Galfar Engineering & Contracting SAOG. MSP-009-F/01; Rev. 0
NON-CONFORMITY REPORT (NCR)
Quality: Ov Date: 09.10.2019
Health & Safety: [_]
Environment, [_] NCR No. 001
NON-CONFORMITY (NG)
Activity Customer Complaints
Product [7] Repetitive: Post delivery deficiency
‘Subcontractor ters (specif: [7]
Violated Provisions (Document No. / Contract Clause / Specification etc)
(9686-8310-SP-000-4501_01
Details of Non-conformity:
‘Stock are being mixed and dumped at site which not acceptable as per testing procedure.
Indicate individual responsible for the Non-conformity
Name: Jayachandran Job No. e163
GECNo. Lge Project Title:___Raz Markaz crude oil par
Designation: Project Manager Vt S-
[Name of Verification Personnel: Mr. Rejasokaran R Signature ay
Designation: Manager QA/QC Date aqhelsoi4
(Forward to the Vice President (QHSE) /QA/QC Incharge / HSE Advisor, as applicable)
REVIEW OF NON-CONFORMITY:
Comments: Stock piles shall not mixed with other stock piles which will change the physical properties and
Not acceptable.
Customer’ Intorested Party Acceptance Requires: [__] Not Required
cods vericaton betore close out by. Vie Presient(aaise) [PAC ncharco il
Wertcaton Personnel (Pl speci): Mr. Rejaskaran R HSE Advisor
Target Date for completion of action: 09.10.2019
Reviewed by (Name}: Rajasekaran R Signature
Designation: QN/GC Manager Date 6Y ho)
Target date for completion of action shall be maximum 21 days from the date of sue of NOR. Any extension of
time shall be agreed with VP (QHSE} | QA/QC Incharge / HSE Advisor / Verification personnel as applicable.