BES GOVERNMENT OF DUBAI ppolisglyasitio Sipe eocinctypiiater xno MATERIAL SUBMITTAL COMMENTS SHEET From: MANAGER ~ CIVIL & ELECTROMECHANICAL, To: __ M/s. Siemens LLC, Dubai Fax N| +971 4 3660541 Ref.: |MCEM/MS/MAI/9214/2016 | Contract | PO#3761500064 Date: | 18/Feb/16 Mat. Subi Ref. | PO-3761500064/MDNASEHA/CIV/003 Date: 14/Feb/16 Substation: | Madinat Al Seha Receipt to TED: | 16/Feb/16 Material Code: CE) MDNASEHA/ MS/ C/ 15/ 32 Rev: 0 T-Spec Ref ‘Name of Material Source Sample | ApprovaiCode Volill, Road Base M/s. Aljbri Crusher UAE | cE 1.5.3.1.0.01 Rev.13 Location for usage: Material used for: Comment: Proposed material “Roadbase” from M/s. Al jabri Crusher, Ajman UAE, as the source to be spread below the structural foundation and Internal Road at Madinat Al Seha 132/11kV substation can be approved subject to the compliance of following comments: Below Structural Foundation Prepare formation for load bearing surface 1, Road base material (Each lot) should be offered to DEWA/consultant site engineer for inspection prior to unloading at site 2. Quarry name to be specified in the delivery notes. 3. Representative sample to be sent to the approved laboratory for testing to confirm the requirements of physical and chemical properties as per soil report and test report shall be submitted for final approval before placing. 22 .c2ib KHAWLA AL DHEBAIEI ‘A | Approved as per sample submitted. ‘Approved subject to full compliance with manufacturer's instructions 8 c D E ‘Approved subject to full compliance with comments. Resubmit for record Representative sample to be prepared at site for final approval ‘Comments as indicated in the material comments sheet. [Not approved. Revise the submittal as per comments and resubmit for approval itractor's responsibilities for compliance with the requirements of the specification, CC: VP-T.Proj /Unikrishna Pillai upacttectucy water Aunty > seg iy Page 1 of 1

You might also like