESTING COMPANY 0 JSA
14:00 FORK LIFT 0 25. TESTS DATE
23:59 OIL FIELD TRUCK 0 BOP`s (PRESS. & FUNCT.)
CO. MAN CAR 0 BOP CONTROL SYSTEM
TIME FLUID (BFPD) OIL (BOPD) WATER(BWPD) GAS (KSCFD) CUMM. OIL CUMM. WATER Sediment [%] Nitrates [ppm] BSW pH API ° Cl- [ppm] HELPERS BUS 0
26. COMPANIES REPRESENTIVES
6:00 STAFF BUS 0
14:00 RIG WATER TRUCK 0 COMPANY MAN
23:00 DISPOSABLE WATER TRUCK 0
21.3. MULTI RATE TEST SUMMARY SERVICES COMPANIES 0 Co. MAN ASSISTANT
FLOW OF INJECTION CUMMULATIVE LABORATORY ANALISYS MINI CAMP 0
BFPD BSW PRODCC. BOPD BWPD
THP (PSI) BIPD BSW OIL WATER Sediment [%] Nitrates [ppm] BSW pH API ° Cl- [ppm] RIG MANAGER
TOTAL DIESEL COMSUPTION TODAY 0
REPORTED TO
STOCK OF DIESEL TODAY 0
FORMATION TESTED INTERVALS LUIS ÑUSTES