CUF is defined as the ratio between the gross energy generation of a power plant and the
maximum gross energy generation possible in the period under operation i.e. period under
which it is in running condition (eg. 330 days). The same can be represented as:-
Where C is the installed capacity of the unit and HOP is the total operating hours (i.e. not
including outages) in the period
Assumptions:
According to the Central Electricity Authority in India, PLF is defined as the ratio between the
gross energy generation of a power plant and the maximum gross energy generation possible in
the total monitoring period under consideration (in our case, a year).The same can be
represented as:-
Where C is the installed capacity of the unit and H total is the total hours (i.e. not including
outages) in the monitoring period under consideration (in our case, a year).
Calculation of PLF (Example):
Assumptions: