You are on page 1of 1

DCCN Lab Mid Project Details

1. 4 Routers connected to a central router


2. Each router is connected to 4 switches
3. Each switch have 2 end devices (PCs/Laptops/Servers)
4. Configure 3 servers (HTTP, DNS and DHCP)
5. Use IP configuration & End devices naming conventions of your choice
6. Each End Device (PC/Laptop/Tablet) is able to connect all the services of
servers
7. Each End Device (PC/Laptop/Tablet) can ping with the other End Device in
the network
Note: Each group may have no more than 3 participants. Each group have to submit hard copy of their
project by no later than 17-10-2019, Thursday. Late submissions wouldn’t be accepted. Marks of project
will be graded after individual viva of each student.

You might also like