The soil is excavated to the next strut At formation level, the reinforced concrete Site Hoarding
level and the second level strut is installed. slab or base slab is constructed, followed
It continues till the excavation reaches by the removal of the lowest level strut Diverted
Road
the final depth or formation level. The and the side walls are constructed.
number of strut levels depends on the
excavation depth.
of Underground Reinstatement
Structure
Reinstated
CONSTRUCTION OF
First Road
The next level of slab is constructed, After the roof slab is completed, the soil
followed by the removal of the strut near is backfilled to the first strut level before
to that slab level. This process progresses the first level strut is removed. This is
upwards till the roof slab is constructed. followed by completely backfilling the top
The underground retaining wall is installed before The soil is excavated to the first strut level.
of the underground structure. If the
excavation commences. The retaining wall can be The first level strut is installed before the
retaining wall is a diaphragm wall or a
a concrete diaphragm wall, a concrete bored pile excavation proceeds further.
October 2004
bored pile wall, the top 2 metres of the
If you have any suggestions or feedback, wall or a steel sheet pile wall; depending on the
wall will be removed. If it is a sheet pile please call our Customer Service Line: 1800 – CALL LTA site condition, soil type and the excavation depth.
wall, the sheet piles will be extracted. 1800 – 2255 582
Refer to 03.
Augering of Borehole Refer to 05.
Concreting of Borehole
01 . 02 . 03 . 04 . 05 . 06 . 07 .
Position of Bored Pile Installation of Casing Augering of Borehole Installation of Steel Cage Concreting of Borehole Extraction of Casing Repetition of Process
Vibro-
Hammer
Vibro-
Hammer
Completed
Casing Contiguous
Cross-Section View Cross-Section View Cross-Section View Bored Pile Wall
Casing
Position of
Bored Pile to Casing Casing Casing
be Constructed
Bentonite
Slurry
Design Design Design Design Concrete Design Concrete Design Design
Depth Depth Depth Depth Depth Depth Depth
100-200mm
100-200mm
The vibro-hammer drives a casing into The auger, a drilling tool, cuts and removes the soil The crane lifts up the steel cage and places Concrete is poured into the borehole The vibro-hammer extracts the
the ground, leaving about 1 metre length within the casing to form a borehole. The soil it within the borehole. to form the bored pile. casing from the ground.
Wooden pegs are used to mark out the of the casing protruding from the ground. surrounding the borehole is supported by the casing. Steps 2 - 6 are repeated till the entire
center position of each bored pile. The If the casing is not long enough to reach the required length of the contiguous bored pile
gap between two bored piles is typically depth in the ground, bentonite slurry is used to support wall construction is completed.
between 100 to 200 millimetres. the soil below the casing.