You are on page 1of 306

TSCM50

SAP ERP Procurement


Academy I

Publication ID:
SAP Copyrights and Trademarks

© 2015 SAP SE. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE. The information contained herein may be changed without prior
notice.
Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors.

● Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.
● IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM,
z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower,
PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere,
Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.
● Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
● Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.
● Oracle is a registered trademark of Oracle Corporation
● UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
● Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.
● HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.
● Java is a registered trademark of Sun Microsystems, Inc.
● JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.
● SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer, StreamWork, and other SAP products and services mentioned herein as well as their respective
logos are trademarks or registered trademarks of SAP SE in Germany and other countries.
● Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services
mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects Software Ltd. Business Objects is an SAP company.
● Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase products and services mentioned herein as well as their respective logos are trademarks or
registered trademarks of Sybase, Inc. Sybase is an SAP company.

All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications
may vary.
These materials are subject to change without notice. These materials are provided by SAP SE and its affiliated companies ("SAP Group") for informational purposes only, without representation or
warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the
express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.
Course Overview

Unit 1: Sources of Supply and Conditions

Unit 2: Source Determination

Unit 3: Optimized Purchasing

Unit 4: Document Release Procedure

Unit 5: Specific Procurement Processes

Unit 6: Invoice Entry

Unit 7: Variances and Invoice Blocks

Unit 8: Subsequent Debit/Credit, Delivery Costs, Credit Memos

Unit 9: Automated processes in Invoice Verification

Unit 10: GR/IR Account Maintenance


Unit 1: Sources of Supply and Conditions

Lesson 1: Creating Purchasing Info Records

Lesson 2: Creating Special Info Records

Lesson 3: Using Special Functions in Info Records

Lesson 4: Creating Central Contracts

Lesson 5: Creating Scheduling Agreements Without Release Documentation

Lesson 6: Creating Scheduling Agreements with Release Documentation


TSCM50 Unit 1 Lesson 1

Lesson 1: Creating Purchasing Info Records

Lesson Objectives
After completing this lesson, you will be able to:

● Create organizational levels of purchasing info records


TSCM50 Unit 1 Lesson 1

Lesson Agenda
Learn About:
● Overview of Sources of Supply

● Purchasing Info Record Data

● Purchasing Info Record Structure

● Purchase Order Default Price

Watch:
● How to Create and Maintain Info Records

Do:
● Create a Purchasing Info Record

● Create Texts in Info Records


TSCM50 Figure 1: Sources of Supply Overview Unit 1 Lesson 1
TSCM50 Figure 2: Purchasing Info Record Unit 1 Lesson 1
TSCM50 Figure 3: Purchasing Info Record Structure Unit 1 Lesson 1
TSCM50 Figure 4: Default Price from Info Record Unit 1 Lesson 1
TSCM50

Summary
You should now be able to:

● Create organizational levels of purchasing info records


TSCM50 Unit 1 Lesson 2

Lesson 2: Creating Special Info Records

Lesson Objectives
After completing this lesson, you will be able to:

● Create special types of info records


TSCM50 Unit 1 Lesson 2

Lesson Agenda
Learn About:
● Special Types of Purchasing Info Records

Watch:
● How to Create Info Records for Material Groups

Do:
● Create Info Records for Material Groups

● Create a Purchase Order


TSCM50 Figure 5: Info Record for Material Group Unit 1 Lesson 2
TSCM50

Summary
You should now be able to:

● Create special types of info records


TSCM50 Unit 1 Lesson 3

Lesson 3: Using Special Functions in Info Records

Lesson Objectives
After completing this lesson, you will be able to:

● Use buyer negotiation sheets to carry out price changes


TSCM50 Unit 1 Lesson 3

Lesson Agenda
Learn About:
● Buyer Negotiation Sheet

● Price Changes

● Analysis of Purchasing Info Records

Learn:
● To Use the Buyer's Negotiation Sheet

● To Perform Price Changes

Watch:
● How to Perform Price Changes for Info Records
TSCM50 Unit 1 Lesson 3

Lesson Agenda
Do:
● Analyze the Buyer Negotiation Sheet

● Perform Price Changes


TSCM50 Figure 6: Price Change in Info Record Unit 1 Lesson 3
TSCM50

Summary
You should now be able to:

● Use buyer negotiation sheets to carry out price changes


TSCM50 Unit 1 Lesson 4

Lesson 4: Creating Central Contracts

Lesson Objectives
After completing this lesson, you will be able to:

● Create central contracts


TSCM50 Unit 1 Lesson 4

Lesson Agenda
Learn About:
● Overview of Outline Agreements

● Contracts Usage

● Contract Types

● Centrally Agreed Contracts

● Contract Monitoring

Watch:
● How to Create a Centrally Agreed Contract

Do:
● Create a Centrally Agreed Contract and Issue Release Orders
TSCM50 Figure 7: Outline Purchase Agreements Overview Unit 1 Lesson 4
TSCM50 Figure 8: Working with Contracts Unit 1 Lesson 4
TSCM50 Figure 9: Contract Release Documentation Unit 1 Lesson 4
TSCM50 Figure 10: Contract Types Unit 1 Lesson 4
TSCM50 Figure 11: Items of Centrally Agreed and Plant Unit 1 Lesson 4
Contracts
TSCM50 Figure 12: Plant Conditions in Centrally Agreed Unit 1 Lesson 4
Contracts
TSCM50 Figure 13: Selection Parameters Unit 1 Lesson 4
TSCM50

Summary
You should now be able to:

● Create central contracts


TSCM50 Unit 1 Lesson 5

Lesson 5: Creating Scheduling Agreements Without Release


Documentation

Lesson Objectives
After completing this lesson, you will be able to:

● Create and maintain scheduling agreements without release documentation


TSCM50 Unit 1 Lesson 5

Lesson Agenda
Learn About:
● Scheduling Agreements Usage

● Automatic Scheduling Agreement Schedule Lines

● Scheduling Agreement Types Without Release Documentation

Watch:
● How to Create Scheduling Agreement and Maintain Delivery Schedule

Do:
● Create Scheduling Agreement Without Release Documentation
TSCM50 Figure 14: Working with Scheduling Agreements Unit 1 Lesson 5
TSCM50 Figure 15: Automatic Scheduling Agreement Unit 1 Lesson 5
Schedule Lines
TSCM50 Figure 16: Scheduling Agreement Without Unit 1 Lesson 5
Release Documentation
TSCM50

Summary
You should now be able to:

● Create and maintain scheduling agreements without release documentation


TSCM50 Unit 1 Lesson 6

Lesson 6: Creating Scheduling Agreements with Release


Documentation

Lesson Objectives
After completing this lesson, you will be able to:

● Create scheduling agreements with release documentation


TSCM50 Unit 1 Lesson 6

Lesson Agenda
Learn About:
● Scheduling Agreement Types with Release Documentation

● Scheduling Agreement Releases

● Scheduling Agreement Releases Archiving

● Control Data for Scheduling Agreements

● Scheduling Agreement Options

Watch:
● How to Create a Scheduling Agreement and Maintain Delivery Schedules

Do:
● Create Scheduling Agreement with Release Documentation
TSCM50 Figure 17: Scheduling Agreements with Release Unit 1 Lesson 6
Documentation
TSCM50 Figure 18: Scheduling Agreement with Forecast Unit 1 Lesson 6
Delivery Schedule
TSCM50 Figure 19: Scheduling Agreement with Forecast Unit 1 Lesson 6
and JIT Delivery Schedules
TSCM50 Figure 20: Control Data for Scheduling Unit 1 Lesson 6
Agreements
TSCM50 Figure 21: Aggregation with the Release Creation Unit 1 Lesson 6
Profile
TSCM50 Figure 22: Tolerance Limits for Scheduling Unit 1 Lesson 6
Agreement Items
TSCM50 Figure 23: Firm and Trade-Off Zones Unit 1 Lesson 6
TSCM50

Summary
You should now be able to:

● Create scheduling agreements with release documentation


Unit 2: Source Determination

Lesson 1: Controlling Source Determination with Source Lists

Lesson 2: Maintaining Source Lists

Lesson 3: Controlling Source Determination with Quota Arrangements

Lesson 4: Executing the Planning Run with Quota Arrangements

Lesson 5: Identifying Additional Aspects of Source Determination

Lesson 6: Blocking Sources of Supply

Lesson 7: Creating Purchase Orders with Source Determination


TSCM50 Unit 2 Lesson 1

Lesson 1: Controlling Source Determination with Source Lists

Lesson Objectives
After completing this lesson, you will be able to:

● Create source lists


TSCM50 Unit 2 Lesson 1

Lesson Agenda
Learn About:
● Source Determination

● Source List Functions

● Source List Requirement

Watch:
● How to Use Source Determination Without Source List

● How to Use Source Determination with Source List

Do:
● Create Purchase Requisitions Without Source List

● Create Purchase Requisitions with Source List


TSCM50 Figure 24: Overview of Supply Source Unit 2 Lesson 1
Determination
TSCM50 Figure 25: Source List Unit 2 Lesson 1
TSCM50 Figure 26: Source List Requirement (Material Unit 2 Lesson 1
Related)
TSCM50 Figure 27: Source List Requirement (Plant Unit 2 Lesson 1
Related)
TSCM50

Summary
You should now be able to:

● Create source lists


TSCM50 Unit 2 Lesson 2

Lesson 2: Maintaining Source Lists

Lesson Objectives
After completing this lesson, you will be able to:

● Use the source list in the planning run


TSCM50 Unit 2 Lesson 2

Lesson Agenda
Learn About:
● Source List Maintenance

● Source List Records for Material Group Contracts

Watch:
● How to Use Source Lists in the Planning Run

Do:
● Create Purchase Requisitions in the Planning Run
TSCM50 Figure 28: Source List Maintenance Unit 2 Lesson 2
TSCM50 Figure 29: Source List Records for Material Group Unit 2 Lesson 2
Contracts
TSCM50

Summary
You should now be able to:

● Use the source list in the planning run


TSCM50 Unit 2 Lesson 3

Lesson 3: Controlling Source Determination with Quota


Arrangements

Lesson Objectives
After completing this lesson, you will be able to:

● Create and maintain quota arrangements


TSCM50 Unit 2 Lesson 3

Lesson Agenda
Learn About:
● Quota Arrangement Functions

● Quota Arrangement Usage

● Quota Arrangement Maintenance

● Operation Mode for Quota Arrangements

Watch:
● How to Use Quota Arrangements in Source Determination

Do:
● Examine Source Determination with Quota Arrangements
TSCM50 Figure 30: Quota Arrangement Usage Unit 2 Lesson 3
TSCM50 Figure 31: Quota Arrangement Unit 2 Lesson 3
TSCM50 Figure 32: Source Determination Unit 2 Lesson 3
TSCM50

Summary
You should now be able to:

● Create and maintain quota arrangements


TSCM50 Unit 2 Lesson 4

Lesson 4: Executing the Planning Run with Quota


Arrangements

Lesson Objectives
After completing this lesson, you will be able to:

● Create purchase requisitions in the planning run


TSCM50 Unit 2 Lesson 4

Lesson Agenda
Learn About:
● Quota Arrangements in Material Requirements Planning

● Quota Arrangements in Invoice Verification

Watch:
● How to Use Quota Arrangements in the Planning Run

● How to Use Quota Arrangements for Stock Transfers

Do:
● Examine Source Determination with Quota Arrangements in the Planning Run

● Examine Stock Transfer with Quota Arrangement


TSCM50 Figure 33: Requirement Splitting Unit 2 Lesson 4
TSCM50 Figure 34: Lot Sizes with Splitting Quota Unit 2 Lesson 4
TSCM50 Figure 35: Maximum Quantity Without Splitting Unit 2 Lesson 4
Quota
TSCM50 Figure 36: Update of Quota Arrangements Unit 2 Lesson 4
Through Invoices
TSCM50

Summary
You should now be able to:

● Create purchase requisitions in the planning run


TSCM50 Unit 2 Lesson 5

Lesson 5: Identifying Additional Aspects of Source


Determination

Lesson Objectives
After completing this lesson, you will be able to:

● Identify priorities in source determination


TSCM50 Unit 2 Lesson 5

Lesson Agenda
Learn About:
● Source Determination in the Planning Run

● Source Determination Outside the Planning Run

● Regular Vendor

Watch:
● How to Reproduce Source Determination in Different Situations

Do:
● Define Priorities in Source Determination
TSCM50 Figure 37: Source Determination in the Planning Unit 2 Lesson 5
Run
TSCM50 Figure 38: Automatic Source Determination Unit 2 Lesson 5
TSCM50 Figure 39: Regular Vendor Unit 2 Lesson 5
TSCM50

Summary
You should now be able to:

● Identify priorities in source determination


TSCM50 Unit 2 Lesson 6

Lesson 6: Blocking Sources of Supply

Lesson Objectives
After completing this lesson, you will be able to:

● Block sources of supply


TSCM50 Unit 2 Lesson 6

Lesson Agenda
Learn About:
● Blocking of Sources of Supply

Watch:
● How to Block Sources of Supply

Do:
● Block Sources of Supply
TSCM50 Figure 40: Blocking Vendors Unit 2 Lesson 6
TSCM50 Figure 41: Blocking Sources of Supply in Source Unit 2 Lesson 6
List
TSCM50

Summary
You should now be able to:

● Block sources of supply


TSCM50 Unit 2 Lesson 7

Lesson 7: Creating Purchase Orders with Source Determination

Lesson Objectives
After completing this lesson, you will be able to:

● Use source determination in purchase orders


TSCM50 Unit 2 Lesson 7

Lesson Agenda
Learn About:
● Functions of Source Determination

● Source Determination in Purchase Orders

● Procurement with Catalog

● External Sourcing

Do:
● Create Purchase Orders with Source Determination
TSCM50 Figure 42: Source Determination for Material Unit 2 Lesson 7
Group
TSCM50 Figure 43: Create Purchase Order with Source Unit 2 Lesson 7
Determination
TSCM50 Figure 44: Procurement in ERP with Catalog Unit 2 Lesson 7
TSCM50 Figure 45: External Sourcing Unit 2 Lesson 7
TSCM50

Summary
You should now be able to:

● Use source determination in purchase orders


Unit 3: Optimized Purchasing

Lesson 1: Processing Unassigned Purchase Requisitions

Lesson 2: Processing Assigned Purchase Requisitions

Lesson 3: Monitoring Purchase Orders


TSCM50 Unit 3 Lesson 1

Lesson 1: Processing Unassigned Purchase Requisitions

Lesson Objectives
After completing this lesson, you will be able to:

● Assign and process purchase requisitions


TSCM50 Unit 3 Lesson 1

Lesson Agenda
Learn About:
● Purchase Requisition Assignment and Processing

Watch:
● How to Assign and Process Purchase Requisitions

Do:
● Assign and Process Purchase Requisitions
TSCM50 Figure 46: Assigning and Processing Purchase Unit 3 Lesson 1
Requisitions
TSCM50 Figure 47: Assign and Process Enjoy Purchase Unit 3 Lesson 1
Requisitions
TSCM50

Summary
You should now be able to:

● Assign and process purchase requisitions


TSCM50 Unit 3 Lesson 2

Lesson 2: Processing Assigned Purchase Requisitions

Lesson Objectives
After completing this lesson, you will be able to:

● Process open purchase requisitions


TSCM50 Unit 3 Lesson 2

Lesson Agenda
Learn About:
● Conversion of Requisitions into Purchase Orders

● Assignment List

● Document Overview

● Automatic Generation of Purchase Orders

Learn:
● To Generate Purchase Orders Automatically

Watch:
● How to Use the Assignment List
TSCM50 Unit 3 Lesson 2

Lesson Agenda
Do:
● Process Assigned Purchase Requisitions

● Create Purchase Orders Automatically


TSCM50 Figure 48: Collective Transactions for Converting Unit 3 Lesson 2
Requisitions
TSCM50 Figure 49: Creating Follow-On Documents Using Unit 3 Lesson 2
an Assignment List
TSCM50 Figure 50: Document Overview as Alternative to Unit 3 Lesson 2
Assignment List
TSCM50 Figure 51: Automatic Generation of Purchase Unit 3 Lesson 2
Orders
TSCM50

Summary
You should now be able to:

● Process open purchase requisitions


TSCM50 Unit 3 Lesson 3

Lesson 3: Monitoring Purchase Orders

Lesson Objectives
After completing this lesson, you will be able to:

● Monitor order confirmations and deliveries


TSCM50 Unit 3 Lesson 3

Lesson Agenda
Learn About:
● Order Confirmation Monitoring

● Order Acknowledgment Expediters Generation

● Delivery Expediters and Reminders

● Confirmation Control Keys

Watch:
● How to Monitor Order Confirmations and Deliveries

Do:
● Perform Order Monitoring
TSCM50 Figure 52: Confirmations in the Purchasing Unit 3 Lesson 3
Process
TSCM50 Unit 3 Lesson 3

You can preset the order acknowledgment indicator as follows,


if you want it to be generally proposed as a default:
● In the purchasing data of the vendor master record
● In the purchasing info record
● Using the user parameter EVO
● In the personal settings for EnjoySAP transaction ME21N
TSCM50 Unit 3 Lesson 3

You have the following options for entering the confirmation:


● Enter the confirmation in the purchasing document.
● Generate an independent document – an inbound delivery.
● Have the confirmation transmitted electronically by the vendor. If the vendor
rejects the purchase order, the rejection indicator and the deletion indicator are set
in the purchase order item.
TSCM50 Unit 3 Lesson 3

To send reminders for due and overdue orders, scheduling


agreement schedule lines, and request for quotations (RFQs),
you must satisfy the following prerequisites:
● You enter one or more reminder levels (reminder periods) in the document item.
● The document has been output.
● You have set the message determination for delivery expediter.
● Message records for the delivery expediter are present in the master data of
Purchasing.
TSCM50 Figure 53: Defining Confirmation Control Keys Unit 3 Lesson 3
TSCM50 Figure 54: Confirmation Sequence Unit 3 Lesson 3
TSCM50

Summary
You should now be able to:

● Monitor order confirmations and deliveries


Unit 4: Document Release Procedure

Lesson 1: Releasing Purchasing Documents

Lesson 2: Converting Released Purchase Requisitions

Lesson 3: Configuring Release Procedures in Customizing

Lesson 4: Creating Release Procedures


TSCM50 Unit 4 Lesson 1

Lesson 1: Releasing Purchasing Documents

Lesson Objectives
After completing this lesson, you will be able to:

● Release blocked purchasing documents


TSCM50 Unit 4 Lesson 1

Lesson Agenda
Learn About:
● Blocked Purchasing Documents Release

● Release Procedure for Purchase Requisitions

Watch:
● How to Release Purchase Requisitions

Do:
● Release Purchase Requisitions
TSCM50 Figure 55: Purchase Requisition Release Unit 4 Lesson 1
TSCM50 Figure 56: Overall and Item-Wise Release of Unit 4 Lesson 1
Purchase Requisitions
TSCM50 Figure 57: Release Options for Blocked Purchase Unit 4 Lesson 1
Requisitions
TSCM50

Summary
You should now be able to:

● Release blocked purchasing documents


TSCM50 Unit 4 Lesson 2

Lesson 2: Converting Released Purchase Requisitions

Lesson Objectives
After completing this lesson, you will be able to:

● Convert released purchase requisitions into purchase orders


TSCM50 Unit 4 Lesson 2

Lesson Agenda
Learn About:
● Release Procedure for Purchasing Documents

● Key Terms for Release Procedures

Watch:
● How to Convert Released Purchase Requisitions into Purchase Orders

Do:
● Create and Release Purchase Orders
TSCM50 Figure 58: Key Terms Unit 4 Lesson 2
TSCM50

Summary
You should now be able to:

● Convert released purchase requisitions into purchase orders


TSCM50 Unit 4 Lesson 3

Lesson 3: Configuring Release Procedures in Customizing

Lesson Objectives
After completing this lesson, you will be able to:

● Check Customizing settings for release procedures


TSCM50 Unit 4 Lesson 3

Lesson Agenda
Learn About:
● Release Procedure Customizing

● Characteristic and Class Creation

Watch:
● How to Set up Release Procedures for Purchase Requisitions

Do:
● Check Settings for Release Procedures
TSCM50 Unit 4 Lesson 3

You can specify the following types of release procedures in


Customizing for purchase requisitions:
● Procedures without classification
● Procedures with classification
TSCM50 Figure 59: Definition of Release Criteria Unit 4 Lesson 3
TSCM50 Figure 60: Release Codes Unit 4 Lesson 3
TSCM50 Figure 61: Release Indicators Unit 4 Lesson 3
TSCM50 Figure 62: Release Strategies Unit 4 Lesson 3
TSCM50 Figure 63: Definitions in the Release Strategies Unit 4 Lesson 3
TSCM50

Summary
You should now be able to:

● Check Customizing settings for release procedures


TSCM50 Unit 4 Lesson 4

Lesson 4: Creating Release Procedures

Lesson Objectives
After completing this lesson, you will be able to:

● Create release procedures for purchase requisitions


TSCM50 Unit 4 Lesson 4

Lesson Agenda
Learn About:
● Authorizations

Watch:
● How to Create Release Procedures for Purchase Requisitions

Do:
● Create a New Release Procedure
TSCM50 Figure 64: Authorization Objects Unit 4 Lesson 4
TSCM50

Summary
You should now be able to:

● Create release procedures for purchase requisitions


Unit 5: Specific Procurement Processes

Lesson 1: Creating Invoices Using Invoice Plans

Lesson 2: Deploying Additional Special Procurement Processes


TSCM50 Unit 5 Lesson 1

Lesson 1: Creating Invoices Using Invoice Plans

Lesson Objectives
After completing this lesson, you will be able to:

● Identify differences between periodic and partial invoice plans


TSCM50 Unit 5 Lesson 1

Lesson Agenda
Learn About:
● Invoicing Plans Overview

● Periodic Invoicing Plan

● Partial Invoicing Plan

● Control Date and Settlement of Invoicing Plans

Do:
● Process an Invoicing Plan
TSCM50 Figure 65: Invoicing Plans Unit 5 Lesson 1
TSCM50 Figure 66: Periodic Invoicing Plan Unit 5 Lesson 1
TSCM50 Figure 67: Partial Invoicing Plan Unit 5 Lesson 1
TSCM50 Figure 68: GR/IR Control Unit 5 Lesson 1
TSCM50

Summary
You should now be able to:

● Identify differences between periodic and partial invoice plans


TSCM50 Unit 5 Lesson 2

Lesson 2: Deploying Additional Special Procurement Processes

Lesson Objectives
After completing this lesson, you will be able to:

● Examine special procurement processes


TSCM50 Unit 5 Lesson 2

Lesson Agenda
Learn About:
● Purchase Requisition and Purchase Order Templates

● Park and Hold for Purchase Requisitions and Purchase Orders

● Multiple Account Assignment

● Down Payments and Security Retentions

Watch:
● How to Create Special Purchase Requisitions

● How to Convert Special Purchase Requisitions


TSCM50 Unit 5 Lesson 2

Lesson Agenda
Do:
● Create Purchase Requisitions

● Convert Purchase Requisitions


TSCM50 Figure 69: Templates for Purchase Requisitions Unit 5 Lesson 2
and Purchase Orders
TSCM50 Figure 70: Park and Hold in Purchasing Unit 5 Lesson 2
TSCM50 Figure 71: Value-Based Multiple Account Unit 5 Lesson 2
Assignment
TSCM50 Figure 72: Valuation for Multiple Account Unit 5 Lesson 2
Assignment
TSCM50 Figure 73: Down Payment Processing Unit 5 Lesson 2
TSCM50 Figure 74: Security Retention Unit 5 Lesson 2
TSCM50

Summary
You should now be able to:

● Examine special procurement processes


Unit 6: Invoice Entry

Lesson 1: Introducing Invoice Verification

Lesson 2: Working with Logistics Invoice Verification

Lesson 3: Parking of Documents

Lesson 4: Applying Taxes, Cash Discounts, and Foreign Currencies

Lesson 5: Creating Invoices for Purchase Orders with Account Assignment


TSCM50 Unit 6 Lesson 1

Lesson 1: Introducing Invoice Verification

Lesson Objectives
After completing this lesson, you will be able to:

● Understand the idea of invoice verification


TSCM50 Unit 6 Lesson 1

Lesson Agenda
Learn About:
● Invoice Verification Environment

● Account Movements and Price Control


TSCM50 Figure 75: Materials Management (MM) Overview Unit 6 Lesson 1
TSCM50 Figure 76: Invoice Verification Environment Unit 6 Lesson 1
TSCM50 Figure 77: Invoice Verification Unit 6 Lesson 1
TSCM50 Figure 78: IR Unit 6 Lesson 1
TSCM50 Figure 79: Posting an Invoice Unit 6 Lesson 1
TSCM50 Figure 80: Account Movements Unit 6 Lesson 1
TSCM50 Figure 81: Price Control Unit 6 Lesson 1
TSCM50

Summary
You should now be able to:

● Understand the idea of invoice verification


TSCM50 Unit 6 Lesson 2

Lesson 2: Working with Logistics Invoice Verification

Lesson Objectives
After completing this lesson, you will be able to:

● Post an invoice

● Use different types of invoice verification


TSCM50 Unit 6 Lesson 2

Lesson Agenda
Learn About:
● Function of Logistics Invoice Verification

● User Parameters for Logistics Invoice Verification

● Types of Invoice Verification

● Return or Reversal During a GR-Based Invoice Receipt (IR)

Do:
● Post an Invoice

● Use Different Types of Invoice Verification


TSCM50 Figure 82: Information in an Invoice Unit 6 Lesson 2
TSCM50 Figure 83: Logistics Invoice Verification – Unit 6 Lesson 2
Transaction MIRO
TSCM50 Figure 84: Invoice Entry – Allocations Unit 6 Lesson 2
TSCM50 Figure 85: Invoice Entry – Item List Unit 6 Lesson 2
TSCM50 Figure 86: Layouts for the Item List Unit 6 Lesson 2
TSCM50 Figure 87: Customizing – Display Variants Unit 6 Lesson 2
TSCM50 Figure 88: Other Functions Unit 6 Lesson 2
TSCM50 Figure 89: User Parameters Unit 6 Lesson 2
TSCM50 Figure 91: PO-Based Invoice Verification Unit 6 Lesson 2
TSCM50 Figure 92: GR-Based Invoice Verification Unit 6 Lesson 2
TSCM50 Figure 93: Return/Reversal During a GR-Based IR Unit 6 Lesson 2
TSCM50

Summary
You should now be able to:

● Post an invoice
● Use different types of invoice verification
TSCM50 Unit 6 Lesson 3

Lesson 3: Parking of Documents

Lesson Objectives
After completing this lesson, you will be able to:

● Park an invoice

● Explain the attributes of prepayment


TSCM50 Unit 6 Lesson 3

Lesson Agenda
Learn About:
● Document Parking

● Standard Workflows

● Customizing – Document Parking Workflow

● Prepayment

Do:
● Park an Invoice
TSCM50 Figure 96: Document Parking Unit 6 Lesson 3
TSCM50 Figure 97: Document Status Unit 6 Lesson 3
TSCM50 Figure 98: Hold Document Unit 6 Lesson 3
TSCM50 Figure 99: Document Parking and Saving as Unit 6 Lesson 3
Complete
TSCM50 Figure 100: Workflow for Document Completion Unit 6 Lesson 3
TSCM50 Figure 101: Workflow for Release and Post Unit 6 Lesson 3
TSCM50 Figure 102: Customizing – Document Parking Unit 6 Lesson 3
Workflow
TSCM50 Figure 104: Prepayment Unit 6 Lesson 3
TSCM50 Figure 105: Account Movements During a Unit 6 Lesson 3
Prepayment
TSCM50 Figure 106: Customizing - Prepayment Unit 6 Lesson 3
TSCM50

Summary
You should now be able to:

● Park an invoice
● Explain the attributes of prepayment
TSCM50 Unit 6 Lesson 4

Lesson 4: Applying Taxes, Cash Discounts, and Foreign


Currencies

Lesson Objectives
After completing this lesson, you will be able to:

● Enter taxes

● Enter cash discount information

● Post an invoice in foreign currency


TSCM50 Unit 6 Lesson 4

Lesson Agenda
Learn About:
● Taxes

● Terms of Payment

● Invoices in a Foreign Currency

Do:
● Enter Taxes

● Enter Cash Discount Information

● Post an Invoice in Foreign Currency


TSCM50 Figure 107: Sales Tax Unit 6 Lesson 4
TSCM50 Figure 108: Entering Tax Data Unit 6 Lesson 4
TSCM50 Figure 109: Customizing – Default Value for Tax Unit 6 Lesson 4
Codes
TSCM50 Figure 111: Terms of Payment Unit 6 Lesson 4
TSCM50 Figure 112: Posting Gross – Posting Net Unit 6 Lesson 4
TSCM50 Figure 113: Account Movements – Gross Posting Unit 6 Lesson 4
TSCM50 Figure 114: Account Movements – Net Posting Unit 6 Lesson 4
TSCM50 Figure 115: Customizing – Terms of Payment Unit 6 Lesson 4
TSCM50 Figure 116: Customizing Document Types for Unit 6 Lesson 4
Accounting Documents
TSCM50 Figure 118: Invoices in a Foreign Currency Unit 6 Lesson 4
TSCM50 Figure 119: Customizing Exchange Rate Unit 6 Lesson 4
Differences
TSCM50

Summary
You should now be able to:

● Enter taxes
● Enter cash discount information
● Post an invoice in foreign currency
TSCM50 Unit 6 Lesson 5

Lesson 5: Creating Invoices for Purchase Orders with Account


Assignment

Lesson Objectives
After completing this lesson, you will be able to:

● Enter an invoice for a purchase order with account assignment

● Enter an invoice for a blanket purchase order


TSCM50 Unit 6 Lesson 5

Lesson Agenda
Learn About:
● Account Assignment and Invoice Verification

● Multiple Account Assignment in the PO Item

● Multiple Account Assignment in Logistics Invoice Verification

● Invoices for Blanket Purchase Orders

Do:
● Enter an Invoice for a Purchase Order with Account Assignment

● Enter an Invoice for a Blanket Purchase Order


TSCM50 Figure 121: PO with Account Assignment Unit 6 Lesson 5
TSCM50 Figure 122: Types of Account Assignment Unit 6 Lesson 5
TSCM50 Figure 123: Account Movements for POs with Unit 6 Lesson 5
Account Assignment
TSCM50 Figure 124: Account Assignment Data in PO Unit 6 Lesson 5
TSCM50 Figure 125: Partial Invoice Indicator Unit 6 Lesson 5
TSCM50 Figure 126: Multiple Account Assignment in MIRO Unit 6 Lesson 5
TSCM50 Figure 129: Invoices for Blanket Purchase Orders Unit 6 Lesson 5
TSCM50

Summary
You should now be able to:

● Enter an invoice for a purchase order with account assignment


● Enter an invoice for a blanket purchase order
Unit 7: Variances and Invoice Blocks

Lesson 1: Entering Invoices with Variances and Handling of Blocking Reasons

Lesson 2: Reducing Invoices

Lesson 3: Handling of Variances Without Reference to an Item

Lesson 4: Releasing Blocked Invoices


TSCM50 Unit 7 Lesson 1

Lesson 1: Entering Invoices with Variances and Handling of


Blocking Reasons

Lesson Objectives
After completing this lesson, you will be able to:

● Enter invoices with variances

● Block an invoice manually


TSCM50 Unit 7 Lesson 1

Lesson Agenda
Learn About:
● Invoice Block Due to Variances

● Other Blocking Reasons

Do:
● Enter Invoices with Variances

● Block an Invoice Manually


TSCM50 Figure 131: Invoices with Variances Unit 7 Lesson 1
TSCM50 Table Unit 7 Lesson 1

Result Action
Is within tolerable limits The invoice is accepted without any further
queries.
Falls short of the lower tolerance limit A relevant message is issued. You can post
the invoice, and it is not blocked for pay-
ment.
Exceeds the upper tolerance limit A relevant message is issued. You can post
the invoice, but it is automatically blocked
for payment.
TSCM50 Figure 132: Variances Unit 7 Lesson 1
TSCM50 Figure 133: Quantity Variance Unit 7 Lesson 1
TSCM50 Figure 134: Price Variance Unit 7 Lesson 1
TSCM50 Figure 135: Price Variance – Material with Unit 7 Lesson 1
Standard Price
TSCM50 Figure 136: Price Variance – Material with MAP Unit 7 Lesson 1
TSCM50 Figure 137: Quantity and Price Variance Unit 7 Lesson 1
TSCM50 Figure 138: PO with Price Quantity Variance Unit 7 Lesson 1
TSCM50 Figure 139: Setting Tolerance Limits Unit 7 Lesson 1
TSCM50 Figure 142: Blocking Due To Quality Inspection Unit 7 Lesson 1
TSCM50 Figure 143: Blocking Due To Amount Unit 7 Lesson 1
TSCM50 Figure 144: Stochastic Block Unit 7 Lesson 1
TSCM50 Figure 145: Manual Blocking Unit 7 Lesson 1
TSCM50 Figure 146: Customizing – Invoice Block Unit 7 Lesson 1
TSCM50

Summary
You should now be able to:

● Enter invoices with variances


● Block an invoice manually
TSCM50 Unit 7 Lesson 2

Lesson 2: Reducing Invoices

Lesson Objectives
After completing this lesson, you will be able to:

● Reduce an invoice
TSCM50 Unit 7 Lesson 2

Lesson Agenda
Learn About:
● Invoice Reduction

● Customizing – Invoice Reduction

Do:
● Reduce an Invoice
TSCM50 Figure 147: Reducing Invoices Unit 7 Lesson 2
TSCM50 Figure 148: Account Movements with Invoice Unit 7 Lesson 2
Reduction
TSCM50 Figure 149: Partial Reduction — Price Variance Unit 7 Lesson 2
TSCM50 Figure 150: Account Movements with Invoice Unit 7 Lesson 2
Reduction Due to Price Variance
TSCM50 Figure 151: Partial Reduction — Quantity Variance Unit 7 Lesson 2
TSCM50 Figure 152: Account Movements with Invoice Unit 7 Lesson 2
Reduction Due to Quantity Variance
TSCM50 Figure 153: Customizing – Invoice Reduction Unit 7 Lesson 2
TSCM50

Summary
You should now be able to:

● Reduce an invoice
TSCM50 Unit 7 Lesson 3

Lesson 3: Handling of Variances Without Reference to an Item

Lesson Objectives
After completing this lesson, you will be able to:

● Post an invoice with a tolerated variance


TSCM50 Unit 7 Lesson 3

Lesson Agenda
Learn About:
● Variances Without Reference to an Item

● Customizing for Vendor-Specific Tolerances

Do:
● Post an Invoice with a Tolerated Variance
TSCM50 Figure 155: Total-Based Invoice Reduction Unit 7 Lesson 3
TSCM50 Figure 156: Total-Based Acceptance Unit 7 Lesson 3
TSCM50 Figure 157: Manual Acceptance Unit 7 Lesson 3
TSCM50 Figure 158: Vendor-Specific Tolerances Unit 7 Lesson 3
TSCM50

Summary
You should now be able to:

● Post an invoice with a tolerated variance


TSCM50 Unit 7 Lesson 4

Lesson 4: Releasing Blocked Invoices

Lesson Objectives
After completing this lesson, you will be able to:

● Release blocked invoices


TSCM50 Unit 7 Lesson 4

Lesson Agenda
Learn About:
● Blocked Invoices

Do:
● Release Blocked Invoices
TSCM50 Figure 160: Blocking Invoices Unit 7 Lesson 4
TSCM50 Figure 161: Releasing Blocked Invoices Unit 7 Lesson 4
TSCM50 Figure 162: Release Invoice Items/Invoices Unit 7 Lesson 4
Manually
TSCM50 Figure 163: Workflow – Releasing Invoices Unit 7 Lesson 4
Blocked Due to Price
TSCM50 Figure 164: Automatic Release Unit 7 Lesson 4
TSCM50

Summary
You should now be able to:

● Release blocked invoices


Unit 8: Subsequent Debit/Credit, Delivery Costs, Credit Memos

Lesson 1: Entering Subsequent Debits/Credits

Lesson 2: Entering Delivery Costs

Lesson 3: Entering Invoices Without Reference to a Purchase Order

Lesson 4: Handling Credit Memos and Reversals


TSCM50 Unit 8 Lesson 1

Lesson 1: Entering Subsequent Debits/Credits

Lesson Objectives
After completing this lesson, you will be able to:

● Enter a subsequent debit


TSCM50 Unit 8 Lesson 1

Lesson Agenda
Learn About:
● Subsequent Debits/Credits

Do:
● Enter a Subsequent Debit
TSCM50 Figure 165: Subsequent Debit Unit 8 Lesson 1
TSCM50 Figure 166: Account Movements with a Unit 8 Lesson 1
Subsequent Debit
TSCM50

Summary
You should now be able to:

● Enter a subsequent debit


TSCM50 Unit 8 Lesson 2

Lesson 2: Entering Delivery Costs

Lesson Objectives
After completing this lesson, you will be able to:

● Enter planned delivery costs

● Enter unplanned delivery costs


TSCM50 Unit 8 Lesson 2

Lesson Agenda
Learn About:
● Delivery Costs

● Planned Delivery Cost

● Unplanned Delivery Costs

Do:
● Enter Planned Delivery Costs

● Enter Unplanned Delivery Costs


TSCM50 Figure 168: Delivery Costs Unit 8 Lesson 2
TSCM50 Figure 169: Planned Delivery Costs Unit 8 Lesson 2
TSCM50 Figure 170: Account Movements with Planned Unit 8 Lesson 2
Delivery Costs
TSCM50 Figure 172: Unplanned Delivery Costs Unit 8 Lesson 2
TSCM50 Figure 173: Distribution of Unplanned Delivery Unit 8 Lesson 2
Costs
TSCM50 Figure 174: Account Movements with Unplanned Unit 8 Lesson 2
Delivery Costs
TSCM50 Figure 175: Customizing - Unplanned Delivery Unit 8 Lesson 2
Costs
TSCM50

Summary
You should now be able to:

● Enter planned delivery costs


● Enter unplanned delivery costs
TSCM50 Unit 8 Lesson 3

Lesson 3: Entering Invoices Without Reference to a Purchase


Order

Lesson Objectives
After completing this lesson, you will be able to:

● Enter an invoice without reference to a purchase order


TSCM50 Unit 8 Lesson 3

Lesson Agenda
Learn About:
● Invoices Without Reference to a Purchase Order

Do:
● Enter an Invoice Without Reference to a Purchase Order
TSCM50 Figure 178: Creating Invoices Without Reference Unit 8 Lesson 3
TSCM50 Figure 179: Direct Posting to a G/L Account Unit 8 Lesson 3
TSCM50 Figure 180: Direct Posting to a Material Unit 8 Lesson 3
TSCM50

Summary
You should now be able to:

● Enter an invoice without reference to a purchase order


TSCM50 Unit 8 Lesson 4

Lesson 4: Handling Credit Memos and Reversals

Lesson Objectives
After completing this lesson, you will be able to:

● Enter a credit memo

● Cancel an invoice
TSCM50 Unit 8 Lesson 4

Lesson Agenda
Learn About:
● Credit Memos

● Reversals

Do:
● Enter a Credit Memo

● Cancel an Invoice
TSCM50 Figure 183: Credit Memos Unit 8 Lesson 4
TSCM50 Figure 186: Reversal Unit 8 Lesson 4
TSCM50

Summary
You should now be able to:

● Enter a credit memo


● Cancel an invoice
Unit 9: Automated processes in Invoice Verification

Lesson 1: Performing Automatic Settlements


TSCM50 Unit 9 Lesson 1

Lesson 1: Performing Automatic Settlements

Lesson Objectives
After completing this lesson, you will be able to:

● Create invoices automatically from goods receipt data

● Execute a vendor consignment settlement

● Execute an invoicing plan settlement

● Describe the EDI process


TSCM50 Unit 9 Lesson 1

Lesson Agenda
Learn About:
● Evaluated Receipt Settlement

● Vendor Consignment

● Invoicing Plan

● EDI - Electronic Data Interchange

Watch:
● How to Execute Vendor Consignment Settlement

● How to Execute an Invoicing Plan Settlement

Do:
● Create Invoices Automatically from Goods Receipt Data
TSCM50 Figure 188: ERS Unit 9 Lesson 1
TSCM50 Figure 189: ERS – Prerequisites Unit 9 Lesson 1
TSCM50 Figure 190: Executing the ERS Unit 9 Lesson 1
TSCM50 Figure 191: Vendor Consignment Unit 9 Lesson 1
TSCM50 Figure 192: Settlement of Withdrawals from Unit 9 Lesson 1
Vendor Consignment Stock
TSCM50 Figure 193: Invoicing Plans Unit 9 Lesson 1
TSCM50 Figure 194: EDI Unit 9 Lesson 1
TSCM50 Figure 195: Customizing for EDI in Invoice Unit 9 Lesson 1
Verification
TSCM50

Summary
You should now be able to:

● Create invoices automatically from goods receipt data


● Execute a vendor consignment settlement
● Execute an invoicing plan settlement
● Describe the EDI process
Unit 10: GR/IR Account Maintenance

Lesson 1: Performing GR/IR Account Maintenance


TSCM50 Unit 10 Lesson 1

Lesson 1: Performing GR/IR Account Maintenance

Lesson Objectives
After completing this lesson, you will be able to:

● Use GR/IR account maintenance functions


TSCM50 Unit 10 Lesson 1

Lesson Agenda
Learn About:
● GR/IR Account Maintenance

Do:
● Use GR/IR Account Maintenance Functions
TSCM50 Figure 196: Quantity Variances Unit 10 Lesson 1
TSCM50 Figure 197: Account Movements with Account Unit 10 Lesson 1
Maintenance
TSCM50

Summary
You should now be able to:

● Use GR/IR account maintenance functions

You might also like