You are on page 1of 485

Table Of Contents

Content Page

Chapter 1 : Description of Project …………………………………………………………………….. 1

Chapter 2 : Scope Of Project …………………………………………………………………………….. 9

Chapter 3 : WBS ……………………………………………………………………………………………... 13

Chapter 4 : Bill Of Quantities …………………………………………………………………….……. 96

Chapter 5 : Study Of Alternatives ………………………………………………….……………… 134

Chapter 6 : Method Of Statement ……………………………………………..…………………. 152

Chapter 7 : Activity Coding …………………………………………………………………………... 165

Chapter 8 : Activity Listing ……………………………………………………………………..…….. 168

Chapter 9 : Resource Costing ……………………………………………………………………….. 174

Chapter 10 : Computerized Schedule …………………………………………………………... 176

Chapter 11 : Resource Profile ……………………………………………………………………….. 362

Chapter 12: Cash Flow and S-Curve ………………………………………………………………. 394

Chapter 13 : Quality Management ……………………………………………………………….. 400

Chapter 14 : Safety Plan ……………………………………………………………………………..… 422

Chapter 15 : What- if Scenario …………………………………………………………………..….. 450

Chapter 16 : Contract analysis ……………………………………………………………………... 457

Chapter 17 : Selected Topic (Revit Structure) …………………………………………………. 475


1
Project Discription Chapter 1

Village Garden in Katameya is located in new cairo in Katameya .

The Total area of project is about 285,000 m² and the total cost of the is about 550
million L.E .

Owner of project is Palm Hills

The architect is Shehab A.Mazhar

The general contractor is Orascom Construction Industries

And structural consultant is Adel EL Atar & Talaat Abdel Fattah and electro mechanical
consultant is Crown Home Consultant .

The project Director is E. Khaled Amen and project manager is E. Dalia Ramadan.

2
Project Discription Chapter 1

The Project consist of :


1- 56 Condominium appartments .
2- 79 Villa divided into 2 types :

Villa Type 1 : 55 villa.

Villa Type 2 : 24 villa.

3- 6 Twin house , each twin house consist of 6 symmetric villa.

3
Project Discription Chapter 1

- It consist of 56 unit and area of each unit is 945 m²

- Each unit consist of:

1- Basment .

2- ground floor .

3- 4 typical floor .

-The one floor consist 4 apartment each apartment consist of :

- 2 Bed room
- Living room
- 2 Bathroom
- Dining room
- reception

4
Project Discription Chapter 1

-Total area equal 154 m2

- It consist of :

1- Ground Floor consist of:

- Reception - toilet

- Dining room - Driver room

- 2 bathroom - Nanny room

- kitchen

2- First Floor consist of :

- 3 Bedroom

- Family living

- 2 bath

5
Project Discription Chapter 1

- the total area equal 121 m2 and consist of :


- Ground Floor

- First floor

6
Project Discription Chapter 1

-Total area equal 717 m2

- It consist of 6 villas each villa area is (15×8) and each villa consist of

- Ground Floor

- First Floor

7
Project Discription Chapter 1

8
9
Scope Chapter 2

Project Parameters:

- Project Vision:

Deliver variety of Residential Buildings and villas of different designs and


sizes to fulfill the needs of different clients , all to be integrated with an
infrastructural Network , landscaping forming a massive residential
compound.

Development Objectives:

The scope will consist of designing & supervising the


construction of:

1. 56 condominum and associated Car Parking areas for building's


residents.

2. 79 villas composed of two types : 55 villa for type 1 and 24 for


type 2 .

3. 6 twin houses

10
Scope Chapter 2

Project Scope:
The Project consists of Several activities including:

1. Mobilization

• Surveying.

• Site Cleaning.

2. Earth Works

• Excavation works.

• Backfilling works.

• Grading.

3. Civil works

• Formwork.

• Pouring concrete.

• Reinforcement.

4. Finishing Works

• External painting Works.

• External Masonary.

• Internal Masonary.

• External Calm shell.

11
Scope Chapter 2

5. Electromechanical Works

• External electric works.

6. Sanitary Works

• External Sanitary Systems.

Project Total cost is Approx. 550,000,000 EGP.

Other project activities that are not included in scope:

• Infrastructure systems.

• Internal plumbing and sanitary works.

12
13
Wbs Chapter 3

14
Wbs Chapter 3

15
Wbs Chapter 3

16
Wbs Chapter 3

17
Wbs Chapter 3

18
Wbs Chapter 3

19
Wbs Chapter 3

20
Wbs Chapter 3

21
Wbs Chapter 3

22
Wbs Chapter 3

23
Wbs Chapter 3

24
Wbs Chapter 3

25
Wbs Chapter 3

26
Wbs Chapter 3

27
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG Katamia Village Garden
KVG.Zone 1 Zone 1 01-Feb-14
KVG.Zone 1.Stage 1 stage 1 30-May-12
KVG.Zone 1.Stage Condonminium Appartments-3 30-May-12
KVG.Zone 1.St Mobilization 01-Nov-11
KVG.Zone 1.St Earth Work 31-Dec-11
KVG.Zone 1.St Civil Work 16-May-12
KVG.Zone 1 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 1 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 1 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 1 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 1 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 1 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 1 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 1 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 1.St Mansonary -Jan-12 22-May-12
KVG.Zone 1 Basement -Jan-12 17-Jan-12
KVG.Zone 1 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 1 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 1 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 1 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 1 Fourth Floor 17-May-12 21-May-12
KVG.Zone 1 Roof 22-May-12 22-May-12
KVG.Zone 1.St Finishing 21-Feb-12 30-May-12
KVG.Zone 1 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-May-12 30-May-12
KVG.Zone 1 Marbling 24-May-12 29-May-12
KVG.Zone 1.Stage Condonminium Appartments-4 30-May-12
KVG.Zone 1.St Mobilization 01-Nov-11
KVG.Zone 1.St Earth Work 31-Dec-11
KVG.Zone 1.St Civil Work 16-May-12
KVG.Zone 1 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 1 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 1 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 1 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 1 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 1 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 1 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12

28
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 1.St Mansonary -Jan-12 22-May-12
KVG.Zone 1 Basement -Jan-12 17-Jan-12
KVG.Zone 1 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 1 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 1 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 1 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 1 Fourth Floor 17-May-12 21-May-12
KVG.Zone 1 Roof 22-May-12 22-May-12
KVG.Zone 1.St Finishing 21-Feb-12 30-May-12
KVG.Zone 1 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-May-12 30-May-12
KVG.Zone 1 Marbling 24-May-12 29-May-12
KVG.Zone 1.Stage Condonminium Appartments-5 30-May-12
KVG.Zone 1.St Mobilization 01-Nov-11
KVG.Zone 1.St Earth Work 31-Dec-11
KVG.Zone 1.St Civil Work 16-May-12
KVG.Zone 1 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 1 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 1 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 1 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 1 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 1 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 1 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 1 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 1.St Mansonary -Jan-12 22-May-12
KVG.Zone 1 Basement -Jan-12 17-Jan-12
KVG.Zone 1 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 1 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 1 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 1 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 1 Fourth Floor 17-May-12 21-May-12
KVG.Zone 1 Roof 22-May-12 22-May-12
KVG.Zone 1.St Finishing 21-Feb-12 30-May-12
KVG.Zone 1 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical

29
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1 Painting Cond. 24-May-12 30-May-12
KVG.Zone 1 Marbling 24-May-12 29-May-12
KVG.Zone 1.Stage Condonminium Appartments-6 30-May-12
KVG.Zone 1.St Mobilization 01-Nov-11
KVG.Zone 1.St Earth Work 31-Dec-11
KVG.Zone 1.St Civil Work 16-May-12
KVG.Zone 1 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 1 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 1 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 1 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 1 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 1 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 1 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 1 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 1.St Mansonary -Jan-12 22-May-12
KVG.Zone 1 Basement -Jan-12 17-Jan-12
KVG.Zone 1 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 1 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 1 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 1 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 1 Fourth Floor 17-May-12 21-May-12
KVG.Zone 1 Roof 22-May-12 22-May-12
KVG.Zone 1.St Finishing 21-Feb-12 30-May-12
KVG.Zone 1 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-May-12 30-May-12
KVG.Zone 1 Marbling 24-May-12 29-May-12
KVG.Zone 1.Stage Condonminium Appartments-13 30-May-12
KVG.Zone 1.St Mobilization 01-Nov-11
KVG.Zone 1.St Earth Work 31-Dec-11
KVG.Zone 1.St Civil Work 16-May-12
KVG.Zone 1 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 1 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 1 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 1 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 1 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 1 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 1 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 1 Roof 26-Apr-12 16-May-12

30
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 1.St Mansonary -Jan-12 22-May-12
KVG.Zone 1 Basement -Jan-12 17-Jan-12
KVG.Zone 1 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 1 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 1 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 1 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 1 Fourth Floor 17-May-12 21-May-12
KVG.Zone 1 Roof 22-May-12 22-May-12
KVG.Zone 1.St Finishing 21-Feb-12 30-May-12
KVG.Zone 1 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-May-12 30-May-12
KVG.Zone 1 Marbling 24-May-12 29-May-12
KVG.Zone 1.Stage Condonminium Appartments-14 30-May-12
KVG.Zone 1.St Mobilization 01-Nov-11
KVG.Zone 1.St Earth Work 31-Dec-11
KVG.Zone 1.St Civil Work 16-May-12
KVG.Zone 1 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 1 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 1 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 1 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 1 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 1 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 1 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 1 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 1.St Mansonary -Jan-12 22-May-12
KVG.Zone 1 Basement -Jan-12 17-Jan-12
KVG.Zone 1 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 1 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 1 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 1 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 1 Fourth Floor 17-May-12 21-May-12
KVG.Zone 1 Roof 22-May-12 22-May-12
KVG.Zone 1.St Finishing 21-Feb-12 30-May-12
KVG.Zone 1 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-May-12 30-May-12

31
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1 Marbling 24-May-12 29-May-12
KVG.Zone 1.stage 2 stage 2 31-May-12 02-Jul-13
KVG.Zone 1.stage Condonminium Appartments-43 31-May-12 30-Dec-12
KVG.Zone 1.sta Mobilization 31-May-12 31-May-12
KVG.Zone 1.sta Earth Work 02-Jun-12 25-Jul-12
KVG.Zone 1.sta Civil Work 10-Jun-12 16-Dec-12
KVG.Zone 1 Foundation 10-Jun-12 14-Jul-12
KVG.Zon Footing 10-Jun-12 14-Jul-12
KVG.Z Plain Concrete 10-Jun-12 20-Jun-12
KVG.Z Reinforced Concrete & Semels 21-Jun-12 14-Jul-12
KVG.Zone 1 Basement 15-Jul-12 13-Aug-12
KVG.Zon Slab On Grade 26-Jul-12 13-Aug-12
KVG.Zon Columns 15-Jul-12 23-Jul-12
KVG.Zone 1 Ground Floor 26-Jul-12 26-Aug-12
KVG.Zon Beam and slab 26-Jul-12 09-Aug-12
KVG.Zon Columns 14-Aug-12 26-Aug-12
KVG.Zone 1 First Floor 27-Aug-12 17-Sep-12
KVG.Zon Beams and slab 27-Aug-12 16-Sep-12
KVG.Zon Columns 09-Sep-12 17-Sep-12
KVG.Zone 1 Second Floor 18-Sep-12 09-Oct-12
KVG.Zon Beams and slab 18-Sep-12 08-Oct-12
KVG.Zon Columns 01-Oct-12 09-Oct-12
KVG.Zone 1 Third Floor 10-Oct-12 04-Nov-12
KVG.Zon Beams and slab 10-Oct-12 03-Nov-12
KVG.Zon Columns 23-Oct-12 04-Nov-12
KVG.Zone 1 Fourth Floor 05-Nov-12 26-Nov-12
KVG.Zon Beams and slab 05-Nov-12 25-Nov-12
KVG.Zon Columns 18-Nov-12 26-Nov-12
KVG.Zone 1 Roof 27-Nov-12 16-Dec-12
KVG.Zon Beams and slab 27-Nov-12 16-Dec-12
KVG.Zone 1.sta Mansonary 11-Aug-12 22-Dec-12
KVG.Zone 1 Basement 11-Aug-12 12-Aug-12
KVG.Zone 1 Ground Floor 17-Sep-12 20-Sep-12
KVG.Zone 1 First Floor 09-Oct-12 13-Oct-12
KVG.Zone 1 Second Floor 04-Nov-12 07-Nov-12
KVG.Zone 1 Third Floor 26-Nov-12 29-Nov-12
KVG.Zone 1 Fourth Floor 17-Dec-12 20-Dec-12
KVG.Zone 1 Roof 22-Dec-12 22-Dec-12
KVG.Zone 1.sta Finishing 19-Sep-12 30-Dec-12
KVG.Zone 1 Ground Floor 19-Sep-12 20-Sep-12
KVG.Zon Calm Shell 19-Sep-12 20-Sep-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 11-Oct-12 13-Oct-12
KVG.Zon Calm Shell 11-Oct-12 13-Oct-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 06-Nov-12 07-Nov-12
KVG.Zon Calm Shell 06-Nov-12 07-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Nov-12 29-Nov-12
KVG.Zon Calm Shell 28-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 19-Dec-12 20-Dec-12
KVG.Zon Calm Shell 19-Dec-12 20-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-Dec-12 23-Dec-12
KVG.Zon Calm Shell 23-Dec-12 23-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-Dec-12 30-Dec-12
KVG.Zone 1 Marbling 24-Dec-12 29-Dec-12
KVG.Zone 1.stage Condonminium Appartments-16 31-May-12 02-Jul-13
KVG.Zone 1.sta Mobilization 02-Jun-12 02-Jun-12
KVG.Zone 1.sta Earth Work 10-Jun-12 31-Jan-13
KVG.Zone 1.sta Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 1 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 1 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 1 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 1 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 1 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 1 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 1 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 1 Roof 30-May-13 18-Jun-13

32
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 1.sta Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 1 Basement 17-Feb-13 18-Feb-13
KVG.Zone 1 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 1 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 1 Second Floor 07-May-13 11-May-13
KVG.Zone 1 Third Floor 29-May-13 02-Jun-13
KVG.Zone 1 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 1 Roof 24-Jun-13 24-Jun-13
KVG.Zone 1.sta Finishing 25-Mar-13 02-Jul-13
KVG.Zone 1 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 1 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 1.stage Condonminium Appartments-24 31-May-12 02-Jul-13
KVG.Zone 1.sta Mobilization 02-Jun-12 02-Jun-12
KVG.Zone 1.sta Earth Work 10-Jun-12 31-Jan-13
KVG.Zone 1.sta Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 1 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 1 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 1 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 1 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 1 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 1 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 1 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 1 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 1.sta Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 1 Basement 17-Feb-13 18-Feb-13
KVG.Zone 1 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 1 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 1 Second Floor 07-May-13 11-May-13
KVG.Zone 1 Third Floor 29-May-13 02-Jun-13
KVG.Zone 1 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 1 Roof 24-Jun-13 24-Jun-13
KVG.Zone 1.sta Finishing 25-Mar-13 02-Jul-13
KVG.Zone 1 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jun-13 02-Jul-13

33
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 1.stage Condonminium Appartments-26 31-May-12 02-Jul-13
KVG.Zone 1.sta Mobilization 02-Jun-12 02-Jun-12
KVG.Zone 1.sta Earth Work 10-Jun-12 31-Jan-13
KVG.Zone 1.sta Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 1 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 1 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 1 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 1 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 1 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 1 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 1 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 1 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 1.sta Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 1 Basement 17-Feb-13 18-Feb-13
KVG.Zone 1 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 1 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 1 Second Floor 07-May-13 11-May-13
KVG.Zone 1 Third Floor 29-May-13 02-Jun-13
KVG.Zone 1 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 1 Roof 24-Jun-13 24-Jun-13
KVG.Zone 1.sta Finishing 25-Mar-13 02-Jul-13
KVG.Zone 1 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 1 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 1.stage Condonminium Appartments-34 31-May-12 02-Jul-13
KVG.Zone 1.sta Mobilization 02-Jun-12 02-Jun-12
KVG.Zone 1.sta Earth Work 10-Jun-12 31-Jan-13
KVG.Zone 1.sta Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 1 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 1 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 1 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 1 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 1 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 1 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 1 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 1 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13

34
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1.sta Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 1 Basement 17-Feb-13 18-Feb-13
KVG.Zone 1 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 1 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 1 Second Floor 07-May-13 11-May-13
KVG.Zone 1 Third Floor 29-May-13 02-Jun-13
KVG.Zone 1 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 1 Roof 24-Jun-13 24-Jun-13
KVG.Zone 1.sta Finishing 25-Mar-13 02-Jul-13
KVG.Zone 1 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 1 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 1.stage Condonminium Appartments-36 31-May-12 02-Jul-13
KVG.Zone 1.sta Mobilization 02-Jun-12 02-Jun-12
KVG.Zone 1.sta Earth Work 10-Jun-12 31-Jan-13
KVG.Zone 1.sta Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 1 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 1 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 1 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 1 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 1 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 1 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 1 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 1 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 1.sta Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 1 Basement 17-Feb-13 18-Feb-13
KVG.Zone 1 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 1 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 1 Second Floor 07-May-13 11-May-13
KVG.Zone 1 Third Floor 29-May-13 02-Jun-13
KVG.Zone 1 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 1 Roof 24-Jun-13 24-Jun-13
KVG.Zone 1.sta Finishing 25-Mar-13 02-Jul-13
KVG.Zone 1 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 1 Marbling 26-Jun-13 01-Jul-13

35
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1.stage Condonminium Appartments-44 31-May-12 02-Jul-13
KVG.Zone 1.sta Mobilization 02-Jun-12 02-Jun-12
KVG.Zone 1.sta Earth Work 10-Jun-12 31-Jan-13
KVG.Zone 1.sta Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 1 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 1 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 1 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 1 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 1 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 1 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 1 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 1 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 1.sta Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 1 Basement 17-Feb-13 18-Feb-13
KVG.Zone 1 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 1 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 1 Second Floor 07-May-13 11-May-13
KVG.Zone 1 Third Floor 29-May-13 02-Jun-13
KVG.Zone 1 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 1 Roof 24-Jun-13 24-Jun-13
KVG.Zone 1.sta Finishing 25-Mar-13 02-Jul-13
KVG.Zone 1 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 1 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 1.stage Condonminium Appartments-15 31-May-12 30-Dec-12
KVG.Zone 1.sta Mobilization 31-May-12 31-May-12
KVG.Zone 1.sta Earth Work 02-Jun-12 25-Jul-12
KVG.Zone 1.sta Civil Work 10-Jun-12 16-Dec-12
KVG.Zone 1 Foundation 10-Jun-12 14-Jul-12
KVG.Zon Footing 10-Jun-12 14-Jul-12
KVG.Z Plain Concrete 10-Jun-12 20-Jun-12
KVG.Z Reinforced Concrete & Semels 21-Jun-12 14-Jul-12
KVG.Zone 1 Basement 15-Jul-12 13-Aug-12
KVG.Zon Slab On Grade 26-Jul-12 13-Aug-12
KVG.Zon Columns 15-Jul-12 23-Jul-12
KVG.Zone 1 Ground Floor 26-Jul-12 26-Aug-12
KVG.Zon Beam and slab 26-Jul-12 09-Aug-12
KVG.Zon Columns 14-Aug-12 26-Aug-12
KVG.Zone 1 First Floor 27-Aug-12 17-Sep-12
KVG.Zon Beams and slab 27-Aug-12 16-Sep-12
KVG.Zon Columns 09-Sep-12 17-Sep-12
KVG.Zone 1 Second Floor 18-Sep-12 09-Oct-12
KVG.Zon Beams and slab 18-Sep-12 08-Oct-12
KVG.Zon Columns 01-Oct-12 09-Oct-12
KVG.Zone 1 Third Floor 10-Oct-12 04-Nov-12
KVG.Zon Beams and slab 10-Oct-12 03-Nov-12
KVG.Zon Columns 23-Oct-12 04-Nov-12
KVG.Zone 1 Fourth Floor 05-Nov-12 26-Nov-12
KVG.Zon Beams and slab 05-Nov-12 25-Nov-12
KVG.Zon Columns 18-Nov-12 26-Nov-12
KVG.Zone 1 Roof 27-Nov-12 16-Dec-12
KVG.Zon Beams and slab 27-Nov-12 16-Dec-12
KVG.Zone 1.sta Mansonary 11-Aug-12 22-Dec-12

36
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1 Basement 11-Aug-12 12-Aug-12
KVG.Zone 1 Ground Floor 17-Sep-12 20-Sep-12
KVG.Zone 1 First Floor 09-Oct-12 13-Oct-12
KVG.Zone 1 Second Floor 04-Nov-12 07-Nov-12
KVG.Zone 1 Third Floor 26-Nov-12 29-Nov-12
KVG.Zone 1 Fourth Floor 17-Dec-12 20-Dec-12
KVG.Zone 1 Roof 22-Dec-12 22-Dec-12
KVG.Zone 1.sta Finishing 19-Sep-12 30-Dec-12
KVG.Zone 1 Ground Floor 19-Sep-12 20-Sep-12
KVG.Zon Calm Shell 19-Sep-12 20-Sep-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 11-Oct-12 13-Oct-12
KVG.Zon Calm Shell 11-Oct-12 13-Oct-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 06-Nov-12 07-Nov-12
KVG.Zon Calm Shell 06-Nov-12 07-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Nov-12 29-Nov-12
KVG.Zon Calm Shell 28-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 19-Dec-12 20-Dec-12
KVG.Zon Calm Shell 19-Dec-12 20-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-Dec-12 23-Dec-12
KVG.Zon Calm Shell 23-Dec-12 23-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-Dec-12 30-Dec-12
KVG.Zone 1 Marbling 24-Dec-12 29-Dec-12
KVG.Zone 1.stage Condonminium Appartments-23 31-May-12 30-Dec-12
KVG.Zone 1.sta Mobilization 31-May-12 31-May-12
KVG.Zone 1.sta Earth Work 02-Jun-12 25-Jul-12
KVG.Zone 1.sta Civil Work 10-Jun-12 16-Dec-12
KVG.Zone 1 Foundation 10-Jun-12 14-Jul-12
KVG.Zon Footing 10-Jun-12 14-Jul-12
KVG.Z Plain Concrete 10-Jun-12 20-Jun-12
KVG.Z Reinforced Concrete & Semels 21-Jun-12 14-Jul-12
KVG.Zone 1 Basement 15-Jul-12 13-Aug-12
KVG.Zon Slab On Grade 26-Jul-12 13-Aug-12
KVG.Zon Columns 15-Jul-12 23-Jul-12
KVG.Zone 1 Ground Floor 26-Jul-12 26-Aug-12
KVG.Zon Beam and slab 26-Jul-12 09-Aug-12
KVG.Zon Columns 14-Aug-12 26-Aug-12
KVG.Zone 1 First Floor 27-Aug-12 17-Sep-12
KVG.Zon Beams and slab 27-Aug-12 16-Sep-12
KVG.Zon Columns 09-Sep-12 17-Sep-12
KVG.Zone 1 Second Floor 18-Sep-12 09-Oct-12
KVG.Zon Beams and slab 18-Sep-12 08-Oct-12
KVG.Zon Columns 01-Oct-12 09-Oct-12
KVG.Zone 1 Third Floor 10-Oct-12 04-Nov-12
KVG.Zon Beams and slab 10-Oct-12 03-Nov-12
KVG.Zon Columns 23-Oct-12 04-Nov-12
KVG.Zone 1 Fourth Floor 05-Nov-12 26-Nov-12
KVG.Zon Beams and slab 05-Nov-12 25-Nov-12
KVG.Zon Columns 18-Nov-12 26-Nov-12
KVG.Zone 1 Roof 27-Nov-12 16-Dec-12
KVG.Zon Beams and slab 27-Nov-12 16-Dec-12
KVG.Zone 1.sta Mansonary 11-Aug-12 22-Dec-12
KVG.Zone 1 Basement 11-Aug-12 12-Aug-12
KVG.Zone 1 Ground Floor 17-Sep-12 20-Sep-12
KVG.Zone 1 First Floor 09-Oct-12 13-Oct-12
KVG.Zone 1 Second Floor 04-Nov-12 07-Nov-12
KVG.Zone 1 Third Floor 26-Nov-12 29-Nov-12
KVG.Zone 1 Fourth Floor 17-Dec-12 20-Dec-12
KVG.Zone 1 Roof 22-Dec-12 22-Dec-12
KVG.Zone 1.sta Finishing 19-Sep-12 30-Dec-12
KVG.Zone 1 Ground Floor 19-Sep-12 20-Sep-12
KVG.Zon Calm Shell 19-Sep-12 20-Sep-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 11-Oct-12 13-Oct-12
KVG.Zon Calm Shell 11-Oct-12 13-Oct-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 06-Nov-12 07-Nov-12
KVG.Zon Calm Shell 06-Nov-12 07-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Nov-12 29-Nov-12
KVG.Zon Calm Shell 28-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 19-Dec-12 20-Dec-12
KVG.Zon Calm Shell 19-Dec-12 20-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-Dec-12 23-Dec-12
KVG.Zon Calm Shell 23-Dec-12 23-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-Dec-12 30-Dec-12
KVG.Zone 1 Marbling 24-Dec-12 29-Dec-12
KVG.Zone 1.stage Condonminium Appartments-25 31-May-12 30-Dec-12

37
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1.sta Mobilization 31-May-12 31-May-12
KVG.Zone 1.sta Earth Work 02-Jun-12 25-Jul-12
KVG.Zone 1.sta Civil Work 10-Jun-12 16-Dec-12
KVG.Zone 1 Foundation 10-Jun-12 14-Jul-12
KVG.Zon Footing 10-Jun-12 14-Jul-12
KVG.Z Plain Concrete 10-Jun-12 20-Jun-12
KVG.Z Reinforced Concrete & Semels 21-Jun-12 14-Jul-12
KVG.Zone 1 Basement 15-Jul-12 13-Aug-12
KVG.Zon Slab On Grade 26-Jul-12 13-Aug-12
KVG.Zon Columns 15-Jul-12 23-Jul-12
KVG.Zone 1 Ground Floor 26-Jul-12 26-Aug-12
KVG.Zon Beam and slab 26-Jul-12 09-Aug-12
KVG.Zon Columns 14-Aug-12 26-Aug-12
KVG.Zone 1 First Floor 27-Aug-12 17-Sep-12
KVG.Zon Beams and slab 27-Aug-12 16-Sep-12
KVG.Zon Columns 09-Sep-12 17-Sep-12
KVG.Zone 1 Second Floor 18-Sep-12 09-Oct-12
KVG.Zon Beams and slab 18-Sep-12 08-Oct-12
KVG.Zon Columns 01-Oct-12 09-Oct-12
KVG.Zone 1 Third Floor 10-Oct-12 04-Nov-12
KVG.Zon Beams and slab 10-Oct-12 03-Nov-12
KVG.Zon Columns 23-Oct-12 04-Nov-12
KVG.Zone 1 Fourth Floor 05-Nov-12 26-Nov-12
KVG.Zon Beams and slab 05-Nov-12 25-Nov-12
KVG.Zon Columns 18-Nov-12 26-Nov-12
KVG.Zone 1 Roof 27-Nov-12 16-Dec-12
KVG.Zon Beams and slab 27-Nov-12 16-Dec-12
KVG.Zone 1.sta Mansonary 11-Aug-12 22-Dec-12
KVG.Zone 1 Basement 11-Aug-12 12-Aug-12
KVG.Zone 1 Ground Floor 17-Sep-12 20-Sep-12
KVG.Zone 1 First Floor 09-Oct-12 13-Oct-12
KVG.Zone 1 Second Floor 04-Nov-12 07-Nov-12
KVG.Zone 1 Third Floor 26-Nov-12 29-Nov-12
KVG.Zone 1 Fourth Floor 17-Dec-12 20-Dec-12
KVG.Zone 1 Roof 22-Dec-12 22-Dec-12
KVG.Zone 1.sta Finishing 19-Sep-12 30-Dec-12
KVG.Zone 1 Ground Floor 19-Sep-12 20-Sep-12
KVG.Zon Calm Shell 19-Sep-12 20-Sep-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 11-Oct-12 13-Oct-12
KVG.Zon Calm Shell 11-Oct-12 13-Oct-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 06-Nov-12 07-Nov-12
KVG.Zon Calm Shell 06-Nov-12 07-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Nov-12 29-Nov-12
KVG.Zon Calm Shell 28-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 19-Dec-12 20-Dec-12
KVG.Zon Calm Shell 19-Dec-12 20-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-Dec-12 23-Dec-12
KVG.Zon Calm Shell 23-Dec-12 23-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-Dec-12 30-Dec-12
KVG.Zone 1 Marbling 24-Dec-12 29-Dec-12
KVG.Zone 1.stage Condonminium Appartments-33 31-May-12 30-Dec-12
KVG.Zone 1.sta Mobilization 31-May-12 31-May-12
KVG.Zone 1.sta Earth Work 02-Jun-12 25-Jul-12
KVG.Zone 1.sta Civil Work 10-Jun-12 16-Dec-12
KVG.Zone 1 Foundation 10-Jun-12 14-Jul-12
KVG.Zon Footing 10-Jun-12 14-Jul-12
KVG.Z Plain Concrete 10-Jun-12 20-Jun-12
KVG.Z Reinforced Concrete & Semels 21-Jun-12 14-Jul-12
KVG.Zone 1 Basement 15-Jul-12 13-Aug-12
KVG.Zon Slab On Grade 26-Jul-12 13-Aug-12
KVG.Zon Columns 15-Jul-12 23-Jul-12
KVG.Zone 1 Ground Floor 26-Jul-12 26-Aug-12
KVG.Zon Beam and slab 26-Jul-12 09-Aug-12
KVG.Zon Columns 14-Aug-12 26-Aug-12
KVG.Zone 1 First Floor 27-Aug-12 17-Sep-12
KVG.Zon Beams and slab 27-Aug-12 16-Sep-12
KVG.Zon Columns 09-Sep-12 17-Sep-12
KVG.Zone 1 Second Floor 18-Sep-12 09-Oct-12
KVG.Zon Beams and slab 18-Sep-12 08-Oct-12
KVG.Zon Columns 01-Oct-12 09-Oct-12
KVG.Zone 1 Third Floor 10-Oct-12 04-Nov-12
KVG.Zon Beams and slab 10-Oct-12 03-Nov-12
KVG.Zon Columns 23-Oct-12 04-Nov-12
KVG.Zone 1 Fourth Floor 05-Nov-12 26-Nov-12
KVG.Zon Beams and slab 05-Nov-12 25-Nov-12
KVG.Zon Columns 18-Nov-12 26-Nov-12
KVG.Zone 1 Roof 27-Nov-12 16-Dec-12
KVG.Zon Beams and slab 27-Nov-12 16-Dec-12
KVG.Zone 1.sta Mansonary 11-Aug-12 22-Dec-12
KVG.Zone 1 Basement 11-Aug-12 12-Aug-12

38
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1 Ground Floor 17-Sep-12 20-Sep-12
KVG.Zone 1 First Floor 09-Oct-12 13-Oct-12
KVG.Zone 1 Second Floor 04-Nov-12 07-Nov-12
KVG.Zone 1 Third Floor 26-Nov-12 29-Nov-12
KVG.Zone 1 Fourth Floor 17-Dec-12 20-Dec-12
KVG.Zone 1 Roof 22-Dec-12 22-Dec-12
KVG.Zone 1.sta Finishing 19-Sep-12 30-Dec-12
KVG.Zone 1 Ground Floor 19-Sep-12 20-Sep-12
KVG.Zon Calm Shell 19-Sep-12 20-Sep-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 11-Oct-12 13-Oct-12
KVG.Zon Calm Shell 11-Oct-12 13-Oct-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 06-Nov-12 07-Nov-12
KVG.Zon Calm Shell 06-Nov-12 07-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Nov-12 29-Nov-12
KVG.Zon Calm Shell 28-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 19-Dec-12 20-Dec-12
KVG.Zon Calm Shell 19-Dec-12 20-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-Dec-12 23-Dec-12
KVG.Zon Calm Shell 23-Dec-12 23-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-Dec-12 30-Dec-12
KVG.Zone 1 Marbling 24-Dec-12 29-Dec-12
KVG.Zone 1.stage Condonminium Appartments-35 31-May-12 30-Dec-12
KVG.Zone 1.sta Mobilization 31-May-12 31-May-12
KVG.Zone 1.sta Earth Work 02-Jun-12 25-Jul-12
KVG.Zone 1.sta Civil Work 10-Jun-12 16-Dec-12
KVG.Zone 1 Foundation 10-Jun-12 14-Jul-12
KVG.Zon Footing 10-Jun-12 14-Jul-12
KVG.Z Plain Concrete 10-Jun-12 20-Jun-12
KVG.Z Reinforced Concrete & Semels 21-Jun-12 14-Jul-12
KVG.Zone 1 Basement 15-Jul-12 13-Aug-12
KVG.Zon Slab On Grade 26-Jul-12 13-Aug-12
KVG.Zon Columns 15-Jul-12 23-Jul-12
KVG.Zone 1 Ground Floor 26-Jul-12 26-Aug-12
KVG.Zon Beam and slab 26-Jul-12 09-Aug-12
KVG.Zon Columns 14-Aug-12 26-Aug-12
KVG.Zone 1 First Floor 27-Aug-12 17-Sep-12
KVG.Zon Beams and slab 27-Aug-12 16-Sep-12
KVG.Zon Columns 09-Sep-12 17-Sep-12
KVG.Zone 1 Second Floor 18-Sep-12 09-Oct-12
KVG.Zon Beams and slab 18-Sep-12 08-Oct-12
KVG.Zon Columns 01-Oct-12 09-Oct-12
KVG.Zone 1 Third Floor 10-Oct-12 04-Nov-12
KVG.Zon Beams and slab 10-Oct-12 03-Nov-12
KVG.Zon Columns 23-Oct-12 04-Nov-12
KVG.Zone 1 Fourth Floor 05-Nov-12 26-Nov-12
KVG.Zon Beams and slab 05-Nov-12 25-Nov-12
KVG.Zon Columns 18-Nov-12 26-Nov-12
KVG.Zone 1 Roof 27-Nov-12 16-Dec-12
KVG.Zon Beams and slab 27-Nov-12 16-Dec-12
KVG.Zone 1.sta Mansonary 11-Aug-12 22-Dec-12
KVG.Zone 1 Basement 11-Aug-12 12-Aug-12
KVG.Zone 1 Ground Floor 17-Sep-12 20-Sep-12
KVG.Zone 1 First Floor 09-Oct-12 13-Oct-12
KVG.Zone 1 Second Floor 04-Nov-12 07-Nov-12
KVG.Zone 1 Third Floor 26-Nov-12 29-Nov-12
KVG.Zone 1 Fourth Floor 17-Dec-12 20-Dec-12
KVG.Zone 1 Roof 22-Dec-12 22-Dec-12
KVG.Zone 1.sta Finishing 19-Sep-12 30-Dec-12
KVG.Zone 1 Ground Floor 19-Sep-12 20-Sep-12
KVG.Zon Calm Shell 19-Sep-12 20-Sep-12
KVG.Zon External Electrical
KVG.Zone 1 First Floor 11-Oct-12 13-Oct-12
KVG.Zon Calm Shell 11-Oct-12 13-Oct-12
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 06-Nov-12 07-Nov-12
KVG.Zon Calm Shell 06-Nov-12 07-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 28-Nov-12 29-Nov-12
KVG.Zon Calm Shell 28-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 19-Dec-12 20-Dec-12
KVG.Zon Calm Shell 19-Dec-12 20-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Roof 23-Dec-12 23-Dec-12
KVG.Zon Calm Shell 23-Dec-12 23-Dec-12
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 24-Dec-12 30-Dec-12
KVG.Zone 1 Marbling 24-Dec-12 29-Dec-12
KVG.Zone 1.stage 3 stage 3 03-Jul-13 01-Feb-14
KVG.Zone 1.stage Condonminium Appartments-45 03-Jul-13 01-Feb-14

39
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1.sta Mobilization 03-Jul-13 03-Jul-13
KVG.Zone 1.sta Earth Work 04-Jul-13 29-Aug-13
KVG.Zone 1.sta Civil Work 13-Jul-13 18-Jan-14
KVG.Zone 1 Foundation 13-Jul-13 18-Aug-13
KVG.Zon Footing 13-Jul-13 18-Aug-13
KVG.Z Plain Concrete 13-Jul-13 23-Jul-13
KVG.Z Reinforced Concrete & Semels 24-Jul-13 18-Aug-13
KVG.Zone 1 Basement 19-Aug-13 17-Sep-13
KVG.Zon Slab On Grade 31-Aug-13 17-Sep-13
KVG.Zon Columns 19-Aug-13 27-Aug-13
KVG.Zone 1 Ground Floor 31-Aug-13 26-Sep-13
KVG.Zon Beam and slab 31-Aug-13 14-Sep-13
KVG.Zon Columns 18-Sep-13 26-Sep-13
KVG.Zone 1 First Floor 28-Sep-13 23-Oct-13
KVG.Zon Beams and slab 28-Sep-13 22-Oct-13
KVG.Zon Columns 12-Oct-13 23-Oct-13
KVG.Zone 1 Second Floor 24-Oct-13 14-Nov-13
KVG.Zon Beams and slab 24-Oct-13 13-Nov-13
KVG.Zon Columns 06-Nov-13 14-Nov-13
KVG.Zone 1 Third Floor 16-Nov-13 07-Dec-13
KVG.Zon Beams and slab 16-Nov-13 05-Dec-13
KVG.Zon Columns 28-Nov-13 07-Dec-13
KVG.Zone 1 Fourth Floor 08-Dec-13 29-Dec-13
KVG.Zon Beams and slab 08-Dec-13 28-Dec-13
KVG.Zon Columns 21-Dec-13 29-Dec-13
KVG.Zone 1 Roof 30-Dec-13 18-Jan-14
KVG.Zon Beams and slab 30-Dec-13 18-Jan-14
KVG.Zone 1.sta Mansonary 15-Sep-13 23-Jan-14
KVG.Zone 1 Basement 15-Sep-13 16-Sep-13
KVG.Zone 1 Ground Floor 23-Oct-13 27-Oct-13
KVG.Zone 1 First Floor 14-Nov-13 18-Nov-13
KVG.Zone 1 Second Floor 07-Dec-13 10-Dec-13
KVG.Zone 1 Third Floor 29-Dec-13 01-Jan-14
KVG.Zone 1 Fourth Floor 19-Jan-14 22-Jan-14
KVG.Zone 1 Roof 23-Jan-14 23-Jan-14
KVG.Zone 1.sta Finishing 26-Oct-13 01-Feb-14
KVG.Zone 1 Ground Floor 26-Oct-13 27-Oct-13
KVG.Zon Calm Shell 26-Oct-13 27-Oct-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 17-Nov-13 18-Nov-13
KVG.Zon Calm Shell 17-Nov-13 18-Nov-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-Dec-13 10-Dec-13
KVG.Zon Calm Shell 09-Dec-13 10-Dec-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 31-Dec-13 01-Jan-14
KVG.Zon Calm Shell 31-Dec-13 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 21-Jan-14 22-Jan-14
KVG.Zon Calm Shell 21-Jan-14 22-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jan-14 25-Jan-14
KVG.Zon Calm Shell 25-Jan-14 25-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jan-14 01-Feb-14
KVG.Zone 1 Marbling 26-Jan-14 30-Jan-14
KVG.Zone 1.stage Condonminium Appartments-46 03-Jul-13 01-Feb-14
KVG.Zone 1.sta Mobilization 03-Jul-13 03-Jul-13
KVG.Zone 1.sta Earth Work 04-Jul-13 29-Aug-13
KVG.Zone 1.sta Civil Work 13-Jul-13 18-Jan-14
KVG.Zone 1 Foundation 13-Jul-13 18-Aug-13
KVG.Zon Footing 13-Jul-13 18-Aug-13
KVG.Z Plain Concrete 13-Jul-13 23-Jul-13
KVG.Z Reinforced Concrete & Semels 24-Jul-13 18-Aug-13
KVG.Zone 1 Basement 19-Aug-13 17-Sep-13
KVG.Zon Slab On Grade 31-Aug-13 17-Sep-13
KVG.Zon Columns 19-Aug-13 27-Aug-13
KVG.Zone 1 Ground Floor 31-Aug-13 26-Sep-13
KVG.Zon Beam and slab 31-Aug-13 14-Sep-13
KVG.Zon Columns 18-Sep-13 26-Sep-13
KVG.Zone 1 First Floor 28-Sep-13 23-Oct-13
KVG.Zon Beams and slab 28-Sep-13 22-Oct-13
KVG.Zon Columns 12-Oct-13 23-Oct-13
KVG.Zone 1 Second Floor 24-Oct-13 14-Nov-13
KVG.Zon Beams and slab 24-Oct-13 13-Nov-13
KVG.Zon Columns 06-Nov-13 14-Nov-13
KVG.Zone 1 Third Floor 16-Nov-13 07-Dec-13
KVG.Zon Beams and slab 16-Nov-13 05-Dec-13
KVG.Zon Columns 28-Nov-13 07-Dec-13
KVG.Zone 1 Fourth Floor 08-Dec-13 29-Dec-13
KVG.Zon Beams and slab 08-Dec-13 28-Dec-13
KVG.Zon Columns 21-Dec-13 29-Dec-13
KVG.Zone 1 Roof 30-Dec-13 18-Jan-14
KVG.Zon Beams and slab 30-Dec-13 18-Jan-14
KVG.Zone 1.sta Mansonary 15-Sep-13 23-Jan-14
KVG.Zone 1 Basement 15-Sep-13 16-Sep-13

40
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1 Ground Floor 23-Oct-13 27-Oct-13
KVG.Zone 1 First Floor 14-Nov-13 18-Nov-13
KVG.Zone 1 Second Floor 07-Dec-13 10-Dec-13
KVG.Zone 1 Third Floor 29-Dec-13 01-Jan-14
KVG.Zone 1 Fourth Floor 19-Jan-14 22-Jan-14
KVG.Zone 1 Roof 23-Jan-14 23-Jan-14
KVG.Zone 1.sta Finishing 26-Oct-13 01-Feb-14
KVG.Zone 1 Ground Floor 26-Oct-13 27-Oct-13
KVG.Zon Calm Shell 26-Oct-13 27-Oct-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 17-Nov-13 18-Nov-13
KVG.Zon Calm Shell 17-Nov-13 18-Nov-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-Dec-13 10-Dec-13
KVG.Zon Calm Shell 09-Dec-13 10-Dec-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 31-Dec-13 01-Jan-14
KVG.Zon Calm Shell 31-Dec-13 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 21-Jan-14 22-Jan-14
KVG.Zon Calm Shell 21-Jan-14 22-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jan-14 25-Jan-14
KVG.Zon Calm Shell 25-Jan-14 25-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jan-14 01-Feb-14
KVG.Zone 1 Marbling 26-Jan-14 30-Jan-14
KVG.Zone 1.stage Condonminium Appartments-47 03-Jul-13 01-Feb-14
KVG.Zone 1.sta Mobilization 03-Jul-13 03-Jul-13
KVG.Zone 1.sta Earth Work 04-Jul-13 29-Aug-13
KVG.Zone 1.sta Civil Work 13-Jul-13 18-Jan-14
KVG.Zone 1 Foundation 13-Jul-13 18-Aug-13
KVG.Zon Footing 13-Jul-13 18-Aug-13
KVG.Z Plain Concrete 13-Jul-13 23-Jul-13
KVG.Z Reinforced Concrete & Semels 24-Jul-13 18-Aug-13
KVG.Zone 1 Basement 19-Aug-13 17-Sep-13
KVG.Zon Slab On Grade 31-Aug-13 17-Sep-13
KVG.Zon Columns 19-Aug-13 27-Aug-13
KVG.Zone 1 Ground Floor 31-Aug-13 26-Sep-13
KVG.Zon Beam and slab 31-Aug-13 14-Sep-13
KVG.Zon Columns 18-Sep-13 26-Sep-13
KVG.Zone 1 First Floor 28-Sep-13 23-Oct-13
KVG.Zon Beams and slab 28-Sep-13 22-Oct-13
KVG.Zon Columns 12-Oct-13 23-Oct-13
KVG.Zone 1 Second Floor 24-Oct-13 14-Nov-13
KVG.Zon Beams and slab 24-Oct-13 13-Nov-13
KVG.Zon Columns 06-Nov-13 14-Nov-13
KVG.Zone 1 Third Floor 16-Nov-13 07-Dec-13
KVG.Zon Beams and slab 16-Nov-13 05-Dec-13
KVG.Zon Columns 28-Nov-13 07-Dec-13
KVG.Zone 1 Fourth Floor 08-Dec-13 29-Dec-13
KVG.Zon Beams and slab 08-Dec-13 28-Dec-13
KVG.Zon Columns 21-Dec-13 29-Dec-13
KVG.Zone 1 Roof 30-Dec-13 18-Jan-14
KVG.Zon Beams and slab 30-Dec-13 18-Jan-14
KVG.Zone 1.sta Mansonary 15-Sep-13 23-Jan-14
KVG.Zone 1 Basement 15-Sep-13 16-Sep-13
KVG.Zone 1 Ground Floor 23-Oct-13 27-Oct-13
KVG.Zone 1 First Floor 14-Nov-13 18-Nov-13
KVG.Zone 1 Second Floor 07-Dec-13 10-Dec-13
KVG.Zone 1 Third Floor 29-Dec-13 01-Jan-14
KVG.Zone 1 Fourth Floor 19-Jan-14 22-Jan-14
KVG.Zone 1 Roof 23-Jan-14 23-Jan-14
KVG.Zone 1.sta Finishing 26-Oct-13 01-Feb-14
KVG.Zone 1 Ground Floor 26-Oct-13 27-Oct-13
KVG.Zon Calm Shell 26-Oct-13 27-Oct-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 17-Nov-13 18-Nov-13
KVG.Zon Calm Shell 17-Nov-13 18-Nov-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-Dec-13 10-Dec-13
KVG.Zon Calm Shell 09-Dec-13 10-Dec-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 31-Dec-13 01-Jan-14
KVG.Zon Calm Shell 31-Dec-13 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 21-Jan-14 22-Jan-14
KVG.Zon Calm Shell 21-Jan-14 22-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jan-14 25-Jan-14
KVG.Zon Calm Shell 25-Jan-14 25-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jan-14 01-Feb-14
KVG.Zone 1 Marbling 26-Jan-14 30-Jan-14
KVG.Zone 1.stage Condonminium Appartments-54 03-Jul-13 01-Feb-14
KVG.Zone 1.sta Mobilization 03-Jul-13 03-Jul-13

41
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1.sta Earth Work 04-Jul-13 29-Aug-13
KVG.Zone 1.sta Civil Work 13-Jul-13 18-Jan-14
KVG.Zone 1 Foundation 13-Jul-13 18-Aug-13
KVG.Zon Footing 13-Jul-13 18-Aug-13
KVG.Z Plain Concrete 13-Jul-13 23-Jul-13
KVG.Z Reinforced Concrete & Semels 24-Jul-13 18-Aug-13
KVG.Zone 1 Basement 19-Aug-13 17-Sep-13
KVG.Zon Slab On Grade 31-Aug-13 17-Sep-13
KVG.Zon Columns 19-Aug-13 27-Aug-13
KVG.Zone 1 Ground Floor 31-Aug-13 26-Sep-13
KVG.Zon Beam and slab 31-Aug-13 14-Sep-13
KVG.Zon Columns 18-Sep-13 26-Sep-13
KVG.Zone 1 First Floor 28-Sep-13 23-Oct-13
KVG.Zon Beams and slab 28-Sep-13 22-Oct-13
KVG.Zon Columns 12-Oct-13 23-Oct-13
KVG.Zone 1 Second Floor 24-Oct-13 14-Nov-13
KVG.Zon Beams and slab 24-Oct-13 13-Nov-13
KVG.Zon Columns 06-Nov-13 14-Nov-13
KVG.Zone 1 Third Floor 16-Nov-13 07-Dec-13
KVG.Zon Beams and slab 16-Nov-13 05-Dec-13
KVG.Zon Columns 28-Nov-13 07-Dec-13
KVG.Zone 1 Fourth Floor 08-Dec-13 29-Dec-13
KVG.Zon Beams and slab 08-Dec-13 28-Dec-13
KVG.Zon Columns 21-Dec-13 29-Dec-13
KVG.Zone 1 Roof 30-Dec-13 18-Jan-14
KVG.Zon Beams and slab 30-Dec-13 18-Jan-14
KVG.Zone 1.sta Mansonary 15-Sep-13 23-Jan-14
KVG.Zone 1 Basement 15-Sep-13 16-Sep-13
KVG.Zone 1 Ground Floor 23-Oct-13 27-Oct-13
KVG.Zone 1 First Floor 14-Nov-13 18-Nov-13
KVG.Zone 1 Second Floor 07-Dec-13 10-Dec-13
KVG.Zone 1 Third Floor 29-Dec-13 01-Jan-14
KVG.Zone 1 Fourth Floor 19-Jan-14 22-Jan-14
KVG.Zone 1 Roof 23-Jan-14 23-Jan-14
KVG.Zone 1.sta Finishing 26-Oct-13 01-Feb-14
KVG.Zone 1 Ground Floor 26-Oct-13 27-Oct-13
KVG.Zon Calm Shell 26-Oct-13 27-Oct-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 17-Nov-13 18-Nov-13
KVG.Zon Calm Shell 17-Nov-13 18-Nov-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-Dec-13 10-Dec-13
KVG.Zon Calm Shell 09-Dec-13 10-Dec-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 31-Dec-13 01-Jan-14
KVG.Zon Calm Shell 31-Dec-13 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 21-Jan-14 22-Jan-14
KVG.Zon Calm Shell 21-Jan-14 22-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jan-14 25-Jan-14
KVG.Zon Calm Shell 25-Jan-14 25-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jan-14 01-Feb-14
KVG.Zone 1 Marbling 26-Jan-14 30-Jan-14
KVG.Zone 1.stage Condonminium Appartments-55 03-Jul-13 01-Feb-14
KVG.Zone 1.sta Mobilization 03-Jul-13 03-Jul-13
KVG.Zone 1.sta Earth Work 04-Jul-13 29-Aug-13
KVG.Zone 1.sta Civil Work 13-Jul-13 18-Jan-14
KVG.Zone 1 Foundation 13-Jul-13 18-Aug-13
KVG.Zon Footing 13-Jul-13 18-Aug-13
KVG.Z Plain Concrete 13-Jul-13 23-Jul-13
KVG.Z Reinforced Concrete & Semels 24-Jul-13 18-Aug-13
KVG.Zone 1 Basement 19-Aug-13 17-Sep-13
KVG.Zon Slab On Grade 31-Aug-13 17-Sep-13
KVG.Zon Columns 19-Aug-13 27-Aug-13
KVG.Zone 1 Ground Floor 31-Aug-13 26-Sep-13
KVG.Zon Beam and slab 31-Aug-13 14-Sep-13
KVG.Zon Columns 18-Sep-13 26-Sep-13
KVG.Zone 1 First Floor 28-Sep-13 23-Oct-13
KVG.Zon Beams and slab 28-Sep-13 22-Oct-13
KVG.Zon Columns 12-Oct-13 23-Oct-13
KVG.Zone 1 Second Floor 24-Oct-13 14-Nov-13
KVG.Zon Beams and slab 24-Oct-13 13-Nov-13
KVG.Zon Columns 06-Nov-13 14-Nov-13
KVG.Zone 1 Third Floor 16-Nov-13 07-Dec-13
KVG.Zon Beams and slab 16-Nov-13 05-Dec-13
KVG.Zon Columns 28-Nov-13 07-Dec-13
KVG.Zone 1 Fourth Floor 08-Dec-13 29-Dec-13
KVG.Zon Beams and slab 08-Dec-13 28-Dec-13
KVG.Zon Columns 21-Dec-13 29-Dec-13
KVG.Zone 1 Roof 30-Dec-13 18-Jan-14
KVG.Zon Beams and slab 30-Dec-13 18-Jan-14
KVG.Zone 1.sta Mansonary 15-Sep-13 23-Jan-14
KVG.Zone 1 Basement 15-Sep-13 16-Sep-13
KVG.Zone 1 Ground Floor 23-Oct-13 27-Oct-13

42
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 1 First Floor 14-Nov-13 18-Nov-13
KVG.Zone 1 Second Floor 07-Dec-13 10-Dec-13
KVG.Zone 1 Third Floor 29-Dec-13 01-Jan-14
KVG.Zone 1 Fourth Floor 19-Jan-14 22-Jan-14
KVG.Zone 1 Roof 23-Jan-14 23-Jan-14
KVG.Zone 1.sta Finishing 26-Oct-13 01-Feb-14
KVG.Zone 1 Ground Floor 26-Oct-13 27-Oct-13
KVG.Zon Calm Shell 26-Oct-13 27-Oct-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 17-Nov-13 18-Nov-13
KVG.Zon Calm Shell 17-Nov-13 18-Nov-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-Dec-13 10-Dec-13
KVG.Zon Calm Shell 09-Dec-13 10-Dec-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 31-Dec-13 01-Jan-14
KVG.Zon Calm Shell 31-Dec-13 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 21-Jan-14 22-Jan-14
KVG.Zon Calm Shell 21-Jan-14 22-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jan-14 25-Jan-14
KVG.Zon Calm Shell 25-Jan-14 25-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jan-14 01-Feb-14
KVG.Zone 1 Marbling 26-Jan-14 30-Jan-14
KVG.Zone 1.stage Condonminium Appartments-56 03-Jul-13 01-Feb-14
KVG.Zone 1.sta Mobilization 03-Jul-13 03-Jul-13
KVG.Zone 1.sta Earth Work 04-Jul-13 29-Aug-13
KVG.Zone 1.sta Civil Work 13-Jul-13 18-Jan-14
KVG.Zone 1 Foundation 13-Jul-13 18-Aug-13
KVG.Zon Footing 13-Jul-13 18-Aug-13
KVG.Z Plain Concrete 13-Jul-13 23-Jul-13
KVG.Z Reinforced Concrete & Semels 24-Jul-13 18-Aug-13
KVG.Zone 1 Basement 19-Aug-13 17-Sep-13
KVG.Zon Slab On Grade 31-Aug-13 17-Sep-13
KVG.Zon Columns 19-Aug-13 27-Aug-13
KVG.Zone 1 Ground Floor 31-Aug-13 26-Sep-13
KVG.Zon Beam and slab 31-Aug-13 14-Sep-13
KVG.Zon Columns 18-Sep-13 26-Sep-13
KVG.Zone 1 First Floor 28-Sep-13 23-Oct-13
KVG.Zon Beams and slab 28-Sep-13 22-Oct-13
KVG.Zon Columns 12-Oct-13 23-Oct-13
KVG.Zone 1 Second Floor 24-Oct-13 14-Nov-13
KVG.Zon Beams and slab 24-Oct-13 13-Nov-13
KVG.Zon Columns 06-Nov-13 14-Nov-13
KVG.Zone 1 Third Floor 16-Nov-13 07-Dec-13
KVG.Zon Beams and slab 16-Nov-13 05-Dec-13
KVG.Zon Columns 28-Nov-13 07-Dec-13
KVG.Zone 1 Fourth Floor 08-Dec-13 29-Dec-13
KVG.Zon Beams and slab 08-Dec-13 28-Dec-13
KVG.Zon Columns 21-Dec-13 29-Dec-13
KVG.Zone 1 Roof 30-Dec-13 18-Jan-14
KVG.Zon Beams and slab 30-Dec-13 18-Jan-14
KVG.Zone 1.sta Mansonary 15-Sep-13 23-Jan-14
KVG.Zone 1 Basement 15-Sep-13 16-Sep-13
KVG.Zone 1 Ground Floor 23-Oct-13 27-Oct-13
KVG.Zone 1 First Floor 14-Nov-13 18-Nov-13
KVG.Zone 1 Second Floor 07-Dec-13 10-Dec-13
KVG.Zone 1 Third Floor 29-Dec-13 01-Jan-14
KVG.Zone 1 Fourth Floor 19-Jan-14 22-Jan-14
KVG.Zone 1 Roof 23-Jan-14 23-Jan-14
KVG.Zone 1.sta Finishing 26-Oct-13 01-Feb-14
KVG.Zone 1 Ground Floor 26-Oct-13 27-Oct-13
KVG.Zon Calm Shell 26-Oct-13 27-Oct-13
KVG.Zon External Electrical
KVG.Zone 1 First Floor 17-Nov-13 18-Nov-13
KVG.Zon Calm Shell 17-Nov-13 18-Nov-13
KVG.Zon External Electrical
KVG.Zone 1 Second Floor 09-Dec-13 10-Dec-13
KVG.Zon Calm Shell 09-Dec-13 10-Dec-13
KVG.Zon External Electrical
KVG.Zone 1 Third Floor 31-Dec-13 01-Jan-14
KVG.Zon Calm Shell 31-Dec-13 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Fourth Floor 21-Jan-14 22-Jan-14
KVG.Zon Calm Shell 21-Jan-14 22-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Roof 25-Jan-14 25-Jan-14
KVG.Zon Calm Shell 25-Jan-14 25-Jan-14
KVG.Zon External Electrical
KVG.Zone 1 Painting Cond. 26-Jan-14 01-Feb-14
KVG.Zone 1 Marbling 26-Jan-14 30-Jan-14
KVG.Zone 2 Zone 2
KVG.Zone 2.Stage 1 Stage 1 06-Dec-12
KVG.Zone 2.Stage Condonminium Appartments-1 30-May-12

43
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2.St Mobilization 01-Nov-11
KVG.Zone 2.St Earth Work 31-Dec-11
KVG.Zone 2.St Civil Work 16-May-12
KVG.Zone 2 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 2 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 2 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 2 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 2 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 2 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 2 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 2 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 2.St Mansonary -Jan-12 22-May-12
KVG.Zone 2 Basement -Jan-12 17-Jan-12
KVG.Zone 2 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 2 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 2 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 2 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 2 Fourth Floor 17-May-12 21-May-12
KVG.Zone 2 Roof 22-May-12 22-May-12
KVG.Zone 2.St Finishing 21-Feb-12 30-May-12
KVG.Zone 2 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 24-May-12 30-May-12
KVG.Zone 2 Marbling 24-May-12 29-May-12
KVG.Zone 2.Stage Condonminium Appartments-2 06-Dec-12
KVG.Zone 2.St Mobilization 02-Nov-11
KVG.Zone 2.St Earth Work 02-Jul-12
KVG.Zone 2.St Civil Work 17-May-12 22-Nov-12
KVG.Zone 2 Foundation 17-May-12 20-Jun-12
KVG.Zon Footing 17-May-12 20-Jun-12
KVG.Z Plain Concrete 17-May-12 28-May-12
KVG.Z Reinforced Concrete & Semels 29-May-12 20-Jun-12
KVG.Zone 2 Basement 21-Jun-12 21-Jul-12
KVG.Zon Slab On Grade 03-Jul-12 21-Jul-12
KVG.Zon Columns 21-Jun-12 30-Jun-12
KVG.Zone 2 Ground Floor 03-Jul-12 30-Jul-12
KVG.Zon Beam and slab 03-Jul-12 17-Jul-12
KVG.Zon Columns 22-Jul-12 30-Jul-12
KVG.Zone 2 First Floor 31-Jul-12 25-Aug-12
KVG.Zon Beams and slab 31-Jul-12 23-Aug-12
KVG.Zon Columns 13-Aug-12 25-Aug-12
KVG.Zone 2 Second Floor 26-Aug-12 16-Sep-12
KVG.Zon Beams and slab 26-Aug-12 15-Sep-12
KVG.Zon Columns 08-Sep-12 16-Sep-12
KVG.Zone 2 Third Floor 17-Sep-12 08-Oct-12
KVG.Zon Beams and slab 17-Sep-12 07-Oct-12
KVG.Zon Columns 30-Sep-12 08-Oct-12
KVG.Zone 2 Fourth Floor 09-Oct-12 03-Nov-12
KVG.Zon Beams and slab 09-Oct-12 01-Nov-12
KVG.Zon Columns 22-Oct-12 03-Nov-12
KVG.Zone 2 Roof 04-Nov-12 22-Nov-12
KVG.Zon Beams and slab 04-Nov-12 22-Nov-12
KVG.Zone 2.St Mansonary 18-Jul-12 28-Nov-12
KVG.Zone 2 Basement 18-Jul-12 19-Jul-12

44
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 Ground Floor 25-Aug-12 28-Aug-12
KVG.Zone 2 First Floor 16-Sep-12 19-Sep-12
KVG.Zone 2 Second Floor 08-Oct-12 11-Oct-12
KVG.Zone 2 Third Floor 03-Nov-12 06-Nov-12
KVG.Zone 2 Fourth Floor 24-Nov-12 27-Nov-12
KVG.Zone 2 Roof 28-Nov-12 28-Nov-12
KVG.Zone 2.St Finishing 27-Aug-12 06-Dec-12
KVG.Zone 2 Ground Floor 27-Aug-12 28-Aug-12
KVG.Zon Calm Shell 27-Aug-12 28-Aug-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 18-Sep-12 19-Sep-12
KVG.Zon Calm Shell 18-Sep-12 19-Sep-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 10-Oct-12 11-Oct-12
KVG.Zon Calm Shell 10-Oct-12 11-Oct-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 05-Nov-12 06-Nov-12
KVG.Zon Calm Shell 05-Nov-12 06-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 26-Nov-12 27-Nov-12
KVG.Zon Calm Shell 26-Nov-12 27-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 29-Nov-12 29-Nov-12
KVG.Zon Calm Shell 29-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 01-Dec-12 06-Dec-12
KVG.Zone 2 Marbling 01-Dec-12 05-Dec-12
KVG.Zone 2.Stage Condonminium Appartments-7 30-May-12
KVG.Zone 2.St Mobilization 01-Nov-11
KVG.Zone 2.St Earth Work 31-Dec-11
KVG.Zone 2.St Civil Work 16-May-12
KVG.Zone 2 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 2 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 2 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 2 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 2 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 2 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 2 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 2 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 2.St Mansonary -Jan-12 22-May-12
KVG.Zone 2 Basement -Jan-12 17-Jan-12
KVG.Zone 2 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 2 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 2 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 2 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 2 Fourth Floor 17-May-12 21-May-12
KVG.Zone 2 Roof 22-May-12 22-May-12
KVG.Zone 2.St Finishing 21-Feb-12 30-May-12
KVG.Zone 2 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 24-May-12 30-May-12
KVG.Zone 2 Marbling 24-May-12 29-May-12
KVG.Zone 2.Stage Condonminium Appartments-8 06-Dec-12
KVG.Zone 2.St Mobilization 02-Nov-11

45
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2.St Earth Work 02-Jul-12
KVG.Zone 2.St Civil Work 17-May-12 22-Nov-12
KVG.Zone 2 Foundation 17-May-12 20-Jun-12
KVG.Zon Footing 17-May-12 20-Jun-12
KVG.Z Plain Concrete 17-May-12 28-May-12
KVG.Z Reinforced Concrete & Semels 29-May-12 20-Jun-12
KVG.Zone 2 Basement 21-Jun-12 21-Jul-12
KVG.Zon Slab On Grade 03-Jul-12 21-Jul-12
KVG.Zon Columns 21-Jun-12 30-Jun-12
KVG.Zone 2 Ground Floor 03-Jul-12 30-Jul-12
KVG.Zon Beam and slab 03-Jul-12 17-Jul-12
KVG.Zon Columns 22-Jul-12 30-Jul-12
KVG.Zone 2 First Floor 31-Jul-12 25-Aug-12
KVG.Zon Beams and slab 31-Jul-12 23-Aug-12
KVG.Zon Columns 13-Aug-12 25-Aug-12
KVG.Zone 2 Second Floor 26-Aug-12 16-Sep-12
KVG.Zon Beams and slab 26-Aug-12 15-Sep-12
KVG.Zon Columns 08-Sep-12 16-Sep-12
KVG.Zone 2 Third Floor 17-Sep-12 08-Oct-12
KVG.Zon Beams and slab 17-Sep-12 07-Oct-12
KVG.Zon Columns 30-Sep-12 08-Oct-12
KVG.Zone 2 Fourth Floor 09-Oct-12 03-Nov-12
KVG.Zon Beams and slab 09-Oct-12 01-Nov-12
KVG.Zon Columns 22-Oct-12 03-Nov-12
KVG.Zone 2 Roof 04-Nov-12 22-Nov-12
KVG.Zon Beams and slab 04-Nov-12 22-Nov-12
KVG.Zone 2.St Mansonary 18-Jul-12 28-Nov-12
KVG.Zone 2 Basement 18-Jul-12 19-Jul-12
KVG.Zone 2 Ground Floor 25-Aug-12 28-Aug-12
KVG.Zone 2 First Floor 16-Sep-12 19-Sep-12
KVG.Zone 2 Second Floor 08-Oct-12 11-Oct-12
KVG.Zone 2 Third Floor 03-Nov-12 06-Nov-12
KVG.Zone 2 Fourth Floor 24-Nov-12 27-Nov-12
KVG.Zone 2 Roof 28-Nov-12 28-Nov-12
KVG.Zone 2.St Finishing 27-Aug-12 06-Dec-12
KVG.Zone 2 Ground Floor 27-Aug-12 28-Aug-12
KVG.Zon Calm Shell 27-Aug-12 28-Aug-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 18-Sep-12 19-Sep-12
KVG.Zon Calm Shell 18-Sep-12 19-Sep-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 10-Oct-12 11-Oct-12
KVG.Zon Calm Shell 10-Oct-12 11-Oct-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 05-Nov-12 06-Nov-12
KVG.Zon Calm Shell 05-Nov-12 06-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 26-Nov-12 27-Nov-12
KVG.Zon Calm Shell 26-Nov-12 27-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 29-Nov-12 29-Nov-12
KVG.Zon Calm Shell 29-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 01-Dec-12 06-Dec-12
KVG.Zone 2 Marbling 01-Dec-12 05-Dec-12
KVG.Zone 2.Stage Condonminium Appartments-9 30-May-12
KVG.Zone 2.St Mobilization 01-Nov-11
KVG.Zone 2.St Earth Work 31-Dec-11
KVG.Zone 2.St Civil Work 16-May-12
KVG.Zone 2 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 2 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 2 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 2 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 2 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 2 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 2 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 2 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 2.St Mansonary -Jan-12 22-May-12
KVG.Zone 2 Basement -Jan-12 17-Jan-12
KVG.Zone 2 Ground Floor 19-Feb-12 22-Feb-12

46
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 2 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 2 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 2 Fourth Floor 17-May-12 21-May-12
KVG.Zone 2 Roof 22-May-12 22-May-12
KVG.Zone 2.St Finishing 21-Feb-12 30-May-12
KVG.Zone 2 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 24-May-12 30-May-12
KVG.Zone 2 Marbling 24-May-12 29-May-12
KVG.Zone 2.Stage Condonminium Appartments-10 06-Dec-12
KVG.Zone 2.St Mobilization 02-Nov-11
KVG.Zone 2.St Earth Work 02-Jul-12
KVG.Zone 2.St Civil Work 17-May-12 22-Nov-12
KVG.Zone 2 Foundation 17-May-12 20-Jun-12
KVG.Zon Footing 17-May-12 20-Jun-12
KVG.Z Plain Concrete 17-May-12 28-May-12
KVG.Z Reinforced Concrete & Semels 29-May-12 20-Jun-12
KVG.Zone 2 Basement 21-Jun-12 21-Jul-12
KVG.Zon Slab On Grade 03-Jul-12 21-Jul-12
KVG.Zon Columns 21-Jun-12 30-Jun-12
KVG.Zone 2 Ground Floor 03-Jul-12 30-Jul-12
KVG.Zon Beam and slab 03-Jul-12 17-Jul-12
KVG.Zon Columns 22-Jul-12 30-Jul-12
KVG.Zone 2 First Floor 31-Jul-12 25-Aug-12
KVG.Zon Beams and slab 31-Jul-12 23-Aug-12
KVG.Zon Columns 13-Aug-12 25-Aug-12
KVG.Zone 2 Second Floor 26-Aug-12 16-Sep-12
KVG.Zon Beams and slab 26-Aug-12 15-Sep-12
KVG.Zon Columns 08-Sep-12 16-Sep-12
KVG.Zone 2 Third Floor 17-Sep-12 08-Oct-12
KVG.Zon Beams and slab 17-Sep-12 07-Oct-12
KVG.Zon Columns 30-Sep-12 08-Oct-12
KVG.Zone 2 Fourth Floor 09-Oct-12 03-Nov-12
KVG.Zon Beams and slab 09-Oct-12 01-Nov-12
KVG.Zon Columns 22-Oct-12 03-Nov-12
KVG.Zone 2 Roof 04-Nov-12 22-Nov-12
KVG.Zon Beams and slab 04-Nov-12 22-Nov-12
KVG.Zone 2.St Mansonary 18-Jul-12 28-Nov-12
KVG.Zone 2 Basement 18-Jul-12 19-Jul-12
KVG.Zone 2 Ground Floor 25-Aug-12 28-Aug-12
KVG.Zone 2 First Floor 16-Sep-12 19-Sep-12
KVG.Zone 2 Second Floor 08-Oct-12 11-Oct-12
KVG.Zone 2 Third Floor 03-Nov-12 06-Nov-12
KVG.Zone 2 Fourth Floor 24-Nov-12 27-Nov-12
KVG.Zone 2 Roof 28-Nov-12 28-Nov-12
KVG.Zone 2.St Finishing 27-Aug-12 06-Dec-12
KVG.Zone 2 Ground Floor 27-Aug-12 28-Aug-12
KVG.Zon Calm Shell 27-Aug-12 28-Aug-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 18-Sep-12 19-Sep-12
KVG.Zon Calm Shell 18-Sep-12 19-Sep-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 10-Oct-12 11-Oct-12
KVG.Zon Calm Shell 10-Oct-12 11-Oct-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 05-Nov-12 06-Nov-12
KVG.Zon Calm Shell 05-Nov-12 06-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 26-Nov-12 27-Nov-12
KVG.Zon Calm Shell 26-Nov-12 27-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 29-Nov-12 29-Nov-12
KVG.Zon Calm Shell 29-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 01-Dec-12 06-Dec-12
KVG.Zone 2 Marbling 01-Dec-12 05-Dec-12
KVG.Zone 2.Stage Condonminium Appartments-11 30-May-12
KVG.Zone 2.St Mobilization 01-Nov-11
KVG.Zone 2.St Earth Work 31-Dec-11

47
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2.St Civil Work 16-May-12
KVG.Zone 2 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 2 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 2 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 2 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 2 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 2 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 2 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 2 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 2.St Mansonary -Jan-12 22-May-12
KVG.Zone 2 Basement -Jan-12 17-Jan-12
KVG.Zone 2 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 2 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 2 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 2 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 2 Fourth Floor 17-May-12 21-May-12
KVG.Zone 2 Roof 22-May-12 22-May-12
KVG.Zone 2.St Finishing 21-Feb-12 30-May-12
KVG.Zone 2 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 24-May-12 30-May-12
KVG.Zone 2 Marbling 24-May-12 29-May-12
KVG.Zone 2.Stage Condonminium Appartments-12 06-Dec-12
KVG.Zone 2.St Mobilization 02-Nov-11
KVG.Zone 2.St Earth Work 02-Jul-12
KVG.Zone 2.St Civil Work 17-May-12 22-Nov-12
KVG.Zone 2 Foundation 17-May-12 20-Jun-12
KVG.Zon Footing 17-May-12 20-Jun-12
KVG.Z Plain Concrete 17-May-12 28-May-12
KVG.Z Reinforced Concrete & Semels 29-May-12 20-Jun-12
KVG.Zone 2 Basement 21-Jun-12 21-Jul-12
KVG.Zon Slab On Grade 03-Jul-12 21-Jul-12
KVG.Zon Columns 21-Jun-12 30-Jun-12
KVG.Zone 2 Ground Floor 03-Jul-12 30-Jul-12
KVG.Zon Beam and slab 03-Jul-12 17-Jul-12
KVG.Zon Columns 22-Jul-12 30-Jul-12
KVG.Zone 2 First Floor 31-Jul-12 25-Aug-12
KVG.Zon Beams and slab 31-Jul-12 23-Aug-12
KVG.Zon Columns 13-Aug-12 25-Aug-12
KVG.Zone 2 Second Floor 26-Aug-12 16-Sep-12
KVG.Zon Beams and slab 26-Aug-12 15-Sep-12
KVG.Zon Columns 08-Sep-12 16-Sep-12
KVG.Zone 2 Third Floor 17-Sep-12 08-Oct-12
KVG.Zon Beams and slab 17-Sep-12 07-Oct-12
KVG.Zon Columns 30-Sep-12 08-Oct-12
KVG.Zone 2 Fourth Floor 09-Oct-12 03-Nov-12
KVG.Zon Beams and slab 09-Oct-12 01-Nov-12
KVG.Zon Columns 22-Oct-12 03-Nov-12
KVG.Zone 2 Roof 04-Nov-12 22-Nov-12
KVG.Zon Beams and slab 04-Nov-12 22-Nov-12
KVG.Zone 2.St Mansonary 18-Jul-12 28-Nov-12
KVG.Zone 2 Basement 18-Jul-12 19-Jul-12
KVG.Zone 2 Ground Floor 25-Aug-12 28-Aug-12
KVG.Zone 2 First Floor 16-Sep-12 19-Sep-12

48
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 Second Floor 08-Oct-12 11-Oct-12
KVG.Zone 2 Third Floor 03-Nov-12 06-Nov-12
KVG.Zone 2 Fourth Floor 24-Nov-12 27-Nov-12
KVG.Zone 2 Roof 28-Nov-12 28-Nov-12
KVG.Zone 2.St Finishing 27-Aug-12 06-Dec-12
KVG.Zone 2 Ground Floor 27-Aug-12 28-Aug-12
KVG.Zon Calm Shell 27-Aug-12 28-Aug-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 18-Sep-12 19-Sep-12
KVG.Zon Calm Shell 18-Sep-12 19-Sep-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 10-Oct-12 11-Oct-12
KVG.Zon Calm Shell 10-Oct-12 11-Oct-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 05-Nov-12 06-Nov-12
KVG.Zon Calm Shell 05-Nov-12 06-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 26-Nov-12 27-Nov-12
KVG.Zon Calm Shell 26-Nov-12 27-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 29-Nov-12 29-Nov-12
KVG.Zon Calm Shell 29-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 01-Dec-12 06-Dec-12
KVG.Zone 2 Marbling 01-Dec-12 05-Dec-12
KVG.Zone 2.Stage Condonminium Appartments-17 30-May-12
KVG.Zone 2.St Mobilization 01-Nov-11
KVG.Zone 2.St Earth Work 31-Dec-11
KVG.Zone 2.St Civil Work 16-May-12
KVG.Zone 2 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 2 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 2 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 2 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 2 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 2 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 2 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 2 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 2.St Mansonary -Jan-12 22-May-12
KVG.Zone 2 Basement -Jan-12 17-Jan-12
KVG.Zone 2 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 2 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 2 Second Floor 03-Apr-12 07-Apr-12
KVG.Zone 2 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 2 Fourth Floor 17-May-12 21-May-12
KVG.Zone 2 Roof 22-May-12 22-May-12
KVG.Zone 2.St Finishing 21-Feb-12 30-May-12
KVG.Zone 2 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 24-May-12 30-May-12
KVG.Zone 2 Marbling 24-May-12 29-May-12
KVG.Zone 2.Stage Condonminium Appartments-18 06-Dec-12
KVG.Zone 2.St Mobilization 02-Nov-11
KVG.Zone 2.St Earth Work 02-Jul-12
KVG.Zone 2.St Civil Work 17-May-12 22-Nov-12

49
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 Foundation 17-May-12 20-Jun-12
KVG.Zon Footing 17-May-12 20-Jun-12
KVG.Z Plain Concrete 17-May-12 28-May-12
KVG.Z Reinforced Concrete & Semels 29-May-12 20-Jun-12
KVG.Zone 2 Basement 21-Jun-12 21-Jul-12
KVG.Zon Slab On Grade 03-Jul-12 21-Jul-12
KVG.Zon Columns 21-Jun-12 30-Jun-12
KVG.Zone 2 Ground Floor 03-Jul-12 30-Jul-12
KVG.Zon Beam and slab 03-Jul-12 17-Jul-12
KVG.Zon Columns 22-Jul-12 30-Jul-12
KVG.Zone 2 First Floor 31-Jul-12 25-Aug-12
KVG.Zon Beams and slab 31-Jul-12 23-Aug-12
KVG.Zon Columns 13-Aug-12 25-Aug-12
KVG.Zone 2 Second Floor 26-Aug-12 16-Sep-12
KVG.Zon Beams and slab 26-Aug-12 15-Sep-12
KVG.Zon Columns 08-Sep-12 16-Sep-12
KVG.Zone 2 Third Floor 17-Sep-12 08-Oct-12
KVG.Zon Beams and slab 17-Sep-12 07-Oct-12
KVG.Zon Columns 30-Sep-12 08-Oct-12
KVG.Zone 2 Fourth Floor 09-Oct-12 03-Nov-12
KVG.Zon Beams and slab 09-Oct-12 01-Nov-12
KVG.Zon Columns 22-Oct-12 03-Nov-12
KVG.Zone 2 Roof 04-Nov-12 22-Nov-12
KVG.Zon Beams and slab 04-Nov-12 22-Nov-12
KVG.Zone 2.St Mansonary 18-Jul-12 28-Nov-12
KVG.Zone 2 Basement 18-Jul-12 19-Jul-12
KVG.Zone 2 Ground Floor 25-Aug-12 28-Aug-12
KVG.Zone 2 First Floor 16-Sep-12 19-Sep-12
KVG.Zone 2 Second Floor 08-Oct-12 11-Oct-12
KVG.Zone 2 Third Floor 03-Nov-12 06-Nov-12
KVG.Zone 2 Fourth Floor 24-Nov-12 27-Nov-12
KVG.Zone 2 Roof 28-Nov-12 28-Nov-12
KVG.Zone 2.St Finishing 27-Aug-12 06-Dec-12
KVG.Zone 2 Ground Floor 27-Aug-12 28-Aug-12
KVG.Zon Calm Shell 27-Aug-12 28-Aug-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 18-Sep-12 19-Sep-12
KVG.Zon Calm Shell 18-Sep-12 19-Sep-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 10-Oct-12 11-Oct-12
KVG.Zon Calm Shell 10-Oct-12 11-Oct-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 05-Nov-12 06-Nov-12
KVG.Zon Calm Shell 05-Nov-12 06-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 26-Nov-12 27-Nov-12
KVG.Zon Calm Shell 26-Nov-12 27-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 29-Nov-12 29-Nov-12
KVG.Zon Calm Shell 29-Nov-12 29-Nov-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 01-Dec-12 06-Dec-12
KVG.Zone 2 Marbling 01-Dec-12 05-Dec-12
KVG.Zone 2.Stage Condonminium Appartments-19 30-May-12
KVG.Zone 2.St Mobilization 01-Nov-11
KVG.Zone 2.St Earth Work 31-Dec-11
KVG.Zone 2.St Civil Work 16-May-12
KVG.Zone 2 Foundation 19-Dec-11
KVG.Zon Footing 19-Dec-11
KVG.Z Plain Concrete 26-Nov-11
KVG.Z Reinforced Concrete & Semels 1 19-Dec-11
KVG.Zone 2 Basement c-11 18-Jan-12
KVG.Zon Slab On Grade an-12 18-Jan-12
KVG.Zon Columns c-11 28-Dec-11
KVG.Zone 2 Ground Floor an-12 28-Jan-12
KVG.Zon Beam and slab an-12 15-Jan-12
KVG.Zon Columns -Jan-12 28-Jan-12
KVG.Zone 2 First Floor 9-Jan-12 19-Feb-12
KVG.Zon Beams and slab 9-Jan-12 18-Feb-12
KVG.Zon Columns 11-Feb-12 19-Feb-12
KVG.Zone 2 Second Floor 20-Feb-12 12-Mar-12
KVG.Zon Beams and slab 20-Feb-12 11-Mar-12
KVG.Zon Columns 04-Mar-12 12-Mar-12
KVG.Zone 2 Third Floor 13-Mar-12 03-Apr-12
KVG.Zon Beams and slab 13-Mar-12 02-Apr-12
KVG.Zon Columns 26-Mar-12 03-Apr-12
KVG.Zone 2 Fourth Floor 04-Apr-12 25-Apr-12
KVG.Zon Beams and slab 04-Apr-12 24-Apr-12
KVG.Zon Columns 17-Apr-12 25-Apr-12
KVG.Zone 2 Roof 26-Apr-12 16-May-12
KVG.Zon Beams and slab 26-Apr-12 16-May-12
KVG.Zone 2.St Mansonary -Jan-12 22-May-12
KVG.Zone 2 Basement -Jan-12 17-Jan-12
KVG.Zone 2 Ground Floor 19-Feb-12 22-Feb-12
KVG.Zone 2 First Floor 12-Mar-12 15-Mar-12
KVG.Zone 2 Second Floor 03-Apr-12 07-Apr-12

50
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 Third Floor 25-Apr-12 29-Apr-12
KVG.Zone 2 Fourth Floor 17-May-12 21-May-12
KVG.Zone 2 Roof 22-May-12 22-May-12
KVG.Zone 2.St Finishing 21-Feb-12 30-May-12
KVG.Zone 2 Ground Floor 21-Feb-12 22-Feb-12
KVG.Zon Calm Shell 21-Feb-12 22-Feb-12
KVG.Zon External Electrical
KVG.Zone 2 First Floor 14-Mar-12 15-Mar-12
KVG.Zon Calm Shell 14-Mar-12 15-Mar-12
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 05-Apr-12 07-Apr-12
KVG.Zon Calm Shell 05-Apr-12 07-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 28-Apr-12 29-Apr-12
KVG.Zon Calm Shell 28-Apr-12 29-Apr-12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 20-May-12 21-May-12
KVG.Zon Calm Shell 20-May-12 21-May-12
KVG.Zon External Electrical
KVG.Zone 2 Roof 23-May-12 23-May-12
KVG.Zon Calm Shell 23-May-12 23-May-12
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 24-May-12 30-May-12
KVG.Zone 2 Marbling 24-May-12 29-May-12
KVG.Zone 2.Stage 2 Stage 2 08-Dec-12 08-Jan-14
KVG.Zone 2.Stage Condonminium Appartments-20 08-Dec-12 02-Jul-13
KVG.Zone 2.St Mobilization 08-Dec-12 08-Dec-12
KVG.Zone 2.St Earth Work 09-Dec-12 31-Jan-13
KVG.Zone 2.St Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 2 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 2 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 2 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 2 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 2 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 2 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 2 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 2 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 2.St Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 2 Basement 17-Feb-13 18-Feb-13
KVG.Zone 2 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 2 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 2 Second Floor 07-May-13 11-May-13
KVG.Zone 2 Third Floor 29-May-13 02-Jun-13
KVG.Zone 2 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 2 Roof 24-Jun-13 24-Jun-13
KVG.Zone 2.St Finishing 25-Mar-13 02-Jul-13
KVG.Zone 2 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 2 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 2.Stage Condonminium Appartments-21 08-Dec-12 08-Jan-14
KVG.Zone 2.St Mobilization 09-Dec-12 09-Dec-12
KVG.Zone 2.St Earth Work 17-Dec-12 04-Aug-13
KVG.Zone 2.St Civil Work 19-Jun-13 25-Dec-13

51
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 Foundation 19-Jun-13 23-Jul-13
KVG.Zon Footing 19-Jun-13 23-Jul-13
KVG.Z Plain Concrete 19-Jun-13 30-Jun-13
KVG.Z Reinforced Concrete & Semels 01-Jul-13 23-Jul-13
KVG.Zone 2 Basement 24-Jul-13 25-Aug-13
KVG.Zon Slab On Grade 05-Aug-13 25-Aug-13
KVG.Zon Columns 24-Jul-13 01-Aug-13
KVG.Zone 2 Ground Floor 05-Aug-13 03-Sep-13
KVG.Zon Beam and slab 05-Aug-13 21-Aug-13
KVG.Zon Columns 26-Aug-13 03-Sep-13
KVG.Zone 2 First Floor 04-Sep-13 25-Sep-13
KVG.Zon Beams and slab 04-Sep-13 24-Sep-13
KVG.Zon Columns 17-Sep-13 25-Sep-13
KVG.Zone 2 Second Floor 26-Sep-13 22-Oct-13
KVG.Zon Beams and slab 26-Sep-13 21-Oct-13
KVG.Zon Columns 10-Oct-13 22-Oct-13
KVG.Zone 2 Third Floor 23-Oct-13 13-Nov-13
KVG.Zon Beams and slab 23-Oct-13 12-Nov-13
KVG.Zon Columns 05-Nov-13 13-Nov-13
KVG.Zone 2 Fourth Floor 14-Nov-13 05-Dec-13
KVG.Zon Beams and slab 14-Nov-13 04-Dec-13
KVG.Zon Columns 27-Nov-13 05-Dec-13
KVG.Zone 2 Roof 07-Dec-13 25-Dec-13
KVG.Zon Beams and slab 07-Dec-13 25-Dec-13
KVG.Zone 2.St Mansonary 22-Aug-13 31-Dec-13
KVG.Zone 2 Basement 22-Aug-13 24-Aug-13
KVG.Zone 2 Ground Floor 25-Sep-13 29-Sep-13
KVG.Zone 2 First Floor 22-Oct-13 26-Oct-13
KVG.Zone 2 Second Floor 13-Nov-13 17-Nov-13
KVG.Zone 2 Third Floor 05-Dec-13 09-Dec-13
KVG.Zone 2 Fourth Floor 26-Dec-13 30-Dec-13
KVG.Zone 2 Roof 31-Dec-13 31-Dec-13
KVG.Zone 2.St Finishing 28-Sep-13 08-Jan-14
KVG.Zone 2 Ground Floor 28-Sep-13 29-Sep-13
KVG.Zon Calm Shell 28-Sep-13 29-Sep-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 24-Oct-13 26-Oct-13
KVG.Zon Calm Shell 24-Oct-13 26-Oct-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 16-Nov-13 17-Nov-13
KVG.Zon Calm Shell 16-Nov-13 17-Nov-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 08-Dec-13 09-Dec-13
KVG.Zon Calm Shell 08-Dec-13 09-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 29-Dec-13 30-Dec-13
KVG.Zon Calm Shell 29-Dec-13 30-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 01-Jan-14 01-Jan-14
KVG.Zon Calm Shell 01-Jan-14 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 02-Jan-14 08-Jan-14
KVG.Zone 2 Marbling 02-Jan-14 07-Jan-14
KVG.Zone 2.Stage Condonminium Appartments-22 08-Dec-12 02-Jul-13
KVG.Zone 2.St Mobilization 08-Dec-12 08-Dec-12
KVG.Zone 2.St Earth Work 09-Dec-12 31-Jan-13
KVG.Zone 2.St Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 2 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 2 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 2 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 2 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 2 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 2 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 2 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 2 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 2.St Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 2 Basement 17-Feb-13 18-Feb-13
KVG.Zone 2 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 2 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 2 Second Floor 07-May-13 11-May-13

52
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 Third Floor 29-May-13 02-Jun-13
KVG.Zone 2 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 2 Roof 24-Jun-13 24-Jun-13
KVG.Zone 2.St Finishing 25-Mar-13 02-Jul-13
KVG.Zone 2 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 2 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 2.Stage Condonminium Appartments-27 08-Dec-12 08-Jan-14
KVG.Zone 2.St Mobilization 09-Dec-12 09-Dec-12
KVG.Zone 2.St Earth Work 17-Dec-12 04-Aug-13
KVG.Zone 2.St Civil Work 19-Jun-13 25-Dec-13
KVG.Zone 2 Foundation 19-Jun-13 23-Jul-13
KVG.Zon Footing 19-Jun-13 23-Jul-13
KVG.Z Plain Concrete 19-Jun-13 30-Jun-13
KVG.Z Reinforced Concrete & Semels 01-Jul-13 23-Jul-13
KVG.Zone 2 Basement 24-Jul-13 25-Aug-13
KVG.Zon Slab On Grade 05-Aug-13 25-Aug-13
KVG.Zon Columns 24-Jul-13 01-Aug-13
KVG.Zone 2 Ground Floor 05-Aug-13 03-Sep-13
KVG.Zon Beam and slab 05-Aug-13 21-Aug-13
KVG.Zon Columns 26-Aug-13 03-Sep-13
KVG.Zone 2 First Floor 04-Sep-13 25-Sep-13
KVG.Zon Beams and slab 04-Sep-13 24-Sep-13
KVG.Zon Columns 17-Sep-13 25-Sep-13
KVG.Zone 2 Second Floor 26-Sep-13 22-Oct-13
KVG.Zon Beams and slab 26-Sep-13 21-Oct-13
KVG.Zon Columns 10-Oct-13 22-Oct-13
KVG.Zone 2 Third Floor 23-Oct-13 13-Nov-13
KVG.Zon Beams and slab 23-Oct-13 12-Nov-13
KVG.Zon Columns 05-Nov-13 13-Nov-13
KVG.Zone 2 Fourth Floor 14-Nov-13 05-Dec-13
KVG.Zon Beams and slab 14-Nov-13 04-Dec-13
KVG.Zon Columns 27-Nov-13 05-Dec-13
KVG.Zone 2 Roof 07-Dec-13 25-Dec-13
KVG.Zon Beams and slab 07-Dec-13 25-Dec-13
KVG.Zone 2.St Mansonary 22-Aug-13 31-Dec-13
KVG.Zone 2 Basement 22-Aug-13 24-Aug-13
KVG.Zone 2 Ground Floor 25-Sep-13 29-Sep-13
KVG.Zone 2 First Floor 22-Oct-13 26-Oct-13
KVG.Zone 2 Second Floor 13-Nov-13 17-Nov-13
KVG.Zone 2 Third Floor 05-Dec-13 09-Dec-13
KVG.Zone 2 Fourth Floor 26-Dec-13 30-Dec-13
KVG.Zone 2 Roof 31-Dec-13 31-Dec-13
KVG.Zone 2.St Finishing 28-Sep-13 08-Jan-14
KVG.Zone 2 Ground Floor 28-Sep-13 29-Sep-13
KVG.Zon Calm Shell 28-Sep-13 29-Sep-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 24-Oct-13 26-Oct-13
KVG.Zon Calm Shell 24-Oct-13 26-Oct-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 16-Nov-13 17-Nov-13
KVG.Zon Calm Shell 16-Nov-13 17-Nov-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 08-Dec-13 09-Dec-13
KVG.Zon Calm Shell 08-Dec-13 09-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 29-Dec-13 30-Dec-13
KVG.Zon Calm Shell 29-Dec-13 30-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 01-Jan-14 01-Jan-14
KVG.Zon Calm Shell 01-Jan-14 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 02-Jan-14 08-Jan-14
KVG.Zone 2 Marbling 02-Jan-14 07-Jan-14
KVG.Zone 2.Stage Condonminium Appartments-28 08-Dec-12 02-Jul-13
KVG.Zone 2.St Mobilization 08-Dec-12 08-Dec-12
KVG.Zone 2.St Earth Work 09-Dec-12 31-Jan-13
KVG.Zone 2.St Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 2 Foundation 17-Dec-12 20-Jan-13

53
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 2 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 2 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 2 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 2 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 2 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 2 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 2 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 2.St Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 2 Basement 17-Feb-13 18-Feb-13
KVG.Zone 2 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 2 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 2 Second Floor 07-May-13 11-May-13
KVG.Zone 2 Third Floor 29-May-13 02-Jun-13
KVG.Zone 2 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 2 Roof 24-Jun-13 24-Jun-13
KVG.Zone 2.St Finishing 25-Mar-13 02-Jul-13
KVG.Zone 2 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 2 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 2.Stage Condonminium Appartments-29 08-Dec-12 08-Jan-14
KVG.Zone 2.St Mobilization 09-Dec-12 09-Dec-12
KVG.Zone 2.St Earth Work 17-Dec-12 04-Aug-13
KVG.Zone 2.St Civil Work 19-Jun-13 25-Dec-13
KVG.Zone 2 Foundation 19-Jun-13 23-Jul-13
KVG.Zon Footing 19-Jun-13 23-Jul-13
KVG.Z Plain Concrete 19-Jun-13 30-Jun-13
KVG.Z Reinforced Concrete & Semels 01-Jul-13 23-Jul-13
KVG.Zone 2 Basement 24-Jul-13 25-Aug-13
KVG.Zon Slab On Grade 05-Aug-13 25-Aug-13
KVG.Zon Columns 24-Jul-13 01-Aug-13
KVG.Zone 2 Ground Floor 05-Aug-13 03-Sep-13
KVG.Zon Beam and slab 05-Aug-13 21-Aug-13
KVG.Zon Columns 26-Aug-13 03-Sep-13
KVG.Zone 2 First Floor 04-Sep-13 25-Sep-13
KVG.Zon Beams and slab 04-Sep-13 24-Sep-13
KVG.Zon Columns 17-Sep-13 25-Sep-13
KVG.Zone 2 Second Floor 26-Sep-13 22-Oct-13
KVG.Zon Beams and slab 26-Sep-13 21-Oct-13
KVG.Zon Columns 10-Oct-13 22-Oct-13
KVG.Zone 2 Third Floor 23-Oct-13 13-Nov-13
KVG.Zon Beams and slab 23-Oct-13 12-Nov-13
KVG.Zon Columns 05-Nov-13 13-Nov-13
KVG.Zone 2 Fourth Floor 14-Nov-13 05-Dec-13
KVG.Zon Beams and slab 14-Nov-13 04-Dec-13
KVG.Zon Columns 27-Nov-13 05-Dec-13
KVG.Zone 2 Roof 07-Dec-13 25-Dec-13
KVG.Zon Beams and slab 07-Dec-13 25-Dec-13
KVG.Zone 2.St Mansonary 22-Aug-13 31-Dec-13
KVG.Zone 2 Basement 22-Aug-13 24-Aug-13
KVG.Zone 2 Ground Floor 25-Sep-13 29-Sep-13
KVG.Zone 2 First Floor 22-Oct-13 26-Oct-13
KVG.Zone 2 Second Floor 13-Nov-13 17-Nov-13
KVG.Zone 2 Third Floor 05-Dec-13 09-Dec-13

54
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 Fourth Floor 26-Dec-13 30-Dec-13
KVG.Zone 2 Roof 31-Dec-13 31-Dec-13
KVG.Zone 2.St Finishing 28-Sep-13 08-Jan-14
KVG.Zone 2 Ground Floor 28-Sep-13 29-Sep-13
KVG.Zon Calm Shell 28-Sep-13 29-Sep-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 24-Oct-13 26-Oct-13
KVG.Zon Calm Shell 24-Oct-13 26-Oct-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 16-Nov-13 17-Nov-13
KVG.Zon Calm Shell 16-Nov-13 17-Nov-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 08-Dec-13 09-Dec-13
KVG.Zon Calm Shell 08-Dec-13 09-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 29-Dec-13 30-Dec-13
KVG.Zon Calm Shell 29-Dec-13 30-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 01-Jan-14 01-Jan-14
KVG.Zon Calm Shell 01-Jan-14 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 02-Jan-14 08-Jan-14
KVG.Zone 2 Marbling 02-Jan-14 07-Jan-14
KVG.Zone 2.Stage Condonminium Appartments-30 08-Dec-12 02-Jul-13
KVG.Zone 2.St Mobilization 08-Dec-12 08-Dec-12
KVG.Zone 2.St Earth Work 09-Dec-12 31-Jan-13
KVG.Zone 2.St Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 2 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 2 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 2 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 2 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 2 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 2 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 2 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 2 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 2.St Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 2 Basement 17-Feb-13 18-Feb-13
KVG.Zone 2 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 2 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 2 Second Floor 07-May-13 11-May-13
KVG.Zone 2 Third Floor 29-May-13 02-Jun-13
KVG.Zone 2 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 2 Roof 24-Jun-13 24-Jun-13
KVG.Zone 2.St Finishing 25-Mar-13 02-Jul-13
KVG.Zone 2 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 2 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 2.Stage Condonminium Appartments-31 08-Dec-12 08-Jan-14
KVG.Zone 2.St Mobilization 09-Dec-12 09-Dec-12
KVG.Zone 2.St Earth Work 17-Dec-12 04-Aug-13
KVG.Zone 2.St Civil Work 19-Jun-13 25-Dec-13
KVG.Zone 2 Foundation 19-Jun-13 23-Jul-13
KVG.Zon Footing 19-Jun-13 23-Jul-13

55
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Z Plain Concrete 19-Jun-13 30-Jun-13
KVG.Z Reinforced Concrete & Semels 01-Jul-13 23-Jul-13
KVG.Zone 2 Basement 24-Jul-13 25-Aug-13
KVG.Zon Slab On Grade 05-Aug-13 25-Aug-13
KVG.Zon Columns 24-Jul-13 01-Aug-13
KVG.Zone 2 Ground Floor 05-Aug-13 03-Sep-13
KVG.Zon Beam and slab 05-Aug-13 21-Aug-13
KVG.Zon Columns 26-Aug-13 03-Sep-13
KVG.Zone 2 First Floor 04-Sep-13 25-Sep-13
KVG.Zon Beams and slab 04-Sep-13 24-Sep-13
KVG.Zon Columns 17-Sep-13 25-Sep-13
KVG.Zone 2 Second Floor 26-Sep-13 22-Oct-13
KVG.Zon Beams and slab 26-Sep-13 21-Oct-13
KVG.Zon Columns 10-Oct-13 22-Oct-13
KVG.Zone 2 Third Floor 23-Oct-13 13-Nov-13
KVG.Zon Beams and slab 23-Oct-13 12-Nov-13
KVG.Zon Columns 05-Nov-13 13-Nov-13
KVG.Zone 2 Fourth Floor 14-Nov-13 05-Dec-13
KVG.Zon Beams and slab 14-Nov-13 04-Dec-13
KVG.Zon Columns 27-Nov-13 05-Dec-13
KVG.Zone 2 Roof 07-Dec-13 25-Dec-13
KVG.Zon Beams and slab 07-Dec-13 25-Dec-13
KVG.Zone 2.St Mansonary 22-Aug-13 31-Dec-13
KVG.Zone 2 Basement 22-Aug-13 24-Aug-13
KVG.Zone 2 Ground Floor 25-Sep-13 29-Sep-13
KVG.Zone 2 First Floor 22-Oct-13 26-Oct-13
KVG.Zone 2 Second Floor 13-Nov-13 17-Nov-13
KVG.Zone 2 Third Floor 05-Dec-13 09-Dec-13
KVG.Zone 2 Fourth Floor 26-Dec-13 30-Dec-13
KVG.Zone 2 Roof 31-Dec-13 31-Dec-13
KVG.Zone 2.St Finishing 28-Sep-13 08-Jan-14
KVG.Zone 2 Ground Floor 28-Sep-13 29-Sep-13
KVG.Zon Calm Shell 28-Sep-13 29-Sep-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 24-Oct-13 26-Oct-13
KVG.Zon Calm Shell 24-Oct-13 26-Oct-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 16-Nov-13 17-Nov-13
KVG.Zon Calm Shell 16-Nov-13 17-Nov-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 08-Dec-13 09-Dec-13
KVG.Zon Calm Shell 08-Dec-13 09-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 29-Dec-13 30-Dec-13
KVG.Zon Calm Shell 29-Dec-13 30-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 01-Jan-14 01-Jan-14
KVG.Zon Calm Shell 01-Jan-14 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 02-Jan-14 08-Jan-14
KVG.Zone 2 Marbling 02-Jan-14 07-Jan-14
KVG.Zone 2.Stage Condonminium Appartments-32 08-Dec-12 02-Jul-13
KVG.Zone 2.St Mobilization 08-Dec-12 08-Dec-12
KVG.Zone 2.St Earth Work 09-Dec-12 31-Jan-13
KVG.Zone 2.St Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 2 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 2 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 2 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 2 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 2 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 2 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 2 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 2 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 2.St Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 2 Basement 17-Feb-13 18-Feb-13
KVG.Zone 2 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 2 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 2 Second Floor 07-May-13 11-May-13
KVG.Zone 2 Third Floor 29-May-13 02-Jun-13
KVG.Zone 2 Fourth Floor 19-Jun-13 23-Jun-13

56
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 Roof 24-Jun-13 24-Jun-13
KVG.Zone 2.St Finishing 25-Mar-13 02-Jul-13
KVG.Zone 2 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 2 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 2.Stage Condonminium Appartments-37 08-Dec-12 08-Jan-14
KVG.Zone 2.St Mobilization 09-Dec-12 09-Dec-12
KVG.Zone 2.St Earth Work 17-Dec-12 04-Aug-13
KVG.Zone 2.St Civil Work 19-Jun-13 25-Dec-13
KVG.Zone 2 Foundation 19-Jun-13 23-Jul-13
KVG.Zon Footing 19-Jun-13 23-Jul-13
KVG.Z Plain Concrete 19-Jun-13 30-Jun-13
KVG.Z Reinforced Concrete & Semels 01-Jul-13 23-Jul-13
KVG.Zone 2 Basement 24-Jul-13 25-Aug-13
KVG.Zon Slab On Grade 05-Aug-13 25-Aug-13
KVG.Zon Columns 24-Jul-13 01-Aug-13
KVG.Zone 2 Ground Floor 05-Aug-13 03-Sep-13
KVG.Zon Beam and slab 05-Aug-13 21-Aug-13
KVG.Zon Columns 26-Aug-13 03-Sep-13
KVG.Zone 2 First Floor 04-Sep-13 25-Sep-13
KVG.Zon Beams and slab 04-Sep-13 24-Sep-13
KVG.Zon Columns 17-Sep-13 25-Sep-13
KVG.Zone 2 Second Floor 26-Sep-13 22-Oct-13
KVG.Zon Beams and slab 26-Sep-13 21-Oct-13
KVG.Zon Columns 10-Oct-13 22-Oct-13
KVG.Zone 2 Third Floor 23-Oct-13 13-Nov-13
KVG.Zon Beams and slab 23-Oct-13 12-Nov-13
KVG.Zon Columns 05-Nov-13 13-Nov-13
KVG.Zone 2 Fourth Floor 14-Nov-13 05-Dec-13
KVG.Zon Beams and slab 14-Nov-13 04-Dec-13
KVG.Zon Columns 27-Nov-13 05-Dec-13
KVG.Zone 2 Roof 07-Dec-13 25-Dec-13
KVG.Zon Beams and slab 07-Dec-13 25-Dec-13
KVG.Zone 2.St Mansonary 22-Aug-13 31-Dec-13
KVG.Zone 2 Basement 22-Aug-13 24-Aug-13
KVG.Zone 2 Ground Floor 25-Sep-13 29-Sep-13
KVG.Zone 2 First Floor 22-Oct-13 26-Oct-13
KVG.Zone 2 Second Floor 13-Nov-13 17-Nov-13
KVG.Zone 2 Third Floor 05-Dec-13 09-Dec-13
KVG.Zone 2 Fourth Floor 26-Dec-13 30-Dec-13
KVG.Zone 2 Roof 31-Dec-13 31-Dec-13
KVG.Zone 2.St Finishing 28-Sep-13 08-Jan-14
KVG.Zone 2 Ground Floor 28-Sep-13 29-Sep-13
KVG.Zon Calm Shell 28-Sep-13 29-Sep-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 24-Oct-13 26-Oct-13
KVG.Zon Calm Shell 24-Oct-13 26-Oct-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 16-Nov-13 17-Nov-13
KVG.Zon Calm Shell 16-Nov-13 17-Nov-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 08-Dec-13 09-Dec-13
KVG.Zon Calm Shell 08-Dec-13 09-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 29-Dec-13 30-Dec-13
KVG.Zon Calm Shell 29-Dec-13 30-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 01-Jan-14 01-Jan-14
KVG.Zon Calm Shell 01-Jan-14 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 02-Jan-14 08-Jan-14
KVG.Zone 2 Marbling 02-Jan-14 07-Jan-14
KVG.Zone 2.Stage Condonminium Appartments-38 08-Dec-12 02-Jul-13
KVG.Zone 2.St Mobilization 08-Dec-12 08-Dec-12
KVG.Zone 2.St Earth Work 09-Dec-12 31-Jan-13
KVG.Zone 2.St Civil Work 17-Dec-12 18-Jun-13
KVG.Zone 2 Foundation 17-Dec-12 20-Jan-13
KVG.Zon Footing 17-Dec-12 20-Jan-13
KVG.Z Plain Concrete 17-Dec-12 27-Dec-12

57
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Z Reinforced Concrete & Semels 29-Dec-12 20-Jan-13
KVG.Zone 2 Basement 21-Jan-13 19-Feb-13
KVG.Zon Slab On Grade 02-Feb-13 19-Feb-13
KVG.Zon Columns 21-Jan-13 29-Jan-13
KVG.Zone 2 Ground Floor 02-Feb-13 28-Feb-13
KVG.Zon Beam and slab 02-Feb-13 16-Feb-13
KVG.Zon Columns 20-Feb-13 28-Feb-13
KVG.Zone 2 First Floor 02-Mar-13 23-Mar-13
KVG.Zon Beams and slab 02-Mar-13 21-Mar-13
KVG.Zon Columns 14-Mar-13 23-Mar-13
KVG.Zone 2 Second Floor 24-Mar-13 14-Apr-13
KVG.Zon Beams and slab 24-Mar-13 13-Apr-13
KVG.Zon Columns 06-Apr-13 14-Apr-13
KVG.Zone 2 Third Floor 15-Apr-13 07-May-13
KVG.Zon Beams and slab 15-Apr-13 06-May-13
KVG.Zon Columns 28-Apr-13 07-May-13
KVG.Zone 2 Fourth Floor 08-May-13 29-May-13
KVG.Zon Beams and slab 08-May-13 28-May-13
KVG.Zon Columns 21-May-13 29-May-13
KVG.Zone 2 Roof 30-May-13 18-Jun-13
KVG.Zon Beams and slab 30-May-13 18-Jun-13
KVG.Zone 2.St Mansonary 17-Feb-13 24-Jun-13
KVG.Zone 2 Basement 17-Feb-13 18-Feb-13
KVG.Zone 2 Ground Floor 23-Mar-13 26-Mar-13
KVG.Zone 2 First Floor 14-Apr-13 17-Apr-13
KVG.Zone 2 Second Floor 07-May-13 11-May-13
KVG.Zone 2 Third Floor 29-May-13 02-Jun-13
KVG.Zone 2 Fourth Floor 19-Jun-13 23-Jun-13
KVG.Zone 2 Roof 24-Jun-13 24-Jun-13
KVG.Zone 2.St Finishing 25-Mar-13 02-Jul-13
KVG.Zone 2 Ground Floor 25-Mar-13 26-Mar-13
KVG.Zon Calm Shell 25-Mar-13 26-Mar-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 16-Apr-13 17-Apr-13
KVG.Zon Calm Shell 16-Apr-13 17-Apr-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 09-May-13 11-May-13
KVG.Zon Calm Shell 09-May-13 11-May-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 01-Jun-13 02-Jun-13
KVG.Zon Calm Shell 01-Jun-13 02-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 22-Jun-13 23-Jun-13
KVG.Zon Calm Shell 22-Jun-13 23-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 25-Jun-13 25-Jun-13
KVG.Zon Calm Shell 25-Jun-13 25-Jun-13
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 26-Jun-13 02-Jul-13
KVG.Zone 2 Marbling 26-Jun-13 01-Jul-13
KVG.Zone 2.Stage Condonminium Appartments-39 08-Dec-12 08-Jan-14
KVG.Zone 2.St Mobilization 09-Dec-12 09-Dec-12
KVG.Zone 2.St Earth Work 17-Dec-12 04-Aug-13
KVG.Zone 2.St Civil Work 19-Jun-13 25-Dec-13
KVG.Zone 2 Foundation 19-Jun-13 23-Jul-13
KVG.Zon Footing 19-Jun-13 23-Jul-13
KVG.Z Plain Concrete 19-Jun-13 30-Jun-13
KVG.Z Reinforced Concrete & Semels 01-Jul-13 23-Jul-13
KVG.Zone 2 Basement 24-Jul-13 25-Aug-13
KVG.Zon Slab On Grade 05-Aug-13 25-Aug-13
KVG.Zon Columns 24-Jul-13 01-Aug-13
KVG.Zone 2 Ground Floor 05-Aug-13 03-Sep-13
KVG.Zon Beam and slab 05-Aug-13 21-Aug-13
KVG.Zon Columns 26-Aug-13 03-Sep-13
KVG.Zone 2 First Floor 04-Sep-13 25-Sep-13
KVG.Zon Beams and slab 04-Sep-13 24-Sep-13
KVG.Zon Columns 17-Sep-13 25-Sep-13
KVG.Zone 2 Second Floor 26-Sep-13 22-Oct-13
KVG.Zon Beams and slab 26-Sep-13 21-Oct-13
KVG.Zon Columns 10-Oct-13 22-Oct-13
KVG.Zone 2 Third Floor 23-Oct-13 13-Nov-13
KVG.Zon Beams and slab 23-Oct-13 12-Nov-13
KVG.Zon Columns 05-Nov-13 13-Nov-13
KVG.Zone 2 Fourth Floor 14-Nov-13 05-Dec-13
KVG.Zon Beams and slab 14-Nov-13 04-Dec-13
KVG.Zon Columns 27-Nov-13 05-Dec-13
KVG.Zone 2 Roof 07-Dec-13 25-Dec-13
KVG.Zon Beams and slab 07-Dec-13 25-Dec-13
KVG.Zone 2.St Mansonary 22-Aug-13 31-Dec-13
KVG.Zone 2 Basement 22-Aug-13 24-Aug-13
KVG.Zone 2 Ground Floor 25-Sep-13 29-Sep-13
KVG.Zone 2 First Floor 22-Oct-13 26-Oct-13
KVG.Zone 2 Second Floor 13-Nov-13 17-Nov-13
KVG.Zone 2 Third Floor 05-Dec-13 09-Dec-13
KVG.Zone 2 Fourth Floor 26-Dec-13 30-Dec-13
KVG.Zone 2 Roof 31-Dec-13 31-Dec-13

58
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2.St Finishing 28-Sep-13 08-Jan-14
KVG.Zone 2 Ground Floor 28-Sep-13 29-Sep-13
KVG.Zon Calm Shell 28-Sep-13 29-Sep-13
KVG.Zon External Electrical
KVG.Zone 2 First Floor 24-Oct-13 26-Oct-13
KVG.Zon Calm Shell 24-Oct-13 26-Oct-13
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 16-Nov-13 17-Nov-13
KVG.Zon Calm Shell 16-Nov-13 17-Nov-13
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 08-Dec-13 09-Dec-13
KVG.Zon Calm Shell 08-Dec-13 09-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 29-Dec-13 30-Dec-13
KVG.Zon Calm Shell 29-Dec-13 30-Dec-13
KVG.Zon External Electrical
KVG.Zone 2 Roof 01-Jan-14 01-Jan-14
KVG.Zon Calm Shell 01-Jan-14 01-Jan-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 02-Jan-14 08-Jan-14
KVG.Zone 2 Marbling 02-Jan-14 07-Jan-14
KVG.Zone 2.Stage 3 Stage 3 09-Jan-14
KVG.Zone 2.Stage Condonminium Appartments-40 09-Jan-14 09-Aug-14
KVG.Zone 2.St Mobilization 09-Jan-14 09-Jan-14
KVG.Zone 2.St Earth Work 11-Jan-14 05-Mar-14
KVG.Zone 2.St Civil Work 19-Jan-14 21-Jul-14
KVG.Zone 2 Foundation 19-Jan-14 22-Feb-14
KVG.Zon Footing 19-Jan-14 22-Feb-14
KVG.Z Plain Concrete 19-Jan-14 29-Jan-14
KVG.Z Reinforced Concrete & Semels 30-Jan-14 22-Feb-14
KVG.Zone 2 Basement 23-Feb-14 24-Mar-14
KVG.Zon Slab On Grade 06-Mar-14 24-Mar-14
KVG.Zon Columns 23-Feb-14 03-Mar-14
KVG.Zone 2 Ground Floor 06-Mar-14 02-Apr-14
KVG.Zon Beam and slab 06-Mar-14 20-Mar-14
KVG.Zon Columns 25-Mar-14 02-Apr-14
KVG.Zone 2 First Floor 03-Apr-14 24-Apr-14
KVG.Zon Beams and slab 03-Apr-14 23-Apr-14
KVG.Zon Columns 16-Apr-14 24-Apr-14
KVG.Zone 2 Second Floor 26-Apr-14 18-May-14
KVG.Zon Beams and slab 26-Apr-14 17-May-14
KVG.Zon Columns 10-May-14 18-May-14
KVG.Zone 2 Third Floor 19-May-14 09-Jun-14
KVG.Zon Beams and slab 19-May-14 08-Jun-14
KVG.Zon Columns 01-Jun-14 09-Jun-14
KVG.Zone 2 Fourth Floor 10-Jun-14 01-Jul-14
KVG.Zon Beams and slab 10-Jun-14 30-Jun-14
KVG.Zon Columns 23-Jun-14 01-Jul-14
KVG.Zone 2 Roof 02-Jul-14 21-Jul-14
KVG.Zon Beams and slab 02-Jul-14 21-Jul-14
KVG.Zone 2.St Mansonary 22-Mar-14 31-Jul-14
KVG.Zone 2 Basement 22-Mar-14 23-Mar-14
KVG.Zone 2 Ground Floor 24-Apr-14 28-Apr-14
KVG.Zone 2 First Floor 18-May-14 21-May-14
KVG.Zone 2 Second Floor 09-Jun-14 12-Jun-14
KVG.Zone 2 Third Floor 01-Jul-14 05-Jul-14
KVG.Zone 2 Fourth Floor 22-Jul-14 26-Jul-14
KVG.Zone 2 Roof 31-Jul-14 31-Jul-14
KVG.Zone 2.St Finishing 27-Apr-14 09-Aug-14
KVG.Zone 2 Ground Floor 27-Apr-14 28-Apr-14
KVG.Zon Calm Shell 27-Apr-14 28-Apr-14
KVG.Zon External Electrical
KVG.Zone 2 First Floor 20-May-14 21-May-14
KVG.Zon Calm Shell 20-May-14 21-May-14
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 11-Jun-14 12-Jun-14
KVG.Zon Calm Shell 11-Jun-14 12-Jun-14
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 03-Jul-14 05-Jul-14
KVG.Zon Calm Shell 03-Jul-14 05-Jul-14
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 24-Jul-14 26-Jul-14
KVG.Zon Calm Shell 24-Jul-14 26-Jul-14
KVG.Zon External Electrical
KVG.Zone 2 Roof 02-Aug-14 02-Aug-14
KVG.Zon Calm Shell 02-Aug-14 02-Aug-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 03-Aug-14 09-Aug-14
KVG.Zone 2 Marbling 03-Aug-14 07-Aug-14
KVG.Zone 2.Stage Condonminium Appartments-41 09-Jan-14
KVG.Zone 2.St Mobilization 11-Jan-14 11-Jan-14
KVG.Zone 2.St Earth Work 19-Jan-14 10-Sep-14
KVG.Zone 2.St Civil Work 22-Jul-14
KVG.Zone 2 Foundation 22-Jul-14 30-Aug-14
KVG.Zon Footing 22-Jul-14 30-Aug-14
KVG.Z Plain Concrete 22-Jul-14 06-Aug-14

59
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Z Reinforced Concrete & Semels 07-Aug-14 30-Aug-14
KVG.Zone 2 Basement 31-Aug-14 29-Sep-14
KVG.Zon Slab On Grade 11-Sep-14 29-Sep-14
KVG.Zon Columns 31-Aug-14 08-Sep-14
KVG.Zone 2 Ground Floor 11-Sep-14 12-Oct-14
KVG.Zon Beam and slab 11-Sep-14 25-Sep-14
KVG.Zon Columns 30-Sep-14 12-Oct-14
KVG.Zone 2 First Floor 13-Oct-14 03-Nov-14
KVG.Zon Beams and slab 13-Oct-14 02-Nov-14
KVG.Zon Columns 26-Oct-14 03-Nov-14
KVG.Zone 2 Second Floor 04-Nov-14 25-Nov-
KVG.Zon Beams and slab 04-Nov-14 24-Nov-
KVG.Zon Columns 17-Nov-14 25-Nov-
KVG.Zone 2 Third Floor 26-Nov-14 17-De
KVG.Zon Beams and slab 26-Nov-14 16-De
KVG.Zon Columns 09-Dec-14 17-De
KVG.Zone 2 Fourth Floor 18-Dec-14 08-
KVG.Zon Beams and slab 18-Dec-14 07-
KVG.Zon Columns 31-Dec-14 08-
KVG.Zone 2 Roof 10-Jan-15
KVG.Zon Beams and slab 10-Jan-15
KVG.Zone 2.St Mansonary 27-Sep-14
KVG.Zone 2 Basement 27-Sep-14 28-Sep-14
KVG.Zone 2 Ground Floor 03-Nov-14 06-Nov-14
KVG.Zone 2 First Floor 25-Nov-14 29-Nov-
KVG.Zone 2 Second Floor 17-Dec-14 21-D
KVG.Zone 2 Third Floor 08-Jan-15 12
KVG.Zone 2 Fourth Floor 29-Jan-15
KVG.Zone 2 Roof 03-Feb-15
KVG.Zone 2.St Finishing 05-Nov-14
KVG.Zone 2 Ground Floor 05-Nov-14 06-Nov-14
KVG.Zon Calm Shell 05-Nov-14 06-Nov-14
KVG.Zon External Electrical
KVG.Zone 2 First Floor 27-Nov-14 29-Nov-
KVG.Zon Calm Shell 27-Nov-14 29-Nov-
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 20-Dec-14 21-D
KVG.Zon Calm Shell 20-Dec-14 21-D
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 11-Jan-15 12
KVG.Zon Calm Shell 11-Jan-15 12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 01-Feb-15
KVG.Zon Calm Shell 01-Feb-15
KVG.Zon External Electrical
KVG.Zone 2 Roof 04-Feb-15
KVG.Zon Calm Shell 04-Feb-15
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 05-Feb-15
KVG.Zone 2 Marbling 05-Feb-15
KVG.Zone 2.Stage Condonminium Appartments-42 09-Jan-14 09-Aug-14
KVG.Zone 2.St Mobilization 09-Jan-14 09-Jan-14
KVG.Zone 2.St Earth Work 11-Jan-14 05-Mar-14
KVG.Zone 2.St Civil Work 19-Jan-14 21-Jul-14
KVG.Zone 2 Foundation 19-Jan-14 22-Feb-14
KVG.Zon Footing 19-Jan-14 22-Feb-14
KVG.Z Plain Concrete 19-Jan-14 29-Jan-14
KVG.Z Reinforced Concrete & Semels 30-Jan-14 22-Feb-14
KVG.Zone 2 Basement 23-Feb-14 24-Mar-14
KVG.Zon Slab On Grade 06-Mar-14 24-Mar-14
KVG.Zon Columns 23-Feb-14 03-Mar-14
KVG.Zone 2 Ground Floor 06-Mar-14 02-Apr-14
KVG.Zon Beam and slab 06-Mar-14 20-Mar-14
KVG.Zon Columns 25-Mar-14 02-Apr-14
KVG.Zone 2 First Floor 03-Apr-14 24-Apr-14
KVG.Zon Beams and slab 03-Apr-14 23-Apr-14
KVG.Zon Columns 16-Apr-14 24-Apr-14
KVG.Zone 2 Second Floor 26-Apr-14 18-May-14
KVG.Zon Beams and slab 26-Apr-14 17-May-14
KVG.Zon Columns 10-May-14 18-May-14
KVG.Zone 2 Third Floor 19-May-14 09-Jun-14
KVG.Zon Beams and slab 19-May-14 08-Jun-14
KVG.Zon Columns 01-Jun-14 09-Jun-14
KVG.Zone 2 Fourth Floor 10-Jun-14 01-Jul-14
KVG.Zon Beams and slab 10-Jun-14 30-Jun-14
KVG.Zon Columns 23-Jun-14 01-Jul-14
KVG.Zone 2 Roof 02-Jul-14 21-Jul-14
KVG.Zon Beams and slab 02-Jul-14 21-Jul-14
KVG.Zone 2.St Mansonary 22-Mar-14 31-Jul-14
KVG.Zone 2 Basement 22-Mar-14 23-Mar-14
KVG.Zone 2 Ground Floor 24-Apr-14 28-Apr-14
KVG.Zone 2 First Floor 18-May-14 21-May-14
KVG.Zone 2 Second Floor 09-Jun-14 12-Jun-14
KVG.Zone 2 Third Floor 01-Jul-14 05-Jul-14
KVG.Zone 2 Fourth Floor 22-Jul-14 26-Jul-14
KVG.Zone 2 Roof 31-Jul-14 31-Jul-14

60
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2.St Finishing 27-Apr-14 09-Aug-14
KVG.Zone 2 Ground Floor 27-Apr-14 28-Apr-14
KVG.Zon Calm Shell 27-Apr-14 28-Apr-14
KVG.Zon External Electrical
KVG.Zone 2 First Floor 20-May-14 21-May-14
KVG.Zon Calm Shell 20-May-14 21-May-14
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 11-Jun-14 12-Jun-14
KVG.Zon Calm Shell 11-Jun-14 12-Jun-14
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 03-Jul-14 05-Jul-14
KVG.Zon Calm Shell 03-Jul-14 05-Jul-14
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 24-Jul-14 26-Jul-14
KVG.Zon Calm Shell 24-Jul-14 26-Jul-14
KVG.Zon External Electrical
KVG.Zone 2 Roof 02-Aug-14 02-Aug-14
KVG.Zon Calm Shell 02-Aug-14 02-Aug-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 03-Aug-14 09-Aug-14
KVG.Zone 2 Marbling 03-Aug-14 07-Aug-14
KVG.Zone 2.Stage Condonminium Appartments-48 09-Jan-14
KVG.Zone 2.St Mobilization 11-Jan-14 11-Jan-14
KVG.Zone 2.St Earth Work 19-Jan-14 10-Sep-14
KVG.Zone 2.St Civil Work 22-Jul-14
KVG.Zone 2 Foundation 22-Jul-14 30-Aug-14
KVG.Zon Footing 22-Jul-14 30-Aug-14
KVG.Z Plain Concrete 22-Jul-14 06-Aug-14
KVG.Z Reinforced Concrete & Semels 07-Aug-14 30-Aug-14
KVG.Zone 2 Basement 31-Aug-14 29-Sep-14
KVG.Zon Slab On Grade 11-Sep-14 29-Sep-14
KVG.Zon Columns 31-Aug-14 08-Sep-14
KVG.Zone 2 Ground Floor 11-Sep-14 12-Oct-14
KVG.Zon Beam and slab 11-Sep-14 25-Sep-14
KVG.Zon Columns 30-Sep-14 12-Oct-14
KVG.Zone 2 First Floor 13-Oct-14 03-Nov-14
KVG.Zon Beams and slab 13-Oct-14 02-Nov-14
KVG.Zon Columns 26-Oct-14 03-Nov-14
KVG.Zone 2 Second Floor 04-Nov-14 25-Nov-
KVG.Zon Beams and slab 04-Nov-14 24-Nov-
KVG.Zon Columns 17-Nov-14 25-Nov-
KVG.Zone 2 Third Floor 26-Nov-14 17-De
KVG.Zon Beams and slab 26-Nov-14 16-De
KVG.Zon Columns 09-Dec-14 17-De
KVG.Zone 2 Fourth Floor 18-Dec-14 08-
KVG.Zon Beams and slab 18-Dec-14 07-
KVG.Zon Columns 31-Dec-14 08-
KVG.Zone 2 Roof 10-Jan-15
KVG.Zon Beams and slab 10-Jan-15
KVG.Zone 2.St Mansonary 27-Sep-14
KVG.Zone 2 Basement 27-Sep-14 28-Sep-14
KVG.Zone 2 Ground Floor 03-Nov-14 06-Nov-14
KVG.Zone 2 First Floor 25-Nov-14 29-Nov-
KVG.Zone 2 Second Floor 17-Dec-14 21-D
KVG.Zone 2 Third Floor 08-Jan-15 12
KVG.Zone 2 Fourth Floor 29-Jan-15
KVG.Zone 2 Roof 03-Feb-15
KVG.Zone 2.St Finishing 05-Nov-14
KVG.Zone 2 Ground Floor 05-Nov-14 06-Nov-14
KVG.Zon Calm Shell 05-Nov-14 06-Nov-14
KVG.Zon External Electrical
KVG.Zone 2 First Floor 27-Nov-14 29-Nov-
KVG.Zon Calm Shell 27-Nov-14 29-Nov-
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 20-Dec-14 21-D
KVG.Zon Calm Shell 20-Dec-14 21-D
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 11-Jan-15 12
KVG.Zon Calm Shell 11-Jan-15 12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 01-Feb-15
KVG.Zon Calm Shell 01-Feb-15
KVG.Zon External Electrical
KVG.Zone 2 Roof 04-Feb-15
KVG.Zon Calm Shell 04-Feb-15
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 05-Feb-15
KVG.Zone 2 Marbling 05-Feb-15
KVG.Zone 2.Stage Condonminium Appartments-49 09-Jan-14 09-Aug-14
KVG.Zone 2.St Mobilization 09-Jan-14 09-Jan-14
KVG.Zone 2.St Earth Work 11-Jan-14 05-Mar-14
KVG.Zone 2.St Civil Work 19-Jan-14 21-Jul-14
KVG.Zone 2 Foundation 19-Jan-14 22-Feb-14
KVG.Zon Footing 19-Jan-14 22-Feb-14
KVG.Z Plain Concrete 19-Jan-14 29-Jan-14
KVG.Z Reinforced Concrete & Semels 30-Jan-14 22-Feb-14

61
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 Basement 23-Feb-14 24-Mar-14
KVG.Zon Slab On Grade 06-Mar-14 24-Mar-14
KVG.Zon Columns 23-Feb-14 03-Mar-14
KVG.Zone 2 Ground Floor 06-Mar-14 02-Apr-14
KVG.Zon Beam and slab 06-Mar-14 20-Mar-14
KVG.Zon Columns 25-Mar-14 02-Apr-14
KVG.Zone 2 First Floor 03-Apr-14 24-Apr-14
KVG.Zon Beams and slab 03-Apr-14 23-Apr-14
KVG.Zon Columns 16-Apr-14 24-Apr-14
KVG.Zone 2 Second Floor 26-Apr-14 18-May-14
KVG.Zon Beams and slab 26-Apr-14 17-May-14
KVG.Zon Columns 10-May-14 18-May-14
KVG.Zone 2 Third Floor 19-May-14 09-Jun-14
KVG.Zon Beams and slab 19-May-14 08-Jun-14
KVG.Zon Columns 01-Jun-14 09-Jun-14
KVG.Zone 2 Fourth Floor 10-Jun-14 01-Jul-14
KVG.Zon Beams and slab 10-Jun-14 30-Jun-14
KVG.Zon Columns 23-Jun-14 01-Jul-14
KVG.Zone 2 Roof 02-Jul-14 21-Jul-14
KVG.Zon Beams and slab 02-Jul-14 21-Jul-14
KVG.Zone 2.St Mansonary 22-Mar-14 31-Jul-14
KVG.Zone 2 Basement 22-Mar-14 23-Mar-14
KVG.Zone 2 Ground Floor 24-Apr-14 28-Apr-14
KVG.Zone 2 First Floor 18-May-14 21-May-14
KVG.Zone 2 Second Floor 09-Jun-14 12-Jun-14
KVG.Zone 2 Third Floor 01-Jul-14 05-Jul-14
KVG.Zone 2 Fourth Floor 22-Jul-14 26-Jul-14
KVG.Zone 2 Roof 31-Jul-14 31-Jul-14
KVG.Zone 2.St Finishing 27-Apr-14 09-Aug-14
KVG.Zone 2 Ground Floor 27-Apr-14 28-Apr-14
KVG.Zon Calm Shell 27-Apr-14 28-Apr-14
KVG.Zon External Electrical
KVG.Zone 2 First Floor 20-May-14 21-May-14
KVG.Zon Calm Shell 20-May-14 21-May-14
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 11-Jun-14 12-Jun-14
KVG.Zon Calm Shell 11-Jun-14 12-Jun-14
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 03-Jul-14 05-Jul-14
KVG.Zon Calm Shell 03-Jul-14 05-Jul-14
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 24-Jul-14 26-Jul-14
KVG.Zon Calm Shell 24-Jul-14 26-Jul-14
KVG.Zon External Electrical
KVG.Zone 2 Roof 02-Aug-14 02-Aug-14
KVG.Zon Calm Shell 02-Aug-14 02-Aug-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 03-Aug-14 09-Aug-14
KVG.Zone 2 Marbling 03-Aug-14 07-Aug-14
KVG.Zone 2.Stage Condonminium Appartments-50 09-Jan-14
KVG.Zone 2.St Mobilization 11-Jan-14 11-Jan-14
KVG.Zone 2.St Earth Work 19-Jan-14 10-Sep-14
KVG.Zone 2.St Civil Work 22-Jul-14
KVG.Zone 2 Foundation 22-Jul-14 30-Aug-14
KVG.Zon Footing 22-Jul-14 30-Aug-14
KVG.Z Plain Concrete 22-Jul-14 06-Aug-14
KVG.Z Reinforced Concrete & Semels 07-Aug-14 30-Aug-14
KVG.Zone 2 Basement 31-Aug-14 29-Sep-14
KVG.Zon Slab On Grade 11-Sep-14 29-Sep-14
KVG.Zon Columns 31-Aug-14 08-Sep-14
KVG.Zone 2 Ground Floor 11-Sep-14 12-Oct-14
KVG.Zon Beam and slab 11-Sep-14 25-Sep-14
KVG.Zon Columns 30-Sep-14 12-Oct-14
KVG.Zone 2 First Floor 13-Oct-14 03-Nov-14
KVG.Zon Beams and slab 13-Oct-14 02-Nov-14
KVG.Zon Columns 26-Oct-14 03-Nov-14
KVG.Zone 2 Second Floor 04-Nov-14 25-Nov-
KVG.Zon Beams and slab 04-Nov-14 24-Nov-
KVG.Zon Columns 17-Nov-14 25-Nov-
KVG.Zone 2 Third Floor 26-Nov-14 17-De
KVG.Zon Beams and slab 26-Nov-14 16-De
KVG.Zon Columns 09-Dec-14 17-De
KVG.Zone 2 Fourth Floor 18-Dec-14 08-
KVG.Zon Beams and slab 18-Dec-14 07-
KVG.Zon Columns 31-Dec-14 08-
KVG.Zone 2 Roof 10-Jan-15
KVG.Zon Beams and slab 10-Jan-15
KVG.Zone 2.St Mansonary 27-Sep-14
KVG.Zone 2 Basement 27-Sep-14 28-Sep-14
KVG.Zone 2 Ground Floor 03-Nov-14 06-Nov-14
KVG.Zone 2 First Floor 25-Nov-14 29-Nov-
KVG.Zone 2 Second Floor 17-Dec-14 21-D
KVG.Zone 2 Third Floor 08-Jan-15 12
KVG.Zone 2 Fourth Floor 29-Jan-15
KVG.Zone 2 Roof 03-Feb-15
KVG.Zone 2.St Finishing 05-Nov-14

62
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 2 Ground Floor 05-Nov-14 06-Nov-14
KVG.Zon Calm Shell 05-Nov-14 06-Nov-14
KVG.Zon External Electrical
KVG.Zone 2 First Floor 27-Nov-14 29-Nov-
KVG.Zon Calm Shell 27-Nov-14 29-Nov-
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 20-Dec-14 21-D
KVG.Zon Calm Shell 20-Dec-14 21-D
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 11-Jan-15 12
KVG.Zon Calm Shell 11-Jan-15 12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 01-Feb-15
KVG.Zon Calm Shell 01-Feb-15
KVG.Zon External Electrical
KVG.Zone 2 Roof 04-Feb-15
KVG.Zon Calm Shell 04-Feb-15
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 05-Feb-15
KVG.Zone 2 Marbling 05-Feb-15
KVG.Zone 2.Stage Condonminium Appartments-51 09-Jan-14 09-Aug-14
KVG.Zone 2.St Mobilization 09-Jan-14 09-Jan-14
KVG.Zone 2.St Earth Work 11-Jan-14 05-Mar-14
KVG.Zone 2.St Civil Work 19-Jan-14 21-Jul-14
KVG.Zone 2 Foundation 19-Jan-14 22-Feb-14
KVG.Zon Footing 19-Jan-14 22-Feb-14
KVG.Z Plain Concrete 19-Jan-14 29-Jan-14
KVG.Z Reinforced Concrete & Semels 30-Jan-14 22-Feb-14
KVG.Zone 2 Basement 23-Feb-14 24-Mar-14
KVG.Zon Slab On Grade 06-Mar-14 24-Mar-14
KVG.Zon Columns 23-Feb-14 03-Mar-14
KVG.Zone 2 Ground Floor 06-Mar-14 02-Apr-14
KVG.Zon Beam and slab 06-Mar-14 20-Mar-14
KVG.Zon Columns 25-Mar-14 02-Apr-14
KVG.Zone 2 First Floor 03-Apr-14 24-Apr-14
KVG.Zon Beams and slab 03-Apr-14 23-Apr-14
KVG.Zon Columns 16-Apr-14 24-Apr-14
KVG.Zone 2 Second Floor 26-Apr-14 18-May-14
KVG.Zon Beams and slab 26-Apr-14 17-May-14
KVG.Zon Columns 10-May-14 18-May-14
KVG.Zone 2 Third Floor 19-May-14 09-Jun-14
KVG.Zon Beams and slab 19-May-14 08-Jun-14
KVG.Zon Columns 01-Jun-14 09-Jun-14
KVG.Zone 2 Fourth Floor 10-Jun-14 01-Jul-14
KVG.Zon Beams and slab 10-Jun-14 30-Jun-14
KVG.Zon Columns 23-Jun-14 01-Jul-14
KVG.Zone 2 Roof 02-Jul-14 21-Jul-14
KVG.Zon Beams and slab 02-Jul-14 21-Jul-14
KVG.Zone 2.St Mansonary 22-Mar-14 31-Jul-14
KVG.Zone 2 Basement 22-Mar-14 23-Mar-14
KVG.Zone 2 Ground Floor 24-Apr-14 28-Apr-14
KVG.Zone 2 First Floor 18-May-14 21-May-14
KVG.Zone 2 Second Floor 09-Jun-14 12-Jun-14
KVG.Zone 2 Third Floor 01-Jul-14 05-Jul-14
KVG.Zone 2 Fourth Floor 22-Jul-14 26-Jul-14
KVG.Zone 2 Roof 31-Jul-14 31-Jul-14
KVG.Zone 2.St Finishing 27-Apr-14 09-Aug-14
KVG.Zone 2 Ground Floor 27-Apr-14 28-Apr-14
KVG.Zon Calm Shell 27-Apr-14 28-Apr-14
KVG.Zon External Electrical
KVG.Zone 2 First Floor 20-May-14 21-May-14
KVG.Zon Calm Shell 20-May-14 21-May-14
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 11-Jun-14 12-Jun-14
KVG.Zon Calm Shell 11-Jun-14 12-Jun-14
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 03-Jul-14 05-Jul-14
KVG.Zon Calm Shell 03-Jul-14 05-Jul-14
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 24-Jul-14 26-Jul-14
KVG.Zon Calm Shell 24-Jul-14 26-Jul-14
KVG.Zon External Electrical
KVG.Zone 2 Roof 02-Aug-14 02-Aug-14
KVG.Zon Calm Shell 02-Aug-14 02-Aug-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 03-Aug-14 09-Aug-14
KVG.Zone 2 Marbling 03-Aug-14 07-Aug-14
KVG.Zone 2.Stage Condonminium Appartments-52 09-Jan-14
KVG.Zone 2.St Mobilization 11-Jan-14 11-Jan-14
KVG.Zone 2.St Earth Work 19-Jan-14 10-Sep-14
KVG.Zone 2.St Civil Work 22-Jul-14
KVG.Zone 2 Foundation 22-Jul-14 30-Aug-14
KVG.Zon Footing 22-Jul-14 30-Aug-14
KVG.Z Plain Concrete 22-Jul-14 06-Aug-14
KVG.Z Reinforced Concrete & Semels 07-Aug-14 30-Aug-14
KVG.Zone 2 Basement 31-Aug-14 29-Sep-14

63
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Slab On Grade 11-Sep-14 29-Sep-14
KVG.Zon Columns 31-Aug-14 08-Sep-14
KVG.Zone 2 Ground Floor 11-Sep-14 12-Oct-14
KVG.Zon Beam and slab 11-Sep-14 25-Sep-14
KVG.Zon Columns 30-Sep-14 12-Oct-14
KVG.Zone 2 First Floor 13-Oct-14 03-Nov-14
KVG.Zon Beams and slab 13-Oct-14 02-Nov-14
KVG.Zon Columns 26-Oct-14 03-Nov-14
KVG.Zone 2 Second Floor 04-Nov-14 25-Nov-
KVG.Zon Beams and slab 04-Nov-14 24-Nov-
KVG.Zon Columns 17-Nov-14 25-Nov-
KVG.Zone 2 Third Floor 26-Nov-14 17-De
KVG.Zon Beams and slab 26-Nov-14 16-De
KVG.Zon Columns 09-Dec-14 17-De
KVG.Zone 2 Fourth Floor 18-Dec-14 08-
KVG.Zon Beams and slab 18-Dec-14 07-
KVG.Zon Columns 31-Dec-14 08-
KVG.Zone 2 Roof 10-Jan-15
KVG.Zon Beams and slab 10-Jan-15
KVG.Zone 2.St Mansonary 27-Sep-14
KVG.Zone 2 Basement 27-Sep-14 28-Sep-14
KVG.Zone 2 Ground Floor 03-Nov-14 06-Nov-14
KVG.Zone 2 First Floor 25-Nov-14 29-Nov-
KVG.Zone 2 Second Floor 17-Dec-14 21-D
KVG.Zone 2 Third Floor 08-Jan-15 12
KVG.Zone 2 Fourth Floor 29-Jan-15
KVG.Zone 2 Roof 03-Feb-15
KVG.Zone 2.St Finishing 05-Nov-14
KVG.Zone 2 Ground Floor 05-Nov-14 06-Nov-14
KVG.Zon Calm Shell 05-Nov-14 06-Nov-14
KVG.Zon External Electrical
KVG.Zone 2 First Floor 27-Nov-14 29-Nov-
KVG.Zon Calm Shell 27-Nov-14 29-Nov-
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 20-Dec-14 21-D
KVG.Zon Calm Shell 20-Dec-14 21-D
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 11-Jan-15 12
KVG.Zon Calm Shell 11-Jan-15 12
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 01-Feb-15
KVG.Zon Calm Shell 01-Feb-15
KVG.Zon External Electrical
KVG.Zone 2 Roof 04-Feb-15
KVG.Zon Calm Shell 04-Feb-15
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 05-Feb-15
KVG.Zone 2 Marbling 05-Feb-15
KVG.Zone 2.Stage Condonminium Appartments-53 09-Jan-14 09-Aug-14
KVG.Zone 2.St Mobilization 09-Jan-14 09-Jan-14
KVG.Zone 2.St Earth Work 11-Jan-14 05-Mar-14
KVG.Zone 2.St Civil Work 19-Jan-14 21-Jul-14
KVG.Zone 2 Foundation 19-Jan-14 22-Feb-14
KVG.Zon Footing 19-Jan-14 22-Feb-14
KVG.Z Plain Concrete 19-Jan-14 29-Jan-14
KVG.Z Reinforced Concrete & Semels 30-Jan-14 22-Feb-14
KVG.Zone 2 Basement 23-Feb-14 24-Mar-14
KVG.Zon Slab On Grade 06-Mar-14 24-Mar-14
KVG.Zon Columns 23-Feb-14 03-Mar-14
KVG.Zone 2 Ground Floor 06-Mar-14 02-Apr-14
KVG.Zon Beam and slab 06-Mar-14 20-Mar-14
KVG.Zon Columns 25-Mar-14 02-Apr-14
KVG.Zone 2 First Floor 03-Apr-14 24-Apr-14
KVG.Zon Beams and slab 03-Apr-14 23-Apr-14
KVG.Zon Columns 16-Apr-14 24-Apr-14
KVG.Zone 2 Second Floor 26-Apr-14 18-May-14
KVG.Zon Beams and slab 26-Apr-14 17-May-14
KVG.Zon Columns 10-May-14 18-May-14
KVG.Zone 2 Third Floor 19-May-14 09-Jun-14
KVG.Zon Beams and slab 19-May-14 08-Jun-14
KVG.Zon Columns 01-Jun-14 09-Jun-14
KVG.Zone 2 Fourth Floor 10-Jun-14 01-Jul-14
KVG.Zon Beams and slab 10-Jun-14 30-Jun-14
KVG.Zon Columns 23-Jun-14 01-Jul-14
KVG.Zone 2 Roof 02-Jul-14 21-Jul-14
KVG.Zon Beams and slab 02-Jul-14 21-Jul-14
KVG.Zone 2.St Mansonary 22-Mar-14 31-Jul-14
KVG.Zone 2 Basement 22-Mar-14 23-Mar-14
KVG.Zone 2 Ground Floor 24-Apr-14 28-Apr-14
KVG.Zone 2 First Floor 18-May-14 21-May-14
KVG.Zone 2 Second Floor 09-Jun-14 12-Jun-14
KVG.Zone 2 Third Floor 01-Jul-14 05-Jul-14
KVG.Zone 2 Fourth Floor 22-Jul-14 26-Jul-14
KVG.Zone 2 Roof 31-Jul-14 31-Jul-14
KVG.Zone 2.St Finishing 27-Apr-14 09-Aug-14
KVG.Zone 2 Ground Floor 27-Apr-14 28-Apr-14

64
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Calm Shell 27-Apr-14 28-Apr-14
KVG.Zon External Electrical
KVG.Zone 2 First Floor 20-May-14 21-May-14
KVG.Zon Calm Shell 20-May-14 21-May-14
KVG.Zon External Electrical
KVG.Zone 2 Second Floor 11-Jun-14 12-Jun-14
KVG.Zon Calm Shell 11-Jun-14 12-Jun-14
KVG.Zon External Electrical
KVG.Zone 2 Third Floor 03-Jul-14 05-Jul-14
KVG.Zon Calm Shell 03-Jul-14 05-Jul-14
KVG.Zon External Electrical
KVG.Zone 2 Fourth Floor 24-Jul-14 26-Jul-14
KVG.Zon Calm Shell 24-Jul-14 26-Jul-14
KVG.Zon External Electrical
KVG.Zone 2 Roof 02-Aug-14 02-Aug-14
KVG.Zon Calm Shell 02-Aug-14 02-Aug-14
KVG.Zon External Electrical
KVG.Zone 2 Painting Cond. 03-Aug-14 09-Aug-14
KVG.Zone 2 Marbling 03-Aug-14 07-Aug-14
KVG.Zone 3 Zone 3 25-D
KVG.Zone 3.Stage 1 Stage 1 24-Nov-12
KVG.Zone 3.Stage Stand alone Villa type 1 14-Feb-12
KVG.Zone 3.St Mobilization 01-Nov-11
KVG.Zone 3.St Earth Work 06-Dec-11
KVG.Zone 3.St Civil Work 05-Feb-12
KVG.Zone 3 Foundation 26-Nov-11
KVG.Zon Footing 26-Nov-11
KVG.Z Plain Concrete 14-Nov-11
KVG.Z Reinforced Concrete&Smeles 26-Nov-11
KVG.Zone 3 Ground Floor 1 25-Dec-11
KVG.Zon Slab on grade 11 25-Dec-11
KVG.Zon Columns 1 04-Dec-11
KVG.Zone 3 First Floor c-11 15-Jan-12
KVG.Zon Beams and slab c-11 15-Jan-12
KVG.Zon Columns Jan-12 15-Jan-12
KVG.Zone 3 Roof -Jan-12 05-Feb-12
KVG.Zon Beams and slab -Jan-12 05-Feb-12
KVG.Zone 3.St Mansonary -Jan-12 09-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 17-Jan-12
KVG.Zone 3 First Floor 06-Feb-12 07-Feb-12
KVG.Zone 3 Roof 08-Feb-12 09-Feb-12
KVG.Zone 3.St Finishing -Jan-12 14-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 19-Jan-12
KVG.Zon Calm Shell -Jan-12 19-Jan-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Feb-12 09-Feb-12
KVG.Zon Calm Shell 08-Feb-12 09-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 11-Feb-12 11-Feb-12
KVG.Zon Calm Shell 11-Feb-12 11-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-Feb-12 14-Feb-12
KVG.Zone 3.Stage Stand alone Villa type 2 14-May-12
KVG.Zone 3.St Mobilization 02-Nov-11
KVG.Zone 3.St Earth Work 04-Mar-12
KVG.Zone 3.St Civil Work 06-Feb-12 05-May-12
KVG.Zone 3 Foundation 06-Feb-12 22-Feb-12
KVG.Zon Footing 06-Feb-12 22-Feb-12
KVG.Z Plain Concrete 06-Feb-12 11-Feb-12
KVG.Z Reinforced Concrete&Smeles 12-Feb-12 22-Feb-12
KVG.Zone 3 Ground Floor 23-Feb-12 22-Mar-12
KVG.Zon Slab on grade 05-Mar-12 22-Mar-12
KVG.Zon Columns 23-Feb-12 01-Mar-12
KVG.Zone 3 First Floor 24-Mar-12 12-Apr-12
KVG.Zon Beams and slab 24-Mar-12 12-Apr-12
KVG.Zon Columns 04-Apr-12 12-Apr-12
KVG.Zone 3 Roof 14-Apr-12 05-May-12
KVG.Zon Beams and slab 14-Apr-12 05-May-12
KVG.Zone 3.St Mansonary 14-Apr-12 09-May-12
KVG.Zone 3 Ground Floor 14-Apr-12 15-Apr-12
KVG.Zone 3 First Floor 06-May-12 07-May-12
KVG.Zone 3 Roof 08-May-12 09-May-12
KVG.Zone 3.St Finishing 16-Apr-12 14-May-12
KVG.Zone 3 Ground Floor 16-Apr-12 17-Apr-12
KVG.Zon Calm Shell 16-Apr-12 17-Apr-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-May-12 09-May-12
KVG.Zon Calm Shell 08-May-12 09-May-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 10-May-12 10-May-12
KVG.Zon Calm Shell 10-May-12 10-May-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-May-12 14-May-12
KVG.Zone 3.Stage Stand alone Villa type 3 11-Aug-12
KVG.Zone 3.St Mobilization 03-Nov-11
KVG.Zone 3.St Earth Work 02-Jun-12

65
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3.St Civil Work 06-May-12 01-Aug-12
KVG.Zone 3 Foundation 06-May-12 22-May-12
KVG.Zon Footing 06-May-12 22-May-12
KVG.Z Plain Concrete 06-May-12 10-May-12
KVG.Z Reinforced Concrete&Smeles 12-May-12 22-May-12
KVG.Zone 3 Ground Floor 23-May-12 20-Jun-12
KVG.Zon Slab on grade 03-Jun-12 20-Jun-12
KVG.Zon Columns 23-May-12 30-May-12
KVG.Zone 3 First Floor 21-Jun-12 11-Jul-12
KVG.Zon Beams and slab 21-Jun-12 11-Jul-12
KVG.Zon Columns 03-Jul-12 11-Jul-12
KVG.Zone 3 Roof 12-Jul-12 01-Aug-12
KVG.Zon Beams and slab 12-Jul-12 01-Aug-12
KVG.Zone 3.St Mansonary 12-Jul-12 06-Aug-12
KVG.Zone 3 Ground Floor 12-Jul-12 14-Jul-12
KVG.Zone 3 First Floor 02-Aug-12 04-Aug-12
KVG.Zone 3 Roof 05-Aug-12 06-Aug-12
KVG.Zone 3.St Finishing 15-Jul-12 11-Aug-12
KVG.Zone 3 Ground Floor 15-Jul-12 16-Jul-12
KVG.Zon Calm Shell 15-Jul-12 16-Jul-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 05-Aug-12 06-Aug-12
KVG.Zon Calm Shell 05-Aug-12 06-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 07-Aug-12 07-Aug-12
KVG.Zon Calm Shell 07-Aug-12 07-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 08-Aug-12 11-Aug-12
KVG.Zone 3.Stage Stand alone Villa type 4 14-Nov-12
KVG.Zone 3.St Mobilization 05-Nov-11
KVG.Zone 3.St Earth Work 02-Sep-12
KVG.Zone 3.St Civil Work 02-Aug-12 05-Nov-12
KVG.Zone 3 Foundation 02-Aug-12 22-Aug-12
KVG.Zon Footing 02-Aug-12 22-Aug-12
KVG.Z Plain Concrete 02-Aug-12 07-Aug-12
KVG.Z Reinforced Concrete&Smeles 08-Aug-12 22-Aug-12
KVG.Zone 3 Ground Floor 23-Aug-12 20-Sep-12
KVG.Zon Slab on grade 03-Sep-12 20-Sep-12
KVG.Zon Columns 23-Aug-12 30-Aug-12
KVG.Zone 3 First Floor 22-Sep-12 11-Oct-12
KVG.Zon Beams and slab 22-Sep-12 11-Oct-12
KVG.Zon Columns 03-Oct-12 11-Oct-12
KVG.Zone 3 Roof 13-Oct-12 05-Nov-12
KVG.Zon Beams and slab 13-Oct-12 05-Nov-12
KVG.Zone 3.St Mansonary 13-Oct-12 10-Nov-12
KVG.Zone 3 Ground Floor 13-Oct-12 14-Oct-12
KVG.Zone 3 First Floor 06-Nov-12 07-Nov-12
KVG.Zone 3 Roof 08-Nov-12 10-Nov-12
KVG.Zone 3.St Finishing 15-Oct-12 14-Nov-12
KVG.Zone 3 Ground Floor 15-Oct-12 16-Oct-12
KVG.Zon Calm Shell 15-Oct-12 16-Oct-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Nov-12 10-Nov-12
KVG.Zon Calm Shell 08-Nov-12 10-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 11-Nov-12 11-Nov-12
KVG.Zon Calm Shell 11-Nov-12 11-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-Nov-12 14-Nov-12
KVG.Zone 3.Stage Stand alone Villa type 5 14-Feb-12
KVG.Zone 3.St Mobilization 01-Nov-11
KVG.Zone 3.St Earth Work 06-Dec-11
KVG.Zone 3.St Civil Work 05-Feb-12
KVG.Zone 3 Foundation 26-Nov-11
KVG.Zon Footing 26-Nov-11
KVG.Z Plain Concrete 14-Nov-11
KVG.Z Reinforced Concrete&Smeles 26-Nov-11
KVG.Zone 3 Ground Floor 1 25-Dec-11
KVG.Zon Slab on grade 11 25-Dec-11
KVG.Zon Columns 1 04-Dec-11
KVG.Zone 3 First Floor c-11 15-Jan-12
KVG.Zon Beams and slab c-11 15-Jan-12
KVG.Zon Columns Jan-12 15-Jan-12
KVG.Zone 3 Roof -Jan-12 05-Feb-12
KVG.Zon Beams and slab -Jan-12 05-Feb-12
KVG.Zone 3.St Mansonary -Jan-12 09-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 17-Jan-12
KVG.Zone 3 First Floor 06-Feb-12 07-Feb-12
KVG.Zone 3 Roof 08-Feb-12 09-Feb-12
KVG.Zone 3.St Finishing -Jan-12 14-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 19-Jan-12
KVG.Zon Calm Shell -Jan-12 19-Jan-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Feb-12 09-Feb-12
KVG.Zon Calm Shell 08-Feb-12 09-Feb-12
KVG.Zon External Electrical

66
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3 Roof 11-Feb-12 11-Feb-12
KVG.Zon Calm Shell 11-Feb-12 11-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-Feb-12 14-Feb-12
KVG.Zone 3.Stage Stand alone Villa type 6 14-May-12
KVG.Zone 3.St Mobilization 02-Nov-11
KVG.Zone 3.St Earth Work 04-Mar-12
KVG.Zone 3.St Civil Work 06-Feb-12 05-May-12
KVG.Zone 3 Foundation 06-Feb-12 22-Feb-12
KVG.Zon Footing 06-Feb-12 22-Feb-12
KVG.Z Plain Concrete 06-Feb-12 11-Feb-12
KVG.Z Reinforced Concrete&Smeles 12-Feb-12 22-Feb-12
KVG.Zone 3 Ground Floor 23-Feb-12 22-Mar-12
KVG.Zon Slab on grade 05-Mar-12 22-Mar-12
KVG.Zon Columns 23-Feb-12 01-Mar-12
KVG.Zone 3 First Floor 24-Mar-12 12-Apr-12
KVG.Zon Beams and slab 24-Mar-12 12-Apr-12
KVG.Zon Columns 04-Apr-12 12-Apr-12
KVG.Zone 3 Roof 14-Apr-12 05-May-12
KVG.Zon Beams and slab 14-Apr-12 05-May-12
KVG.Zone 3.St Mansonary 14-Apr-12 09-May-12
KVG.Zone 3 Ground Floor 14-Apr-12 15-Apr-12
KVG.Zone 3 First Floor 06-May-12 07-May-12
KVG.Zone 3 Roof 08-May-12 09-May-12
KVG.Zone 3.St Finishing 16-Apr-12 14-May-12
KVG.Zone 3 Ground Floor 16-Apr-12 17-Apr-12
KVG.Zon Calm Shell 16-Apr-12 17-Apr-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-May-12 09-May-12
KVG.Zon Calm Shell 08-May-12 09-May-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 10-May-12 10-May-12
KVG.Zon Calm Shell 10-May-12 10-May-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-May-12 14-May-12
KVG.Zone 3.Stage Stand alone Villa type 7 11-Aug-12
KVG.Zone 3.St Mobilization 03-Nov-11
KVG.Zone 3.St Earth Work 02-Jun-12
KVG.Zone 3.St Civil Work 06-May-12 01-Aug-12
KVG.Zone 3 Foundation 06-May-12 22-May-12
KVG.Zon Footing 06-May-12 22-May-12
KVG.Z Plain Concrete 06-May-12 10-May-12
KVG.Z Reinforced Concrete&Smeles 12-May-12 22-May-12
KVG.Zone 3 Ground Floor 23-May-12 20-Jun-12
KVG.Zon Slab on grade 03-Jun-12 20-Jun-12
KVG.Zon Columns 23-May-12 30-May-12
KVG.Zone 3 First Floor 21-Jun-12 11-Jul-12
KVG.Zon Beams and slab 21-Jun-12 11-Jul-12
KVG.Zon Columns 03-Jul-12 11-Jul-12
KVG.Zone 3 Roof 12-Jul-12 01-Aug-12
KVG.Zon Beams and slab 12-Jul-12 01-Aug-12
KVG.Zone 3.St Mansonary 12-Jul-12 06-Aug-12
KVG.Zone 3 Ground Floor 12-Jul-12 14-Jul-12
KVG.Zone 3 First Floor 02-Aug-12 04-Aug-12
KVG.Zone 3 Roof 05-Aug-12 06-Aug-12
KVG.Zone 3.St Finishing 15-Jul-12 11-Aug-12
KVG.Zone 3 Ground Floor 15-Jul-12 16-Jul-12
KVG.Zon Calm Shell 15-Jul-12 16-Jul-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 05-Aug-12 06-Aug-12
KVG.Zon Calm Shell 05-Aug-12 06-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 07-Aug-12 07-Aug-12
KVG.Zon Calm Shell 07-Aug-12 07-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 08-Aug-12 11-Aug-12
KVG.Zone 3.Stage Stand alone Villa type 8 14-Nov-12
KVG.Zone 3.St Mobilization 05-Nov-11
KVG.Zone 3.St Earth Work 02-Sep-12
KVG.Zone 3.St Civil Work 02-Aug-12 05-Nov-12
KVG.Zone 3 Foundation 02-Aug-12 22-Aug-12
KVG.Zon Footing 02-Aug-12 22-Aug-12
KVG.Z Plain Concrete 02-Aug-12 07-Aug-12
KVG.Z Reinforced Concrete&Smeles 08-Aug-12 22-Aug-12
KVG.Zone 3 Ground Floor 23-Aug-12 20-Sep-12
KVG.Zon Slab on grade 03-Sep-12 20-Sep-12
KVG.Zon Columns 23-Aug-12 30-Aug-12
KVG.Zone 3 First Floor 22-Sep-12 11-Oct-12
KVG.Zon Beams and slab 22-Sep-12 11-Oct-12
KVG.Zon Columns 03-Oct-12 11-Oct-12
KVG.Zone 3 Roof 13-Oct-12 05-Nov-12
KVG.Zon Beams and slab 13-Oct-12 05-Nov-12
KVG.Zone 3.St Mansonary 13-Oct-12 10-Nov-12
KVG.Zone 3 Ground Floor 13-Oct-12 14-Oct-12
KVG.Zone 3 First Floor 06-Nov-12 07-Nov-12
KVG.Zone 3 Roof 08-Nov-12 10-Nov-12

67
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3.St Finishing 15-Oct-12 14-Nov-12
KVG.Zone 3 Ground Floor 15-Oct-12 16-Oct-12
KVG.Zon Calm Shell 15-Oct-12 16-Oct-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Nov-12 10-Nov-12
KVG.Zon Calm Shell 08-Nov-12 10-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 11-Nov-12 11-Nov-12
KVG.Zon Calm Shell 11-Nov-12 11-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-Nov-12 14-Nov-12
KVG.Zone 3.Stage Stand alone Villa type 9 14-Feb-12
KVG.Zone 3.St Mobilization 01-Nov-11
KVG.Zone 3.St Earth Work 06-Dec-11
KVG.Zone 3.St Civil Work 05-Feb-12
KVG.Zone 3 Foundation 26-Nov-11
KVG.Zon Footing 26-Nov-11
KVG.Z Plain Concrete 14-Nov-11
KVG.Z Reinforced Concrete&Smeles 26-Nov-11
KVG.Zone 3 Ground Floor 1 25-Dec-11
KVG.Zon Slab on grade 11 25-Dec-11
KVG.Zon Columns 1 04-Dec-11
KVG.Zone 3 First Floor c-11 15-Jan-12
KVG.Zon Beams and slab c-11 15-Jan-12
KVG.Zon Columns Jan-12 15-Jan-12
KVG.Zone 3 Roof -Jan-12 05-Feb-12
KVG.Zon Beams and slab -Jan-12 05-Feb-12
KVG.Zone 3.St Mansonary -Jan-12 09-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 17-Jan-12
KVG.Zone 3 First Floor 06-Feb-12 07-Feb-12
KVG.Zone 3 Roof 08-Feb-12 09-Feb-12
KVG.Zone 3.St Finishing -Jan-12 14-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 19-Jan-12
KVG.Zon Calm Shell -Jan-12 19-Jan-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Feb-12 09-Feb-12
KVG.Zon Calm Shell 08-Feb-12 09-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 11-Feb-12 11-Feb-12
KVG.Zon Calm Shell 11-Feb-12 11-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-Feb-12 14-Feb-12
KVG.Zone 3.Stage Stand alone Villa type 10 14-May-12
KVG.Zone 3.St Mobilization 02-Nov-11
KVG.Zone 3.St Earth Work 04-Mar-12
KVG.Zone 3.St Civil Work 06-Feb-12 05-May-12
KVG.Zone 3 Foundation 06-Feb-12 22-Feb-12
KVG.Zon Footing 06-Feb-12 22-Feb-12
KVG.Z Plain Concrete 06-Feb-12 11-Feb-12
KVG.Z Reinforced Concrete&Smeles 12-Feb-12 22-Feb-12
KVG.Zone 3 Ground Floor 23-Feb-12 22-Mar-12
KVG.Zon Slab on grade 05-Mar-12 22-Mar-12
KVG.Zon Columns 23-Feb-12 01-Mar-12
KVG.Zone 3 First Floor 24-Mar-12 12-Apr-12
KVG.Zon Beams and slab 24-Mar-12 12-Apr-12
KVG.Zon Columns 04-Apr-12 12-Apr-12
KVG.Zone 3 Roof 14-Apr-12 05-May-12
KVG.Zon Beams and slab 14-Apr-12 05-May-12
KVG.Zone 3.St Mansonary 14-Apr-12 09-May-12
KVG.Zone 3 Ground Floor 14-Apr-12 15-Apr-12
KVG.Zone 3 First Floor 06-May-12 07-May-12
KVG.Zone 3 Roof 08-May-12 09-May-12
KVG.Zone 3.St Finishing 16-Apr-12 14-May-12
KVG.Zone 3 Ground Floor 16-Apr-12 17-Apr-12
KVG.Zon Calm Shell 16-Apr-12 17-Apr-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-May-12 09-May-12
KVG.Zon Calm Shell 08-May-12 09-May-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 10-May-12 10-May-12
KVG.Zon Calm Shell 10-May-12 10-May-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-May-12 14-May-12
KVG.Zone 3.Stage Stand alone Villa type 11 11-Aug-12
KVG.Zone 3.St Mobilization 03-Nov-11
KVG.Zone 3.St Earth Work 02-Jun-12
KVG.Zone 3.St Civil Work 06-May-12 01-Aug-12
KVG.Zone 3 Foundation 06-May-12 22-May-12
KVG.Zon Footing 06-May-12 22-May-12
KVG.Z Plain Concrete 06-May-12 10-May-12
KVG.Z Reinforced Concrete&Smeles 12-May-12 22-May-12
KVG.Zone 3 Ground Floor 23-May-12 20-Jun-12
KVG.Zon Slab on grade 03-Jun-12 20-Jun-12
KVG.Zon Columns 23-May-12 30-May-12
KVG.Zone 3 First Floor 21-Jun-12 11-Jul-12
KVG.Zon Beams and slab 21-Jun-12 11-Jul-12

68
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Columns 03-Jul-12 11-Jul-12
KVG.Zone 3 Roof 12-Jul-12 01-Aug-12
KVG.Zon Beams and slab 12-Jul-12 01-Aug-12
KVG.Zone 3.St Mansonary 12-Jul-12 06-Aug-12
KVG.Zone 3 Ground Floor 12-Jul-12 14-Jul-12
KVG.Zone 3 First Floor 02-Aug-12 04-Aug-12
KVG.Zone 3 Roof 05-Aug-12 06-Aug-12
KVG.Zone 3.St Finishing 15-Jul-12 11-Aug-12
KVG.Zone 3 Ground Floor 15-Jul-12 16-Jul-12
KVG.Zon Calm Shell 15-Jul-12 16-Jul-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 05-Aug-12 06-Aug-12
KVG.Zon Calm Shell 05-Aug-12 06-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 07-Aug-12 07-Aug-12
KVG.Zon Calm Shell 07-Aug-12 07-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 08-Aug-12 11-Aug-12
KVG.Zone 3.Stage Stand alone Villa type 12 14-Nov-12
KVG.Zone 3.St Mobilization 05-Nov-11
KVG.Zone 3.St Earth Work 02-Sep-12
KVG.Zone 3.St Civil Work 02-Aug-12 05-Nov-12
KVG.Zone 3 Foundation 02-Aug-12 22-Aug-12
KVG.Zon Footing 02-Aug-12 22-Aug-12
KVG.Z Plain Concrete 02-Aug-12 07-Aug-12
KVG.Z Reinforced Concrete&Smeles 08-Aug-12 22-Aug-12
KVG.Zone 3 Ground Floor 23-Aug-12 20-Sep-12
KVG.Zon Slab on grade 03-Sep-12 20-Sep-12
KVG.Zon Columns 23-Aug-12 30-Aug-12
KVG.Zone 3 First Floor 22-Sep-12 11-Oct-12
KVG.Zon Beams and slab 22-Sep-12 11-Oct-12
KVG.Zon Columns 03-Oct-12 11-Oct-12
KVG.Zone 3 Roof 13-Oct-12 05-Nov-12
KVG.Zon Beams and slab 13-Oct-12 05-Nov-12
KVG.Zone 3.St Mansonary 13-Oct-12 10-Nov-12
KVG.Zone 3 Ground Floor 13-Oct-12 14-Oct-12
KVG.Zone 3 First Floor 06-Nov-12 07-Nov-12
KVG.Zone 3 Roof 08-Nov-12 10-Nov-12
KVG.Zone 3.St Finishing 15-Oct-12 14-Nov-12
KVG.Zone 3 Ground Floor 15-Oct-12 16-Oct-12
KVG.Zon Calm Shell 15-Oct-12 16-Oct-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Nov-12 10-Nov-12
KVG.Zon Calm Shell 08-Nov-12 10-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 11-Nov-12 11-Nov-12
KVG.Zon Calm Shell 11-Nov-12 11-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-Nov-12 14-Nov-12
KVG.Zone 3.Stage Stand alone Villa type 13 14-Feb-12
KVG.Zone 3.St Mobilization 01-Nov-11
KVG.Zone 3.St Earth Work 06-Dec-11
KVG.Zone 3.St Civil Work 05-Feb-12
KVG.Zone 3 Foundation 26-Nov-11
KVG.Zon Footing 26-Nov-11
KVG.Z Plain Concrete 14-Nov-11
KVG.Z Reinforced Concrete&Smeles 26-Nov-11
KVG.Zone 3 Ground Floor 1 25-Dec-11
KVG.Zon Slab on grade 11 25-Dec-11
KVG.Zon Columns 1 04-Dec-11
KVG.Zone 3 First Floor c-11 15-Jan-12
KVG.Zon Beams and slab c-11 15-Jan-12
KVG.Zon Columns Jan-12 15-Jan-12
KVG.Zone 3 Roof -Jan-12 05-Feb-12
KVG.Zon Beams and slab -Jan-12 05-Feb-12
KVG.Zone 3.St Mansonary -Jan-12 09-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 17-Jan-12
KVG.Zone 3 First Floor 06-Feb-12 07-Feb-12
KVG.Zone 3 Roof 08-Feb-12 09-Feb-12
KVG.Zone 3.St Finishing -Jan-12 14-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 19-Jan-12
KVG.Zon Calm Shell -Jan-12 19-Jan-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Feb-12 09-Feb-12
KVG.Zon Calm Shell 08-Feb-12 09-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 11-Feb-12 11-Feb-12
KVG.Zon Calm Shell 11-Feb-12 11-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-Feb-12 14-Feb-12
KVG.Zone 3.Stage Stand alone Villa type 14 14-May-12
KVG.Zone 3.St Mobilization 02-Nov-11
KVG.Zone 3.St Earth Work 04-Mar-12
KVG.Zone 3.St Civil Work 06-Feb-12 05-May-12
KVG.Zone 3 Foundation 06-Feb-12 22-Feb-12
KVG.Zon Footing 06-Feb-12 22-Feb-12

69
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Z Plain Concrete 06-Feb-12 11-Feb-12
KVG.Z Reinforced Concrete&Smeles 12-Feb-12 22-Feb-12
KVG.Zone 3 Ground Floor 23-Feb-12 22-Mar-12
KVG.Zon Slab on grade 05-Mar-12 22-Mar-12
KVG.Zon Columns 23-Feb-12 01-Mar-12
KVG.Zone 3 First Floor 24-Mar-12 12-Apr-12
KVG.Zon Beams and slab 24-Mar-12 12-Apr-12
KVG.Zon Columns 04-Apr-12 12-Apr-12
KVG.Zone 3 Roof 14-Apr-12 05-May-12
KVG.Zon Beams and slab 14-Apr-12 05-May-12
KVG.Zone 3.St Mansonary 14-Apr-12 09-May-12
KVG.Zone 3 Ground Floor 14-Apr-12 15-Apr-12
KVG.Zone 3 First Floor 06-May-12 07-May-12
KVG.Zone 3 Roof 08-May-12 09-May-12
KVG.Zone 3.St Finishing 16-Apr-12 14-May-12
KVG.Zone 3 Ground Floor 16-Apr-12 17-Apr-12
KVG.Zon Calm Shell 16-Apr-12 17-Apr-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-May-12 09-May-12
KVG.Zon Calm Shell 08-May-12 09-May-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 10-May-12 10-May-12
KVG.Zon Calm Shell 10-May-12 10-May-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-May-12 14-May-12
KVG.Zone 3.Stage Stand alone Villa type 15 11-Aug-12
KVG.Zone 3.St Mobilization 03-Nov-11
KVG.Zone 3.St Earth Work 02-Jun-12
KVG.Zone 3.St Civil Work 06-May-12 01-Aug-12
KVG.Zone 3 Foundation 06-May-12 22-May-12
KVG.Zon Footing 06-May-12 22-May-12
KVG.Z Plain Concrete 06-May-12 10-May-12
KVG.Z Reinforced Concrete&Smeles 12-May-12 22-May-12
KVG.Zone 3 Ground Floor 23-May-12 20-Jun-12
KVG.Zon Slab on grade 03-Jun-12 20-Jun-12
KVG.Zon Columns 23-May-12 30-May-12
KVG.Zone 3 First Floor 21-Jun-12 11-Jul-12
KVG.Zon Beams and slab 21-Jun-12 11-Jul-12
KVG.Zon Columns 03-Jul-12 11-Jul-12
KVG.Zone 3 Roof 12-Jul-12 01-Aug-12
KVG.Zon Beams and slab 12-Jul-12 01-Aug-12
KVG.Zone 3.St Mansonary 12-Jul-12 06-Aug-12
KVG.Zone 3 Ground Floor 12-Jul-12 14-Jul-12
KVG.Zone 3 First Floor 02-Aug-12 04-Aug-12
KVG.Zone 3 Roof 05-Aug-12 06-Aug-12
KVG.Zone 3.St Finishing 15-Jul-12 11-Aug-12
KVG.Zone 3 Ground Floor 15-Jul-12 16-Jul-12
KVG.Zon Calm Shell 15-Jul-12 16-Jul-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 05-Aug-12 06-Aug-12
KVG.Zon Calm Shell 05-Aug-12 06-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 07-Aug-12 07-Aug-12
KVG.Zon Calm Shell 07-Aug-12 07-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 08-Aug-12 11-Aug-12
KVG.Zone 3.Stage Stand alone Villa type 16 14-Nov-12
KVG.Zone 3.St Mobilization 05-Nov-11
KVG.Zone 3.St Earth Work 02-Sep-12
KVG.Zone 3.St Civil Work 02-Aug-12 05-Nov-12
KVG.Zone 3 Foundation 02-Aug-12 22-Aug-12
KVG.Zon Footing 02-Aug-12 22-Aug-12
KVG.Z Plain Concrete 02-Aug-12 07-Aug-12
KVG.Z Reinforced Concrete&Smeles 08-Aug-12 22-Aug-12
KVG.Zone 3 Ground Floor 23-Aug-12 20-Sep-12
KVG.Zon Slab on grade 03-Sep-12 20-Sep-12
KVG.Zon Columns 23-Aug-12 30-Aug-12
KVG.Zone 3 First Floor 22-Sep-12 11-Oct-12
KVG.Zon Beams and slab 22-Sep-12 11-Oct-12
KVG.Zon Columns 03-Oct-12 11-Oct-12
KVG.Zone 3 Roof 13-Oct-12 05-Nov-12
KVG.Zon Beams and slab 13-Oct-12 05-Nov-12
KVG.Zone 3.St Mansonary 13-Oct-12 10-Nov-12
KVG.Zone 3 Ground Floor 13-Oct-12 14-Oct-12
KVG.Zone 3 First Floor 06-Nov-12 07-Nov-12
KVG.Zone 3 Roof 08-Nov-12 10-Nov-12
KVG.Zone 3.St Finishing 15-Oct-12 14-Nov-12
KVG.Zone 3 Ground Floor 15-Oct-12 16-Oct-12
KVG.Zon Calm Shell 15-Oct-12 16-Oct-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Nov-12 10-Nov-12
KVG.Zon Calm Shell 08-Nov-12 10-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 11-Nov-12 11-Nov-12
KVG.Zon Calm Shell 11-Nov-12 11-Nov-12
KVG.Zon External Electrical

70
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3 Paint Villa 1 12-Nov-12 14-Nov-12
KVG.Zone 3.Stage Stand alone Villa type 17 14-Feb-12
KVG.Zone 3.St Mobilization 01-Nov-11
KVG.Zone 3.St Earth Work 06-Dec-11
KVG.Zone 3.St Civil Work 05-Feb-12
KVG.Zone 3 Foundation 26-Nov-11
KVG.Zon Footing 26-Nov-11
KVG.Z Plain Concrete 14-Nov-11
KVG.Z Reinforced Concrete&Smeles 26-Nov-11
KVG.Zone 3 Ground Floor 1 25-Dec-11
KVG.Zon Slab on grade 11 25-Dec-11
KVG.Zon Columns 1 04-Dec-11
KVG.Zone 3 First Floor c-11 15-Jan-12
KVG.Zon Beams and slab c-11 15-Jan-12
KVG.Zon Columns Jan-12 15-Jan-12
KVG.Zone 3 Roof -Jan-12 05-Feb-12
KVG.Zon Beams and slab -Jan-12 05-Feb-12
KVG.Zone 3.St Mansonary -Jan-12 09-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 17-Jan-12
KVG.Zone 3 First Floor 06-Feb-12 07-Feb-12
KVG.Zone 3 Roof 08-Feb-12 09-Feb-12
KVG.Zone 3.St Finishing -Jan-12 14-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 19-Jan-12
KVG.Zon Calm Shell -Jan-12 19-Jan-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Feb-12 09-Feb-12
KVG.Zon Calm Shell 08-Feb-12 09-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 11-Feb-12 11-Feb-12
KVG.Zon Calm Shell 11-Feb-12 11-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-Feb-12 14-Feb-12
KVG.Zone 3.Stage Stand alone Villa type 18 14-May-12
KVG.Zone 3.St Mobilization 02-Nov-11
KVG.Zone 3.St Earth Work 04-Mar-12
KVG.Zone 3.St Civil Work 06-Feb-12 05-May-12
KVG.Zone 3 Foundation 06-Feb-12 22-Feb-12
KVG.Zon Footing 06-Feb-12 22-Feb-12
KVG.Z Plain Concrete 06-Feb-12 11-Feb-12
KVG.Z Reinforced Concrete&Smeles 12-Feb-12 22-Feb-12
KVG.Zone 3 Ground Floor 23-Feb-12 22-Mar-12
KVG.Zon Slab on grade 05-Mar-12 22-Mar-12
KVG.Zon Columns 23-Feb-12 01-Mar-12
KVG.Zone 3 First Floor 24-Mar-12 12-Apr-12
KVG.Zon Beams and slab 24-Mar-12 12-Apr-12
KVG.Zon Columns 04-Apr-12 12-Apr-12
KVG.Zone 3 Roof 14-Apr-12 05-May-12
KVG.Zon Beams and slab 14-Apr-12 05-May-12
KVG.Zone 3.St Mansonary 14-Apr-12 09-May-12
KVG.Zone 3 Ground Floor 14-Apr-12 15-Apr-12
KVG.Zone 3 First Floor 06-May-12 07-May-12
KVG.Zone 3 Roof 08-May-12 09-May-12
KVG.Zone 3.St Finishing 16-Apr-12 14-May-12
KVG.Zone 3 Ground Floor 16-Apr-12 17-Apr-12
KVG.Zon Calm Shell 16-Apr-12 17-Apr-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-May-12 09-May-12
KVG.Zon Calm Shell 08-May-12 09-May-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 10-May-12 10-May-12
KVG.Zon Calm Shell 10-May-12 10-May-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-May-12 14-May-12
KVG.Zone 3.Stage Stand alone Villa type 19 11-Aug-12
KVG.Zone 3.St Mobilization 03-Nov-11
KVG.Zone 3.St Earth Work 02-Jun-12
KVG.Zone 3.St Civil Work 06-May-12 01-Aug-12
KVG.Zone 3 Foundation 06-May-12 22-May-12
KVG.Zon Footing 06-May-12 22-May-12
KVG.Z Plain Concrete 06-May-12 10-May-12
KVG.Z Reinforced Concrete&Smeles 12-May-12 22-May-12
KVG.Zone 3 Ground Floor 23-May-12 20-Jun-12
KVG.Zon Slab on grade 03-Jun-12 20-Jun-12
KVG.Zon Columns 23-May-12 30-May-12
KVG.Zone 3 First Floor 21-Jun-12 11-Jul-12
KVG.Zon Beams and slab 21-Jun-12 11-Jul-12
KVG.Zon Columns 03-Jul-12 11-Jul-12
KVG.Zone 3 Roof 12-Jul-12 01-Aug-12
KVG.Zon Beams and slab 12-Jul-12 01-Aug-12
KVG.Zone 3.St Mansonary 12-Jul-12 06-Aug-12
KVG.Zone 3 Ground Floor 12-Jul-12 14-Jul-12
KVG.Zone 3 First Floor 02-Aug-12 04-Aug-12
KVG.Zone 3 Roof 05-Aug-12 06-Aug-12
KVG.Zone 3.St Finishing 15-Jul-12 11-Aug-12
KVG.Zone 3 Ground Floor 15-Jul-12 16-Jul-12
KVG.Zon Calm Shell 15-Jul-12 16-Jul-12

71
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon External Electrical
KVG.Zone 3 First Floor 05-Aug-12 06-Aug-12
KVG.Zon Calm Shell 05-Aug-12 06-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 07-Aug-12 07-Aug-12
KVG.Zon Calm Shell 07-Aug-12 07-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 08-Aug-12 11-Aug-12
KVG.Zone 3.Stage Stand alone Villa type 20 14-Nov-12
KVG.Zone 3.St Mobilization 05-Nov-11
KVG.Zone 3.St Earth Work 02-Sep-12
KVG.Zone 3.St Civil Work 02-Aug-12 05-Nov-12
KVG.Zone 3 Foundation 02-Aug-12 22-Aug-12
KVG.Zon Footing 02-Aug-12 22-Aug-12
KVG.Z Plain Concrete 02-Aug-12 07-Aug-12
KVG.Z Reinforced Concrete&Smeles 08-Aug-12 22-Aug-12
KVG.Zone 3 Ground Floor 23-Aug-12 20-Sep-12
KVG.Zon Slab on grade 03-Sep-12 20-Sep-12
KVG.Zon Columns 23-Aug-12 30-Aug-12
KVG.Zone 3 First Floor 22-Sep-12 11-Oct-12
KVG.Zon Beams and slab 22-Sep-12 11-Oct-12
KVG.Zon Columns 03-Oct-12 11-Oct-12
KVG.Zone 3 Roof 13-Oct-12 05-Nov-12
KVG.Zon Beams and slab 13-Oct-12 05-Nov-12
KVG.Zone 3.St Mansonary 13-Oct-12 10-Nov-12
KVG.Zone 3 Ground Floor 13-Oct-12 14-Oct-12
KVG.Zone 3 First Floor 06-Nov-12 07-Nov-12
KVG.Zone 3 Roof 08-Nov-12 10-Nov-12
KVG.Zone 3.St Finishing 15-Oct-12 14-Nov-12
KVG.Zone 3 Ground Floor 15-Oct-12 16-Oct-12
KVG.Zon Calm Shell 15-Oct-12 16-Oct-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Nov-12 10-Nov-12
KVG.Zon Calm Shell 08-Nov-12 10-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 11-Nov-12 11-Nov-12
KVG.Zon Calm Shell 11-Nov-12 11-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-Nov-12 14-Nov-12
KVG.Zone 3.Stage Stand alone Villa type 21 14-Feb-12
KVG.Zone 3.St Mobilization 01-Nov-11
KVG.Zone 3.St Earth Work 06-Dec-11
KVG.Zone 3.St Civil Work 05-Feb-12
KVG.Zone 3 Foundation 26-Nov-11
KVG.Zon Footing 26-Nov-11
KVG.Z Plain Concrete 14-Nov-11
KVG.Z Reinforced Concrete&Smeles 26-Nov-11
KVG.Zone 3 Ground Floor 1 25-Dec-11
KVG.Zon Slab on grade 11 25-Dec-11
KVG.Zon Columns 1 04-Dec-11
KVG.Zone 3 First Floor c-11 15-Jan-12
KVG.Zon Beams and slab c-11 15-Jan-12
KVG.Zon Columns Jan-12 15-Jan-12
KVG.Zone 3 Roof -Jan-12 05-Feb-12
KVG.Zon Beams and slab -Jan-12 05-Feb-12
KVG.Zone 3.St Mansonary -Jan-12 09-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 17-Jan-12
KVG.Zone 3 First Floor 06-Feb-12 07-Feb-12
KVG.Zone 3 Roof 08-Feb-12 09-Feb-12
KVG.Zone 3.St Finishing -Jan-12 14-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 19-Jan-12
KVG.Zon Calm Shell -Jan-12 19-Jan-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Feb-12 09-Feb-12
KVG.Zon Calm Shell 08-Feb-12 09-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 11-Feb-12 11-Feb-12
KVG.Zon Calm Shell 11-Feb-12 11-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 12-Feb-12 14-Feb-12
KVG.Zone 3.Stage Stand alone Villa type 22 16-May-12
KVG.Zone 3.St Mobilization 02-Nov-11
KVG.Zone 3.St Earth Work 04-Mar-12
KVG.Zone 3.St Civil Work 06-Feb-12 07-May-12
KVG.Zone 3 Foundation 06-Feb-12 22-Feb-12
KVG.Zon Footing 06-Feb-12 22-Feb-12
KVG.Z Plain Concrete 06-Feb-12 12-Feb-12
KVG.Z Reinforced Concrete&Semels 13-Feb-12 22-Feb-12
KVG.Zone 3 Ground Floor 23-Feb-12 24-Mar-12
KVG.Zon Slab on grade 05-Mar-12 24-Mar-12
KVG.Zon Columns 23-Feb-12 03-Mar-12
KVG.Zone 3 First Floor 25-Mar-12 15-Apr-12
KVG.Zon Beams and Slabs 25-Mar-12 14-Apr-12
KVG.Zon Columns 05-Apr-12 15-Apr-12
KVG.Zone 3 Roof 16-Apr-12 07-May-12
KVG.Zon Beams and Slabs 16-Apr-12 07-May-12

72
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3.St Mansonary 15-Apr-12 10-May-12
KVG.Zone 3 Ground Floor 15-Apr-12 16-Apr-12
KVG.Zone 3 First Floor 08-May-12 09-May-12
KVG.Zone 3 Roof 10-May-12 10-May-12
KVG.Zone 3.St Finishing 17-Apr-12 16-May-12
KVG.Zone 3 Ground Floor 17-Apr-12 18-Apr-12
KVG.Zon Calm Shell 17-Apr-12 18-Apr-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 10-May-12 12-May-12
KVG.Zon Calm Shell 10-May-12 12-May-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 13-May-12 13-May-12
KVG.Zon Calm Shell 13-May-12 13-May-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 14-May-12 16-May-12
KVG.Zone 3.Stage Stand alone Villa type 23 15-Aug-12
KVG.Zone 3.St Mobilization 03-Nov-11
KVG.Zone 3.St Earth Work 04-Jun-12
KVG.Zone 3.St Civil Work 08-May-12 06-Aug-12
KVG.Zone 3 Foundation 08-May-12 24-May-12
KVG.Zon Footing 08-May-12 24-May-12
KVG.Z Plain Concrete 08-May-12 14-May-12
KVG.Z Reinforced Concrete&Semels 15-May-12 24-May-12
KVG.Zone 3 Ground Floor 26-May-12 24-Jun-12
KVG.Zon Slab on grade 05-Jun-12 24-Jun-12
KVG.Zon Columns 26-May-12 03-Jun-12
KVG.Zone 3 First Floor 25-Jun-12 16-Jul-12
KVG.Zon Beams and Slabs 25-Jun-12 15-Jul-12
KVG.Zon Columns 07-Jul-12 16-Jul-12
KVG.Zone 3 Roof 17-Jul-12 06-Aug-12
KVG.Zon Beams and Slabs 17-Jul-12 06-Aug-12
KVG.Zone 3.St Mansonary 16-Jul-12 09-Aug-12
KVG.Zone 3 Ground Floor 16-Jul-12 17-Jul-12
KVG.Zone 3 First Floor 07-Aug-12 08-Aug-12
KVG.Zone 3 Roof 09-Aug-12 09-Aug-12
KVG.Zone 3.St Finishing 18-Jul-12 15-Aug-12
KVG.Zone 3 Ground Floor 18-Jul-12 19-Jul-12
KVG.Zon Calm Shell 18-Jul-12 19-Jul-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 09-Aug-12 11-Aug-12
KVG.Zon Calm Shell 09-Aug-12 11-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 12-Aug-12 12-Aug-12
KVG.Zon Calm Shell 12-Aug-12 12-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 13-Aug-12 15-Aug-12
KVG.Zone 3.Stage Stand alone Villa type 24 21-Nov-12
KVG.Zone 3.St Mobilization 05-Nov-11
KVG.Zone 3.St Earth Work 06-Sep-12
KVG.Zone 3.St Civil Work 07-Aug-12 12-Nov-12
KVG.Zone 3 Foundation 07-Aug-12 27-Aug-12
KVG.Zon Footing 07-Aug-12 27-Aug-12
KVG.Z Plain Concrete 07-Aug-12 13-Aug-12
KVG.Z Reinforced Concrete&Semels 14-Aug-12 27-Aug-12
KVG.Zone 3 Ground Floor 28-Aug-12 26-Sep-12
KVG.Zon Slab on grade 08-Sep-12 26-Sep-12
KVG.Zon Columns 28-Aug-12 05-Sep-12
KVG.Zone 3 First Floor 27-Sep-12 18-Oct-12
KVG.Zon Beams and Slabs 27-Sep-12 17-Oct-12
KVG.Zon Columns 09-Oct-12 18-Oct-12
KVG.Zone 3 Roof 20-Oct-12 12-Nov-12
KVG.Zon Beams and Slabs 20-Oct-12 12-Nov-12
KVG.Zone 3.St Mansonary 18-Oct-12 15-Nov-12
KVG.Zone 3 Ground Floor 18-Oct-12 20-Oct-12
KVG.Zone 3 First Floor 13-Nov-12 14-Nov-12
KVG.Zone 3 Roof 15-Nov-12 15-Nov-12
KVG.Zone 3.St Finishing 21-Oct-12 21-Nov-12
KVG.Zone 3 Ground Floor 21-Oct-12 22-Oct-12
KVG.Zon Calm Shell 21-Oct-12 22-Oct-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 15-Nov-12 17-Nov-12
KVG.Zon Calm Shell 15-Nov-12 17-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 18-Nov-12 18-Nov-12
KVG.Zon Calm Shell 18-Nov-12 18-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 19-Nov-12 21-Nov-12
KVG.Zone 3.Stage Stand alone Villa type 25 16-Feb-12
KVG.Zone 3.St Mobilization 01-Nov-11
KVG.Zone 3.St Earth Work 06-Dec-11
KVG.Zone 3.St Civil Work 07-Feb-12
KVG.Zone 3 Foundation 26-Nov-11
KVG.Zon Footing 26-Nov-11
KVG.Z Plain Concrete 15-Nov-11
KVG.Z Reinforced Concrete&Semels 26-Nov-11
KVG.Zone 3 Ground Floor 1 26-Dec-11

73
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Slab on grade 11 26-Dec-11
KVG.Zon Columns 1 05-Dec-11
KVG.Zone 3 First Floor ec-11 17-Jan-12
KVG.Zon Beams and Slabs ec-11 16-Jan-12
KVG.Zon Columns Jan-12 17-Jan-12
KVG.Zone 3 Roof -Jan-12 07-Feb-12
KVG.Zon Beams and Slabs -Jan-12 07-Feb-12
KVG.Zone 3.St Mansonary -Jan-12 11-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 18-Jan-12
KVG.Zone 3 First Floor 08-Feb-12 09-Feb-12
KVG.Zone 3 Roof 11-Feb-12 11-Feb-12
KVG.Zone 3.St Finishing -Jan-12 16-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 21-Jan-12
KVG.Zon Calm Shell -Jan-12 21-Jan-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 11-Feb-12 12-Feb-12
KVG.Zon Calm Shell 11-Feb-12 12-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 13-Feb-12 13-Feb-12
KVG.Zon Calm Shell 13-Feb-12 13-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 14-Feb-12 16-Feb-12
KVG.Zone 3.Stage Stand alone Villa type 26 19-May-12
KVG.Zone 3.St Mobilization 02-Nov-11
KVG.Zone 3.St Earth Work 06-Mar-12
KVG.Zone 3.St Civil Work 08-Feb-12 09-May-12
KVG.Zone 3 Foundation 08-Feb-12 25-Feb-12
KVG.Zon Footing 08-Feb-12 25-Feb-12
KVG.Z Plain Concrete 08-Feb-12 14-Feb-12
KVG.Z Reinforced Concrete&Semels 15-Feb-12 25-Feb-12
KVG.Zone 3 Ground Floor 26-Feb-12 26-Mar-12
KVG.Zon Slab on grade 07-Mar-12 26-Mar-12
KVG.Zon Columns 26-Feb-12 05-Mar-12
KVG.Zone 3 First Floor 27-Mar-12 17-Apr-12
KVG.Zon Beams and Slabs 27-Mar-12 16-Apr-12
KVG.Zon Columns 08-Apr-12 17-Apr-12
KVG.Zone 3 Roof 18-Apr-12 09-May-12
KVG.Zon Beams and Slabs 18-Apr-12 09-May-12
KVG.Zone 3.St Mansonary 17-Apr-12 13-May-12
KVG.Zone 3 Ground Floor 17-Apr-12 18-Apr-12
KVG.Zone 3 First Floor 10-May-12 12-May-12
KVG.Zone 3 Roof 13-May-12 13-May-12
KVG.Zone 3.St Finishing 19-Apr-12 19-May-12
KVG.Zone 3 Ground Floor 19-Apr-12 21-Apr-12
KVG.Zon Calm Shell 19-Apr-12 21-Apr-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 13-May-12 14-May-12
KVG.Zon Calm Shell 13-May-12 14-May-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 15-May-12 15-May-12
KVG.Zon Calm Shell 15-May-12 15-May-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 16-May-12 19-May-12
KVG.Zone 3.Stage Stand alone Villa type 27 18-Aug-12
KVG.Zone 3.St Mobilization 03-Nov-11
KVG.Zone 3.St Earth Work 06-Jun-12
KVG.Zone 3.St Civil Work 10-May-12 08-Aug-12
KVG.Zone 3 Foundation 10-May-12 27-May-12
KVG.Zon Footing 10-May-12 27-May-12
KVG.Z Plain Concrete 10-May-12 16-May-12
KVG.Z Reinforced Concrete&Semels 17-May-12 27-May-12
KVG.Zone 3 Ground Floor 28-May-12 26-Jun-12
KVG.Zon Slab on grade 07-Jun-12 26-Jun-12
KVG.Zon Columns 28-May-12 05-Jun-12
KVG.Zone 3 First Floor 27-Jun-12 18-Jul-12
KVG.Zon Beams and Slabs 27-Jun-12 17-Jul-12
KVG.Zon Columns 09-Jul-12 18-Jul-12
KVG.Zone 3 Roof 19-Jul-12 08-Aug-12
KVG.Zon Beams and Slabs 19-Jul-12 08-Aug-12
KVG.Zone 3.St Mansonary 18-Jul-12 12-Aug-12
KVG.Zone 3 Ground Floor 18-Jul-12 19-Jul-12
KVG.Zone 3 First Floor 09-Aug-12 11-Aug-12
KVG.Zone 3 Roof 12-Aug-12 12-Aug-12
KVG.Zone 3.St Finishing 21-Jul-12 18-Aug-12
KVG.Zone 3 Ground Floor 21-Jul-12 22-Jul-12
KVG.Zon Calm Shell 21-Jul-12 22-Jul-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 12-Aug-12 13-Aug-12
KVG.Zon Calm Shell 12-Aug-12 13-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 14-Aug-12 14-Aug-12
KVG.Zon Calm Shell 14-Aug-12 14-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 15-Aug-12 18-Aug-12
KVG.Zone 3.Stage Stand alone Villa type 28 24-Nov-12
KVG.Zone 3.St Mobilization 05-Nov-11

74
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3.St Earth Work 09-Sep-12
KVG.Zone 3.St Civil Work 09-Aug-12 14-Nov-12
KVG.Zone 3 Foundation 09-Aug-12 29-Aug-12
KVG.Zon Footing 09-Aug-12 29-Aug-12
KVG.Z Plain Concrete 09-Aug-12 15-Aug-12
KVG.Z Reinforced Concrete&Semels 16-Aug-12 29-Aug-12
KVG.Zone 3 Ground Floor 30-Aug-12 29-Sep-12
KVG.Zon Slab on grade 10-Sep-12 29-Sep-12
KVG.Zon Columns 30-Aug-12 08-Sep-12
KVG.Zone 3 First Floor 30-Sep-12 21-Oct-12
KVG.Zon Beams and Slabs 30-Sep-12 20-Oct-12
KVG.Zon Columns 11-Oct-12 21-Oct-12
KVG.Zone 3 Roof 22-Oct-12 14-Nov-12
KVG.Zon Beams and Slabs 22-Oct-12 14-Nov-12
KVG.Zone 3.St Mansonary 21-Oct-12 18-Nov-12
KVG.Zone 3 Ground Floor 21-Oct-12 22-Oct-12
KVG.Zone 3 First Floor 15-Nov-12 17-Nov-12
KVG.Zone 3 Roof 18-Nov-12 18-Nov-12
KVG.Zone 3.St Finishing 23-Oct-12 24-Nov-12
KVG.Zone 3 Ground Floor 23-Oct-12 24-Oct-12
KVG.Zon Calm Shell 23-Oct-12 24-Oct-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 18-Nov-12 19-Nov-12
KVG.Zon Calm Shell 18-Nov-12 19-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 20-Nov-12 20-Nov-12
KVG.Zon Calm Shell 20-Nov-12 20-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 21-Nov-12 24-Nov-12
KVG.Zone 3.Stage Stand alone Villa type 29 16-Feb-12
KVG.Zone 3.St Mobilization 01-Nov-11
KVG.Zone 3.St Earth Work 06-Dec-11
KVG.Zone 3.St Civil Work 07-Feb-12
KVG.Zone 3 Foundation 26-Nov-11
KVG.Zon Footing 26-Nov-11
KVG.Z Plain Concrete 15-Nov-11
KVG.Z Reinforced Concrete&Semels 26-Nov-11
KVG.Zone 3 Ground Floor 1 26-Dec-11
KVG.Zon Slab on grade 11 26-Dec-11
KVG.Zon Columns 1 05-Dec-11
KVG.Zone 3 First Floor ec-11 17-Jan-12
KVG.Zon Beams and Slabs ec-11 16-Jan-12
KVG.Zon Columns Jan-12 17-Jan-12
KVG.Zone 3 Roof -Jan-12 07-Feb-12
KVG.Zon Beams and Slabs -Jan-12 07-Feb-12
KVG.Zone 3.St Mansonary -Jan-12 11-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 18-Jan-12
KVG.Zone 3 First Floor 08-Feb-12 09-Feb-12
KVG.Zone 3 Roof 11-Feb-12 11-Feb-12
KVG.Zone 3.St Finishing -Jan-12 16-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 21-Jan-12
KVG.Zon Calm Shell -Jan-12 21-Jan-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 11-Feb-12 12-Feb-12
KVG.Zon Calm Shell 11-Feb-12 12-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 13-Feb-12 13-Feb-12
KVG.Zon Calm Shell 13-Feb-12 13-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 14-Feb-12 16-Feb-12
KVG.Zone 3.Stage Stand alone Villa type 30 19-May-12
KVG.Zone 3.St Mobilization 02-Nov-11
KVG.Zone 3.St Earth Work 06-Mar-12
KVG.Zone 3.St Civil Work 08-Feb-12 09-May-12
KVG.Zone 3 Foundation 08-Feb-12 25-Feb-12
KVG.Zon Footing 08-Feb-12 25-Feb-12
KVG.Z Plain Concrete 08-Feb-12 14-Feb-12
KVG.Z Reinforced Concrete&Semels 15-Feb-12 25-Feb-12
KVG.Zone 3 Ground Floor 26-Feb-12 26-Mar-12
KVG.Zon Slab on grade 07-Mar-12 26-Mar-12
KVG.Zon Columns 26-Feb-12 05-Mar-12
KVG.Zone 3 First Floor 27-Mar-12 17-Apr-12
KVG.Zon Beams and Slabs 27-Mar-12 16-Apr-12
KVG.Zon Columns 08-Apr-12 17-Apr-12
KVG.Zone 3 Roof 18-Apr-12 09-May-12
KVG.Zon Beams and Slabs 18-Apr-12 09-May-12
KVG.Zone 3.St Mansonary 17-Apr-12 13-May-12
KVG.Zone 3 Ground Floor 17-Apr-12 18-Apr-12
KVG.Zone 3 First Floor 10-May-12 12-May-12
KVG.Zone 3 Roof 13-May-12 13-May-12
KVG.Zone 3.St Finishing 19-Apr-12 19-May-12
KVG.Zone 3 Ground Floor 19-Apr-12 21-Apr-12
KVG.Zon Calm Shell 19-Apr-12 21-Apr-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 13-May-12 14-May-12
KVG.Zon Calm Shell 13-May-12 14-May-12

75
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon External Electrical
KVG.Zone 3 Roof 15-May-12 15-May-12
KVG.Zon Calm Shell 15-May-12 15-May-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 16-May-12 19-May-12
KVG.Zone 3.Stage Stand alone Villa type 31 18-Aug-12
KVG.Zone 3.St Mobilization 03-Nov-11
KVG.Zone 3.St Earth Work 06-Jun-12
KVG.Zone 3.St Civil Work 10-May-12 08-Aug-12
KVG.Zone 3 Foundation 10-May-12 27-May-12
KVG.Zon Footing 10-May-12 27-May-12
KVG.Z Plain Concrete 10-May-12 16-May-12
KVG.Z Reinforced Concrete&Semels 17-May-12 27-May-12
KVG.Zone 3 Ground Floor 28-May-12 26-Jun-12
KVG.Zon Slab on grade 07-Jun-12 26-Jun-12
KVG.Zon Columns 28-May-12 05-Jun-12
KVG.Zone 3 First Floor 27-Jun-12 18-Jul-12
KVG.Zon Beams and Slabs 27-Jun-12 17-Jul-12
KVG.Zon Columns 09-Jul-12 18-Jul-12
KVG.Zone 3 Roof 19-Jul-12 08-Aug-12
KVG.Zon Beams and Slabs 19-Jul-12 08-Aug-12
KVG.Zone 3.St Mansonary 18-Jul-12 12-Aug-12
KVG.Zone 3 Ground Floor 18-Jul-12 19-Jul-12
KVG.Zone 3 First Floor 09-Aug-12 11-Aug-12
KVG.Zone 3 Roof 12-Aug-12 12-Aug-12
KVG.Zone 3.St Finishing 21-Jul-12 18-Aug-12
KVG.Zone 3 Ground Floor 21-Jul-12 22-Jul-12
KVG.Zon Calm Shell 21-Jul-12 22-Jul-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 12-Aug-12 13-Aug-12
KVG.Zon Calm Shell 12-Aug-12 13-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 14-Aug-12 14-Aug-12
KVG.Zon Calm Shell 14-Aug-12 14-Aug-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 15-Aug-12 18-Aug-12
KVG.Zone 3.Stage Stand alone Villa type 32 24-Nov-12
KVG.Zone 3.St Mobilization 05-Nov-11
KVG.Zone 3.St Earth Work 09-Sep-12
KVG.Zone 3.St Civil Work 09-Aug-12 14-Nov-12
KVG.Zone 3 Foundation 09-Aug-12 29-Aug-12
KVG.Zon Footing 09-Aug-12 29-Aug-12
KVG.Z Plain Concrete 09-Aug-12 15-Aug-12
KVG.Z Reinforced Concrete&Semels 16-Aug-12 29-Aug-12
KVG.Zone 3 Ground Floor 30-Aug-12 29-Sep-12
KVG.Zon Slab on grade 10-Sep-12 29-Sep-12
KVG.Zon Columns 30-Aug-12 08-Sep-12
KVG.Zone 3 First Floor 30-Sep-12 21-Oct-12
KVG.Zon Beams and Slabs 30-Sep-12 20-Oct-12
KVG.Zon Columns 11-Oct-12 21-Oct-12
KVG.Zone 3 Roof 22-Oct-12 14-Nov-12
KVG.Zon Beams and Slabs 22-Oct-12 14-Nov-12
KVG.Zone 3.St Mansonary 21-Oct-12 18-Nov-12
KVG.Zone 3 Ground Floor 21-Oct-12 22-Oct-12
KVG.Zone 3 First Floor 15-Nov-12 17-Nov-12
KVG.Zone 3 Roof 18-Nov-12 18-Nov-12
KVG.Zone 3.St Finishing 23-Oct-12 24-Nov-12
KVG.Zone 3 Ground Floor 23-Oct-12 24-Oct-12
KVG.Zon Calm Shell 23-Oct-12 24-Oct-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 18-Nov-12 19-Nov-12
KVG.Zon Calm Shell 18-Nov-12 19-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 20-Nov-12 20-Nov-12
KVG.Zon Calm Shell 20-Nov-12 20-Nov-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 21-Nov-12 24-Nov-12
KVG.Zone 3.Stage Stand alone Villa type 33 16-Feb-12
KVG.Zone 3.St Mobilization 01-Nov-11
KVG.Zone 3.St Earth Work 06-Dec-11
KVG.Zone 3.St Civil Work 07-Feb-12
KVG.Zone 3 Foundation 26-Nov-11
KVG.Zon Footing 26-Nov-11
KVG.Z Plain Concrete 15-Nov-11
KVG.Z Reinforced Concrete&Semels 26-Nov-11
KVG.Zone 3 Ground Floor 1 26-Dec-11
KVG.Zon Slab on grade 11 26-Dec-11
KVG.Zon Columns 1 05-Dec-11
KVG.Zone 3 First Floor ec-11 17-Jan-12
KVG.Zon Beams and Slabs ec-11 16-Jan-12
KVG.Zon Columns Jan-12 17-Jan-12
KVG.Zone 3 Roof -Jan-12 07-Feb-12
KVG.Zon Beams and Slabs -Jan-12 07-Feb-12
KVG.Zone 3.St Mansonary -Jan-12 11-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 18-Jan-12
KVG.Zone 3 First Floor 08-Feb-12 09-Feb-12

76
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3 Roof 11-Feb-12 11-Feb-12
KVG.Zone 3.St Finishing -Jan-12 16-Feb-12
KVG.Zone 3 Ground Floor -Jan-12 21-Jan-12
KVG.Zon Calm Shell -Jan-12 21-Jan-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 11-Feb-12 12-Feb-12
KVG.Zon Calm Shell 11-Feb-12 12-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 13-Feb-12 13-Feb-12
KVG.Zon Calm Shell 13-Feb-12 13-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 14-Feb-12 16-Feb-12
KVG.Zone 3.Stage Twin House 1 26-Jun-12
KVG.Zone 3.St Mobilization 02-Nov-11
KVG.Zone 3.St Earth Work 21-Mar-12
KVG.Zone 3.St Civil Work 08-Feb-12 04-Jun-12
KVG.Zone 3 Foundation 08-Feb-12 07-Mar-12
KVG.Zon Footing 08-Feb-12 07-Mar-12
KVG.Z Plain Concrete 08-Feb-12 16-Feb-12
KVG.Z Reinforced Concrete&Semels 18-Feb-12 07-Mar-12
KVG.Zone 3 Ground Floor 08-Mar-12 16-Apr-12
KVG.Zon Slab on grade 22-Mar-12 16-Apr-12
KVG.Zon Columns 08-Mar-12 18-Mar-12
KVG.Zone 3 First Floor 17-Apr-12 12-May-12
KVG.Zon Beams and Slabs 17-Apr-12 10-May-12
KVG.Zon Columns 02-May-12 12-May-12
KVG.Zone 3 Roof 13-May-12 04-Jun-12
KVG.Zon Beams and Slabs 13-May-12 04-Jun-12
KVG.Zone 3.St Mansonary 12-May-12 17-Jun-12
KVG.Zone 3 Ground Floor 12-May-12 21-May-12
KVG.Zone 3 First Floor 05-Jun-12 14-Jun-12
KVG.Zone 3 Roof 16-Jun-12 17-Jun-12
KVG.Zone 3.St Finishing 15-May-12 26-Jun-12
KVG.Zone 3 Ground Floor 15-May-12 16-May-12
KVG.Zon Calm Shell 15-May-12 16-May-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 09-Jun-12 10-Jun-12
KVG.Zon Calm Shell 09-Jun-12 10-Jun-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 18-Jun-12 18-Jun-12
KVG.Zon Calm Shell 18-Jun-12 18-Jun-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Twin House 19-Jun-12 26-Jun-12
KVG.Zone 3.Stage Twin House 2 24-Oct-12
KVG.Zone 3.St Mobilization 03-Nov-11
KVG.Zone 3.St Earth Work 17-Jul-12
KVG.Zone 3.St Civil Work 05-Jun-12 02-Oct-12
KVG.Zone 3 Foundation 05-Jun-12 03-Jul-12
KVG.Zon Footing 05-Jun-12 03-Jul-12
KVG.Z Plain Concrete 05-Jun-12 13-Jun-12
KVG.Z Reinforced Concrete&Semels 14-Jun-12 03-Jul-12
KVG.Zone 3 Ground Floor 04-Jul-12 12-Aug-12
KVG.Zon Slab on grade 18-Jul-12 12-Aug-12
KVG.Zon Columns 04-Jul-12 14-Jul-12
KVG.Zone 3 First Floor 13-Aug-12 09-Sep-12
KVG.Zon Beams and Slabs 13-Aug-12 08-Sep-12
KVG.Zon Columns 30-Aug-12 09-Sep-12
KVG.Zone 3 Roof 10-Sep-12 02-Oct-12
KVG.Zon Beams and Slabs 10-Sep-12 02-Oct-12
KVG.Zone 3.St Mansonary 09-Sep-12 15-Oct-12
KVG.Zone 3 Ground Floor 09-Sep-12 18-Sep-12
KVG.Zone 3 First Floor 03-Oct-12 13-Oct-12
KVG.Zone 3 Roof 14-Oct-12 15-Oct-12
KVG.Zone 3.St Finishing 12-Sep-12 24-Oct-12
KVG.Zone 3 Ground Floor 12-Sep-12 13-Sep-12
KVG.Zon Calm Shell 12-Sep-12 13-Sep-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 07-Oct-12 08-Oct-12
KVG.Zon Calm Shell 07-Oct-12 08-Oct-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 16-Oct-12 16-Oct-12
KVG.Zon Calm Shell 16-Oct-12 16-Oct-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Twin House 17-Oct-12 24-Oct-12
KVG.Zone 3.Stage Twin House 4 27-Mar-12
KVG.Zone 3.St Mobilization 01-Nov-11
KVG.Zone 3.St Earth Work 22-Dec-11
KVG.Zone 3.St Civil Work 05-Mar-12
KVG.Zone 3 Foundation 08-Dec-11
KVG.Zon Footing 08-Dec-11
KVG.Z Plain Concrete 19-Nov-11
KVG.Z Reinforced Concrete&Semels 08-Dec-11
KVG.Zone 3 Ground Floor 11 17-Jan-12
KVG.Zon Slab on grade c-11 17-Jan-12
KVG.Zon Columns 11 19-Dec-11
KVG.Zone 3 First Floor -Jan-12 11-Feb-12

77
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Beams and Slabs -Jan-12 09-Feb-12
KVG.Zon Columns 1-Feb-12 11-Feb-12
KVG.Zone 3 Roof 12-Feb-12 05-Mar-12
KVG.Zon Beams and Slabs 12-Feb-12 05-Mar-12
KVG.Zone 3.St Mansonary 11-Feb-12 18-Mar-12
KVG.Zone 3 Ground Floor 11-Feb-12 20-Feb-12
KVG.Zone 3 First Floor 06-Mar-12 15-Mar-12
KVG.Zone 3 Roof 17-Mar-12 18-Mar-12
KVG.Zone 3.St Finishing 14-Feb-12 27-Mar-12
KVG.Zone 3 Ground Floor 14-Feb-12 15-Feb-12
KVG.Zon Calm Shell 14-Feb-12 15-Feb-12
KVG.Zon External Electrical
KVG.Zone 3 First Floor 10-Mar-12 11-Mar-12
KVG.Zon Calm Shell 10-Mar-12 11-Mar-12
KVG.Zon External Electrical
KVG.Zone 3 Roof 19-Mar-12 19-Mar-12
KVG.Zon Calm Shell 19-Mar-12 19-Mar-12
KVG.Zon External Electrical
KVG.Zone 3 Paint Twin House 20-Mar-12 27-Mar-12
KVG.Zone 3.Stage 2 Stage 2 25-Nov-12 14-Dec-13
KVG.Zone 3.Stage Stand alone Villa type 34 25-Nov-12 07-Mar-13
KVG.Zone 3.St Mobilization 25-Nov-12 25-Nov-12
KVG.Zone 3.St Earth Work 26-Nov-12 25-Dec-12
KVG.Zone 3.St Civil Work 28-Nov-12 26-Feb-13
KVG.Zone 3 Foundation 28-Nov-12 15-Dec-12
KVG.Zon Footing 28-Nov-12 15-Dec-12
KVG.Z Plain Concrete 28-Nov-12 04-Dec-12
KVG.Z Reinforced Concrete&Semels 05-Dec-12 15-Dec-12
KVG.Zone 3 Ground Floor 16-Dec-12 14-Jan-13
KVG.Zon Slab on grade 26-Dec-12 14-Jan-13
KVG.Zon Columns 16-Dec-12 24-Dec-12
KVG.Zone 3 First Floor 15-Jan-13 05-Feb-13
KVG.Zon Beams and Slabs 15-Jan-13 04-Feb-13
KVG.Zon Columns 27-Jan-13 05-Feb-13
KVG.Zone 3 Roof 06-Feb-13 26-Feb-13
KVG.Zon Beams and Slabs 06-Feb-13 26-Feb-13
KVG.Zone 3.St Mansonary 05-Feb-13 02-Mar-13
KVG.Zone 3 Ground Floor 05-Feb-13 06-Feb-13
KVG.Zone 3 First Floor 27-Feb-13 28-Feb-13
KVG.Zone 3 Roof 02-Mar-13 02-Mar-13
KVG.Zone 3.St Finishing 07-Feb-13 07-Mar-13
KVG.Zone 3 Ground Floor 07-Feb-13 09-Feb-13
KVG.Zon Calm Shell 07-Feb-13 09-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 02-Mar-13 03-Mar-13
KVG.Zon Calm Shell 02-Mar-13 03-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 04-Mar-13 04-Mar-13
KVG.Zon Calm Shell 04-Mar-13 04-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 05-Mar-13 07-Mar-13
KVG.Zone 3.Stage Stand alone Villa type 35 25-Nov-12 08-Jun-13
KVG.Zone 3.St Mobilization 26-Nov-12 26-Nov-12
KVG.Zone 3.St Earth Work 28-Nov-12 26-Mar-13
KVG.Zone 3.St Civil Work 27-Feb-13 29-May-13
KVG.Zone 3 Foundation 27-Feb-13 16-Mar-13
KVG.Zon Footing 27-Feb-13 16-Mar-13
KVG.Z Plain Concrete 27-Feb-13 05-Mar-13
KVG.Z Reinforced Concrete&Semels 06-Mar-13 16-Mar-13
KVG.Zone 3 Ground Floor 17-Mar-13 15-Apr-13
KVG.Zon Slab on grade 27-Mar-13 15-Apr-13
KVG.Zon Columns 17-Mar-13 25-Mar-13
KVG.Zone 3 First Floor 16-Apr-13 08-May-13
KVG.Zon Beams and Slabs 16-Apr-13 07-May-13
KVG.Zon Columns 28-Apr-13 08-May-13
KVG.Zone 3 Roof 09-May-13 29-May-13
KVG.Zon Beams and Slabs 09-May-13 29-May-13
KVG.Zone 3.St Mansonary 08-May-13 02-Jun-13
KVG.Zone 3 Ground Floor 08-May-13 09-May-13
KVG.Zone 3 First Floor 30-May-13 01-Jun-13
KVG.Zone 3 Roof 02-Jun-13 02-Jun-13
KVG.Zone 3.St Finishing 11-May-13 08-Jun-13
KVG.Zone 3 Ground Floor 11-May-13 12-May-13
KVG.Zon Calm Shell 11-May-13 12-May-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 02-Jun-13 03-Jun-13
KVG.Zon Calm Shell 02-Jun-13 03-Jun-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 04-Jun-13 04-Jun-13
KVG.Zon Calm Shell 04-Jun-13 04-Jun-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 05-Jun-13 08-Jun-13
KVG.Zone 3.Stage Stand alone Villa type 36 25-Nov-12 09-Sep-13
KVG.Zone 3.St Mobilization 27-Nov-12 27-Nov-12
KVG.Zone 3.St Earth Work 01-Dec-12 26-Jun-13
KVG.Zone 3.St Civil Work 30-May-13 31-Aug-13

78
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3 Foundation 30-May-13 16-Jun-13
KVG.Zon Footing 30-May-13 16-Jun-13
KVG.Z Plain Concrete 30-May-13 05-Jun-13
KVG.Z Reinforced Concrete&Semels 06-Jun-13 16-Jun-13
KVG.Zone 3 Ground Floor 17-Jun-13 16-Jul-13
KVG.Zon Slab on grade 27-Jun-13 16-Jul-13
KVG.Zon Columns 17-Jun-13 25-Jun-13
KVG.Zone 3 First Floor 17-Jul-13 07-Aug-13
KVG.Zon Beams and Slabs 17-Jul-13 06-Aug-13
KVG.Zon Columns 29-Jul-13 07-Aug-13
KVG.Zone 3 Roof 11-Aug-13 31-Aug-13
KVG.Zon Beams and Slabs 11-Aug-13 31-Aug-13
KVG.Zone 3.St Mansonary 07-Aug-13 03-Sep-13
KVG.Zone 3 Ground Floor 07-Aug-13 11-Aug-13
KVG.Zone 3 First Floor 01-Sep-13 02-Sep-13
KVG.Zone 3 Roof 03-Sep-13 03-Sep-13
KVG.Zone 3.St Finishing 12-Aug-13 09-Sep-13
KVG.Zone 3 Ground Floor 12-Aug-13 13-Aug-13
KVG.Zon Calm Shell 12-Aug-13 13-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 03-Sep-13 04-Sep-13
KVG.Zon Calm Shell 03-Sep-13 04-Sep-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 05-Sep-13 05-Sep-13
KVG.Zon Calm Shell 05-Sep-13 05-Sep-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 07-Sep-13 09-Sep-13
KVG.Zone 3.Stage Stand alone Villa type 37 25-Nov-12 14-Dec-13
KVG.Zone 3.St Mobilization 28-Nov-12 28-Nov-12
KVG.Zone 3.St Earth Work 03-Dec-12 28-Sep-13
KVG.Zone 3.St Civil Work 01-Sep-13 04-Dec-13
KVG.Zone 3 Foundation 01-Sep-13 17-Sep-13
KVG.Zon Footing 01-Sep-13 17-Sep-13
KVG.Z Plain Concrete 01-Sep-13 07-Sep-13
KVG.Z Reinforced Concrete&Semels 08-Sep-13 17-Sep-13
KVG.Zone 3 Ground Floor 18-Sep-13 22-Oct-13
KVG.Zon Slab on grade 29-Sep-13 22-Oct-13
KVG.Zon Columns 18-Sep-13 26-Sep-13
KVG.Zone 3 First Floor 23-Oct-13 13-Nov-13
KVG.Zon Beams and Slabs 23-Oct-13 12-Nov-13
KVG.Zon Columns 04-Nov-13 13-Nov-13
KVG.Zone 3 Roof 14-Nov-13 04-Dec-13
KVG.Zon Beams and Slabs 14-Nov-13 04-Dec-13
KVG.Zone 3.St Mansonary 13-Nov-13 08-Dec-13
KVG.Zone 3 Ground Floor 13-Nov-13 14-Nov-13
KVG.Zone 3 First Floor 05-Dec-13 07-Dec-13
KVG.Zone 3 Roof 08-Dec-13 08-Dec-13
KVG.Zone 3.St Finishing 16-Nov-13 14-Dec-13
KVG.Zone 3 Ground Floor 16-Nov-13 17-Nov-13
KVG.Zon Calm Shell 16-Nov-13 17-Nov-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Dec-13 09-Dec-13
KVG.Zon Calm Shell 08-Dec-13 09-Dec-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 10-Dec-13 10-Dec-13
KVG.Zon Calm Shell 10-Dec-13 10-Dec-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 11-Dec-13 14-Dec-13
KVG.Zone 3.Stage Stand alone Villa type 38 25-Nov-12 07-Mar-13
KVG.Zone 3.St Mobilization 25-Nov-12 25-Nov-12
KVG.Zone 3.St Earth Work 26-Nov-12 25-Dec-12
KVG.Zone 3.St Civil Work 28-Nov-12 26-Feb-13
KVG.Zone 3 Foundation 28-Nov-12 15-Dec-12
KVG.Zon Footing 28-Nov-12 15-Dec-12
KVG.Z Plain Concrete 28-Nov-12 04-Dec-12
KVG.Z Reinforced Concrete&Semels 05-Dec-12 15-Dec-12
KVG.Zone 3 Ground Floor 16-Dec-12 14-Jan-13
KVG.Zon Slab on grade 26-Dec-12 14-Jan-13
KVG.Zon Columns 16-Dec-12 24-Dec-12
KVG.Zone 3 First Floor 15-Jan-13 05-Feb-13
KVG.Zon Beams and Slabs 15-Jan-13 04-Feb-13
KVG.Zon Columns 27-Jan-13 05-Feb-13
KVG.Zone 3 Roof 06-Feb-13 26-Feb-13
KVG.Zon Beams and Slabs 06-Feb-13 26-Feb-13
KVG.Zone 3.St Mansonary 05-Feb-13 02-Mar-13
KVG.Zone 3 Ground Floor 05-Feb-13 06-Feb-13
KVG.Zone 3 First Floor 27-Feb-13 28-Feb-13
KVG.Zone 3 Roof 02-Mar-13 02-Mar-13
KVG.Zone 3.St Finishing 07-Feb-13 07-Mar-13
KVG.Zone 3 Ground Floor 07-Feb-13 09-Feb-13
KVG.Zon Calm Shell 07-Feb-13 09-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 02-Mar-13 03-Mar-13
KVG.Zon Calm Shell 02-Mar-13 03-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 04-Mar-13 04-Mar-13

79
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Calm Shell 04-Mar-13 04-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 05-Mar-13 07-Mar-13
KVG.Zone 3.Stage Stand alone Villa type 39 25-Nov-12 08-Jun-13
KVG.Zone 3.St Mobilization 26-Nov-12 26-Nov-12
KVG.Zone 3.St Earth Work 28-Nov-12 26-Mar-13
KVG.Zone 3.St Civil Work 27-Feb-13 29-May-13
KVG.Zone 3 Foundation 27-Feb-13 16-Mar-13
KVG.Zon Footing 27-Feb-13 16-Mar-13
KVG.Z Plain Concrete 27-Feb-13 05-Mar-13
KVG.Z Reinforced Concrete&Semels 06-Mar-13 16-Mar-13
KVG.Zone 3 Ground Floor 17-Mar-13 15-Apr-13
KVG.Zon Slab on grade 27-Mar-13 15-Apr-13
KVG.Zon Columns 17-Mar-13 25-Mar-13
KVG.Zone 3 First Floor 16-Apr-13 08-May-13
KVG.Zon Beams and Slabs 16-Apr-13 07-May-13
KVG.Zon Columns 28-Apr-13 08-May-13
KVG.Zone 3 Roof 09-May-13 29-May-13
KVG.Zon Beams and Slabs 09-May-13 29-May-13
KVG.Zone 3.St Mansonary 08-May-13 02-Jun-13
KVG.Zone 3 Ground Floor 08-May-13 09-May-13
KVG.Zone 3 First Floor 30-May-13 01-Jun-13
KVG.Zone 3 Roof 02-Jun-13 02-Jun-13
KVG.Zone 3.St Finishing 11-May-13 08-Jun-13
KVG.Zone 3 Ground Floor 11-May-13 12-May-13
KVG.Zon Calm Shell 11-May-13 12-May-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 02-Jun-13 03-Jun-13
KVG.Zon Calm Shell 02-Jun-13 03-Jun-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 04-Jun-13 04-Jun-13
KVG.Zon Calm Shell 04-Jun-13 04-Jun-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 05-Jun-13 08-Jun-13
KVG.Zone 3.Stage Stand alone Villa type 40 25-Nov-12 09-Sep-13
KVG.Zone 3.St Mobilization 27-Nov-12 27-Nov-12
KVG.Zone 3.St Earth Work 01-Dec-12 26-Jun-13
KVG.Zone 3.St Civil Work 30-May-13 31-Aug-13
KVG.Zone 3 Foundation 30-May-13 16-Jun-13
KVG.Zon Footing 30-May-13 16-Jun-13
KVG.Z Plain Concrete 30-May-13 05-Jun-13
KVG.Z Reinforced Concrete&Semels 06-Jun-13 16-Jun-13
KVG.Zone 3 Ground Floor 17-Jun-13 16-Jul-13
KVG.Zon Slab on grade 27-Jun-13 16-Jul-13
KVG.Zon Columns 17-Jun-13 25-Jun-13
KVG.Zone 3 First Floor 17-Jul-13 07-Aug-13
KVG.Zon Beams and Slabs 17-Jul-13 06-Aug-13
KVG.Zon Columns 29-Jul-13 07-Aug-13
KVG.Zone 3 Roof 11-Aug-13 31-Aug-13
KVG.Zon Beams and Slabs 11-Aug-13 31-Aug-13
KVG.Zone 3.St Mansonary 07-Aug-13 03-Sep-13
KVG.Zone 3 Ground Floor 07-Aug-13 11-Aug-13
KVG.Zone 3 First Floor 01-Sep-13 02-Sep-13
KVG.Zone 3 Roof 03-Sep-13 03-Sep-13
KVG.Zone 3.St Finishing 12-Aug-13 09-Sep-13
KVG.Zone 3 Ground Floor 12-Aug-13 13-Aug-13
KVG.Zon Calm Shell 12-Aug-13 13-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 03-Sep-13 04-Sep-13
KVG.Zon Calm Shell 03-Sep-13 04-Sep-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 05-Sep-13 05-Sep-13
KVG.Zon Calm Shell 05-Sep-13 05-Sep-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 07-Sep-13 09-Sep-13
KVG.Zone 3.Stage Stand alone Villa type 41 25-Nov-12 14-Dec-13
KVG.Zone 3.St Mobilization 28-Nov-12 28-Nov-12
KVG.Zone 3.St Earth Work 03-Dec-12 28-Sep-13
KVG.Zone 3.St Civil Work 01-Sep-13 04-Dec-13
KVG.Zone 3 Foundation 01-Sep-13 17-Sep-13
KVG.Zon Footing 01-Sep-13 17-Sep-13
KVG.Z Plain Concrete 01-Sep-13 07-Sep-13
KVG.Z Reinforced Concrete&Semels 08-Sep-13 17-Sep-13
KVG.Zone 3 Ground Floor 18-Sep-13 22-Oct-13
KVG.Zon Slab on grade 29-Sep-13 22-Oct-13
KVG.Zon Columns 18-Sep-13 26-Sep-13
KVG.Zone 3 First Floor 23-Oct-13 13-Nov-13
KVG.Zon Beams and Slabs 23-Oct-13 12-Nov-13
KVG.Zon Columns 04-Nov-13 13-Nov-13
KVG.Zone 3 Roof 14-Nov-13 04-Dec-13
KVG.Zon Beams and Slabs 14-Nov-13 04-Dec-13
KVG.Zone 3.St Mansonary 13-Nov-13 08-Dec-13
KVG.Zone 3 Ground Floor 13-Nov-13 14-Nov-13
KVG.Zone 3 First Floor 05-Dec-13 07-Dec-13
KVG.Zone 3 Roof 08-Dec-13 08-Dec-13
KVG.Zone 3.St Finishing 16-Nov-13 14-Dec-13

80
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3 Ground Floor 16-Nov-13 17-Nov-13
KVG.Zon Calm Shell 16-Nov-13 17-Nov-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Dec-13 09-Dec-13
KVG.Zon Calm Shell 08-Dec-13 09-Dec-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 10-Dec-13 10-Dec-13
KVG.Zon Calm Shell 10-Dec-13 10-Dec-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 11-Dec-13 14-Dec-13
KVG.Zone 3.Stage Stand alone Villa type 42 25-Nov-12 07-Mar-13
KVG.Zone 3.St Mobilization 25-Nov-12 25-Nov-12
KVG.Zone 3.St Earth Work 26-Nov-12 25-Dec-12
KVG.Zone 3.St Civil Work 28-Nov-12 26-Feb-13
KVG.Zone 3 Foundation 28-Nov-12 15-Dec-12
KVG.Zon Footing 28-Nov-12 15-Dec-12
KVG.Z Plain Concrete 28-Nov-12 04-Dec-12
KVG.Z Reinforced Concrete&Semels 05-Dec-12 15-Dec-12
KVG.Zone 3 Ground Floor 16-Dec-12 14-Jan-13
KVG.Zon Slab on grade 26-Dec-12 14-Jan-13
KVG.Zon Columns 16-Dec-12 24-Dec-12
KVG.Zone 3 First Floor 15-Jan-13 05-Feb-13
KVG.Zon Beams and Slabs 15-Jan-13 04-Feb-13
KVG.Zon Columns 27-Jan-13 05-Feb-13
KVG.Zone 3 Roof 06-Feb-13 26-Feb-13
KVG.Zon Beams and Slabs 06-Feb-13 26-Feb-13
KVG.Zone 3.St Mansonary 05-Feb-13 02-Mar-13
KVG.Zone 3 Ground Floor 05-Feb-13 06-Feb-13
KVG.Zone 3 First Floor 27-Feb-13 28-Feb-13
KVG.Zone 3 Roof 02-Mar-13 02-Mar-13
KVG.Zone 3.St Finishing 07-Feb-13 07-Mar-13
KVG.Zone 3 Ground Floor 07-Feb-13 09-Feb-13
KVG.Zon Calm Shell 07-Feb-13 09-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 02-Mar-13 03-Mar-13
KVG.Zon Calm Shell 02-Mar-13 03-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 04-Mar-13 04-Mar-13
KVG.Zon Calm Shell 04-Mar-13 04-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 05-Mar-13 07-Mar-13
KVG.Zone 3.Stage Stand alone Villa type 43 25-Nov-12 08-Jun-13
KVG.Zone 3.St Mobilization 26-Nov-12 26-Nov-12
KVG.Zone 3.St Earth Work 28-Nov-12 26-Mar-13
KVG.Zone 3.St Civil Work 27-Feb-13 29-May-13
KVG.Zone 3 Foundation 27-Feb-13 16-Mar-13
KVG.Zon Footing 27-Feb-13 16-Mar-13
KVG.Z Plain Concrete 27-Feb-13 05-Mar-13
KVG.Z Reinforced Concrete&Semels 06-Mar-13 16-Mar-13
KVG.Zone 3 Ground Floor 17-Mar-13 15-Apr-13
KVG.Zon Slab on grade 27-Mar-13 15-Apr-13
KVG.Zon Columns 17-Mar-13 25-Mar-13
KVG.Zone 3 First Floor 16-Apr-13 08-May-13
KVG.Zon Beams and Slabs 16-Apr-13 07-May-13
KVG.Zon Columns 28-Apr-13 08-May-13
KVG.Zone 3 Roof 09-May-13 29-May-13
KVG.Zon Beams and Slabs 09-May-13 29-May-13
KVG.Zone 3.St Mansonary 08-May-13 02-Jun-13
KVG.Zone 3 Ground Floor 08-May-13 09-May-13
KVG.Zone 3 First Floor 30-May-13 01-Jun-13
KVG.Zone 3 Roof 02-Jun-13 02-Jun-13
KVG.Zone 3.St Finishing 11-May-13 08-Jun-13
KVG.Zone 3 Ground Floor 11-May-13 12-May-13
KVG.Zon Calm Shell 11-May-13 12-May-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 02-Jun-13 03-Jun-13
KVG.Zon Calm Shell 02-Jun-13 03-Jun-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 04-Jun-13 04-Jun-13
KVG.Zon Calm Shell 04-Jun-13 04-Jun-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 05-Jun-13 08-Jun-13
KVG.Zone 3.Stage Stand alone Villa type 44 25-Nov-12 09-Sep-13
KVG.Zone 3.St Mobilization 27-Nov-12 27-Nov-12
KVG.Zone 3.St Earth Work 01-Dec-12 26-Jun-13
KVG.Zone 3.St Civil Work 30-May-13 31-Aug-13
KVG.Zone 3 Foundation 30-May-13 16-Jun-13
KVG.Zon Footing 30-May-13 16-Jun-13
KVG.Z Plain Concrete 30-May-13 05-Jun-13
KVG.Z Reinforced Concrete&Semels 06-Jun-13 16-Jun-13
KVG.Zone 3 Ground Floor 17-Jun-13 16-Jul-13
KVG.Zon Slab on grade 27-Jun-13 16-Jul-13
KVG.Zon Columns 17-Jun-13 25-Jun-13
KVG.Zone 3 First Floor 17-Jul-13 07-Aug-13
KVG.Zon Beams and Slabs 17-Jul-13 06-Aug-13
KVG.Zon Columns 29-Jul-13 07-Aug-13

81
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3 Roof 11-Aug-13 31-Aug-13
KVG.Zon Beams and Slabs 11-Aug-13 31-Aug-13
KVG.Zone 3.St Mansonary 07-Aug-13 03-Sep-13
KVG.Zone 3 Ground Floor 07-Aug-13 11-Aug-13
KVG.Zone 3 First Floor 01-Sep-13 02-Sep-13
KVG.Zone 3 Roof 03-Sep-13 03-Sep-13
KVG.Zone 3.St Finishing 12-Aug-13 09-Sep-13
KVG.Zone 3 Ground Floor 12-Aug-13 13-Aug-13
KVG.Zon Calm Shell 12-Aug-13 13-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 03-Sep-13 04-Sep-13
KVG.Zon Calm Shell 03-Sep-13 04-Sep-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 05-Sep-13 05-Sep-13
KVG.Zon Calm Shell 05-Sep-13 05-Sep-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 07-Sep-13 09-Sep-13
KVG.Zone 3.Stage Stand alone Villa type 45 25-Nov-12 14-Dec-13
KVG.Zone 3.St Mobilization 28-Nov-12 28-Nov-12
KVG.Zone 3.St Earth Work 03-Dec-12 28-Sep-13
KVG.Zone 3.St Civil Work 01-Sep-13 04-Dec-13
KVG.Zone 3 Foundation 01-Sep-13 17-Sep-13
KVG.Zon Footing 01-Sep-13 17-Sep-13
KVG.Z Plain Concrete 01-Sep-13 07-Sep-13
KVG.Z Reinforced Concrete&Semels 08-Sep-13 17-Sep-13
KVG.Zone 3 Ground Floor 18-Sep-13 22-Oct-13
KVG.Zon Slab on grade 29-Sep-13 22-Oct-13
KVG.Zon Columns 18-Sep-13 26-Sep-13
KVG.Zone 3 First Floor 23-Oct-13 13-Nov-13
KVG.Zon Beams and Slabs 23-Oct-13 12-Nov-13
KVG.Zon Columns 04-Nov-13 13-Nov-13
KVG.Zone 3 Roof 14-Nov-13 04-Dec-13
KVG.Zon Beams and Slabs 14-Nov-13 04-Dec-13
KVG.Zone 3.St Mansonary 13-Nov-13 08-Dec-13
KVG.Zone 3 Ground Floor 13-Nov-13 14-Nov-13
KVG.Zone 3 First Floor 05-Dec-13 07-Dec-13
KVG.Zone 3 Roof 08-Dec-13 08-Dec-13
KVG.Zone 3.St Finishing 16-Nov-13 14-Dec-13
KVG.Zone 3 Ground Floor 16-Nov-13 17-Nov-13
KVG.Zon Calm Shell 16-Nov-13 17-Nov-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 08-Dec-13 09-Dec-13
KVG.Zon Calm Shell 08-Dec-13 09-Dec-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 10-Dec-13 10-Dec-13
KVG.Zon Calm Shell 10-Dec-13 10-Dec-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 2 11-Dec-13 14-Dec-13
KVG.Zone 3.Stage Stand alone Villa type 46 25-Nov-12 05-Mar-13
KVG.Zone 3.St Mobilization 25-Nov-12 25-Nov-12
KVG.Zone 3.St Earth Work 26-Nov-12 25-Dec-12
KVG.Zone 3.St Civil Work 28-Nov-12 24-Feb-13
KVG.Zone 3 Foundation 28-Nov-12 15-Dec-12
KVG.Zon Footing 28-Nov-12 15-Dec-12
KVG.Z Plain Concrete 28-Nov-12 03-Dec-12
KVG.Z Reinforced Concrete&Smeles 04-Dec-12 15-Dec-12
KVG.Zone 3 Ground Floor 16-Dec-12 13-Jan-13
KVG.Zon Slab on grade 26-Dec-12 13-Jan-13
KVG.Zon Columns 16-Dec-12 23-Dec-12
KVG.Zone 3 First Floor 14-Jan-13 03-Feb-13
KVG.Zon Beams and slab 14-Jan-13 03-Feb-13
KVG.Zon Columns 26-Jan-13 03-Feb-13
KVG.Zone 3 Roof 04-Feb-13 24-Feb-13
KVG.Zon Beams and slab 04-Feb-13 24-Feb-13
KVG.Zone 3.St Mansonary 04-Feb-13 28-Feb-13
KVG.Zone 3 Ground Floor 04-Feb-13 05-Feb-13
KVG.Zone 3 First Floor 25-Feb-13 26-Feb-13
KVG.Zone 3 Roof 27-Feb-13 28-Feb-13
KVG.Zone 3.St Finishing 06-Feb-13 05-Mar-13
KVG.Zone 3 Ground Floor 06-Feb-13 07-Feb-13
KVG.Zon Calm Shell 06-Feb-13 07-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 27-Feb-13 28-Feb-13
KVG.Zon Calm Shell 27-Feb-13 28-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 02-Mar-13 02-Mar-13
KVG.Zon Calm Shell 02-Mar-13 02-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 03-Mar-13 05-Mar-13
KVG.Zone 3.Stage Stand alone Villa type 47 25-Nov-12 03-Jun-13
KVG.Zone 3.St Mobilization 26-Nov-12 26-Nov-12
KVG.Zone 3.St Earth Work 28-Nov-12 24-Mar-13
KVG.Zone 3.St Civil Work 25-Feb-13 25-May-13
KVG.Zone 3 Foundation 25-Feb-13 13-Mar-13
KVG.Zon Footing 25-Feb-13 13-Mar-13
KVG.Z Plain Concrete 25-Feb-13 02-Mar-13

82
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Z Reinforced Concrete&Smeles 03-Mar-13 13-Mar-13
KVG.Zone 3 Ground Floor 14-Mar-13 11-Apr-13
KVG.Zon Slab on grade 25-Mar-13 11-Apr-13
KVG.Zon Columns 14-Mar-13 21-Mar-13
KVG.Zone 3 First Floor 13-Apr-13 04-May-13
KVG.Zon Beams and slab 13-Apr-13 04-May-13
KVG.Zon Columns 24-Apr-13 04-May-13
KVG.Zone 3 Roof 05-May-13 25-May-13
KVG.Zon Beams and slab 05-May-13 25-May-13
KVG.Zone 3.St Mansonary 05-May-13 29-May-13
KVG.Zone 3 Ground Floor 05-May-13 06-May-13
KVG.Zone 3 First Floor 26-May-13 27-May-13
KVG.Zone 3 Roof 28-May-13 29-May-13
KVG.Zone 3.St Finishing 07-May-13 03-Jun-13
KVG.Zone 3 Ground Floor 07-May-13 08-May-13
KVG.Zon Calm Shell 07-May-13 08-May-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 28-May-13 29-May-13
KVG.Zon Calm Shell 28-May-13 29-May-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 30-May-13 30-May-13
KVG.Zon Calm Shell 30-May-13 30-May-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 01-Jun-13 03-Jun-13
KVG.Zone 3.Stage Stand alone Villa type 48 25-Nov-12 02-Sep-13
KVG.Zone 3.St Mobilization 27-Nov-12 27-Nov-12
KVG.Zone 3.St Earth Work 01-Dec-12 22-Jun-13
KVG.Zone 3.St Civil Work 26-May-13 24-Aug-13
KVG.Zone 3 Foundation 26-May-13 11-Jun-13
KVG.Zon Footing 26-May-13 11-Jun-13
KVG.Z Plain Concrete 26-May-13 30-May-13
KVG.Z Reinforced Concrete&Smeles 01-Jun-13 11-Jun-13
KVG.Zone 3 Ground Floor 12-Jun-13 10-Jul-13
KVG.Zon Slab on grade 23-Jun-13 10-Jul-13
KVG.Zon Columns 12-Jun-13 19-Jun-13
KVG.Zone 3 First Floor 11-Jul-13 31-Jul-13
KVG.Zon Beams and slab 11-Jul-13 31-Jul-13
KVG.Zon Columns 23-Jul-13 31-Jul-13
KVG.Zone 3 Roof 01-Aug-13 24-Aug-13
KVG.Zon Beams and slab 01-Aug-13 24-Aug-13
KVG.Zone 3.St Mansonary 01-Aug-13 28-Aug-13
KVG.Zone 3 Ground Floor 01-Aug-13 03-Aug-13
KVG.Zone 3 First Floor 25-Aug-13 26-Aug-13
KVG.Zone 3 Roof 27-Aug-13 28-Aug-13
KVG.Zone 3.St Finishing 04-Aug-13 02-Sep-13
KVG.Zone 3 Ground Floor 04-Aug-13 05-Aug-13
KVG.Zon Calm Shell 04-Aug-13 05-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 27-Aug-13 28-Aug-13
KVG.Zon Calm Shell 27-Aug-13 28-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 29-Aug-13 29-Aug-13
KVG.Zon Calm Shell 29-Aug-13 29-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 31-Aug-13 02-Sep-13
KVG.Zone 3.Stage Stand alone Villa type 49 25-Nov-12 04-Dec-13
KVG.Zone 3.St Mobilization 28-Nov-12 28-Nov-12
KVG.Zone 3.St Earth Work 03-Dec-12 21-Sep-13
KVG.Zone 3.St Civil Work 25-Aug-13 25-Nov-13
KVG.Zone 3 Foundation 25-Aug-13 10-Sep-13
KVG.Zon Footing 25-Aug-13 10-Sep-13
KVG.Z Plain Concrete 25-Aug-13 29-Aug-13
KVG.Z Reinforced Concrete&Smeles 31-Aug-13 10-Sep-13
KVG.Zone 3 Ground Floor 11-Sep-13 10-Oct-13
KVG.Zon Slab on grade 22-Sep-13 10-Oct-13
KVG.Zon Columns 11-Sep-13 18-Sep-13
KVG.Zone 3 First Floor 12-Oct-13 04-Nov-13
KVG.Zon Beams and slab 12-Oct-13 04-Nov-13
KVG.Zon Columns 27-Oct-13 04-Nov-13
KVG.Zone 3 Roof 05-Nov-13 25-Nov-13
KVG.Zon Beams and slab 05-Nov-13 25-Nov-13
KVG.Zone 3.St Mansonary 05-Nov-13 30-Nov-13
KVG.Zone 3 Ground Floor 05-Nov-13 06-Nov-13
KVG.Zone 3 First Floor 26-Nov-13 27-Nov-13
KVG.Zone 3 Roof 28-Nov-13 30-Nov-13
KVG.Zone 3.St Finishing 07-Nov-13 04-Dec-13
KVG.Zone 3 Ground Floor 07-Nov-13 09-Nov-13
KVG.Zon Calm Shell 07-Nov-13 09-Nov-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 28-Nov-13 30-Nov-13
KVG.Zon Calm Shell 28-Nov-13 30-Nov-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 01-Dec-13 01-Dec-13
KVG.Zon Calm Shell 01-Dec-13 01-Dec-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 02-Dec-13 04-Dec-13

83
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3.Stage Stand alone Villa type 50 25-Nov-12 05-Mar-13
KVG.Zone 3.St Mobilization 25-Nov-12 25-Nov-12
KVG.Zone 3.St Earth Work 26-Nov-12 25-Dec-12
KVG.Zone 3.St Civil Work 28-Nov-12 24-Feb-13
KVG.Zone 3 Foundation 28-Nov-12 15-Dec-12
KVG.Zon Footing 28-Nov-12 15-Dec-12
KVG.Z Plain Concrete 28-Nov-12 03-Dec-12
KVG.Z Reinforced Concrete&Smeles 04-Dec-12 15-Dec-12
KVG.Zone 3 Ground Floor 16-Dec-12 13-Jan-13
KVG.Zon Slab on grade 26-Dec-12 13-Jan-13
KVG.Zon Columns 16-Dec-12 23-Dec-12
KVG.Zone 3 First Floor 14-Jan-13 03-Feb-13
KVG.Zon Beams and slab 14-Jan-13 03-Feb-13
KVG.Zon Columns 26-Jan-13 03-Feb-13
KVG.Zone 3 Roof 04-Feb-13 24-Feb-13
KVG.Zon Beams and slab 04-Feb-13 24-Feb-13
KVG.Zone 3.St Mansonary 04-Feb-13 28-Feb-13
KVG.Zone 3 Ground Floor 04-Feb-13 05-Feb-13
KVG.Zone 3 First Floor 25-Feb-13 26-Feb-13
KVG.Zone 3 Roof 27-Feb-13 28-Feb-13
KVG.Zone 3.St Finishing 06-Feb-13 05-Mar-13
KVG.Zone 3 Ground Floor 06-Feb-13 07-Feb-13
KVG.Zon Calm Shell 06-Feb-13 07-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 27-Feb-13 28-Feb-13
KVG.Zon Calm Shell 27-Feb-13 28-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 02-Mar-13 02-Mar-13
KVG.Zon Calm Shell 02-Mar-13 02-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 03-Mar-13 05-Mar-13
KVG.Zone 3.Stage Stand alone Villa type 51 25-Nov-12 03-Jun-13
KVG.Zone 3.St Mobilization 26-Nov-12 26-Nov-12
KVG.Zone 3.St Earth Work 28-Nov-12 24-Mar-13
KVG.Zone 3.St Civil Work 25-Feb-13 25-May-13
KVG.Zone 3 Foundation 25-Feb-13 13-Mar-13
KVG.Zon Footing 25-Feb-13 13-Mar-13
KVG.Z Plain Concrete 25-Feb-13 02-Mar-13
KVG.Z Reinforced Concrete&Smeles 03-Mar-13 13-Mar-13
KVG.Zone 3 Ground Floor 14-Mar-13 11-Apr-13
KVG.Zon Slab on grade 25-Mar-13 11-Apr-13
KVG.Zon Columns 14-Mar-13 21-Mar-13
KVG.Zone 3 First Floor 13-Apr-13 04-May-13
KVG.Zon Beams and slab 13-Apr-13 04-May-13
KVG.Zon Columns 24-Apr-13 04-May-13
KVG.Zone 3 Roof 05-May-13 25-May-13
KVG.Zon Beams and slab 05-May-13 25-May-13
KVG.Zone 3.St Mansonary 05-May-13 29-May-13
KVG.Zone 3 Ground Floor 05-May-13 06-May-13
KVG.Zone 3 First Floor 26-May-13 27-May-13
KVG.Zone 3 Roof 28-May-13 29-May-13
KVG.Zone 3.St Finishing 07-May-13 03-Jun-13
KVG.Zone 3 Ground Floor 07-May-13 08-May-13
KVG.Zon Calm Shell 07-May-13 08-May-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 28-May-13 29-May-13
KVG.Zon Calm Shell 28-May-13 29-May-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 30-May-13 30-May-13
KVG.Zon Calm Shell 30-May-13 30-May-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 01-Jun-13 03-Jun-13
KVG.Zone 3.Stage Stand alone Villa type 52 25-Nov-12 02-Sep-13
KVG.Zone 3.St Mobilization 27-Nov-12 27-Nov-12
KVG.Zone 3.St Earth Work 01-Dec-12 22-Jun-13
KVG.Zone 3.St Civil Work 26-May-13 24-Aug-13
KVG.Zone 3 Foundation 26-May-13 11-Jun-13
KVG.Zon Footing 26-May-13 11-Jun-13
KVG.Z Plain Concrete 26-May-13 30-May-13
KVG.Z Reinforced Concrete&Smeles 01-Jun-13 11-Jun-13
KVG.Zone 3 Ground Floor 12-Jun-13 10-Jul-13
KVG.Zon Slab on grade 23-Jun-13 10-Jul-13
KVG.Zon Columns 12-Jun-13 19-Jun-13
KVG.Zone 3 First Floor 11-Jul-13 31-Jul-13
KVG.Zon Beams and slab 11-Jul-13 31-Jul-13
KVG.Zon Columns 23-Jul-13 31-Jul-13
KVG.Zone 3 Roof 01-Aug-13 24-Aug-13
KVG.Zon Beams and slab 01-Aug-13 24-Aug-13
KVG.Zone 3.St Mansonary 01-Aug-13 28-Aug-13
KVG.Zone 3 Ground Floor 01-Aug-13 03-Aug-13
KVG.Zone 3 First Floor 25-Aug-13 26-Aug-13
KVG.Zone 3 Roof 27-Aug-13 28-Aug-13
KVG.Zone 3.St Finishing 04-Aug-13 02-Sep-13
KVG.Zone 3 Ground Floor 04-Aug-13 05-Aug-13
KVG.Zon Calm Shell 04-Aug-13 05-Aug-13
KVG.Zon External Electrical

84
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3 First Floor 27-Aug-13 28-Aug-13
KVG.Zon Calm Shell 27-Aug-13 28-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 29-Aug-13 29-Aug-13
KVG.Zon Calm Shell 29-Aug-13 29-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 31-Aug-13 02-Sep-13
KVG.Zone 3.Stage Stand alone Villa type 53 25-Nov-12 04-Dec-13
KVG.Zone 3.St Mobilization 28-Nov-12 28-Nov-12
KVG.Zone 3.St Earth Work 03-Dec-12 21-Sep-13
KVG.Zone 3.St Civil Work 25-Aug-13 25-Nov-13
KVG.Zone 3 Foundation 25-Aug-13 10-Sep-13
KVG.Zon Footing 25-Aug-13 10-Sep-13
KVG.Z Plain Concrete 25-Aug-13 29-Aug-13
KVG.Z Reinforced Concrete&Smeles 31-Aug-13 10-Sep-13
KVG.Zone 3 Ground Floor 11-Sep-13 10-Oct-13
KVG.Zon Slab on grade 22-Sep-13 10-Oct-13
KVG.Zon Columns 11-Sep-13 18-Sep-13
KVG.Zone 3 First Floor 12-Oct-13 04-Nov-13
KVG.Zon Beams and slab 12-Oct-13 04-Nov-13
KVG.Zon Columns 27-Oct-13 04-Nov-13
KVG.Zone 3 Roof 05-Nov-13 25-Nov-13
KVG.Zon Beams and slab 05-Nov-13 25-Nov-13
KVG.Zone 3.St Mansonary 05-Nov-13 30-Nov-13
KVG.Zone 3 Ground Floor 05-Nov-13 06-Nov-13
KVG.Zone 3 First Floor 26-Nov-13 27-Nov-13
KVG.Zone 3 Roof 28-Nov-13 30-Nov-13
KVG.Zone 3.St Finishing 07-Nov-13 04-Dec-13
KVG.Zone 3 Ground Floor 07-Nov-13 09-Nov-13
KVG.Zon Calm Shell 07-Nov-13 09-Nov-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 28-Nov-13 30-Nov-13
KVG.Zon Calm Shell 28-Nov-13 30-Nov-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 01-Dec-13 01-Dec-13
KVG.Zon Calm Shell 01-Dec-13 01-Dec-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 02-Dec-13 04-Dec-13
KVG.Zone 3.Stage Stand alone Villa type 54 25-Nov-12 05-Mar-13
KVG.Zone 3.St Mobilization 25-Nov-12 25-Nov-12
KVG.Zone 3.St Earth Work 26-Nov-12 25-Dec-12
KVG.Zone 3.St Civil Work 28-Nov-12 24-Feb-13
KVG.Zone 3 Foundation 28-Nov-12 15-Dec-12
KVG.Zon Footing 28-Nov-12 15-Dec-12
KVG.Z Plain Concrete 28-Nov-12 03-Dec-12
KVG.Z Reinforced Concrete&Smeles 04-Dec-12 15-Dec-12
KVG.Zone 3 Ground Floor 16-Dec-12 13-Jan-13
KVG.Zon Slab on grade 26-Dec-12 13-Jan-13
KVG.Zon Columns 16-Dec-12 23-Dec-12
KVG.Zone 3 First Floor 14-Jan-13 03-Feb-13
KVG.Zon Beams and slab 14-Jan-13 03-Feb-13
KVG.Zon Columns 26-Jan-13 03-Feb-13
KVG.Zone 3 Roof 04-Feb-13 24-Feb-13
KVG.Zon Beams and slab 04-Feb-13 24-Feb-13
KVG.Zone 3.St Mansonary 04-Feb-13 28-Feb-13
KVG.Zone 3 Ground Floor 04-Feb-13 05-Feb-13
KVG.Zone 3 First Floor 25-Feb-13 26-Feb-13
KVG.Zone 3 Roof 27-Feb-13 28-Feb-13
KVG.Zone 3.St Finishing 06-Feb-13 05-Mar-13
KVG.Zone 3 Ground Floor 06-Feb-13 07-Feb-13
KVG.Zon Calm Shell 06-Feb-13 07-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 27-Feb-13 28-Feb-13
KVG.Zon Calm Shell 27-Feb-13 28-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 02-Mar-13 02-Mar-13
KVG.Zon Calm Shell 02-Mar-13 02-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 03-Mar-13 05-Mar-13
KVG.Zone 3.Stage Stand alone Villa type 55 25-Nov-12 03-Jun-13
KVG.Zone 3.St Mobilization 26-Nov-12 26-Nov-12
KVG.Zone 3.St Earth Work 28-Nov-12 24-Mar-13
KVG.Zone 3.St Civil Work 25-Feb-13 25-May-13
KVG.Zone 3 Foundation 25-Feb-13 13-Mar-13
KVG.Zon Footing 25-Feb-13 13-Mar-13
KVG.Z Plain Concrete 25-Feb-13 02-Mar-13
KVG.Z Reinforced Concrete&Smeles 03-Mar-13 13-Mar-13
KVG.Zone 3 Ground Floor 14-Mar-13 11-Apr-13
KVG.Zon Slab on grade 25-Mar-13 11-Apr-13
KVG.Zon Columns 14-Mar-13 21-Mar-13
KVG.Zone 3 First Floor 13-Apr-13 04-May-13
KVG.Zon Beams and slab 13-Apr-13 04-May-13
KVG.Zon Columns 24-Apr-13 04-May-13
KVG.Zone 3 Roof 05-May-13 25-May-13
KVG.Zon Beams and slab 05-May-13 25-May-13
KVG.Zone 3.St Mansonary 05-May-13 29-May-13

85
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3 Ground Floor 05-May-13 06-May-13
KVG.Zone 3 First Floor 26-May-13 27-May-13
KVG.Zone 3 Roof 28-May-13 29-May-13
KVG.Zone 3.St Finishing 07-May-13 03-Jun-13
KVG.Zone 3 Ground Floor 07-May-13 08-May-13
KVG.Zon Calm Shell 07-May-13 08-May-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 28-May-13 29-May-13
KVG.Zon Calm Shell 28-May-13 29-May-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 30-May-13 30-May-13
KVG.Zon Calm Shell 30-May-13 30-May-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 01-Jun-13 03-Jun-13
KVG.Zone 3.Stage Stand alone Villa type 56 25-Nov-12 02-Sep-13
KVG.Zone 3.St Mobilization 27-Nov-12 27-Nov-12
KVG.Zone 3.St Earth Work 01-Dec-12 22-Jun-13
KVG.Zone 3.St Civil Work 26-May-13 24-Aug-13
KVG.Zone 3 Foundation 26-May-13 11-Jun-13
KVG.Zon Footing 26-May-13 11-Jun-13
KVG.Z Plain Concrete 26-May-13 30-May-13
KVG.Z Reinforced Concrete&Smeles 01-Jun-13 11-Jun-13
KVG.Zone 3 Ground Floor 12-Jun-13 10-Jul-13
KVG.Zon Slab on grade 23-Jun-13 10-Jul-13
KVG.Zon Columns 12-Jun-13 19-Jun-13
KVG.Zone 3 First Floor 11-Jul-13 31-Jul-13
KVG.Zon Beams and slab 11-Jul-13 31-Jul-13
KVG.Zon Columns 23-Jul-13 31-Jul-13
KVG.Zone 3 Roof 01-Aug-13 24-Aug-13
KVG.Zon Beams and slab 01-Aug-13 24-Aug-13
KVG.Zone 3.St Mansonary 01-Aug-13 28-Aug-13
KVG.Zone 3 Ground Floor 01-Aug-13 03-Aug-13
KVG.Zone 3 First Floor 25-Aug-13 26-Aug-13
KVG.Zone 3 Roof 27-Aug-13 28-Aug-13
KVG.Zone 3.St Finishing 04-Aug-13 02-Sep-13
KVG.Zone 3 Ground Floor 04-Aug-13 05-Aug-13
KVG.Zon Calm Shell 04-Aug-13 05-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 27-Aug-13 28-Aug-13
KVG.Zon Calm Shell 27-Aug-13 28-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 29-Aug-13 29-Aug-13
KVG.Zon Calm Shell 29-Aug-13 29-Aug-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 31-Aug-13 02-Sep-13
KVG.Zone 3.Stage Stand alone Villa type 57 25-Nov-12 04-Dec-13
KVG.Zone 3.St Mobilization 28-Nov-12 28-Nov-12
KVG.Zone 3.St Earth Work 03-Dec-12 21-Sep-13
KVG.Zone 3.St Civil Work 25-Aug-13 25-Nov-13
KVG.Zone 3 Foundation 25-Aug-13 10-Sep-13
KVG.Zon Footing 25-Aug-13 10-Sep-13
KVG.Z Plain Concrete 25-Aug-13 29-Aug-13
KVG.Z Reinforced Concrete&Smeles 31-Aug-13 10-Sep-13
KVG.Zone 3 Ground Floor 11-Sep-13 10-Oct-13
KVG.Zon Slab on grade 22-Sep-13 10-Oct-13
KVG.Zon Columns 11-Sep-13 18-Sep-13
KVG.Zone 3 First Floor 12-Oct-13 04-Nov-13
KVG.Zon Beams and slab 12-Oct-13 04-Nov-13
KVG.Zon Columns 27-Oct-13 04-Nov-13
KVG.Zone 3 Roof 05-Nov-13 25-Nov-13
KVG.Zon Beams and slab 05-Nov-13 25-Nov-13
KVG.Zone 3.St Mansonary 05-Nov-13 30-Nov-13
KVG.Zone 3 Ground Floor 05-Nov-13 06-Nov-13
KVG.Zone 3 First Floor 26-Nov-13 27-Nov-13
KVG.Zone 3 Roof 28-Nov-13 30-Nov-13
KVG.Zone 3.St Finishing 07-Nov-13 04-Dec-13
KVG.Zone 3 Ground Floor 07-Nov-13 09-Nov-13
KVG.Zon Calm Shell 07-Nov-13 09-Nov-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 28-Nov-13 30-Nov-13
KVG.Zon Calm Shell 28-Nov-13 30-Nov-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 01-Dec-13 01-Dec-13
KVG.Zon Calm Shell 01-Dec-13 01-Dec-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 02-Dec-13 04-Dec-13
KVG.Zone 3.Stage Stand alone Villa type 58 25-Nov-12 05-Mar-13
KVG.Zone 3.St Mobilization 25-Nov-12 25-Nov-12
KVG.Zone 3.St Earth Work 26-Nov-12 25-Dec-12
KVG.Zone 3.St Civil Work 28-Nov-12 24-Feb-13
KVG.Zone 3 Foundation 28-Nov-12 15-Dec-12
KVG.Zon Footing 28-Nov-12 15-Dec-12
KVG.Z Plain Concrete 28-Nov-12 03-Dec-12
KVG.Z Reinforced Concrete&Smeles 04-Dec-12 15-Dec-12
KVG.Zone 3 Ground Floor 16-Dec-12 13-Jan-13
KVG.Zon Slab on grade 26-Dec-12 13-Jan-13

86
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Columns 16-Dec-12 23-Dec-12
KVG.Zone 3 First Floor 14-Jan-13 03-Feb-13
KVG.Zon Beams and slab 14-Jan-13 03-Feb-13
KVG.Zon Columns 26-Jan-13 03-Feb-13
KVG.Zone 3 Roof 04-Feb-13 24-Feb-13
KVG.Zon Beams and slab 04-Feb-13 24-Feb-13
KVG.Zone 3.St Mansonary 04-Feb-13 28-Feb-13
KVG.Zone 3 Ground Floor 04-Feb-13 05-Feb-13
KVG.Zone 3 First Floor 25-Feb-13 26-Feb-13
KVG.Zone 3 Roof 27-Feb-13 28-Feb-13
KVG.Zone 3.St Finishing 06-Feb-13 05-Mar-13
KVG.Zone 3 Ground Floor 06-Feb-13 07-Feb-13
KVG.Zon Calm Shell 06-Feb-13 07-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 27-Feb-13 28-Feb-13
KVG.Zon Calm Shell 27-Feb-13 28-Feb-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 02-Mar-13 02-Mar-13
KVG.Zon Calm Shell 02-Mar-13 02-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 03-Mar-13 05-Mar-13
KVG.Zone 3.Stage Stand alone Villa type 59 25-Nov-12 03-Jun-13
KVG.Zone 3.St Mobilization 26-Nov-12 26-Nov-12
KVG.Zone 3.St Earth Work 28-Nov-12 24-Mar-13
KVG.Zone 3.St Civil Work 25-Feb-13 25-May-13
KVG.Zone 3 Foundation 25-Feb-13 13-Mar-13
KVG.Zon Footing 25-Feb-13 13-Mar-13
KVG.Z Plain Concrete 25-Feb-13 02-Mar-13
KVG.Z Reinforced Concrete&Smeles 03-Mar-13 13-Mar-13
KVG.Zone 3 Ground Floor 14-Mar-13 11-Apr-13
KVG.Zon Slab on grade 25-Mar-13 11-Apr-13
KVG.Zon Columns 14-Mar-13 21-Mar-13
KVG.Zone 3 First Floor 13-Apr-13 04-May-13
KVG.Zon Beams and slab 13-Apr-13 04-May-13
KVG.Zon Columns 24-Apr-13 04-May-13
KVG.Zone 3 Roof 05-May-13 25-May-13
KVG.Zon Beams and slab 05-May-13 25-May-13
KVG.Zone 3.St Mansonary 05-May-13 29-May-13
KVG.Zone 3 Ground Floor 05-May-13 06-May-13
KVG.Zone 3 First Floor 26-May-13 27-May-13
KVG.Zone 3 Roof 28-May-13 29-May-13
KVG.Zone 3.St Finishing 07-May-13 03-Jun-13
KVG.Zone 3 Ground Floor 07-May-13 08-May-13
KVG.Zon Calm Shell 07-May-13 08-May-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 28-May-13 29-May-13
KVG.Zon Calm Shell 28-May-13 29-May-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 30-May-13 30-May-13
KVG.Zon Calm Shell 30-May-13 30-May-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 01-Jun-13 03-Jun-13
KVG.Zone 3.Stage Twin House 3 25-Nov-12 14-Oct-13
KVG.Zone 3.St Mobilization 27-Nov-12 27-Nov-12
KVG.Zone 3.St Earth Work 01-Dec-12 07-Jul-13
KVG.Zone 3.St Civil Work 26-May-13 21-Sep-13
KVG.Zone 3 Foundation 26-May-13 23-Jun-13
KVG.Zon Footing 26-May-13 23-Jun-13
KVG.Z Plain Concrete 26-May-13 03-Jun-13
KVG.Z Reinforced Concrete&Semels 04-Jun-13 23-Jun-13
KVG.Zone 3 Ground Floor 24-Jun-13 01-Aug-13
KVG.Zon Slab on grade 08-Jul-13 01-Aug-13
KVG.Zon Columns 24-Jun-13 03-Jul-13
KVG.Zone 3 First Floor 03-Aug-13 28-Aug-13
KVG.Zon Beams and Slabs 03-Aug-13 27-Aug-13
KVG.Zon Columns 19-Aug-13 28-Aug-13
KVG.Zone 3 Roof 29-Aug-13 21-Sep-13
KVG.Zon Beams and Slabs 29-Aug-13 21-Sep-13
KVG.Zone 3.St Mansonary 28-Aug-13 03-Oct-13
KVG.Zone 3 Ground Floor 28-Aug-13 07-Sep-13
KVG.Zone 3 First Floor 22-Sep-13 01-Oct-13
KVG.Zone 3 Roof 02-Oct-13 03-Oct-13
KVG.Zone 3.St Finishing 01-Sep-13 14-Oct-13
KVG.Zone 3 Ground Floor 01-Sep-13 02-Sep-13
KVG.Zon Calm Shell 01-Sep-13 02-Sep-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 25-Sep-13 26-Sep-13
KVG.Zon Calm Shell 25-Sep-13 26-Sep-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 05-Oct-13 05-Oct-13
KVG.Zon Calm Shell 05-Oct-13 05-Oct-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Twin House 07-Oct-13 14-Oct-13
KVG.Zone 3.Stage Twin House 5 25-Nov-12 16-Apr-13
KVG.Zone 3.St Mobilization 25-Nov-12 25-Nov-12
KVG.Zone 3.St Earth Work 26-Nov-12 10-Jan-13

87
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3.St Civil Work 29-Nov-12 25-Mar-13
KVG.Zone 3 Foundation 29-Nov-12 27-Dec-12
KVG.Zon Footing 29-Nov-12 27-Dec-12
KVG.Z Plain Concrete 29-Nov-12 08-Dec-12
KVG.Z Reinforced Concrete&Semels 09-Dec-12 27-Dec-12
KVG.Zone 3 Ground Floor 29-Dec-12 05-Feb-13
KVG.Zon Slab on grade 12-Jan-13 05-Feb-13
KVG.Zon Columns 29-Dec-12 07-Jan-13
KVG.Zone 3 First Floor 06-Feb-13 02-Mar-13
KVG.Zon Beams and Slabs 06-Feb-13 28-Feb-13
KVG.Zon Columns 20-Feb-13 02-Mar-13
KVG.Zone 3 Roof 03-Mar-13 25-Mar-13
KVG.Zon Beams and Slabs 03-Mar-13 25-Mar-13
KVG.Zone 3.St Mansonary 02-Mar-13 07-Apr-13
KVG.Zone 3 Ground Floor 02-Mar-13 11-Mar-13
KVG.Zone 3 First Floor 26-Mar-13 04-Apr-13
KVG.Zone 3 Roof 06-Apr-13 07-Apr-13
KVG.Zone 3.St Finishing 05-Mar-13 16-Apr-13
KVG.Zone 3 Ground Floor 05-Mar-13 06-Mar-13
KVG.Zon Calm Shell 05-Mar-13 06-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 First Floor 30-Mar-13 31-Mar-13
KVG.Zon Calm Shell 30-Mar-13 31-Mar-13
KVG.Zon External Electrical
KVG.Zone 3 Roof 08-Apr-13 08-Apr-13
KVG.Zon Calm Shell 08-Apr-13 08-Apr-13
KVG.Zon External Electrical
KVG.Zone 3 Paint Twin House 09-Apr-13 16-Apr-13
KVG.Zone 3.Stage 3 Stage 3 15-Dec-13 25-D
KVG.Zone 3.Stage Stand alone Villa type 60 15-Dec-13 25-Mar-14
KVG.Zone 3.St Mobilization 15-Dec-13 15-Dec-13
KVG.Zone 3.St Earth Work 16-Dec-13 14-Jan-14
KVG.Zone 3.St Civil Work 18-Dec-13 16-Mar-14
KVG.Zone 3 Foundation 18-Dec-13 04-Jan-14
KVG.Zon Footing 18-Dec-13 04-Jan-14
KVG.Z Plain Concrete 18-Dec-13 23-Dec-13
KVG.Z Reinforced Concrete&Smeles 24-Dec-13 04-Jan-14
KVG.Zone 3 Ground Floor 05-Jan-14 02-Feb-14
KVG.Zon Slab on grade 15-Jan-14 02-Feb-14
KVG.Zon Columns 05-Jan-14 12-Jan-14
KVG.Zone 3 First Floor 03-Feb-14 23-Feb-14
KVG.Zon Beams and slab 03-Feb-14 23-Feb-14
KVG.Zon Columns 15-Feb-14 23-Feb-14
KVG.Zone 3 Roof 24-Feb-14 16-Mar-14
KVG.Zon Beams and slab 24-Feb-14 16-Mar-14
KVG.Zone 3.St Mansonary 24-Feb-14 20-Mar-14
KVG.Zone 3 Ground Floor 24-Feb-14 25-Feb-14
KVG.Zone 3 First Floor 17-Mar-14 18-Mar-14
KVG.Zone 3 Roof 19-Mar-14 20-Mar-14
KVG.Zone 3.St Finishing 26-Feb-14 25-Mar-14
KVG.Zone 3 Ground Floor 26-Feb-14 27-Feb-14
KVG.Zon Calm Shell 26-Feb-14 27-Feb-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 19-Mar-14 20-Mar-14
KVG.Zon Calm Shell 19-Mar-14 20-Mar-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 22-Mar-14 22-Mar-14
KVG.Zon Calm Shell 22-Mar-14 22-Mar-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 23-Mar-14 25-Mar-14
KVG.Zone 3.Stage Stand alone Villa type 61 15-Dec-13 23-Jun-14
KVG.Zone 3.St Mobilization 16-Dec-13 16-Dec-13
KVG.Zone 3.St Earth Work 18-Dec-13 13-Apr-14
KVG.Zone 3.St Civil Work 17-Mar-14 14-Jun-14
KVG.Zone 3 Foundation 17-Mar-14 02-Apr-14
KVG.Zon Footing 17-Mar-14 02-Apr-14
KVG.Z Plain Concrete 17-Mar-14 22-Mar-14
KVG.Z Reinforced Concrete&Smeles 23-Mar-14 02-Apr-14
KVG.Zone 3 Ground Floor 03-Apr-14 03-May-14
KVG.Zon Slab on grade 14-Apr-14 03-May-14
KVG.Zon Columns 03-Apr-14 10-Apr-14
KVG.Zone 3 First Floor 04-May-14 24-May-14
KVG.Zon Beams and slab 04-May-14 24-May-14
KVG.Zon Columns 15-May-14 24-May-14
KVG.Zone 3 Roof 25-May-14 14-Jun-14
KVG.Zon Beams and slab 25-May-14 14-Jun-14
KVG.Zone 3.St Mansonary 25-May-14 18-Jun-14
KVG.Zone 3 Ground Floor 25-May-14 26-May-14
KVG.Zone 3 First Floor 15-Jun-14 16-Jun-14
KVG.Zone 3 Roof 17-Jun-14 18-Jun-14
KVG.Zone 3.St Finishing 27-May-14 23-Jun-14
KVG.Zone 3 Ground Floor 27-May-14 28-May-14
KVG.Zon Calm Shell 27-May-14 28-May-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 17-Jun-14 18-Jun-14
KVG.Zon Calm Shell 17-Jun-14 18-Jun-14

88
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon External Electrical
KVG.Zone 3 Roof 19-Jun-14 19-Jun-14
KVG.Zon Calm Shell 19-Jun-14 19-Jun-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 21-Jun-14 23-Jun-14
KVG.Zone 3.Stage Stand alone Villa type 62 15-Dec-13 24-Sep-14
KVG.Zone 3.St Mobilization 17-Dec-13 17-Dec-13
KVG.Zone 3.St Earth Work 21-Dec-13 12-Jul-14
KVG.Zone 3.St Civil Work 15-Jun-14 15-Sep-14
KVG.Zone 3 Foundation 15-Jun-14 01-Jul-14
KVG.Zon Footing 15-Jun-14 01-Jul-14
KVG.Z Plain Concrete 15-Jun-14 19-Jun-14
KVG.Z Reinforced Concrete&Smeles 21-Jun-14 01-Jul-14
KVG.Zone 3 Ground Floor 02-Jul-14 04-Aug-14
KVG.Zon Slab on grade 13-Jul-14 04-Aug-14
KVG.Zon Columns 02-Jul-14 09-Jul-14
KVG.Zone 3 First Floor 05-Aug-14 25-Aug-14
KVG.Zon Beams and slab 05-Aug-14 25-Aug-14
KVG.Zon Columns 17-Aug-14 25-Aug-14
KVG.Zone 3 Roof 26-Aug-14 15-Sep-14
KVG.Zon Beams and slab 26-Aug-14 15-Sep-14
KVG.Zone 3.St Mansonary 26-Aug-14 20-Sep-14
KVG.Zone 3 Ground Floor 26-Aug-14 27-Aug-14
KVG.Zone 3 First Floor 16-Sep-14 17-Sep-14
KVG.Zone 3 Roof 18-Sep-14 20-Sep-14
KVG.Zone 3.St Finishing 28-Aug-14 24-Sep-14
KVG.Zone 3 Ground Floor 28-Aug-14 30-Aug-14
KVG.Zon Calm Shell 28-Aug-14 30-Aug-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 18-Sep-14 20-Sep-14
KVG.Zon Calm Shell 18-Sep-14 20-Sep-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 21-Sep-14 21-Sep-14
KVG.Zon Calm Shell 21-Sep-14 21-Sep-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 22-Sep-14 24-Sep-14
KVG.Zone 3.Stage Stand alone Villa type 63 15-Dec-13 25-D
KVG.Zone 3.St Mobilization 18-Dec-13 18-Dec-13
KVG.Zone 3.St Earth Work 23-Dec-13 16-Oct-14
KVG.Zone 3.St Civil Work 16-Sep-14 16-De
KVG.Zone 3 Foundation 16-Sep-14 02-Oct-14
KVG.Zon Footing 16-Sep-14 02-Oct-14
KVG.Z Plain Concrete 16-Sep-14 21-Sep-14
KVG.Z Reinforced Concrete&Smeles 22-Sep-14 02-Oct-14
KVG.Zone 3 Ground Floor 04-Oct-14 04-Nov-14
KVG.Zon Slab on grade 18-Oct-14 04-Nov-14
KVG.Zon Columns 04-Oct-14 14-Oct-14
KVG.Zone 3 First Floor 05-Nov-14 25-Nov-
KVG.Zon Beams and slab 05-Nov-14 25-Nov-
KVG.Zon Columns 17-Nov-14 25-Nov-
KVG.Zone 3 Roof 26-Nov-14 16-De
KVG.Zon Beams and slab 26-Nov-14 16-De
KVG.Zone 3.St Mansonary 26-Nov-14 21-D
KVG.Zone 3 Ground Floor 26-Nov-14 27-Nov-
KVG.Zone 3 First Floor 17-Dec-14 18-De
KVG.Zone 3 Roof 20-Dec-14 21-D
KVG.Zone 3.St Finishing 29-Nov-14 25-D
KVG.Zone 3 Ground Floor 29-Nov-14 30-Nov-
KVG.Zon Calm Shell 29-Nov-14 30-Nov-
KVG.Zon External Electrical
KVG.Zone 3 First Floor 20-Dec-14 21-D
KVG.Zon Calm Shell 20-Dec-14 21-D
KVG.Zon External Electrical
KVG.Zone 3 Roof 22-Dec-14 22-D
KVG.Zon Calm Shell 22-Dec-14 22-D
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 23-Dec-14 25-D
KVG.Zone 3.Stage Stand alone Villa type 64 15-Dec-13 25-Mar-14
KVG.Zone 3.St Mobilization 15-Dec-13 15-Dec-13
KVG.Zone 3.St Earth Work 16-Dec-13 14-Jan-14
KVG.Zone 3.St Civil Work 18-Dec-13 16-Mar-14
KVG.Zone 3 Foundation 18-Dec-13 04-Jan-14
KVG.Zon Footing 18-Dec-13 04-Jan-14
KVG.Z Plain Concrete 18-Dec-13 23-Dec-13
KVG.Z Reinforced Concrete&Smeles 24-Dec-13 04-Jan-14
KVG.Zone 3 Ground Floor 05-Jan-14 02-Feb-14
KVG.Zon Slab on grade 15-Jan-14 02-Feb-14
KVG.Zon Columns 05-Jan-14 12-Jan-14
KVG.Zone 3 First Floor 03-Feb-14 23-Feb-14
KVG.Zon Beams and slab 03-Feb-14 23-Feb-14
KVG.Zon Columns 15-Feb-14 23-Feb-14
KVG.Zone 3 Roof 24-Feb-14 16-Mar-14
KVG.Zon Beams and slab 24-Feb-14 16-Mar-14
KVG.Zone 3.St Mansonary 24-Feb-14 20-Mar-14
KVG.Zone 3 Ground Floor 24-Feb-14 25-Feb-14
KVG.Zone 3 First Floor 17-Mar-14 18-Mar-14

89
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zone 3 Roof 19-Mar-14 20-Mar-14
KVG.Zone 3.St Finishing 26-Feb-14 25-Mar-14
KVG.Zone 3 Ground Floor 26-Feb-14 27-Feb-14
KVG.Zon Calm Shell 26-Feb-14 27-Feb-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 19-Mar-14 20-Mar-14
KVG.Zon Calm Shell 19-Mar-14 20-Mar-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 22-Mar-14 22-Mar-14
KVG.Zon Calm Shell 22-Mar-14 22-Mar-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 23-Mar-14 25-Mar-14
KVG.Zone 3.Stage Stand alone Villa type 65 15-Dec-13 23-Jun-14
KVG.Zone 3.St Mobilization 16-Dec-13 16-Dec-13
KVG.Zone 3.St Earth Work 18-Dec-13 13-Apr-14
KVG.Zone 3.St Civil Work 17-Mar-14 14-Jun-14
KVG.Zone 3 Foundation 17-Mar-14 02-Apr-14
KVG.Zon Footing 17-Mar-14 02-Apr-14
KVG.Z Plain Concrete 17-Mar-14 22-Mar-14
KVG.Z Reinforced Concrete&Smeles 23-Mar-14 02-Apr-14
KVG.Zone 3 Ground Floor 03-Apr-14 03-May-14
KVG.Zon Slab on grade 14-Apr-14 03-May-14
KVG.Zon Columns 03-Apr-14 10-Apr-14
KVG.Zone 3 First Floor 04-May-14 24-May-14
KVG.Zon Beams and slab 04-May-14 24-May-14
KVG.Zon Columns 15-May-14 24-May-14
KVG.Zone 3 Roof 25-May-14 14-Jun-14
KVG.Zon Beams and slab 25-May-14 14-Jun-14
KVG.Zone 3.St Mansonary 25-May-14 18-Jun-14
KVG.Zone 3 Ground Floor 25-May-14 26-May-14
KVG.Zone 3 First Floor 15-Jun-14 16-Jun-14
KVG.Zone 3 Roof 17-Jun-14 18-Jun-14
KVG.Zone 3.St Finishing 27-May-14 23-Jun-14
KVG.Zone 3 Ground Floor 27-May-14 28-May-14
KVG.Zon Calm Shell 27-May-14 28-May-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 17-Jun-14 18-Jun-14
KVG.Zon Calm Shell 17-Jun-14 18-Jun-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 19-Jun-14 19-Jun-14
KVG.Zon Calm Shell 19-Jun-14 19-Jun-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 21-Jun-14 23-Jun-14
KVG.Zone 3.Stage Stand alone Villa type 66 15-Dec-13 24-Sep-14
KVG.Zone 3.St Mobilization 17-Dec-13 17-Dec-13
KVG.Zone 3.St Earth Work 21-Dec-13 12-Jul-14
KVG.Zone 3.St Civil Work 15-Jun-14 15-Sep-14
KVG.Zone 3 Foundation 15-Jun-14 01-Jul-14
KVG.Zon Footing 15-Jun-14 01-Jul-14
KVG.Z Plain Concrete 15-Jun-14 19-Jun-14
KVG.Z Reinforced Concrete&Smeles 21-Jun-14 01-Jul-14
KVG.Zone 3 Ground Floor 02-Jul-14 04-Aug-14
KVG.Zon Slab on grade 13-Jul-14 04-Aug-14
KVG.Zon Columns 02-Jul-14 09-Jul-14
KVG.Zone 3 First Floor 05-Aug-14 25-Aug-14
KVG.Zon Beams and slab 05-Aug-14 25-Aug-14
KVG.Zon Columns 17-Aug-14 25-Aug-14
KVG.Zone 3 Roof 26-Aug-14 15-Sep-14
KVG.Zon Beams and slab 26-Aug-14 15-Sep-14
KVG.Zone 3.St Mansonary 26-Aug-14 20-Sep-14
KVG.Zone 3 Ground Floor 26-Aug-14 27-Aug-14
KVG.Zone 3 First Floor 16-Sep-14 17-Sep-14
KVG.Zone 3 Roof 18-Sep-14 20-Sep-14
KVG.Zone 3.St Finishing 28-Aug-14 24-Sep-14
KVG.Zone 3 Ground Floor 28-Aug-14 30-Aug-14
KVG.Zon Calm Shell 28-Aug-14 30-Aug-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 18-Sep-14 20-Sep-14
KVG.Zon Calm Shell 18-Sep-14 20-Sep-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 21-Sep-14 21-Sep-14
KVG.Zon Calm Shell 21-Sep-14 21-Sep-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 22-Sep-14 24-Sep-14
KVG.Zone 3.Stage Stand alone Villa type 67 15-Dec-13 25-D
KVG.Zone 3.St Mobilization 18-Dec-13 18-Dec-13
KVG.Zone 3.St Earth Work 23-Dec-13 16-Oct-14
KVG.Zone 3.St Civil Work 16-Sep-14 16-De
KVG.Zone 3 Foundation 16-Sep-14 02-Oct-14
KVG.Zon Footing 16-Sep-14 02-Oct-14
KVG.Z Plain Concrete 16-Sep-14 21-Sep-14
KVG.Z Reinforced Concrete&Smeles 22-Sep-14 02-Oct-14
KVG.Zone 3 Ground Floor 04-Oct-14 04-Nov-14
KVG.Zon Slab on grade 18-Oct-14 04-Nov-14
KVG.Zon Columns 04-Oct-14 14-Oct-14
KVG.Zone 3 First Floor 05-Nov-14 25-Nov-

90
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Beams and slab 05-Nov-14 25-Nov-
KVG.Zon Columns 17-Nov-14 25-Nov-
KVG.Zone 3 Roof 26-Nov-14 16-De
KVG.Zon Beams and slab 26-Nov-14 16-De
KVG.Zone 3.St Mansonary 26-Nov-14 21-D
KVG.Zone 3 Ground Floor 26-Nov-14 27-Nov-
KVG.Zone 3 First Floor 17-Dec-14 18-De
KVG.Zone 3 Roof 20-Dec-14 21-D
KVG.Zone 3.St Finishing 29-Nov-14 25-D
KVG.Zone 3 Ground Floor 29-Nov-14 30-Nov-
KVG.Zon Calm Shell 29-Nov-14 30-Nov-
KVG.Zon External Electrical
KVG.Zone 3 First Floor 20-Dec-14 21-D
KVG.Zon Calm Shell 20-Dec-14 21-D
KVG.Zon External Electrical
KVG.Zone 3 Roof 22-Dec-14 22-D
KVG.Zon Calm Shell 22-Dec-14 22-D
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 23-Dec-14 25-D
KVG.Zone 3.Stage Stand alone Villa type 68 15-Dec-13 25-Mar-14
KVG.Zone 3.St Mobilization 15-Dec-13 15-Dec-13
KVG.Zone 3.St Earth Work 16-Dec-13 14-Jan-14
KVG.Zone 3.St Civil Work 18-Dec-13 16-Mar-14
KVG.Zone 3 Foundation 18-Dec-13 04-Jan-14
KVG.Zon Footing 18-Dec-13 04-Jan-14
KVG.Z Plain Concrete 18-Dec-13 23-Dec-13
KVG.Z Reinforced Concrete&Smeles 24-Dec-13 04-Jan-14
KVG.Zone 3 Ground Floor 05-Jan-14 02-Feb-14
KVG.Zon Slab on grade 15-Jan-14 02-Feb-14
KVG.Zon Columns 05-Jan-14 12-Jan-14
KVG.Zone 3 First Floor 03-Feb-14 23-Feb-14
KVG.Zon Beams and slab 03-Feb-14 23-Feb-14
KVG.Zon Columns 15-Feb-14 23-Feb-14
KVG.Zone 3 Roof 24-Feb-14 16-Mar-14
KVG.Zon Beams and slab 24-Feb-14 16-Mar-14
KVG.Zone 3.St Mansonary 24-Feb-14 20-Mar-14
KVG.Zone 3 Ground Floor 24-Feb-14 25-Feb-14
KVG.Zone 3 First Floor 17-Mar-14 18-Mar-14
KVG.Zone 3 Roof 19-Mar-14 20-Mar-14
KVG.Zone 3.St Finishing 26-Feb-14 25-Mar-14
KVG.Zone 3 Ground Floor 26-Feb-14 27-Feb-14
KVG.Zon Calm Shell 26-Feb-14 27-Feb-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 19-Mar-14 20-Mar-14
KVG.Zon Calm Shell 19-Mar-14 20-Mar-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 22-Mar-14 22-Mar-14
KVG.Zon Calm Shell 22-Mar-14 22-Mar-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 23-Mar-14 25-Mar-14
KVG.Zone 3.Stage Stand alone Villa type 69 15-Dec-13 23-Jun-14
KVG.Zone 3.St Mobilization 16-Dec-13 16-Dec-13
KVG.Zone 3.St Earth Work 18-Dec-13 13-Apr-14
KVG.Zone 3.St Civil Work 17-Mar-14 14-Jun-14
KVG.Zone 3 Foundation 17-Mar-14 02-Apr-14
KVG.Zon Footing 17-Mar-14 02-Apr-14
KVG.Z Plain Concrete 17-Mar-14 22-Mar-14
KVG.Z Reinforced Concrete&Smeles 23-Mar-14 02-Apr-14
KVG.Zone 3 Ground Floor 03-Apr-14 03-May-14
KVG.Zon Slab on grade 14-Apr-14 03-May-14
KVG.Zon Columns 03-Apr-14 10-Apr-14
KVG.Zone 3 First Floor 04-May-14 24-May-14
KVG.Zon Beams and slab 04-May-14 24-May-14
KVG.Zon Columns 15-May-14 24-May-14
KVG.Zone 3 Roof 25-May-14 14-Jun-14
KVG.Zon Beams and slab 25-May-14 14-Jun-14
KVG.Zone 3.St Mansonary 25-May-14 18-Jun-14
KVG.Zone 3 Ground Floor 25-May-14 26-May-14
KVG.Zone 3 First Floor 15-Jun-14 16-Jun-14
KVG.Zone 3 Roof 17-Jun-14 18-Jun-14
KVG.Zone 3.St Finishing 27-May-14 23-Jun-14
KVG.Zone 3 Ground Floor 27-May-14 28-May-14
KVG.Zon Calm Shell 27-May-14 28-May-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 17-Jun-14 18-Jun-14
KVG.Zon Calm Shell 17-Jun-14 18-Jun-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 19-Jun-14 19-Jun-14
KVG.Zon Calm Shell 19-Jun-14 19-Jun-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 21-Jun-14 23-Jun-14
KVG.Zone 3.Stage Stand alone Villa type 70 15-Dec-13 24-Sep-14
KVG.Zone 3.St Mobilization 17-Dec-13 17-Dec-13
KVG.Zone 3.St Earth Work 21-Dec-13 12-Jul-14
KVG.Zone 3.St Civil Work 15-Jun-14 15-Sep-14
KVG.Zone 3 Foundation 15-Jun-14 01-Jul-14

91
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Footing 15-Jun-14 01-Jul-14
KVG.Z Plain Concrete 15-Jun-14 19-Jun-14
KVG.Z Reinforced Concrete&Smeles 21-Jun-14 01-Jul-14
KVG.Zone 3 Ground Floor 02-Jul-14 04-Aug-14
KVG.Zon Slab on grade 13-Jul-14 04-Aug-14
KVG.Zon Columns 02-Jul-14 09-Jul-14
KVG.Zone 3 First Floor 05-Aug-14 25-Aug-14
KVG.Zon Beams and slab 05-Aug-14 25-Aug-14
KVG.Zon Columns 17-Aug-14 25-Aug-14
KVG.Zone 3 Roof 26-Aug-14 15-Sep-14
KVG.Zon Beams and slab 26-Aug-14 15-Sep-14
KVG.Zone 3.St Mansonary 26-Aug-14 20-Sep-14
KVG.Zone 3 Ground Floor 26-Aug-14 27-Aug-14
KVG.Zone 3 First Floor 16-Sep-14 17-Sep-14
KVG.Zone 3 Roof 18-Sep-14 20-Sep-14
KVG.Zone 3.St Finishing 28-Aug-14 24-Sep-14
KVG.Zone 3 Ground Floor 28-Aug-14 30-Aug-14
KVG.Zon Calm Shell 28-Aug-14 30-Aug-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 18-Sep-14 20-Sep-14
KVG.Zon Calm Shell 18-Sep-14 20-Sep-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 21-Sep-14 21-Sep-14
KVG.Zon Calm Shell 21-Sep-14 21-Sep-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 22-Sep-14 24-Sep-14
KVG.Zone 3.Stage Stand alone Villa type 71 15-Dec-13 25-D
KVG.Zone 3.St Mobilization 18-Dec-13 18-Dec-13
KVG.Zone 3.St Earth Work 23-Dec-13 16-Oct-14
KVG.Zone 3.St Civil Work 16-Sep-14 16-De
KVG.Zone 3 Foundation 16-Sep-14 02-Oct-14
KVG.Zon Footing 16-Sep-14 02-Oct-14
KVG.Z Plain Concrete 16-Sep-14 21-Sep-14
KVG.Z Reinforced Concrete&Smeles 22-Sep-14 02-Oct-14
KVG.Zone 3 Ground Floor 04-Oct-14 04-Nov-14
KVG.Zon Slab on grade 18-Oct-14 04-Nov-14
KVG.Zon Columns 04-Oct-14 14-Oct-14
KVG.Zone 3 First Floor 05-Nov-14 25-Nov-
KVG.Zon Beams and slab 05-Nov-14 25-Nov-
KVG.Zon Columns 17-Nov-14 25-Nov-
KVG.Zone 3 Roof 26-Nov-14 16-De
KVG.Zon Beams and slab 26-Nov-14 16-De
KVG.Zone 3.St Mansonary 26-Nov-14 21-D
KVG.Zone 3 Ground Floor 26-Nov-14 27-Nov-
KVG.Zone 3 First Floor 17-Dec-14 18-De
KVG.Zone 3 Roof 20-Dec-14 21-D
KVG.Zone 3.St Finishing 29-Nov-14 25-D
KVG.Zone 3 Ground Floor 29-Nov-14 30-Nov-
KVG.Zon Calm Shell 29-Nov-14 30-Nov-
KVG.Zon External Electrical
KVG.Zone 3 First Floor 20-Dec-14 21-D
KVG.Zon Calm Shell 20-Dec-14 21-D
KVG.Zon External Electrical
KVG.Zone 3 Roof 22-Dec-14 22-D
KVG.Zon Calm Shell 22-Dec-14 22-D
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 23-Dec-14 25-D
KVG.Zone 3.Stage Stand alone Villa type 72 15-Dec-13 25-Mar-14
KVG.Zone 3.St Mobilization 15-Dec-13 15-Dec-13
KVG.Zone 3.St Earth Work 16-Dec-13 14-Jan-14
KVG.Zone 3.St Civil Work 18-Dec-13 16-Mar-14
KVG.Zone 3 Foundation 18-Dec-13 04-Jan-14
KVG.Zon Footing 18-Dec-13 04-Jan-14
KVG.Z Plain Concrete 18-Dec-13 23-Dec-13
KVG.Z Reinforced Concrete&Smeles 24-Dec-13 04-Jan-14
KVG.Zone 3 Ground Floor 05-Jan-14 02-Feb-14
KVG.Zon Slab on grade 15-Jan-14 02-Feb-14
KVG.Zon Columns 05-Jan-14 12-Jan-14
KVG.Zone 3 First Floor 03-Feb-14 23-Feb-14
KVG.Zon Beams and slab 03-Feb-14 23-Feb-14
KVG.Zon Columns 15-Feb-14 23-Feb-14
KVG.Zone 3 Roof 24-Feb-14 16-Mar-14
KVG.Zon Beams and slab 24-Feb-14 16-Mar-14
KVG.Zone 3.St Mansonary 24-Feb-14 20-Mar-14
KVG.Zone 3 Ground Floor 24-Feb-14 25-Feb-14
KVG.Zone 3 First Floor 17-Mar-14 18-Mar-14
KVG.Zone 3 Roof 19-Mar-14 20-Mar-14
KVG.Zone 3.St Finishing 26-Feb-14 25-Mar-14
KVG.Zone 3 Ground Floor 26-Feb-14 27-Feb-14
KVG.Zon Calm Shell 26-Feb-14 27-Feb-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 19-Mar-14 20-Mar-14
KVG.Zon Calm Shell 19-Mar-14 20-Mar-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 22-Mar-14 22-Mar-14
KVG.Zon Calm Shell 22-Mar-14 22-Mar-14

92
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 23-Mar-14 25-Mar-14
KVG.Zone 3.Stage Stand alone Villa type 73 15-Dec-13 23-Jun-14
KVG.Zone 3.St Mobilization 16-Dec-13 16-Dec-13
KVG.Zone 3.St Earth Work 18-Dec-13 13-Apr-14
KVG.Zone 3.St Civil Work 17-Mar-14 14-Jun-14
KVG.Zone 3 Foundation 17-Mar-14 02-Apr-14
KVG.Zon Footing 17-Mar-14 02-Apr-14
KVG.Z Plain Concrete 17-Mar-14 22-Mar-14
KVG.Z Reinforced Concrete&Smeles 23-Mar-14 02-Apr-14
KVG.Zone 3 Ground Floor 03-Apr-14 03-May-14
KVG.Zon Slab on grade 14-Apr-14 03-May-14
KVG.Zon Columns 03-Apr-14 10-Apr-14
KVG.Zone 3 First Floor 04-May-14 24-May-14
KVG.Zon Beams and slab 04-May-14 24-May-14
KVG.Zon Columns 15-May-14 24-May-14
KVG.Zone 3 Roof 25-May-14 14-Jun-14
KVG.Zon Beams and slab 25-May-14 14-Jun-14
KVG.Zone 3.St Mansonary 25-May-14 18-Jun-14
KVG.Zone 3 Ground Floor 25-May-14 26-May-14
KVG.Zone 3 First Floor 15-Jun-14 16-Jun-14
KVG.Zone 3 Roof 17-Jun-14 18-Jun-14
KVG.Zone 3.St Finishing 27-May-14 23-Jun-14
KVG.Zone 3 Ground Floor 27-May-14 28-May-14
KVG.Zon Calm Shell 27-May-14 28-May-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 17-Jun-14 18-Jun-14
KVG.Zon Calm Shell 17-Jun-14 18-Jun-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 19-Jun-14 19-Jun-14
KVG.Zon Calm Shell 19-Jun-14 19-Jun-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 21-Jun-14 23-Jun-14
KVG.Zone 3.Stage Stand alone Villa type 74 15-Dec-13 24-Sep-14
KVG.Zone 3.St Mobilization 17-Dec-13 17-Dec-13
KVG.Zone 3.St Earth Work 21-Dec-13 12-Jul-14
KVG.Zone 3.St Civil Work 15-Jun-14 15-Sep-14
KVG.Zone 3 Foundation 15-Jun-14 01-Jul-14
KVG.Zon Footing 15-Jun-14 01-Jul-14
KVG.Z Plain Concrete 15-Jun-14 19-Jun-14
KVG.Z Reinforced Concrete&Smeles 21-Jun-14 01-Jul-14
KVG.Zone 3 Ground Floor 02-Jul-14 04-Aug-14
KVG.Zon Slab on grade 13-Jul-14 04-Aug-14
KVG.Zon Columns 02-Jul-14 09-Jul-14
KVG.Zone 3 First Floor 05-Aug-14 25-Aug-14
KVG.Zon Beams and slab 05-Aug-14 25-Aug-14
KVG.Zon Columns 17-Aug-14 25-Aug-14
KVG.Zone 3 Roof 26-Aug-14 15-Sep-14
KVG.Zon Beams and slab 26-Aug-14 15-Sep-14
KVG.Zone 3.St Mansonary 26-Aug-14 20-Sep-14
KVG.Zone 3 Ground Floor 26-Aug-14 27-Aug-14
KVG.Zone 3 First Floor 16-Sep-14 17-Sep-14
KVG.Zone 3 Roof 18-Sep-14 20-Sep-14
KVG.Zone 3.St Finishing 28-Aug-14 24-Sep-14
KVG.Zone 3 Ground Floor 28-Aug-14 30-Aug-14
KVG.Zon Calm Shell 28-Aug-14 30-Aug-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 18-Sep-14 20-Sep-14
KVG.Zon Calm Shell 18-Sep-14 20-Sep-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 21-Sep-14 21-Sep-14
KVG.Zon Calm Shell 21-Sep-14 21-Sep-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 22-Sep-14 24-Sep-14
KVG.Zone 3.Stage Stand alone Villa type 75 15-Dec-13 25-D
KVG.Zone 3.St Mobilization 18-Dec-13 18-Dec-13
KVG.Zone 3.St Earth Work 23-Dec-13 16-Oct-14
KVG.Zone 3.St Civil Work 16-Sep-14 16-De
KVG.Zone 3 Foundation 16-Sep-14 02-Oct-14
KVG.Zon Footing 16-Sep-14 02-Oct-14
KVG.Z Plain Concrete 16-Sep-14 21-Sep-14
KVG.Z Reinforced Concrete&Smeles 22-Sep-14 02-Oct-14
KVG.Zone 3 Ground Floor 04-Oct-14 04-Nov-14
KVG.Zon Slab on grade 18-Oct-14 04-Nov-14
KVG.Zon Columns 04-Oct-14 14-Oct-14
KVG.Zone 3 First Floor 05-Nov-14 25-Nov-
KVG.Zon Beams and slab 05-Nov-14 25-Nov-
KVG.Zon Columns 17-Nov-14 25-Nov-
KVG.Zone 3 Roof 26-Nov-14 16-De
KVG.Zon Beams and slab 26-Nov-14 16-De
KVG.Zone 3.St Mansonary 26-Nov-14 21-D
KVG.Zone 3 Ground Floor 26-Nov-14 27-Nov-
KVG.Zone 3 First Floor 17-Dec-14 18-De
KVG.Zone 3 Roof 20-Dec-14 21-D
KVG.Zone 3.St Finishing 29-Nov-14 25-D
KVG.Zone 3 Ground Floor 29-Nov-14 30-Nov-

93
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Calm Shell 29-Nov-14 30-Nov-
KVG.Zon External Electrical
KVG.Zone 3 First Floor 20-Dec-14 21-D
KVG.Zon Calm Shell 20-Dec-14 21-D
KVG.Zon External Electrical
KVG.Zone 3 Roof 22-Dec-14 22-D
KVG.Zon Calm Shell 22-Dec-14 22-D
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 23-Dec-14 25-D
KVG.Zone 3.Stage Stand alone Villa type 76 15-Dec-13 25-Mar-14
KVG.Zone 3.St Mobilization 15-Dec-13 15-Dec-13
KVG.Zone 3.St Earth Work 16-Dec-13 14-Jan-14
KVG.Zone 3.St Civil Work 18-Dec-13 16-Mar-14
KVG.Zone 3 Foundation 18-Dec-13 04-Jan-14
KVG.Zon Footing 18-Dec-13 04-Jan-14
KVG.Z Plain Concrete 18-Dec-13 23-Dec-13
KVG.Z Reinforced Concrete&Smeles 24-Dec-13 04-Jan-14
KVG.Zone 3 Ground Floor 05-Jan-14 02-Feb-14
KVG.Zon Slab on grade 15-Jan-14 02-Feb-14
KVG.Zon Columns 05-Jan-14 12-Jan-14
KVG.Zone 3 First Floor 03-Feb-14 23-Feb-14
KVG.Zon Beams and slab 03-Feb-14 23-Feb-14
KVG.Zon Columns 15-Feb-14 23-Feb-14
KVG.Zone 3 Roof 24-Feb-14 16-Mar-14
KVG.Zon Beams and slab 24-Feb-14 16-Mar-14
KVG.Zone 3.St Mansonary 24-Feb-14 20-Mar-14
KVG.Zone 3 Ground Floor 24-Feb-14 25-Feb-14
KVG.Zone 3 First Floor 17-Mar-14 18-Mar-14
KVG.Zone 3 Roof 19-Mar-14 20-Mar-14
KVG.Zone 3.St Finishing 26-Feb-14 25-Mar-14
KVG.Zone 3 Ground Floor 26-Feb-14 27-Feb-14
KVG.Zon Calm Shell 26-Feb-14 27-Feb-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 19-Mar-14 20-Mar-14
KVG.Zon Calm Shell 19-Mar-14 20-Mar-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 22-Mar-14 22-Mar-14
KVG.Zon Calm Shell 22-Mar-14 22-Mar-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 23-Mar-14 25-Mar-14
KVG.Zone 3.Stage Stand alone Villa type 77 15-Dec-13 23-Jun-14
KVG.Zone 3.St Mobilization 16-Dec-13 16-Dec-13
KVG.Zone 3.St Earth Work 18-Dec-13 13-Apr-14
KVG.Zone 3.St Civil Work 17-Mar-14 14-Jun-14
KVG.Zone 3 Foundation 17-Mar-14 02-Apr-14
KVG.Zon Footing 17-Mar-14 02-Apr-14
KVG.Z Plain Concrete 17-Mar-14 22-Mar-14
KVG.Z Reinforced Concrete&Smeles 23-Mar-14 02-Apr-14
KVG.Zone 3 Ground Floor 03-Apr-14 03-May-14
KVG.Zon Slab on grade 14-Apr-14 03-May-14
KVG.Zon Columns 03-Apr-14 10-Apr-14
KVG.Zone 3 First Floor 04-May-14 24-May-14
KVG.Zon Beams and slab 04-May-14 24-May-14
KVG.Zon Columns 15-May-14 24-May-14
KVG.Zone 3 Roof 25-May-14 14-Jun-14
KVG.Zon Beams and slab 25-May-14 14-Jun-14
KVG.Zone 3.St Mansonary 25-May-14 18-Jun-14
KVG.Zone 3 Ground Floor 25-May-14 26-May-14
KVG.Zone 3 First Floor 15-Jun-14 16-Jun-14
KVG.Zone 3 Roof 17-Jun-14 18-Jun-14
KVG.Zone 3.St Finishing 27-May-14 23-Jun-14
KVG.Zone 3 Ground Floor 27-May-14 28-May-14
KVG.Zon Calm Shell 27-May-14 28-May-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 17-Jun-14 18-Jun-14
KVG.Zon Calm Shell 17-Jun-14 18-Jun-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 19-Jun-14 19-Jun-14
KVG.Zon Calm Shell 19-Jun-14 19-Jun-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 21-Jun-14 23-Jun-14
KVG.Zone 3.Stage Stand alone Villa type 78 15-Dec-13 24-Sep-14
KVG.Zone 3.St Mobilization 17-Dec-13 17-Dec-13
KVG.Zone 3.St Earth Work 21-Dec-13 12-Jul-14
KVG.Zone 3.St Civil Work 15-Jun-14 15-Sep-14
KVG.Zone 3 Foundation 15-Jun-14 01-Jul-14
KVG.Zon Footing 15-Jun-14 01-Jul-14
KVG.Z Plain Concrete 15-Jun-14 19-Jun-14
KVG.Z Reinforced Concrete&Smeles 21-Jun-14 01-Jul-14
KVG.Zone 3 Ground Floor 02-Jul-14 04-Aug-14
KVG.Zon Slab on grade 13-Jul-14 04-Aug-14
KVG.Zon Columns 02-Jul-14 09-Jul-14
KVG.Zone 3 First Floor 05-Aug-14 25-Aug-14
KVG.Zon Beams and slab 05-Aug-14 25-Aug-14
KVG.Zon Columns 17-Aug-14 25-Aug-14
KVG.Zone 3 Roof 26-Aug-14 15-Sep-14

94
WBS Code WBS Name 2012 2013 2014 2015
Wbs Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Chapter
Q3 3
Q4 Q1
KVG.Zon Beams and slab 26-Aug-14 15-Sep-14
KVG.Zone 3.St Mansonary 26-Aug-14 20-Sep-14
KVG.Zone 3 Ground Floor 26-Aug-14 27-Aug-14
KVG.Zone 3 First Floor 16-Sep-14 17-Sep-14
KVG.Zone 3 Roof 18-Sep-14 20-Sep-14
KVG.Zone 3.St Finishing 28-Aug-14 24-Sep-14
KVG.Zone 3 Ground Floor 28-Aug-14 30-Aug-14
KVG.Zon Calm Shell 28-Aug-14 30-Aug-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 18-Sep-14 20-Sep-14
KVG.Zon Calm Shell 18-Sep-14 20-Sep-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 21-Sep-14 21-Sep-14
KVG.Zon Calm Shell 21-Sep-14 21-Sep-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 22-Sep-14 24-Sep-14
KVG.Zone 3.Stage Stand alone Villa type 79 15-Dec-13 25-D
KVG.Zone 3.St Mobilization 18-Dec-13 18-Dec-13
KVG.Zone 3.St Earth Work 23-Dec-13 16-Oct-14
KVG.Zone 3.St Civil Work 16-Sep-14 16-De
KVG.Zone 3 Foundation 16-Sep-14 02-Oct-14
KVG.Zon Footing 16-Sep-14 02-Oct-14
KVG.Z Plain Concrete 16-Sep-14 21-Sep-14
KVG.Z Reinforced Concrete&Smeles 22-Sep-14 02-Oct-14
KVG.Zone 3 Ground Floor 04-Oct-14 04-Nov-14
KVG.Zon Slab on grade 18-Oct-14 04-Nov-14
KVG.Zon Columns 04-Oct-14 14-Oct-14
KVG.Zone 3 First Floor 05-Nov-14 25-Nov-
KVG.Zon Beams and slab 05-Nov-14 25-Nov-
KVG.Zon Columns 17-Nov-14 25-Nov-
KVG.Zone 3 Roof 26-Nov-14 16-De
KVG.Zon Beams and slab 26-Nov-14 16-De
KVG.Zone 3.St Mansonary 26-Nov-14 21-D
KVG.Zone 3 Ground Floor 26-Nov-14 27-Nov-
KVG.Zone 3 First Floor 17-Dec-14 18-De
KVG.Zone 3 Roof 20-Dec-14 21-D
KVG.Zone 3.St Finishing 29-Nov-14 25-D
KVG.Zone 3 Ground Floor 29-Nov-14 30-Nov-
KVG.Zon Calm Shell 29-Nov-14 30-Nov-
KVG.Zon External Electrical
KVG.Zone 3 First Floor 20-Dec-14 21-D
KVG.Zon Calm Shell 20-Dec-14 21-D
KVG.Zon External Electrical
KVG.Zone 3 Roof 22-Dec-14 22-D
KVG.Zon Calm Shell 22-Dec-14 22-D
KVG.Zon External Electrical
KVG.Zone 3 Paint Villa 1 23-Dec-14 25-D
KVG.Zone 3.Stage Twin House 6 15-Dec-13 07-May-14
KVG.Zone 3.St Mobilization 15-Dec-13 15-Dec-13
KVG.Zone 3.St Earth Work 16-Dec-13 30-Jan-14
KVG.Zone 3.St Civil Work 19-Dec-13 14-Apr-14
KVG.Zone 3 Foundation 19-Dec-13 16-Jan-14
KVG.Zon Footing 19-Dec-13 16-Jan-14
KVG.Z Plain Concrete 19-Dec-13 28-Dec-13
KVG.Z Reinforced Concrete&Semels 29-Dec-13 16-Jan-14
KVG.Zone 3 Ground Floor 18-Jan-14 25-Feb-14
KVG.Zon Slab on grade 01-Feb-14 25-Feb-14
KVG.Zon Columns 18-Jan-14 27-Jan-14
KVG.Zone 3 First Floor 26-Feb-14 22-Mar-14
KVG.Zon Beams and Slabs 26-Feb-14 20-Mar-14
KVG.Zon Columns 12-Mar-14 22-Mar-14
KVG.Zone 3 Roof 23-Mar-14 14-Apr-14
KVG.Zon Beams and Slabs 23-Mar-14 14-Apr-14
KVG.Zone 3.St Mansonary 22-Mar-14 27-Apr-14
KVG.Zone 3 Ground Floor 22-Mar-14 31-Mar-14
KVG.Zone 3 First Floor 15-Apr-14 24-Apr-14
KVG.Zone 3 Roof 26-Apr-14 27-Apr-14
KVG.Zone 3.St Finishing 25-Mar-14 07-May-14
KVG.Zone 3 Ground Floor 25-Mar-14 26-Mar-14
KVG.Zon Calm Shell 25-Mar-14 26-Mar-14
KVG.Zon External Electrical
KVG.Zone 3 First Floor 19-Apr-14 20-Apr-14
KVG.Zon Calm Shell 19-Apr-14 20-Apr-14
KVG.Zon External Electrical
KVG.Zone 3 Roof 28-Apr-14 28-Apr-14
KVG.Zon Calm Shell 28-Apr-14 28-Apr-14
KVG.Zon External Electrical
KVG.Zone 3 Paint Twin House 29-Apr-14 07-May-14

95
96
BOQ Chapter 4

Back fill

𝐵𝑎𝑐𝑘 𝐹𝑖𝑙𝑙 = 𝑎𝑟𝑒𝑎 𝑐𝑢𝑡 − 𝑎𝑟𝑒𝑎 𝑓𝑜𝑜𝑡𝑖𝑛𝑔𝑠 − 𝑎𝑟𝑒𝑎 𝑠𝑒𝑚𝑒𝑙𝑠 − 𝑎𝑟𝑒𝑎 𝑐𝑜𝑙𝑢𝑚𝑛𝑠 ∗ 𝐷𝑒𝑝𝑡ℎ

Area cut = 945 m²


Area plan footing = 468.89 m²

Area Concrete Footing = 277.1 m²

Area Semels = 62.55 m²


Area Columns = 15.31 m²
Back Fill = (945-468.89-277.2-62.55-15.31)*1

Back Fill = 121.1 m³

97
BOQ Chapter 4

Form Work Est.


PC Footing

Dimensions of Unit
Type No. Length ( m ) No. of faces Width (m) No. of Faces Depth (m)
Total

F1 1 5.4 2 3.8 2 0.4 7.36


F2 2 3.2 2 2.25 2 0.4 8.72
F4 1 5.8 2 4.6 2 0.4 8.32
F5 1 3.95 2 3.15 2 0.4 5.68
F6 2 3.5 2 2.9 2 0.4 10.24
F7 4 3.25 2 2.8 2 0.4 19.36
F8 5 2.8 2 2.5 2 0.4 20.2
F9 19 2.45 2 2.25 2 0.4 74.48
F10 1 2.95 2 2.95 2 0.4 4.72
F11 1 3.2 2 1.7 2 0.4 3.92
F12 20 2.15 2 2.15 2 0.4 68.8
F3 2 - - - - 0.4 19.504
F13 2 - - - - 0.4 10.38

Total = 261.58 m²

98
BOQ Chapter 4

Concrete Estimation
Pc Footing
Dimensions of Unit
Type No. Length ( m ) Width ( m ) Height ( m )
Total

F1 1 504 3.8 0.4 8.208


F2 2 3.2 2.55 0.4 5.76
F4 1 5.8 4.6 0.4 10.672
F5 1 3.95 3.15 0.4 4.977
F6 2 3.5 2.9 0.4 8.12
F7 4 3.25 2.8 0.4 14.56
F8 5 2.8 2.5 0.4 14
F9 19 2.45 2.25 0.4 41.895
F10 1 2.95 2.95 0.4 3.481
F11 1 3.2 1.7 0.4 2.176
F12 20 2.15 2.15 0.4 36.98
F3 2 - - 0.4 29.2
F13 2 - - 0.4 7.527

Total = 187.56 m³

99
BOQ Chapter 4

Form Work Est.


RC Footing
Dimensions of Unit
Type No. Length ( m ) No. of faces Width (m) No. of faces) Depth (m)
Total

F1 1 4.6 2 3 2 0.7 10.64


F2 2 2.4 2 1.45 2 0.7 10.78
F4 1 5 2 3.8 2 0.7 12.32
F5 1 3.15 2 2.35 2 0.7 7.7
F6 2 2.7 2 2.1 2 0.6 13.44
F7 4 2.45 2 2 2 0.6 31.45
F8 5 2 2 1.7 2 0.6 22.2
F9 19 1.85 2 1.45 2 0.6 75.24
F10 1 2.15 2 2.15 2 0.6 5.16
F11 1 2.4 2 1.3 2 0.6 4.44
F12 20 1.35 2 1.35 2 0.6 64.8
F3 2 - - - - 0.7 30.03
F13 2 - - - - 0.6 11.244

Total = 301.4 m²

100
BOQ Chapter 4

Steel Estimation
Rc Footing
Dimensions of Steel bar Bottom
Type No. Weight
No. Diameter Ø ( mm ) Length (m ) Metric Weight Length of Footing
F1 Long 1 6 22 5.7 2.59 3 310.023

F1 Short 1 6 22 4.1 2.59 4.6 341.9318

F2 Long 2 5 16 3.5 1.578 1.45 96.1002

F2 Short 2 5 16 2.55 1.578 2.4 115.8883

F3 long 2 7 22 8.35 2.59 1.98 685.1275

F3 Short 2 7 22 12.12 2.59 3.07 1541.916

F4 long 1 7 22 6.1 2.59 3.8 480.2896

F4 Short 1 8 22 4.9 2.59 5 571.095

F5 Long 1 7 16 4.25 1.578 2.35 126.0822

F5 Short 1 7 16 3.45 1.578 3.15 137.1913

F6 long 2 7 16 3.1 1.578 2.1 164.3645

F6 Short 2 7 16 3 1.578 2.7 204.5088

F7 long 4 6 16 3.35 1.578 2 296.0328

F7 short 4 6 16 2.9 1.578 2.45 313.9273

F8 long 5 5 16 2.9 1.578 1.7 233.3862

F8 short 5 5 16 2.6 1.578 2 246.168

F9 long 19 5 16 1056 1.578 1.45 275450.6

F9 short 19 5 16 2.35 1.578 1.65 697.5312

F10 long 1 6 16 3.05 1.578 2.15 72.43415

F10 short 1 6 16 3.05 1.578 2.15 72.43415

F11 long 1 5 16 4.3 1.578 1.3 52.92612

F11 Short 1 5 16 2.2 1.578 2.4 49.99104

F12 long 20 5 16 2.25 1.578 1.35 575.181

F12short 20 5 16 2.25 1.578 1.35 575.181

F13 long 2 5 16 3.97 1.578 5 375.8796

F13 short 2 5 16 2.87 1.578 6.15 334.2299

101
BOQ Chapter 4

Dimensions of Steel bar Bottom


Type No. Weight
No. Diameter Ø ( mm ) Length (m ) Metric Weight Length of Footing
F1 Long 1 - - - - 3 -

F1 Short 1 - - - - 4.6 -
F2 Long 2 - - - - 1.45 -

F2 Short 2 - - - - 2.4 -

F3 long 2 7 16 6.2 1.578 1.98 309.944448

F3 Short 2 7 16 6.2 1.578 3.07 480.570432

F4 long 1 6 12 6.1 0.88 3.8 142.7888

F4 Short 1 6 12 4.9 0.88 5 150.92

F5 Long 1 - - - - 2.35 -

F5 Short 1 - - - - 3.15 -

F6 long 2 - - - - 2.1 -

F6 Short 2 - - - - 2.7 -

F7 long 4 - - - - 2 -

F7 short 4 - - - - 2.45 -

F8 long 5 - - - - 1.7 -

F8 short 5 - - - - 2 -

F9 long 19 - - - - 1.45 -

F9 short 19 - - - - 1.65 -

F10 long 1 - - - - 2.15 -

F10 short 1 - - - - 2.15 -

F11 long 1 - - - - 1.3 -

F11 Short 1 - - - - 2.4 -

F12 long 20 - - - - 1.35 -

F12short 20 - - - - 1.35 -

F13 long 2 5 16 3.97 1.578 5 375.8796

F13 short 2 5 16 2.87 1.578 6.15 334.229868

Total = 11.15 Ton

102
BOQ Chapter 4

Concrete Estimation
RC Footing

Dimensions of Unit
Type No. Length ( m ) Width ( m ) Height ( m )
Total

F1 1 4.6 3 0.7 9.66


F2 2 2.4 1.45 0.7 4.704
F4 1 5 3.8 0.7 13.3
F5 1 3.15 2.35 0.7 5.1817
F6 2 2.7 2.1 0.6 6.804
F7 4 2 1.45 0.6 11.76
F8 5 2 1.7 0.6 10.2
F9 19 1.85 1.45 0.6 30.58
F10 1 2.15 2.15 0.6 2.77
F11 1 2.4 1.3 0.6 1.872
F12 20 1.35 1.35 0.6 21.87
F3 2 - - 0.7 41.242
F13 2 - - 0.6 6.3174

Total = 166.261 m³

103
BOQ Chapter 4

Form Work Est.


Semels
Dimensions of Unit
Type No. Length ( m ) Width (m) No. of faces Depth (m) No. of faces
Total

S2.1 4 1.724 0.3 1 0.6 2 10.33


S2.2 2 3.52 0.3 1 0.6 2 10.56
S2.3 2 2.9 0.3 1 0.6 2 8.7
S2.4 2 5 0.3 1 0.6 2 15
S2.5 2 3.65 0.3 1 0.6 2 10.95
S2.6 2 3.43 0.3 1 0.6 2 10.29
S2.7 2 0.97 0.3 1 0.6 2 2.91
S2.8 2 1.34 0.3 1 0.6 2 4.02
S2.9 1 1.24 0.3 1 0.6 2 1.86
S2.10 2 1.65 0.3 1 0.6 2 4.95
S2.11 2 1.79 0.3 1 0.6 2 5.37
S2.12 2 2.245 0.3 1 0.6 2 6.735
S2.13 2 1.795 0.3 1 0.6 2 5.385
S2.14 2 1.04 0.3 1 0.6 2 1.872
S2.15 2 1.59 0.3 1 0.6 2 2.862
S2.16 3 1.235 0.3 1 0.6 2 2.593
S2.17 2 2.36 0.3 1 0.6 2 4.248
S2.18 1 3.65 0.3 1 0.6 2 6.57
S2.19 2 3.5 0.3 1 0.6 2 6.3
S2.20 2 5.104 0.3 1 0.6 2 9.187
S2.21 1 2.87 0.3 1 0.6 2 4.305
S2.22 2 - 0.3 1 0.6 2 4.833
S2.23 2 - 0.3 1 0.6 2 3.582
S2.24 2 - 0.3 1 0.6 2 4.221
S2.25 1 - 0.3 1 0.6 2 2.287

104
BOQ Chapter 4

S2.26 3 - 0.3 1 0.6 2 7.1925


S2.27 4 - 0.3 1 0.6 2 2.568
S2.28 2 - 0.3 1 0.6 2 14.04
S2.29 2 - 0.3 1 0.6 2 5.859
S2.30 5 - 0.3 1 0.6 2 1.89
S2.31 3 - 0.3 1 0.6 2 0.63
S2.32 1 - 0.3 1 0.6 2 6.18
S2.33 2 - 0.3 1 0.6 2 4.374
S2.34 2 - 0.3 1 0.6 2 3.42
S2.35 1 - 0.3 1 0.6 2 3.72
S2.36 2 - 0.3 1 0.6 2 4.32
S2.37 2 - 0.3 1 0.6 2 5.94
S2.38 1 - 0.3 1 0.6 2 4.68
S4.1 2 - 0.3 1 0.6 2 4.5
S4.2 2 - 0.3 1 0.6 2 6.462
S4.3 2 - 0.3 1 0.6 2 1.6
S5 1 - 0.3 1 0.6 2 8.548

Total = 233 m²

105
BOQ Chapter 4

Steel Estimation
Semels
Dimension of Bottom steel Bare Stirrups (kg)
Type No. Length (m) No Diamter  Metric Weight
Weight (kg)
Length Metric Weight N0 Weight
Total(Kg)

S2.1 4 1.624 2 12 0.88 11.43296 2 0.39 10 31.2 42.633


S2.2 2 3.42 2 12 0.88 12.0384 2 0.39 18 28.08 40.118
S2.3 2 2.8 2 12 0.88 9.856 2 0.39 15 23.4 33.256
S2.4 2 4.9 2 12 0.88 17.248 2 0.39 26 40.56 57.808
S2.5 2 3.55 2 12 0.88 12.496 2 0.39 20 31.2 43.696
S2.6 2 3.24 2 12 0.88 11.4048 2 0.39 18 28.08 39.485
S2.7 2 0.87 2 12 0.88 3.0624 2 0.39 6 9.36 12.422
S2.8 2 1.24 2 12 0.88 4.3648 2 0.39 8 12.48 16.845
S2.9 1 1.14 2 12 0.88 2.0064 2 0.39 7 5.46 7.4664
S2.10 2 1.55 2 12 0.88 5.456 2 0.39 10 15.6 21.056
S2.11 2 1.69 2 12 0.88 5.9488 2 0.39 10 15.6 21.549
S2.12 2 2.145 2 12 0.88 7.5504 2 0.39 12 18.72 26.27
S2.13 2 1.695 2 12 0.88 5.9664 2 0.39 10 15.6 21.566
S2.14 2 0.94 2 12 0.88 3.3088 2 0.39 6 9.36 12.669
S2.15 2 1.49 2 12 0.88 5.2448 2 0.39 9 14.04 19.285
S2.16 3 1.135 2 12 0.88 5.9928 2 0.39 7 16.38 22.373
S2.17 2 2.26 2 12 0.88 7.9552 2 0.39 13 20.28 28.235
S2.18 1 3.55 2 12 0.88 6.248 2 0.39 19 14.82 21.068
S2.19 2 3.4 2 12 0.88 11.968 2 0.39 19 29.64 41.608
S2.20 2 5.0045 2 12 0.88 17.61584 2 0.39 27 42.12 59.736
S2.21 1 2.77 2 12 0.88 4.8752 2 0.39 16 12.48 17.355
S2.22 2 2.585 2 12 0.88 9.0992 2 0.39 15 23.4 32.499
S2.23 2 1.89 2 12 0.88 6.6528 2 0.39 11 17.16 23.813
S2.24 2 2.245 2 12 0.88 7.9024 2 0.39 13 20.28 28.182
S2.25 1 1.425 2 12 0.88 2.508 2 0.39 9 7.02 9.528
S2.26 3 3.325 2 12 0.88 17.556 2 0.39 18 42.12 59.676
S2.27 4 0.97 2 12 0.88 6.8288 2 0.39 7 21.84 28.669
S2.28 2 7.7 2 12 0.88 27.104 2 0.39 40 62.4 89.504
S2.29 2 3.155 2 12 0.88 11.1056 2 0.39 17 26.52 37.626
S2.30 5 0.6 2 12 0.88 5.28 2 0.39 5 19.5 24.78
S2.31 3 0.2 2 12 0.88 1.056 2 0.39 3 7.02 8.076
S2.32 1 4.02 2 12 0.88 7.0752 2 0.39 22 17.16 24.235
S2.33 2 2.33 2 12 0.88 8.2016 2 0.39 13 20.28 28.482
S2.34 2 1.8 2 12 0.88 6.336 2 0.39 11 17.16 23.496
S2.35 1 2.38 2 12 0.88 4.1888 2 0.39 14 10.92 15.109
S2.36 2 2.3 2 12 0.88 8.096 2 0.39 13 20.28 28.376
S2.37 2 3.2 2 12 0.88 11.264 2 0.39 18 28.08 39.344
S2.38 1 2.5 2 12 0.88 4.4 2 0.39 14 10.92 15.32
S4.1 2 2.4 4 16 1.578 30.2976 2.2 0.39 14 24.024 54.322
S4.2 2 3.49 4 16 1.578 44.05776 2.2 0.39 19 32.604 76.662
S4.3 2 0.7 4 16 1.578 8.8368 2.2 0.39 5 8.58 17.417
S5 1 4.62 4 18 1.999 36.94152 2.6 0.39 23 23.322 60.264

Total = 1331.88 kg

106
BOQ Chapter 4

Concrete Estimation
Semels
Dimensions of Unit
Type No. Length ( m ) Width ( m ) Height ( m )
Total

S2.1 4 1.724 0.6 0.3 1.241


S2.2 2 3.52 0.6 0.3 1.267
S2.3 2 2.9 0.6 0.3 1.044
S2.4 2 5 0.6 0.3 1.8
S2.5 2 3.65 0.6 0.3 1.314
S2.6 2 3.34 0.6 0.3 1.23
S2.7 2 0.97 0.6 0.3 0.284
S2.8 2 1.34 0.6 0.3 0.482
S2.9 1 1.24 0.6 0.3 0.223
S2.10 2 1.65 0.6 0.3 0.594
S2.11 2 1.79 0.6 0.3 0.644
S2.12 2 2.245 0.6 0.3 0.8
S2.13 2 1.795 0.6 0.3 0.646
S2.14 2 1.04 0.6 0.3 0.374
S2.15 2 1.59 0.6 0.3 0.572
S2.16 3 1.235 0.6 0.3 0.666
S2.17 2 2.36 0.6 0.3 1.2096
S2.18 1 3.65 0.6 0.3 0.657
S2.19 2 3.5 0.6 0.3 1.26
S2.20 2 5.1045 0.6 0.3 1.837
S2.21 1 2.87 0.6 0.3 0.5166
S2.22 2 2.685 0.6 0.3 0.966
S2.23 2 1.99 0.6 0.3 0.7164
S2.24 2 2.345 0.6 0.3 0.8442
S2.25 1 1.525 0.6 0.3 0.2745

107
BOQ Chapter 4

S2.26 3 3.425 0.6 0.3 1.849


S2.27 4 1.07 0.6 0.3 0.77
S2.28 2 7.8 0.6 0.3 2.808
S2.29 2 3.255 0.6 0.3 1.17
S2.30 5 0.7 0.6 0.3 0.63
S2.31 3 0.3 0.6 0.3 0.162
S2.32 1 4.12 0.6 0.3 0.74
S2.33 2 2.43 0.6 0.3 0.847
S2.34 2 1.9 0.6 0.3 0.684
S2.35 1 2.48 0.6 0.3 0.89
S2.36 2 2.4 0.6 0.3 0.864
S2.37 2 3.3 0.6 0.3 1.188
S2.38 1 2.6 0.6 0.3 0.468
S4.1 2 2.5 0.6 0.4 0.9
S4.2 2 3.59 0.6 0.4 1.2924
S4.3 2 0.8 0.6 0.4 2.288
S5 1 4.27 0.8 0.4 1.3664

Total = 37.53 m³

108
BOQ Chapter 4

Form Work Est.


Columns
Basement

Dimensions of Unit
Type No. Length ( m ) No. of faces Width ( m ) No. of Faces Height (m)
Total Area ( m² )

C1 2 0.3 2 0.3 2 4.6 11.04


C2 15 0.4 2 0.4 2 4.6 110.4
C3 2 0.45 2 0.45 2 4.6 16.56
C4 2 0.45 2 0.5 2 4.6 17.48
C5 4 0.3 2 0.4 2 4.6 25.76
C6 18 0.3 2 0.5 2 4.6 132.48
C7 8 0.3 2 0.6 2 4.6 66.24
C8 2 0.3 2 0.65 2 4.6 17.48
C9 2 0.3 2 0.7 2 4.6 18.4
C10 2 0.3 2 0.75 2 4.6 19.32
C11 1 0.3 2 0.8 2 4.6 10.12
C12 1 0.3 2 0.9 2 4.6 11.04
C13 1 0.3 2 1.1 2 4.6 12.88
C14 1 0.5 2 0.5 2 4.6 9.2
C15 2 0.25 2 0.7 2 4.6 17.48
C16 2 0.3 2 1.25 2 4.6 28.52
W1 1 0.3 2 2.5 2 4.6 25.76
W2 2 0.38 2 2.04 2 4.6 44.528
2.5 2 1.65 1 4.6
Core 1 1 0.25 2 2 2 4.6 45.05
2.1 1 4.6

Total Area = 639.74 m²

109
BOQ Chapter 4

Basement
Bricks
Dimensions of Unit
Total(m³)
Type Lenth(m) faces Width(m) Hight(m)
1 9.04 2 0.25 4.6 20.792
2 3.26 2 0.25 4.6 7.498
3 12.99 2 0.25 4.6 29.877
4 3.58 1 0.25 4.6 4.117
5 2.87 1 0.25 4.6 3.3005
6 2.72 1 0.25 4.6 3.128
7 3.93 2 0.25 4.6 9.039
8 4 2 0.25 4.6 9.2
9 3.43 2 0.25 4.6 7.889
10 6.16 2 0.25 4.6 14.168
11 4.86 2 0.25 4.6 11.178
12 10.95 1 0.25 4.6 12.5925
13 11.68 1 0.25 4.6 13.432

Total = 146.211 m³

110
BOQ Chapter 4

Columns steel
Basement
Dimension of Bottom steel Bare
Length (m) Weight (Kg)
Type No. N Diameter Ø ( mm ) Metric Weight
C1 2 4 16 1.568 4.6 57.7024
C2 14 8 16 1.568 4.6 807.8336
C3 2 12 16 1.568 4.6 173.1072
C4 2 12 16 1.568 4.6 173.1072
C5 5 8 16 1.568 4.6 288.512
C6 18 10 16 1.568 4.6 1298.304
C7 9 12 16 1.568 4.6 778.9824
C8 1 12 16 1.568 4.6 86.5536
C9 2 14 16 1.568 4.6 201.9584
C10 2 14 16 1.568 4.6 201.9584
C11 1 16 16 1.568 4.6 115.4048
C12 1 16 16 1.568 4.6 115.4048
C13 1 20 16 1.568 4.6 144.256
C14 1 12 16 1.568 4.6 86.5536
C15 2 12 16 1.568 4.6 173.1072
C16 2 20 16 1.568 4.6 288.512

Toatal = 4991.2576 Kg

111
BOQ Chapter 4

Formwork columns
Basement
Dimensions of Unit
Type No. Length ( m ) Width ( m ) Height ( m )
Total

C1 2 0.3 0.3 4.6 0.828


C2 14 0.4 0.4 4.6 10.304
C3 2 0.45 0.45 4.6 1.863
C4 2 0.45 0.3 4.6 1.242
C5 5 0.3 0.4 4.6 2.76
C6 18 0.3 0.5 4.6 12.42
C7 9 0.3 0.8 4.6 9.936
C8 1 0.3 0.85 4.6 1.173
C9 2 0.3 0.7 4.6 1.932
C10 2 0.3 0.75 4.6 2.07
C11 1 0.3 0.8 4.6 1.104
C12 1 0.3 0.9 4.6 1.242
C13 1 0.3 1.1 4.6 1.518
C14 1 0.5 0.5 4.6 1.15
C15 2 0.25 0.7 4.6 1.61
C16 2 0.3 1.25 4.6 3.45
W1 1 0.3 2.5 4.6 3.45
W2 2 0.38 2 4.6 6.992
CORE 1 1.1 1 4.6 5.06

Total = 70.104 m³

112
BOQ Chapter 4

Form Work Est.


Beams
Ground Floor

Dimensions of Unit
Type No. Length ( m ) Width ( m ) No. of faces Depth (m) No. of Faces
Total Area ( m² )

B2 -1 2 3.42 0.4 1 0.4 2 8.2


1.2 0.3 1 0.4 2
B2 -2 2 4.6
0.78 0.4 1 0.4 2
B2 - 3 1 1.78 0.25 1 0.8 2 3.3
B2 - 4 2 1.73 0.25 1 0.74 2 6
B2 - 5 1 4.38 0.25 1 0.6 2 6.35
B2 - 6 1 2.1 0.12 1 0.6 2 2.77
B2 - 7 1 1.8 0.12 1 0.6 2 2.4
B3 - 1 1 1.76 0.25 1 0.8 2 3.26
B3 - 2 1 1.73 0.25 1 0.8 2 3.2
B3 - 3 2 3.18 0.25 1 0.8 2 11.76
B3 - 4 1 3.68 0.25 1 0.6 2 5.34
B3 - 5 1 4.02 0.38 1 0.8 2 7.96
B4 - 1 2 2.6 0.4 1 0.4 2 6.24
B4 - 2 1 1.57 0.25 1 0.6 2
5.25
1.8 0.4 1 0.8 2
B4 - 3 2 8.59 0.4 1 0.6 2 27.4
1.99 0.25 1 0.6 2
B4 - 4 1 5.85
1.8 0.4 1 0.6 2
B4 - 5 2 3.96 0.25 1 0.8 2 14.66
B4 - 6 2 2.7 0.3 1 0.8 2 10.26
B4 - 7 1 2.31 0.3 1 0.6 2 3.5
B4 - 8 1 3.68 0.3 1 0.7 2 6.3
B4 - 9 2 0.92 0.3 1 1.45 2 5.88
B4 - 10 1 2.62 0.3 1 0.6 2 3.93

113
BOQ Chapter 4

B4 - 11 1 1.8 0.25 1 0.7 2 2.97


B4 - 12 1 2.16 0.25 1 0.8 2 3.99
B4 - 13 1 0.62 0.3 1 0.6 2 0.93
0.7 0.12 1 0.15 2
B5 - 1 1 1.46 0.25 1 0.7 2 5.4
1.42 0.4 1 0.7 2
B5 - 2 1 1.65 0.25 1 0.8 2 3.1
B5 - 3 1 3.45 0.25 1 0.8 2 6.4
B9 - 1 2 2.8 0.25 1 0.8 2 10.4
B9 - 2 2 3.07 0.12 1 0.74 2 9.8
B9 - 3 2 2.8 0.12 1 0.8 2 9.64
B10 1 2.76 0.25 1 0.8 2 5.11
B11 - 1 1 3 0.4 1 0.6 2 4.8
B11 - 2 1 4.27 0.25 1 0.8 2 7.99
B11 - 3 1 4.72 0.25 1 0.8 2 8.7
B11 - 4 1 2.96 0.4 1 0.6 2 4.74
B11 - 4 1 4.2 0.25 1 0.6 2 6.09
CA2 1 0.53 0.12 1 0.74 2 0.85
CA3 - 1 1 0.55 0.25 1 0.8 2 1.02
CA3 - 2 1 1.46 0.12 1 0.6 2 1.93
CA4 - 1 1 1.55 0.38 1 0.8 2 3.1
CA4 - 2 1 0.25 0.4 1 0.8 2 0.5
CA4 - 3 1 1.07 0.3 1 0.8 2 2.033
0.9 0.4 1 0.8 2
CA4 - 4 1 3.55
0.88 0.3 1 0.8 2
0.7 0.3 1 0.97 2
CA5 1 5.63
1.4 0.3 1 1.3 2

Total Area = 263.08 m²

114
BOQ Chapter 4

Form Work Est.


Columns
Ground Floor

Dimensions of Unit
Type No. Length ( m ) No. of faces Width ( m ) No. of Faces Height (m)
Total Area ( m² )

C1 1 0.3 2 0.3 2 3.4 4.08


C2 15 0.4 2 0.4 2 3.4 81.6
C3 2 0.45 2 0.45 2 3.4 12.24
C4 2 0.45 2 0.5 2 3.4 12.92
C5 4 0.3 2 0.4 2 3.4 19.04
C6 16 0.3 2 0.5 2 3.4 87.04
C7 8 0.3 2 0.6 2 3.4 48.96
C8 2 0.3 2 0.65 2 3.4 12.92
C9 2 0.3 2 0.7 2 3.4 13.6
C10 2 0.3 2 0.75 2 3.4 14.28
C11 1 0.3 2 0.8 2 3.4 7.48
C12 1 0.3 2 0.9 2 3.4 8.16
C13 1 0.3 2 1.1 2 3.4 9.52
C14 1 0.5 2 0.5 2 3.4 6.8
C15 2 0.25 2 0.7 2 3.4 12.92
C16 2 0.3 2 1.25 2 3.4 21.08
W1 1 0.3 2 2.5 2 3.4 19.04
W2 2 0.38 2 2.04 2 3.4 32.912
2.5 2 1.65 1 3.4
Core 1 1 0.25 2 2 2 3.4 45.05
2.1 1 3.4

Total Area = 469.64 m²

115
BOQ Chapter 4

concrete
Columns
Ground Floor

Dimensions of Unit
Type No. Length ( m ) Width ( m ) Height (m)
Total volume ( m3 )

C1 1 0.3 0.3 3.4 0.306


C2 15 0.4 0.4 3.4 8.16
C3 2 0.45 0.45 3.4 1.377
C4 2 0.45 0.5 3.4 1.53
C5 4 0.3 0.4 3.4 1.632
C6 16 0.3 0.5 3.4 8.16
C7 8 0.3 0.6 3.4 4.896
C8 2 0.3 0.65 3.4 1.326
C9 2 0.3 0.7 3.4 1.428
C10 2 0.3 0.75 3.4 1.53
C11 1 0.3 0.8 3.4 0.816
C12 1 0.3 0.9 3.4 0.918
C13 1 0.3 1.1 3.4 1.122
C14 1 0.5 0.5 3.4 0.85
C15 2 0.25 0.7 3.4 1.19
C16 2 0.3 1.25 3.4 2.55
W1 1 0.3 2.5 3.4 2.55
W2 2 0.38 2.04 3.4 5.27136
2.5 1.65 3.4
Core 1 1 0.25 2 3.4 5.865
2.1 3.4

Total volume = 51.47736 m3

116
BOQ Chapter 4

concrete
Beams
Ground Floor

Dimensions of Unit
Type No. Length ( m ) Width ( m ) Depth (m)
Total volume ( m3)

B2 -1 2 3.42 0.4 0.4 1.0944


1.2 0.3 0.4
B2 -2 2 0.5376
0.78 0.4 0.4
B2 - 3 1 1.78 0.25 0.8 0.356
B2 - 4 2 1.73 0.25 0.74 0.6401
B2 - 5 1 4.38 0.25 0.6 0.657
B2 - 6 1 2.1 0.12 0.6 0.1512
B2 - 7 1 1.8 0.12 0.6 0.1296
B3 - 1 1 1.76 0.25 0.8 0.352
B3 - 2 1 1.73 0.25 0.8 0.346
B3 - 3 2 3.18 0.25 0.8 1.272
B3 - 4 1 3.68 0.25 0.6 0.552
B3 - 5 1 4.02 0.38 0.8 1.22208
B4 - 1 2 2.6 0.4 0.4 0.832
B4 - 2 1 1.57 0.25 0.6
0.8115
1.8 0.4 0.8
B4 - 3 2 8.59 0.4 0.6 4.1232
1.99 0.25 0.6
B4 - 4 1 0.7305
1.8 0.4 0.6
B4 - 5 2 3.96 0.25 0.8 1.584
B4 - 6 2 2.7 0.3 0.8 1.296
B4 - 7 1 2.31 0.3 0.6 0.4158
B4 - 8 1 3.68 0.3 0.7 0.7728
B4 - 9 2 0.92 0.3 1.45 0.8004
B4 - 10 1 2.62 0.3 0.6 0.4716
B4 - 11 1 1.8 0.25 0.7 0.315
B4 - 12 1 2.16 0.25 0.8 0.432
B4 - 13 1 0.62 0.3 0.6 0.1116

117
BOQ Chapter 4

0.7 0.12 0.15


B5 - 1 1 1.46 0.25 0.7 0.6657
1.42 0.4 0.7
B5 - 2 1 1.65 0.25 0.8 0.33
B5 - 3 1 3.45 0.25 0.8 0.69
B9 - 1 2 2.8 0.25 0.8 1.12
B9 - 2 2 3.07 0.12 0.74 0.545232
B9 - 3 2 2.8 0.12 0.8 0.5376
B10 1 2.76 0.25 0.8 0.552
B11 - 1 1 3 0.4 0.6 0.72
B11 - 2 1 4.27 0.25 0.8 0.854
B11 - 3 1 4.72 0.25 0.8 0.944
B11 - 4 1 2.96 0.4 0.6 0.7104
B11 - 4 1 4.2 0.25 0.6 0.63
CA2 1 0.53 0.12 0.74 0.047064
CA3 - 1 1 0.55 0.25 0.8 0.11
CA3 - 2 1 1.46 0.12 0.6 0.10512
CA4 - 1 1 1.55 0.38 0.8 0.4712
CA4 - 2 1 0.25 0.4 0.8 0.08
CA4 - 3 1 1.07 0.3 0.8 0.2568
0.9 0.4 0.8
CA4 - 4 1 0.4992
0.88 0.3 0.8
0.7 0.3 0.97
CA5 1 0.7497
1.4 0.3 1.3

Total volume = 30.624 m3

118
BOQ Chapter 4

Steel Estimation
Ground Beam
Dimensions of Steel bar
Type No. Weight (kg)
No. Diameter Ø ( mm ) Length ( m ) metric Length
B2 -1 2 8 12 3.42 0.88 48.1536
B2 -2 2 8 12 1.98 0.88 27.8784
B2 - 3 1 8 12 1.78 0.88 12.5312
B2 - 4 2 8 12 1.73 0.88 24.3584
B2 - 5 1 8 12 4.38 0.88 30.8352
B2 - 6 1 8 12 2.1 0.88 14.784
B2 - 7 1 8 12 1.8 0.88 12.672
B3 - 1 1 4 18 1.76 1.999 14.07296
B3 - 2 1 4 18 1.73 1.999 13.83308
B3 - 3 2 4 18 3.18 1.999 50.85456
B3 - 4 1 4 18 3.68 1.999 29.42528
B3 - 5 1 4 18 4.02 1.999 32.14392
B4 - 1 2 8 16 2.6 1.578 65.6448
B4 - 2 2 8 16 3.37 1.578 85.08576
B4 - 3 2 8 16 8.59 1.578 216.88032
B4 - 4 2 8 16 3.79 1.578 95.68992
B4 - 5 2 8 16 3.96 1.578 99.98208
B4 - 6 2 8 16 2.7 1.578 68.1696
B4 - 7 1 8 16 2.31 1.578 29.16144
B4 - 8 1 8 16 3.68 1.578 46.45632
B4 - 9 2 8 16 0.92 1.578 23.22816
B4 - 10 1 8 16 2.62 1.578 33.07488
B4 - 11 1 8 16 1.8 1.578 22.7232
B4 - 12 1 8 16 2.16 1.578 27.26784
B4 - 13 1 8 16 0.62 1.578 7.82688
B5 - 1 1 8 18 3.58 1.999 57.25136
B5 - 2 1 8 18 1.65 1.999 26.3868
B5 - 3 1 8 18 3.45 1.999 55.1724

119
BOQ Chapter 4

4 16 1.578 35.3472
B9 - 1 2 2.8
4 18 1.999 44.7776
4 16 1.578 38.75568
B9 - 2 2 3.07
4 18 1.999 49.09544
4 16 1.578 35.3472
B9 - 3 2 2.8
4 18 1.999 44.7776
2 16 1.578 8.71056
B10 1 2.76
6 18 1.999 33.10344
4 18 1.999 23.988
B11 - 1 1 3
4 22 2.95 35.4
4 18 1.999 1.999
CA4-2 1 0.25
4 22 2.95 2.95
4 18 1.999 8.55572
CA4 -3 1 1.07
4 22 2.95 12.626
4 18 1.999 14.23288
CA4-4 1 1.78
4 22 2.95 21.004
2 12 0.88 7.392
CA- 5 2 4 16 2.1 1.578 26.5104

Total = 1716.11708 Kg

120
BOQ Chapter 4

Steel Estimation
column ground

Dimensions of Steel bar


Type No. Weight (kg)
No. Diameter Ø ( mm ) Length ( m ) Metric Weight
C1 1 4 16 3.4 1.578 21.4608
C2 15 8 16 3.4 1.578 643.824
C3 2 12 16 3.4 1.578 128.7648
C4 2 12 16 3.4 1.578 128.7648
C5 4 8 16 3.4 1.578 171.6864
C6 16 10 16 3.4 1.578 858.432
C7 8 12 16 3.4 1.578 515.0592
C8 2 12 16 3.4 1.578 128.7648
C9 2 14 16 3.4 1.578 150.2256
C10 2 14 16 3.4 1.578 150.2256
C11 1 16 16 3.4 1.578 85.8432
C12 1 16 16 3.4 1.578 85.8432
C13 1 20 16 3.4 1.578 107.304
C14 1 2 16 3.4 1.578 10.7304
C15 2 12 16 3.4 1.578 128.7648
C16 2 20 16 3.4 1.578 214.608
W1 1 12 16 3.4 1.578 64.3824
W2 2 14 16 3.4 1.578 150.2256
Core 1 1 44 16 3.4 1.578 236.0688

Total= 3980.9784 Kg

121
BOQ Chapter 4

Form Work Est.


Columns
First Floor

Dimensions of Unit
Type No. Length ( m ) No. of faces Width ( m ) No. of Faces Height (m)
Total Area ( m² )

C1 1 0.3 2 0.3 2 3.4 4.08


C2 14 0.4 2 0.4 2 3.4 76.16
C3 2 0.45 2 0.45 2 3.4 12.24
C4 2 0.45 2 0.5 2 3.4 12.92
C5 4 0.3 2 0.4 2 3.4 19.04
C6 16 0.3 2 0.5 2 3.4 87.04
C7 8 0.3 2 0.6 2 3.4 48.96
C8 2 0.3 2 0.65 2 3.4 12.92
C9 2 0.3 2 0.7 2 3.4 13.6
C10 2 0.3 2 0.75 2 3.4 14.28
C11 1 0.3 2 0.8 2 3.4 7.48
C12 1 0.3 2 0.9 2 3.4 8.16
C13 1 0.3 2 1.1 2 3.4 9.52
C14 1 0.5 2 0.5 2 3.4 6.8
C15 2 0.25 2 0.7 2 3.4 12.92
C16 2 0.3 2 1.25 2 3.4 21.08
W1 1 0.3 2 2.5 2 3.4 19.04
W2 2 0.38 2 2.04 2 3.4 32.912
2.5 2 1.65 1 3.4
Core 1 1 0.25 2 2 2 3.4 45.05
2.1 1 3.4

Total Area = 464.2 m²

122
BOQ Chapter 4

concrete
column
first floor

Dimensions of Unit
Type No. Length ( m ) Width ( m ) Height (m)
Total volume ( m3 )

C1 1 0.3 0.3 3.4 0.306


C2 14 0.4 0.4 3.4 7.616
C3 2 0.45 0.45 3.4 1.377
C4 2 0.45 0.5 3.4 1.53
C5 4 0.3 0.4 3.4 1.632
C6 16 0.3 0.5 3.4 8.16
C7 8 0.3 0.6 3.4 4.896
C8 2 0.3 0.65 3.4 1.326
C9 2 0.3 0.7 3.4 1.428
C10 2 0.3 0.75 3.4 1.53
C11 1 0.3 0.8 3.4 0.816
C12 1 0.3 0.9 3.4 0.918
C13 1 0.3 1.1 3.4 1.122
C14 1 0.5 0.5 3.4 0.85
C15 2 0.25 0.7 3.4 1.19
C16 3 0.3 1.25 3.4 3.825
W1 1 0.3 2.5 3.4 2.55
W2 2 0.38 2.04 3.4 5.27136
2.5 1.65 3.4
Core 1 1 0.25 2 3.4 5.865
2.1 - 3.4

Total volume = 52.20836 m3

123
BOQ Chapter 4

concrete
Beams
Ground Floor

Dimensions of Unit
Type No. Length ( m ) Width ( m ) Depth (m)
Total volume ( m3)

B2 -1 2 3.42 0.4 0.4 1.0944


1.2 0.3 0.4
B2 -2 2 0.5376
0.78 0.4 0.4
B2 - 3 1 1.78 0.25 0.8 0.356
B2 - 4 2 1.73 0.25 0.74 0.6401
B2 - 5 1 4.38 0.25 0.6 0.657
B2 - 6 1 2.1 0.12 0.6 0.1512
B2 - 7 1 1.8 0.12 0.6 0.1296
B3 - 1 1 1.76 0.25 0.8 0.352
B3 - 2 1 1.73 0.25 0.8 0.346
B3 - 3 2 3.18 0.25 0.8 1.272
B3 - 4 1 3.68 0.25 0.6 0.552
B3 - 5 1 4.02 0.38 0.8 1.22208
B4 - 1 2 2.6 0.4 0.4 0.832
B4 - 2 1 1.57 0.25 0.6
0.8115
1.8 0.4 0.8
B4 - 3 2 8.59 0.4 0.6 4.1232
1.99 0.25 0.6
B4 - 4 1 0.7305
1.8 0.4 0.6
B4 - 5 2 3.96 0.25 0.8 1.584
B4 - 6 2 2.7 0.3 0.8 1.296
B4 - 7 1 2.31 0.3 0.6 0.4158
B4 - 8 1 3.68 0.3 0.7 0.7728
B4 - 9 2 0.92 0.3 1.45 0.8004
B4 - 10 1 2.62 0.3 0.6 0.4716
B4 - 11 1 1.8 0.25 0.7 0.315
B4 - 12 1 2.16 0.25 0.8 0.432
B4 - 13 1 0.62 0.3 0.6 0.1116

124
BOQ Chapter 4

0.7 0.12 0.15


B5 - 1 1 1.46 0.25 0.7 0.6657
1.42 0.4 0.7
B5 - 2 1 1.65 0.25 0.8 0.33
B5 - 3 1 3.45 0.25 0.8 0.69
B9 - 1 2 2.8 0.25 0.8 1.12
B9 - 2 2 3.07 0.12 0.74 0.545232
B9 - 3 2 2.8 0.12 0.8 0.5376
B10 1 2.76 0.25 0.8 0.552
B11 - 1 1 3 0.4 0.6 0.72
B11 - 2 1 4.27 0.25 0.8 0.854
B11 - 3 1 4.72 0.25 0.8 0.944
B11 - 4 1 2.96 0.4 0.6 0.7104
B11 - 4 1 4.2 0.25 0.6 0.63
CA2 1 0.53 0.12 0.74 0.047064
CA3 - 1 1 0.55 0.25 0.8 0.11
CA3 - 2 1 1.46 0.12 0.6 0.10512
CA4 - 1 1 1.55 0.38 0.8 0.4712
CA4 - 2 1 0.25 0.4 0.8 0.08
CA4 - 3 1 1.07 0.3 0.8 0.2568
0.9 0.4 0.8
CA4 - 4 1 0.4992
0.88 0.3 0.8
0.7 0.3 0.97
CA5 1 0.7497
1.4 0.3 1.3

Total volume = 30.624 m3

125
BOQ Chapter 4

Steel Estimation
First floor
Beam

Dimensions of Steel bar


Type No. Total
No. Diameter Ø ( mm ) Length ( m ) Metric Weight
B2 -1 2 8 12 3.42 0.88 48.1536
B2 -2 2 8 12 1.98 0.88 27.8784
B2 - 3 1 8 12 1.78 0.88 12.5312
B2 - 4 2 8 12 1.73 0.88 24.3584
B2 - 5 1 8 12 4.38 0.88 30.8352
B2 - 6 1 8 12 2.1 0.88 14.784
B2 - 7 1 8 12 1.8 0.88 12.672
B3 - 1 1 4 18 1.76 1.999 14.073
B3 - 2 1 4 18 1.73 1.999 13.8331
B3 - 3 2 4 18 3.18 1.999 50.8546
B3 - 4 1 4 18 3.68 1.999 29.4253
B3 - 5 1 4 18 4.02 1.999 32.1439
B4 - 1 2 8 16 2.6 1.578 65.6448
B4 - 2 2 8 16 3.37 1.578 85.0858
B4 - 3 2 8 16 8.59 1.578 216.88
B4 - 4 2 8 16 3.79 1.578 95.6899
B4 - 5 2 8 16 3.96 1.578 99.9821
B4 - 6 2 8 16 2.7 1.578 68.1696
B4 - 7 1 8 16 2.31 1.578 29.1614
B4 - 8 1 8 16 3.68 1.578 46.4563
B4 - 9 2 8 16 0.92 1.578 23.2282
B4 - 10 1 8 16 2.62 1.578 33.0749
B4 - 11 1 8 16 1.8 1.578 22.7232
B4 - 12 1 8 16 2.16 1.578 27.2678
B4 - 13 1 8 16 0.62 1.578 7.82688
B5 - 1 1 8 18 3.58 1.999 57.2514
B5 - 2 1 8 18 1.65 1.999 26.3868
B5 - 3 1 8 18 3.45 1.999 55.1724

126
BOQ Chapter 4

4 16 1.578 35.3472
B9 - 1 2 2.8
4 18 1.999 44.7776
4 16 1.578 38.7557
B9 - 2 2 3.07
4 18 1.999 49.0954
4 16 1.578 35.3472
B9 - 3 2 2.8
4 18 1.999 44.7776
2 16 1.578 8.71056
B10 1 2.76
6 18 1.999 33.1034
4 18 1.999 23.988
B11 - 1 1 3
4 22 2.59 31.08
4 18 1.999 1.999
CA4-2 1 0.25
4 22 2.59 2.59
4 18 1.999 8.55572
CA4 -3 1 1.07
4 22 2.59 11.0852
4 18 1.999 14.2329
CA4-4 1 1.78
4 22 2.59 18.4408
2 12 0.88 7.392
CA- 5 2 4 16
2.1 1.578 26.5104

Total = 1707.33308

127
BOQ Chapter 4

Steel Estimation
column first
Dimensions of Steel bar
Type No. Weight (kg)
No. Diameter Ø ( mm ) Length ( m ) Metric Weight
C1 1 4 16 3.4 1.578 21.4608
C2 14 8 16 3.4 1.578 600.9024
C3 2 12 16 3.4 1.578 128.7648
C4 2 12 16 3.4 1.578 128.7648
C5 4 8 16 3.4 1.578 171.6864
C6 16 10 16 3.4 1.578 858.432
C7 8 12 16 3.4 1.578 515.0592
C8 2 12 16 3.4 1.578 128.7648
C9 2 14 16 3.4 1.578 150.2256
C10 2 14 16 3.4 1.578 150.2256
C11 1 16 16 3.4 1.578 85.8432
C12 1 16 16 3.4 1.578 85.8432
C13 1 20 16 3.4 1.578 107.304
C14 1 2 16 3.4 1.578 10.7304
C15 2 12 16 3.4 1.578 128.7648
C16 3 20 16 3.4 1.578 321.912
W1 1 12 16 3.4 1.578 64.3824
W2 2 14 16 3.4 1.578 150.2256
Core 1 1 44 16 3.4 1.578 236.0688

Total = 4045.3608 Kg

128
BOQ Chapter 4

Interior Walls

Dimension
Description Length ( m ) Thickness ( m ) Height ( m )
Area of Masonry ( m2 )

G.Floor-Int 103.75 0.125 3.14 325.8


1st Floor-Int - 0.125 3.14 441.5
2nd Floor-Int - 0.125 3.14 441.5
3rd Floor-Int - 0.125 3.14 441.5
4th Floor-Int - 0.125 3.14 441.5
Roof - - - -
Total - - - 2104.4

129
BOQ Chapter 4

Form Work Est.

Columns
Second Floor

Dimensions of Unit
Type No. Length ( m ) No. of faces Width ( m ) No. of Faces Height (m)
Total Area ( m² )

C2 14 0.4 2 0.4 2 3.4 76.16


C3 2 0.45 2 0.45 2 3.4 12.24
C4 2 0.45 2 0.5 2 3.4 12.92
C5 4 0.3 2 0.4 2 3.4 19.04
C6 16 0.3 2 0.5 2 3.4 87.04
C7 9 0.3 2 0.6 2 3.4 55.08
C8 1 0.3 2 0.65 2 3.4 6.46
C9 2 0.3 2 0.7 2 3.4 13.6
C10 2 0.3 2 0.75 2 3.4 14.28
C11 1 0.3 2 0.8 2 3.4 7.48
C12 1 0.3 2 0.9 2 3.4 8.16
C13 1 0.3 2 1.1 2 3.4 9.52
C14 1 0.5 2 0.5 2 3.4 6.8
C15 1 0.25 2 0.7 2 3.4 6.46
C16 2 0.3 2 1.25 2 3.4 21.08
W1 1 0.3 2 2.5 2 3.4 19.04
W2 2 0.38 2 2.04 2 3.4 32.912
2.5 2 1.65 1 3.4
Core 1 1 0.25 2 2 2 3.4 45.05
2.1 1 3.4

Total Area = 453.32 m²

130
BOQ Chapter 4

Form Work Est.


Columns
Third Floor

Dimensions of Unit
Type No. Length ( m ) No. of faces Width ( m ) No. of Faces Height (m)
Total Area ( m² )

C2 14 0.4 2 0.4 2 3.4 76.16


C3 2 0.45 2 0.45 2 3.4 12.24
C4 2 0.45 2 0.5 2 3.4 12.92
C5 4 0.3 2 0.4 2 3.4 19.04
C6 16 0.3 2 0.5 2 3.4 87.04
C7 9 0.3 2 0.6 2 3.4 55.08
C8 1 0.3 2 0.65 2 3.4 6.46
C9 2 0.3 2 0.7 2 3.4 13.6
C10 2 0.3 2 0.75 2 3.4 14.28
C11 1 0.3 2 0.8 2 3.4 7.48
C12 1 0.3 2 0.9 2 3.4 8.16
C13 1 0.3 2 1.1 2 3.4 9.52
C14 1 0.5 2 0.5 2 3.4 6.8
C15 1 0.25 2 0.7 2 3.4 6.46
C16 2 0.3 2 1.25 2 3.4 21.08
W1 1 0.3 2 2.5 2 3.4 19.04
W2 2 0.38 2 2.04 2 3.4 32.912
2.5 2 1.65 1 3.4
Core 1 1 0.25 2 2 2 3.4 45.05
2.1 1 3.4

Total Area = 453.32 m²

131
BOQ Chapter 4

Form Work Est.


Columns
Fourth Floor

Dimensions of Unit
Type No. Length ( m ) No. of faces Width ( m ) No. of Faces Height (m)
Total Area ( m² )

C2 14 0.4 2 0.4 2 3.4 76.16


C3 2 0.45 2 0.45 2 3.4 12.24
C4 2 0.45 2 0.5 2 3.4 12.92
C5 4 0.3 2 0.4 2 3.4 19.04
C6 16 0.3 2 0.5 2 3.4 87.04
C7 9 0.3 2 0.6 2 3.4 55.08
C8 1 0.3 2 0.65 2 3.4 6.46
C9 2 0.3 2 0.7 2 3.4 13.6
C10 2 0.3 2 0.75 2 3.4 14.28
C11 1 0.3 2 0.8 2 3.4 7.48
C12 1 0.3 2 0.9 2 3.4 8.16
C13 1 0.3 2 1.1 2 3.4 9.52
C14 1 0.5 2 0.5 2 3.4 6.8
C15 1 0.25 2 0.7 2 3.4 6.46
C16 2 0.3 2 1.25 2 3.4 21.08
W1 1 0.3 2 2.5 2 3.4 19.04
2.5 2 1.65 1 3.4
Core 1 1 0.25 2 2 2 3.4 45.05
2.1 1 - - 3.4

Total Area = 420.41 m²

132
BOQ Chapter 4

Form Work Est.


Beams
Roof

Dimensions of Unit
Type No. Length ( m ) Width ( m ) No. of faces Depth (m) No. of Faces
Total Area ( m² )

B3 - 1 1 2.31 0.3 1 0.55 2 3.234


B3 - 2 1 1.96 0.3 1 0.7 2 3.33
B3 - 3 1 1.52 0.25 1 0.7 2 2.51
B3 - 4 1 2 0.25 1 0.7 2 3.3
B4 - 1 1 3.68 0.3 1 0.7 2 6.3
B4 - 2 2 3.22 0.3 1 0.55 2 9.02
B4 - 3 1 2.94 0.3 1 0.55 2 4.12
B4 - 4 1 2.91 0.25 1 0.7 2 4.8
B4 - 5 1 1.52 0.25 1 1.26 2 4.2
B7 1 2 0.12 1 0.7 2 3.04
B8 1 3 0.25 1 0.55 2 4.05
B9 1 3 0.4 1 0.7 2 5.4
B10 1 3.37 0.3 1 0.7 2 5.73
CA3 1 1.22 0.25 1 0.7 2 2.01
CA4 - 1 1 1.59 0.3 1 0.55 2 2.23
CA4 - 2 1 1.12 0.3 1 0.55 2 1.57
CA4 - 3 1 1.3 0.3 1 0.55 2 1.82
CA4 - 4 1 1.22 0.25 1 1.26 2 3.38

Total Area = 70.044 m²

133
134
Alternatives Chapter 5

135
Alternatives Chapter 5

AHP Definition
the analytical hierarchy process is a frame work of logic and problem
resolving achieved by organizing perception , feelings, judgments and
memories into a hierarchy of forces that influence decision result .

we provide matrix of comparison of 5 categories:


1= same important
3= slightly more important
5= much important
7= very much important
9= absolutely important

1) Construction method:

1. Form Work.
2. Concrete Used.
3. Insulation.
4. Equipment.

136
Alternatives Chapter 5

1- Form Work:
a- Timber Formwork.
b- Steel Formwork.
- Comparison Factor:
 Cost.
 Time for Concrete hardening.
 Durability.
 Finished concrete shape.

a - Timber Form Work:


 Cost is Low.

 Time for concrete hardening is low.

 The life time for timber is low.

 It is widely spread in Egypt and easily to find it.

 The shape of the finished concrete is bad.

137
Alternatives Chapter 5

b- Steel Form Work:


 Cost is high.

 Time for concrete hardening is high.

 Life time for steel form work is high.

 It is used for large and important project.

 The shape of finished concrete is good.

Using AHP process

Point of comparsion :

1 -Lower Cost

Timber Steel
Cost Weight Eigen Vector
formwork formwork
Timber
1 3 4 0.75
formwork
Steel
1/3 1 1.33 0.25
formwork

138
Alternatives Chapter 5

2 - Time for concrete hardening

Timber Steel
Time Weight Eigen Vector
formwork formwork
Timber
1 1/7 1.143 0.125
formwork
Steel
7 1 8 0.875
formwork

3 - Durability

Timber Steel
Durability Weight Eigen Vector
formwork formwork
Timber
1 1/5 1.2 0.167
formwork
Steel
5 1 6 0.833
formwork

4- Finished concrete shape

Finished
Timber Steel
concrete Weight Eigen Vector
formwork formwork
shape
Timber
1 1/3 1.33 0.25
formwork
Steel
3 1 4 0.75
formwork

139
Alternatives Chapter 5

Point of cost Time Durability Shape weight %w


comparsion
Cost 1 1/5 5 5 11.2 0.28
Time 5 1 7 7 20 0.511
Durability 1/5 1/7 1 5 6.34 0.1622
Shape 1/5 1/7 1/5 1 1.543 0.04

For Alternative 1 : Timber Formwork


Score = 0.28*0.75+0.511*0.125+0.1662*0.167+0.04*0.25= 0.3116

For Alternative 2 : Steel Formwork


Score = 0.28*0.25+0.511*0.875+0.1622*0.833+0.04*0.75= 0.6855

Score of steel form is higher than Timber form

So , We Will use steel form instead of timber form

140
Alternatives Chapter 5

2- Concrete Used:

A. Ready mix concrete.


B. Patch plant.

A.Ready mix Concrete:

Advantages:
 Initial cost is low.
 Economic for less amount of concrete in small project.

Disadvantages:

 Less Quality.
 Limited Concrete.
 Not available at sometimes and must be reserved before.
 Time is high.
 More risk ( transfer , bringing concrete early or late)

141
Alternatives Chapter 5

B. Batch Plant:

Advantages:
 Quality is high.
 Risk is low.
 Unlimited concrete.

 Less time.

Disadvantages:

 Initial cost is high.


 Not economic for small project.

142
Alternatives Chapter 5

Using AHP Process

Point of Comparison :-

1-Lower Cost
Cost Ready Mix Batch Plant Weight Eigen vector

Ready Mix 1 3 4 0.75

Batch Plant 1/3 1 1.33 0.25

2-Time of arrival early

Time Ready Mix Batch Plant Weight Eigen vector

Ready Mix 1 1/3 1.33 0.25

Batch Plant 3 1 4 0.75

3-Lower Risk

Risk Ready Mix Batch Plant Weight Eigen vector

Ready Mix 1 1/5 1.2 0.167

Batch Plant 5 1 6 0.833

143
Alternatives Chapter 5

Point of
cost Time Risk Weight % weight
comparsion

cost 1 1/5 3 4.2 0.25

5 1 5 11 0.657
Time
1/3 1/5 1 1.533 0.0916
Risk

For alternative 1 : Ready Mix

Score: 0.75*0.25+0.25*0.657+0.167*0.0916= 0.367

For alternative 2 : Batch Plant

Score 0.25*0.25+0.75*0.657+0.833*0.0916= 0.63155

So , We Will use Batch plant instead of ready Mix Concrete

144
Alternatives Chapter 5

3- Insulation :

Local Strips

Cost is low Cost is low

Speed in small project Used in large project

Quality is low Quality is high

So we will use Strips insulation

145
Alternatives Chapter 5

4. Equipment:

a- Buying.

b- Rental.

a- Buying:

Advantages:
 More economical if used sufficiently.

 Availability of equipment when needed.

Disadvantages:
 Can be more expensive.
 Requires a substantial investment.

b- Rental:

Advantages:
 More economical for short duration jobs.

 Provides the opportunity to operate a specific

machine under actual project condition before

making purchase decision.

146
Alternatives Chapter 5

Disadvantages:
 Unavailability of equipment during peak work
Season.
 Unavailability of specialized equipment.

Comparison between costs :


1- Excavator

Price : 1,902,860 EGP

Salvage : 1,000,000 EGP after 2 years


Condation : Good

147
Alternatives Chapter 5

Rental Price 1600 LE / day

No of years = 24 month = 2 years

Salvage value =1,000,000 LE

Working days = 365 day/year= 2920 hr/yr

1) Buying the Equipment


A) using Average Annual Investment
n = 2 , i= 0.08

AAI= ( P(n+1) +S(n-1) )/ 2n=1677145 LE/yr

Cost1 = 0.08*AAI / 2920 = 45.95 LE / hr

Initial cost= 1,902,860 LE

Salvage cost = 1,000,000 LE

Cost2 = ( 1902860-1541716)/(2920*2) = 154.6 LE/hr

Total cost = 45.95+154.6=200.55 LE/hr


B) Taxes, Insurance, and storage
Assume ( taxes=1%, Insurance=2%, Storage= 0.75% )

Cost= (3.75% * 1677145)/2920 = 21.54 LE/hr

148
Alternatives Chapter 5

C) Fuel
Fuel consumption diesel engine 0.04 gal per fwhp-hr

Assume combined factor = 0.69 & 200 fwhp

Cost of gal = 6 LE /gal

No. of gallons = 0.04 * 200*0.69 = 5.52 gal/hr

Cost= 5.52*6= 33.12 LE/hr

D) Oil
Assume Capacity = 8 gal
number of hours between oil changes = 150hr
cost = 12 LE/gal

No.of gallons= (200*0.69*0.006Ib/hp-hr)/ (7.4Ib/gal) + 8/150 =


0.165 gal/hr

Cost = 0.165*12= 2 LE/hr

Total cost of purchases = 200.55+21.54+33.12+2= 257.21 LE/hr


Rent cost = 1600 LE/day=225 LE/hr

So , Rent more Economic than buy so we will rent the Equipment

149
Alternatives Chapter 5

2 - Statical System

a- Used type: Flat Slab


 The cost is high.
 Time needed is short.
 The work is easy to build.
 Carry large loads and have large spans.
 Labor is familiar to flat slab and it is widly spread.
 The design of concrete elements is critical as there is punching and
shear and any mistake will make a disaster.
 It is very compatibility with architecture shape as there is no
dropped beams.

B- Suggest type: 1- Solid Slab:


 Cost is low.
 Time needed is large than flat slab.
 The work is difficult than flat slab as the form work is difficult
.
 Carry small loads and limited spans.
 The Labor is more familiar to solid slab.
 The design risk is low.
 It is not compatible with the architecture shape there a drop
beam.

150
Alternatives Chapter 5

2- Panelled Beams:
 Used for larger span with no columns inside.
 Very difficult to built it.

So we will recommend that we use the solid


slab as the alternative of flat slab.

151
152
Method of statment Chapter 6

What is the method statement :

It’s a detailed description of how the work will be delivered in the site associated

with risks and the precautions to be taken during working on site. It provides the

basis for the control of operations while the company is on site.

The purpose of this statement :

 To outline how the work will be achieved in the site.

 To provide a document that the contractor must read and understand before

starting the job.

 To meet legal requirements.

 To predict possible problems.

 To plan work , materials , time and cost.

153
Method of statment Chapter 6

Traditional Works
1) Surveying Works:

Work procedures as follows:

- Contractor should be performing surveying works to identify the levels and axes of
the project according to a known reference point .

2) Site Mobilization:

A- Site preparing and grading:

- Removal of the surface soil: which is at depth 100 mm of weak sand and doesn’t
contain solids and rocks of diameter more than 50 mm.

- Leveling and grading the site must be done before the start of any activity .

- Making a fence and gate for the entrance of the site.

B- Material Storage:

- Storage of soils that should be removed in the site according to instructions of the
Engineer’s representative to be used later .

-Getting rid of other removed soil which will not be used later for leveling or
backfilling.

154
Method of statment Chapter 6

C-Installing of caravans and utilities :

-Install caravans.

-Prepare tanks of the water.

-Prepare the sanitary works.

-Connect the generators with caravans.

3) Excavation works:

Work procedures as follows:

-From the soil reports the type of soil is sand therefore no dewatering is required.

-All excavation section slopes should be performed according to the Egyptian Code
of Soils & Foundations: CH.8 , Strengthening and shoring in case of difficulty of
execution of side slope or any weakness of the soil.

-Excavation will be performed on one stage for each building to reach the required
foundation level.

-Physical barriers will be erected around the excavation where appropriate to


prevent work accidents.

-Crew of an excavator , surveyor, 2 trucks a 1 workers are used for


excavation.

155
Method of statment Chapter 6

-The excavator will be used to dig the required volume of soil to reach the desired
foundation level.

-The excavated materials will be loaded to the trucks and moved away from
excavation area to prevent any surcharge on sides of excavation sections and they
will be stored for reuse at backfilling.

-Steel Formworks will be installed in required positions according to drawings and


surveying works.

-Concrete will be brought from a batch plant which belongs to a company named
(Lafarge) & it's located in-site .

-Concrete will be poured in the formworks followed by a worker using a vibrator for
compaction.

-Past-pour checks to be carried out to ensure line and level are within contract
tolerance.

4 ) Backfilling:

Work procedures as follows:

-The product of excavation will be used in backfilling after the approval of the
geotechnical engineer.

-A crew consisting of a loader/shovel, truck, worker and a roller for compaction will
be used for backfilling.

-backfilling should take place using a clean sand consisting of layers with 250 mm
thickness transferred by shovel or loader depending on the area to be backfilled.

156
Method of statment Chapter 6

-Water from an approved source by the consultant will be added to the backfilling
material to reach a moisture content in range of 90% of Optimum Moisture Content.

-The backfilled area should be compacted using a roller with an adequate number of
passes to reach the required compaction level.

-Compacted areas should be tested for the required Field Dry density as required by
ECP and if the tested samples are rejected re-watering should take place and repeat
the test.

-Levels should be inspected to match the required ground levels.

 Risk and hazard assessment:

-Incidents that could happen as a result of poor planning.

-Unsuitable equipment locations which can cause several accidents.

-Collapse of work area.

-Accidents caused by heavy equipments.

157
Method of statment Chapter 6

 Health and safety control measures:

-Site Security: All workers in the site should have identification cards.

-Site safety:

 Make sure to put barricades and signs in different work areas to avoid accidents.
 Fences must be installed around work areas to avoid falling or injuries.

-Personal protective equipment: All operatives will wear the following: safety
boots whilst working with concrete, safety helmet, high visibility vest and gloves.

-Site rules: All operatives will be informed (via a site induction / toolbox talk) of
and expected to comply with the contractor’s site rules.

-Specific site hazards: Any specific site hazards will be identified and dealt with
prior to any performed work.

-Access to the work area: The provision of a safe means of access to the work
area is the responsibility of the contractor.

158
Method of statment Chapter 6

5) Concrete Works

Work procedures as follows:

- Concrete will be brought from a batch plant which belongs to a company named
(Lafarage) & it's located in-site .

-Pre-pour check, check line & levels and a check sheet must be completed before
pouring.

-The dimensions and alignment of R.C components and formworks should be


inspected by the site engineer.

- Steel reinforcement should be placed and it's alignment & number of steel bars
should be revised according to the drawings.

-Ensure that the concrete delivery vehicles have suitable access to the intended
areas.

- Concrete is poured using a pump followed by a worker with a vibrator for the
compaction of the concrete.

-Surveying instruments and level should be set up during the pouring to ensure the
formwork state.

-Cubes of the designed mix must be tested for compressive strength at 7 days and
28 days for the initial approval satisfying a 350 kg/cm² compressive strength.

-The structure should be checked after the pour, line and levels should also be
verified.

159
Method of statment Chapter 6

 Risk and hazard assessment:

-Inadequate training.

-Incidents that could happen as a result of poor planning.

-Unsuitable equipment locations which can cause several accidents.

-Collapse of work area.

-Live electrical lines in working area.

-Injury through failure in equipments.

-Vehicle damage

-Personnel struck by hoses or concrete.

-Working in extreme weather conditions.

 Health and safety control measures:

-Site Security: All workers in the site should have identification cards.

-Site safety: -Make sure to put barricades and signs in different work areas to
avoid accidents.

- Identify all electrical lines in the site and mark them if possible.

-Ensure that other personnel not involved in pouring concrete

activities are in safety zone.

160
Method of statment Chapter 6

-Personal protective equipment: All operatives will wear the following: safety
boots whilst working with concrete, safety helmet, high visibility vest and gloves.
-Site rules: All operatives will be informed (via a site induction / toolbox talk) of
and expected to comply with the contractor’s site rules.
-Specific site hazards: Any specific site hazards will be identified and dealt with
prior to any performed work.

6) Insulation works

Work procedures as follows:

 Water Insulation:

- It should be done for footings , smells, underground column necks and any
underground or basement slabs.

-Another type of water insulation should be done for bathrooms.

-Crew of 2 workers will perform that activity.

-Used materials for each component that should be insulated are:

 Liquid Bitumen for footings


 P.V.C strips are used for the basement roof.
 Epoxy is used above basement floor.
 Bituminous strips are used for bathroom walls and other slabs subjected to
water.

-There should be a 2 cm covering layer for protection and overlaps between strips

161
Method of statment Chapter 6

7) Bricklaying works :

Work procedures as follows:

-Lines and levels should be set out and datum's marked whenever possible.

-Material should be stacked as close to working site a possible.

-Materials used are : Perforated bricks, light bricks, cement hollow and solid blocks

connected using a binding mortar.

-Binding mortar will be mixed on site to ensure consistency .

-Levels and line checks will be performed periodically during works.

-For masonry works underground bricks will be insulated using liquid bitumen.

-Bricklaying will be performed using a crew consisting of 3 workers and 3 helpers.

162
Method of statment Chapter 6

8) Plastering:

Work procedures as follows:

Exterior Plastering will be performed on 3 stages :

1. Spattering

-Cleaning wall surface from salts, dusts and other roughness then sprinkle it with
water and smooth the surface using a steel brush.

- Sprinkle a mortar of ..to.... to the walls at thickness of 3mm using a trowel and
keep it wet for 3 days.

2. Level dots & Strings:

- It's done using gypsum.

-They are dots of thickness equals to the thickness of plastering layer.

3. Plastering:

-Sprinkle the walls with water.

-Fill between the strings with a mortar of 300 kg cement per 1 m³ of sand.

-Level the surface.

-The thickness is about 20 mm.

-The produced surface must be vertical

163
Method of statment Chapter 6

9) Painting:

Work procedures as follows:

- 1st face pasting

-Emery

-2nd face pasting

-Emery

-Underlay painting

-Curing

-1st face painting

-2nd face painting

-Painting is exterior only as per contract conditions.

164
165
Activity Coding Chapter 7

Activity coding

ID Activity Code
M. Sur. Site Surveying
Ex. Excavation
B.F. Backfill
FW. PC. Foot. Form Work Plain Concrete Footing
Pour. Pc. Foot. Pouring concrete Plain Concrete Footing
R. FW. Pc. Foot. Remove Formwork Plain Concrete Footing
FW. Rc. and S. Foot. Form Work Reinforced Concrete and semels Footing
RFT. Rc. and s. Foot. R.F.T Reinforced Concrete and semels Footing
Pour. Rc. and s. Foot. Pouring concrete Reinforced Concrete and semels Footing
R. FW. Rc. and s. Foot. Remove Formwork Reinforced Concrete and semels Footing
Ins. Foot. Insulting Reinforced Concrete and semels Footing
FW. SoG. B Form Work Slab on grade Basement
Rft. SOG. B R.F.T Slab on grade Basement
Pour. SOG. B Pouring concrete Slab on grade Basement
R. FW. SOG. B Remove Formwork Slab on grade Basement
Fw. Col. B Form Work Columns Basement
Rft. Col. B R.F.T Columns Basement
Pour. Col. B Pouring concrete Columns Basement
R.FW. Col.B Remove Formwork Columns Basement
FW. B and s. G. Form Work Beams and slabs Ground floor
Rft. B and s.G . R.F.T Beams and slabs Ground floor
Pour. B and s. G. Pouring concrete Beams and slabs Ground floor
R. FW. B and s.G. Remove Formwork Beams and slabs Ground floor
Fw. Col. G. Form Work Columns Ground floor
Rft. Col. G. R.F.T Columns Ground floor
Pour. Col. G. Pouring concrete Columns Ground floor
R. FW. Col. G. Remove Formwork Columns Ground floor
FW. B and s. st. Form Work Beams and slabs First Floor
Rft. B and s. st. R.F.T Beams and slabs First Floor
Pour. B and s. st. Pouring concrete Beams and slabs First Floor
R. FW. B and s. st. Remove Formwork Beams and slabs First Floor
Fw. Col. st. Form Work Columns First Floor
Rft. Col. st. R.F.T Columns First Floor
Pour. Col. st. Pouring concrete Columns First Floor
R. FW. Col. st. Remove Formwork Columns First Floor
FW. B and S. nd. Form Work Beams and slabs Second Floor
Rft. B and S. nd . R.F.T Beams and slabs Second Floor
Pour. Band S. nd. Pouring concrete Beams and slabs Second Floor
R. FW. B and S .nd. Remove Formwork Beams and slabs Second Floor
Fw. Col. nd. Form Work Columns Second Floor
Rft. Col. nd. R.F.T Columns Second Floor
Pour. Col. nd. Pouring concrete Columns Second Floor
R. FW. Col. nd. Remove Formwork Columns Second Floor
FW. B. and s. rd. Form Work Beams and slabs third Floor
Rft. B. and s. rd. R.F.T Beams and slabs third Floor
Pour. B. and s. rd. Pouring concrete Beams and slabs third Floor
R. FW. B. and s. rd. Remove Formwork Beams and slabs third Floor

166
Activity Coding Chapter 7

Fw. Col. rd. Form Work Columns third Floor


Rft. Col. rd. R.F.T Columns third Floor
Pour. Col. rd. Pouring concrete Columns third Floor
R. FW. Col. rd. Remove Formwork Columns third Floor
FW. B and s. th. Form Work Beams and slabs Forth Floor
Rft. B and s.th . R.F.T Beams and slabs Forth Floor
Pour. B and s. th. Pouring concrete Beams and slabs Forth Floor
R. FW. B and s.th. Remove Formwork Beams and slabs Forth Floor
Fw. Col. th. Form Work Columns Forth Floor
Rft. Col. th. R.F.T Columns Forth Floor
Pour. Col. th. Pouring concrete Columns Forth Floor
R. FW. Col. th. Remove Formwork Columns Forth Floor
FW. B and s. roof. Form Work Beams and slabs Roof
Rft. B and s.roof . R.F.T Beams and slabs Roof
Pour. B and s. roof. Pouring concrete Beams and slabs Roof
R. FW. B and s.roof. Remove Formwork Beams and slabs Roof
E. B. M. External Basement Masonary
E. G. M. External Ground floor Masonary
I. G. M. Internal Ground floor Masonary
E. St. M. External First Floor Masonary
I. St. M. Internal First Floor Masonary
E. nd. M. External Second Floor Masonary
I. nd. M. Internal Second Floor Masonary
E. rd. M. External third Floor Masonary
I. rd. M. Internal third Floor Masonary
E. th. M. External Forth Floor Masonary
I. th. M. Internal Forth Floor Masonary
E. R. M. External Roof Masonary
E. Ch. G. External Calm Shell Ground floor
E. ch. st. External Calm Shell First Floor
E. ch. nd. External Calm Shell Second Floor
E. ch.rd. External Calm Shell third Floor
E. ch. Th. External Calm Shell Forth Floor
E. ch. roof. External Calm Shell Roof
E.P.F External External Painting
E.M.F. Entrance Marble Finishing
S.M.F. Stairs Marble Finishing

167
168
Activity Listing Chapter 8

Activity listing
Condonminium Appartment
ID Activity Quantity Unit Resources Prod/ crew No. crew Total Pro Duration Cost (LE/hr)

Mobilization
M. Sur. Site Surveying 1 surveyor + 1 helper +1 total station ---- 1 ---- 1 33
Earth Work
Ex. Excavation 6355 M³ 1 Excavator+2 Truck + 1 helper 500 2 1000 7 903
B.F. Backfill 2195 M³ 1 helper +1 Truck 400 3 1200 2 394
Civil Work
Foundation
Footing
Plain Concrete
FW. PC. Foot. Form Work 242 M³ 1 Carpenter + 1 Helper 3 12 36 7 390
Pour. Pc. Foot. Pouring concrete 242 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. Pc. Foot. Remove Formwork 242 M³ 1 Carpenter + 1 Helper ---- 12 ---- 1 390
Reinforced Concrete and semels
FW. Rc and s. Foot. Form Work 268.9 M³ 1 Carpenter + 1 Helper 3 12 36 8 390
RFT. Rc and s. Foot. R.F.T 17.45 Ton 1 Steel worker + 1 helper 0.3 10 3 6 325
Pour. Rc and s. Foot. Pouring concrete 268.9 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. Rc and s. Foot. Remove Formwork 268.9 ---- 1 Carpenter + 1 Helper ---- 12 ----- 1 390
Ins. Foot. Insulting 698 M² 2 helper 75 4 300 3 90
Basement
Slab on grade
FW. SOG. B Form Work 144 M³ 1 Carpenter + 1 Helper 3 10 30 5 325
Rft. SOG. B R.F.T 12.15 Ton 1 Steel worker + 1 helper 0.3 10 3 4 325
Pour. SOG. B Pouring concrete 144 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. SOG. B Remove Formwork 144 ---- 1 Carpenter + 1 Helper ---- 10 ---- 1 325
Columns
Fw. Col. B Form Work 51.25 M³ 1 Carpenter + 1 Helper 3 8 24 2 260
Rft. Col. B R.F.T 8.38 Ton 1 Steel worker + 1 helper 0.3 10 3 3 325
Pour. Col. B Pouring concrete 51.25 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R.FW. Col.B Remove Formwork 51.25 ---- 1 Carpenter + 1 Helper ---- 8 ---- 1 260
Ground floor
Beams and slabs
FW. B and s. G. Form Work 168.12 M³ 1 Carpenter + 1 Helper 3 12 42 5 390
Rft. B and s.G . R.F.T 16.08 Ton 1 Steel worker + 1 helper 0.3 12 3.6 5 390
Pour. B and s. G. Pouring concrete 168.12 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. B and s.G. Remove Formwork 168.12 ---- 1 Carpenter + 1 Helper ---- 12 ----- 1 390
Columns
Fw. Col. G. Form Work 51.25 M² 1 Carpenter + 1 Helper 3 8 24 2 260
Rft. Col. G. R.F.T 8.38 Ton 1 Steel worker + 1 helper 0.3 10 3 3 325
Pour. Col. G. Pouring concrete 51.25 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. Col. G. Remove Formwork 51.25 ---- 1 Carpenter + 1 Helper ---- 8 ---- 1 260
First Floor
Beams and slabs
FW. B and s. st. Form Work 168.12 M³ 1 Carpenter + 1 Helper 3 12 42 5 390
Rft. B and s.st. R.F.T 16.08 Ton 1 Steel worker + 1 helper 0.3 12 3.6 5 390
Pour. B and s. st. Pouring concrete 168.12 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. B and s.st. Remove Formwork 168.12 ---- 1 Carpenter + 1 Helper ---- 12 ----- 1 390
Columns
Fw. Col. st. Form Work 51.25 M² 1 Carpenter + 1 Helper 3 8 24 2 260
Rft. Col. st. R.F.T 8.38 Ton 1 Steel worker + 1 helper 0.3 10 3 3 325
Pour. Col. st. Pouring concrete 51.25 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. Col. st. Remove Formwork 51.25 ---- 1 Carpenter + 1 Helper ---- 8 ---- 1 260
Second Floor
Beams and slabs
FW. B and S. nd. Form Work 168.12 M³ 1 Carpenter + 1 Helper 3 12 42 5 390
Rft. B and S.nd . R.F.T 16.08 Ton 1 Steel worker + 1 helper 0.3 12 3.6 5 390
Pour. Band S. nd. Pouring concrete 168.12 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. B and S.nd. Remove Formwork 168.12 ---- 1 Carpenter + 1 Helper ---- 12 ----- 1 390
Columns
Fw. Col. nd. Form Work 51.25 M² 1 Carpenter + 1 Helper 3 8 24 2 260
Rft. Col. nd. R.F.T 8.38 Ton 1 Steel worker + 1 helper 0.3 10 3 3 325
Pour. Col. nd. Pouring concrete 51.25 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. Col. nd. Remove Formwork 51.25 ---- 1 Carpenter + 1 Helper ---- 8 ---- 1 260
third Floor
Beams and slabs
FW. B. and s. rd. Form Work 168.12 M³ 1 Carpenter + 1 Helper 3 12 42 5 390
Rft. B. and s. rd. R.F.T 16.08 Ton 1 Steel worker + 1 helper 0.3 12 3.6 5 390
Pour. B. and s. rd. Pouring concrete 168.12 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. B. and s. rd. Remove Formwork 168.12 ---- 1 Carpenter + 1 Helper ---- 12 ----- 1 390
Columns
Fw. Col. rd. Form Work 51.25 M² 1 Carpenter + 1 Helper 3 8 24 2 260
Rft. Col. rd. R.F.T 8.38 Ton 1 Steel worker + 1 helper 0.3 10 3 3 325
Pour. Col. rd. Pouring concrete 51.25 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. Col. rd. Remove Formwork 51.25 ---- 1 Carpenter + 1 Helper ---- 8 ---- 1 260

169
Activity Listing Chapter 8

Forth Floor
Beams and slabs
FW. B and s. th. Form Work 168.12 M³ 1 Carpenter + 1 Helper 3 12 42 5 390
Rft. B and s.th . R.F.T 16.08 Ton 1 Steel worker + 1 helper 0.3 12 3.6 5 390
Pour. B and s. th. Pouring concrete 168.12 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. B and s.th. Remove Formwork 168.12 ---- 1 Carpenter + 1 Helper ---- 12 ----- 1 390
Columns
Fw. Col. th. Form Work 51.25 M² 1 Carpenter + 1 Helper 3 8 24 2 260
Rft. Col. th. R.F.T 8.38 Ton 1 Steel worker + 1 helper 0.3 10 3 3 325
Pour. Col. th. Pouring concrete 51.25 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. Col. th. Remove Formwork 51.25 ---- 1 Carpenter + 1 Helper ---- 8 ---- 1 260
Roof
Beams and slabs
FW. B and s. roof. Form Work 168.12 M³ 1 Carpenter + 1 Helper 3 12 42 5 390
Rft. B and s.roof . R.F.T 16.08 Ton 1 Steel worker + 1 helper 0.3 12 3.6 5 390
Pour. B and s. roof. Pouring concrete 168.12 M³ 1 Pump +1 truck Mix + 1 helper 300 1 300 1 322
R. FW. B and s.roof. Remove Formwork 168.12 ---- 1 Carpenter + 1 Helper ---- 12 ----- 1 390
Masonary
Basement
E. B. M. External 83.33 M³ 1 Builder + 2 helper + 1 mwan 25 2 50 2 105
Ground floor
E. G. M. External 83.33 M³ 1 Builder + 2 helper + 1 mwan 25 2 50 2 105
I. G. M. Internal 332.33 M² 1 Builder + 2 helper + 1 mwan 25 4 100 4 210
First Floor
E. St. M. External 83.33 M³ 1 Builder + 2 helper + 1 mwan 25 2 50 2 105
I. St. M. Internal 332.33 M² 1 Builder + 2 helper + 1 mwan 25 4 100 4 210
Second Floor
E. nd. M. External 83.33 M³ 1 Builder + 2 helper + 1 mwan 25 2 50 2 105
I. nd. M. Internal 332.33 M² 1 Builder + 2 helper + 1 mwan 25 4 100 4 210
third Floor
E. rd. M. External 83.33 M³ 1 Builder + 2 helper + 1 mwan 25 2 50 2 105
I. rd. M. Internal 332.33 M² 1 Builder + 2 helper + 1 mwan 25 4 100 4 210
Forth Floor
E. th. M. External 83.33 M³ 1 Builder + 2 helper + 1 mwan 25 2 50 2 105
I. th. M. Internal 332.33 M² 1 Builder + 2 helper + 1 mwan 25 4 100 4 210
Roof
E. R. M. External 30 M³ 1 Builder + 2 helper + 1 mwan 25 2 50 1 105
Finishing
Ground floor
Calm Shell
E. Cs. G. External 390.66 M² 1 concrete Painter + 1helper 30 7 200 2 184
External Electrical
First Floor
Calm Shell
E. cs. st. External 390.66 M² 1 concrete Painter + 1helper 30 7 210 2 184
External Electrical
Second Floor
Calm Shell
E. cs. nd. External 390.66 M² 1 concrete Painter + 1helper 30 7 210 2 184
External Electrical
third Floor
Calm Shell
E. cs.rd. External 390.66 M² 1 concrete Painter + 1helper 30 7 210 2 184
External Electrical
Forth Floor
Calm Shell
E. cs. Th. External 390.66 M² 1 concrete Painter + 1helper 30 7 210 2 184
External Electrical
Roof
Calm Shell
E. cs. roof. External 130.22 M² 1 concrete Painter + 1helper 30 7 210 1 184
External Painting
E.P.F. External 2396 M² 1 painter+1 helper 30 15 450 6 394
Marble
E.M.F. Entrance 49 M² 1 Marbling worker + 2 helper 7 2 14 4 75
S.M.F. Stairs 100 Unit 1 Marbling worker + 2 helper 20 1 20 5 38

170
Activity Listing Chapter 8

Stand Alone Villa Type 1


ID Activity Quantity Unit Resources Prod/ crew No. crew Total Pro Duration Cost (LE/hr)

Mobilization
M. Sur. Site Surveying 1 surveyor + 1 helper +1 total station ---- 1 ---- 1 33
Earth Work
Ex. Excavation 508 M³ 1 Excavator+2 Truck + 1 helper 400 1 400 2 452
BF. Backfill 462 M³ 1 Loader +1 Truck 200 2 400 2 540
Civil Work
Foundation
Footing
Plain Concrete
FW. Pc. Foot. Form Work 16 M³ 1 Carpenter + 1 Helper 3 3 9 2 98
Pour. Pc. Foot. Pouring concrete 16 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Pc. Foot. Remove Formwork 16 ---- 1 Carpenter + 1 Helper ---- 3 ---- 1 98
Reinforced Concrete and semels
FW. Rc and s. Foot. Form Work 28.2 M³ 1 Carpenter + 1 Helper 3 3 9 4 98
RFT. Rc and s. Foot. R.F.T 3.14 Ton 1 Steel worker + 1 helper 0.3 6 1.8 2 195
Pour. Rc and s. Foot. Pouring concrete 28.2 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Rc and s. Foot. Remove Formwork 28.2 ---- 1 Carpenter + 1 Helper ---- 3 ---- 1 98
Ins. Foot. Insulting 222.6 M² 2 helper 75 3 225 1 68
Ground floor
Slab on grade
FW. SOG. G. Form Work 19.45 M³ 1 Carpenter + 1 Helper 3 2 6 4 65
Rft. SOG. G. R.F.T 1.52 Ton 1 Steel worker + 1 helper 0.3 2 0.6 3 65
Pour. SOG. G. Pouring concrete 19.45 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. SOG. G. Remove Formwork 19.45 ---- 1 Carpenter + 1 Helper ---- 2 ---- 1 65
Columns
Fw. Col. G. Form Work 5.36 M³ 1 Carpenter + 1 Helper 3 1 3 2 33
Rft. Col. G. R.F.T 1.165 Ton 1 Steel worker + 1 helper 0.3 2 0.6 2 65
Pour. Col. G. Pouring concrete 5.36 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Col. G. Remove Formwork 5.36 ---- 1 Carpenter + 1 Helper ---- 1 ---- 1 33
First Floor
Beams and slabs
FW. B and s. st. Form Work 33.95 M³ 1 Carpenter + 1 Helper 3 2 6 6 65
R. FW. B and s. st. R.F.T 3.165 Ton 1 Steel worker + 1 helper 0.3 4 1.2 3 130
Pour. B and s. st. Pouring concrete 33.95 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
RFT. B. st. Remove Formwork 33.95 ---- 1 Carpenter + 1 Helper ---- 2 ---- 1 65
Columns
Fw. Col. st. Form Work 5.36 M³ 1 Carpenter + 1 Helper 3 1 3 3 33
Rft. Col. st. R.F.T 1.165 Ton 1 Steel worker + 1 helper 0.3 2 0.6 2 65
Pour. Col. St. Pouring concrete 5.36 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Col. St. Remove Formwork 5.36 ---- 1 Carpenter + 1 Helper ---- 1 ---- 1 33
Roof
Beams and slabs
FW. B and s. roof. Form Work 33.95 M³ 1 Carpenter + 1 Helper 3 2 6 6 65
R. FW. B and s. roof. R.F.T 3.165 Ton 1 Steel worker + 1 helper 0.3 4 1.2 3 130
Pour. B and s. roof. Pouring concrete 33.95 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
RFT. B and s. roof. Remove Formwork 33.95 ---- 1 Carpenter + 1 Helper ---- 2 ---- 1 65
Masonary
Ground floor
E. G. M. External 54 M³ 1 Builder + 2 helper + 1 mwan 25 2 50 1 105
I. G. M. Internal 90 M² 1 Builder + 2 helper + 1 mwan 25 2 50 2 105
First Floor
E. St. M. External 54 M³ 1 Builder + 2 helper + 1 mwan 25 2 50 1 105
I. St. M. Internal 90 M² 1 Builder + 2 helper + 1 mwan 25 2 50 2 105
Roof
E. R. M. External 18 M³ 1 Builder + 2 helper + 1 mwan 25 2 50 1 105
Finishing
Ground floor
Calm Shell
E.CS. G. External 270 M² 1 concrete Painter + 1helper 30 5 150 2 132
External Electrical
First Floor
Calm Shell
E.cs. st. External 270 M² 1 concrete Painter + 1helper 30 5 150 2 132
External Electrical
Roof
Calm Shell
E.cs. roof. External 90 M² 1 concrete Painter + 1helper 30 5 150 1 132
External Painting
E.P.F. External 540 M² 1 painter+1 helper 30 6 180 3 158

171
Activity Listing Chapter 8

Stand Alone Villa Type 2

ID Activity Quantity Unit Resources Prod/ crew No. crew Total Pro Duration Cost (LE/hr)

Mobilization
M. Sur. Site Surveying 1 surveyor + 1 helper +1 total station ---- 1 ---- 1 33
Earth Work
Ex. Excavation 446 M³ 1 Excavator+2 Truck + 1 helper 400 1 400 2 452
BF. Backfill 400 M³ 1 Loader +1 Truck 200 2 400 1 540
Civil Work
Foundation
Footing
Plain Concrete
FW. Pc. Foot. Form Work 16 M³ 1 Carpenter + 1 Helper 3 2 6 3 65
Pour. Pc. Foot. Pouring concrete 16 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Pc. Foot. Remove Formwork 16 ---- 1 Carpenter + 1 Helper ---- 2 ---- 1 65
Reinforced Concrete and semels
FW. Rc and s. Foot. Form Work 25.98 M³ 1 Carpenter + 1 Helper 3 4 12 3 130
RFT. Rc and s. Foot. R.F.T 3.42 Ton 1 Steel worker + 1 helper 0.3 6 1.8 2 195
Pour. Rc and s. Foot. Pouring concrete 25.98 M³ 1 pump + 1 mix truck + 1 helper 300 1 300 1 322
R. FW. Rc and s. Foot. Remove Formwork 25.98 ---- 1 Carpenter + 1 Helper ---- 4 ---- 1 130
Ins. Foot. Insulting 218.4 M² 2 helper 75 3 225 1 68
Ground floor
Slab on grade
FW. SOG. G. Form Work 19.2 M² 1 Carpenter + 1 Helper 3 2 6 4 65
Rft. SOG. G. R.F.T 1.82 Ton 1 Steel worker + 1 helper 0.3 2 0.6 4 65
Pour. SOG. G. Pouring concrete 19.2 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. SOG. G. Remove Formwork 19.2 ---- 1 Carpenter + 1 Helper ---- 2 ---- 1 65
Columns
Fw. Col. G. Form Work 9 M³ 1 Carpenter + 1 Helper 3 1 3 3 33
Rft. Col. G. R.F.T 1.19 Ton 1 Steel worker + 1 helper 0.3 2 0.6 2 65
Pour. Col. G. Pouring concrete 9 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Col. G. Remove Formwork 9 ---- 1 Carpenter + 1 Helper ---- 1 ---- 1 33
First Floor
Beams and slab
FW. B and s. st. Form Work 33.47 M³ 1 Carpenter + 1 Helper 3 2 6 6 65
RFT. B and s. st. R.F.T 2.87 Ton 1 Steel worker + 1 helper 0.3 4 1.2 3 130
Pour. B and s. st. Pouring concrete 33.47 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. B and s. st. Remove Formwork 33.47 ---- 1 Carpenter + 1 Helper ---- 2 ---- 1 65
Columns
Fw. Col. st. Form Work 9 M³ 1 Carpenter + 1 Helper 3 1 3 3 33
Rft. Col. st. R.F.T 1.19 Ton 1 Steel worker + 1 helper 0.3 2 0.6 3 65
Pour. Col. St. Pouring concrete 9 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Col. St. Remove Formwork 9 ---- 1 Carpenter + 1 Helper ---- 1 ---- 1 33
Roof
Beams and slab
FW. B and s. roof. Form Work 33.47 M³ 1 Carpenter + 1 Helper 3 2 6 6 65
RFT. B and s. roof. R.F.T 2.87 Ton 1 Steel worker + 1 helper 0.3 4 1.2 3 130
Pour. B and s. roof. Pouring concrete 33.47 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. B and s. roof. Remove Formwork 33.47 ---- 1 Carpenter + 1 Helper ---- 2 ---- 1 65
Ground floor
E. G. M. External 45 M³ 1 Builder + 2 helper + 1 mwan 25 1 25 2 53
I. G. M. Internal 75 M² 1 Builder + 2 helper + 1 mwan 25 2 50 2 105
First Floor
E. St. M. External 45 M³ 1 Builder +2 helper +1 mawan 25 1 25 2 53
I. St. M. Internal 75 M² 1 Builder +2 helper +1 mawan 25 2 50 2 105
Roof
E. Roof. M. External 15 M³ 1 Builder +2 helper +1 mawan 25 1 25 1 53
Finishing
Ground floor
Calm Shell
E.CS. G. External 270 M² 1 concrete Painter + 1helper 30 5 150 2 132
External Electrical
First Floor
Calm Shell
E.cs. st. External 270 M² 1 concrete Painter + 1helper 30 5 150 2 132
External Electrical
Roof
Calm Shell
E.cs. roof. External 90 M² 1 concrete Painter + 1helper 30 5 150 1 132
External Painting
E.P.F. External 540 M² 1 painter+1 helper 30 6 180 3 158

172
Activity Listing Chapter 8

Twin House
ID Activity Quantity Unit Resources Prod/ crew No. crew Total Pro Duration Cost (LE/hr)

Mobilization
M. Sur. Site Surveying 1 surveyor + 1 helper +1 total station ---- 1 ---- 1 33
Earth Work
Ex. Excavation 1937 M³ 1 Excavator+2 Truck + 1 helper 400 2 800 3 903
BF. Backfill 1737 M³ 1 Loader +1 Truck 200 3 600 3 394
Civil Work
Foundation
Footing
Plain Concrete
FW. Pc. Foot. Form Work 66.7 M³ 1 Carpenter + 1 Helper 3 5 15 5 163
Pour. Pc. Foot. Poring concrete 66.7 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Pc. Foot. Remove Formwork 66.7 ---- 1 Carpenter + 1 Helper ---- 5 ---- 1 163
Reinforced Concrete and semels
FW. Rc and s. Foot. Form Work 123.4 M³ 1 Carpenter + 1 Helper 3 9 27 5 293
RFT. Rc and s. Foot. R.F.T 12.35 Ton 1 Steel worker + 1 helper 0.3 9 2.7 5 293
Pour. Rc and s. Foot. Pouring concrete 123.4 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Rc and s. Foot. Remove Formwork 123.4 ---- 1 Carpenter + 1 Helper ---- 9 ---- 1 293
Ins. Foot. Insulting 1288 M² 2 helper 75 5 375 4 113
Ground floor
Slab on grade
FW. SOG. G. Form Work 99.1 M² 1 Carpenter + 1 Helper 3 6 18 6 195
Rft. SOG. G. R.F.T 10.2 Ton 1 Steel worker + 1 helper 0.3 5 1.5 7 163
Pour. SOG. G. Pouring concrete 99.1 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. SOG. G. Remove Formwork 99.1 ---- 1 Carpenter + 1 Helper ---- 6 ---- 1 195
Columns
Fw. Col. G. Form Work 40 M³ 1 Carpenter + 1 Helper 3 5 15 3 163
Rft. Col. G. R.F.T 3.75 Ton 1 Steel worker + 1 helper 0.3 5 1.5 3 163
Pour. Col. G. Pouring concrete 40 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Col. G. Remove Formwork 40 ---- 1 Carpenter + 1 Helper ---- 5 ---- 1 163
First Floor
Beams and slabs
FW. B and s. st. Form Work 149.1 M³ 1 Carpenter + 1 Helper 3 10 30 5 325
RFT. B and s. st. R.F.T 17.635 Ton 1 Steel worker + 1 helper 0.3 10 3 6 325
Pour. B and s. st. Pouring concrete 149.1 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. B and s. st. Remove Formwork 149.1 ---- 1 Carpenter + 1 Helper ---- 10 ---- 1 325
Columns
Fw. Col. st. Form Work 40 M³ 1 Carpenter + 1 Helper 3 5 15 3 163
Rft. Col. st. R.F.T 3.75 Ton 1 Steel worker + 1 helper 0.3 5 1.5 3 163
Pour. Col. st. Pouring concrete 40 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. Col. st. Remove Formwork 40 ---- 1 Carpenter + 1 Helper ---- 5 ---- 1 163
Roof
Beams and slabs
FW. B and s. roof. Form Work 149.1 M³ 1 Carpenter + 1 Helper 3 10 30 5 325
RFT. B and s. roof. R.F.T 17.635 Ton 1 Steel worker + 1 helper 0.3 10 3 6 325
Pour. B and s. roof. Pouring concrete 149.1 M³ 1 pump + 1 mix truck + helper 300 1 300 1 322
R. FW. B and s. roof. Remove Formwork 149.1 ---- 1 Carpenter + 1 Helper ---- 10 ---- 1 325
Masonary
Ground floor
E. G. M. External 155 M³ 1 Builder +2 helper +1 mawan 25 3 75 3 158
I. G. M. Internal 1058 M² 1 Builder +2 helper +1 mawan 25 5 125 9 263
First Floor
E. St. M. External 155 M³ 1 Builder +2 helper +1 mawan 25 3 75 3 158
I. St. M. Internal 1058 M² 1 Builder +2 helper +1 mawan 25 5 125 9 263
Roof
E. Roof. M. External 51 M³ 1 Builder +2 helper +1 mawan 25 1 25 2 53
Finishing
Ground floor
Calm Shell
E.CS. G. External 648 M² 1 concrete Painter + 1helper 30 12 360 2 315
External Electrical
First Floor
Calm Shell
E.cs. st. External 648 M² 1 concrete Painter + 1helper 30 12 360 2 315
External Electrical
Roof
Calm Shell
E.cs. roof. External 216 M² 1 concrete Painter + 1helper 30 12 360 1 315
External Painting
E.P.F. External 1510 M² 1 painter+1 helper 30 8 240 7 210

173
174
Resource Costing Chapter 9

Project Cost
Labor
Labor Cost (LE/day)
Carpenter 170
Helper 90
Steel Worker 170
surveyor 170
mwan 120
Builder 120
Concrete Painter 120
Painter 120
Marbling worker 120

Material
Material Cost Unit
BackFill 60 LE/M³
Concrete 400 LE/M³
marble 500 LE/M²
marble stairs 200 LE/Unit
Steel 6000 LE/Ton
Insulting 50 LE/M²
External Masonary 1500 LE/M³
Internal Masonary 500 LE/M²

Equipment

Equipment Cost Unit


Excavator 200 (LE/hr)
Truck 120 (LE/hr)
Loader 150 (LE/hr)
Pump 130 (LE/hr)
Truck Mix 180 (LE/hr)
Crane 70 (LE/hr)

175
176
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Katamia Village Garden
Ga 1002d 01-Nov-11 11-Feb-15 11-Feb-

A7460 Start of project 0d 01-Nov-11 Start of project


A7470 finish of project 0d 11-Feb-15 finish of

Zone 1 688d 01-Nov-11 01-Feb-14 01-Feb-14, Zone 1


A4880 start of zone 1 0d 01-Nov-11 start of zone 1
A4890 finish of zone 1 0d 01-Feb-14 finish of zone 1
stage 1 177d 01-Nov-11 30-May-12 30-May-12, stage 1
A4820 start of stage 1 0d 01-Nov-11 start of stage 1
A4830 finish of stage 1 0d 30-May-12 finish of stage 1
Condonminium Appartments-3
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-3
A4450 start of cond. 0d 01-Nov-11 start of cond.
A4440 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.680 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.680 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F680 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG6 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B6 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st6 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab

Actual Work Critical Remaining Work Summary Page 1 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

177
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M680 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M680 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M680 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M680 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M680 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M680 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M680 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M680 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M680 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M680 Internal 4d 17-May-12 21-May-12 Internal
E. th .M680 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof
E .R .M680 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.6 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st68 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd68 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd680 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th680 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r680 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint680 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F680 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F680 Stairs 5d 24-May-12 29-May-12 Stairs

Actual Work Critical Remaining Work Summary Page 2 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

178
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Condonminium Appartments-4
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-4
A4430 start of cond. 0d 01-Nov-11 start of cond.
A4420 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.670 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.670 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F670 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG6 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B6 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st6 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork

Actual Work Critical Remaining Work Summary Page 3 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

179
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M670 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M670 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M670 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M670 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M670 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M670 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M670 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M670 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M670 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M670 Internal 4d 17-May-12 21-May-12 Internal
E. th .M670 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof
E .R .M670 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.6 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st67 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd67 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd670 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th670 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r670 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint670 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F670 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F670 Stairs 5d 24-May-12 29-May-12 Stairs
Condonminium Appartments-5
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-5
A4410 start of cond. 0d 01-Nov-11 start of cond.
A4400 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.660 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.660 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F660 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work

Actual Work Critical Remaining Work Summary Page 4 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

180
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG6 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B6 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st6 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T

Actual Work Critical Remaining Work Summary Page 5 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

181
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M660 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M660 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M660 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M660 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M660 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M660 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M660 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M660 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M660 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M660 Internal 4d 17-May-12 21-May-12 Internal
E. th .M660 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof
E .R .M660 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.6 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st66 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd66 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd660 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th660 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r660 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint660 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F660 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F660 Stairs 5d 24-May-12 29-May-12 Stairs
Condonminium Appartments-6
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-6
A4350 start of cond. 0d 01-Nov-11 start of cond.
A4340 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.630 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.630 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F630 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T

Actual Work Critical Remaining Work Summary Page 6 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

182
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG6 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B6 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st6 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary

Actual Work Critical Remaining Work Summary Page 7 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

183
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M630 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M630 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M630 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M630 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M630 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M630 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M630 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M630 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M630 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M630 Internal 4d 17-May-12 21-May-12 Internal
E. th .M630 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof
E .R .M630 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.6 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st63 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd63 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd630 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th630 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r630 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint630 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F630 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F630 Stairs 5d 24-May-12 29-May-12 Stairs
Condonminium Appartments-13
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-13
A4370 start of cond. 0d 01-Nov-11 start of cond.
A4360 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.640 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.640 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F640 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG6 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork

Actual Work Critical Remaining Work Summary Page 8 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

184
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B6 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st6 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M640 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M640 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M640 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M640 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M640 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor

Actual Work Critical Remaining Work Summary Page 9 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

185
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
I . nd .M640 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M640 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M640 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M640 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M640 Internal 4d 17-May-12 21-May-12 Internal
E. th .M640 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof
E .R .M640 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.6 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st64 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd64 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd640 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th640 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r640 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint640 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F640 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F640 Stairs 5d 24-May-12 29-May-12 Stairs
Condonminium Appartments-14
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-14
A4390 start of cond. 0d 01-Nov-11 start of cond.
A4380 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.650 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.650 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F650 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG6 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B6 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T

Actual Work Critical Remaining Work Summary Page 10 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

186
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st6 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M650 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M650 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M650 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M650 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M650 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M650 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M650 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M650 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M650 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M650 Internal 4d 17-May-12 21-May-12 Internal
E. th .M650 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof

Actual Work Critical Remaining Work Summary Page 11 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

187
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E .R .M650 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.6 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st65 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd65 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd650 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th650 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r650 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint650 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F650 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F650 Stairs 5d 24-May-12 29-May-12 Stairs
stage 2 334d 31-May-12 02-Jul-13 02-Jul-13, stage 2
A4840 start of stage 2 0d 31-May-12 start of stage 2
A4850 finish of stage 2 0d 02-Jul-13 finish of stage 2
Condonminium Appartments-43
App 177d 31-May-12 30-Dec-12 30-Dec-12, Condonminium Appartments-43
A4690 start of cond. 0d 31-May-12 start of cond.
A4680 finish of cond. 0d 30-Dec-12 finish of cond.
Mobilization 1d 31-May-12 31-May-12 31-May-12, Mobilization
M.Sur.800 Site Surveying 1d 31-May-12 31-May-12 Site Surveying
Earth Work 47d 02-Jun-12 25-Jul-12 25-Jul-12, Earth Work
Ex.800 Excavation 7d 02-Jun-12 09-Jun-12 Excavation
B.F800 BackFill 2d 24-Jul-12 25-Jul-12 BackFill
Civil Work 157d 10-Jun-12 16-Dec-12 16-Dec-12, Civil Work
Foundation 30d 10-Jun-12 14-Jul-12 14-Jul-12, Foundation
Footing 30d 10-Jun-12 14-Jul-12 14-Jul-12, Footing
Plain Concrete
Con 10d 10-Jun-12 20-Jun-12 20-Jun-12, Plain Concrete
FW.PC Form Work 7d 10-Jun-12 17-Jun-12 Form Work
Pour.Pc Pouring Concrete 1d 18-Jun-12 18-Jun-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 20-Jun-12 20-Jun-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 21-Jun-12 14-Jul-12 14-Jul-12, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 21-Jun-12 30-Jun-12 Form Work
R.F.T.R R.F.T 6d 01-Jul-12 07-Jul-12 R.F.T
Pour.Rc Pouring Concrete 1d 08-Jul-12 08-Jul-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 10-Jul-12 10-Jul-12 Remove Formwork
InsRc& Insulting 3d 11-Jul-12 14-Jul-12 Insulting
Basement 26d 15-Jul-12 13-Aug-12 13-Aug-12, Basement
Slab On Grade
Gra 16d 26-Jul-12 13-Aug-12 13-Aug-12, Slab On Grade
FW.SOG8 Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 01-Aug-12 05-Aug-12 R.F.T
Pour.SOG Pouring Concrete 1d 06-Aug-12 06-Aug-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 13-Aug-12 13-Aug-12 Remove Formwork
Columns 8d 15-Jul-12 23-Jul-12 23-Jul-12, Columns
FW.Col.B8 Form Work 2d 15-Jul-12 16-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 17-Jul-12 19-Jul-12 R.F.T
Pour.Col.B Pouring Concrete 1d 21-Jul-12 21-Jul-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Jul-12 23-Jul-12 Remove Formwork
Ground Floor 24d 26-Jul-12 26-Aug-12 26-Aug-12, Ground Floor
Beam and s
slab 13d 26-Jul-12 09-Aug-12 09-Aug-12, Beam and slab
FW.B&S.G Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 26-Jul-12 31-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 01-Aug-12 01-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 09-Aug-12 09-Aug-12 Remove Formwork
Columns 8d 14-Aug-12 26-Aug-12 26-Aug-12, Columns
FW.Col.G Form Work 2d 14-Aug-12 15-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 16-Aug-12 22-Aug-12 R.F.T
Pour..Col.G Pouring Concrete 1d 23-Aug-12 23-Aug-12 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 12 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

188
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.Fw.Col.G Remove Formwork 1d 26-Aug-12 26-Aug-12 Remove Formwork
First Floor 19d 27-Aug-12 17-Sep-12 17-Sep-12, First Floor
Beams and slab 18d 27-Aug-12 16-Sep-12 16-Sep-12, Beams and slab
FW.B&S.s Form Work 5d 27-Aug-12 01-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 02-Sep-12 06-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Sep-12 08-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Columns 8d 09-Sep-12 17-Sep-12 17-Sep-12, Columns
FW.Col.st8 Form Work 2d 09-Sep-12 10-Sep-12 Form Work
R.F.T.Col. R.F.T 3d 11-Sep-12 13-Sep-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Sep-12 15-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Sep-12 17-Sep-12 Remove Formwork
Second Floor 19d 18-Sep-12 09-Oct-12 09-Oct-12, Second Floor
Beams and slab 18d 18-Sep-12 08-Oct-12 08-Oct-12, Beams and slab
FW.B&S.n Form Work 5d 18-Sep-12 23-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 24-Sep-12 29-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Sep-12 30-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Columns 8d 01-Oct-12 09-Oct-12 09-Oct-12, Columns
FW.Col.nd Form Work 2d 01-Oct-12 02-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 03-Oct-12 06-Oct-12 R.F.T
Pour.Col.n Pouring Concrete 1d 07-Oct-12 07-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Oct-12 09-Oct-12 Remove Formwork
Third Floor 19d 10-Oct-12 04-Nov-12 04-Nov-12, Third Floor
Beams and slab 18d 10-Oct-12 03-Nov-12 03-Nov-12, Beams and slab
FW.B&S.r Form Work 5d 10-Oct-12 15-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 16-Oct-12 21-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Oct-12 22-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Columns 8d 23-Oct-12 04-Nov-12 04-Nov-12, Columns
FW.Col.rd Form Work 2d 23-Oct-12 24-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 25-Oct-12 31-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Nov-12 01-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 04-Nov-12 04-Nov-12 Remove Formwork
Fourth Floor 19d 05-Nov-12 26-Nov-12 26-Nov-12, Fourth Floor
Beams and slab 18d 05-Nov-12 25-Nov-12 25-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 05-Nov-12 10-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 11-Nov-12 15-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Nov-12 17-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Nov-12 25-Nov-12 Remove Formwork
Columns 8d 18-Nov-12 26-Nov-12 26-Nov-12, Columns
FW.Col.th Form Work 2d 18-Nov-12 19-Nov-12 Form Work
R.F.T.Col. R.F.T 3d 20-Nov-12 22-Nov-12 R.F.T
Pour.Col.th Pouring Concrete 1d 24-Nov-12 24-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 26-Nov-12 26-Nov-12 Remove Formwork
Roof 17d 27-Nov-12 16-Dec-12 16-Dec-12, Roof
Beams and slab 17d 27-Nov-12 16-Dec-12 16-Dec-12, Beams and slab
FW.B&S.R Form Work 5d 27-Nov-12 02-Dec-12 Form Work
R.F.T.B&S R.F.T 5d 03-Dec-12 08-Dec-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Dec-12 09-Dec-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Dec-12 16-Dec-12 Remove Formwork
Mansonary 109d 11-Aug-12 22-Dec-12 22-Dec-12, Mansonary
Basement 2d 11-Aug-12 12-Aug-12 12-Aug-12, Basement
E.B.M800 External 2d 11-Aug-12 12-Aug-12 External
Ground Floor 4d 17-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
I.G.M800 Internal 4d 17-Sep-12 20-Sep-12 Internal
E.G.M800 External 2d 17-Sep-12 18-Sep-12 External
First Floor 4d 09-Oct-12 13-Oct-12 13-Oct-12, First Floor
I.st .M800 Internal 4d 09-Oct-12 13-Oct-12 Internal
E.st .M800 External 2d 09-Oct-12 10-Oct-12 External
Second Floor 4d 04-Nov-12 07-Nov-12 07-Nov-12, Second Floor
I . nd .M800 Internal 4d 04-Nov-12 07-Nov-12 Internal
E. nd .M800 External 2d 04-Nov-12 05-Nov-12 External
Third Floor 4d 26-Nov-12 29-Nov-12 29-Nov-12, Third Floor
I . rd .M800 Internal 4d 26-Nov-12 29-Nov-12 Internal
E . rd .M800 External 2d 26-Nov-12 27-Nov-12 External
Fourth Floor 4d 17-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
I .th .M800 Internal 4d 17-Dec-12 20-Dec-12 Internal
E. th .M800 External 2d 17-Dec-12 18-Dec-12 External
Roof 1d 22-Dec-12 22-Dec-12 22-Dec-12, Roof
E .R .M800 External 1d 22-Dec-12 22-Dec-12 External
Finishing 85d 19-Sep-12 30-Dec-12 30-Dec-12, Finishing
Ground Floor 2d 19-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
Calm Shell 2d 19-Sep-12 20-Sep-12 20-Sep-12, Calm Shell
E.Ch .G.8 External 2d 19-Sep-12 20-Sep-12 External
External Ele
Electrical 0d

Actual Work Critical Remaining Work Summary Page 13 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

189
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
First Floor 2d 11-Oct-12 13-Oct-12 13-Oct-12, First Floor
Calm Shell 2d 11-Oct-12 13-Oct-12 13-Oct-12, Calm Shell
E .ch .st80 External 2d 11-Oct-12 13-Oct-12 External
External Ele
Electrical 0d
Second Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, Second Floor
Calm Shell 2d 06-Nov-12 07-Nov-12 07-Nov-12, Calm Shell
E.ch .nd80 External 2d 06-Nov-12 07-Nov-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Nov-12 29-Nov-12 29-Nov-12, Third Floor
Calm Shell 2d 28-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch. rd800 External 2d 28-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Fourth Floor 2d 19-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
Calm Shell 2d 19-Dec-12 20-Dec-12 20-Dec-12, Calm Shell
E.ch .th800 External 2d 19-Dec-12 20-Dec-12 External
External Ele
Electrical 0d
Roof 1d 23-Dec-12 23-Dec-12 23-Dec-12, Roof
Calm Shell 1d 23-Dec-12 23-Dec-12 23-Dec-12, Calm Shell
E.ch .r800 External 1d 23-Dec-12 23-Dec-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-Dec-12 30-Dec-12 30-Dec-12, Painting Cond.
Ex. Paint800 External Painting 6d 24-Dec-12 30-Dec-12 External Painting
Marbling 5d 24-Dec-12 29-Dec-12 29-Dec-12, Marbling
E.M.F800 Entrance 4d 24-Dec-12 27-Dec-12 Entrance
S.M.F800 Stairs 5d 24-Dec-12 29-Dec-12 Stairs
Condonminium Appartments-16
App 334d 31-May-12 02-Jul-13 02-Jul-13, Condonminium Appartments-16
A4470 start of cond. 0d 31-May-12 start of cond.
A4460 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 02-Jun-12 02-Jun-12 02-Jun-12, Mobilization
M.Sur.690 Site Surveying 1d 02-Jun-12 02-Jun-12 Site Surveying
Earth Work 197d 10-Jun-12 31-Jan-13 31-Jan-13, Earth Work
Ex.690 Excavation 7d 10-Jun-12 17-Jun-12 Excavation
B.F690 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG6 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B6 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st6 Form Work 2d 14-Mar-13 16-Mar-13 Form Work

Actual Work Critical Remaining Work Summary Page 14 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

190
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M690 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M690 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M690 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M690 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M690 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M690 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M690 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M690 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M690 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M690 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M690 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M690 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.6 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st69 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd69 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor

Actual Work Critical Remaining Work Summary Page 15 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

191
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd690 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th690 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r690 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint690 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F690 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F690 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-24
App 334d 31-May-12 02-Jul-13 02-Jul-13, Condonminium Appartments-24
A4510 start of cond. 0d 31-May-12 start of cond.
A4500 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 02-Jun-12 02-Jun-12 02-Jun-12, Mobilization
M.Sur.710 Site Surveying 1d 02-Jun-12 02-Jun-12 Site Surveying
Earth Work 197d 10-Jun-12 31-Jan-13 31-Jan-13, Earth Work
Ex.710 Excavation 7d 10-Jun-12 17-Jun-12 Excavation
B.F710 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG7 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B7 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st7 Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork

Actual Work Critical Remaining Work Summary Page 16 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

192
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M710 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M710 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M710 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M710 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M710 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M710 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M710 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M710 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M710 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M710 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M710 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M710 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.7 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st71 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd71 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd710 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th710 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell

Actual Work Critical Remaining Work Summary Page 17 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

193
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.ch .r710 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint710 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F710 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F710 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-26
App 334d 31-May-12 02-Jul-13 02-Jul-13, Condonminium Appartments-26
A4550 start of cond. 0d 31-May-12 start of cond.
A4540 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 02-Jun-12 02-Jun-12 02-Jun-12, Mobilization
M.Sur.730 Site Surveying 1d 02-Jun-12 02-Jun-12 Site Surveying
Earth Work 197d 10-Jun-12 31-Jan-13 31-Jan-13, Earth Work
Ex.730 Excavation 7d 10-Jun-12 17-Jun-12 Excavation
B.F730 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG7 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B7 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st7 Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T

Actual Work Critical Remaining Work Summary Page 18 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

194
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M730 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M730 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M730 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M730 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M730 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M730 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M730 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M730 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M730 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M730 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M730 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M730 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.7 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st73 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd73 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd730 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th730 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r730 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint730 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F730 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F730 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-34
App 334d 31-May-12 02-Jul-13 02-Jul-13, Condonminium Appartments-34
A4590 start of cond. 0d 31-May-12 start of cond.

Actual Work Critical Remaining Work Summary Page 19 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

195
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
A4580 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 02-Jun-12 02-Jun-12 02-Jun-12, Mobilization
M.Sur.750 Site Surveying 1d 02-Jun-12 02-Jun-12 Site Surveying
Earth Work 197d 10-Jun-12 31-Jan-13 31-Jan-13, Earth Work
Ex.750 Excavation 7d 10-Jun-12 17-Jun-12 Excavation
B.F750 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG7 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B7 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st7 Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab

Actual Work Critical Remaining Work Summary Page 20 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

196
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M750 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M750 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M750 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M750 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M750 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M750 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M750 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M750 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M750 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M750 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M750 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M750 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.7 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st75 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd75 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd750 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th750 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r750 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint750 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F750 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F750 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-36
App 334d 31-May-12 02-Jul-13 02-Jul-13, Condonminium Appartments-36
A4630 start of cond. 0d 31-May-12 start of cond.
A4620 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 02-Jun-12 02-Jun-12 02-Jun-12, Mobilization
M.Sur.770 Site Surveying 1d 02-Jun-12 02-Jun-12 Site Surveying
Earth Work 197d 10-Jun-12 31-Jan-13 31-Jan-13, Earth Work
Ex.770 Excavation 7d 10-Jun-12 17-Jun-12 Excavation
B.F770 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing

Actual Work Critical Remaining Work Summary Page 21 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

197
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG7 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B7 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st7 Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork

Actual Work Critical Remaining Work Summary Page 22 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

198
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M770 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M770 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M770 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M770 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M770 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M770 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M770 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M770 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M770 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M770 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M770 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M770 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.7 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st77 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd77 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd770 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th770 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r770 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint770 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F770 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F770 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-44
App 334d 31-May-12 02-Jul-13 02-Jul-13, Condonminium Appartments-44
A4670 start of cond. 0d 31-May-12 start of cond.
A4660 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 02-Jun-12 02-Jun-12 02-Jun-12, Mobilization
M.Sur.790 Site Surveying 1d 02-Jun-12 02-Jun-12 Site Surveying
Earth Work 197d 10-Jun-12 31-Jan-13 31-Jan-13, Earth Work
Ex.790 Excavation 7d 10-Jun-12 17-Jun-12 Excavation
B.F790 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork

Actual Work Critical Remaining Work Summary Page 23 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

199
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG7 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B7 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st7 Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M790 External 2d 17-Feb-13 18-Feb-13 External

Actual Work Critical Remaining Work Summary Page 24 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

200
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M790 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M790 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M790 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M790 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M790 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M790 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M790 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M790 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M790 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M790 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M790 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.7 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st79 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd79 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd790 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th790 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r790 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint790 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F790 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F790 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-15
App 177d 31-May-12 30-Dec-12 30-Dec-12, Condonminium Appartments-15
A4490 start of cond. 0d 31-May-12 start of cond.
A4480 finish of cond. 0d 30-Dec-12 finish of cond.
Mobilization 1d 31-May-12 31-May-12 31-May-12, Mobilization
M.Sur.700 Site Surveying 1d 31-May-12 31-May-12 Site Surveying
Earth Work 47d 02-Jun-12 25-Jul-12 25-Jul-12, Earth Work
Ex.700 Excavation 7d 02-Jun-12 09-Jun-12 Excavation
B.F700 BackFill 2d 24-Jul-12 25-Jul-12 BackFill
Civil Work 157d 10-Jun-12 16-Dec-12 16-Dec-12, Civil Work
Foundation 30d 10-Jun-12 14-Jul-12 14-Jul-12, Foundation
Footing 30d 10-Jun-12 14-Jul-12 14-Jul-12, Footing
Plain Concrete
Con 10d 10-Jun-12 20-Jun-12 20-Jun-12, Plain Concrete
FW.PC Form Work 7d 10-Jun-12 17-Jun-12 Form Work
Pour.Pc Pouring Concrete 1d 18-Jun-12 18-Jun-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 20-Jun-12 20-Jun-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 21-Jun-12 14-Jul-12 14-Jul-12, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 21-Jun-12 30-Jun-12 Form Work
R.F.T.R R.F.T 6d 01-Jul-12 07-Jul-12 R.F.T
Pour.Rc Pouring Concrete 1d 08-Jul-12 08-Jul-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 10-Jul-12 10-Jul-12 Remove Formwork
InsRc& Insulting 3d 11-Jul-12 14-Jul-12 Insulting
Basement 26d 15-Jul-12 13-Aug-12 13-Aug-12, Basement
Slab On Grade
Gra 16d 26-Jul-12 13-Aug-12 13-Aug-12, Slab On Grade
FW.SOG7 Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 01-Aug-12 05-Aug-12 R.F.T
Pour.SOG Pouring Concrete 1d 06-Aug-12 06-Aug-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 13-Aug-12 13-Aug-12 Remove Formwork
Columns 8d 15-Jul-12 23-Jul-12 23-Jul-12, Columns
FW.Col.B7 Form Work 2d 15-Jul-12 16-Jul-12 Form Work

Actual Work Critical Remaining Work Summary Page 25 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

201
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.Col. R.F.T 3d 17-Jul-12 19-Jul-12 R.F.T
Pour.Col.B Pouring Concrete 1d 21-Jul-12 21-Jul-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Jul-12 23-Jul-12 Remove Formwork
Ground Floor 24d 26-Jul-12 26-Aug-12 26-Aug-12, Ground Floor
Beam and s
slab 13d 26-Jul-12 09-Aug-12 09-Aug-12, Beam and slab
FW.B&S.G Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 26-Jul-12 31-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 01-Aug-12 01-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 09-Aug-12 09-Aug-12 Remove Formwork
Columns 8d 14-Aug-12 26-Aug-12 26-Aug-12, Columns
FW.Col.G Form Work 2d 14-Aug-12 15-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 16-Aug-12 22-Aug-12 R.F.T
Pour..Col.G Pouring Concrete 1d 23-Aug-12 23-Aug-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Aug-12 26-Aug-12 Remove Formwork
First Floor 19d 27-Aug-12 17-Sep-12 17-Sep-12, First Floor
Beams and slab 18d 27-Aug-12 16-Sep-12 16-Sep-12, Beams and slab
FW.B&S.s Form Work 5d 27-Aug-12 01-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 02-Sep-12 06-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Sep-12 08-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Columns 8d 09-Sep-12 17-Sep-12 17-Sep-12, Columns
FW.Col.st7 Form Work 2d 09-Sep-12 10-Sep-12 Form Work
R.F.T.Col. R.F.T 3d 11-Sep-12 13-Sep-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Sep-12 15-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Sep-12 17-Sep-12 Remove Formwork
Second Floor 19d 18-Sep-12 09-Oct-12 09-Oct-12, Second Floor
Beams and slab 18d 18-Sep-12 08-Oct-12 08-Oct-12, Beams and slab
FW.B&S.n Form Work 5d 18-Sep-12 23-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 24-Sep-12 29-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Sep-12 30-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Columns 8d 01-Oct-12 09-Oct-12 09-Oct-12, Columns
FW.Col.nd Form Work 2d 01-Oct-12 02-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 03-Oct-12 06-Oct-12 R.F.T
Pour.Col.n Pouring Concrete 1d 07-Oct-12 07-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Oct-12 09-Oct-12 Remove Formwork
Third Floor 19d 10-Oct-12 04-Nov-12 04-Nov-12, Third Floor
Beams and slab 18d 10-Oct-12 03-Nov-12 03-Nov-12, Beams and slab
FW.B&S.r Form Work 5d 10-Oct-12 15-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 16-Oct-12 21-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Oct-12 22-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Columns 8d 23-Oct-12 04-Nov-12 04-Nov-12, Columns
FW.Col.rd Form Work 2d 23-Oct-12 24-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 25-Oct-12 31-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Nov-12 01-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 04-Nov-12 04-Nov-12 Remove Formwork
Fourth Floor 19d 05-Nov-12 26-Nov-12 26-Nov-12, Fourth Floor
Beams and slab 18d 05-Nov-12 25-Nov-12 25-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 05-Nov-12 10-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 11-Nov-12 15-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Nov-12 17-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Nov-12 25-Nov-12 Remove Formwork
Columns 8d 18-Nov-12 26-Nov-12 26-Nov-12, Columns
FW.Col.th Form Work 2d 18-Nov-12 19-Nov-12 Form Work
R.F.T.Col. R.F.T 3d 20-Nov-12 22-Nov-12 R.F.T
Pour.Col.th Pouring Concrete 1d 24-Nov-12 24-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 26-Nov-12 26-Nov-12 Remove Formwork
Roof 17d 27-Nov-12 16-Dec-12 16-Dec-12, Roof
Beams and slab 17d 27-Nov-12 16-Dec-12 16-Dec-12, Beams and slab
FW.B&S.R Form Work 5d 27-Nov-12 02-Dec-12 Form Work
R.F.T.B&S R.F.T 5d 03-Dec-12 08-Dec-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Dec-12 09-Dec-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Dec-12 16-Dec-12 Remove Formwork
Mansonary 109d 11-Aug-12 22-Dec-12 22-Dec-12, Mansonary
Basement 2d 11-Aug-12 12-Aug-12 12-Aug-12, Basement
E.B.M700 External 2d 11-Aug-12 12-Aug-12 External
Ground Floor 4d 17-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
I.G.M700 Internal 4d 17-Sep-12 20-Sep-12 Internal
E.G.M700 External 2d 17-Sep-12 18-Sep-12 External
First Floor 4d 09-Oct-12 13-Oct-12 13-Oct-12, First Floor
I.st .M700 Internal 4d 09-Oct-12 13-Oct-12 Internal
E.st .M700 External 2d 09-Oct-12 10-Oct-12 External
Second Floor 4d 04-Nov-12 07-Nov-12 07-Nov-12, Second Floor
I . nd .M700 Internal 4d 04-Nov-12 07-Nov-12 Internal
E. nd .M700 External 2d 04-Nov-12 05-Nov-12 External

Actual Work Critical Remaining Work Summary Page 26 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

202
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Third Floor 4d 26-Nov-12 29-Nov-12 29-Nov-12, Third Floor
I . rd .M700 Internal 4d 26-Nov-12 29-Nov-12 Internal
E . rd .M700 External 2d 26-Nov-12 27-Nov-12 External
Fourth Floor 4d 17-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
I .th .M700 Internal 4d 17-Dec-12 20-Dec-12 Internal
E. th .M700 External 2d 17-Dec-12 18-Dec-12 External
Roof 1d 22-Dec-12 22-Dec-12 22-Dec-12, Roof
E .R .M700 External 1d 22-Dec-12 22-Dec-12 External
Finishing 85d 19-Sep-12 30-Dec-12 30-Dec-12, Finishing
Ground Floor 2d 19-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
Calm Shell 2d 19-Sep-12 20-Sep-12 20-Sep-12, Calm Shell
E.Ch .G.7 External 2d 19-Sep-12 20-Sep-12 External
External Ele
Electrical 0d
First Floor 2d 11-Oct-12 13-Oct-12 13-Oct-12, First Floor
Calm Shell 2d 11-Oct-12 13-Oct-12 13-Oct-12, Calm Shell
E .ch .st70 External 2d 11-Oct-12 13-Oct-12 External
External Ele
Electrical 0d
Second Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, Second Floor
Calm Shell 2d 06-Nov-12 07-Nov-12 07-Nov-12, Calm Shell
E.ch .nd70 External 2d 06-Nov-12 07-Nov-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Nov-12 29-Nov-12 29-Nov-12, Third Floor
Calm Shell 2d 28-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch. rd700 External 2d 28-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Fourth Floor 2d 19-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
Calm Shell 2d 19-Dec-12 20-Dec-12 20-Dec-12, Calm Shell
E.ch .th700 External 2d 19-Dec-12 20-Dec-12 External
External Ele
Electrical 0d
Roof 1d 23-Dec-12 23-Dec-12 23-Dec-12, Roof
Calm Shell 1d 23-Dec-12 23-Dec-12 23-Dec-12, Calm Shell
E.ch .r700 External 1d 23-Dec-12 23-Dec-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-Dec-12 30-Dec-12 30-Dec-12, Painting Cond.
Ex. Paint700 External Painting 6d 24-Dec-12 30-Dec-12 External Painting
Marbling 5d 24-Dec-12 29-Dec-12 29-Dec-12, Marbling
E.M.F700 Entrance 4d 24-Dec-12 27-Dec-12 Entrance
S.M.F700 Stairs 5d 24-Dec-12 29-Dec-12 Stairs
Condonminium Appartments-23
App 177d 31-May-12 30-Dec-12 30-Dec-12, Condonminium Appartments-23
A4530 start of cond. 0d 31-May-12 start of cond.
A4520 finish of cond. 0d 30-Dec-12 finish of cond.
Mobilization 1d 31-May-12 31-May-12 31-May-12, Mobilization
M.Sur.720 Site Surveying 1d 31-May-12 31-May-12 Site Surveying
Earth Work 47d 02-Jun-12 25-Jul-12 25-Jul-12, Earth Work
Ex.720 Excavation 7d 02-Jun-12 09-Jun-12 Excavation
B.F720 BackFill 2d 24-Jul-12 25-Jul-12 BackFill
Civil Work 157d 10-Jun-12 16-Dec-12 16-Dec-12, Civil Work
Foundation 30d 10-Jun-12 14-Jul-12 14-Jul-12, Foundation
Footing 30d 10-Jun-12 14-Jul-12 14-Jul-12, Footing
Plain Concrete
Con 10d 10-Jun-12 20-Jun-12 20-Jun-12, Plain Concrete
FW.PC Form Work 7d 10-Jun-12 17-Jun-12 Form Work
Pour.Pc Pouring Concrete 1d 18-Jun-12 18-Jun-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 20-Jun-12 20-Jun-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 21-Jun-12 14-Jul-12 14-Jul-12, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 21-Jun-12 30-Jun-12 Form Work
R.F.T.R R.F.T 6d 01-Jul-12 07-Jul-12 R.F.T
Pour.Rc Pouring Concrete 1d 08-Jul-12 08-Jul-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 10-Jul-12 10-Jul-12 Remove Formwork
InsRc& Insulting 3d 11-Jul-12 14-Jul-12 Insulting
Basement 26d 15-Jul-12 13-Aug-12 13-Aug-12, Basement
Slab On Grade
Gra 16d 26-Jul-12 13-Aug-12 13-Aug-12, Slab On Grade
FW.SOG7 Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 01-Aug-12 05-Aug-12 R.F.T
Pour.SOG Pouring Concrete 1d 06-Aug-12 06-Aug-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 13-Aug-12 13-Aug-12 Remove Formwork
Columns 8d 15-Jul-12 23-Jul-12 23-Jul-12, Columns
FW.Col.B7 Form Work 2d 15-Jul-12 16-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 17-Jul-12 19-Jul-12 R.F.T
Pour.Col.B Pouring Concrete 1d 21-Jul-12 21-Jul-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Jul-12 23-Jul-12 Remove Formwork
Ground Floor 24d 26-Jul-12 26-Aug-12 26-Aug-12, Ground Floor
Beam and s
slab 13d 26-Jul-12 09-Aug-12 09-Aug-12, Beam and slab
FW.B&S.G Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 26-Jul-12 31-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 01-Aug-12 01-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 09-Aug-12 09-Aug-12 Remove Formwork

Actual Work Critical Remaining Work Summary Page 27 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

203
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Columns 8d 14-Aug-12 26-Aug-12 26-Aug-12, Columns
FW.Col.G Form Work 2d 14-Aug-12 15-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 16-Aug-12 22-Aug-12 R.F.T
Pour..Col.G Pouring Concrete 1d 23-Aug-12 23-Aug-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Aug-12 26-Aug-12 Remove Formwork
First Floor 19d 27-Aug-12 17-Sep-12 17-Sep-12, First Floor
Beams and slab 18d 27-Aug-12 16-Sep-12 16-Sep-12, Beams and slab
FW.B&S.s Form Work 5d 27-Aug-12 01-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 02-Sep-12 06-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Sep-12 08-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Columns 8d 09-Sep-12 17-Sep-12 17-Sep-12, Columns
FW.Col.st7 Form Work 2d 09-Sep-12 10-Sep-12 Form Work
R.F.T.Col. R.F.T 3d 11-Sep-12 13-Sep-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Sep-12 15-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Sep-12 17-Sep-12 Remove Formwork
Second Floor 19d 18-Sep-12 09-Oct-12 09-Oct-12, Second Floor
Beams and slab 18d 18-Sep-12 08-Oct-12 08-Oct-12, Beams and slab
FW.B&S.n Form Work 5d 18-Sep-12 23-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 24-Sep-12 29-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Sep-12 30-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Columns 8d 01-Oct-12 09-Oct-12 09-Oct-12, Columns
FW.Col.nd Form Work 2d 01-Oct-12 02-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 03-Oct-12 06-Oct-12 R.F.T
Pour.Col.n Pouring Concrete 1d 07-Oct-12 07-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Oct-12 09-Oct-12 Remove Formwork
Third Floor 19d 10-Oct-12 04-Nov-12 04-Nov-12, Third Floor
Beams and slab 18d 10-Oct-12 03-Nov-12 03-Nov-12, Beams and slab
FW.B&S.r Form Work 5d 10-Oct-12 15-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 16-Oct-12 21-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Oct-12 22-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Columns 8d 23-Oct-12 04-Nov-12 04-Nov-12, Columns
FW.Col.rd Form Work 2d 23-Oct-12 24-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 25-Oct-12 31-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Nov-12 01-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 04-Nov-12 04-Nov-12 Remove Formwork
Fourth Floor 19d 05-Nov-12 26-Nov-12 26-Nov-12, Fourth Floor
Beams and slab 18d 05-Nov-12 25-Nov-12 25-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 05-Nov-12 10-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 11-Nov-12 15-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Nov-12 17-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Nov-12 25-Nov-12 Remove Formwork
Columns 8d 18-Nov-12 26-Nov-12 26-Nov-12, Columns
FW.Col.th Form Work 2d 18-Nov-12 19-Nov-12 Form Work
R.F.T.Col. R.F.T 3d 20-Nov-12 22-Nov-12 R.F.T
Pour.Col.th Pouring Concrete 1d 24-Nov-12 24-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 26-Nov-12 26-Nov-12 Remove Formwork
Roof 17d 27-Nov-12 16-Dec-12 16-Dec-12, Roof
Beams and slab 17d 27-Nov-12 16-Dec-12 16-Dec-12, Beams and slab
FW.B&S.R Form Work 5d 27-Nov-12 02-Dec-12 Form Work
R.F.T.B&S R.F.T 5d 03-Dec-12 08-Dec-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Dec-12 09-Dec-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Dec-12 16-Dec-12 Remove Formwork
Mansonary 109d 11-Aug-12 22-Dec-12 22-Dec-12, Mansonary
Basement 2d 11-Aug-12 12-Aug-12 12-Aug-12, Basement
E.B.M720 External 2d 11-Aug-12 12-Aug-12 External
Ground Floor 4d 17-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
I.G.M720 Internal 4d 17-Sep-12 20-Sep-12 Internal
E.G.M720 External 2d 17-Sep-12 18-Sep-12 External
First Floor 4d 09-Oct-12 13-Oct-12 13-Oct-12, First Floor
I.st .M720 Internal 4d 09-Oct-12 13-Oct-12 Internal
E.st .M720 External 2d 09-Oct-12 10-Oct-12 External
Second Floor 4d 04-Nov-12 07-Nov-12 07-Nov-12, Second Floor
I . nd .M720 Internal 4d 04-Nov-12 07-Nov-12 Internal
E. nd .M720 External 2d 04-Nov-12 05-Nov-12 External
Third Floor 4d 26-Nov-12 29-Nov-12 29-Nov-12, Third Floor
I . rd .M720 Internal 4d 26-Nov-12 29-Nov-12 Internal
E . rd .M720 External 2d 26-Nov-12 27-Nov-12 External
Fourth Floor 4d 17-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
I .th .M720 Internal 4d 17-Dec-12 20-Dec-12 Internal
E. th .M720 External 2d 17-Dec-12 18-Dec-12 External
Roof 1d 22-Dec-12 22-Dec-12 22-Dec-12, Roof
E .R .M720 External 1d 22-Dec-12 22-Dec-12 External
Finishing 85d 19-Sep-12 30-Dec-12 30-Dec-12, Finishing

Actual Work Critical Remaining Work Summary Page 28 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

204
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ground Floor 2d 19-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
Calm Shell 2d 19-Sep-12 20-Sep-12 20-Sep-12, Calm Shell
E.Ch .G.7 External 2d 19-Sep-12 20-Sep-12 External
External Ele
Electrical 0d
First Floor 2d 11-Oct-12 13-Oct-12 13-Oct-12, First Floor
Calm Shell 2d 11-Oct-12 13-Oct-12 13-Oct-12, Calm Shell
E .ch .st72 External 2d 11-Oct-12 13-Oct-12 External
External Ele
Electrical 0d
Second Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, Second Floor
Calm Shell 2d 06-Nov-12 07-Nov-12 07-Nov-12, Calm Shell
E.ch .nd72 External 2d 06-Nov-12 07-Nov-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Nov-12 29-Nov-12 29-Nov-12, Third Floor
Calm Shell 2d 28-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch. rd720 External 2d 28-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Fourth Floor 2d 19-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
Calm Shell 2d 19-Dec-12 20-Dec-12 20-Dec-12, Calm Shell
E.ch .th720 External 2d 19-Dec-12 20-Dec-12 External
External Ele
Electrical 0d
Roof 1d 23-Dec-12 23-Dec-12 23-Dec-12, Roof
Calm Shell 1d 23-Dec-12 23-Dec-12 23-Dec-12, Calm Shell
E.ch .r720 External 1d 23-Dec-12 23-Dec-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-Dec-12 30-Dec-12 30-Dec-12, Painting Cond.
Ex. Paint720 External Painting 6d 24-Dec-12 30-Dec-12 External Painting
Marbling 5d 24-Dec-12 29-Dec-12 29-Dec-12, Marbling
E.M.F720 Entrance 4d 24-Dec-12 27-Dec-12 Entrance
S.M.F720 Stairs 5d 24-Dec-12 29-Dec-12 Stairs
Condonminium Appartments-25
App 177d 31-May-12 30-Dec-12 30-Dec-12, Condonminium Appartments-25
A4570 start of cond. 0d 31-May-12 start of cond.
A4560 finish of cond. 0d 30-Dec-12 finish of cond.
Mobilization 1d 31-May-12 31-May-12 31-May-12, Mobilization
M.Sur.740 Site Surveying 1d 31-May-12 31-May-12 Site Surveying
Earth Work 47d 02-Jun-12 25-Jul-12 25-Jul-12, Earth Work
Ex.740 Excavation 7d 02-Jun-12 09-Jun-12 Excavation
B.F740 BackFill 2d 24-Jul-12 25-Jul-12 BackFill
Civil Work 157d 10-Jun-12 16-Dec-12 16-Dec-12, Civil Work
Foundation 30d 10-Jun-12 14-Jul-12 14-Jul-12, Foundation
Footing 30d 10-Jun-12 14-Jul-12 14-Jul-12, Footing
Plain Concrete
Con 10d 10-Jun-12 20-Jun-12 20-Jun-12, Plain Concrete
FW.PC Form Work 7d 10-Jun-12 17-Jun-12 Form Work
Pour.Pc Pouring Concrete 1d 18-Jun-12 18-Jun-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 20-Jun-12 20-Jun-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 21-Jun-12 14-Jul-12 14-Jul-12, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 21-Jun-12 30-Jun-12 Form Work
R.F.T.R R.F.T 6d 01-Jul-12 07-Jul-12 R.F.T
Pour.Rc Pouring Concrete 1d 08-Jul-12 08-Jul-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 10-Jul-12 10-Jul-12 Remove Formwork
InsRc& Insulting 3d 11-Jul-12 14-Jul-12 Insulting
Basement 26d 15-Jul-12 13-Aug-12 13-Aug-12, Basement
Slab On Grade
Gra 16d 26-Jul-12 13-Aug-12 13-Aug-12, Slab On Grade
FW.SOG7 Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 01-Aug-12 05-Aug-12 R.F.T
Pour.SOG Pouring Concrete 1d 06-Aug-12 06-Aug-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 13-Aug-12 13-Aug-12 Remove Formwork
Columns 8d 15-Jul-12 23-Jul-12 23-Jul-12, Columns
FW.Col.B7 Form Work 2d 15-Jul-12 16-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 17-Jul-12 19-Jul-12 R.F.T
Pour.Col.B Pouring Concrete 1d 21-Jul-12 21-Jul-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Jul-12 23-Jul-12 Remove Formwork
Ground Floor 24d 26-Jul-12 26-Aug-12 26-Aug-12, Ground Floor
Beam and s
slab 13d 26-Jul-12 09-Aug-12 09-Aug-12, Beam and slab
FW.B&S.G Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 26-Jul-12 31-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 01-Aug-12 01-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 09-Aug-12 09-Aug-12 Remove Formwork
Columns 8d 14-Aug-12 26-Aug-12 26-Aug-12, Columns
FW.Col.G Form Work 2d 14-Aug-12 15-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 16-Aug-12 22-Aug-12 R.F.T
Pour..Col.G Pouring Concrete 1d 23-Aug-12 23-Aug-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Aug-12 26-Aug-12 Remove Formwork
First Floor 19d 27-Aug-12 17-Sep-12 17-Sep-12, First Floor
Beams and slab 18d 27-Aug-12 16-Sep-12 16-Sep-12, Beams and slab
FW.B&S.s Form Work 5d 27-Aug-12 01-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 02-Sep-12 06-Sep-12 R.F.T

Actual Work Critical Remaining Work Summary Page 29 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

205
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.B&S. Pouring Concrete 1d 08-Sep-12 08-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Columns 8d 09-Sep-12 17-Sep-12 17-Sep-12, Columns
FW.Col.st7 Form Work 2d 09-Sep-12 10-Sep-12 Form Work
R.F.T.Col. R.F.T 3d 11-Sep-12 13-Sep-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Sep-12 15-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Sep-12 17-Sep-12 Remove Formwork
Second Floor 19d 18-Sep-12 09-Oct-12 09-Oct-12, Second Floor
Beams and slab 18d 18-Sep-12 08-Oct-12 08-Oct-12, Beams and slab
FW.B&S.n Form Work 5d 18-Sep-12 23-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 24-Sep-12 29-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Sep-12 30-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Columns 8d 01-Oct-12 09-Oct-12 09-Oct-12, Columns
FW.Col.nd Form Work 2d 01-Oct-12 02-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 03-Oct-12 06-Oct-12 R.F.T
Pour.Col.n Pouring Concrete 1d 07-Oct-12 07-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Oct-12 09-Oct-12 Remove Formwork
Third Floor 19d 10-Oct-12 04-Nov-12 04-Nov-12, Third Floor
Beams and slab 18d 10-Oct-12 03-Nov-12 03-Nov-12, Beams and slab
FW.B&S.r Form Work 5d 10-Oct-12 15-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 16-Oct-12 21-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Oct-12 22-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Columns 8d 23-Oct-12 04-Nov-12 04-Nov-12, Columns
FW.Col.rd Form Work 2d 23-Oct-12 24-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 25-Oct-12 31-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Nov-12 01-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 04-Nov-12 04-Nov-12 Remove Formwork
Fourth Floor 19d 05-Nov-12 26-Nov-12 26-Nov-12, Fourth Floor
Beams and slab 18d 05-Nov-12 25-Nov-12 25-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 05-Nov-12 10-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 11-Nov-12 15-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Nov-12 17-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Nov-12 25-Nov-12 Remove Formwork
Columns 8d 18-Nov-12 26-Nov-12 26-Nov-12, Columns
FW.Col.th Form Work 2d 18-Nov-12 19-Nov-12 Form Work
R.F.T.Col. R.F.T 3d 20-Nov-12 22-Nov-12 R.F.T
Pour.Col.th Pouring Concrete 1d 24-Nov-12 24-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 26-Nov-12 26-Nov-12 Remove Formwork
Roof 17d 27-Nov-12 16-Dec-12 16-Dec-12, Roof
Beams and slab 17d 27-Nov-12 16-Dec-12 16-Dec-12, Beams and slab
FW.B&S.R Form Work 5d 27-Nov-12 02-Dec-12 Form Work
R.F.T.B&S R.F.T 5d 03-Dec-12 08-Dec-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Dec-12 09-Dec-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Dec-12 16-Dec-12 Remove Formwork
Mansonary 109d 11-Aug-12 22-Dec-12 22-Dec-12, Mansonary
Basement 2d 11-Aug-12 12-Aug-12 12-Aug-12, Basement
E.B.M740 External 2d 11-Aug-12 12-Aug-12 External
Ground Floor 4d 17-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
I.G.M740 Internal 4d 17-Sep-12 20-Sep-12 Internal
E.G.M740 External 2d 17-Sep-12 18-Sep-12 External
First Floor 4d 09-Oct-12 13-Oct-12 13-Oct-12, First Floor
I.st .M740 Internal 4d 09-Oct-12 13-Oct-12 Internal
E.st .M740 External 2d 09-Oct-12 10-Oct-12 External
Second Floor 4d 04-Nov-12 07-Nov-12 07-Nov-12, Second Floor
I . nd .M740 Internal 4d 04-Nov-12 07-Nov-12 Internal
E. nd .M740 External 2d 04-Nov-12 05-Nov-12 External
Third Floor 4d 26-Nov-12 29-Nov-12 29-Nov-12, Third Floor
I . rd .M740 Internal 4d 26-Nov-12 29-Nov-12 Internal
E . rd .M740 External 2d 26-Nov-12 27-Nov-12 External
Fourth Floor 4d 17-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
I .th .M740 Internal 4d 17-Dec-12 20-Dec-12 Internal
E. th .M740 External 2d 17-Dec-12 18-Dec-12 External
Roof 1d 22-Dec-12 22-Dec-12 22-Dec-12, Roof
E .R .M740 External 1d 22-Dec-12 22-Dec-12 External
Finishing 85d 19-Sep-12 30-Dec-12 30-Dec-12, Finishing
Ground Floor 2d 19-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
Calm Shell 2d 19-Sep-12 20-Sep-12 20-Sep-12, Calm Shell
E.Ch .G.7 External 2d 19-Sep-12 20-Sep-12 External
External Ele
Electrical 0d
First Floor 2d 11-Oct-12 13-Oct-12 13-Oct-12, First Floor
Calm Shell 2d 11-Oct-12 13-Oct-12 13-Oct-12, Calm Shell
E .ch .st74 External 2d 11-Oct-12 13-Oct-12 External
External Ele
Electrical 0d
Second Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, Second Floor

Actual Work Critical Remaining Work Summary Page 30 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

206
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Calm Shell 2d 06-Nov-12 07-Nov-12 07-Nov-12, Calm Shell
E.ch .nd74 External 2d 06-Nov-12 07-Nov-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Nov-12 29-Nov-12 29-Nov-12, Third Floor
Calm Shell 2d 28-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch. rd740 External 2d 28-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Fourth Floor 2d 19-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
Calm Shell 2d 19-Dec-12 20-Dec-12 20-Dec-12, Calm Shell
E.ch .th740 External 2d 19-Dec-12 20-Dec-12 External
External Ele
Electrical 0d
Roof 1d 23-Dec-12 23-Dec-12 23-Dec-12, Roof
Calm Shell 1d 23-Dec-12 23-Dec-12 23-Dec-12, Calm Shell
E.ch .r740 External 1d 23-Dec-12 23-Dec-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-Dec-12 30-Dec-12 30-Dec-12, Painting Cond.
Ex. Paint740 External Painting 6d 24-Dec-12 30-Dec-12 External Painting
Marbling 5d 24-Dec-12 29-Dec-12 29-Dec-12, Marbling
E.M.F740 Entrance 4d 24-Dec-12 27-Dec-12 Entrance
S.M.F740 Stairs 5d 24-Dec-12 29-Dec-12 Stairs
Condonminium Appartments-33
App 177d 31-May-12 30-Dec-12 30-Dec-12, Condonminium Appartments-33
A4610 start of cond. 0d 31-May-12 start of cond.
A4600 finish of cond. 0d 30-Dec-12 finish of cond.
Mobilization 1d 31-May-12 31-May-12 31-May-12, Mobilization
M.Sur.760 Site Surveying 1d 31-May-12 31-May-12 Site Surveying
Earth Work 47d 02-Jun-12 25-Jul-12 25-Jul-12, Earth Work
Ex.760 Excavation 7d 02-Jun-12 09-Jun-12 Excavation
B.F760 BackFill 2d 24-Jul-12 25-Jul-12 BackFill
Civil Work 157d 10-Jun-12 16-Dec-12 16-Dec-12, Civil Work
Foundation 30d 10-Jun-12 14-Jul-12 14-Jul-12, Foundation
Footing 30d 10-Jun-12 14-Jul-12 14-Jul-12, Footing
Plain Concrete
Con 10d 10-Jun-12 20-Jun-12 20-Jun-12, Plain Concrete
FW.PC Form Work 7d 10-Jun-12 17-Jun-12 Form Work
Pour.Pc Pouring Concrete 1d 18-Jun-12 18-Jun-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 20-Jun-12 20-Jun-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 21-Jun-12 14-Jul-12 14-Jul-12, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 21-Jun-12 30-Jun-12 Form Work
R.F.T.R R.F.T 6d 01-Jul-12 07-Jul-12 R.F.T
Pour.Rc Pouring Concrete 1d 08-Jul-12 08-Jul-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 10-Jul-12 10-Jul-12 Remove Formwork
InsRc& Insulting 3d 11-Jul-12 14-Jul-12 Insulting
Basement 26d 15-Jul-12 13-Aug-12 13-Aug-12, Basement
Slab On Grade
Gra 16d 26-Jul-12 13-Aug-12 13-Aug-12, Slab On Grade
FW.SOG7 Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 01-Aug-12 05-Aug-12 R.F.T
Pour.SOG Pouring Concrete 1d 06-Aug-12 06-Aug-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 13-Aug-12 13-Aug-12 Remove Formwork
Columns 8d 15-Jul-12 23-Jul-12 23-Jul-12, Columns
FW.Col.B7 Form Work 2d 15-Jul-12 16-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 17-Jul-12 19-Jul-12 R.F.T
Pour.Col.B Pouring Concrete 1d 21-Jul-12 21-Jul-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Jul-12 23-Jul-12 Remove Formwork
Ground Floor 24d 26-Jul-12 26-Aug-12 26-Aug-12, Ground Floor
Beam and s
slab 13d 26-Jul-12 09-Aug-12 09-Aug-12, Beam and slab
FW.B&S.G Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 26-Jul-12 31-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 01-Aug-12 01-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 09-Aug-12 09-Aug-12 Remove Formwork
Columns 8d 14-Aug-12 26-Aug-12 26-Aug-12, Columns
FW.Col.G Form Work 2d 14-Aug-12 15-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 16-Aug-12 22-Aug-12 R.F.T
Pour..Col.G Pouring Concrete 1d 23-Aug-12 23-Aug-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Aug-12 26-Aug-12 Remove Formwork
First Floor 19d 27-Aug-12 17-Sep-12 17-Sep-12, First Floor
Beams and slab 18d 27-Aug-12 16-Sep-12 16-Sep-12, Beams and slab
FW.B&S.s Form Work 5d 27-Aug-12 01-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 02-Sep-12 06-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Sep-12 08-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Columns 8d 09-Sep-12 17-Sep-12 17-Sep-12, Columns
FW.Col.st7 Form Work 2d 09-Sep-12 10-Sep-12 Form Work
R.F.T.Col. R.F.T 3d 11-Sep-12 13-Sep-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Sep-12 15-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Sep-12 17-Sep-12 Remove Formwork
Second Floor 19d 18-Sep-12 09-Oct-12 09-Oct-12, Second Floor
Beams and slab 18d 18-Sep-12 08-Oct-12 08-Oct-12, Beams and slab

Actual Work Critical Remaining Work Summary Page 31 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

207
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.B&S.n Form Work 5d 18-Sep-12 23-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 24-Sep-12 29-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Sep-12 30-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Columns 8d 01-Oct-12 09-Oct-12 09-Oct-12, Columns
FW.Col.nd Form Work 2d 01-Oct-12 02-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 03-Oct-12 06-Oct-12 R.F.T
Pour.Col.n Pouring Concrete 1d 07-Oct-12 07-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Oct-12 09-Oct-12 Remove Formwork
Third Floor 19d 10-Oct-12 04-Nov-12 04-Nov-12, Third Floor
Beams and slab 18d 10-Oct-12 03-Nov-12 03-Nov-12, Beams and slab
FW.B&S.r Form Work 5d 10-Oct-12 15-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 16-Oct-12 21-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Oct-12 22-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Columns 8d 23-Oct-12 04-Nov-12 04-Nov-12, Columns
FW.Col.rd Form Work 2d 23-Oct-12 24-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 25-Oct-12 31-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Nov-12 01-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 04-Nov-12 04-Nov-12 Remove Formwork
Fourth Floor 19d 05-Nov-12 26-Nov-12 26-Nov-12, Fourth Floor
Beams and slab 18d 05-Nov-12 25-Nov-12 25-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 05-Nov-12 10-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 11-Nov-12 15-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Nov-12 17-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Nov-12 25-Nov-12 Remove Formwork
Columns 8d 18-Nov-12 26-Nov-12 26-Nov-12, Columns
FW.Col.th Form Work 2d 18-Nov-12 19-Nov-12 Form Work
R.F.T.Col. R.F.T 3d 20-Nov-12 22-Nov-12 R.F.T
Pour.Col.th Pouring Concrete 1d 24-Nov-12 24-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 26-Nov-12 26-Nov-12 Remove Formwork
Roof 17d 27-Nov-12 16-Dec-12 16-Dec-12, Roof
Beams and slab 17d 27-Nov-12 16-Dec-12 16-Dec-12, Beams and slab
FW.B&S.R Form Work 5d 27-Nov-12 02-Dec-12 Form Work
R.F.T.B&S R.F.T 5d 03-Dec-12 08-Dec-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Dec-12 09-Dec-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Dec-12 16-Dec-12 Remove Formwork
Mansonary 109d 11-Aug-12 22-Dec-12 22-Dec-12, Mansonary
Basement 2d 11-Aug-12 12-Aug-12 12-Aug-12, Basement
E.B.M760 External 2d 11-Aug-12 12-Aug-12 External
Ground Floor 4d 17-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
I.G.M760 Internal 4d 17-Sep-12 20-Sep-12 Internal
E.G.M760 External 2d 17-Sep-12 18-Sep-12 External
First Floor 4d 09-Oct-12 13-Oct-12 13-Oct-12, First Floor
I.st .M760 Internal 4d 09-Oct-12 13-Oct-12 Internal
E.st .M760 External 2d 09-Oct-12 10-Oct-12 External
Second Floor 4d 04-Nov-12 07-Nov-12 07-Nov-12, Second Floor
I . nd .M760 Internal 4d 04-Nov-12 07-Nov-12 Internal
E. nd .M760 External 2d 04-Nov-12 05-Nov-12 External
Third Floor 4d 26-Nov-12 29-Nov-12 29-Nov-12, Third Floor
I . rd .M760 Internal 4d 26-Nov-12 29-Nov-12 Internal
E . rd .M760 External 2d 26-Nov-12 27-Nov-12 External
Fourth Floor 4d 17-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
I .th .M760 Internal 4d 17-Dec-12 20-Dec-12 Internal
E. th .M760 External 2d 17-Dec-12 18-Dec-12 External
Roof 1d 22-Dec-12 22-Dec-12 22-Dec-12, Roof
E .R .M760 External 1d 22-Dec-12 22-Dec-12 External
Finishing 85d 19-Sep-12 30-Dec-12 30-Dec-12, Finishing
Ground Floor 2d 19-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
Calm Shell 2d 19-Sep-12 20-Sep-12 20-Sep-12, Calm Shell
E.Ch .G.7 External 2d 19-Sep-12 20-Sep-12 External
External Ele
Electrical 0d
First Floor 2d 11-Oct-12 13-Oct-12 13-Oct-12, First Floor
Calm Shell 2d 11-Oct-12 13-Oct-12 13-Oct-12, Calm Shell
E .ch .st76 External 2d 11-Oct-12 13-Oct-12 External
External Ele
Electrical 0d
Second Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, Second Floor
Calm Shell 2d 06-Nov-12 07-Nov-12 07-Nov-12, Calm Shell
E.ch .nd76 External 2d 06-Nov-12 07-Nov-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Nov-12 29-Nov-12 29-Nov-12, Third Floor
Calm Shell 2d 28-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch. rd760 External 2d 28-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Fourth Floor 2d 19-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
Calm Shell 2d 19-Dec-12 20-Dec-12 20-Dec-12, Calm Shell

Actual Work Critical Remaining Work Summary Page 32 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

208
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.ch .th760 External 2d 19-Dec-12 20-Dec-12 External
External Ele
Electrical 0d
Roof 1d 23-Dec-12 23-Dec-12 23-Dec-12, Roof
Calm Shell 1d 23-Dec-12 23-Dec-12 23-Dec-12, Calm Shell
E.ch .r760 External 1d 23-Dec-12 23-Dec-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-Dec-12 30-Dec-12 30-Dec-12, Painting Cond.
Ex. Paint760 External Painting 6d 24-Dec-12 30-Dec-12 External Painting
Marbling 5d 24-Dec-12 29-Dec-12 29-Dec-12, Marbling
E.M.F760 Entrance 4d 24-Dec-12 27-Dec-12 Entrance
S.M.F760 Stairs 5d 24-Dec-12 29-Dec-12 Stairs
Condonminium Appartments-35
App 177d 31-May-12 30-Dec-12 30-Dec-12, Condonminium Appartments-35
A4650 start of cond. 0d 31-May-12 start of cond.
A4640 finish of cond. 0d 30-Dec-12 finish of cond.
Mobilization 1d 31-May-12 31-May-12 31-May-12, Mobilization
M.Sur.780 Site Surveying 1d 31-May-12 31-May-12 Site Surveying
Earth Work 47d 02-Jun-12 25-Jul-12 25-Jul-12, Earth Work
Ex.780 Excavation 7d 02-Jun-12 09-Jun-12 Excavation
B.F780 BackFill 2d 24-Jul-12 25-Jul-12 BackFill
Civil Work 157d 10-Jun-12 16-Dec-12 16-Dec-12, Civil Work
Foundation 30d 10-Jun-12 14-Jul-12 14-Jul-12, Foundation
Footing 30d 10-Jun-12 14-Jul-12 14-Jul-12, Footing
Plain Concrete
Con 10d 10-Jun-12 20-Jun-12 20-Jun-12, Plain Concrete
FW.PC Form Work 7d 10-Jun-12 17-Jun-12 Form Work
Pour.Pc Pouring Concrete 1d 18-Jun-12 18-Jun-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 20-Jun-12 20-Jun-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 21-Jun-12 14-Jul-12 14-Jul-12, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 21-Jun-12 30-Jun-12 Form Work
R.F.T.R R.F.T 6d 01-Jul-12 07-Jul-12 R.F.T
Pour.Rc Pouring Concrete 1d 08-Jul-12 08-Jul-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 10-Jul-12 10-Jul-12 Remove Formwork
InsRc& Insulting 3d 11-Jul-12 14-Jul-12 Insulting
Basement 26d 15-Jul-12 13-Aug-12 13-Aug-12, Basement
Slab On Grade
Gra 16d 26-Jul-12 13-Aug-12 13-Aug-12, Slab On Grade
FW.SOG7 Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 01-Aug-12 05-Aug-12 R.F.T
Pour.SOG Pouring Concrete 1d 06-Aug-12 06-Aug-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 13-Aug-12 13-Aug-12 Remove Formwork
Columns 8d 15-Jul-12 23-Jul-12 23-Jul-12, Columns
FW.Col.B7 Form Work 2d 15-Jul-12 16-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 17-Jul-12 19-Jul-12 R.F.T
Pour.Col.B Pouring Concrete 1d 21-Jul-12 21-Jul-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Jul-12 23-Jul-12 Remove Formwork
Ground Floor 24d 26-Jul-12 26-Aug-12 26-Aug-12, Ground Floor
Beam and s
slab 13d 26-Jul-12 09-Aug-12 09-Aug-12, Beam and slab
FW.B&S.G Form Work 5d 26-Jul-12 31-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 26-Jul-12 31-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 01-Aug-12 01-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 09-Aug-12 09-Aug-12 Remove Formwork
Columns 8d 14-Aug-12 26-Aug-12 26-Aug-12, Columns
FW.Col.G Form Work 2d 14-Aug-12 15-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 16-Aug-12 22-Aug-12 R.F.T
Pour..Col.G Pouring Concrete 1d 23-Aug-12 23-Aug-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Aug-12 26-Aug-12 Remove Formwork
First Floor 19d 27-Aug-12 17-Sep-12 17-Sep-12, First Floor
Beams and slab 18d 27-Aug-12 16-Sep-12 16-Sep-12, Beams and slab
FW.B&S.s Form Work 5d 27-Aug-12 01-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 02-Sep-12 06-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Sep-12 08-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Columns 8d 09-Sep-12 17-Sep-12 17-Sep-12, Columns
FW.Col.st7 Form Work 2d 09-Sep-12 10-Sep-12 Form Work
R.F.T.Col. R.F.T 3d 11-Sep-12 13-Sep-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Sep-12 15-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Sep-12 17-Sep-12 Remove Formwork
Second Floor 19d 18-Sep-12 09-Oct-12 09-Oct-12, Second Floor
Beams and slab 18d 18-Sep-12 08-Oct-12 08-Oct-12, Beams and slab
FW.B&S.n Form Work 5d 18-Sep-12 23-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 24-Sep-12 29-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Sep-12 30-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Columns 8d 01-Oct-12 09-Oct-12 09-Oct-12, Columns
FW.Col.nd Form Work 2d 01-Oct-12 02-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 03-Oct-12 06-Oct-12 R.F.T
Pour.Col.n Pouring Concrete 1d 07-Oct-12 07-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Oct-12 09-Oct-12 Remove Formwork

Actual Work Critical Remaining Work Summary Page 33 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

209
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Third Floor 19d 10-Oct-12 04-Nov-12 04-Nov-12, Third Floor
Beams and slab 18d 10-Oct-12 03-Nov-12 03-Nov-12, Beams and slab
FW.B&S.r Form Work 5d 10-Oct-12 15-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 16-Oct-12 21-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Oct-12 22-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Columns 8d 23-Oct-12 04-Nov-12 04-Nov-12, Columns
FW.Col.rd Form Work 2d 23-Oct-12 24-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 25-Oct-12 31-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Nov-12 01-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 04-Nov-12 04-Nov-12 Remove Formwork
Fourth Floor 19d 05-Nov-12 26-Nov-12 26-Nov-12, Fourth Floor
Beams and slab 18d 05-Nov-12 25-Nov-12 25-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 05-Nov-12 10-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 11-Nov-12 15-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Nov-12 17-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Nov-12 25-Nov-12 Remove Formwork
Columns 8d 18-Nov-12 26-Nov-12 26-Nov-12, Columns
FW.Col.th Form Work 2d 18-Nov-12 19-Nov-12 Form Work
R.F.T.Col. R.F.T 3d 20-Nov-12 22-Nov-12 R.F.T
Pour.Col.th Pouring Concrete 1d 24-Nov-12 24-Nov-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 26-Nov-12 26-Nov-12 Remove Formwork
Roof 17d 27-Nov-12 16-Dec-12 16-Dec-12, Roof
Beams and slab 17d 27-Nov-12 16-Dec-12 16-Dec-12, Beams and slab
FW.B&S.R Form Work 5d 27-Nov-12 02-Dec-12 Form Work
R.F.T.B&S R.F.T 5d 03-Dec-12 08-Dec-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Dec-12 09-Dec-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Dec-12 16-Dec-12 Remove Formwork
Mansonary 109d 11-Aug-12 22-Dec-12 22-Dec-12, Mansonary
Basement 2d 11-Aug-12 12-Aug-12 12-Aug-12, Basement
E.B.M780 External 2d 11-Aug-12 12-Aug-12 External
Ground Floor 4d 17-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
I.G.M780 Internal 4d 17-Sep-12 20-Sep-12 Internal
E.G.M780 External 2d 17-Sep-12 18-Sep-12 External
First Floor 4d 09-Oct-12 13-Oct-12 13-Oct-12, First Floor
I.st .M780 Internal 4d 09-Oct-12 13-Oct-12 Internal
E.st .M780 External 2d 09-Oct-12 10-Oct-12 External
Second Floor 4d 04-Nov-12 07-Nov-12 07-Nov-12, Second Floor
I . nd .M780 Internal 4d 04-Nov-12 07-Nov-12 Internal
E. nd .M780 External 2d 04-Nov-12 05-Nov-12 External
Third Floor 4d 26-Nov-12 29-Nov-12 29-Nov-12, Third Floor
I . rd .M780 Internal 4d 26-Nov-12 29-Nov-12 Internal
E . rd .M780 External 2d 26-Nov-12 27-Nov-12 External
Fourth Floor 4d 17-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
I .th .M780 Internal 4d 17-Dec-12 20-Dec-12 Internal
E. th .M780 External 2d 17-Dec-12 18-Dec-12 External
Roof 1d 22-Dec-12 22-Dec-12 22-Dec-12, Roof
E .R .M780 External 1d 22-Dec-12 22-Dec-12 External
Finishing 85d 19-Sep-12 30-Dec-12 30-Dec-12, Finishing
Ground Floor 2d 19-Sep-12 20-Sep-12 20-Sep-12, Ground Floor
Calm Shell 2d 19-Sep-12 20-Sep-12 20-Sep-12, Calm Shell
E.Ch .G.7 External 2d 19-Sep-12 20-Sep-12 External
External Ele
Electrical 0d
First Floor 2d 11-Oct-12 13-Oct-12 13-Oct-12, First Floor
Calm Shell 2d 11-Oct-12 13-Oct-12 13-Oct-12, Calm Shell
E .ch .st78 External 2d 11-Oct-12 13-Oct-12 External
External Ele
Electrical 0d
Second Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, Second Floor
Calm Shell 2d 06-Nov-12 07-Nov-12 07-Nov-12, Calm Shell
E.ch .nd78 External 2d 06-Nov-12 07-Nov-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Nov-12 29-Nov-12 29-Nov-12, Third Floor
Calm Shell 2d 28-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch. rd780 External 2d 28-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Fourth Floor 2d 19-Dec-12 20-Dec-12 20-Dec-12, Fourth Floor
Calm Shell 2d 19-Dec-12 20-Dec-12 20-Dec-12, Calm Shell
E.ch .th780 External 2d 19-Dec-12 20-Dec-12 External
External Ele
Electrical 0d
Roof 1d 23-Dec-12 23-Dec-12 23-Dec-12, Roof
Calm Shell 1d 23-Dec-12 23-Dec-12 23-Dec-12, Calm Shell
E.ch .r780 External 1d 23-Dec-12 23-Dec-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-Dec-12 30-Dec-12 30-Dec-12, Painting Cond.
Ex. Paint780 External Painting 6d 24-Dec-12 30-Dec-12 External Painting
Marbling 5d 24-Dec-12 29-Dec-12 29-Dec-12, Marbling

Actual Work Critical Remaining Work Summary Page 34 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

210
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.M.F780 Entrance 4d 24-Dec-12 27-Dec-12 Entrance
S.M.F780 Stairs 5d 24-Dec-12 29-Dec-12 Stairs
stage 3 177d 03-Jul-13 01-Feb-14 01-Feb-14, stage 3
A4860 start of stage 3 0d 03-Jul-13 start of stage 3
A4870 finish of stage 3 0d 01-Feb-14 finish of stage 3
Condonminium Appartments-45
App 177d 03-Jul-13 01-Feb-14 01-Feb-14, Condonminium Appartments-
A4710 start of cond. 0d 03-Jul-13 start of cond.
A4700 finish of cond. 0d 01-Feb-14 finish of cond.
Mobilization 1d 03-Jul-13 03-Jul-13 03-Jul-13, Mobilization
M.Sur.810 Site Surveying 1d 03-Jul-13 03-Jul-13 Site Surveying
Earth Work 47d 04-Jul-13 29-Aug-13 29-Aug-13, Earth Work
Ex.810 Excavation 7d 04-Jul-13 11-Jul-13 Excavation
B.F810 BackFill 2d 28-Aug-13 29-Aug-13 BackFill
Civil Work 157d 13-Jul-13 18-Jan-14 18-Jan-14, Civil Work
Foundation 30d 13-Jul-13 18-Aug-13 18-Aug-13, Foundation
Footing 30d 13-Jul-13 18-Aug-13 18-Aug-13, Footing
Plain Concrete
Con 10d 13-Jul-13 23-Jul-13 23-Jul-13, Plain Concrete
FW.PC Form Work 7d 13-Jul-13 20-Jul-13 Form Work
Pour.Pc Pouring Concrete 1d 21-Jul-13 21-Jul-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Jul-13 23-Jul-13 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 24-Jul-13 18-Aug-13 18-Aug-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 24-Jul-13 01-Aug-13 Form Work
R.F.T.R R.F.T 6d 03-Aug-13 11-Aug-13 R.F.T
Pour.Rc Pouring Concrete 1d 12-Aug-13 12-Aug-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 14-Aug-13 14-Aug-13 Remove Formwork
InsRc& Insulting 3d 15-Aug-13 18-Aug-13 Insulting
Basement 26d 19-Aug-13 17-Sep-13 17-Sep-13, Basement
Slab On Grade
Gra 16d 31-Aug-13 17-Sep-13 17-Sep-13, Slab On Grade
FW.SOG8 Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.SOG R.F.T 4d 05-Sep-13 09-Sep-13 R.F.T
Pour.SOG Pouring Concrete 1d 10-Sep-13 10-Sep-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 17-Sep-13 17-Sep-13 Remove Formwork
Columns 8d 19-Aug-13 27-Aug-13 27-Aug-13, Columns
FW.Col.B8 Form Work 2d 19-Aug-13 20-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 21-Aug-13 24-Aug-13 R.F.T
Pour.Col.B Pouring Concrete 1d 25-Aug-13 25-Aug-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 27-Aug-13 27-Aug-13 Remove Formwork
Ground Floor 24d 31-Aug-13 26-Sep-13 26-Sep-13, Ground Floor
Beam and s
slab 13d 31-Aug-13 14-Sep-13 14-Sep-13, Beam and slab
FW.B&S.G Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 31-Aug-13 04-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Sep-13 05-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 14-Sep-13 14-Sep-13 Remove Formwork
Columns 8d 18-Sep-13 26-Sep-13 26-Sep-13, Columns
FW.Col.G Form Work 2d 18-Sep-13 19-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 21-Sep-13 23-Sep-13 R.F.T
Pour..Col.G Pouring Concrete 1d 24-Sep-13 24-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Sep-13 26-Sep-13 Remove Formwork
First Floor 19d 28-Sep-13 23-Oct-13 23-Oct-13, First Floor
Beams and slab 18d 28-Sep-13 22-Oct-13 22-Oct-13, Beams and slab
FW.B&S.s Form Work 5d 28-Sep-13 02-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 03-Oct-13 09-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 10-Oct-13 10-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Columns 8d 12-Oct-13 23-Oct-13 23-Oct-13, Columns
FW.Col.st8 Form Work 2d 12-Oct-13 13-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 14-Oct-13 20-Oct-13 R.F.T
Pour.Col.s Pouring Concrete 1d 21-Oct-13 21-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Oct-13 23-Oct-13 Remove Formwork
Second Floor 19d 24-Oct-13 14-Nov-13 14-Nov-13, Second Floor
Beams and slab 18d 24-Oct-13 13-Nov-13 13-Nov-13, Beams and slab
FW.B&S.n Form Work 5d 24-Oct-13 29-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 30-Oct-13 04-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Nov-13 05-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Columns 8d 06-Nov-13 14-Nov-13 14-Nov-13, Columns
FW.Col.nd Form Work 2d 06-Nov-13 07-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 09-Nov-13 11-Nov-13 R.F.T
Pour.Col.n Pouring Concrete 1d 12-Nov-13 12-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Nov-13 14-Nov-13 Remove Formwork
Third Floor 19d 16-Nov-13 07-Dec-13 07-Dec-13, Third Floor
Beams and slab 18d 16-Nov-13 05-Dec-13 05-Dec-13, Beams and slab
FW.B&S.r Form Work 5d 16-Nov-13 20-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 21-Nov-13 26-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Nov-13 27-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork

Actual Work Critical Remaining Work Summary Page 35 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

211
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Columns 8d 28-Nov-13 07-Dec-13 07-Dec-13, Columns
FW.Col.rd Form Work 2d 28-Nov-13 30-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 01-Dec-13 03-Dec-13 R.F.T
Pour.col.rd Pouring Concrete 1d 04-Dec-13 04-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-Dec-13 07-Dec-13 Remove Formwork
Fourth Floor 19d 08-Dec-13 29-Dec-13 29-Dec-13, Fourth Floor
Beams and slab 18d 08-Dec-13 28-Dec-13 28-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 08-Dec-13 12-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 14-Dec-13 18-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 19-Dec-13 19-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-Dec-13 28-Dec-13 Remove Formwork
Columns 8d 21-Dec-13 29-Dec-13 29-Dec-13, Columns
FW.Col.th Form Work 2d 21-Dec-13 22-Dec-13 Form Work
R.F.T.Col. R.F.T 3d 23-Dec-13 25-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 26-Dec-13 26-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Dec-13 29-Dec-13 Remove Formwork
Roof 17d 30-Dec-13 18-Jan-14 18-Jan-14, Roof
Beams and slab 17d 30-Dec-13 18-Jan-14 18-Jan-14, Beams and slab
FW.B&S.R Form Work 5d 30-Dec-13 04-Jan-14 Form Work
R.F.T.B&S R.F.T 5d 05-Jan-14 09-Jan-14 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jan-14 11-Jan-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jan-14 18-Jan-14 Remove Formwork
Mansonary 109d 15-Sep-13 23-Jan-14 23-Jan-14, Mansonary
Basement 2d 15-Sep-13 16-Sep-13 16-Sep-13, Basement
E.B.M810 External 2d 15-Sep-13 16-Sep-13 External
Ground Floor 4d 23-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
I.G.M810 Internal 4d 23-Oct-13 27-Oct-13 Internal
E.G.M810 External 2d 23-Oct-13 24-Oct-13 External
First Floor 4d 14-Nov-13 18-Nov-13 18-Nov-13, First Floor
I.st .M810 Internal 4d 14-Nov-13 18-Nov-13 Internal
E.st .M810 External 2d 14-Nov-13 16-Nov-13 External
Second Floor 4d 07-Dec-13 10-Dec-13 10-Dec-13, Second Floor
I . nd .M810 Internal 4d 07-Dec-13 10-Dec-13 Internal
E. nd .M810 External 2d 07-Dec-13 08-Dec-13 External
Third Floor 4d 29-Dec-13 01-Jan-14 01-Jan-14, Third Floor
I . rd .M810 Internal 4d 29-Dec-13 01-Jan-14 Internal
E . rd .M810 External 2d 29-Dec-13 30-Dec-13 External
Fourth Floor 4d 19-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
I .th .M810 Internal 4d 19-Jan-14 22-Jan-14 Internal
E. th .M810 External 2d 19-Jan-14 20-Jan-14 External
Roof 1d 23-Jan-14 23-Jan-14 23-Jan-14, Roof
E .R .M810 External 1d 23-Jan-14 23-Jan-14 External
Finishing 85d 26-Oct-13 01-Feb-14 01-Feb-14, Finishing
Ground Floor 2d 26-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
Calm Shell 2d 26-Oct-13 27-Oct-13 27-Oct-13, Calm Shell
E.Ch .G.8 External 2d 26-Oct-13 27-Oct-13 External
External Ele
Electrical 0d
First Floor 2d 17-Nov-13 18-Nov-13 18-Nov-13, First Floor
Calm Shell 2d 17-Nov-13 18-Nov-13 18-Nov-13, Calm Shell
E .ch .st81 External 2d 17-Nov-13 18-Nov-13 External
External Ele
Electrical 0d
Second Floor 2d 09-Dec-13 10-Dec-13 10-Dec-13, Second Floor
Calm Shell 2d 09-Dec-13 10-Dec-13 10-Dec-13, Calm Shell
E.ch .nd81 External 2d 09-Dec-13 10-Dec-13 External
External Ele
Electrical 0d
Third Floor 2d 31-Dec-13 01-Jan-14 01-Jan-14, Third Floor
Calm Shell 2d 31-Dec-13 01-Jan-14 01-Jan-14, Calm Shell
E.ch. rd810 External 2d 31-Dec-13 01-Jan-14 External
External Ele
Electrical 0d
Fourth Floor 2d 21-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
Calm Shell 2d 21-Jan-14 22-Jan-14 22-Jan-14, Calm Shell
E.ch .th810 External 2d 21-Jan-14 22-Jan-14 External
External Ele
Electrical 0d
Roof 1d 25-Jan-14 25-Jan-14 25-Jan-14, Roof
Calm Shell 1d 25-Jan-14 25-Jan-14 25-Jan-14, Calm Shell
E.ch .r810 External 1d 25-Jan-14 25-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jan-14 01-Feb-14 01-Feb-14, Painting Cond.
Ex. Paint810 External Painting 6d 26-Jan-14 01-Feb-14 External Painting
Marbling 5d 26-Jan-14 30-Jan-14 30-Jan-14, Marbling
E.M.F810 Entrance 4d 26-Jan-14 29-Jan-14 Entrance
S.M.F810 Stairs 5d 26-Jan-14 30-Jan-14 Stairs
Condonminium Appartments-46
App 177d 03-Jul-13 01-Feb-14 01-Feb-14, Condonminium Appartments-
A4730 start of cond. 0d 03-Jul-13 start of cond.
A4720 finish of cond. 0d 01-Feb-14 finish of cond.
Mobilization 1d 03-Jul-13 03-Jul-13 03-Jul-13, Mobilization

Actual Work Critical Remaining Work Summary Page 36 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

212
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
M.Sur.820 Site Surveying 1d 03-Jul-13 03-Jul-13 Site Surveying
Earth Work 47d 04-Jul-13 29-Aug-13 29-Aug-13, Earth Work
Ex.820 Excavation 7d 04-Jul-13 11-Jul-13 Excavation
B.F820 BackFill 2d 28-Aug-13 29-Aug-13 BackFill
Civil Work 157d 13-Jul-13 18-Jan-14 18-Jan-14, Civil Work
Foundation 30d 13-Jul-13 18-Aug-13 18-Aug-13, Foundation
Footing 30d 13-Jul-13 18-Aug-13 18-Aug-13, Footing
Plain Concrete
Con 10d 13-Jul-13 23-Jul-13 23-Jul-13, Plain Concrete
FW.PC Form Work 7d 13-Jul-13 20-Jul-13 Form Work
Pour.Pc Pouring Concrete 1d 21-Jul-13 21-Jul-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Jul-13 23-Jul-13 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 24-Jul-13 18-Aug-13 18-Aug-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 24-Jul-13 01-Aug-13 Form Work
R.F.T.R R.F.T 6d 03-Aug-13 11-Aug-13 R.F.T
Pour.Rc Pouring Concrete 1d 12-Aug-13 12-Aug-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 14-Aug-13 14-Aug-13 Remove Formwork
InsRc& Insulting 3d 15-Aug-13 18-Aug-13 Insulting
Basement 26d 19-Aug-13 17-Sep-13 17-Sep-13, Basement
Slab On Grade
Gra 16d 31-Aug-13 17-Sep-13 17-Sep-13, Slab On Grade
FW.SOG8 Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.SOG R.F.T 4d 05-Sep-13 09-Sep-13 R.F.T
Pour.SOG Pouring Concrete 1d 10-Sep-13 10-Sep-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 17-Sep-13 17-Sep-13 Remove Formwork
Columns 8d 19-Aug-13 27-Aug-13 27-Aug-13, Columns
FW.Col.B8 Form Work 2d 19-Aug-13 20-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 21-Aug-13 24-Aug-13 R.F.T
Pour.Col.B Pouring Concrete 1d 25-Aug-13 25-Aug-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 27-Aug-13 27-Aug-13 Remove Formwork
Ground Floor 24d 31-Aug-13 26-Sep-13 26-Sep-13, Ground Floor
Beam and s
slab 13d 31-Aug-13 14-Sep-13 14-Sep-13, Beam and slab
FW.B&S.G Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 31-Aug-13 04-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Sep-13 05-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 14-Sep-13 14-Sep-13 Remove Formwork
Columns 8d 18-Sep-13 26-Sep-13 26-Sep-13, Columns
FW.Col.G Form Work 2d 18-Sep-13 19-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 21-Sep-13 23-Sep-13 R.F.T
Pour..Col.G Pouring Concrete 1d 24-Sep-13 24-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Sep-13 26-Sep-13 Remove Formwork
First Floor 19d 28-Sep-13 23-Oct-13 23-Oct-13, First Floor
Beams and slab 18d 28-Sep-13 22-Oct-13 22-Oct-13, Beams and slab
FW.B&S.s Form Work 5d 28-Sep-13 02-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 03-Oct-13 09-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 10-Oct-13 10-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Columns 8d 12-Oct-13 23-Oct-13 23-Oct-13, Columns
FW.Col.st8 Form Work 2d 12-Oct-13 13-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 14-Oct-13 20-Oct-13 R.F.T
Pour.Col.s Pouring Concrete 1d 21-Oct-13 21-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Oct-13 23-Oct-13 Remove Formwork
Second Floor 19d 24-Oct-13 14-Nov-13 14-Nov-13, Second Floor
Beams and slab 18d 24-Oct-13 13-Nov-13 13-Nov-13, Beams and slab
FW.B&S.n Form Work 5d 24-Oct-13 29-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 30-Oct-13 04-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Nov-13 05-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Columns 8d 06-Nov-13 14-Nov-13 14-Nov-13, Columns
FW.Col.nd Form Work 2d 06-Nov-13 07-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 09-Nov-13 11-Nov-13 R.F.T
Pour.Col.n Pouring Concrete 1d 12-Nov-13 12-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Nov-13 14-Nov-13 Remove Formwork
Third Floor 19d 16-Nov-13 07-Dec-13 07-Dec-13, Third Floor
Beams and slab 18d 16-Nov-13 05-Dec-13 05-Dec-13, Beams and slab
FW.B&S.r Form Work 5d 16-Nov-13 20-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 21-Nov-13 26-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Nov-13 27-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Columns 8d 28-Nov-13 07-Dec-13 07-Dec-13, Columns
FW.Col.rd Form Work 2d 28-Nov-13 30-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 01-Dec-13 03-Dec-13 R.F.T
Pour.col.rd Pouring Concrete 1d 04-Dec-13 04-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-Dec-13 07-Dec-13 Remove Formwork
Fourth Floor 19d 08-Dec-13 29-Dec-13 29-Dec-13, Fourth Floor
Beams and slab 18d 08-Dec-13 28-Dec-13 28-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 08-Dec-13 12-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 14-Dec-13 18-Dec-13 R.F.T

Actual Work Critical Remaining Work Summary Page 37 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

213
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.B&S. Pouring Concrete 1d 19-Dec-13 19-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-Dec-13 28-Dec-13 Remove Formwork
Columns 8d 21-Dec-13 29-Dec-13 29-Dec-13, Columns
FW.Col.th Form Work 2d 21-Dec-13 22-Dec-13 Form Work
R.F.T.Col. R.F.T 3d 23-Dec-13 25-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 26-Dec-13 26-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Dec-13 29-Dec-13 Remove Formwork
Roof 17d 30-Dec-13 18-Jan-14 18-Jan-14, Roof
Beams and slab 17d 30-Dec-13 18-Jan-14 18-Jan-14, Beams and slab
FW.B&S.R Form Work 5d 30-Dec-13 04-Jan-14 Form Work
R.F.T.B&S R.F.T 5d 05-Jan-14 09-Jan-14 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jan-14 11-Jan-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jan-14 18-Jan-14 Remove Formwork
Mansonary 109d 15-Sep-13 23-Jan-14 23-Jan-14, Mansonary
Basement 2d 15-Sep-13 16-Sep-13 16-Sep-13, Basement
E.B.M820 External 2d 15-Sep-13 16-Sep-13 External
Ground Floor 4d 23-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
I.G.M820 Internal 4d 23-Oct-13 27-Oct-13 Internal
E.G.M820 External 2d 23-Oct-13 24-Oct-13 External
First Floor 4d 14-Nov-13 18-Nov-13 18-Nov-13, First Floor
I.st .M820 Internal 4d 14-Nov-13 18-Nov-13 Internal
E.st .M820 External 2d 14-Nov-13 16-Nov-13 External
Second Floor 4d 07-Dec-13 10-Dec-13 10-Dec-13, Second Floor
I . nd .M820 Internal 4d 07-Dec-13 10-Dec-13 Internal
E. nd .M820 External 2d 07-Dec-13 08-Dec-13 External
Third Floor 4d 29-Dec-13 01-Jan-14 01-Jan-14, Third Floor
I . rd .M820 Internal 4d 29-Dec-13 01-Jan-14 Internal
E . rd .M820 External 2d 29-Dec-13 30-Dec-13 External
Fourth Floor 4d 19-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
I .th .M820 Internal 4d 19-Jan-14 22-Jan-14 Internal
E. th .M820 External 2d 19-Jan-14 20-Jan-14 External
Roof 1d 23-Jan-14 23-Jan-14 23-Jan-14, Roof
E .R .M820 External 1d 23-Jan-14 23-Jan-14 External
Finishing 85d 26-Oct-13 01-Feb-14 01-Feb-14, Finishing
Ground Floor 2d 26-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
Calm Shell 2d 26-Oct-13 27-Oct-13 27-Oct-13, Calm Shell
E.Ch .G.8 External 2d 26-Oct-13 27-Oct-13 External
External Ele
Electrical 0d
First Floor 2d 17-Nov-13 18-Nov-13 18-Nov-13, First Floor
Calm Shell 2d 17-Nov-13 18-Nov-13 18-Nov-13, Calm Shell
E .ch .st82 External 2d 17-Nov-13 18-Nov-13 External
External Ele
Electrical 0d
Second Floor 2d 09-Dec-13 10-Dec-13 10-Dec-13, Second Floor
Calm Shell 2d 09-Dec-13 10-Dec-13 10-Dec-13, Calm Shell
E.ch .nd82 External 2d 09-Dec-13 10-Dec-13 External
External Ele
Electrical 0d
Third Floor 2d 31-Dec-13 01-Jan-14 01-Jan-14, Third Floor
Calm Shell 2d 31-Dec-13 01-Jan-14 01-Jan-14, Calm Shell
E.ch. rd820 External 2d 31-Dec-13 01-Jan-14 External
External Ele
Electrical 0d
Fourth Floor 2d 21-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
Calm Shell 2d 21-Jan-14 22-Jan-14 22-Jan-14, Calm Shell
E.ch .th820 External 2d 21-Jan-14 22-Jan-14 External
External Ele
Electrical 0d
Roof 1d 25-Jan-14 25-Jan-14 25-Jan-14, Roof
Calm Shell 1d 25-Jan-14 25-Jan-14 25-Jan-14, Calm Shell
E.ch .r820 External 1d 25-Jan-14 25-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jan-14 01-Feb-14 01-Feb-14, Painting Cond.
Ex. Paint820 External Painting 6d 26-Jan-14 01-Feb-14 External Painting
Marbling 5d 26-Jan-14 30-Jan-14 30-Jan-14, Marbling
E.M.F820 Entrance 4d 26-Jan-14 29-Jan-14 Entrance
S.M.F820 Stairs 5d 26-Jan-14 30-Jan-14 Stairs
Condonminium Appartments-47
App 177d 03-Jul-13 01-Feb-14 01-Feb-14, Condonminium Appartments-
A4750 start of cond. 0d 03-Jul-13 start of cond.
A4740 finish of cond. 0d 01-Feb-14 finish of cond.
Mobilization 1d 03-Jul-13 03-Jul-13 03-Jul-13, Mobilization
M.Sur.830 Site Surveying 1d 03-Jul-13 03-Jul-13 Site Surveying
Earth Work 47d 04-Jul-13 29-Aug-13 29-Aug-13, Earth Work
Ex.830 Excavation 7d 04-Jul-13 11-Jul-13 Excavation
B.F830 BackFill 2d 28-Aug-13 29-Aug-13 BackFill
Civil Work 157d 13-Jul-13 18-Jan-14 18-Jan-14, Civil Work
Foundation 30d 13-Jul-13 18-Aug-13 18-Aug-13, Foundation
Footing 30d 13-Jul-13 18-Aug-13 18-Aug-13, Footing
Plain Concrete
Con 10d 13-Jul-13 23-Jul-13 23-Jul-13, Plain Concrete
FW.PC Form Work 7d 13-Jul-13 20-Jul-13 Form Work

Actual Work Critical Remaining Work Summary Page 38 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

214
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.Pc Pouring Concrete 1d 21-Jul-13 21-Jul-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Jul-13 23-Jul-13 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 24-Jul-13 18-Aug-13 18-Aug-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 24-Jul-13 01-Aug-13 Form Work
R.F.T.R R.F.T 6d 03-Aug-13 11-Aug-13 R.F.T
Pour.Rc Pouring Concrete 1d 12-Aug-13 12-Aug-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 14-Aug-13 14-Aug-13 Remove Formwork
InsRc& Insulting 3d 15-Aug-13 18-Aug-13 Insulting
Basement 26d 19-Aug-13 17-Sep-13 17-Sep-13, Basement
Slab On Grade
Gra 16d 31-Aug-13 17-Sep-13 17-Sep-13, Slab On Grade
FW.SOG8 Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.SOG R.F.T 4d 05-Sep-13 09-Sep-13 R.F.T
Pour.SOG Pouring Concrete 1d 10-Sep-13 10-Sep-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 17-Sep-13 17-Sep-13 Remove Formwork
Columns 8d 19-Aug-13 27-Aug-13 27-Aug-13, Columns
FW.Col.B8 Form Work 2d 19-Aug-13 20-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 21-Aug-13 24-Aug-13 R.F.T
Pour.Col.B Pouring Concrete 1d 25-Aug-13 25-Aug-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 27-Aug-13 27-Aug-13 Remove Formwork
Ground Floor 24d 31-Aug-13 26-Sep-13 26-Sep-13, Ground Floor
Beam and s
slab 13d 31-Aug-13 14-Sep-13 14-Sep-13, Beam and slab
FW.B&S.G Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 31-Aug-13 04-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Sep-13 05-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 14-Sep-13 14-Sep-13 Remove Formwork
Columns 8d 18-Sep-13 26-Sep-13 26-Sep-13, Columns
FW.Col.G Form Work 2d 18-Sep-13 19-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 21-Sep-13 23-Sep-13 R.F.T
Pour..Col.G Pouring Concrete 1d 24-Sep-13 24-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Sep-13 26-Sep-13 Remove Formwork
First Floor 19d 28-Sep-13 23-Oct-13 23-Oct-13, First Floor
Beams and slab 18d 28-Sep-13 22-Oct-13 22-Oct-13, Beams and slab
FW.B&S.s Form Work 5d 28-Sep-13 02-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 03-Oct-13 09-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 10-Oct-13 10-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Columns 8d 12-Oct-13 23-Oct-13 23-Oct-13, Columns
FW.Col.st8 Form Work 2d 12-Oct-13 13-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 14-Oct-13 20-Oct-13 R.F.T
Pour.Col.s Pouring Concrete 1d 21-Oct-13 21-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Oct-13 23-Oct-13 Remove Formwork
Second Floor 19d 24-Oct-13 14-Nov-13 14-Nov-13, Second Floor
Beams and slab 18d 24-Oct-13 13-Nov-13 13-Nov-13, Beams and slab
FW.B&S.n Form Work 5d 24-Oct-13 29-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 30-Oct-13 04-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Nov-13 05-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Columns 8d 06-Nov-13 14-Nov-13 14-Nov-13, Columns
FW.Col.nd Form Work 2d 06-Nov-13 07-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 09-Nov-13 11-Nov-13 R.F.T
Pour.Col.n Pouring Concrete 1d 12-Nov-13 12-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Nov-13 14-Nov-13 Remove Formwork
Third Floor 19d 16-Nov-13 07-Dec-13 07-Dec-13, Third Floor
Beams and slab 18d 16-Nov-13 05-Dec-13 05-Dec-13, Beams and slab
FW.B&S.r Form Work 5d 16-Nov-13 20-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 21-Nov-13 26-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Nov-13 27-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Columns 8d 28-Nov-13 07-Dec-13 07-Dec-13, Columns
FW.Col.rd Form Work 2d 28-Nov-13 30-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 01-Dec-13 03-Dec-13 R.F.T
Pour.col.rd Pouring Concrete 1d 04-Dec-13 04-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-Dec-13 07-Dec-13 Remove Formwork
Fourth Floor 19d 08-Dec-13 29-Dec-13 29-Dec-13, Fourth Floor
Beams and slab 18d 08-Dec-13 28-Dec-13 28-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 08-Dec-13 12-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 14-Dec-13 18-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 19-Dec-13 19-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-Dec-13 28-Dec-13 Remove Formwork
Columns 8d 21-Dec-13 29-Dec-13 29-Dec-13, Columns
FW.Col.th Form Work 2d 21-Dec-13 22-Dec-13 Form Work
R.F.T.Col. R.F.T 3d 23-Dec-13 25-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 26-Dec-13 26-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Dec-13 29-Dec-13 Remove Formwork
Roof 17d 30-Dec-13 18-Jan-14 18-Jan-14, Roof
Beams and slab 17d 30-Dec-13 18-Jan-14 18-Jan-14, Beams and slab

Actual Work Critical Remaining Work Summary Page 39 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

215
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.B&S.R Form Work 5d 30-Dec-13 04-Jan-14 Form Work
R.F.T.B&S R.F.T 5d 05-Jan-14 09-Jan-14 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jan-14 11-Jan-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jan-14 18-Jan-14 Remove Formwork
Mansonary 109d 15-Sep-13 23-Jan-14 23-Jan-14, Mansonary
Basement 2d 15-Sep-13 16-Sep-13 16-Sep-13, Basement
E.B.M830 External 2d 15-Sep-13 16-Sep-13 External
Ground Floor 4d 23-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
I.G.M830 Internal 4d 23-Oct-13 27-Oct-13 Internal
E.G.M830 External 2d 23-Oct-13 24-Oct-13 External
First Floor 4d 14-Nov-13 18-Nov-13 18-Nov-13, First Floor
I.st .M830 Internal 4d 14-Nov-13 18-Nov-13 Internal
E.st .M830 External 2d 14-Nov-13 16-Nov-13 External
Second Floor 4d 07-Dec-13 10-Dec-13 10-Dec-13, Second Floor
I . nd .M830 Internal 4d 07-Dec-13 10-Dec-13 Internal
E. nd .M830 External 2d 07-Dec-13 08-Dec-13 External
Third Floor 4d 29-Dec-13 01-Jan-14 01-Jan-14, Third Floor
I . rd .M830 Internal 4d 29-Dec-13 01-Jan-14 Internal
E . rd .M830 External 2d 29-Dec-13 30-Dec-13 External
Fourth Floor 4d 19-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
I .th .M830 Internal 4d 19-Jan-14 22-Jan-14 Internal
E. th .M830 External 2d 19-Jan-14 20-Jan-14 External
Roof 1d 23-Jan-14 23-Jan-14 23-Jan-14, Roof
E .R .M830 External 1d 23-Jan-14 23-Jan-14 External
Finishing 85d 26-Oct-13 01-Feb-14 01-Feb-14, Finishing
Ground Floor 2d 26-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
Calm Shell 2d 26-Oct-13 27-Oct-13 27-Oct-13, Calm Shell
E.Ch .G.8 External 2d 26-Oct-13 27-Oct-13 External
External Ele
Electrical 0d
First Floor 2d 17-Nov-13 18-Nov-13 18-Nov-13, First Floor
Calm Shell 2d 17-Nov-13 18-Nov-13 18-Nov-13, Calm Shell
E .ch .st83 External 2d 17-Nov-13 18-Nov-13 External
External Ele
Electrical 0d
Second Floor 2d 09-Dec-13 10-Dec-13 10-Dec-13, Second Floor
Calm Shell 2d 09-Dec-13 10-Dec-13 10-Dec-13, Calm Shell
E.ch .nd83 External 2d 09-Dec-13 10-Dec-13 External
External Ele
Electrical 0d
Third Floor 2d 31-Dec-13 01-Jan-14 01-Jan-14, Third Floor
Calm Shell 2d 31-Dec-13 01-Jan-14 01-Jan-14, Calm Shell
E.ch. rd830 External 2d 31-Dec-13 01-Jan-14 External
External Ele
Electrical 0d
Fourth Floor 2d 21-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
Calm Shell 2d 21-Jan-14 22-Jan-14 22-Jan-14, Calm Shell
E.ch .th830 External 2d 21-Jan-14 22-Jan-14 External
External Ele
Electrical 0d
Roof 1d 25-Jan-14 25-Jan-14 25-Jan-14, Roof
Calm Shell 1d 25-Jan-14 25-Jan-14 25-Jan-14, Calm Shell
E.ch .r830 External 1d 25-Jan-14 25-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jan-14 01-Feb-14 01-Feb-14, Painting Cond.
Ex. Paint830 External Painting 6d 26-Jan-14 01-Feb-14 External Painting
Marbling 5d 26-Jan-14 30-Jan-14 30-Jan-14, Marbling
E.M.F830 Entrance 4d 26-Jan-14 29-Jan-14 Entrance
S.M.F830 Stairs 5d 26-Jan-14 30-Jan-14 Stairs
Condonminium Appartments-54
App 177d 03-Jul-13 01-Feb-14 01-Feb-14, Condonminium Appartments-
A4770 start of cond. 0d 03-Jul-13 start of cond.
A4760 finish of cond. 0d 01-Feb-14 finish of cond.
Mobilization 1d 03-Jul-13 03-Jul-13 03-Jul-13, Mobilization
M.Sur.840 Site Surveying 1d 03-Jul-13 03-Jul-13 Site Surveying
Earth Work 47d 04-Jul-13 29-Aug-13 29-Aug-13, Earth Work
Ex.840 Excavation 7d 04-Jul-13 11-Jul-13 Excavation
B.F840 BackFill 2d 28-Aug-13 29-Aug-13 BackFill
Civil Work 157d 13-Jul-13 18-Jan-14 18-Jan-14, Civil Work
Foundation 30d 13-Jul-13 18-Aug-13 18-Aug-13, Foundation
Footing 30d 13-Jul-13 18-Aug-13 18-Aug-13, Footing
Plain Concrete
Con 10d 13-Jul-13 23-Jul-13 23-Jul-13, Plain Concrete
FW.PC Form Work 7d 13-Jul-13 20-Jul-13 Form Work
Pour.Pc Pouring Concrete 1d 21-Jul-13 21-Jul-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Jul-13 23-Jul-13 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 24-Jul-13 18-Aug-13 18-Aug-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 24-Jul-13 01-Aug-13 Form Work
R.F.T.R R.F.T 6d 03-Aug-13 11-Aug-13 R.F.T
Pour.Rc Pouring Concrete 1d 12-Aug-13 12-Aug-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 14-Aug-13 14-Aug-13 Remove Formwork
InsRc& Insulting 3d 15-Aug-13 18-Aug-13 Insulting
Basement 26d 19-Aug-13 17-Sep-13 17-Sep-13, Basement

Actual Work Critical Remaining Work Summary Page 40 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

216
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Slab On Grade
Gra 16d 31-Aug-13 17-Sep-13 17-Sep-13, Slab On Grade
FW.SOG8 Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.SOG R.F.T 4d 05-Sep-13 09-Sep-13 R.F.T
Pour.SOG Pouring Concrete 1d 10-Sep-13 10-Sep-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 17-Sep-13 17-Sep-13 Remove Formwork
Columns 8d 19-Aug-13 27-Aug-13 27-Aug-13, Columns
FW.Col.B8 Form Work 2d 19-Aug-13 20-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 21-Aug-13 24-Aug-13 R.F.T
Pour.Col.B Pouring Concrete 1d 25-Aug-13 25-Aug-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 27-Aug-13 27-Aug-13 Remove Formwork
Ground Floor 24d 31-Aug-13 26-Sep-13 26-Sep-13, Ground Floor
Beam and s
slab 13d 31-Aug-13 14-Sep-13 14-Sep-13, Beam and slab
FW.B&S.G Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 31-Aug-13 04-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Sep-13 05-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 14-Sep-13 14-Sep-13 Remove Formwork
Columns 8d 18-Sep-13 26-Sep-13 26-Sep-13, Columns
FW.Col.G Form Work 2d 18-Sep-13 19-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 21-Sep-13 23-Sep-13 R.F.T
Pour..Col.G Pouring Concrete 1d 24-Sep-13 24-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Sep-13 26-Sep-13 Remove Formwork
First Floor 19d 28-Sep-13 23-Oct-13 23-Oct-13, First Floor
Beams and slab 18d 28-Sep-13 22-Oct-13 22-Oct-13, Beams and slab
FW.B&S.s Form Work 5d 28-Sep-13 02-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 03-Oct-13 09-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 10-Oct-13 10-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Columns 8d 12-Oct-13 23-Oct-13 23-Oct-13, Columns
FW.Col.st8 Form Work 2d 12-Oct-13 13-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 14-Oct-13 20-Oct-13 R.F.T
Pour.Col.s Pouring Concrete 1d 21-Oct-13 21-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Oct-13 23-Oct-13 Remove Formwork
Second Floor 19d 24-Oct-13 14-Nov-13 14-Nov-13, Second Floor
Beams and slab 18d 24-Oct-13 13-Nov-13 13-Nov-13, Beams and slab
FW.B&S.n Form Work 5d 24-Oct-13 29-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 30-Oct-13 04-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Nov-13 05-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Columns 8d 06-Nov-13 14-Nov-13 14-Nov-13, Columns
FW.Col.nd Form Work 2d 06-Nov-13 07-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 09-Nov-13 11-Nov-13 R.F.T
Pour.Col.n Pouring Concrete 1d 12-Nov-13 12-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Nov-13 14-Nov-13 Remove Formwork
Third Floor 19d 16-Nov-13 07-Dec-13 07-Dec-13, Third Floor
Beams and slab 18d 16-Nov-13 05-Dec-13 05-Dec-13, Beams and slab
FW.B&S.r Form Work 5d 16-Nov-13 20-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 21-Nov-13 26-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Nov-13 27-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Columns 8d 28-Nov-13 07-Dec-13 07-Dec-13, Columns
FW.Col.rd Form Work 2d 28-Nov-13 30-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 01-Dec-13 03-Dec-13 R.F.T
Pour.col.rd Pouring Concrete 1d 04-Dec-13 04-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-Dec-13 07-Dec-13 Remove Formwork
Fourth Floor 19d 08-Dec-13 29-Dec-13 29-Dec-13, Fourth Floor
Beams and slab 18d 08-Dec-13 28-Dec-13 28-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 08-Dec-13 12-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 14-Dec-13 18-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 19-Dec-13 19-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-Dec-13 28-Dec-13 Remove Formwork
Columns 8d 21-Dec-13 29-Dec-13 29-Dec-13, Columns
FW.Col.th Form Work 2d 21-Dec-13 22-Dec-13 Form Work
R.F.T.Col. R.F.T 3d 23-Dec-13 25-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 26-Dec-13 26-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Dec-13 29-Dec-13 Remove Formwork
Roof 17d 30-Dec-13 18-Jan-14 18-Jan-14, Roof
Beams and slab 17d 30-Dec-13 18-Jan-14 18-Jan-14, Beams and slab
FW.B&S.R Form Work 5d 30-Dec-13 04-Jan-14 Form Work
R.F.T.B&S R.F.T 5d 05-Jan-14 09-Jan-14 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jan-14 11-Jan-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jan-14 18-Jan-14 Remove Formwork
Mansonary 109d 15-Sep-13 23-Jan-14 23-Jan-14, Mansonary
Basement 2d 15-Sep-13 16-Sep-13 16-Sep-13, Basement
E.B.M840 External 2d 15-Sep-13 16-Sep-13 External
Ground Floor 4d 23-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
I.G.M840 Internal 4d 23-Oct-13 27-Oct-13 Internal

Actual Work Critical Remaining Work Summary Page 41 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

217
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.G.M840 External 2d 23-Oct-13 24-Oct-13 External
First Floor 4d 14-Nov-13 18-Nov-13 18-Nov-13, First Floor
I.st .M840 Internal 4d 14-Nov-13 18-Nov-13 Internal
E.st .M840 External 2d 14-Nov-13 16-Nov-13 External
Second Floor 4d 07-Dec-13 10-Dec-13 10-Dec-13, Second Floor
I . nd .M840 Internal 4d 07-Dec-13 10-Dec-13 Internal
E. nd .M840 External 2d 07-Dec-13 08-Dec-13 External
Third Floor 4d 29-Dec-13 01-Jan-14 01-Jan-14, Third Floor
I . rd .M840 Internal 4d 29-Dec-13 01-Jan-14 Internal
E . rd .M840 External 2d 29-Dec-13 30-Dec-13 External
Fourth Floor 4d 19-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
I .th .M840 Internal 4d 19-Jan-14 22-Jan-14 Internal
E. th .M840 External 2d 19-Jan-14 20-Jan-14 External
Roof 1d 23-Jan-14 23-Jan-14 23-Jan-14, Roof
E .R .M840 External 1d 23-Jan-14 23-Jan-14 External
Finishing 85d 26-Oct-13 01-Feb-14 01-Feb-14, Finishing
Ground Floor 2d 26-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
Calm Shell 2d 26-Oct-13 27-Oct-13 27-Oct-13, Calm Shell
E.Ch .G.8 External 2d 26-Oct-13 27-Oct-13 External
External Ele
Electrical 0d
First Floor 2d 17-Nov-13 18-Nov-13 18-Nov-13, First Floor
Calm Shell 2d 17-Nov-13 18-Nov-13 18-Nov-13, Calm Shell
E .ch .st84 External 2d 17-Nov-13 18-Nov-13 External
External Ele
Electrical 0d
Second Floor 2d 09-Dec-13 10-Dec-13 10-Dec-13, Second Floor
Calm Shell 2d 09-Dec-13 10-Dec-13 10-Dec-13, Calm Shell
E.ch .nd84 External 2d 09-Dec-13 10-Dec-13 External
External Ele
Electrical 0d
Third Floor 2d 31-Dec-13 01-Jan-14 01-Jan-14, Third Floor
Calm Shell 2d 31-Dec-13 01-Jan-14 01-Jan-14, Calm Shell
E.ch. rd840 External 2d 31-Dec-13 01-Jan-14 External
External Ele
Electrical 0d
Fourth Floor 2d 21-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
Calm Shell 2d 21-Jan-14 22-Jan-14 22-Jan-14, Calm Shell
E.ch .th840 External 2d 21-Jan-14 22-Jan-14 External
External Ele
Electrical 0d
Roof 1d 25-Jan-14 25-Jan-14 25-Jan-14, Roof
Calm Shell 1d 25-Jan-14 25-Jan-14 25-Jan-14, Calm Shell
E.ch .r840 External 1d 25-Jan-14 25-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jan-14 01-Feb-14 01-Feb-14, Painting Cond.
Ex. Paint840 External Painting 6d 26-Jan-14 01-Feb-14 External Painting
Marbling 5d 26-Jan-14 30-Jan-14 30-Jan-14, Marbling
E.M.F840 Entrance 4d 26-Jan-14 29-Jan-14 Entrance
S.M.F840 Stairs 5d 26-Jan-14 30-Jan-14 Stairs
Condonminium Appartments-55
App 177d 03-Jul-13 01-Feb-14 01-Feb-14, Condonminium Appartments-
A4790 start of cond. 0d 03-Jul-13 start of cond.
A4780 finish of cond. 0d 01-Feb-14 finish of cond.
Mobilization 1d 03-Jul-13 03-Jul-13 03-Jul-13, Mobilization
M.Sur.850 Site Surveying 1d 03-Jul-13 03-Jul-13 Site Surveying
Earth Work 47d 04-Jul-13 29-Aug-13 29-Aug-13, Earth Work
Ex.850 Excavation 7d 04-Jul-13 11-Jul-13 Excavation
B.F850 BackFill 2d 28-Aug-13 29-Aug-13 BackFill
Civil Work 157d 13-Jul-13 18-Jan-14 18-Jan-14, Civil Work
Foundation 30d 13-Jul-13 18-Aug-13 18-Aug-13, Foundation
Footing 30d 13-Jul-13 18-Aug-13 18-Aug-13, Footing
Plain Concrete
Con 10d 13-Jul-13 23-Jul-13 23-Jul-13, Plain Concrete
FW.PC Form Work 7d 13-Jul-13 20-Jul-13 Form Work
Pour.Pc Pouring Concrete 1d 21-Jul-13 21-Jul-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Jul-13 23-Jul-13 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 24-Jul-13 18-Aug-13 18-Aug-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 24-Jul-13 01-Aug-13 Form Work
R.F.T.R R.F.T 6d 03-Aug-13 11-Aug-13 R.F.T
Pour.Rc Pouring Concrete 1d 12-Aug-13 12-Aug-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 14-Aug-13 14-Aug-13 Remove Formwork
InsRc& Insulting 3d 15-Aug-13 18-Aug-13 Insulting
Basement 26d 19-Aug-13 17-Sep-13 17-Sep-13, Basement
Slab On Grade
Gra 16d 31-Aug-13 17-Sep-13 17-Sep-13, Slab On Grade
FW.SOG8 Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.SOG R.F.T 4d 05-Sep-13 09-Sep-13 R.F.T
Pour.SOG Pouring Concrete 1d 10-Sep-13 10-Sep-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 17-Sep-13 17-Sep-13 Remove Formwork
Columns 8d 19-Aug-13 27-Aug-13 27-Aug-13, Columns
FW.Col.B8 Form Work 2d 19-Aug-13 20-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 21-Aug-13 24-Aug-13 R.F.T
Pour.Col.B Pouring Concrete 1d 25-Aug-13 25-Aug-13 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 42 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

218
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.Col. Remove Formwork 1d 27-Aug-13 27-Aug-13 Remove Formwork
Ground Floor 24d 31-Aug-13 26-Sep-13 26-Sep-13, Ground Floor
Beam and s
slab 13d 31-Aug-13 14-Sep-13 14-Sep-13, Beam and slab
FW.B&S.G Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 31-Aug-13 04-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Sep-13 05-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 14-Sep-13 14-Sep-13 Remove Formwork
Columns 8d 18-Sep-13 26-Sep-13 26-Sep-13, Columns
FW.Col.G Form Work 2d 18-Sep-13 19-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 21-Sep-13 23-Sep-13 R.F.T
Pour..Col.G Pouring Concrete 1d 24-Sep-13 24-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Sep-13 26-Sep-13 Remove Formwork
First Floor 19d 28-Sep-13 23-Oct-13 23-Oct-13, First Floor
Beams and slab 18d 28-Sep-13 22-Oct-13 22-Oct-13, Beams and slab
FW.B&S.s Form Work 5d 28-Sep-13 02-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 03-Oct-13 09-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 10-Oct-13 10-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Columns 8d 12-Oct-13 23-Oct-13 23-Oct-13, Columns
FW.Col.st8 Form Work 2d 12-Oct-13 13-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 14-Oct-13 20-Oct-13 R.F.T
Pour.Col.s Pouring Concrete 1d 21-Oct-13 21-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Oct-13 23-Oct-13 Remove Formwork
Second Floor 19d 24-Oct-13 14-Nov-13 14-Nov-13, Second Floor
Beams and slab 18d 24-Oct-13 13-Nov-13 13-Nov-13, Beams and slab
FW.B&S.n Form Work 5d 24-Oct-13 29-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 30-Oct-13 04-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Nov-13 05-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Columns 8d 06-Nov-13 14-Nov-13 14-Nov-13, Columns
FW.Col.nd Form Work 2d 06-Nov-13 07-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 09-Nov-13 11-Nov-13 R.F.T
Pour.Col.n Pouring Concrete 1d 12-Nov-13 12-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Nov-13 14-Nov-13 Remove Formwork
Third Floor 19d 16-Nov-13 07-Dec-13 07-Dec-13, Third Floor
Beams and slab 18d 16-Nov-13 05-Dec-13 05-Dec-13, Beams and slab
FW.B&S.r Form Work 5d 16-Nov-13 20-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 21-Nov-13 26-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Nov-13 27-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Columns 8d 28-Nov-13 07-Dec-13 07-Dec-13, Columns
FW.Col.rd Form Work 2d 28-Nov-13 30-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 01-Dec-13 03-Dec-13 R.F.T
Pour.col.rd Pouring Concrete 1d 04-Dec-13 04-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-Dec-13 07-Dec-13 Remove Formwork
Fourth Floor 19d 08-Dec-13 29-Dec-13 29-Dec-13, Fourth Floor
Beams and slab 18d 08-Dec-13 28-Dec-13 28-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 08-Dec-13 12-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 14-Dec-13 18-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 19-Dec-13 19-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-Dec-13 28-Dec-13 Remove Formwork
Columns 8d 21-Dec-13 29-Dec-13 29-Dec-13, Columns
FW.Col.th Form Work 2d 21-Dec-13 22-Dec-13 Form Work
R.F.T.Col. R.F.T 3d 23-Dec-13 25-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 26-Dec-13 26-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Dec-13 29-Dec-13 Remove Formwork
Roof 17d 30-Dec-13 18-Jan-14 18-Jan-14, Roof
Beams and slab 17d 30-Dec-13 18-Jan-14 18-Jan-14, Beams and slab
FW.B&S.R Form Work 5d 30-Dec-13 04-Jan-14 Form Work
R.F.T.B&S R.F.T 5d 05-Jan-14 09-Jan-14 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jan-14 11-Jan-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jan-14 18-Jan-14 Remove Formwork
Mansonary 109d 15-Sep-13 23-Jan-14 23-Jan-14, Mansonary
Basement 2d 15-Sep-13 16-Sep-13 16-Sep-13, Basement
E.B.M850 External 2d 15-Sep-13 16-Sep-13 External
Ground Floor 4d 23-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
I.G.M850 Internal 4d 23-Oct-13 27-Oct-13 Internal
E.G.M850 External 2d 23-Oct-13 24-Oct-13 External
First Floor 4d 14-Nov-13 18-Nov-13 18-Nov-13, First Floor
I.st .M850 Internal 4d 14-Nov-13 18-Nov-13 Internal
E.st .M850 External 2d 14-Nov-13 16-Nov-13 External
Second Floor 4d 07-Dec-13 10-Dec-13 10-Dec-13, Second Floor
I . nd .M850 Internal 4d 07-Dec-13 10-Dec-13 Internal
E. nd .M850 External 2d 07-Dec-13 08-Dec-13 External
Third Floor 4d 29-Dec-13 01-Jan-14 01-Jan-14, Third Floor
I . rd .M850 Internal 4d 29-Dec-13 01-Jan-14 Internal

Actual Work Critical Remaining Work Summary Page 43 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

219
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E . rd .M850 External 2d 29-Dec-13 30-Dec-13 External
Fourth Floor 4d 19-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
I .th .M850 Internal 4d 19-Jan-14 22-Jan-14 Internal
E. th .M850 External 2d 19-Jan-14 20-Jan-14 External
Roof 1d 23-Jan-14 23-Jan-14 23-Jan-14, Roof
E .R .M850 External 1d 23-Jan-14 23-Jan-14 External
Finishing 85d 26-Oct-13 01-Feb-14 01-Feb-14, Finishing
Ground Floor 2d 26-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
Calm Shell 2d 26-Oct-13 27-Oct-13 27-Oct-13, Calm Shell
E.Ch .G.8 External 2d 26-Oct-13 27-Oct-13 External
External Ele
Electrical 0d
First Floor 2d 17-Nov-13 18-Nov-13 18-Nov-13, First Floor
Calm Shell 2d 17-Nov-13 18-Nov-13 18-Nov-13, Calm Shell
E .ch .st85 External 2d 17-Nov-13 18-Nov-13 External
External Ele
Electrical 0d
Second Floor 2d 09-Dec-13 10-Dec-13 10-Dec-13, Second Floor
Calm Shell 2d 09-Dec-13 10-Dec-13 10-Dec-13, Calm Shell
E.ch .nd85 External 2d 09-Dec-13 10-Dec-13 External
External Ele
Electrical 0d
Third Floor 2d 31-Dec-13 01-Jan-14 01-Jan-14, Third Floor
Calm Shell 2d 31-Dec-13 01-Jan-14 01-Jan-14, Calm Shell
E.ch. rd850 External 2d 31-Dec-13 01-Jan-14 External
External Ele
Electrical 0d
Fourth Floor 2d 21-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
Calm Shell 2d 21-Jan-14 22-Jan-14 22-Jan-14, Calm Shell
E.ch .th850 External 2d 21-Jan-14 22-Jan-14 External
External Ele
Electrical 0d
Roof 1d 25-Jan-14 25-Jan-14 25-Jan-14, Roof
Calm Shell 1d 25-Jan-14 25-Jan-14 25-Jan-14, Calm Shell
E.ch .r850 External 1d 25-Jan-14 25-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jan-14 01-Feb-14 01-Feb-14, Painting Cond.
Ex. Paint850 External Painting 6d 26-Jan-14 01-Feb-14 External Painting
Marbling 5d 26-Jan-14 30-Jan-14 30-Jan-14, Marbling
E.M.F850 Entrance 4d 26-Jan-14 29-Jan-14 Entrance
S.M.F850 Stairs 5d 26-Jan-14 30-Jan-14 Stairs
Condonminium Appartments-56
App 177d 03-Jul-13 01-Feb-14 01-Feb-14, Condonminium Appartments-
A4810 start of cond. 0d 03-Jul-13 start of cond.
A4800 finish of cond. 0d 01-Feb-14 finish of cond.
Mobilization 1d 03-Jul-13 03-Jul-13 03-Jul-13, Mobilization
M.Sur.860 Site Surveying 1d 03-Jul-13 03-Jul-13 Site Surveying
Earth Work 47d 04-Jul-13 29-Aug-13 29-Aug-13, Earth Work
Ex.860 Excavation 7d 04-Jul-13 11-Jul-13 Excavation
B.F860 BackFill 2d 28-Aug-13 29-Aug-13 BackFill
Civil Work 157d 13-Jul-13 18-Jan-14 18-Jan-14, Civil Work
Foundation 30d 13-Jul-13 18-Aug-13 18-Aug-13, Foundation
Footing 30d 13-Jul-13 18-Aug-13 18-Aug-13, Footing
Plain Concrete
Con 10d 13-Jul-13 23-Jul-13 23-Jul-13, Plain Concrete
FW.PC Form Work 7d 13-Jul-13 20-Jul-13 Form Work
Pour.Pc Pouring Concrete 1d 21-Jul-13 21-Jul-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Jul-13 23-Jul-13 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 24-Jul-13 18-Aug-13 18-Aug-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 24-Jul-13 01-Aug-13 Form Work
R.F.T.R R.F.T 6d 03-Aug-13 11-Aug-13 R.F.T
Pour.Rc Pouring Concrete 1d 12-Aug-13 12-Aug-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 14-Aug-13 14-Aug-13 Remove Formwork
InsRc& Insulting 3d 15-Aug-13 18-Aug-13 Insulting
Basement 26d 19-Aug-13 17-Sep-13 17-Sep-13, Basement
Slab On Grade
Gra 16d 31-Aug-13 17-Sep-13 17-Sep-13, Slab On Grade
FW.SOG8 Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.SOG R.F.T 4d 05-Sep-13 09-Sep-13 R.F.T
Pour.SOG Pouring Concrete 1d 10-Sep-13 10-Sep-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 17-Sep-13 17-Sep-13 Remove Formwork
Columns 8d 19-Aug-13 27-Aug-13 27-Aug-13, Columns
FW.Col.B8 Form Work 2d 19-Aug-13 20-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 21-Aug-13 24-Aug-13 R.F.T
Pour.Col.B Pouring Concrete 1d 25-Aug-13 25-Aug-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 27-Aug-13 27-Aug-13 Remove Formwork
Ground Floor 24d 31-Aug-13 26-Sep-13 26-Sep-13, Ground Floor
Beam and s
slab 13d 31-Aug-13 14-Sep-13 14-Sep-13, Beam and slab
FW.B&S.G Form Work 5d 31-Aug-13 04-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 31-Aug-13 04-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Sep-13 05-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 14-Sep-13 14-Sep-13 Remove Formwork
Columns 8d 18-Sep-13 26-Sep-13 26-Sep-13, Columns
FW.Col.G Form Work 2d 18-Sep-13 19-Sep-13 Form Work

Actual Work Critical Remaining Work Summary Page 44 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

220
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.Col. R.F.T 3d 21-Sep-13 23-Sep-13 R.F.T
Pour..Col.G Pouring Concrete 1d 24-Sep-13 24-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 26-Sep-13 26-Sep-13 Remove Formwork
First Floor 19d 28-Sep-13 23-Oct-13 23-Oct-13, First Floor
Beams and slab 18d 28-Sep-13 22-Oct-13 22-Oct-13, Beams and slab
FW.B&S.s Form Work 5d 28-Sep-13 02-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 03-Oct-13 09-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 10-Oct-13 10-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Columns 8d 12-Oct-13 23-Oct-13 23-Oct-13, Columns
FW.Col.st8 Form Work 2d 12-Oct-13 13-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 14-Oct-13 20-Oct-13 R.F.T
Pour.Col.s Pouring Concrete 1d 21-Oct-13 21-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Oct-13 23-Oct-13 Remove Formwork
Second Floor 19d 24-Oct-13 14-Nov-13 14-Nov-13, Second Floor
Beams and slab 18d 24-Oct-13 13-Nov-13 13-Nov-13, Beams and slab
FW.B&S.n Form Work 5d 24-Oct-13 29-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 30-Oct-13 04-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Nov-13 05-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Columns 8d 06-Nov-13 14-Nov-13 14-Nov-13, Columns
FW.Col.nd Form Work 2d 06-Nov-13 07-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 09-Nov-13 11-Nov-13 R.F.T
Pour.Col.n Pouring Concrete 1d 12-Nov-13 12-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Nov-13 14-Nov-13 Remove Formwork
Third Floor 19d 16-Nov-13 07-Dec-13 07-Dec-13, Third Floor
Beams and slab 18d 16-Nov-13 05-Dec-13 05-Dec-13, Beams and slab
FW.B&S.r Form Work 5d 16-Nov-13 20-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 21-Nov-13 26-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Nov-13 27-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Columns 8d 28-Nov-13 07-Dec-13 07-Dec-13, Columns
FW.Col.rd Form Work 2d 28-Nov-13 30-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 01-Dec-13 03-Dec-13 R.F.T
Pour.col.rd Pouring Concrete 1d 04-Dec-13 04-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-Dec-13 07-Dec-13 Remove Formwork
Fourth Floor 19d 08-Dec-13 29-Dec-13 29-Dec-13, Fourth Floor
Beams and slab 18d 08-Dec-13 28-Dec-13 28-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 08-Dec-13 12-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 14-Dec-13 18-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 19-Dec-13 19-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-Dec-13 28-Dec-13 Remove Formwork
Columns 8d 21-Dec-13 29-Dec-13 29-Dec-13, Columns
FW.Col.th Form Work 2d 21-Dec-13 22-Dec-13 Form Work
R.F.T.Col. R.F.T 3d 23-Dec-13 25-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 26-Dec-13 26-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Dec-13 29-Dec-13 Remove Formwork
Roof 17d 30-Dec-13 18-Jan-14 18-Jan-14, Roof
Beams and slab 17d 30-Dec-13 18-Jan-14 18-Jan-14, Beams and slab
FW.B&S.R Form Work 5d 30-Dec-13 04-Jan-14 Form Work
R.F.T.B&S R.F.T 5d 05-Jan-14 09-Jan-14 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jan-14 11-Jan-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jan-14 18-Jan-14 Remove Formwork
Mansonary 109d 15-Sep-13 23-Jan-14 23-Jan-14, Mansonary
Basement 2d 15-Sep-13 16-Sep-13 16-Sep-13, Basement
E.B.M860 External 2d 15-Sep-13 16-Sep-13 External
Ground Floor 4d 23-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
I.G.M860 Internal 4d 23-Oct-13 27-Oct-13 Internal
E.G.M860 External 2d 23-Oct-13 24-Oct-13 External
First Floor 4d 14-Nov-13 18-Nov-13 18-Nov-13, First Floor
I.st .M860 Internal 4d 14-Nov-13 18-Nov-13 Internal
E.st .M860 External 2d 14-Nov-13 16-Nov-13 External
Second Floor 4d 07-Dec-13 10-Dec-13 10-Dec-13, Second Floor
I . nd .M860 Internal 4d 07-Dec-13 10-Dec-13 Internal
E. nd .M860 External 2d 07-Dec-13 08-Dec-13 External
Third Floor 4d 29-Dec-13 01-Jan-14 01-Jan-14, Third Floor
I . rd .M860 Internal 4d 29-Dec-13 01-Jan-14 Internal
E . rd .M860 External 2d 29-Dec-13 30-Dec-13 External
Fourth Floor 4d 19-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
I .th .M860 Internal 4d 19-Jan-14 22-Jan-14 Internal
E. th .M860 External 2d 19-Jan-14 20-Jan-14 External
Roof 1d 23-Jan-14 23-Jan-14 23-Jan-14, Roof
E .R .M860 External 1d 23-Jan-14 23-Jan-14 External
Finishing 85d 26-Oct-13 01-Feb-14 01-Feb-14, Finishing
Ground Floor 2d 26-Oct-13 27-Oct-13 27-Oct-13, Ground Floor
Calm Shell 2d 26-Oct-13 27-Oct-13 27-Oct-13, Calm Shell

Actual Work Critical Remaining Work Summary Page 45 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

221
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.Ch .G.8 External 2d 26-Oct-13 27-Oct-13 External
External Ele
Electrical 0d
First Floor 2d 17-Nov-13 18-Nov-13 18-Nov-13, First Floor
Calm Shell 2d 17-Nov-13 18-Nov-13 18-Nov-13, Calm Shell
E .ch .st86 External 2d 17-Nov-13 18-Nov-13 External
External Ele
Electrical 0d
Second Floor 2d 09-Dec-13 10-Dec-13 10-Dec-13, Second Floor
Calm Shell 2d 09-Dec-13 10-Dec-13 10-Dec-13, Calm Shell
E.ch .nd86 External 2d 09-Dec-13 10-Dec-13 External
External Ele
Electrical 0d
Third Floor 2d 31-Dec-13 01-Jan-14 01-Jan-14, Third Floor
Calm Shell 2d 31-Dec-13 01-Jan-14 01-Jan-14, Calm Shell
E.ch. rd860 External 2d 31-Dec-13 01-Jan-14 External
External Ele
Electrical 0d
Fourth Floor 2d 21-Jan-14 22-Jan-14 22-Jan-14, Fourth Floor
Calm Shell 2d 21-Jan-14 22-Jan-14 22-Jan-14, Calm Shell
E.ch .th860 External 2d 21-Jan-14 22-Jan-14 External
External Ele
Electrical 0d
Roof 1d 25-Jan-14 25-Jan-14 25-Jan-14, Roof
Calm Shell 1d 25-Jan-14 25-Jan-14 25-Jan-14, Calm Shell
E.ch .r860 External 1d 25-Jan-14 25-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jan-14 01-Feb-14 01-Feb-14, Painting Cond.
Ex. Paint860 External Painting 6d 26-Jan-14 01-Feb-14 External Painting
Marbling 5d 26-Jan-14 30-Jan-14 30-Jan-14, Marbling
E.M.F860 Entrance 4d 26-Jan-14 29-Jan-14 Entrance
S.M.F860 Stairs 5d 26-Jan-14 30-Jan-14 Stairs

Zone 2 1002d 01-Nov-11 11-Feb-15 11-Feb-


A5540 Start of Zone 2 0d 01-Nov-11 Start of Zone 2

A5550 Finish of Zone 2 0d 11-Feb-15 Finish of


Stage 1 334d 01-Nov-11 06-Dec-12 06-Dec-12, Stage 1
A5560 Start of Stage 1 0d 01-Nov-11 Start of Stage 1
A5570 Finsih of Stage 1 0d 06-Dec-12 Finsih of Stage 1
Condonminium Appartments-1
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-1
A4930 start of cond. 0d 01-Nov-11 start of cond.
A4920 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.880 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.880 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F880 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG8 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B8 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab

Actual Work Critical Remaining Work Summary Page 46 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

222
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st8 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M880 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M880 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M880 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M880 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M880 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M880 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M880 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M880 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M880 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M880 Internal 4d 17-May-12 21-May-12 Internal
E. th .M880 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof
E .R .M880 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.8 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st88 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd88 External 2d 05-Apr-12 07-Apr-12 External

Actual Work Critical Remaining Work Summary Page 47 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

223
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd880 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th880 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r880 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint880 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F880 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F880 Stairs 5d 24-May-12 29-May-12 Stairs
Condonminium Appartments-2
App 334d 01-Nov-11 06-Dec-12 06-Dec-12, Condonminium Appartments-2
A4910 start of cond. 0d 01-Nov-11 start of cond.
A4900 finish of cond. 0d 06-Dec-12 finish of cond.
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M.Sur.870 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 197d 15-Nov-11 02-Jul-12 02-Jul-12, Earth Work
Ex.870 Excavation 7d 15-Nov-11 22-Nov-11 Excavation
B.F870 BackFill 2d 01-Jul-12 02-Jul-12 BackFill
Civil Work 157d 17-May-12 22-Nov-12 22-Nov-12, Civil Work
Foundation 30d 17-May-12 20-Jun-12 20-Jun-12, Foundation
Footing 30d 17-May-12 20-Jun-12 20-Jun-12, Footing
Plain Concrete
Con 10d 17-May-12 28-May-12 28-May-12, Plain Concrete
FW.PC Form Work 7d 17-May-12 24-May-12 Form Work
Pour.Pc Pouring Concrete 1d 26-May-12 26-May-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 28-May-12 28-May-12 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 29-May-12 20-Jun-12 20-Jun-12, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-May-12 06-Jun-12 Form Work
R.F.T.R R.F.T 6d 07-Jun-12 13-Jun-12 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jun-12 14-Jun-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 17-Jun-12 17-Jun-12 Remove Formwork
InsRc& Insulting 3d 18-Jun-12 20-Jun-12 Insulting
Basement 26d 21-Jun-12 21-Jul-12 21-Jul-12, Basement
Slab On Grade
Gra 16d 03-Jul-12 21-Jul-12 21-Jul-12, Slab On Grade
FW.SOG8 Form Work 5d 03-Jul-12 08-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 09-Jul-12 12-Jul-12 R.F.T
Pour.SOG Pouring Concrete 1d 14-Jul-12 14-Jul-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 21-Jul-12 21-Jul-12 Remove Formwork
Columns 8d 21-Jun-12 30-Jun-12 30-Jun-12, Columns
FW.Col.B8 Form Work 2d 21-Jun-12 23-Jun-12 Form Work
R.F.T.Col. R.F.T 3d 24-Jun-12 26-Jun-12 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jun-12 27-Jun-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 30-Jun-12 30-Jun-12 Remove Formwork
Ground Floor 24d 03-Jul-12 30-Jul-12 30-Jul-12, Ground Floor
Beam and s
slab 13d 03-Jul-12 17-Jul-12 17-Jul-12, Beam and slab
FW.B&S.G Form Work 5d 03-Jul-12 08-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 03-Jul-12 08-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Jul-12 09-Jul-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 17-Jul-12 17-Jul-12 Remove Formwork
Columns 8d 22-Jul-12 30-Jul-12 30-Jul-12, Columns
FW.Col.G Form Work 2d 22-Jul-12 23-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 24-Jul-12 26-Jul-12 R.F.T
Pour..Col.G Pouring Concrete 1d 28-Jul-12 28-Jul-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 30-Jul-12 30-Jul-12 Remove Formwork
First Floor 19d 31-Jul-12 25-Aug-12 25-Aug-12, First Floor
Beams and slab 18d 31-Jul-12 23-Aug-12 23-Aug-12, Beams and slab
FW.B&S.s Form Work 5d 31-Jul-12 05-Aug-12 Form Work
R.F.T.B&S R.F.T 5d 06-Aug-12 11-Aug-12 R.F.T
Pour.B&S. Pouring Concrete 1d 12-Aug-12 12-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 23-Aug-12 23-Aug-12 Remove Formwork
Columns 8d 13-Aug-12 25-Aug-12 25-Aug-12, Columns
FW.Col.st8 Form Work 2d 13-Aug-12 14-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 15-Aug-12 18-Aug-12 R.F.T
Pour.Col.s Pouring Concrete 1d 22-Aug-12 22-Aug-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Aug-12 25-Aug-12 Remove Formwork
Second Floor 19d 26-Aug-12 16-Sep-12 16-Sep-12, Second Floor
Beams and slab 18d 26-Aug-12 15-Sep-12 15-Sep-12, Beams and slab
FW.B&S.n Form Work 5d 26-Aug-12 30-Aug-12 Form Work
R.F.T.B&S R.F.T 5d 01-Sep-12 05-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Sep-12 06-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Sep-12 15-Sep-12 Remove Formwork
Columns 8d 08-Sep-12 16-Sep-12 16-Sep-12, Columns
FW.Col.nd Form Work 2d 08-Sep-12 09-Sep-12 Form Work

Actual Work Critical Remaining Work Summary Page 48 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

224
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.Col. R.F.T 3d 10-Sep-12 12-Sep-12 R.F.T
Pour.Col.n Pouring Concrete 1d 13-Sep-12 13-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Third Floor 19d 17-Sep-12 08-Oct-12 08-Oct-12, Third Floor
Beams and slab 18d 17-Sep-12 07-Oct-12 07-Oct-12, Beams and slab
FW.B&S.r Form Work 5d 17-Sep-12 22-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 23-Sep-12 27-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Sep-12 29-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 07-Oct-12 07-Oct-12 Remove Formwork
Columns 8d 30-Sep-12 08-Oct-12 08-Oct-12, Columns
FW.Col.rd Form Work 2d 30-Sep-12 01-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 02-Oct-12 04-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 06-Oct-12 06-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Fourth Floor 19d 09-Oct-12 03-Nov-12 03-Nov-12, Fourth Floor
Beams and slab 18d 09-Oct-12 01-Nov-12 01-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 09-Oct-12 14-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 15-Oct-12 20-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Oct-12 21-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 01-Nov-12 01-Nov-12 Remove Formwork
Columns 8d 22-Oct-12 03-Nov-12 03-Nov-12, Columns
FW.Col.th Form Work 2d 22-Oct-12 23-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 24-Oct-12 30-Oct-12 R.F.T
Pour.Col.th Pouring Concrete 1d 31-Oct-12 31-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Roof 17d 04-Nov-12 22-Nov-12 22-Nov-12, Roof
Beams and slab 17d 04-Nov-12 22-Nov-12 22-Nov-12, Beams and slab
FW.B&S.R Form Work 5d 04-Nov-12 08-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 10-Nov-12 14-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 15-Nov-12 15-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Nov-12 22-Nov-12 Remove Formwork
Mansonary 109d 18-Jul-12 28-Nov-12 28-Nov-12, Mansonary
Basement 2d 18-Jul-12 19-Jul-12 19-Jul-12, Basement
E.B.M870 External 2d 18-Jul-12 19-Jul-12 External
Ground Floor 4d 25-Aug-12 28-Aug-12 28-Aug-12, Ground Floor
I.G.M870 Internal 4d 25-Aug-12 28-Aug-12 Internal
E.G.M870 External 2d 25-Aug-12 26-Aug-12 External
First Floor 4d 16-Sep-12 19-Sep-12 19-Sep-12, First Floor
I.st .M870 Internal 4d 16-Sep-12 19-Sep-12 Internal
E.st .M870 External 2d 16-Sep-12 17-Sep-12 External
Second Floor 4d 08-Oct-12 11-Oct-12 11-Oct-12, Second Floor
I . nd .M870 Internal 4d 08-Oct-12 11-Oct-12 Internal
E. nd .M870 External 2d 08-Oct-12 09-Oct-12 External
Third Floor 4d 03-Nov-12 06-Nov-12 06-Nov-12, Third Floor
I . rd .M870 Internal 4d 03-Nov-12 06-Nov-12 Internal
E . rd .M870 External 2d 03-Nov-12 04-Nov-12 External
Fourth Floor 4d 24-Nov-12 27-Nov-12 27-Nov-12, Fourth Floor
I .th .M870 Internal 4d 24-Nov-12 27-Nov-12 Internal
E. th .M870 External 2d 24-Nov-12 25-Nov-12 External
Roof 1d 28-Nov-12 28-Nov-12 28-Nov-12, Roof
E .R .M870 External 1d 28-Nov-12 28-Nov-12 External
Finishing 85d 27-Aug-12 06-Dec-12 06-Dec-12, Finishing
Ground Floor 2d 27-Aug-12 28-Aug-12 28-Aug-12, Ground Floor
Calm Shell 2d 27-Aug-12 28-Aug-12 28-Aug-12, Calm Shell
E.Ch .G.8 External 2d 27-Aug-12 28-Aug-12 External
External Ele
Electrical 0d
First Floor 2d 18-Sep-12 19-Sep-12 19-Sep-12, First Floor
Calm Shell 2d 18-Sep-12 19-Sep-12 19-Sep-12, Calm Shell
E .ch .st87 External 2d 18-Sep-12 19-Sep-12 External
External Ele
Electrical 0d
Second Floor 2d 10-Oct-12 11-Oct-12 11-Oct-12, Second Floor
Calm Shell 2d 10-Oct-12 11-Oct-12 11-Oct-12, Calm Shell
E.ch .nd87 External 2d 10-Oct-12 11-Oct-12 External
External Ele
Electrical 0d
Third Floor 2d 05-Nov-12 06-Nov-12 06-Nov-12, Third Floor
Calm Shell 2d 05-Nov-12 06-Nov-12 06-Nov-12, Calm Shell
E.ch. rd870 External 2d 05-Nov-12 06-Nov-12 External
External Ele
Electrical 0d
Fourth Floor 2d 26-Nov-12 27-Nov-12 27-Nov-12, Fourth Floor
Calm Shell 2d 26-Nov-12 27-Nov-12 27-Nov-12, Calm Shell
E.ch .th870 External 2d 26-Nov-12 27-Nov-12 External
External Ele
Electrical 0d
Roof 1d 29-Nov-12 29-Nov-12 29-Nov-12, Roof
Calm Shell 1d 29-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch .r870 External 1d 29-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Painting Cond. 6d 01-Dec-12 06-Dec-12 06-Dec-12, Painting Cond.
Ex. Paint870 External Painting 6d 01-Dec-12 06-Dec-12 External Painting
Marbling 5d 01-Dec-12 05-Dec-12 05-Dec-12, Marbling
E.M.F870 Entrance 4d 01-Dec-12 04-Dec-12 Entrance

Actual Work Critical Remaining Work Summary Page 49 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

225
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
S.M.F870 Stairs 5d 01-Dec-12 05-Dec-12 Stairs
Condonminium Appartments-7
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-7
A4970 start of cond. 0d 01-Nov-11 start of cond.
A4960 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.900 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.900 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F900 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG9 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B9 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st9 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab

Actual Work Critical Remaining Work Summary Page 50 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

226
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M900 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M900 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M900 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M900 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M900 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M900 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M900 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M900 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M900 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M900 Internal 4d 17-May-12 21-May-12 Internal
E. th .M900 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof
E .R .M900 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.9 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st90 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd90 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd900 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th900 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r900 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint900 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F900 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F900 Stairs 5d 24-May-12 29-May-12 Stairs
Condonminium Appartments-8
App 334d 01-Nov-11 06-Dec-12 06-Dec-12, Condonminium Appartments-8
A4950 start of cond. 0d 01-Nov-11 start of cond.
A4940 finish of cond. 0d 06-Dec-12 finish of cond.
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M.Sur.890 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 197d 15-Nov-11 02-Jul-12 02-Jul-12, Earth Work
Ex.890 Excavation 7d 15-Nov-11 22-Nov-11 Excavation
B.F890 BackFill 2d 01-Jul-12 02-Jul-12 BackFill
Civil Work 157d 17-May-12 22-Nov-12 22-Nov-12, Civil Work
Foundation 30d 17-May-12 20-Jun-12 20-Jun-12, Foundation
Footing 30d 17-May-12 20-Jun-12 20-Jun-12, Footing
Plain Concrete
Con 10d 17-May-12 28-May-12 28-May-12, Plain Concrete
FW.PC Form Work 7d 17-May-12 24-May-12 Form Work
Pour.Pc Pouring Concrete 1d 26-May-12 26-May-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 28-May-12 28-May-12 Remove Formwork
Reinforced Concrete & Semels
Reinforce 20d 29-May-12 20-Jun-12 20-Jun-12, Reinforced Concrete & Semels

Actual Work Critical Remaining Work Summary Page 51 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

227
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.Rc& Form Work 8d 29-May-12 06-Jun-12 Form Work
R.F.T.R R.F.T 6d 07-Jun-12 13-Jun-12 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jun-12 14-Jun-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 17-Jun-12 17-Jun-12 Remove Formwork
InsRc& Insulting 3d 18-Jun-12 20-Jun-12 Insulting
Basement 26d 21-Jun-12 21-Jul-12 21-Jul-12, Basement
Slab On Grade
Gra 16d 03-Jul-12 21-Jul-12 21-Jul-12, Slab On Grade
FW.SOG8 Form Work 5d 03-Jul-12 08-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 09-Jul-12 12-Jul-12 R.F.T
Pour.SOG Pouring Concrete 1d 14-Jul-12 14-Jul-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 21-Jul-12 21-Jul-12 Remove Formwork
Columns 8d 21-Jun-12 30-Jun-12 30-Jun-12, Columns
FW.Col.B8 Form Work 2d 21-Jun-12 23-Jun-12 Form Work
R.F.T.Col. R.F.T 3d 24-Jun-12 26-Jun-12 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jun-12 27-Jun-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 30-Jun-12 30-Jun-12 Remove Formwork
Ground Floor 24d 03-Jul-12 30-Jul-12 30-Jul-12, Ground Floor
Beam and s
slab 13d 03-Jul-12 17-Jul-12 17-Jul-12, Beam and slab
FW.B&S.G Form Work 5d 03-Jul-12 08-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 03-Jul-12 08-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Jul-12 09-Jul-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 17-Jul-12 17-Jul-12 Remove Formwork
Columns 8d 22-Jul-12 30-Jul-12 30-Jul-12, Columns
FW.Col.G Form Work 2d 22-Jul-12 23-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 24-Jul-12 26-Jul-12 R.F.T
Pour..Col.G Pouring Concrete 1d 28-Jul-12 28-Jul-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 30-Jul-12 30-Jul-12 Remove Formwork
First Floor 19d 31-Jul-12 25-Aug-12 25-Aug-12, First Floor
Beams and slab 18d 31-Jul-12 23-Aug-12 23-Aug-12, Beams and slab
FW.B&S.s Form Work 5d 31-Jul-12 05-Aug-12 Form Work
R.F.T.B&S R.F.T 5d 06-Aug-12 11-Aug-12 R.F.T
Pour.B&S. Pouring Concrete 1d 12-Aug-12 12-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 23-Aug-12 23-Aug-12 Remove Formwork
Columns 8d 13-Aug-12 25-Aug-12 25-Aug-12, Columns
FW.Col.st8 Form Work 2d 13-Aug-12 14-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 15-Aug-12 18-Aug-12 R.F.T
Pour.Col.s Pouring Concrete 1d 22-Aug-12 22-Aug-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Aug-12 25-Aug-12 Remove Formwork
Second Floor 19d 26-Aug-12 16-Sep-12 16-Sep-12, Second Floor
Beams and slab 18d 26-Aug-12 15-Sep-12 15-Sep-12, Beams and slab
FW.B&S.n Form Work 5d 26-Aug-12 30-Aug-12 Form Work
R.F.T.B&S R.F.T 5d 01-Sep-12 05-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Sep-12 06-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Sep-12 15-Sep-12 Remove Formwork
Columns 8d 08-Sep-12 16-Sep-12 16-Sep-12, Columns
FW.Col.nd Form Work 2d 08-Sep-12 09-Sep-12 Form Work
R.F.T.Col. R.F.T 3d 10-Sep-12 12-Sep-12 R.F.T
Pour.Col.n Pouring Concrete 1d 13-Sep-12 13-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Third Floor 19d 17-Sep-12 08-Oct-12 08-Oct-12, Third Floor
Beams and slab 18d 17-Sep-12 07-Oct-12 07-Oct-12, Beams and slab
FW.B&S.r Form Work 5d 17-Sep-12 22-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 23-Sep-12 27-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Sep-12 29-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 07-Oct-12 07-Oct-12 Remove Formwork
Columns 8d 30-Sep-12 08-Oct-12 08-Oct-12, Columns
FW.Col.rd Form Work 2d 30-Sep-12 01-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 02-Oct-12 04-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 06-Oct-12 06-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Fourth Floor 19d 09-Oct-12 03-Nov-12 03-Nov-12, Fourth Floor
Beams and slab 18d 09-Oct-12 01-Nov-12 01-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 09-Oct-12 14-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 15-Oct-12 20-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Oct-12 21-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 01-Nov-12 01-Nov-12 Remove Formwork
Columns 8d 22-Oct-12 03-Nov-12 03-Nov-12, Columns
FW.Col.th Form Work 2d 22-Oct-12 23-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 24-Oct-12 30-Oct-12 R.F.T
Pour.Col.th Pouring Concrete 1d 31-Oct-12 31-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Roof 17d 04-Nov-12 22-Nov-12 22-Nov-12, Roof
Beams and slab 17d 04-Nov-12 22-Nov-12 22-Nov-12, Beams and slab
FW.B&S.R Form Work 5d 04-Nov-12 08-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 10-Nov-12 14-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 15-Nov-12 15-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Nov-12 22-Nov-12 Remove Formwork
Mansonary 109d 18-Jul-12 28-Nov-12 28-Nov-12, Mansonary
Basement 2d 18-Jul-12 19-Jul-12 19-Jul-12, Basement

Actual Work Critical Remaining Work Summary Page 52 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

228
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.B.M890 External 2d 18-Jul-12 19-Jul-12 External
Ground Floor 4d 25-Aug-12 28-Aug-12 28-Aug-12, Ground Floor
I.G.M890 Internal 4d 25-Aug-12 28-Aug-12 Internal
E.G.M890 External 2d 25-Aug-12 26-Aug-12 External
First Floor 4d 16-Sep-12 19-Sep-12 19-Sep-12, First Floor
I.st .M890 Internal 4d 16-Sep-12 19-Sep-12 Internal
E.st .M890 External 2d 16-Sep-12 17-Sep-12 External
Second Floor 4d 08-Oct-12 11-Oct-12 11-Oct-12, Second Floor
I . nd .M890 Internal 4d 08-Oct-12 11-Oct-12 Internal
E. nd .M890 External 2d 08-Oct-12 09-Oct-12 External
Third Floor 4d 03-Nov-12 06-Nov-12 06-Nov-12, Third Floor
I . rd .M890 Internal 4d 03-Nov-12 06-Nov-12 Internal
E . rd .M890 External 2d 03-Nov-12 04-Nov-12 External
Fourth Floor 4d 24-Nov-12 27-Nov-12 27-Nov-12, Fourth Floor
I .th .M890 Internal 4d 24-Nov-12 27-Nov-12 Internal
E. th .M890 External 2d 24-Nov-12 25-Nov-12 External
Roof 1d 28-Nov-12 28-Nov-12 28-Nov-12, Roof
E .R .M890 External 1d 28-Nov-12 28-Nov-12 External
Finishing 85d 27-Aug-12 06-Dec-12 06-Dec-12, Finishing
Ground Floor 2d 27-Aug-12 28-Aug-12 28-Aug-12, Ground Floor
Calm Shell 2d 27-Aug-12 28-Aug-12 28-Aug-12, Calm Shell
E.Ch .G.8 External 2d 27-Aug-12 28-Aug-12 External
External Ele
Electrical 0d
First Floor 2d 18-Sep-12 19-Sep-12 19-Sep-12, First Floor
Calm Shell 2d 18-Sep-12 19-Sep-12 19-Sep-12, Calm Shell
E .ch .st89 External 2d 18-Sep-12 19-Sep-12 External
External Ele
Electrical 0d
Second Floor 2d 10-Oct-12 11-Oct-12 11-Oct-12, Second Floor
Calm Shell 2d 10-Oct-12 11-Oct-12 11-Oct-12, Calm Shell
E.ch .nd89 External 2d 10-Oct-12 11-Oct-12 External
External Ele
Electrical 0d
Third Floor 2d 05-Nov-12 06-Nov-12 06-Nov-12, Third Floor
Calm Shell 2d 05-Nov-12 06-Nov-12 06-Nov-12, Calm Shell
E.ch. rd890 External 2d 05-Nov-12 06-Nov-12 External
External Ele
Electrical 0d
Fourth Floor 2d 26-Nov-12 27-Nov-12 27-Nov-12, Fourth Floor
Calm Shell 2d 26-Nov-12 27-Nov-12 27-Nov-12, Calm Shell
E.ch .th890 External 2d 26-Nov-12 27-Nov-12 External
External Ele
Electrical 0d
Roof 1d 29-Nov-12 29-Nov-12 29-Nov-12, Roof
Calm Shell 1d 29-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch .r890 External 1d 29-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Painting Cond. 6d 01-Dec-12 06-Dec-12 06-Dec-12, Painting Cond.
Ex. Paint890 External Painting 6d 01-Dec-12 06-Dec-12 External Painting
Marbling 5d 01-Dec-12 05-Dec-12 05-Dec-12, Marbling
E.M.F890 Entrance 4d 01-Dec-12 04-Dec-12 Entrance
S.M.F890 Stairs 5d 01-Dec-12 05-Dec-12 Stairs
Condonminium Appartments-9
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-9
A5010 start of cond. 0d 01-Nov-11 start of cond.
A5000 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.920 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.920 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F920 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG9 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B9 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor

Actual Work Critical Remaining Work Summary Page 53 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

229
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st9 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M920 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M920 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M920 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M920 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M920 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M920 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M920 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M920 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M920 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M920 Internal 4d 17-May-12 21-May-12 Internal
E. th .M920 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof

Actual Work Critical Remaining Work Summary Page 54 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

230
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E .R .M920 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.9 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st92 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd92 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd920 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th920 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r920 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint920 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F920 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F920 Stairs 5d 24-May-12 29-May-12 Stairs
Condonminium Appartments-10
App 334d 01-Nov-11 06-Dec-12 06-Dec-12, Condonminium Appartments-10
A4990 start of cond. 0d 01-Nov-11 start of cond.
A4980 finish of cond. 0d 06-Dec-12 finish of cond.
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M.Sur.910 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 197d 15-Nov-11 02-Jul-12 02-Jul-12, Earth Work
Ex.910 Excavation 7d 15-Nov-11 22-Nov-11 Excavation
B.F910 BackFill 2d 01-Jul-12 02-Jul-12 BackFill
Civil Work 157d 17-May-12 22-Nov-12 22-Nov-12, Civil Work
Foundation 30d 17-May-12 20-Jun-12 20-Jun-12, Foundation
Footing 30d 17-May-12 20-Jun-12 20-Jun-12, Footing
Plain Concrete
Con 10d 17-May-12 28-May-12 28-May-12, Plain Concrete
FW.PC Form Work 7d 17-May-12 24-May-12 Form Work
Pour.Pc Pouring Concrete 1d 26-May-12 26-May-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 28-May-12 28-May-12 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 29-May-12 20-Jun-12 20-Jun-12, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-May-12 06-Jun-12 Form Work
R.F.T.R R.F.T 6d 07-Jun-12 13-Jun-12 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jun-12 14-Jun-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 17-Jun-12 17-Jun-12 Remove Formwork
InsRc& Insulting 3d 18-Jun-12 20-Jun-12 Insulting
Basement 26d 21-Jun-12 21-Jul-12 21-Jul-12, Basement
Slab On Grade
Gra 16d 03-Jul-12 21-Jul-12 21-Jul-12, Slab On Grade
FW.SOG9 Form Work 5d 03-Jul-12 08-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 09-Jul-12 12-Jul-12 R.F.T
Pour.SOG Pouring Concrete 1d 14-Jul-12 14-Jul-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 21-Jul-12 21-Jul-12 Remove Formwork
Columns 8d 21-Jun-12 30-Jun-12 30-Jun-12, Columns
FW.Col.B9 Form Work 2d 21-Jun-12 23-Jun-12 Form Work
R.F.T.Col. R.F.T 3d 24-Jun-12 26-Jun-12 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jun-12 27-Jun-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 30-Jun-12 30-Jun-12 Remove Formwork
Ground Floor 24d 03-Jul-12 30-Jul-12 30-Jul-12, Ground Floor
Beam and s
slab 13d 03-Jul-12 17-Jul-12 17-Jul-12, Beam and slab
FW.B&S.G Form Work 5d 03-Jul-12 08-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 03-Jul-12 08-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Jul-12 09-Jul-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 17-Jul-12 17-Jul-12 Remove Formwork
Columns 8d 22-Jul-12 30-Jul-12 30-Jul-12, Columns
FW.Col.G Form Work 2d 22-Jul-12 23-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 24-Jul-12 26-Jul-12 R.F.T
Pour..Col.G Pouring Concrete 1d 28-Jul-12 28-Jul-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 30-Jul-12 30-Jul-12 Remove Formwork
First Floor 19d 31-Jul-12 25-Aug-12 25-Aug-12, First Floor
Beams and slab 18d 31-Jul-12 23-Aug-12 23-Aug-12, Beams and slab
FW.B&S.s Form Work 5d 31-Jul-12 05-Aug-12 Form Work
R.F.T.B&S R.F.T 5d 06-Aug-12 11-Aug-12 R.F.T
Pour.B&S. Pouring Concrete 1d 12-Aug-12 12-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 23-Aug-12 23-Aug-12 Remove Formwork
Columns 8d 13-Aug-12 25-Aug-12 25-Aug-12, Columns

Actual Work Critical Remaining Work Summary Page 55 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

231
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.Col.st9 Form Work 2d 13-Aug-12 14-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 15-Aug-12 18-Aug-12 R.F.T
Pour.Col.s Pouring Concrete 1d 22-Aug-12 22-Aug-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Aug-12 25-Aug-12 Remove Formwork
Second Floor 19d 26-Aug-12 16-Sep-12 16-Sep-12, Second Floor
Beams and slab 18d 26-Aug-12 15-Sep-12 15-Sep-12, Beams and slab
FW.B&S.n Form Work 5d 26-Aug-12 30-Aug-12 Form Work
R.F.T.B&S R.F.T 5d 01-Sep-12 05-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Sep-12 06-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Sep-12 15-Sep-12 Remove Formwork
Columns 8d 08-Sep-12 16-Sep-12 16-Sep-12, Columns
FW.Col.nd Form Work 2d 08-Sep-12 09-Sep-12 Form Work
R.F.T.Col. R.F.T 3d 10-Sep-12 12-Sep-12 R.F.T
Pour.Col.n Pouring Concrete 1d 13-Sep-12 13-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Third Floor 19d 17-Sep-12 08-Oct-12 08-Oct-12, Third Floor
Beams and slab 18d 17-Sep-12 07-Oct-12 07-Oct-12, Beams and slab
FW.B&S.r Form Work 5d 17-Sep-12 22-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 23-Sep-12 27-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Sep-12 29-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 07-Oct-12 07-Oct-12 Remove Formwork
Columns 8d 30-Sep-12 08-Oct-12 08-Oct-12, Columns
FW.Col.rd Form Work 2d 30-Sep-12 01-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 02-Oct-12 04-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 06-Oct-12 06-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Fourth Floor 19d 09-Oct-12 03-Nov-12 03-Nov-12, Fourth Floor
Beams and slab 18d 09-Oct-12 01-Nov-12 01-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 09-Oct-12 14-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 15-Oct-12 20-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Oct-12 21-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 01-Nov-12 01-Nov-12 Remove Formwork
Columns 8d 22-Oct-12 03-Nov-12 03-Nov-12, Columns
FW.Col.th Form Work 2d 22-Oct-12 23-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 24-Oct-12 30-Oct-12 R.F.T
Pour.Col.th Pouring Concrete 1d 31-Oct-12 31-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Roof 17d 04-Nov-12 22-Nov-12 22-Nov-12, Roof
Beams and slab 17d 04-Nov-12 22-Nov-12 22-Nov-12, Beams and slab
FW.B&S.R Form Work 5d 04-Nov-12 08-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 10-Nov-12 14-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 15-Nov-12 15-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Nov-12 22-Nov-12 Remove Formwork
Mansonary 109d 18-Jul-12 28-Nov-12 28-Nov-12, Mansonary
Basement 2d 18-Jul-12 19-Jul-12 19-Jul-12, Basement
E.B.M910 External 2d 18-Jul-12 19-Jul-12 External
Ground Floor 4d 25-Aug-12 28-Aug-12 28-Aug-12, Ground Floor
I.G.M910 Internal 4d 25-Aug-12 28-Aug-12 Internal
E.G.M910 External 2d 25-Aug-12 26-Aug-12 External
First Floor 4d 16-Sep-12 19-Sep-12 19-Sep-12, First Floor
I.st .M910 Internal 4d 16-Sep-12 19-Sep-12 Internal
E.st .M910 External 2d 16-Sep-12 17-Sep-12 External
Second Floor 4d 08-Oct-12 11-Oct-12 11-Oct-12, Second Floor
I . nd .M910 Internal 4d 08-Oct-12 11-Oct-12 Internal
E. nd .M910 External 2d 08-Oct-12 09-Oct-12 External
Third Floor 4d 03-Nov-12 06-Nov-12 06-Nov-12, Third Floor
I . rd .M910 Internal 4d 03-Nov-12 06-Nov-12 Internal
E . rd .M910 External 2d 03-Nov-12 04-Nov-12 External
Fourth Floor 4d 24-Nov-12 27-Nov-12 27-Nov-12, Fourth Floor
I .th .M910 Internal 4d 24-Nov-12 27-Nov-12 Internal
E. th .M910 External 2d 24-Nov-12 25-Nov-12 External
Roof 1d 28-Nov-12 28-Nov-12 28-Nov-12, Roof
E .R .M910 External 1d 28-Nov-12 28-Nov-12 External
Finishing 85d 27-Aug-12 06-Dec-12 06-Dec-12, Finishing
Ground Floor 2d 27-Aug-12 28-Aug-12 28-Aug-12, Ground Floor
Calm Shell 2d 27-Aug-12 28-Aug-12 28-Aug-12, Calm Shell
E.Ch .G.9 External 2d 27-Aug-12 28-Aug-12 External
External Ele
Electrical 0d
First Floor 2d 18-Sep-12 19-Sep-12 19-Sep-12, First Floor
Calm Shell 2d 18-Sep-12 19-Sep-12 19-Sep-12, Calm Shell
E .ch .st91 External 2d 18-Sep-12 19-Sep-12 External
External Ele
Electrical 0d
Second Floor 2d 10-Oct-12 11-Oct-12 11-Oct-12, Second Floor
Calm Shell 2d 10-Oct-12 11-Oct-12 11-Oct-12, Calm Shell
E.ch .nd91 External 2d 10-Oct-12 11-Oct-12 External
External Ele
Electrical 0d
Third Floor 2d 05-Nov-12 06-Nov-12 06-Nov-12, Third Floor
Calm Shell 2d 05-Nov-12 06-Nov-12 06-Nov-12, Calm Shell
E.ch. rd910 External 2d 05-Nov-12 06-Nov-12 External
External Ele
Electrical 0d

Actual Work Critical Remaining Work Summary Page 56 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

232
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Fourth Floor 2d 26-Nov-12 27-Nov-12 27-Nov-12, Fourth Floor
Calm Shell 2d 26-Nov-12 27-Nov-12 27-Nov-12, Calm Shell
E.ch .th910 External 2d 26-Nov-12 27-Nov-12 External
External Ele
Electrical 0d
Roof 1d 29-Nov-12 29-Nov-12 29-Nov-12, Roof
Calm Shell 1d 29-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch .r910 External 1d 29-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Painting Cond. 6d 01-Dec-12 06-Dec-12 06-Dec-12, Painting Cond.
Ex. Paint910 External Painting 6d 01-Dec-12 06-Dec-12 External Painting
Marbling 5d 01-Dec-12 05-Dec-12 05-Dec-12, Marbling
E.M.F910 Entrance 4d 01-Dec-12 04-Dec-12 Entrance
S.M.F910 Stairs 5d 01-Dec-12 05-Dec-12 Stairs
Condonminium Appartments-11
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-11
A5050 start of cond. 0d 01-Nov-11 start of cond.
A5040 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.940 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.940 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F940 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG9 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B9 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st9 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab

Actual Work Critical Remaining Work Summary Page 57 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

233
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M940 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M940 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M940 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M940 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M940 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M940 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M940 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M940 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M940 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M940 Internal 4d 17-May-12 21-May-12 Internal
E. th .M940 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof
E .R .M940 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.9 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st94 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd94 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd940 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th940 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r940 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint940 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F940 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F940 Stairs 5d 24-May-12 29-May-12 Stairs
Condonminium Appartments-12
App 334d 01-Nov-11 06-Dec-12 06-Dec-12, Condonminium Appartments-12
A5030 start of cond. 0d 01-Nov-11 start of cond.
A5020 finish of cond. 0d 06-Dec-12 finish of cond.
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization

Actual Work Critical Remaining Work Summary Page 58 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

234
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
M.Sur.930 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 197d 15-Nov-11 02-Jul-12 02-Jul-12, Earth Work
Ex.930 Excavation 7d 15-Nov-11 22-Nov-11 Excavation
B.F930 BackFill 2d 01-Jul-12 02-Jul-12 BackFill
Civil Work 157d 17-May-12 22-Nov-12 22-Nov-12, Civil Work
Foundation 30d 17-May-12 20-Jun-12 20-Jun-12, Foundation
Footing 30d 17-May-12 20-Jun-12 20-Jun-12, Footing
Plain Concrete
Con 10d 17-May-12 28-May-12 28-May-12, Plain Concrete
FW.PC Form Work 7d 17-May-12 24-May-12 Form Work
Pour.Pc Pouring Concrete 1d 26-May-12 26-May-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 28-May-12 28-May-12 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 29-May-12 20-Jun-12 20-Jun-12, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-May-12 06-Jun-12 Form Work
R.F.T.R R.F.T 6d 07-Jun-12 13-Jun-12 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jun-12 14-Jun-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 17-Jun-12 17-Jun-12 Remove Formwork
InsRc& Insulting 3d 18-Jun-12 20-Jun-12 Insulting
Basement 26d 21-Jun-12 21-Jul-12 21-Jul-12, Basement
Slab On Grade
Gra 16d 03-Jul-12 21-Jul-12 21-Jul-12, Slab On Grade
FW.SOG9 Form Work 5d 03-Jul-12 08-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 09-Jul-12 12-Jul-12 R.F.T
Pour.SOG Pouring Concrete 1d 14-Jul-12 14-Jul-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 21-Jul-12 21-Jul-12 Remove Formwork
Columns 8d 21-Jun-12 30-Jun-12 30-Jun-12, Columns
FW.Col.B9 Form Work 2d 21-Jun-12 23-Jun-12 Form Work
R.F.T.Col. R.F.T 3d 24-Jun-12 26-Jun-12 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jun-12 27-Jun-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 30-Jun-12 30-Jun-12 Remove Formwork
Ground Floor 24d 03-Jul-12 30-Jul-12 30-Jul-12, Ground Floor
Beam and s
slab 13d 03-Jul-12 17-Jul-12 17-Jul-12, Beam and slab
FW.B&S.G Form Work 5d 03-Jul-12 08-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 03-Jul-12 08-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Jul-12 09-Jul-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 17-Jul-12 17-Jul-12 Remove Formwork
Columns 8d 22-Jul-12 30-Jul-12 30-Jul-12, Columns
FW.Col.G Form Work 2d 22-Jul-12 23-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 24-Jul-12 26-Jul-12 R.F.T
Pour..Col.G Pouring Concrete 1d 28-Jul-12 28-Jul-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 30-Jul-12 30-Jul-12 Remove Formwork
First Floor 19d 31-Jul-12 25-Aug-12 25-Aug-12, First Floor
Beams and slab 18d 31-Jul-12 23-Aug-12 23-Aug-12, Beams and slab
FW.B&S.s Form Work 5d 31-Jul-12 05-Aug-12 Form Work
R.F.T.B&S R.F.T 5d 06-Aug-12 11-Aug-12 R.F.T
Pour.B&S. Pouring Concrete 1d 12-Aug-12 12-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 23-Aug-12 23-Aug-12 Remove Formwork
Columns 8d 13-Aug-12 25-Aug-12 25-Aug-12, Columns
FW.Col.st9 Form Work 2d 13-Aug-12 14-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 15-Aug-12 18-Aug-12 R.F.T
Pour.Col.s Pouring Concrete 1d 22-Aug-12 22-Aug-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Aug-12 25-Aug-12 Remove Formwork
Second Floor 19d 26-Aug-12 16-Sep-12 16-Sep-12, Second Floor
Beams and slab 18d 26-Aug-12 15-Sep-12 15-Sep-12, Beams and slab
FW.B&S.n Form Work 5d 26-Aug-12 30-Aug-12 Form Work
R.F.T.B&S R.F.T 5d 01-Sep-12 05-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Sep-12 06-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Sep-12 15-Sep-12 Remove Formwork
Columns 8d 08-Sep-12 16-Sep-12 16-Sep-12, Columns
FW.Col.nd Form Work 2d 08-Sep-12 09-Sep-12 Form Work
R.F.T.Col. R.F.T 3d 10-Sep-12 12-Sep-12 R.F.T
Pour.Col.n Pouring Concrete 1d 13-Sep-12 13-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Third Floor 19d 17-Sep-12 08-Oct-12 08-Oct-12, Third Floor
Beams and slab 18d 17-Sep-12 07-Oct-12 07-Oct-12, Beams and slab
FW.B&S.r Form Work 5d 17-Sep-12 22-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 23-Sep-12 27-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Sep-12 29-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 07-Oct-12 07-Oct-12 Remove Formwork
Columns 8d 30-Sep-12 08-Oct-12 08-Oct-12, Columns
FW.Col.rd Form Work 2d 30-Sep-12 01-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 02-Oct-12 04-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 06-Oct-12 06-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Fourth Floor 19d 09-Oct-12 03-Nov-12 03-Nov-12, Fourth Floor
Beams and slab 18d 09-Oct-12 01-Nov-12 01-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 09-Oct-12 14-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 15-Oct-12 20-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Oct-12 21-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 01-Nov-12 01-Nov-12 Remove Formwork
Columns 8d 22-Oct-12 03-Nov-12 03-Nov-12, Columns

Actual Work Critical Remaining Work Summary Page 59 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

235
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.Col.th Form Work 2d 22-Oct-12 23-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 24-Oct-12 30-Oct-12 R.F.T
Pour.Col.th Pouring Concrete 1d 31-Oct-12 31-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Roof 17d 04-Nov-12 22-Nov-12 22-Nov-12, Roof
Beams and slab 17d 04-Nov-12 22-Nov-12 22-Nov-12, Beams and slab
FW.B&S.R Form Work 5d 04-Nov-12 08-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 10-Nov-12 14-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 15-Nov-12 15-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Nov-12 22-Nov-12 Remove Formwork
Mansonary 109d 18-Jul-12 28-Nov-12 28-Nov-12, Mansonary
Basement 2d 18-Jul-12 19-Jul-12 19-Jul-12, Basement
E.B.M930 External 2d 18-Jul-12 19-Jul-12 External
Ground Floor 4d 25-Aug-12 28-Aug-12 28-Aug-12, Ground Floor
I.G.M930 Internal 4d 25-Aug-12 28-Aug-12 Internal
E.G.M930 External 2d 25-Aug-12 26-Aug-12 External
First Floor 4d 16-Sep-12 19-Sep-12 19-Sep-12, First Floor
I.st .M930 Internal 4d 16-Sep-12 19-Sep-12 Internal
E.st .M930 External 2d 16-Sep-12 17-Sep-12 External
Second Floor 4d 08-Oct-12 11-Oct-12 11-Oct-12, Second Floor
I . nd .M930 Internal 4d 08-Oct-12 11-Oct-12 Internal
E. nd .M930 External 2d 08-Oct-12 09-Oct-12 External
Third Floor 4d 03-Nov-12 06-Nov-12 06-Nov-12, Third Floor
I . rd .M930 Internal 4d 03-Nov-12 06-Nov-12 Internal
E . rd .M930 External 2d 03-Nov-12 04-Nov-12 External
Fourth Floor 4d 24-Nov-12 27-Nov-12 27-Nov-12, Fourth Floor
I .th .M930 Internal 4d 24-Nov-12 27-Nov-12 Internal
E. th .M930 External 2d 24-Nov-12 25-Nov-12 External
Roof 1d 28-Nov-12 28-Nov-12 28-Nov-12, Roof
E .R .M930 External 1d 28-Nov-12 28-Nov-12 External
Finishing 85d 27-Aug-12 06-Dec-12 06-Dec-12, Finishing
Ground Floor 2d 27-Aug-12 28-Aug-12 28-Aug-12, Ground Floor
Calm Shell 2d 27-Aug-12 28-Aug-12 28-Aug-12, Calm Shell
E.Ch .G.9 External 2d 27-Aug-12 28-Aug-12 External
External Ele
Electrical 0d
First Floor 2d 18-Sep-12 19-Sep-12 19-Sep-12, First Floor
Calm Shell 2d 18-Sep-12 19-Sep-12 19-Sep-12, Calm Shell
E .ch .st93 External 2d 18-Sep-12 19-Sep-12 External
External Ele
Electrical 0d
Second Floor 2d 10-Oct-12 11-Oct-12 11-Oct-12, Second Floor
Calm Shell 2d 10-Oct-12 11-Oct-12 11-Oct-12, Calm Shell
E.ch .nd93 External 2d 10-Oct-12 11-Oct-12 External
External Ele
Electrical 0d
Third Floor 2d 05-Nov-12 06-Nov-12 06-Nov-12, Third Floor
Calm Shell 2d 05-Nov-12 06-Nov-12 06-Nov-12, Calm Shell
E.ch. rd930 External 2d 05-Nov-12 06-Nov-12 External
External Ele
Electrical 0d
Fourth Floor 2d 26-Nov-12 27-Nov-12 27-Nov-12, Fourth Floor
Calm Shell 2d 26-Nov-12 27-Nov-12 27-Nov-12, Calm Shell
E.ch .th930 External 2d 26-Nov-12 27-Nov-12 External
External Ele
Electrical 0d
Roof 1d 29-Nov-12 29-Nov-12 29-Nov-12, Roof
Calm Shell 1d 29-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch .r930 External 1d 29-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Painting Cond. 6d 01-Dec-12 06-Dec-12 06-Dec-12, Painting Cond.
Ex. Paint930 External Painting 6d 01-Dec-12 06-Dec-12 External Painting
Marbling 5d 01-Dec-12 05-Dec-12 05-Dec-12, Marbling
E.M.F930 Entrance 4d 01-Dec-12 04-Dec-12 Entrance
S.M.F930 Stairs 5d 01-Dec-12 05-Dec-12 Stairs
Condonminium Appartments-17
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-17
A5090 start of cond. 0d 01-Nov-11 start of cond.
A5080 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.960 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.960 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F960 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting

Actual Work Critical Remaining Work Summary Page 60 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

236
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG9 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B9 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st9 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M960 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M960 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M960 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor

Actual Work Critical Remaining Work Summary Page 61 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

237
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
I.st .M960 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M960 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M960 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M960 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M960 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M960 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M960 Internal 4d 17-May-12 21-May-12 Internal
E. th .M960 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof
E .R .M960 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.9 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st96 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd96 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd960 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th960 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r960 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint960 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F960 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F960 Stairs 5d 24-May-12 29-May-12 Stairs
Condonminium Appartments-18
App 334d 01-Nov-11 06-Dec-12 06-Dec-12, Condonminium Appartments-18
A5070 start of cond. 0d 01-Nov-11 start of cond.
A5060 finish of cond. 0d 06-Dec-12 finish of cond.
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M.Sur.950 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 197d 15-Nov-11 02-Jul-12 02-Jul-12, Earth Work
Ex.950 Excavation 7d 15-Nov-11 22-Nov-11 Excavation
B.F950 BackFill 2d 01-Jul-12 02-Jul-12 BackFill
Civil Work 157d 17-May-12 22-Nov-12 22-Nov-12, Civil Work
Foundation 30d 17-May-12 20-Jun-12 20-Jun-12, Foundation
Footing 30d 17-May-12 20-Jun-12 20-Jun-12, Footing
Plain Concrete
Con 10d 17-May-12 28-May-12 28-May-12, Plain Concrete
FW.PC Form Work 7d 17-May-12 24-May-12 Form Work
Pour.Pc Pouring Concrete 1d 26-May-12 26-May-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 28-May-12 28-May-12 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 29-May-12 20-Jun-12 20-Jun-12, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-May-12 06-Jun-12 Form Work
R.F.T.R R.F.T 6d 07-Jun-12 13-Jun-12 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jun-12 14-Jun-12 Pouring Concrete
R.Fw.R Remove Formwork 1d 17-Jun-12 17-Jun-12 Remove Formwork
InsRc& Insulting 3d 18-Jun-12 20-Jun-12 Insulting
Basement 26d 21-Jun-12 21-Jul-12 21-Jul-12, Basement
Slab On Grade
Gra 16d 03-Jul-12 21-Jul-12 21-Jul-12, Slab On Grade
FW.SOG9 Form Work 5d 03-Jul-12 08-Jul-12 Form Work
R.F.T.SOG R.F.T 4d 09-Jul-12 12-Jul-12 R.F.T
Pour.SOG Pouring Concrete 1d 14-Jul-12 14-Jul-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 21-Jul-12 21-Jul-12 Remove Formwork
Columns 8d 21-Jun-12 30-Jun-12 30-Jun-12, Columns
FW.Col.B9 Form Work 2d 21-Jun-12 23-Jun-12 Form Work
R.F.T.Col. R.F.T 3d 24-Jun-12 26-Jun-12 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jun-12 27-Jun-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 30-Jun-12 30-Jun-12 Remove Formwork
Ground Floor 24d 03-Jul-12 30-Jul-12 30-Jul-12, Ground Floor
Beam and s
slab 13d 03-Jul-12 17-Jul-12 17-Jul-12, Beam and slab
FW.B&S.G Form Work 5d 03-Jul-12 08-Jul-12 Form Work
R.F.T.B&S R.F.T 5d 03-Jul-12 08-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Jul-12 09-Jul-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 17-Jul-12 17-Jul-12 Remove Formwork

Actual Work Critical Remaining Work Summary Page 62 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

238
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Columns 8d 22-Jul-12 30-Jul-12 30-Jul-12, Columns
FW.Col.G Form Work 2d 22-Jul-12 23-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 24-Jul-12 26-Jul-12 R.F.T
Pour..Col.G Pouring Concrete 1d 28-Jul-12 28-Jul-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 30-Jul-12 30-Jul-12 Remove Formwork
First Floor 19d 31-Jul-12 25-Aug-12 25-Aug-12, First Floor
Beams and slab 18d 31-Jul-12 23-Aug-12 23-Aug-12, Beams and slab
FW.B&S.s Form Work 5d 31-Jul-12 05-Aug-12 Form Work
R.F.T.B&S R.F.T 5d 06-Aug-12 11-Aug-12 R.F.T
Pour.B&S. Pouring Concrete 1d 12-Aug-12 12-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 23-Aug-12 23-Aug-12 Remove Formwork
Columns 8d 13-Aug-12 25-Aug-12 25-Aug-12, Columns
FW.Col.st9 Form Work 2d 13-Aug-12 14-Aug-12 Form Work
R.F.T.Col. R.F.T 3d 15-Aug-12 18-Aug-12 R.F.T
Pour.Col.s Pouring Concrete 1d 22-Aug-12 22-Aug-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Aug-12 25-Aug-12 Remove Formwork
Second Floor 19d 26-Aug-12 16-Sep-12 16-Sep-12, Second Floor
Beams and slab 18d 26-Aug-12 15-Sep-12 15-Sep-12, Beams and slab
FW.B&S.n Form Work 5d 26-Aug-12 30-Aug-12 Form Work
R.F.T.B&S R.F.T 5d 01-Sep-12 05-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Sep-12 06-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Sep-12 15-Sep-12 Remove Formwork
Columns 8d 08-Sep-12 16-Sep-12 16-Sep-12, Columns
FW.Col.nd Form Work 2d 08-Sep-12 09-Sep-12 Form Work
R.F.T.Col. R.F.T 3d 10-Sep-12 12-Sep-12 R.F.T
Pour.Col.n Pouring Concrete 1d 13-Sep-12 13-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 16-Sep-12 16-Sep-12 Remove Formwork
Third Floor 19d 17-Sep-12 08-Oct-12 08-Oct-12, Third Floor
Beams and slab 18d 17-Sep-12 07-Oct-12 07-Oct-12, Beams and slab
FW.B&S.r Form Work 5d 17-Sep-12 22-Sep-12 Form Work
R.F.T.B&S R.F.T 5d 23-Sep-12 27-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Sep-12 29-Sep-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 07-Oct-12 07-Oct-12 Remove Formwork
Columns 8d 30-Sep-12 08-Oct-12 08-Oct-12, Columns
FW.Col.rd Form Work 2d 30-Sep-12 01-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 02-Oct-12 04-Oct-12 R.F.T
Pour.col.rd Pouring Concrete 1d 06-Oct-12 06-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-Oct-12 08-Oct-12 Remove Formwork
Fourth Floor 19d 09-Oct-12 03-Nov-12 03-Nov-12, Fourth Floor
Beams and slab 18d 09-Oct-12 01-Nov-12 01-Nov-12, Beams and slab
FW.B&S.th Form Work 5d 09-Oct-12 14-Oct-12 Form Work
R.F.T.B&S R.F.T 5d 15-Oct-12 20-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Oct-12 21-Oct-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 01-Nov-12 01-Nov-12 Remove Formwork
Columns 8d 22-Oct-12 03-Nov-12 03-Nov-12, Columns
FW.Col.th Form Work 2d 22-Oct-12 23-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 24-Oct-12 30-Oct-12 R.F.T
Pour.Col.th Pouring Concrete 1d 31-Oct-12 31-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Nov-12 03-Nov-12 Remove Formwork
Roof 17d 04-Nov-12 22-Nov-12 22-Nov-12, Roof
Beams and slab 17d 04-Nov-12 22-Nov-12 22-Nov-12, Beams and slab
FW.B&S.R Form Work 5d 04-Nov-12 08-Nov-12 Form Work
R.F.T.B&S R.F.T 5d 10-Nov-12 14-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 15-Nov-12 15-Nov-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 22-Nov-12 22-Nov-12 Remove Formwork
Mansonary 109d 18-Jul-12 28-Nov-12 28-Nov-12, Mansonary
Basement 2d 18-Jul-12 19-Jul-12 19-Jul-12, Basement
E.B.M950 External 2d 18-Jul-12 19-Jul-12 External
Ground Floor 4d 25-Aug-12 28-Aug-12 28-Aug-12, Ground Floor
I.G.M950 Internal 4d 25-Aug-12 28-Aug-12 Internal
E.G.M950 External 2d 25-Aug-12 26-Aug-12 External
First Floor 4d 16-Sep-12 19-Sep-12 19-Sep-12, First Floor
I.st .M950 Internal 4d 16-Sep-12 19-Sep-12 Internal
E.st .M950 External 2d 16-Sep-12 17-Sep-12 External
Second Floor 4d 08-Oct-12 11-Oct-12 11-Oct-12, Second Floor
I . nd .M950 Internal 4d 08-Oct-12 11-Oct-12 Internal
E. nd .M950 External 2d 08-Oct-12 09-Oct-12 External
Third Floor 4d 03-Nov-12 06-Nov-12 06-Nov-12, Third Floor
I . rd .M950 Internal 4d 03-Nov-12 06-Nov-12 Internal
E . rd .M950 External 2d 03-Nov-12 04-Nov-12 External
Fourth Floor 4d 24-Nov-12 27-Nov-12 27-Nov-12, Fourth Floor
I .th .M950 Internal 4d 24-Nov-12 27-Nov-12 Internal
E. th .M950 External 2d 24-Nov-12 25-Nov-12 External
Roof 1d 28-Nov-12 28-Nov-12 28-Nov-12, Roof
E .R .M950 External 1d 28-Nov-12 28-Nov-12 External
Finishing 85d 27-Aug-12 06-Dec-12 06-Dec-12, Finishing
Ground Floor 2d 27-Aug-12 28-Aug-12 28-Aug-12, Ground Floor
Calm Shell 2d 27-Aug-12 28-Aug-12 28-Aug-12, Calm Shell
E.Ch .G.9 External 2d 27-Aug-12 28-Aug-12 External

Actual Work Critical Remaining Work Summary Page 63 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

239
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
External Ele
Electrical 0d
First Floor 2d 18-Sep-12 19-Sep-12 19-Sep-12, First Floor
Calm Shell 2d 18-Sep-12 19-Sep-12 19-Sep-12, Calm Shell
E .ch .st95 External 2d 18-Sep-12 19-Sep-12 External
External Ele
Electrical 0d
Second Floor 2d 10-Oct-12 11-Oct-12 11-Oct-12, Second Floor
Calm Shell 2d 10-Oct-12 11-Oct-12 11-Oct-12, Calm Shell
E.ch .nd95 External 2d 10-Oct-12 11-Oct-12 External
External Ele
Electrical 0d
Third Floor 2d 05-Nov-12 06-Nov-12 06-Nov-12, Third Floor
Calm Shell 2d 05-Nov-12 06-Nov-12 06-Nov-12, Calm Shell
E.ch. rd950 External 2d 05-Nov-12 06-Nov-12 External
External Ele
Electrical 0d
Fourth Floor 2d 26-Nov-12 27-Nov-12 27-Nov-12, Fourth Floor
Calm Shell 2d 26-Nov-12 27-Nov-12 27-Nov-12, Calm Shell
E.ch .th950 External 2d 26-Nov-12 27-Nov-12 External
External Ele
Electrical 0d
Roof 1d 29-Nov-12 29-Nov-12 29-Nov-12, Roof
Calm Shell 1d 29-Nov-12 29-Nov-12 29-Nov-12, Calm Shell
E.ch .r950 External 1d 29-Nov-12 29-Nov-12 External
External Ele
Electrical 0d
Painting Cond. 6d 01-Dec-12 06-Dec-12 06-Dec-12, Painting Cond.
Ex. Paint950 External Painting 6d 01-Dec-12 06-Dec-12 External Painting
Marbling 5d 01-Dec-12 05-Dec-12 05-Dec-12, Marbling
E.M.F950 Entrance 4d 01-Dec-12 04-Dec-12 Entrance
S.M.F950 Stairs 5d 01-Dec-12 05-Dec-12 Stairs
Condonminium Appartments-19
App 177d 01-Nov-11 30-May-12 30-May-12, Condonminium Appartments-19
A5110 start of cond. 0d 01-Nov-11 start of cond.
A5100 finish of cond. 0d 30-May-12 finish of cond.
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur.970 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 47d 02-Nov-11 31-Dec-11 31-Dec-11, Earth Work
Ex.970 Excavation 7d 02-Nov-11 14-Nov-11 Excavation
B.F970 BackFill 2d 29-Dec-11 31-Dec-11 BackFill
Civil Work 157d 15-Nov-11 16-May-12 16-May-12, Civil Work
Foundation 30d 15-Nov-11 19-Dec-11 19-Dec-11, Foundation
Footing 30d 15-Nov-11 19-Dec-11 19-Dec-11, Footing
Plain Concrete
Con 10d 15-Nov-11 26-Nov-11 26-Nov-11, Plain Concrete
FW.PC Form Work 7d 15-Nov-11 22-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 23-Nov-11 23-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 26-Nov-11 26-Nov-11 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 27-Nov-11 19-Dec-11 19-Dec-11, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 27-Nov-11 05-Dec-11 Form Work
R.F.T.R R.F.T 6d 06-Dec-11 12-Dec-11 R.F.T
Pour.Rc Pouring Concrete 1d 13-Dec-11 13-Dec-11 Pouring Concrete
R.Fw.R Remove Formwork 1d 15-Dec-11 15-Dec-11 Remove Formwork
InsRc& Insulting 3d 17-Dec-11 19-Dec-11 Insulting
Basement 26d 20-Dec-11 18-Jan-12 18-Jan-12, Basement
Slab On Grade
Gra 16d 01-Jan-12 18-Jan-12 18-Jan-12, Slab On Grade
FW.SOG9 Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.SOG R.F.T 4d 07-Jan-12 10-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jan-12 11-Jan-12 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 18-Jan-12 18-Jan-12 Remove Formwork
Columns 8d 20-Dec-11 28-Dec-11 28-Dec-11, Columns
FW.Col.B9 Form Work 2d 20-Dec-11 21-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 22-Dec-11 25-Dec-11 R.F.T
Pour.Col.B Pouring Concrete 1d 26-Dec-11 26-Dec-11 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Dec-11 28-Dec-11 Remove Formwork
Ground Floor 24d 01-Jan-12 28-Jan-12 28-Jan-12, Ground Floor
Beam and s
slab 13d 01-Jan-12 15-Jan-12 15-Jan-12, Beam and slab
FW.B&S.G Form Work 5d 01-Jan-12 05-Jan-12 Form Work
R.F.T.B&S R.F.T 5d 01-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 15-Jan-12 15-Jan-12 Remove Formwork
Columns 8d 19-Jan-12 28-Jan-12 28-Jan-12, Columns
FW.Col.G Form Work 2d 19-Jan-12 21-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 22-Jan-12 24-Jan-12 R.F.T
Pour..Col.G Pouring Concrete 1d 25-Jan-12 25-Jan-12 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Jan-12 28-Jan-12 Remove Formwork
First Floor 19d 29-Jan-12 19-Feb-12 19-Feb-12, First Floor
Beams and slab 18d 29-Jan-12 18-Feb-12 18-Feb-12, Beams and slab
FW.B&S.s Form Work 5d 29-Jan-12 02-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 04-Feb-12 08-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Feb-12 18-Feb-12 Remove Formwork
Columns 8d 11-Feb-12 19-Feb-12 19-Feb-12, Columns
FW.Col.st9 Form Work 2d 11-Feb-12 12-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 13-Feb-12 15-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Feb-12 16-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 19-Feb-12 19-Feb-12 Remove Formwork

Actual Work Critical Remaining Work Summary Page 64 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

240
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Second Floor 19d 20-Feb-12 12-Mar-12 12-Mar-12, Second Floor
Beams and slab 18d 20-Feb-12 11-Mar-12 11-Mar-12, Beams and slab
FW.B&S.n Form Work 5d 20-Feb-12 25-Feb-12 Form Work
R.F.T.B&S R.F.T 5d 26-Feb-12 01-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 11-Mar-12 11-Mar-12 Remove Formwork
Columns 8d 04-Mar-12 12-Mar-12 12-Mar-12, Columns
FW.Col.nd Form Work 2d 04-Mar-12 05-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 06-Mar-12 08-Mar-12 R.F.T
Pour.Col.n Pouring Concrete 1d 10-Mar-12 10-Mar-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-Mar-12 12-Mar-12 Remove Formwork
Third Floor 19d 13-Mar-12 03-Apr-12 03-Apr-12, Third Floor
Beams and slab 18d 13-Mar-12 02-Apr-12 02-Apr-12, Beams and slab
FW.B&S.r Form Work 5d 13-Mar-12 18-Mar-12 Form Work
R.F.T.B&S R.F.T 5d 19-Mar-12 24-Mar-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Mar-12 25-Mar-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Apr-12 02-Apr-12 Remove Formwork
Columns 8d 26-Mar-12 03-Apr-12 03-Apr-12, Columns
FW.Col.rd Form Work 2d 26-Mar-12 27-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 28-Mar-12 31-Mar-12 R.F.T
Pour.col.rd Pouring Concrete 1d 01-Apr-12 01-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Apr-12 03-Apr-12 Remove Formwork
Fourth Floor 19d 04-Apr-12 25-Apr-12 25-Apr-12, Fourth Floor
Beams and slab 18d 04-Apr-12 24-Apr-12 24-Apr-12, Beams and slab
FW.B&S.th Form Work 5d 04-Apr-12 09-Apr-12 Form Work
R.F.T.B&S R.F.T 5d 10-Apr-12 15-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Apr-12 16-Apr-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Apr-12 24-Apr-12 Remove Formwork
Columns 8d 17-Apr-12 25-Apr-12 25-Apr-12, Columns
FW.Col.th Form Work 2d 17-Apr-12 18-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-12 22-Apr-12 R.F.T
Pour.Col.th Pouring Concrete 1d 23-Apr-12 23-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Apr-12 25-Apr-12 Remove Formwork
Roof 17d 26-Apr-12 16-May-12 16-May-12, Roof
Beams and slab 17d 26-Apr-12 16-May-12 16-May-12, Beams and slab
FW.B&S.R Form Work 5d 26-Apr-12 02-May-12 Form Work
R.F.T.B&S R.F.T 5d 03-May-12 08-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Mansonary 109d 16-Jan-12 22-May-12 22-May-12, Mansonary
Basement 2d 16-Jan-12 17-Jan-12 17-Jan-12, Basement
E.B.M970 External 2d 16-Jan-12 17-Jan-12 External
Ground Floor 4d 19-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
I.G.M970 Internal 4d 19-Feb-12 22-Feb-12 Internal
E.G.M970 External 2d 19-Feb-12 20-Feb-12 External
First Floor 4d 12-Mar-12 15-Mar-12 15-Mar-12, First Floor
I.st .M970 Internal 4d 12-Mar-12 15-Mar-12 Internal
E.st .M970 External 2d 12-Mar-12 13-Mar-12 External
Second Floor 4d 03-Apr-12 07-Apr-12 07-Apr-12, Second Floor
I . nd .M970 Internal 4d 03-Apr-12 07-Apr-12 Internal
E. nd .M970 External 2d 03-Apr-12 04-Apr-12 External
Third Floor 4d 25-Apr-12 29-Apr-12 29-Apr-12, Third Floor
I . rd .M970 Internal 4d 25-Apr-12 29-Apr-12 Internal
E . rd .M970 External 2d 25-Apr-12 26-Apr-12 External
Fourth Floor 4d 17-May-12 21-May-12 21-May-12, Fourth Floor
I .th .M970 Internal 4d 17-May-12 21-May-12 Internal
E. th .M970 External 2d 17-May-12 19-May-12 External
Roof 1d 22-May-12 22-May-12 22-May-12, Roof
E .R .M970 External 1d 22-May-12 22-May-12 External
Finishing 85d 21-Feb-12 30-May-12 30-May-12, Finishing
Ground Floor 2d 21-Feb-12 22-Feb-12 22-Feb-12, Ground Floor
Calm Shell 2d 21-Feb-12 22-Feb-12 22-Feb-12, Calm Shell
E.Ch .G.9 External 2d 21-Feb-12 22-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 14-Mar-12 15-Mar-12 15-Mar-12, First Floor
Calm Shell 2d 14-Mar-12 15-Mar-12 15-Mar-12, Calm Shell
E .ch .st97 External 2d 14-Mar-12 15-Mar-12 External
External Ele
Electrical 0d
Second Floor 2d 05-Apr-12 07-Apr-12 07-Apr-12, Second Floor
Calm Shell 2d 05-Apr-12 07-Apr-12 07-Apr-12, Calm Shell
E.ch .nd97 External 2d 05-Apr-12 07-Apr-12 External
External Ele
Electrical 0d
Third Floor 2d 28-Apr-12 29-Apr-12 29-Apr-12, Third Floor
Calm Shell 2d 28-Apr-12 29-Apr-12 29-Apr-12, Calm Shell
E.ch. rd970 External 2d 28-Apr-12 29-Apr-12 External
External Ele
Electrical 0d
Fourth Floor 2d 20-May-12 21-May-12 21-May-12, Fourth Floor
Calm Shell 2d 20-May-12 21-May-12 21-May-12, Calm Shell
E.ch .th970 External 2d 20-May-12 21-May-12 External
External Ele
Electrical 0d

Actual Work Critical Remaining Work Summary Page 65 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

241
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Roof 1d 23-May-12 23-May-12 23-May-12, Roof
Calm Shell 1d 23-May-12 23-May-12 23-May-12, Calm Shell
E.ch .r970 External 1d 23-May-12 23-May-12 External
External Ele
Electrical 0d
Painting Cond. 6d 24-May-12 30-May-12 30-May-12, Painting Cond.
Ex. Paint970 External Painting 6d 24-May-12 30-May-12 External Painting
Marbling 5d 24-May-12 29-May-12 29-May-12, Marbling
E.M.F970 Entrance 4d 24-May-12 28-May-12 Entrance
S.M.F970 Stairs 5d 24-May-12 29-May-12 Stairs
Stage 2 334d 08-Dec-12 08-Jan-14 08-Jan-14, Stage 2
A5580 Start of Stage 2 0d 08-Dec-12 Start of Stage 2
A5590 Finsih of Stage 2 0d 08-Jan-14 Finsih of Stage 2
Condonminium Appartments-20
App 177d 08-Dec-12 02-Jul-13 02-Jul-13, Condonminium Appartments-20
A5150 start of cond. 0d 08-Dec-12 start of cond.
A5140 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 08-Dec-12 08-Dec-12 08-Dec-12, Mobilization
M.Sur.990 Site Surveying 1d 08-Dec-12 08-Dec-12 Site Surveying
Earth Work 47d 09-Dec-12 31-Jan-13 31-Jan-13, Earth Work
Ex.990 Excavation 7d 09-Dec-12 16-Dec-12 Excavation
B.F990 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG9 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B9 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st9 Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab

Actual Work Critical Remaining Work Summary Page 66 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

242
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:37

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M990 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M990 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M990 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M990 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M990 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M990 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M990 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M990 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M990 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M990 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M990 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M990 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.9 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st99 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd99 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd990 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th990 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r990 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint990 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F990 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F990 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-21
App 334d 08-Dec-12 08-Jan-14 08-Jan-14, Condonminium Appartments-21
A5130 start of cond. 0d 08-Dec-12 start of cond.
A5120 finish of cond. 0d 08-Jan-14 finish of cond.
Mobilization 1d 09-Dec-12 09-Dec-12 09-Dec-12, Mobilization

Actual Work Critical Remaining Work Summary Page 67 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

243
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
M.Sur.980 Site Surveying 1d 09-Dec-12 09-Dec-12 Site Surveying
Earth Work 197d 17-Dec-12 04-Aug-13 04-Aug-13, Earth Work
Ex.980 Excavation 7d 17-Dec-12 24-Dec-12 Excavation
B.F980 BackFill 2d 03-Aug-13 04-Aug-13 BackFill
Civil Work 157d 19-Jun-13 25-Dec-13 25-Dec-13, Civil Work
Foundation 30d 19-Jun-13 23-Jul-13 23-Jul-13, Foundation
Footing 30d 19-Jun-13 23-Jul-13 23-Jul-13, Footing
Plain Concrete
Con 10d 19-Jun-13 30-Jun-13 30-Jun-13, Plain Concrete
FW.PC Form Work 7d 19-Jun-13 26-Jun-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Jun-13 27-Jun-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 30-Jun-13 30-Jun-13 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 01-Jul-13 23-Jul-13 23-Jul-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 01-Jul-13 09-Jul-13 Form Work
R.F.T.R R.F.T 6d 10-Jul-13 16-Jul-13 R.F.T
Pour.Rc Pouring Concrete 1d 17-Jul-13 17-Jul-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 20-Jul-13 20-Jul-13 Remove Formwork
InsRc& Insulting 3d 21-Jul-13 23-Jul-13 Insulting
Basement 26d 24-Jul-13 25-Aug-13 25-Aug-13, Basement
Slab On Grade
Gra 16d 05-Aug-13 25-Aug-13 25-Aug-13, Slab On Grade
FW.SOG9 Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.SOG R.F.T 4d 13-Aug-13 17-Aug-13 R.F.T
Pour.SOG Pouring Concrete 1d 18-Aug-13 18-Aug-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 25-Aug-13 25-Aug-13 Remove Formwork
Columns 8d 24-Jul-13 01-Aug-13 01-Aug-13, Columns
FW.Col.B9 Form Work 2d 24-Jul-13 25-Jul-13 Form Work
R.F.T.Col. R.F.T 3d 27-Jul-13 29-Jul-13 R.F.T
Pour.Col.B Pouring Concrete 1d 30-Jul-13 30-Jul-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Aug-13 01-Aug-13 Remove Formwork
Ground Floor 24d 05-Aug-13 03-Sep-13 03-Sep-13, Ground Floor
Beam and s
slab 13d 05-Aug-13 21-Aug-13 21-Aug-13, Beam and slab
FW.B&S.G Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.B&S R.F.T 5d 05-Aug-13 12-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Aug-13 13-Aug-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Aug-13 21-Aug-13 Remove Formwork
Columns 8d 26-Aug-13 03-Sep-13 03-Sep-13, Columns
FW.Col.G Form Work 2d 26-Aug-13 27-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 28-Aug-13 31-Aug-13 R.F.T
Pour..Col.G Pouring Concrete 1d 01-Sep-13 01-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 03-Sep-13 03-Sep-13 Remove Formwork
First Floor 19d 04-Sep-13 25-Sep-13 25-Sep-13, First Floor
Beams and slab 18d 04-Sep-13 24-Sep-13 24-Sep-13, Beams and slab
FW.B&S.s Form Work 5d 04-Sep-13 09-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 10-Sep-13 15-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Sep-13 16-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Sep-13 24-Sep-13 Remove Formwork
Columns 8d 17-Sep-13 25-Sep-13 25-Sep-13, Columns
FW.Col.st9 Form Work 2d 17-Sep-13 18-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 19-Sep-13 22-Sep-13 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Sep-13 23-Sep-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Sep-13 25-Sep-13 Remove Formwork
Second Floor 19d 26-Sep-13 22-Oct-13 22-Oct-13, Second Floor
Beams and slab 18d 26-Sep-13 21-Oct-13 21-Oct-13, Beams and slab
FW.B&S.n Form Work 5d 26-Sep-13 01-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 02-Oct-13 08-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Oct-13 09-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Oct-13 21-Oct-13 Remove Formwork
Columns 8d 10-Oct-13 22-Oct-13 22-Oct-13, Columns
FW.Col.nd Form Work 2d 10-Oct-13 12-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 13-Oct-13 19-Oct-13 R.F.T
Pour.Col.n Pouring Concrete 1d 20-Oct-13 20-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Third Floor 19d 23-Oct-13 13-Nov-13 13-Nov-13, Third Floor
Beams and slab 18d 23-Oct-13 12-Nov-13 12-Nov-13, Beams and slab
FW.B&S.r Form Work 5d 23-Oct-13 28-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 29-Oct-13 03-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Nov-13 04-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 12-Nov-13 12-Nov-13 Remove Formwork
Columns 8d 05-Nov-13 13-Nov-13 13-Nov-13, Columns
FW.Col.rd Form Work 2d 05-Nov-13 06-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 07-Nov-13 10-Nov-13 R.F.T
Pour.col.rd Pouring Concrete 1d 11-Nov-13 11-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Fourth Floor 19d 14-Nov-13 05-Dec-13 05-Dec-13, Fourth Floor
Beams and slab 18d 14-Nov-13 04-Dec-13 04-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 14-Nov-13 19-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 20-Nov-13 25-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Nov-13 26-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 04-Dec-13 04-Dec-13 Remove Formwork
Columns 8d 27-Nov-13 05-Dec-13 05-Dec-13, Columns

Actual Work Critical Remaining Work Summary Page 68 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

244
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.Col.th Form Work 2d 27-Nov-13 28-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 30-Nov-13 02-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 03-Dec-13 03-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Roof 17d 07-Dec-13 25-Dec-13 25-Dec-13, Roof
Beams and slab 17d 07-Dec-13 25-Dec-13 25-Dec-13, Beams and slab
FW.B&S.R Form Work 5d 07-Dec-13 11-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 12-Dec-13 17-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 18-Dec-13 18-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Dec-13 25-Dec-13 Remove Formwork
Mansonary 109d 22-Aug-13 31-Dec-13 31-Dec-13, Mansonary
Basement 2d 22-Aug-13 24-Aug-13 24-Aug-13, Basement
E.B.M980 External 2d 22-Aug-13 24-Aug-13 External
Ground Floor 4d 25-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
I.G.M980 Internal 4d 25-Sep-13 29-Sep-13 Internal
E.G.M980 External 2d 25-Sep-13 26-Sep-13 External
First Floor 4d 22-Oct-13 26-Oct-13 26-Oct-13, First Floor
I.st .M980 Internal 4d 22-Oct-13 26-Oct-13 Internal
E.st .M980 External 2d 22-Oct-13 23-Oct-13 External
Second Floor 4d 13-Nov-13 17-Nov-13 17-Nov-13, Second Floor
I . nd .M980 Internal 4d 13-Nov-13 17-Nov-13 Internal
E. nd .M980 External 2d 13-Nov-13 14-Nov-13 External
Third Floor 4d 05-Dec-13 09-Dec-13 09-Dec-13, Third Floor
I . rd .M980 Internal 4d 05-Dec-13 09-Dec-13 Internal
E . rd .M980 External 2d 05-Dec-13 07-Dec-13 External
Fourth Floor 4d 26-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
I .th .M980 Internal 4d 26-Dec-13 30-Dec-13 Internal
E. th .M980 External 2d 26-Dec-13 28-Dec-13 External
Roof 1d 31-Dec-13 31-Dec-13 31-Dec-13, Roof
E .R .M980 External 1d 31-Dec-13 31-Dec-13 External
Finishing 85d 28-Sep-13 08-Jan-14 08-Jan-14, Finishing
Ground Floor 2d 28-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
Calm Shell 2d 28-Sep-13 29-Sep-13 29-Sep-13, Calm Shell
E.Ch .G.9 External 2d 28-Sep-13 29-Sep-13 External
External Ele
Electrical 0d
First Floor 2d 24-Oct-13 26-Oct-13 26-Oct-13, First Floor
Calm Shell 2d 24-Oct-13 26-Oct-13 26-Oct-13, Calm Shell
E .ch .st98 External 2d 24-Oct-13 26-Oct-13 External
External Ele
Electrical 0d
Second Floor 2d 16-Nov-13 17-Nov-13 17-Nov-13, Second Floor
Calm Shell 2d 16-Nov-13 17-Nov-13 17-Nov-13, Calm Shell
E.ch .nd98 External 2d 16-Nov-13 17-Nov-13 External
External Ele
Electrical 0d
Third Floor 2d 08-Dec-13 09-Dec-13 09-Dec-13, Third Floor
Calm Shell 2d 08-Dec-13 09-Dec-13 09-Dec-13, Calm Shell
E.ch. rd980 External 2d 08-Dec-13 09-Dec-13 External
External Ele
Electrical 0d
Fourth Floor 2d 29-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
Calm Shell 2d 29-Dec-13 30-Dec-13 30-Dec-13, Calm Shell
E.ch .th980 External 2d 29-Dec-13 30-Dec-13 External
External Ele
Electrical 0d
Roof 1d 01-Jan-14 01-Jan-14 01-Jan-14, Roof
Calm Shell 1d 01-Jan-14 01-Jan-14 01-Jan-14, Calm Shell
E.ch .r980 External 1d 01-Jan-14 01-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 02-Jan-14 08-Jan-14 08-Jan-14, Painting Cond.
Ex. Paint980 External Painting 6d 02-Jan-14 08-Jan-14 External Painting
Marbling 5d 02-Jan-14 07-Jan-14 07-Jan-14, Marbling
E.M.F980 Entrance 4d 02-Jan-14 06-Jan-14 Entrance
S.M.F980 Stairs 5d 02-Jan-14 07-Jan-14 Stairs
Condonminium Appartments-22
App 177d 08-Dec-12 02-Jul-13 02-Jul-13, Condonminium Appartments-22
A5190 start of cond. 0d 08-Dec-12 start of cond.
A5180 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 08-Dec-12 08-Dec-12 08-Dec-12, Mobilization
M.Sur.1010 Site Surveying 1d 08-Dec-12 08-Dec-12 Site Surveying
Earth Work 47d 09-Dec-12 31-Jan-13 31-Jan-13, Earth Work
Ex.1010 Excavation 7d 09-Dec-12 16-Dec-12 Excavation
B.F1010 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting

Actual Work Critical Remaining Work Summary Page 69 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

245
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG1 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B1 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M1010 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M1010 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M1010 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor

Actual Work Critical Remaining Work Summary Page 70 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

246
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
I.st .M1010 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M1010 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M1010 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M1010 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M1010 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M1010 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M1010 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M1010 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M1010 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.1 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st10 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd10 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd10 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th10 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r1010 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint1010 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F1010 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F1010 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-27
App 334d 08-Dec-12 08-Jan-14 08-Jan-14, Condonminium Appartments-27
A5170 start of cond. 0d 08-Dec-12 start of cond.
A5160 finish of cond. 0d 08-Jan-14 finish of cond.
Mobilization 1d 09-Dec-12 09-Dec-12 09-Dec-12, Mobilization
M.Sur.1000 Site Surveying 1d 09-Dec-12 09-Dec-12 Site Surveying
Earth Work 197d 17-Dec-12 04-Aug-13 04-Aug-13, Earth Work
Ex.1000 Excavation 7d 17-Dec-12 24-Dec-12 Excavation
B.F1000 BackFill 2d 03-Aug-13 04-Aug-13 BackFill
Civil Work 157d 19-Jun-13 25-Dec-13 25-Dec-13, Civil Work
Foundation 30d 19-Jun-13 23-Jul-13 23-Jul-13, Foundation
Footing 30d 19-Jun-13 23-Jul-13 23-Jul-13, Footing
Plain Concrete
Con 10d 19-Jun-13 30-Jun-13 30-Jun-13, Plain Concrete
FW.PC Form Work 7d 19-Jun-13 26-Jun-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Jun-13 27-Jun-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 30-Jun-13 30-Jun-13 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 01-Jul-13 23-Jul-13 23-Jul-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 01-Jul-13 09-Jul-13 Form Work
R.F.T.R R.F.T 6d 10-Jul-13 16-Jul-13 R.F.T
Pour.Rc Pouring Concrete 1d 17-Jul-13 17-Jul-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 20-Jul-13 20-Jul-13 Remove Formwork
InsRc& Insulting 3d 21-Jul-13 23-Jul-13 Insulting
Basement 26d 24-Jul-13 25-Aug-13 25-Aug-13, Basement
Slab On Grade
Gra 16d 05-Aug-13 25-Aug-13 25-Aug-13, Slab On Grade
FW.SOG1 Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.SOG R.F.T 4d 13-Aug-13 17-Aug-13 R.F.T
Pour.SOG Pouring Concrete 1d 18-Aug-13 18-Aug-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 25-Aug-13 25-Aug-13 Remove Formwork
Columns 8d 24-Jul-13 01-Aug-13 01-Aug-13, Columns
FW.Col.B1 Form Work 2d 24-Jul-13 25-Jul-13 Form Work
R.F.T.Col. R.F.T 3d 27-Jul-13 29-Jul-13 R.F.T
Pour.Col.B Pouring Concrete 1d 30-Jul-13 30-Jul-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Aug-13 01-Aug-13 Remove Formwork
Ground Floor 24d 05-Aug-13 03-Sep-13 03-Sep-13, Ground Floor
Beam and s
slab 13d 05-Aug-13 21-Aug-13 21-Aug-13, Beam and slab
FW.B&S.G Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.B&S R.F.T 5d 05-Aug-13 12-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Aug-13 13-Aug-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Aug-13 21-Aug-13 Remove Formwork

Actual Work Critical Remaining Work Summary Page 71 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

247
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Columns 8d 26-Aug-13 03-Sep-13 03-Sep-13, Columns
FW.Col.G Form Work 2d 26-Aug-13 27-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 28-Aug-13 31-Aug-13 R.F.T
Pour..Col.G Pouring Concrete 1d 01-Sep-13 01-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 03-Sep-13 03-Sep-13 Remove Formwork
First Floor 19d 04-Sep-13 25-Sep-13 25-Sep-13, First Floor
Beams and slab 18d 04-Sep-13 24-Sep-13 24-Sep-13, Beams and slab
FW.B&S.s Form Work 5d 04-Sep-13 09-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 10-Sep-13 15-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Sep-13 16-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Sep-13 24-Sep-13 Remove Formwork
Columns 8d 17-Sep-13 25-Sep-13 25-Sep-13, Columns
FW.Col.st Form Work 2d 17-Sep-13 18-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 19-Sep-13 22-Sep-13 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Sep-13 23-Sep-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Sep-13 25-Sep-13 Remove Formwork
Second Floor 19d 26-Sep-13 22-Oct-13 22-Oct-13, Second Floor
Beams and slab 18d 26-Sep-13 21-Oct-13 21-Oct-13, Beams and slab
FW.B&S.n Form Work 5d 26-Sep-13 01-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 02-Oct-13 08-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Oct-13 09-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Oct-13 21-Oct-13 Remove Formwork
Columns 8d 10-Oct-13 22-Oct-13 22-Oct-13, Columns
FW.Col.nd Form Work 2d 10-Oct-13 12-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 13-Oct-13 19-Oct-13 R.F.T
Pour.Col.n Pouring Concrete 1d 20-Oct-13 20-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Third Floor 19d 23-Oct-13 13-Nov-13 13-Nov-13, Third Floor
Beams and slab 18d 23-Oct-13 12-Nov-13 12-Nov-13, Beams and slab
FW.B&S.r Form Work 5d 23-Oct-13 28-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 29-Oct-13 03-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Nov-13 04-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 12-Nov-13 12-Nov-13 Remove Formwork
Columns 8d 05-Nov-13 13-Nov-13 13-Nov-13, Columns
FW.Col.rd Form Work 2d 05-Nov-13 06-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 07-Nov-13 10-Nov-13 R.F.T
Pour.col.rd Pouring Concrete 1d 11-Nov-13 11-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Fourth Floor 19d 14-Nov-13 05-Dec-13 05-Dec-13, Fourth Floor
Beams and slab 18d 14-Nov-13 04-Dec-13 04-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 14-Nov-13 19-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 20-Nov-13 25-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Nov-13 26-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 04-Dec-13 04-Dec-13 Remove Formwork
Columns 8d 27-Nov-13 05-Dec-13 05-Dec-13, Columns
FW.Col.th Form Work 2d 27-Nov-13 28-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 30-Nov-13 02-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 03-Dec-13 03-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Roof 17d 07-Dec-13 25-Dec-13 25-Dec-13, Roof
Beams and slab 17d 07-Dec-13 25-Dec-13 25-Dec-13, Beams and slab
FW.B&S.R Form Work 5d 07-Dec-13 11-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 12-Dec-13 17-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 18-Dec-13 18-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Dec-13 25-Dec-13 Remove Formwork
Mansonary 109d 22-Aug-13 31-Dec-13 31-Dec-13, Mansonary
Basement 2d 22-Aug-13 24-Aug-13 24-Aug-13, Basement
E.B.M1000 External 2d 22-Aug-13 24-Aug-13 External
Ground Floor 4d 25-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
I.G.M1000 Internal 4d 25-Sep-13 29-Sep-13 Internal
E.G.M1000 External 2d 25-Sep-13 26-Sep-13 External
First Floor 4d 22-Oct-13 26-Oct-13 26-Oct-13, First Floor
I.st .M1000 Internal 4d 22-Oct-13 26-Oct-13 Internal
E.st .M1000 External 2d 22-Oct-13 23-Oct-13 External
Second Floor 4d 13-Nov-13 17-Nov-13 17-Nov-13, Second Floor
I . nd .M1000 Internal 4d 13-Nov-13 17-Nov-13 Internal
E. nd .M1000 External 2d 13-Nov-13 14-Nov-13 External
Third Floor 4d 05-Dec-13 09-Dec-13 09-Dec-13, Third Floor
I . rd .M1000 Internal 4d 05-Dec-13 09-Dec-13 Internal
E . rd .M1000 External 2d 05-Dec-13 07-Dec-13 External
Fourth Floor 4d 26-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
I .th .M1000 Internal 4d 26-Dec-13 30-Dec-13 Internal
E. th .M1000 External 2d 26-Dec-13 28-Dec-13 External
Roof 1d 31-Dec-13 31-Dec-13 31-Dec-13, Roof
E .R .M1000 External 1d 31-Dec-13 31-Dec-13 External
Finishing 85d 28-Sep-13 08-Jan-14 08-Jan-14, Finishing
Ground Floor 2d 28-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
Calm Shell 2d 28-Sep-13 29-Sep-13 29-Sep-13, Calm Shell
E.Ch .G.1 External 2d 28-Sep-13 29-Sep-13 External

Actual Work Critical Remaining Work Summary Page 72 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

248
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
External Ele
Electrical 0d
First Floor 2d 24-Oct-13 26-Oct-13 26-Oct-13, First Floor
Calm Shell 2d 24-Oct-13 26-Oct-13 26-Oct-13, Calm Shell
E .ch .st10 External 2d 24-Oct-13 26-Oct-13 External
External Ele
Electrical 0d
Second Floor 2d 16-Nov-13 17-Nov-13 17-Nov-13, Second Floor
Calm Shell 2d 16-Nov-13 17-Nov-13 17-Nov-13, Calm Shell
E.ch .nd10 External 2d 16-Nov-13 17-Nov-13 External
External Ele
Electrical 0d
Third Floor 2d 08-Dec-13 09-Dec-13 09-Dec-13, Third Floor
Calm Shell 2d 08-Dec-13 09-Dec-13 09-Dec-13, Calm Shell
E.ch. rd10 External 2d 08-Dec-13 09-Dec-13 External
External Ele
Electrical 0d
Fourth Floor 2d 29-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
Calm Shell 2d 29-Dec-13 30-Dec-13 30-Dec-13, Calm Shell
E.ch .th10 External 2d 29-Dec-13 30-Dec-13 External
External Ele
Electrical 0d
Roof 1d 01-Jan-14 01-Jan-14 01-Jan-14, Roof
Calm Shell 1d 01-Jan-14 01-Jan-14 01-Jan-14, Calm Shell
E.ch .r1000 External 1d 01-Jan-14 01-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 02-Jan-14 08-Jan-14 08-Jan-14, Painting Cond.
Ex. Paint1000 External Painting 6d 02-Jan-14 08-Jan-14 External Painting
Marbling 5d 02-Jan-14 07-Jan-14 07-Jan-14, Marbling
E.M.F1000 Entrance 4d 02-Jan-14 06-Jan-14 Entrance
S.M.F1000 Stairs 5d 02-Jan-14 07-Jan-14 Stairs
Condonminium Appartments-28
App 177d 08-Dec-12 02-Jul-13 02-Jul-13, Condonminium Appartments-28
A5230 start of cond. 0d 08-Dec-12 start of cond.
A5220 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 08-Dec-12 08-Dec-12 08-Dec-12, Mobilization
M.Sur.1030 Site Surveying 1d 08-Dec-12 08-Dec-12 Site Surveying
Earth Work 47d 09-Dec-12 31-Jan-13 31-Jan-13, Earth Work
Ex.1030 Excavation 7d 09-Dec-12 16-Dec-12 Excavation
B.F1030 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG1 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B1 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork

Actual Work Critical Remaining Work Summary Page 73 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

249
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M1030 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M1030 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M1030 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M1030 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M1030 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M1030 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M1030 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M1030 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M1030 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M1030 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M1030 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M1030 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.1 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st10 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd10 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd10 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th10 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d

Actual Work Critical Remaining Work Summary Page 74 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

250
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r1030 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint1030 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F1030 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F1030 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-29
App 334d 08-Dec-12 08-Jan-14 08-Jan-14, Condonminium Appartments-29
A5330 start of cond. 0d 08-Dec-12 start of cond.
A5320 finish of cond. 0d 08-Jan-14 finish of cond.
Mobilization 1d 09-Dec-12 09-Dec-12 09-Dec-12, Mobilization
M.Sur.1080 Site Surveying 1d 09-Dec-12 09-Dec-12 Site Surveying
Earth Work 197d 17-Dec-12 04-Aug-13 04-Aug-13, Earth Work
Ex.1080 Excavation 7d 17-Dec-12 24-Dec-12 Excavation
B.F1080 BackFill 2d 03-Aug-13 04-Aug-13 BackFill
Civil Work 157d 19-Jun-13 25-Dec-13 25-Dec-13, Civil Work
Foundation 30d 19-Jun-13 23-Jul-13 23-Jul-13, Foundation
Footing 30d 19-Jun-13 23-Jul-13 23-Jul-13, Footing
Plain Concrete
Con 10d 19-Jun-13 30-Jun-13 30-Jun-13, Plain Concrete
FW.PC Form Work 7d 19-Jun-13 26-Jun-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Jun-13 27-Jun-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 30-Jun-13 30-Jun-13 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 01-Jul-13 23-Jul-13 23-Jul-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 01-Jul-13 09-Jul-13 Form Work
R.F.T.R R.F.T 6d 10-Jul-13 16-Jul-13 R.F.T
Pour.Rc Pouring Concrete 1d 17-Jul-13 17-Jul-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 20-Jul-13 20-Jul-13 Remove Formwork
InsRc& Insulting 3d 21-Jul-13 23-Jul-13 Insulting
Basement 26d 24-Jul-13 25-Aug-13 25-Aug-13, Basement
Slab On Grade
Gra 16d 05-Aug-13 25-Aug-13 25-Aug-13, Slab On Grade
FW.SOG1 Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.SOG R.F.T 4d 13-Aug-13 17-Aug-13 R.F.T
Pour.SOG Pouring Concrete 1d 18-Aug-13 18-Aug-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 25-Aug-13 25-Aug-13 Remove Formwork
Columns 8d 24-Jul-13 01-Aug-13 01-Aug-13, Columns
FW.Col.B1 Form Work 2d 24-Jul-13 25-Jul-13 Form Work
R.F.T.Col. R.F.T 3d 27-Jul-13 29-Jul-13 R.F.T
Pour.Col.B Pouring Concrete 1d 30-Jul-13 30-Jul-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Aug-13 01-Aug-13 Remove Formwork
Ground Floor 24d 05-Aug-13 03-Sep-13 03-Sep-13, Ground Floor
Beam and s
slab 13d 05-Aug-13 21-Aug-13 21-Aug-13, Beam and slab
FW.B&S.G Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.B&S R.F.T 5d 05-Aug-13 12-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Aug-13 13-Aug-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Aug-13 21-Aug-13 Remove Formwork
Columns 8d 26-Aug-13 03-Sep-13 03-Sep-13, Columns
FW.Col.G Form Work 2d 26-Aug-13 27-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 28-Aug-13 31-Aug-13 R.F.T
Pour..Col.G Pouring Concrete 1d 01-Sep-13 01-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 03-Sep-13 03-Sep-13 Remove Formwork
First Floor 19d 04-Sep-13 25-Sep-13 25-Sep-13, First Floor
Beams and slab 18d 04-Sep-13 24-Sep-13 24-Sep-13, Beams and slab
FW.B&S.s Form Work 5d 04-Sep-13 09-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 10-Sep-13 15-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Sep-13 16-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Sep-13 24-Sep-13 Remove Formwork
Columns 8d 17-Sep-13 25-Sep-13 25-Sep-13, Columns
FW.Col.st Form Work 2d 17-Sep-13 18-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 19-Sep-13 22-Sep-13 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Sep-13 23-Sep-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Sep-13 25-Sep-13 Remove Formwork
Second Floor 19d 26-Sep-13 22-Oct-13 22-Oct-13, Second Floor
Beams and slab 18d 26-Sep-13 21-Oct-13 21-Oct-13, Beams and slab
FW.B&S.n Form Work 5d 26-Sep-13 01-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 02-Oct-13 08-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Oct-13 09-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Oct-13 21-Oct-13 Remove Formwork
Columns 8d 10-Oct-13 22-Oct-13 22-Oct-13, Columns
FW.Col.nd Form Work 2d 10-Oct-13 12-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 13-Oct-13 19-Oct-13 R.F.T
Pour.Col.n Pouring Concrete 1d 20-Oct-13 20-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Third Floor 19d 23-Oct-13 13-Nov-13 13-Nov-13, Third Floor
Beams and slab 18d 23-Oct-13 12-Nov-13 12-Nov-13, Beams and slab
FW.B&S.r Form Work 5d 23-Oct-13 28-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 29-Oct-13 03-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Nov-13 04-Nov-13 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 75 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

251
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.B&S Remove Formwork 1d 12-Nov-13 12-Nov-13 Remove Formwork
Columns 8d 05-Nov-13 13-Nov-13 13-Nov-13, Columns
FW.Col.rd Form Work 2d 05-Nov-13 06-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 07-Nov-13 10-Nov-13 R.F.T
Pour.col.rd Pouring Concrete 1d 11-Nov-13 11-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Fourth Floor 19d 14-Nov-13 05-Dec-13 05-Dec-13, Fourth Floor
Beams and slab 18d 14-Nov-13 04-Dec-13 04-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 14-Nov-13 19-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 20-Nov-13 25-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Nov-13 26-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 04-Dec-13 04-Dec-13 Remove Formwork
Columns 8d 27-Nov-13 05-Dec-13 05-Dec-13, Columns
FW.Col.th Form Work 2d 27-Nov-13 28-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 30-Nov-13 02-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 03-Dec-13 03-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Roof 17d 07-Dec-13 25-Dec-13 25-Dec-13, Roof
Beams and slab 17d 07-Dec-13 25-Dec-13 25-Dec-13, Beams and slab
FW.B&S.R Form Work 5d 07-Dec-13 11-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 12-Dec-13 17-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 18-Dec-13 18-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Dec-13 25-Dec-13 Remove Formwork
Mansonary 109d 22-Aug-13 31-Dec-13 31-Dec-13, Mansonary
Basement 2d 22-Aug-13 24-Aug-13 24-Aug-13, Basement
E.B.M1080 External 2d 22-Aug-13 24-Aug-13 External
Ground Floor 4d 25-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
I.G.M1080 Internal 4d 25-Sep-13 29-Sep-13 Internal
E.G.M1080 External 2d 25-Sep-13 26-Sep-13 External
First Floor 4d 22-Oct-13 26-Oct-13 26-Oct-13, First Floor
I.st .M1080 Internal 4d 22-Oct-13 26-Oct-13 Internal
E.st .M1080 External 2d 22-Oct-13 23-Oct-13 External
Second Floor 4d 13-Nov-13 17-Nov-13 17-Nov-13, Second Floor
I . nd .M1080 Internal 4d 13-Nov-13 17-Nov-13 Internal
E. nd .M1080 External 2d 13-Nov-13 14-Nov-13 External
Third Floor 4d 05-Dec-13 09-Dec-13 09-Dec-13, Third Floor
I . rd .M1080 Internal 4d 05-Dec-13 09-Dec-13 Internal
E . rd .M1080 External 2d 05-Dec-13 07-Dec-13 External
Fourth Floor 4d 26-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
I .th .M1080 Internal 4d 26-Dec-13 30-Dec-13 Internal
E. th .M1080 External 2d 26-Dec-13 28-Dec-13 External
Roof 1d 31-Dec-13 31-Dec-13 31-Dec-13, Roof
E .R .M1080 External 1d 31-Dec-13 31-Dec-13 External
Finishing 85d 28-Sep-13 08-Jan-14 08-Jan-14, Finishing
Ground Floor 2d 28-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
Calm Shell 2d 28-Sep-13 29-Sep-13 29-Sep-13, Calm Shell
E.Ch .G.1 External 2d 28-Sep-13 29-Sep-13 External
External Ele
Electrical 0d
First Floor 2d 24-Oct-13 26-Oct-13 26-Oct-13, First Floor
Calm Shell 2d 24-Oct-13 26-Oct-13 26-Oct-13, Calm Shell
E .ch .st10 External 2d 24-Oct-13 26-Oct-13 External
External Ele
Electrical 0d
Second Floor 2d 16-Nov-13 17-Nov-13 17-Nov-13, Second Floor
Calm Shell 2d 16-Nov-13 17-Nov-13 17-Nov-13, Calm Shell
E.ch .nd10 External 2d 16-Nov-13 17-Nov-13 External
External Ele
Electrical 0d
Third Floor 2d 08-Dec-13 09-Dec-13 09-Dec-13, Third Floor
Calm Shell 2d 08-Dec-13 09-Dec-13 09-Dec-13, Calm Shell
E.ch. rd10 External 2d 08-Dec-13 09-Dec-13 External
External Ele
Electrical 0d
Fourth Floor 2d 29-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
Calm Shell 2d 29-Dec-13 30-Dec-13 30-Dec-13, Calm Shell
E.ch .th10 External 2d 29-Dec-13 30-Dec-13 External
External Ele
Electrical 0d
Roof 1d 01-Jan-14 01-Jan-14 01-Jan-14, Roof
Calm Shell 1d 01-Jan-14 01-Jan-14 01-Jan-14, Calm Shell
E.ch .r1080 External 1d 01-Jan-14 01-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 02-Jan-14 08-Jan-14 08-Jan-14, Painting Cond.
Ex. Paint1080 External Painting 6d 02-Jan-14 08-Jan-14 External Painting
Marbling 5d 02-Jan-14 07-Jan-14 07-Jan-14, Marbling
E.M.F1080 Entrance 4d 02-Jan-14 06-Jan-14 Entrance
S.M.F1080 Stairs 5d 02-Jan-14 07-Jan-14 Stairs
Condonminium Appartments-30
App 177d 08-Dec-12 02-Jul-13 02-Jul-13, Condonminium Appartments-30
A5270 start of cond. 0d 08-Dec-12 start of cond.
A5260 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 08-Dec-12 08-Dec-12 08-Dec-12, Mobilization
M.Sur.1050 Site Surveying 1d 08-Dec-12 08-Dec-12 Site Surveying
Earth Work 47d 09-Dec-12 31-Jan-13 31-Jan-13, Earth Work
Ex.1050 Excavation 7d 09-Dec-12 16-Dec-12 Excavation
B.F1050 BackFill 2d 30-Jan-13 31-Jan-13 BackFill

Actual Work Critical Remaining Work Summary Page 76 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

252
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG1 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B1 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork

Actual Work Critical Remaining Work Summary Page 77 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

253
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M1050 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M1050 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M1050 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M1050 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M1050 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M1050 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M1050 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M1050 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M1050 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M1050 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M1050 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M1050 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.1 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st10 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd10 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd10 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th10 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r1050 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint1050 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F1050 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F1050 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-31
App 334d 08-Dec-12 08-Jan-14 08-Jan-14, Condonminium Appartments-31
A5250 start of cond. 0d 08-Dec-12 start of cond.
A5240 finish of cond. 0d 08-Jan-14 finish of cond.
Mobilization 1d 09-Dec-12 09-Dec-12 09-Dec-12, Mobilization
M.Sur.1040 Site Surveying 1d 09-Dec-12 09-Dec-12 Site Surveying
Earth Work 197d 17-Dec-12 04-Aug-13 04-Aug-13, Earth Work
Ex.1040 Excavation 7d 17-Dec-12 24-Dec-12 Excavation
B.F1040 BackFill 2d 03-Aug-13 04-Aug-13 BackFill
Civil Work 157d 19-Jun-13 25-Dec-13 25-Dec-13, Civil Work
Foundation 30d 19-Jun-13 23-Jul-13 23-Jul-13, Foundation
Footing 30d 19-Jun-13 23-Jul-13 23-Jul-13, Footing
Plain Concrete
Con 10d 19-Jun-13 30-Jun-13 30-Jun-13, Plain Concrete
FW.PC Form Work 7d 19-Jun-13 26-Jun-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Jun-13 27-Jun-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 30-Jun-13 30-Jun-13 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 01-Jul-13 23-Jul-13 23-Jul-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 01-Jul-13 09-Jul-13 Form Work
R.F.T.R R.F.T 6d 10-Jul-13 16-Jul-13 R.F.T
Pour.Rc Pouring Concrete 1d 17-Jul-13 17-Jul-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 20-Jul-13 20-Jul-13 Remove Formwork
InsRc& Insulting 3d 21-Jul-13 23-Jul-13 Insulting
Basement 26d 24-Jul-13 25-Aug-13 25-Aug-13, Basement
Slab On Grade
Gra 16d 05-Aug-13 25-Aug-13 25-Aug-13, Slab On Grade
FW.SOG1 Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.SOG R.F.T 4d 13-Aug-13 17-Aug-13 R.F.T

Actual Work Critical Remaining Work Summary Page 78 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

254
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.SOG Pouring Concrete 1d 18-Aug-13 18-Aug-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 25-Aug-13 25-Aug-13 Remove Formwork
Columns 8d 24-Jul-13 01-Aug-13 01-Aug-13, Columns
FW.Col.B1 Form Work 2d 24-Jul-13 25-Jul-13 Form Work
R.F.T.Col. R.F.T 3d 27-Jul-13 29-Jul-13 R.F.T
Pour.Col.B Pouring Concrete 1d 30-Jul-13 30-Jul-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Aug-13 01-Aug-13 Remove Formwork
Ground Floor 24d 05-Aug-13 03-Sep-13 03-Sep-13, Ground Floor
Beam and s
slab 13d 05-Aug-13 21-Aug-13 21-Aug-13, Beam and slab
FW.B&S.G Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.B&S R.F.T 5d 05-Aug-13 12-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Aug-13 13-Aug-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Aug-13 21-Aug-13 Remove Formwork
Columns 8d 26-Aug-13 03-Sep-13 03-Sep-13, Columns
FW.Col.G Form Work 2d 26-Aug-13 27-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 28-Aug-13 31-Aug-13 R.F.T
Pour..Col.G Pouring Concrete 1d 01-Sep-13 01-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 03-Sep-13 03-Sep-13 Remove Formwork
First Floor 19d 04-Sep-13 25-Sep-13 25-Sep-13, First Floor
Beams and slab 18d 04-Sep-13 24-Sep-13 24-Sep-13, Beams and slab
FW.B&S.s Form Work 5d 04-Sep-13 09-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 10-Sep-13 15-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Sep-13 16-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Sep-13 24-Sep-13 Remove Formwork
Columns 8d 17-Sep-13 25-Sep-13 25-Sep-13, Columns
FW.Col.st Form Work 2d 17-Sep-13 18-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 19-Sep-13 22-Sep-13 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Sep-13 23-Sep-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Sep-13 25-Sep-13 Remove Formwork
Second Floor 19d 26-Sep-13 22-Oct-13 22-Oct-13, Second Floor
Beams and slab 18d 26-Sep-13 21-Oct-13 21-Oct-13, Beams and slab
FW.B&S.n Form Work 5d 26-Sep-13 01-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 02-Oct-13 08-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Oct-13 09-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Oct-13 21-Oct-13 Remove Formwork
Columns 8d 10-Oct-13 22-Oct-13 22-Oct-13, Columns
FW.Col.nd Form Work 2d 10-Oct-13 12-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 13-Oct-13 19-Oct-13 R.F.T
Pour.Col.n Pouring Concrete 1d 20-Oct-13 20-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Third Floor 19d 23-Oct-13 13-Nov-13 13-Nov-13, Third Floor
Beams and slab 18d 23-Oct-13 12-Nov-13 12-Nov-13, Beams and slab
FW.B&S.r Form Work 5d 23-Oct-13 28-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 29-Oct-13 03-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Nov-13 04-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 12-Nov-13 12-Nov-13 Remove Formwork
Columns 8d 05-Nov-13 13-Nov-13 13-Nov-13, Columns
FW.Col.rd Form Work 2d 05-Nov-13 06-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 07-Nov-13 10-Nov-13 R.F.T
Pour.col.rd Pouring Concrete 1d 11-Nov-13 11-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Fourth Floor 19d 14-Nov-13 05-Dec-13 05-Dec-13, Fourth Floor
Beams and slab 18d 14-Nov-13 04-Dec-13 04-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 14-Nov-13 19-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 20-Nov-13 25-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Nov-13 26-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 04-Dec-13 04-Dec-13 Remove Formwork
Columns 8d 27-Nov-13 05-Dec-13 05-Dec-13, Columns
FW.Col.th Form Work 2d 27-Nov-13 28-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 30-Nov-13 02-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 03-Dec-13 03-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Roof 17d 07-Dec-13 25-Dec-13 25-Dec-13, Roof
Beams and slab 17d 07-Dec-13 25-Dec-13 25-Dec-13, Beams and slab
FW.B&S.R Form Work 5d 07-Dec-13 11-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 12-Dec-13 17-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 18-Dec-13 18-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Dec-13 25-Dec-13 Remove Formwork
Mansonary 109d 22-Aug-13 31-Dec-13 31-Dec-13, Mansonary
Basement 2d 22-Aug-13 24-Aug-13 24-Aug-13, Basement
E.B.M1040 External 2d 22-Aug-13 24-Aug-13 External
Ground Floor 4d 25-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
I.G.M1040 Internal 4d 25-Sep-13 29-Sep-13 Internal
E.G.M1040 External 2d 25-Sep-13 26-Sep-13 External
First Floor 4d 22-Oct-13 26-Oct-13 26-Oct-13, First Floor
I.st .M1040 Internal 4d 22-Oct-13 26-Oct-13 Internal
E.st .M1040 External 2d 22-Oct-13 23-Oct-13 External
Second Floor 4d 13-Nov-13 17-Nov-13 17-Nov-13, Second Floor
I . nd .M1040 Internal 4d 13-Nov-13 17-Nov-13 Internal

Actual Work Critical Remaining Work Summary Page 79 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

255
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E. nd .M1040 External 2d 13-Nov-13 14-Nov-13 External
Third Floor 4d 05-Dec-13 09-Dec-13 09-Dec-13, Third Floor
I . rd .M1040 Internal 4d 05-Dec-13 09-Dec-13 Internal
E . rd .M1040 External 2d 05-Dec-13 07-Dec-13 External
Fourth Floor 4d 26-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
I .th .M1040 Internal 4d 26-Dec-13 30-Dec-13 Internal
E. th .M1040 External 2d 26-Dec-13 28-Dec-13 External
Roof 1d 31-Dec-13 31-Dec-13 31-Dec-13, Roof
E .R .M1040 External 1d 31-Dec-13 31-Dec-13 External
Finishing 85d 28-Sep-13 08-Jan-14 08-Jan-14, Finishing
Ground Floor 2d 28-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
Calm Shell 2d 28-Sep-13 29-Sep-13 29-Sep-13, Calm Shell
E.Ch .G.1 External 2d 28-Sep-13 29-Sep-13 External
External Ele
Electrical 0d
First Floor 2d 24-Oct-13 26-Oct-13 26-Oct-13, First Floor
Calm Shell 2d 24-Oct-13 26-Oct-13 26-Oct-13, Calm Shell
E .ch .st10 External 2d 24-Oct-13 26-Oct-13 External
External Ele
Electrical 0d
Second Floor 2d 16-Nov-13 17-Nov-13 17-Nov-13, Second Floor
Calm Shell 2d 16-Nov-13 17-Nov-13 17-Nov-13, Calm Shell
E.ch .nd10 External 2d 16-Nov-13 17-Nov-13 External
External Ele
Electrical 0d
Third Floor 2d 08-Dec-13 09-Dec-13 09-Dec-13, Third Floor
Calm Shell 2d 08-Dec-13 09-Dec-13 09-Dec-13, Calm Shell
E.ch. rd10 External 2d 08-Dec-13 09-Dec-13 External
External Ele
Electrical 0d
Fourth Floor 2d 29-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
Calm Shell 2d 29-Dec-13 30-Dec-13 30-Dec-13, Calm Shell
E.ch .th10 External 2d 29-Dec-13 30-Dec-13 External
External Ele
Electrical 0d
Roof 1d 01-Jan-14 01-Jan-14 01-Jan-14, Roof
Calm Shell 1d 01-Jan-14 01-Jan-14 01-Jan-14, Calm Shell
E.ch .r1040 External 1d 01-Jan-14 01-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 02-Jan-14 08-Jan-14 08-Jan-14, Painting Cond.
Ex. Paint1040 External Painting 6d 02-Jan-14 08-Jan-14 External Painting
Marbling 5d 02-Jan-14 07-Jan-14 07-Jan-14, Marbling
E.M.F1040 Entrance 4d 02-Jan-14 06-Jan-14 Entrance
S.M.F1040 Stairs 5d 02-Jan-14 07-Jan-14 Stairs
Condonminium Appartments-32
App 177d 08-Dec-12 02-Jul-13 02-Jul-13, Condonminium Appartments-32
A5310 start of cond. 0d 08-Dec-12 start of cond.
A5300 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 08-Dec-12 08-Dec-12 08-Dec-12, Mobilization
M.Sur.1070 Site Surveying 1d 08-Dec-12 08-Dec-12 Site Surveying
Earth Work 47d 09-Dec-12 31-Jan-13 31-Jan-13, Earth Work
Ex.1070 Excavation 7d 09-Dec-12 16-Dec-12 Excavation
B.F1070 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG1 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B1 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 80 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

256
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M1070 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M1070 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M1070 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M1070 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M1070 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M1070 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M1070 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M1070 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M1070 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M1070 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M1070 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M1070 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.1 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st10 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d

Actual Work Critical Remaining Work Summary Page 81 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

257
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd10 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd10 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th10 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r1070 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint1070 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F1070 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F1070 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-37
App 334d 08-Dec-12 08-Jan-14 08-Jan-14, Condonminium Appartments-37
A5290 start of cond. 0d 08-Dec-12 start of cond.
A5280 finish of cond. 0d 08-Jan-14 finish of cond.
Mobilization 1d 09-Dec-12 09-Dec-12 09-Dec-12, Mobilization
M.Sur.1060 Site Surveying 1d 09-Dec-12 09-Dec-12 Site Surveying
Earth Work 197d 17-Dec-12 04-Aug-13 04-Aug-13, Earth Work
Ex.1060 Excavation 7d 17-Dec-12 24-Dec-12 Excavation
B.F1060 BackFill 2d 03-Aug-13 04-Aug-13 BackFill
Civil Work 157d 19-Jun-13 25-Dec-13 25-Dec-13, Civil Work
Foundation 30d 19-Jun-13 23-Jul-13 23-Jul-13, Foundation
Footing 30d 19-Jun-13 23-Jul-13 23-Jul-13, Footing
Plain Concrete
Con 10d 19-Jun-13 30-Jun-13 30-Jun-13, Plain Concrete
FW.PC Form Work 7d 19-Jun-13 26-Jun-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Jun-13 27-Jun-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 30-Jun-13 30-Jun-13 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 01-Jul-13 23-Jul-13 23-Jul-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 01-Jul-13 09-Jul-13 Form Work
R.F.T.R R.F.T 6d 10-Jul-13 16-Jul-13 R.F.T
Pour.Rc Pouring Concrete 1d 17-Jul-13 17-Jul-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 20-Jul-13 20-Jul-13 Remove Formwork
InsRc& Insulting 3d 21-Jul-13 23-Jul-13 Insulting
Basement 26d 24-Jul-13 25-Aug-13 25-Aug-13, Basement
Slab On Grade
Gra 16d 05-Aug-13 25-Aug-13 25-Aug-13, Slab On Grade
FW.SOG1 Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.SOG R.F.T 4d 13-Aug-13 17-Aug-13 R.F.T
Pour.SOG Pouring Concrete 1d 18-Aug-13 18-Aug-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 25-Aug-13 25-Aug-13 Remove Formwork
Columns 8d 24-Jul-13 01-Aug-13 01-Aug-13, Columns
FW.Col.B1 Form Work 2d 24-Jul-13 25-Jul-13 Form Work
R.F.T.Col. R.F.T 3d 27-Jul-13 29-Jul-13 R.F.T
Pour.Col.B Pouring Concrete 1d 30-Jul-13 30-Jul-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Aug-13 01-Aug-13 Remove Formwork
Ground Floor 24d 05-Aug-13 03-Sep-13 03-Sep-13, Ground Floor
Beam and s
slab 13d 05-Aug-13 21-Aug-13 21-Aug-13, Beam and slab
FW.B&S.G Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.B&S R.F.T 5d 05-Aug-13 12-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Aug-13 13-Aug-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Aug-13 21-Aug-13 Remove Formwork
Columns 8d 26-Aug-13 03-Sep-13 03-Sep-13, Columns
FW.Col.G Form Work 2d 26-Aug-13 27-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 28-Aug-13 31-Aug-13 R.F.T
Pour..Col.G Pouring Concrete 1d 01-Sep-13 01-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 03-Sep-13 03-Sep-13 Remove Formwork
First Floor 19d 04-Sep-13 25-Sep-13 25-Sep-13, First Floor
Beams and slab 18d 04-Sep-13 24-Sep-13 24-Sep-13, Beams and slab
FW.B&S.s Form Work 5d 04-Sep-13 09-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 10-Sep-13 15-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Sep-13 16-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Sep-13 24-Sep-13 Remove Formwork
Columns 8d 17-Sep-13 25-Sep-13 25-Sep-13, Columns
FW.Col.st Form Work 2d 17-Sep-13 18-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 19-Sep-13 22-Sep-13 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Sep-13 23-Sep-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Sep-13 25-Sep-13 Remove Formwork
Second Floor 19d 26-Sep-13 22-Oct-13 22-Oct-13, Second Floor
Beams and slab 18d 26-Sep-13 21-Oct-13 21-Oct-13, Beams and slab
FW.B&S.n Form Work 5d 26-Sep-13 01-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 02-Oct-13 08-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Oct-13 09-Oct-13 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 82 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

258
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.B&S Remove Formwork 1d 21-Oct-13 21-Oct-13 Remove Formwork
Columns 8d 10-Oct-13 22-Oct-13 22-Oct-13, Columns
FW.Col.nd Form Work 2d 10-Oct-13 12-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 13-Oct-13 19-Oct-13 R.F.T
Pour.Col.n Pouring Concrete 1d 20-Oct-13 20-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Third Floor 19d 23-Oct-13 13-Nov-13 13-Nov-13, Third Floor
Beams and slab 18d 23-Oct-13 12-Nov-13 12-Nov-13, Beams and slab
FW.B&S.r Form Work 5d 23-Oct-13 28-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 29-Oct-13 03-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Nov-13 04-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 12-Nov-13 12-Nov-13 Remove Formwork
Columns 8d 05-Nov-13 13-Nov-13 13-Nov-13, Columns
FW.Col.rd Form Work 2d 05-Nov-13 06-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 07-Nov-13 10-Nov-13 R.F.T
Pour.col.rd Pouring Concrete 1d 11-Nov-13 11-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Fourth Floor 19d 14-Nov-13 05-Dec-13 05-Dec-13, Fourth Floor
Beams and slab 18d 14-Nov-13 04-Dec-13 04-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 14-Nov-13 19-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 20-Nov-13 25-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Nov-13 26-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 04-Dec-13 04-Dec-13 Remove Formwork
Columns 8d 27-Nov-13 05-Dec-13 05-Dec-13, Columns
FW.Col.th Form Work 2d 27-Nov-13 28-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 30-Nov-13 02-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 03-Dec-13 03-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Roof 17d 07-Dec-13 25-Dec-13 25-Dec-13, Roof
Beams and slab 17d 07-Dec-13 25-Dec-13 25-Dec-13, Beams and slab
FW.B&S.R Form Work 5d 07-Dec-13 11-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 12-Dec-13 17-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 18-Dec-13 18-Dec-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Dec-13 25-Dec-13 Remove Formwork
Mansonary 109d 22-Aug-13 31-Dec-13 31-Dec-13, Mansonary
Basement 2d 22-Aug-13 24-Aug-13 24-Aug-13, Basement
E.B.M1060 External 2d 22-Aug-13 24-Aug-13 External
Ground Floor 4d 25-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
I.G.M1060 Internal 4d 25-Sep-13 29-Sep-13 Internal
E.G.M1060 External 2d 25-Sep-13 26-Sep-13 External
First Floor 4d 22-Oct-13 26-Oct-13 26-Oct-13, First Floor
I.st .M1060 Internal 4d 22-Oct-13 26-Oct-13 Internal
E.st .M1060 External 2d 22-Oct-13 23-Oct-13 External
Second Floor 4d 13-Nov-13 17-Nov-13 17-Nov-13, Second Floor
I . nd .M1060 Internal 4d 13-Nov-13 17-Nov-13 Internal
E. nd .M1060 External 2d 13-Nov-13 14-Nov-13 External
Third Floor 4d 05-Dec-13 09-Dec-13 09-Dec-13, Third Floor
I . rd .M1060 Internal 4d 05-Dec-13 09-Dec-13 Internal
E . rd .M1060 External 2d 05-Dec-13 07-Dec-13 External
Fourth Floor 4d 26-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
I .th .M1060 Internal 4d 26-Dec-13 30-Dec-13 Internal
E. th .M1060 External 2d 26-Dec-13 28-Dec-13 External
Roof 1d 31-Dec-13 31-Dec-13 31-Dec-13, Roof
E .R .M1060 External 1d 31-Dec-13 31-Dec-13 External
Finishing 85d 28-Sep-13 08-Jan-14 08-Jan-14, Finishing
Ground Floor 2d 28-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
Calm Shell 2d 28-Sep-13 29-Sep-13 29-Sep-13, Calm Shell
E.Ch .G.1 External 2d 28-Sep-13 29-Sep-13 External
External Ele
Electrical 0d
First Floor 2d 24-Oct-13 26-Oct-13 26-Oct-13, First Floor
Calm Shell 2d 24-Oct-13 26-Oct-13 26-Oct-13, Calm Shell
E .ch .st10 External 2d 24-Oct-13 26-Oct-13 External
External Ele
Electrical 0d
Second Floor 2d 16-Nov-13 17-Nov-13 17-Nov-13, Second Floor
Calm Shell 2d 16-Nov-13 17-Nov-13 17-Nov-13, Calm Shell
E.ch .nd10 External 2d 16-Nov-13 17-Nov-13 External
External Ele
Electrical 0d
Third Floor 2d 08-Dec-13 09-Dec-13 09-Dec-13, Third Floor
Calm Shell 2d 08-Dec-13 09-Dec-13 09-Dec-13, Calm Shell
E.ch. rd10 External 2d 08-Dec-13 09-Dec-13 External
External Ele
Electrical 0d
Fourth Floor 2d 29-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
Calm Shell 2d 29-Dec-13 30-Dec-13 30-Dec-13, Calm Shell
E.ch .th10 External 2d 29-Dec-13 30-Dec-13 External
External Ele
Electrical 0d
Roof 1d 01-Jan-14 01-Jan-14 01-Jan-14, Roof
Calm Shell 1d 01-Jan-14 01-Jan-14 01-Jan-14, Calm Shell
E.ch .r1060 External 1d 01-Jan-14 01-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 02-Jan-14 08-Jan-14 08-Jan-14, Painting Cond.

Actual Work Critical Remaining Work Summary Page 83 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

259
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ex. Paint1060 External Painting 6d 02-Jan-14 08-Jan-14 External Painting
Marbling 5d 02-Jan-14 07-Jan-14 07-Jan-14, Marbling
E.M.F1060 Entrance 4d 02-Jan-14 06-Jan-14 Entrance
S.M.F1060 Stairs 5d 02-Jan-14 07-Jan-14 Stairs
Condonminium Appartments-38
App 177d 08-Dec-12 02-Jul-13 02-Jul-13, Condonminium Appartments-38
A5350 start of cond. 0d 08-Dec-12 start of cond.
A5340 finish of cond. 0d 02-Jul-13 finish of cond.
Mobilization 1d 08-Dec-12 08-Dec-12 08-Dec-12, Mobilization
M.Sur.1090 Site Surveying 1d 08-Dec-12 08-Dec-12 Site Surveying
Earth Work 47d 09-Dec-12 31-Jan-13 31-Jan-13, Earth Work
Ex.1090 Excavation 7d 09-Dec-12 16-Dec-12 Excavation
B.F1090 BackFill 2d 30-Jan-13 31-Jan-13 BackFill
Civil Work 157d 17-Dec-12 18-Jun-13 18-Jun-13, Civil Work
Foundation 30d 17-Dec-12 20-Jan-13 20-Jan-13, Foundation
Footing 30d 17-Dec-12 20-Jan-13 20-Jan-13, Footing
Plain Concrete
Con 10d 17-Dec-12 27-Dec-12 27-Dec-12, Plain Concrete
FW.PC Form Work 7d 17-Dec-12 24-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-12 25-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 27-Dec-12 27-Dec-12 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 29-Dec-12 20-Jan-13 20-Jan-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 29-Dec-12 06-Jan-13 Form Work
R.F.T.R R.F.T 6d 07-Jan-13 13-Jan-13 R.F.T
Pour.Rc Pouring Concrete 1d 14-Jan-13 14-Jan-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 16-Jan-13 16-Jan-13 Remove Formwork
InsRc& Insulting 3d 17-Jan-13 20-Jan-13 Insulting
Basement 26d 21-Jan-13 19-Feb-13 19-Feb-13, Basement
Slab On Grade
Gra 16d 02-Feb-13 19-Feb-13 19-Feb-13, Slab On Grade
FW.SOG1 Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.SOG R.F.T 4d 07-Feb-13 11-Feb-13 R.F.T
Pour.SOG Pouring Concrete 1d 12-Feb-13 12-Feb-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 19-Feb-13 19-Feb-13 Remove Formwork
Columns 8d 21-Jan-13 29-Jan-13 29-Jan-13, Columns
FW.Col.B1 Form Work 2d 21-Jan-13 22-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 23-Jan-13 26-Jan-13 R.F.T
Pour.Col.B Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-Jan-13 29-Jan-13 Remove Formwork
Ground Floor 24d 02-Feb-13 28-Feb-13 28-Feb-13, Ground Floor
Beam and s
slab 13d 02-Feb-13 16-Feb-13 16-Feb-13, Beam and slab
FW.B&S.G Form Work 5d 02-Feb-13 06-Feb-13 Form Work
R.F.T.B&S R.F.T 5d 02-Feb-13 06-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Feb-13 07-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 16-Feb-13 16-Feb-13 Remove Formwork
Columns 8d 20-Feb-13 28-Feb-13 28-Feb-13, Columns
FW.Col.G Form Work 2d 20-Feb-13 21-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 23-Feb-13 25-Feb-13 R.F.T
Pour..Col.G Pouring Concrete 1d 26-Feb-13 26-Feb-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
First Floor 19d 02-Mar-13 23-Mar-13 23-Mar-13, First Floor
Beams and slab 18d 02-Mar-13 21-Mar-13 21-Mar-13, Beams and slab
FW.B&S.s Form Work 5d 02-Mar-13 06-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 07-Mar-13 12-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Mar-13 13-Mar-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Mar-13 21-Mar-13 Remove Formwork
Columns 8d 14-Mar-13 23-Mar-13 23-Mar-13, Columns
FW.Col.st Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 3d 17-Mar-13 19-Mar-13 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Mar-13 20-Mar-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 23-Mar-13 23-Mar-13 Remove Formwork
Second Floor 19d 24-Mar-13 14-Apr-13 14-Apr-13, Second Floor
Beams and slab 18d 24-Mar-13 13-Apr-13 13-Apr-13, Beams and slab
FW.B&S.n Form Work 5d 24-Mar-13 28-Mar-13 Form Work
R.F.T.B&S R.F.T 5d 30-Mar-13 03-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-13 04-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 13-Apr-13 13-Apr-13 Remove Formwork
Columns 8d 06-Apr-13 14-Apr-13 14-Apr-13, Columns
FW.Col.nd Form Work 2d 06-Apr-13 07-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 08-Apr-13 10-Apr-13 R.F.T
Pour.Col.n Pouring Concrete 1d 11-Apr-13 11-Apr-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 14-Apr-13 14-Apr-13 Remove Formwork
Third Floor 19d 15-Apr-13 07-May-13 07-May-13, Third Floor
Beams and slab 18d 15-Apr-13 06-May-13 06-May-13, Beams and slab
FW.B&S.r Form Work 5d 15-Apr-13 20-Apr-13 Form Work
R.F.T.B&S R.F.T 5d 21-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 06-May-13 06-May-13 Remove Formwork
Columns 8d 28-Apr-13 07-May-13 07-May-13, Columns
FW.Col.rd Form Work 2d 28-Apr-13 29-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 30-Apr-13 04-May-13 R.F.T
Pour.col.rd Pouring Concrete 1d 05-May-13 05-May-13 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 84 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

260
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.Col. Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Fourth Floor 19d 08-May-13 29-May-13 29-May-13, Fourth Floor
Beams and slab 18d 08-May-13 28-May-13 28-May-13, Beams and slab
FW.B&S.th Form Work 5d 08-May-13 13-May-13 Form Work
R.F.T.B&S R.F.T 5d 14-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-May-13 28-May-13 Remove Formwork
Columns 8d 21-May-13 29-May-13 29-May-13, Columns
FW.Col.th Form Work 2d 21-May-13 22-May-13 Form Work
R.F.T.Col. R.F.T 3d 23-May-13 26-May-13 R.F.T
Pour.Col.th Pouring Concrete 1d 27-May-13 27-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Roof 17d 30-May-13 18-Jun-13 18-Jun-13, Roof
Beams and slab 17d 30-May-13 18-Jun-13 18-Jun-13, Beams and slab
FW.B&S.R Form Work 5d 30-May-13 04-Jun-13 Form Work
R.F.T.B&S R.F.T 5d 05-Jun-13 10-Jun-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Jun-13 11-Jun-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Mansonary 109d 17-Feb-13 24-Jun-13 24-Jun-13, Mansonary
Basement 2d 17-Feb-13 18-Feb-13 18-Feb-13, Basement
E.B.M1090 External 2d 17-Feb-13 18-Feb-13 External
Ground Floor 4d 23-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
I.G.M1090 Internal 4d 23-Mar-13 26-Mar-13 Internal
E.G.M1090 External 2d 23-Mar-13 24-Mar-13 External
First Floor 4d 14-Apr-13 17-Apr-13 17-Apr-13, First Floor
I.st .M1090 Internal 4d 14-Apr-13 17-Apr-13 Internal
E.st .M1090 External 2d 14-Apr-13 15-Apr-13 External
Second Floor 4d 07-May-13 11-May-13 11-May-13, Second Floor
I . nd .M1090 Internal 4d 07-May-13 11-May-13 Internal
E. nd .M1090 External 2d 07-May-13 08-May-13 External
Third Floor 4d 29-May-13 02-Jun-13 02-Jun-13, Third Floor
I . rd .M1090 Internal 4d 29-May-13 02-Jun-13 Internal
E . rd .M1090 External 2d 29-May-13 30-May-13 External
Fourth Floor 4d 19-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
I .th .M1090 Internal 4d 19-Jun-13 23-Jun-13 Internal
E. th .M1090 External 2d 19-Jun-13 20-Jun-13 External
Roof 1d 24-Jun-13 24-Jun-13 24-Jun-13, Roof
E .R .M1090 External 1d 24-Jun-13 24-Jun-13 External
Finishing 85d 25-Mar-13 02-Jul-13 02-Jul-13, Finishing
Ground Floor 2d 25-Mar-13 26-Mar-13 26-Mar-13, Ground Floor
Calm Shell 2d 25-Mar-13 26-Mar-13 26-Mar-13, Calm Shell
E.Ch .G.1 External 2d 25-Mar-13 26-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 16-Apr-13 17-Apr-13 17-Apr-13, First Floor
Calm Shell 2d 16-Apr-13 17-Apr-13 17-Apr-13, Calm Shell
E .ch .st10 External 2d 16-Apr-13 17-Apr-13 External
External Ele
Electrical 0d
Second Floor 2d 09-May-13 11-May-13 11-May-13, Second Floor
Calm Shell 2d 09-May-13 11-May-13 11-May-13, Calm Shell
E.ch .nd10 External 2d 09-May-13 11-May-13 External
External Ele
Electrical 0d
Third Floor 2d 01-Jun-13 02-Jun-13 02-Jun-13, Third Floor
Calm Shell 2d 01-Jun-13 02-Jun-13 02-Jun-13, Calm Shell
E.ch. rd10 External 2d 01-Jun-13 02-Jun-13 External
External Ele
Electrical 0d
Fourth Floor 2d 22-Jun-13 23-Jun-13 23-Jun-13, Fourth Floor
Calm Shell 2d 22-Jun-13 23-Jun-13 23-Jun-13, Calm Shell
E.ch .th10 External 2d 22-Jun-13 23-Jun-13 External
External Ele
Electrical 0d
Roof 1d 25-Jun-13 25-Jun-13 25-Jun-13, Roof
Calm Shell 1d 25-Jun-13 25-Jun-13 25-Jun-13, Calm Shell
E.ch .r1090 External 1d 25-Jun-13 25-Jun-13 External
External Ele
Electrical 0d
Painting Cond. 6d 26-Jun-13 02-Jul-13 02-Jul-13, Painting Cond.
Ex. Paint1090 External Painting 6d 26-Jun-13 02-Jul-13 External Painting
Marbling 5d 26-Jun-13 01-Jul-13 01-Jul-13, Marbling
E.M.F1090 Entrance 4d 26-Jun-13 30-Jun-13 Entrance
S.M.F1090 Stairs 5d 26-Jun-13 01-Jul-13 Stairs
Condonminium Appartments-39
App 334d 08-Dec-12 08-Jan-14 08-Jan-14, Condonminium Appartments-39
A5210 start of cond. 0d 08-Dec-12 start of cond.
A5200 finish of cond. 0d 08-Jan-14 finish of cond.
Mobilization 1d 09-Dec-12 09-Dec-12 09-Dec-12, Mobilization
M.Sur.1020 Site Surveying 1d 09-Dec-12 09-Dec-12 Site Surveying
Earth Work 197d 17-Dec-12 04-Aug-13 04-Aug-13, Earth Work
Ex.1020 Excavation 7d 17-Dec-12 24-Dec-12 Excavation
B.F1020 BackFill 2d 03-Aug-13 04-Aug-13 BackFill
Civil Work 157d 19-Jun-13 25-Dec-13 25-Dec-13, Civil Work
Foundation 30d 19-Jun-13 23-Jul-13 23-Jul-13, Foundation
Footing 30d 19-Jun-13 23-Jul-13 23-Jul-13, Footing
Plain Concrete
Con 10d 19-Jun-13 30-Jun-13 30-Jun-13, Plain Concrete
FW.PC Form Work 7d 19-Jun-13 26-Jun-13 Form Work

Actual Work Critical Remaining Work Summary Page 85 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

261
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.Pc Pouring Concrete 1d 27-Jun-13 27-Jun-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 30-Jun-13 30-Jun-13 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 01-Jul-13 23-Jul-13 23-Jul-13, Reinforced Concrete & Semels
FW.Rc& Form Work 8d 01-Jul-13 09-Jul-13 Form Work
R.F.T.R R.F.T 6d 10-Jul-13 16-Jul-13 R.F.T
Pour.Rc Pouring Concrete 1d 17-Jul-13 17-Jul-13 Pouring Concrete
R.Fw.R Remove Formwork 1d 20-Jul-13 20-Jul-13 Remove Formwork
InsRc& Insulting 3d 21-Jul-13 23-Jul-13 Insulting
Basement 26d 24-Jul-13 25-Aug-13 25-Aug-13, Basement
Slab On Grade
Gra 16d 05-Aug-13 25-Aug-13 25-Aug-13, Slab On Grade
FW.SOG1 Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.SOG R.F.T 4d 13-Aug-13 17-Aug-13 R.F.T
Pour.SOG Pouring Concrete 1d 18-Aug-13 18-Aug-13 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 25-Aug-13 25-Aug-13 Remove Formwork
Columns 8d 24-Jul-13 01-Aug-13 01-Aug-13, Columns
FW.Col.B1 Form Work 2d 24-Jul-13 25-Jul-13 Form Work
R.F.T.Col. R.F.T 3d 27-Jul-13 29-Jul-13 R.F.T
Pour.Col.B Pouring Concrete 1d 30-Jul-13 30-Jul-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Aug-13 01-Aug-13 Remove Formwork
Ground Floor 24d 05-Aug-13 03-Sep-13 03-Sep-13, Ground Floor
Beam and s
slab 13d 05-Aug-13 21-Aug-13 21-Aug-13, Beam and slab
FW.B&S.G Form Work 5d 05-Aug-13 12-Aug-13 Form Work
R.F.T.B&S R.F.T 5d 05-Aug-13 12-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Aug-13 13-Aug-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Aug-13 21-Aug-13 Remove Formwork
Columns 8d 26-Aug-13 03-Sep-13 03-Sep-13, Columns
FW.Col.G Form Work 2d 26-Aug-13 27-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 28-Aug-13 31-Aug-13 R.F.T
Pour..Col.G Pouring Concrete 1d 01-Sep-13 01-Sep-13 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 03-Sep-13 03-Sep-13 Remove Formwork
First Floor 19d 04-Sep-13 25-Sep-13 25-Sep-13, First Floor
Beams and slab 18d 04-Sep-13 24-Sep-13 24-Sep-13, Beams and slab
FW.B&S.s Form Work 5d 04-Sep-13 09-Sep-13 Form Work
R.F.T.B&S R.F.T 5d 10-Sep-13 15-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Sep-13 16-Sep-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 24-Sep-13 24-Sep-13 Remove Formwork
Columns 8d 17-Sep-13 25-Sep-13 25-Sep-13, Columns
FW.Col.st Form Work 2d 17-Sep-13 18-Sep-13 Form Work
R.F.T.Col. R.F.T 3d 19-Sep-13 22-Sep-13 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Sep-13 23-Sep-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 25-Sep-13 25-Sep-13 Remove Formwork
Second Floor 19d 26-Sep-13 22-Oct-13 22-Oct-13, Second Floor
Beams and slab 18d 26-Sep-13 21-Oct-13 21-Oct-13, Beams and slab
FW.B&S.n Form Work 5d 26-Sep-13 01-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 02-Oct-13 08-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 09-Oct-13 09-Oct-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Oct-13 21-Oct-13 Remove Formwork
Columns 8d 10-Oct-13 22-Oct-13 22-Oct-13, Columns
FW.Col.nd Form Work 2d 10-Oct-13 12-Oct-13 Form Work
R.F.T.Col. R.F.T 3d 13-Oct-13 19-Oct-13 R.F.T
Pour.Col.n Pouring Concrete 1d 20-Oct-13 20-Oct-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Third Floor 19d 23-Oct-13 13-Nov-13 13-Nov-13, Third Floor
Beams and slab 18d 23-Oct-13 12-Nov-13 12-Nov-13, Beams and slab
FW.B&S.r Form Work 5d 23-Oct-13 28-Oct-13 Form Work
R.F.T.B&S R.F.T 5d 29-Oct-13 03-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Nov-13 04-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 12-Nov-13 12-Nov-13 Remove Formwork
Columns 8d 05-Nov-13 13-Nov-13 13-Nov-13, Columns
FW.Col.rd Form Work 2d 05-Nov-13 06-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 07-Nov-13 10-Nov-13 R.F.T
Pour.col.rd Pouring Concrete 1d 11-Nov-13 11-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Fourth Floor 19d 14-Nov-13 05-Dec-13 05-Dec-13, Fourth Floor
Beams and slab 18d 14-Nov-13 04-Dec-13 04-Dec-13, Beams and slab
FW.B&S.th Form Work 5d 14-Nov-13 19-Nov-13 Form Work
R.F.T.B&S R.F.T 5d 20-Nov-13 25-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Nov-13 26-Nov-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 04-Dec-13 04-Dec-13 Remove Formwork
Columns 8d 27-Nov-13 05-Dec-13 05-Dec-13, Columns
FW.Col.th Form Work 2d 27-Nov-13 28-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 30-Nov-13 02-Dec-13 R.F.T
Pour.Col.th Pouring Concrete 1d 03-Dec-13 03-Dec-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 05-Dec-13 05-Dec-13 Remove Formwork
Roof 17d 07-Dec-13 25-Dec-13 25-Dec-13, Roof
Beams and slab 17d 07-Dec-13 25-Dec-13 25-Dec-13, Beams and slab
FW.B&S.R Form Work 5d 07-Dec-13 11-Dec-13 Form Work
R.F.T.B&S R.F.T 5d 12-Dec-13 17-Dec-13 R.F.T
Pour.B&S. Pouring Concrete 1d 18-Dec-13 18-Dec-13 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 86 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

262
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.B&S Remove Formwork 1d 25-Dec-13 25-Dec-13 Remove Formwork
Mansonary 109d 22-Aug-13 31-Dec-13 31-Dec-13, Mansonary
Basement 2d 22-Aug-13 24-Aug-13 24-Aug-13, Basement
E.B.M1020 External 2d 22-Aug-13 24-Aug-13 External
Ground Floor 4d 25-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
I.G.M1020 Internal 4d 25-Sep-13 29-Sep-13 Internal
E.G.M1020 External 2d 25-Sep-13 26-Sep-13 External
First Floor 4d 22-Oct-13 26-Oct-13 26-Oct-13, First Floor
I.st .M1020 Internal 4d 22-Oct-13 26-Oct-13 Internal
E.st .M1020 External 2d 22-Oct-13 23-Oct-13 External
Second Floor 4d 13-Nov-13 17-Nov-13 17-Nov-13, Second Floor
I . nd .M1020 Internal 4d 13-Nov-13 17-Nov-13 Internal
E. nd .M1020 External 2d 13-Nov-13 14-Nov-13 External
Third Floor 4d 05-Dec-13 09-Dec-13 09-Dec-13, Third Floor
I . rd .M1020 Internal 4d 05-Dec-13 09-Dec-13 Internal
E . rd .M1020 External 2d 05-Dec-13 07-Dec-13 External
Fourth Floor 4d 26-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
I .th .M1020 Internal 4d 26-Dec-13 30-Dec-13 Internal
E. th .M1020 External 2d 26-Dec-13 28-Dec-13 External
Roof 1d 31-Dec-13 31-Dec-13 31-Dec-13, Roof
E .R .M1020 External 1d 31-Dec-13 31-Dec-13 External
Finishing 85d 28-Sep-13 08-Jan-14 08-Jan-14, Finishing
Ground Floor 2d 28-Sep-13 29-Sep-13 29-Sep-13, Ground Floor
Calm Shell 2d 28-Sep-13 29-Sep-13 29-Sep-13, Calm Shell
E.Ch .G.1 External 2d 28-Sep-13 29-Sep-13 External
External Ele
Electrical 0d
First Floor 2d 24-Oct-13 26-Oct-13 26-Oct-13, First Floor
Calm Shell 2d 24-Oct-13 26-Oct-13 26-Oct-13, Calm Shell
E .ch .st10 External 2d 24-Oct-13 26-Oct-13 External
External Ele
Electrical 0d
Second Floor 2d 16-Nov-13 17-Nov-13 17-Nov-13, Second Floor
Calm Shell 2d 16-Nov-13 17-Nov-13 17-Nov-13, Calm Shell
E.ch .nd10 External 2d 16-Nov-13 17-Nov-13 External
External Ele
Electrical 0d
Third Floor 2d 08-Dec-13 09-Dec-13 09-Dec-13, Third Floor
Calm Shell 2d 08-Dec-13 09-Dec-13 09-Dec-13, Calm Shell
E.ch. rd10 External 2d 08-Dec-13 09-Dec-13 External
External Ele
Electrical 0d
Fourth Floor 2d 29-Dec-13 30-Dec-13 30-Dec-13, Fourth Floor
Calm Shell 2d 29-Dec-13 30-Dec-13 30-Dec-13, Calm Shell
E.ch .th10 External 2d 29-Dec-13 30-Dec-13 External
External Ele
Electrical 0d
Roof 1d 01-Jan-14 01-Jan-14 01-Jan-14, Roof
Calm Shell 1d 01-Jan-14 01-Jan-14 01-Jan-14, Calm Shell
E.ch .r1020 External 1d 01-Jan-14 01-Jan-14 External
External Ele
Electrical 0d
Painting Cond. 6d 02-Jan-14 08-Jan-14 08-Jan-14, Painting Cond.
Ex. Paint1020 External Painting 6d 02-Jan-14 08-Jan-14 External Painting
Marbling 5d 02-Jan-14 07-Jan-14 07-Jan-14, Marbling
E.M.F1020 Entrance 4d 02-Jan-14 06-Jan-14 Entrance
S.M.F1020 Stairs 5d 02-Jan-14 07-Jan-14 Stairs
Stage 3 334d 09-Jan-14 11-Feb-15 11-Feb-
A5600 Start of Stage 3 0d 09-Jan-14 Start of Stage 3
A5610 Finsih of Stage 3 0d 11-Feb-15 Finsih of
Condonminium Appartments-40
App 177d 09-Jan-14 09-Aug-14 09-Aug-14, Condonminiu
A5390 start of cond. 0d 09-Jan-14 start of cond.
A5380 finish of cond. 0d 09-Aug-14 finish of cond.
Mobilization 1d 09-Jan-14 09-Jan-14 09-Jan-14, Mobilization
M.Sur.1110 Site Surveying 1d 09-Jan-14 09-Jan-14 Site Surveying
Earth Work 47d 11-Jan-14 05-Mar-14 05-Mar-14, Earth Work
Ex.1110 Excavation 7d 11-Jan-14 18-Jan-14 Excavation
B.F1110 BackFill 2d 04-Mar-14 05-Mar-14 BackFill
Civil Work 157d 19-Jan-14 21-Jul-14 21-Jul-14, Civil Work
Foundation 30d 19-Jan-14 22-Feb-14 22-Feb-14, Foundation
Footing 30d 19-Jan-14 22-Feb-14 22-Feb-14, Footing
Plain Concrete
Con 10d 19-Jan-14 29-Jan-14 29-Jan-14, Plain Concrete
FW.PC Form Work 7d 19-Jan-14 26-Jan-14 Form Work
Pour.Pc Pouring Concrete 1d 27-Jan-14 27-Jan-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 29-Jan-14 29-Jan-14 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 30-Jan-14 22-Feb-14 22-Feb-14, Reinforced Concrete & Sem
FW.Rc& Form Work 8d 30-Jan-14 08-Feb-14 Form Work
R.F.T.R R.F.T 6d 09-Feb-14 15-Feb-14 R.F.T
Pour.Rc Pouring Concrete 1d 16-Feb-14 16-Feb-14 Pouring Concrete
R.Fw.R Remove Formwork 1d 18-Feb-14 18-Feb-14 Remove Formwork
InsRc& Insulting 3d 19-Feb-14 22-Feb-14 Insulting
Basement 26d 23-Feb-14 24-Mar-14 24-Mar-14, Basement
Slab On Grade
Gra 16d 06-Mar-14 24-Mar-14 24-Mar-14, Slab On Grade
FW.SOG1 Form Work 5d 06-Mar-14 11-Mar-14 Form Work
R.F.T.SOG R.F.T 4d 12-Mar-14 16-Mar-14 R.F.T
Pour.SOG Pouring Concrete 1d 17-Mar-14 17-Mar-14 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 24-Mar-14 24-Mar-14 Remove Formwork

Actual Work Critical Remaining Work Summary Page 87 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

263
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Columns 8d 23-Feb-14 03-Mar-14 03-Mar-14, Columns
FW.Col.B1 Form Work 2d 23-Feb-14 24-Feb-14 Form Work
R.F.T.Col. R.F.T 3d 25-Feb-14 27-Feb-14 R.F.T
Pour.Col.B Pouring Concrete 1d 01-Mar-14 01-Mar-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Mar-14 03-Mar-14 Remove Formwork
Ground Floor 24d 06-Mar-14 02-Apr-14 02-Apr-14, Ground Floor
Beam and s
slab 13d 06-Mar-14 20-Mar-14 20-Mar-14, Beam and slab
FW.B&S.G Form Work 5d 06-Mar-14 11-Mar-14 Form Work
R.F.T.B&S R.F.T 5d 06-Mar-14 11-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 12-Mar-14 12-Mar-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 20-Mar-14 20-Mar-14 Remove Formwork
Columns 8d 25-Mar-14 02-Apr-14 02-Apr-14, Columns
FW.Col.G Form Work 2d 25-Mar-14 26-Mar-14 Form Work
R.F.T.Col. R.F.T 3d 27-Mar-14 30-Mar-14 R.F.T
Pour..Col.G Pouring Concrete 1d 31-Mar-14 31-Mar-14 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 02-Apr-14 02-Apr-14 Remove Formwork
First Floor 19d 03-Apr-14 24-Apr-14 24-Apr-14, First Floor
Beams and slab 18d 03-Apr-14 23-Apr-14 23-Apr-14, Beams and slab
FW.B&S.s Form Work 5d 03-Apr-14 08-Apr-14 Form Work
R.F.T.B&S R.F.T 5d 09-Apr-14 14-Apr-14 R.F.T
Pour.B&S. Pouring Concrete 1d 15-Apr-14 15-Apr-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 23-Apr-14 23-Apr-14 Remove Formwork
Columns 8d 16-Apr-14 24-Apr-14 24-Apr-14, Columns
FW.Col.st Form Work 2d 16-Apr-14 17-Apr-14 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-14 21-Apr-14 R.F.T
Pour.Col.s Pouring Concrete 1d 22-Apr-14 22-Apr-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 24-Apr-14 24-Apr-14 Remove Formwork
Second Floor 19d 26-Apr-14 18-May-14 18-May-14, Second Floor
Beams and slab 18d 26-Apr-14 17-May-14 17-May-14, Beams and slab
FW.B&S.n Form Work 5d 26-Apr-14 30-Apr-14 Form Work
R.F.T.B&S R.F.T 5d 03-May-14 07-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 08-May-14 08-May-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 17-May-14 17-May-14 Remove Formwork
Columns 8d 10-May-14 18-May-14 18-May-14, Columns
FW.Col.nd Form Work 2d 10-May-14 11-May-14 Form Work
R.F.T.Col. R.F.T 3d 12-May-14 14-May-14 R.F.T
Pour.Col.n Pouring Concrete 1d 15-May-14 15-May-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 18-May-14 18-May-14 Remove Formwork
Third Floor 19d 19-May-14 09-Jun-14 09-Jun-14, Third Floor
Beams and slab 18d 19-May-14 08-Jun-14 08-Jun-14, Beams and slab
FW.B&S.r Form Work 5d 19-May-14 24-May-14 Form Work
R.F.T.B&S R.F.T 5d 25-May-14 29-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 31-May-14 31-May-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Jun-14 08-Jun-14 Remove Formwork
Columns 8d 01-Jun-14 09-Jun-14 09-Jun-14, Columns
FW.Col.rd Form Work 2d 01-Jun-14 02-Jun-14 Form Work
R.F.T.Col. R.F.T 3d 03-Jun-14 05-Jun-14 R.F.T
Pour.col.rd Pouring Concrete 1d 07-Jun-14 07-Jun-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Jun-14 09-Jun-14 Remove Formwork
Fourth Floor 19d 10-Jun-14 01-Jul-14 01-Jul-14, Fourth Floor
Beams and slab 18d 10-Jun-14 30-Jun-14 30-Jun-14, Beams and slab
FW.B&S.th Form Work 5d 10-Jun-14 15-Jun-14 Form Work
R.F.T.B&S R.F.T 5d 16-Jun-14 21-Jun-14 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Jun-14 22-Jun-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 30-Jun-14 30-Jun-14 Remove Formwork
Columns 8d 23-Jun-14 01-Jul-14 01-Jul-14, Columns
FW.Col.th Form Work 2d 23-Jun-14 24-Jun-14 Form Work
R.F.T.Col. R.F.T 3d 25-Jun-14 28-Jun-14 R.F.T
Pour.Col.th Pouring Concrete 1d 29-Jun-14 29-Jun-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Jul-14 01-Jul-14 Remove Formwork
Roof 17d 02-Jul-14 21-Jul-14 21-Jul-14, Roof
Beams and slab 17d 02-Jul-14 21-Jul-14 21-Jul-14, Beams and slab
FW.B&S.R Form Work 5d 02-Jul-14 07-Jul-14 Form Work
R.F.T.B&S R.F.T 5d 08-Jul-14 13-Jul-14 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Jul-14 14-Jul-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Jul-14 21-Jul-14 Remove Formwork
Mansonary 109d 22-Mar-14 31-Jul-14 31-Jul-14, Mansonary
Basement 2d 22-Mar-14 23-Mar-14 23-Mar-14, Basement
E.B.M1110 External 2d 22-Mar-14 23-Mar-14 External
Ground Floor 4d 24-Apr-14 28-Apr-14 28-Apr-14, Ground Floor
I.G.M1110 Internal 4d 24-Apr-14 28-Apr-14 Internal
E.G.M1110 External 2d 24-Apr-14 26-Apr-14 External
First Floor 4d 18-May-14 21-May-14 21-May-14, First Floor
I.st .M1110 Internal 4d 18-May-14 21-May-14 Internal
E.st .M1110 External 2d 18-May-14 19-May-14 External
Second Floor 4d 09-Jun-14 12-Jun-14 12-Jun-14, Second Floor
I . nd .M1110 Internal 4d 09-Jun-14 12-Jun-14 Internal
E. nd .M1110 External 2d 09-Jun-14 10-Jun-14 External
Third Floor 4d 01-Jul-14 05-Jul-14 05-Jul-14, Third Floor

Actual Work Critical Remaining Work Summary Page 88 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

264
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
I . rd .M1110 Internal 4d 01-Jul-14 05-Jul-14 Internal
E . rd .M1110 External 2d 01-Jul-14 02-Jul-14 External
Fourth Floor 4d 22-Jul-14 26-Jul-14 26-Jul-14, Fourth Floor
I .th .M1110 Internal 4d 22-Jul-14 26-Jul-14 Internal
E. th .M1110 External 2d 22-Jul-14 23-Jul-14 External
Roof 1d 31-Jul-14 31-Jul-14 31-Jul-14, Roof
E .R .M1110 External 1d 31-Jul-14 31-Jul-14 External
Finishing 85d 27-Apr-14 09-Aug-14 09-Aug-14, Finishing
Ground Floor 2d 27-Apr-14 28-Apr-14 28-Apr-14, Ground Floor
Calm Shell 2d 27-Apr-14 28-Apr-14 28-Apr-14, Calm Shell
E.Ch .G.1 External 2d 27-Apr-14 28-Apr-14 External
External Ele
Electrical 0d
First Floor 2d 20-May-14 21-May-14 21-May-14, First Floor
Calm Shell 2d 20-May-14 21-May-14 21-May-14, Calm Shell
E .ch .st11 External 2d 20-May-14 21-May-14 External
External Ele
Electrical 0d
Second Floor 2d 11-Jun-14 12-Jun-14 12-Jun-14, Second Floor
Calm Shell 2d 11-Jun-14 12-Jun-14 12-Jun-14, Calm Shell
E.ch .nd11 External 2d 11-Jun-14 12-Jun-14 External
External Ele
Electrical 0d
Third Floor 2d 03-Jul-14 05-Jul-14 05-Jul-14, Third Floor
Calm Shell 2d 03-Jul-14 05-Jul-14 05-Jul-14, Calm Shell
E.ch. rd11 External 2d 03-Jul-14 05-Jul-14 External
External Ele
Electrical 0d
Fourth Floor 2d 24-Jul-14 26-Jul-14 26-Jul-14, Fourth Floor
Calm Shell 2d 24-Jul-14 26-Jul-14 26-Jul-14, Calm Shell
E.ch .th111 External 2d 24-Jul-14 26-Jul-14 External
External Ele
Electrical 0d
Roof 1d 02-Aug-14 02-Aug-14 02-Aug-14, Roof
Calm Shell 1d 02-Aug-14 02-Aug-14 02-Aug-14, Calm Shell
E.ch .r1110 External 1d 02-Aug-14 02-Aug-14 External
External Ele
Electrical 0d
Painting Cond. 6d 03-Aug-14 09-Aug-14 09-Aug-14, Painting Con
Ex. Paint1110 External Painting 6d 03-Aug-14 09-Aug-14 External Painting
Marbling 5d 03-Aug-14 07-Aug-14 07-Aug-14, Marbling
E.M.F1110 Entrance 4d 03-Aug-14 06-Aug-14 Entrance
S.M.F1110 Stairs 5d 03-Aug-14 07-Aug-14 Stairs
Condonminium Appartments-41
App 334d 09-Jan-14 11-Feb-15 11-Feb-
A5370 start of cond. 0d 09-Jan-14 start of cond.
A5360 finish of cond. 0d 11-Feb-15 finish of
Mobilization 1d 11-Jan-14 11-Jan-14 11-Jan-14, Mobilization
M.Sur.1100 Site Surveying 1d 11-Jan-14 11-Jan-14 Site Surveying
Earth Work 197d 19-Jan-14 10-Sep-14 10-Sep-14, Earth Wo
Ex.1100 Excavation 7d 19-Jan-14 26-Jan-14 Excavation
B.F1100 BackFill 2d 09-Sep-14 10-Sep-14 BackFill
Civil Work 157d 22-Jul-14 28-Jan-15 28-Jan-15
Foundation 30d 22-Jul-14 30-Aug-14 30-Aug-14, Foundation
Footing 30d 22-Jul-14 30-Aug-14 30-Aug-14, Footing
Plain Concrete
Con 10d 22-Jul-14 06-Aug-14 06-Aug-14, Plain Concre
FW.PC Form Work 7d 22-Jul-14 03-Aug-14 Form Work
Pour.Pc Pouring Concrete 1d 04-Aug-14 04-Aug-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 06-Aug-14 06-Aug-14 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 07-Aug-14 30-Aug-14 30-Aug-14, Reinforced
FW.Rc& Form Work 8d 07-Aug-14 16-Aug-14 Form Work
R.F.T.R R.F.T 6d 17-Aug-14 23-Aug-14 R.F.T
Pour.Rc Pouring Concrete 1d 24-Aug-14 24-Aug-14 Pouring Concrete
R.Fw.R Remove Formwork 1d 26-Aug-14 26-Aug-14 Remove Formwork
InsRc& Insulting 3d 27-Aug-14 30-Aug-14 Insulting
Basement 26d 31-Aug-14 29-Sep-14 29-Sep-14, Baseme
Slab On Grade
Gra 16d 11-Sep-14 29-Sep-14 29-Sep-14, Slab On
FW.SOG1 Form Work 5d 11-Sep-14 16-Sep-14 Form Work
R.F.T.SOG R.F.T 4d 17-Sep-14 21-Sep-14 R.F.T
Pour.SOG Pouring Concrete 1d 22-Sep-14 22-Sep-14 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 29-Sep-14 29-Sep-14 Remove Formwork
Columns 8d 31-Aug-14 08-Sep-14 08-Sep-14, Columns
FW.Col.B1 Form Work 2d 31-Aug-14 01-Sep-14 Form Work
R.F.T.Col. R.F.T 3d 02-Sep-14 04-Sep-14 R.F.T
Pour.Col.B Pouring Concrete 1d 06-Sep-14 06-Sep-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-Sep-14 08-Sep-14 Remove Formwork
Ground Floor 24d 11-Sep-14 12-Oct-14 12-Oct-14, Ground
Beam and s
slab 13d 11-Sep-14 25-Sep-14 25-Sep-14, Beam an
FW.B&S.G Form Work 5d 11-Sep-14 16-Sep-14 Form Work
R.F.T.B&S R.F.T 5d 11-Sep-14 16-Sep-14 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Sep-14 17-Sep-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Sep-14 25-Sep-14 Remove Formwork
Columns 8d 30-Sep-14 12-Oct-14 12-Oct-14, Column
FW.Col.G Form Work 2d 30-Sep-14 01-Oct-14 Form Work
R.F.T.Col. R.F.T 3d 02-Oct-14 08-Oct-14 R.F.T
Pour..Col.G Pouring Concrete 1d 09-Oct-14 09-Oct-14 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 12-Oct-14 12-Oct-14 Remove Formwork
First Floor 19d 13-Oct-14 03-Nov-14 03-Nov-14, First

Actual Work Critical Remaining Work Summary Page 89 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

265
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Beams and slab 18d 13-Oct-14 02-Nov-14 02-Nov-14, Beam
FW.B&S.s Form Work 5d 13-Oct-14 18-Oct-14 Form Work
R.F.T.B&S R.F.T 5d 19-Oct-14 23-Oct-14 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Oct-14 25-Oct-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Nov-14 02-Nov-14 Remove Formwo
Columns 8d 26-Oct-14 03-Nov-14 03-Nov-14, Colum
FW.Col.st Form Work 2d 26-Oct-14 27-Oct-14 Form Work
R.F.T.Col. R.F.T 3d 28-Oct-14 30-Oct-14 R.F.T
Pour.Col.s Pouring Concrete 1d 01-Nov-14 01-Nov-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Nov-14 03-Nov-14 Remove Formwo
Second Floor 19d 04-Nov-14 25-Nov-14 25-Nov-14, Sec
Beams and slab 18d 04-Nov-14 24-Nov-14 24-Nov-14, Bea
FW.B&S.n Form Work 5d 04-Nov-14 09-Nov-14 Form Work
R.F.T.B&S R.F.T 5d 10-Nov-14 15-Nov-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-14 16-Nov-14 Pouring Concre
R.FW.B&S Remove Formwork 1d 24-Nov-14 24-Nov-14 Remove Formw
Columns 8d 17-Nov-14 25-Nov-14 25-Nov-14, Co
FW.Col.nd Form Work 2d 17-Nov-14 18-Nov-14 Form Work
R.F.T.Col. R.F.T 3d 19-Nov-14 22-Nov-14 R.F.T
Pour.Col.n Pouring Concrete 1d 23-Nov-14 23-Nov-14 Pouring Concre
R.FW.Col. Remove Formwork 1d 25-Nov-14 25-Nov-14 Remove Formw
Third Floor 19d 26-Nov-14 17-Dec-14 17-Dec-14, T
Beams and slab 18d 26-Nov-14 16-Dec-14 16-Dec-14, B
FW.B&S.r Form Work 5d 26-Nov-14 01-Dec-14 Form Work
R.F.T.B&S R.F.T 5d 02-Dec-14 07-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Dec-14 08-Dec-14 Pouring Concr
R.FW.B&S Remove Formwork 1d 16-Dec-14 16-Dec-14 Remove Form
Columns 8d 09-Dec-14 17-Dec-14 17-Dec-14, C
FW.Col.rd Form Work 2d 09-Dec-14 10-Dec-14 Form Work
R.F.T.Col. R.F.T 3d 11-Dec-14 14-Dec-14 R.F.T
Pour.col.rd Pouring Concrete 1d 15-Dec-14 15-Dec-14 Pouring Conc
R.FW.Col. Remove Formwork 1d 17-Dec-14 17-Dec-14 Remove Form
Fourth Floor 19d 18-Dec-14 08-Jan-15 08-Jan-15,
Beams and slab 18d 18-Dec-14 07-Jan-15 07-Jan-15,
FW.B&S.th Form Work 5d 18-Dec-14 23-Dec-14 Form Work
R.F.T.B&S R.F.T 5d 24-Dec-14 29-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Dec-14 30-Dec-14 Pouring Con
R.FW.B&S Remove Formwork 1d 07-Jan-15 07-Jan-15 Remove Fo
Columns 8d 31-Dec-14 08-Jan-15 08-Jan-15,
FW.Col.th Form Work 2d 31-Dec-14 01-Jan-15 Form Work
R.F.T.Col. R.F.T 3d 03-Jan-15 05-Jan-15 R.F.T
Pour.Col.th Pouring Concrete 1d 06-Jan-15 06-Jan-15 Pouring Co
R.FW.Col. Remove Formwork 1d 08-Jan-15 08-Jan-15 Remove Fo
Roof 17d 10-Jan-15 28-Jan-15 28-Jan-15
Beams and slab 17d 10-Jan-15 28-Jan-15 28-Jan-15
FW.B&S.R Form Work 5d 10-Jan-15 14-Jan-15 Form Work
R.F.T.B&S R.F.T 5d 15-Jan-15 20-Jan-15 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Jan-15 21-Jan-15 Pouring C
R.FW.B&S Remove Formwork 1d 28-Jan-15 28-Jan-15 Remove F
Mansonary 109d 27-Sep-14 03-Feb-15 03-Feb-1
Basement 2d 27-Sep-14 28-Sep-14 28-Sep-14, Baseme
E.B.M1100 External 2d 27-Sep-14 28-Sep-14 External
Ground Floor 4d 03-Nov-14 06-Nov-14 06-Nov-14, Grou
I.G.M1100 Internal 4d 03-Nov-14 06-Nov-14 Internal
E.G.M1100 External 2d 03-Nov-14 04-Nov-14 External
First Floor 4d 25-Nov-14 29-Nov-14 29-Nov-14, Fir
I.st .M1100 Internal 4d 25-Nov-14 29-Nov-14 Internal
E.st .M1100 External 2d 25-Nov-14 26-Nov-14 External
Second Floor 4d 17-Dec-14 21-Dec-14 21-Dec-14, S
I . nd .M1100 Internal 4d 17-Dec-14 21-Dec-14 Internal
E. nd .M1100 External 2d 17-Dec-14 18-Dec-14 External
Third Floor 4d 08-Jan-15 12-Jan-15 12-Jan-15,
I . rd .M1100 Internal 4d 08-Jan-15 12-Jan-15 Internal
E . rd .M1100 External 2d 08-Jan-15 10-Jan-15 External
Fourth Floor 4d 29-Jan-15 02-Feb-15 02-Feb-1
I .th .M1100 Internal 4d 29-Jan-15 02-Feb-15 Internal
E. th .M1100 External 2d 29-Jan-15 31-Jan-15 External
Roof 1d 03-Feb-15 03-Feb-15 03-Feb-1
E .R .M1100 External 1d 03-Feb-15 03-Feb-15 External
Finishing 85d 05-Nov-14 11-Feb-15 11-Feb-
Ground Floor 2d 05-Nov-14 06-Nov-14 06-Nov-14, Grou
Calm Shell 2d 05-Nov-14 06-Nov-14 06-Nov-14, Calm
E.Ch .G.1 External 2d 05-Nov-14 06-Nov-14 External
External Ele
Electrical 0d
First Floor 2d 27-Nov-14 29-Nov-14 29-Nov-14, Fir
Calm Shell 2d 27-Nov-14 29-Nov-14 29-Nov-14, Ca
E .ch .st11 External 2d 27-Nov-14 29-Nov-14 External
External Ele
Electrical 0d
Second Floor 2d 20-Dec-14 21-Dec-14 21-Dec-14, S
Calm Shell 2d 20-Dec-14 21-Dec-14 21-Dec-14, C

Actual Work Critical Remaining Work Summary Page 90 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

266
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.ch .nd11 External 2d 20-Dec-14 21-Dec-14 External
External Ele
Electrical 0d
Third Floor 2d 11-Jan-15 12-Jan-15 12-Jan-15,
Calm Shell 2d 11-Jan-15 12-Jan-15 12-Jan-15,
E.ch. rd11 External 2d 11-Jan-15 12-Jan-15 External
External Ele
Electrical 0d
Fourth Floor 2d 01-Feb-15 02-Feb-15 02-Feb-1
Calm Shell 2d 01-Feb-15 02-Feb-15 02-Feb-1
E.ch .th110 External 2d 01-Feb-15 02-Feb-15 External
External Ele
Electrical 0d
Roof 1d 04-Feb-15 04-Feb-15 04-Feb-1
Calm Shell 1d 04-Feb-15 04-Feb-15 04-Feb-1
E.ch .r1100 External 1d 04-Feb-15 04-Feb-15 External
External Ele
Electrical 0d
Painting Cond. 6d 05-Feb-15 11-Feb-15 11-Feb-
Ex. Paint1100 External Painting 6d 05-Feb-15 11-Feb-15 External
Marbling 5d 05-Feb-15 10-Feb-15 10-Feb-
E.M.F1100 Entrance 4d 05-Feb-15 09-Feb-15 Entrance
S.M.F1100 Stairs 5d 05-Feb-15 10-Feb-15 Stairs
Condonminium Appartments-42
App 177d 09-Jan-14 09-Aug-14 09-Aug-14, Condonminiu
A5430 start of cond. 0d 09-Jan-14 start of cond.
A5420 finish of cond. 0d 09-Aug-14 finish of cond.
Mobilization 1d 09-Jan-14 09-Jan-14 09-Jan-14, Mobilization
M.Sur.1130 Site Surveying 1d 09-Jan-14 09-Jan-14 Site Surveying
Earth Work 47d 11-Jan-14 05-Mar-14 05-Mar-14, Earth Work
Ex.1130 Excavation 7d 11-Jan-14 18-Jan-14 Excavation
B.F1130 BackFill 2d 04-Mar-14 05-Mar-14 BackFill
Civil Work 157d 19-Jan-14 21-Jul-14 21-Jul-14, Civil Work
Foundation 30d 19-Jan-14 22-Feb-14 22-Feb-14, Foundation
Footing 30d 19-Jan-14 22-Feb-14 22-Feb-14, Footing
Plain Concrete
Con 10d 19-Jan-14 29-Jan-14 29-Jan-14, Plain Concrete
FW.PC Form Work 7d 19-Jan-14 26-Jan-14 Form Work
Pour.Pc Pouring Concrete 1d 27-Jan-14 27-Jan-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 29-Jan-14 29-Jan-14 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 30-Jan-14 22-Feb-14 22-Feb-14, Reinforced Concrete & Sem
FW.Rc& Form Work 8d 30-Jan-14 08-Feb-14 Form Work
R.F.T.R R.F.T 6d 09-Feb-14 15-Feb-14 R.F.T
Pour.Rc Pouring Concrete 1d 16-Feb-14 16-Feb-14 Pouring Concrete
R.Fw.R Remove Formwork 1d 18-Feb-14 18-Feb-14 Remove Formwork
InsRc& Insulting 3d 19-Feb-14 22-Feb-14 Insulting
Basement 26d 23-Feb-14 24-Mar-14 24-Mar-14, Basement
Slab On Grade
Gra 16d 06-Mar-14 24-Mar-14 24-Mar-14, Slab On Grade
FW.SOG1 Form Work 5d 06-Mar-14 11-Mar-14 Form Work
R.F.T.SOG R.F.T 4d 12-Mar-14 16-Mar-14 R.F.T
Pour.SOG Pouring Concrete 1d 17-Mar-14 17-Mar-14 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 24-Mar-14 24-Mar-14 Remove Formwork
Columns 8d 23-Feb-14 03-Mar-14 03-Mar-14, Columns
FW.Col.B1 Form Work 2d 23-Feb-14 24-Feb-14 Form Work
R.F.T.Col. R.F.T 3d 25-Feb-14 27-Feb-14 R.F.T
Pour.Col.B Pouring Concrete 1d 01-Mar-14 01-Mar-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Mar-14 03-Mar-14 Remove Formwork
Ground Floor 24d 06-Mar-14 02-Apr-14 02-Apr-14, Ground Floor
Beam and s
slab 13d 06-Mar-14 20-Mar-14 20-Mar-14, Beam and slab
FW.B&S.G Form Work 5d 06-Mar-14 11-Mar-14 Form Work
R.F.T.B&S R.F.T 5d 06-Mar-14 11-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 12-Mar-14 12-Mar-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 20-Mar-14 20-Mar-14 Remove Formwork
Columns 8d 25-Mar-14 02-Apr-14 02-Apr-14, Columns
FW.Col.G Form Work 2d 25-Mar-14 26-Mar-14 Form Work
R.F.T.Col. R.F.T 3d 27-Mar-14 30-Mar-14 R.F.T
Pour..Col.G Pouring Concrete 1d 31-Mar-14 31-Mar-14 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 02-Apr-14 02-Apr-14 Remove Formwork
First Floor 19d 03-Apr-14 24-Apr-14 24-Apr-14, First Floor
Beams and slab 18d 03-Apr-14 23-Apr-14 23-Apr-14, Beams and slab
FW.B&S.s Form Work 5d 03-Apr-14 08-Apr-14 Form Work
R.F.T.B&S R.F.T 5d 09-Apr-14 14-Apr-14 R.F.T
Pour.B&S. Pouring Concrete 1d 15-Apr-14 15-Apr-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 23-Apr-14 23-Apr-14 Remove Formwork
Columns 8d 16-Apr-14 24-Apr-14 24-Apr-14, Columns
FW.Col.st Form Work 2d 16-Apr-14 17-Apr-14 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-14 21-Apr-14 R.F.T
Pour.Col.s Pouring Concrete 1d 22-Apr-14 22-Apr-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 24-Apr-14 24-Apr-14 Remove Formwork
Second Floor 19d 26-Apr-14 18-May-14 18-May-14, Second Floor
Beams and slab 18d 26-Apr-14 17-May-14 17-May-14, Beams and slab
FW.B&S.n Form Work 5d 26-Apr-14 30-Apr-14 Form Work
R.F.T.B&S R.F.T 5d 03-May-14 07-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 08-May-14 08-May-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 17-May-14 17-May-14 Remove Formwork
Columns 8d 10-May-14 18-May-14 18-May-14, Columns

Actual Work Critical Remaining Work Summary Page 91 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

267
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.Col.nd Form Work 2d 10-May-14 11-May-14 Form Work
R.F.T.Col. R.F.T 3d 12-May-14 14-May-14 R.F.T
Pour.Col.n Pouring Concrete 1d 15-May-14 15-May-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 18-May-14 18-May-14 Remove Formwork
Third Floor 19d 19-May-14 09-Jun-14 09-Jun-14, Third Floor
Beams and slab 18d 19-May-14 08-Jun-14 08-Jun-14, Beams and slab
FW.B&S.r Form Work 5d 19-May-14 24-May-14 Form Work
R.F.T.B&S R.F.T 5d 25-May-14 29-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 31-May-14 31-May-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Jun-14 08-Jun-14 Remove Formwork
Columns 8d 01-Jun-14 09-Jun-14 09-Jun-14, Columns
FW.Col.rd Form Work 2d 01-Jun-14 02-Jun-14 Form Work
R.F.T.Col. R.F.T 3d 03-Jun-14 05-Jun-14 R.F.T
Pour.col.rd Pouring Concrete 1d 07-Jun-14 07-Jun-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Jun-14 09-Jun-14 Remove Formwork
Fourth Floor 19d 10-Jun-14 01-Jul-14 01-Jul-14, Fourth Floor
Beams and slab 18d 10-Jun-14 30-Jun-14 30-Jun-14, Beams and slab
FW.B&S.th Form Work 5d 10-Jun-14 15-Jun-14 Form Work
R.F.T.B&S R.F.T 5d 16-Jun-14 21-Jun-14 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Jun-14 22-Jun-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 30-Jun-14 30-Jun-14 Remove Formwork
Columns 8d 23-Jun-14 01-Jul-14 01-Jul-14, Columns
FW.Col.th Form Work 2d 23-Jun-14 24-Jun-14 Form Work
R.F.T.Col. R.F.T 3d 25-Jun-14 28-Jun-14 R.F.T
Pour.Col.th Pouring Concrete 1d 29-Jun-14 29-Jun-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Jul-14 01-Jul-14 Remove Formwork
Roof 17d 02-Jul-14 21-Jul-14 21-Jul-14, Roof
Beams and slab 17d 02-Jul-14 21-Jul-14 21-Jul-14, Beams and slab
FW.B&S.R Form Work 5d 02-Jul-14 07-Jul-14 Form Work
R.F.T.B&S R.F.T 5d 08-Jul-14 13-Jul-14 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Jul-14 14-Jul-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Jul-14 21-Jul-14 Remove Formwork
Mansonary 109d 22-Mar-14 31-Jul-14 31-Jul-14, Mansonary
Basement 2d 22-Mar-14 23-Mar-14 23-Mar-14, Basement
E.B.M1130 External 2d 22-Mar-14 23-Mar-14 External
Ground Floor 4d 24-Apr-14 28-Apr-14 28-Apr-14, Ground Floor
I.G.M1130 Internal 4d 24-Apr-14 28-Apr-14 Internal
E.G.M1130 External 2d 24-Apr-14 26-Apr-14 External
First Floor 4d 18-May-14 21-May-14 21-May-14, First Floor
I.st .M1130 Internal 4d 18-May-14 21-May-14 Internal
E.st .M1130 External 2d 18-May-14 19-May-14 External
Second Floor 4d 09-Jun-14 12-Jun-14 12-Jun-14, Second Floor
I . nd .M1130 Internal 4d 09-Jun-14 12-Jun-14 Internal
E. nd .M1130 External 2d 09-Jun-14 10-Jun-14 External
Third Floor 4d 01-Jul-14 05-Jul-14 05-Jul-14, Third Floor
I . rd .M1130 Internal 4d 01-Jul-14 05-Jul-14 Internal
E . rd .M1130 External 2d 01-Jul-14 02-Jul-14 External
Fourth Floor 4d 22-Jul-14 26-Jul-14 26-Jul-14, Fourth Floor
I .th .M1130 Internal 4d 22-Jul-14 26-Jul-14 Internal
E. th .M1130 External 2d 22-Jul-14 23-Jul-14 External
Roof 1d 31-Jul-14 31-Jul-14 31-Jul-14, Roof
E .R .M1130 External 1d 31-Jul-14 31-Jul-14 External
Finishing 85d 27-Apr-14 09-Aug-14 09-Aug-14, Finishing
Ground Floor 2d 27-Apr-14 28-Apr-14 28-Apr-14, Ground Floor
Calm Shell 2d 27-Apr-14 28-Apr-14 28-Apr-14, Calm Shell
E.Ch .G.1 External 2d 27-Apr-14 28-Apr-14 External
External Ele
Electrical 0d
First Floor 2d 20-May-14 21-May-14 21-May-14, First Floor
Calm Shell 2d 20-May-14 21-May-14 21-May-14, Calm Shell
E .ch .st11 External 2d 20-May-14 21-May-14 External
External Ele
Electrical 0d
Second Floor 2d 11-Jun-14 12-Jun-14 12-Jun-14, Second Floor
Calm Shell 2d 11-Jun-14 12-Jun-14 12-Jun-14, Calm Shell
E.ch .nd11 External 2d 11-Jun-14 12-Jun-14 External
External Ele
Electrical 0d
Third Floor 2d 03-Jul-14 05-Jul-14 05-Jul-14, Third Floor
Calm Shell 2d 03-Jul-14 05-Jul-14 05-Jul-14, Calm Shell
E.ch. rd11 External 2d 03-Jul-14 05-Jul-14 External
External Ele
Electrical 0d
Fourth Floor 2d 24-Jul-14 26-Jul-14 26-Jul-14, Fourth Floor
Calm Shell 2d 24-Jul-14 26-Jul-14 26-Jul-14, Calm Shell
E.ch .th113 External 2d 24-Jul-14 26-Jul-14 External
External Ele
Electrical 0d
Roof 1d 02-Aug-14 02-Aug-14 02-Aug-14, Roof
Calm Shell 1d 02-Aug-14 02-Aug-14 02-Aug-14, Calm Shell
E.ch .r1130 External 1d 02-Aug-14 02-Aug-14 External
External Ele
Electrical 0d
Painting Cond. 6d 03-Aug-14 09-Aug-14 09-Aug-14, Painting Con
Ex. Paint1130 External Painting 6d 03-Aug-14 09-Aug-14 External Painting
Marbling 5d 03-Aug-14 07-Aug-14 07-Aug-14, Marbling

Actual Work Critical Remaining Work Summary Page 92 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

268
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.M.F1130 Entrance 4d 03-Aug-14 06-Aug-14 Entrance
S.M.F1130 Stairs 5d 03-Aug-14 07-Aug-14 Stairs
Condonminium Appartments-48
App 334d 09-Jan-14 11-Feb-15 11-Feb-
A5410 start of cond. 0d 09-Jan-14 start of cond.
A5400 finish of cond. 0d 11-Feb-15 finish of
Mobilization 1d 11-Jan-14 11-Jan-14 11-Jan-14, Mobilization
M.Sur.1120 Site Surveying 1d 11-Jan-14 11-Jan-14 Site Surveying
Earth Work 197d 19-Jan-14 10-Sep-14 10-Sep-14, Earth Wo
Ex.1120 Excavation 7d 19-Jan-14 26-Jan-14 Excavation
B.F1120 BackFill 2d 09-Sep-14 10-Sep-14 BackFill
Civil Work 157d 22-Jul-14 28-Jan-15 28-Jan-15
Foundation 30d 22-Jul-14 30-Aug-14 30-Aug-14, Foundation
Footing 30d 22-Jul-14 30-Aug-14 30-Aug-14, Footing
Plain Concrete
Con 10d 22-Jul-14 06-Aug-14 06-Aug-14, Plain Concre
FW.PC Form Work 7d 22-Jul-14 03-Aug-14 Form Work
Pour.Pc Pouring Concrete 1d 04-Aug-14 04-Aug-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 06-Aug-14 06-Aug-14 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 07-Aug-14 30-Aug-14 30-Aug-14, Reinforced
FW.Rc& Form Work 8d 07-Aug-14 16-Aug-14 Form Work
R.F.T.R R.F.T 6d 17-Aug-14 23-Aug-14 R.F.T
Pour.Rc Pouring Concrete 1d 24-Aug-14 24-Aug-14 Pouring Concrete
R.Fw.R Remove Formwork 1d 26-Aug-14 26-Aug-14 Remove Formwork
InsRc& Insulting 3d 27-Aug-14 30-Aug-14 Insulting
Basement 26d 31-Aug-14 29-Sep-14 29-Sep-14, Baseme
Slab On Grade
Gra 16d 11-Sep-14 29-Sep-14 29-Sep-14, Slab On
FW.SOG1 Form Work 5d 11-Sep-14 16-Sep-14 Form Work
R.F.T.SOG R.F.T 4d 17-Sep-14 21-Sep-14 R.F.T
Pour.SOG Pouring Concrete 1d 22-Sep-14 22-Sep-14 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 29-Sep-14 29-Sep-14 Remove Formwork
Columns 8d 31-Aug-14 08-Sep-14 08-Sep-14, Columns
FW.Col.B1 Form Work 2d 31-Aug-14 01-Sep-14 Form Work
R.F.T.Col. R.F.T 3d 02-Sep-14 04-Sep-14 R.F.T
Pour.Col.B Pouring Concrete 1d 06-Sep-14 06-Sep-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-Sep-14 08-Sep-14 Remove Formwork
Ground Floor 24d 11-Sep-14 12-Oct-14 12-Oct-14, Ground
Beam and s
slab 13d 11-Sep-14 25-Sep-14 25-Sep-14, Beam an
FW.B&S.G Form Work 5d 11-Sep-14 16-Sep-14 Form Work
R.F.T.B&S R.F.T 5d 11-Sep-14 16-Sep-14 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Sep-14 17-Sep-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Sep-14 25-Sep-14 Remove Formwork
Columns 8d 30-Sep-14 12-Oct-14 12-Oct-14, Column
FW.Col.G Form Work 2d 30-Sep-14 01-Oct-14 Form Work
R.F.T.Col. R.F.T 3d 02-Oct-14 08-Oct-14 R.F.T
Pour..Col.G Pouring Concrete 1d 09-Oct-14 09-Oct-14 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 12-Oct-14 12-Oct-14 Remove Formwork
First Floor 19d 13-Oct-14 03-Nov-14 03-Nov-14, First
Beams and slab 18d 13-Oct-14 02-Nov-14 02-Nov-14, Beam
FW.B&S.s Form Work 5d 13-Oct-14 18-Oct-14 Form Work
R.F.T.B&S R.F.T 5d 19-Oct-14 23-Oct-14 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Oct-14 25-Oct-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Nov-14 02-Nov-14 Remove Formwo
Columns 8d 26-Oct-14 03-Nov-14 03-Nov-14, Colum
FW.Col.st Form Work 2d 26-Oct-14 27-Oct-14 Form Work
R.F.T.Col. R.F.T 3d 28-Oct-14 30-Oct-14 R.F.T
Pour.Col.s Pouring Concrete 1d 01-Nov-14 01-Nov-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Nov-14 03-Nov-14 Remove Formwo
Second Floor 19d 04-Nov-14 25-Nov-14 25-Nov-14, Sec
Beams and slab 18d 04-Nov-14 24-Nov-14 24-Nov-14, Bea
FW.B&S.n Form Work 5d 04-Nov-14 09-Nov-14 Form Work
R.F.T.B&S R.F.T 5d 10-Nov-14 15-Nov-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-14 16-Nov-14 Pouring Concre
R.FW.B&S Remove Formwork 1d 24-Nov-14 24-Nov-14 Remove Formw
Columns 8d 17-Nov-14 25-Nov-14 25-Nov-14, Co
FW.Col.nd Form Work 2d 17-Nov-14 18-Nov-14 Form Work
R.F.T.Col. R.F.T 3d 19-Nov-14 22-Nov-14 R.F.T
Pour.Col.n Pouring Concrete 1d 23-Nov-14 23-Nov-14 Pouring Concre
R.FW.Col. Remove Formwork 1d 25-Nov-14 25-Nov-14 Remove Formw
Third Floor 19d 26-Nov-14 17-Dec-14 17-Dec-14, T
Beams and slab 18d 26-Nov-14 16-Dec-14 16-Dec-14, B
FW.B&S.r Form Work 5d 26-Nov-14 01-Dec-14 Form Work
R.F.T.B&S R.F.T 5d 02-Dec-14 07-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Dec-14 08-Dec-14 Pouring Concr
R.FW.B&S Remove Formwork 1d 16-Dec-14 16-Dec-14 Remove Form
Columns 8d 09-Dec-14 17-Dec-14 17-Dec-14, C
FW.Col.rd Form Work 2d 09-Dec-14 10-Dec-14 Form Work
R.F.T.Col. R.F.T 3d 11-Dec-14 14-Dec-14 R.F.T
Pour.col.rd Pouring Concrete 1d 15-Dec-14 15-Dec-14 Pouring Conc
R.FW.Col. Remove Formwork 1d 17-Dec-14 17-Dec-14 Remove Form
Fourth Floor 19d 18-Dec-14 08-Jan-15 08-Jan-15,

Actual Work Critical Remaining Work Summary Page 93 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

269
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Beams and slab 18d 18-Dec-14 07-Jan-15 07-Jan-15,
FW.B&S.th Form Work 5d 18-Dec-14 23-Dec-14 Form Work
R.F.T.B&S R.F.T 5d 24-Dec-14 29-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Dec-14 30-Dec-14 Pouring Con
R.FW.B&S Remove Formwork 1d 07-Jan-15 07-Jan-15 Remove Fo
Columns 8d 31-Dec-14 08-Jan-15 08-Jan-15,
FW.Col.th Form Work 2d 31-Dec-14 01-Jan-15 Form Work
R.F.T.Col. R.F.T 3d 03-Jan-15 05-Jan-15 R.F.T
Pour.Col.th Pouring Concrete 1d 06-Jan-15 06-Jan-15 Pouring Co
R.FW.Col. Remove Formwork 1d 08-Jan-15 08-Jan-15 Remove Fo
Roof 17d 10-Jan-15 28-Jan-15 28-Jan-15
Beams and slab 17d 10-Jan-15 28-Jan-15 28-Jan-15
FW.B&S.R Form Work 5d 10-Jan-15 14-Jan-15 Form Work
R.F.T.B&S R.F.T 5d 15-Jan-15 20-Jan-15 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Jan-15 21-Jan-15 Pouring C
R.FW.B&S Remove Formwork 1d 28-Jan-15 28-Jan-15 Remove F
Mansonary 109d 27-Sep-14 03-Feb-15 03-Feb-1
Basement 2d 27-Sep-14 28-Sep-14 28-Sep-14, Baseme
E.B.M1120 External 2d 27-Sep-14 28-Sep-14 External
Ground Floor 4d 03-Nov-14 06-Nov-14 06-Nov-14, Grou
I.G.M1120 Internal 4d 03-Nov-14 06-Nov-14 Internal
E.G.M1120 External 2d 03-Nov-14 04-Nov-14 External
First Floor 4d 25-Nov-14 29-Nov-14 29-Nov-14, Fir
I.st .M1120 Internal 4d 25-Nov-14 29-Nov-14 Internal
E.st .M1120 External 2d 25-Nov-14 26-Nov-14 External
Second Floor 4d 17-Dec-14 21-Dec-14 21-Dec-14, S
I . nd .M1120 Internal 4d 17-Dec-14 21-Dec-14 Internal
E. nd .M1120 External 2d 17-Dec-14 18-Dec-14 External
Third Floor 4d 08-Jan-15 12-Jan-15 12-Jan-15,
I . rd .M1120 Internal 4d 08-Jan-15 12-Jan-15 Internal
E . rd .M1120 External 2d 08-Jan-15 10-Jan-15 External
Fourth Floor 4d 29-Jan-15 02-Feb-15 02-Feb-1
I .th .M1120 Internal 4d 29-Jan-15 02-Feb-15 Internal
E. th .M1120 External 2d 29-Jan-15 31-Jan-15 External
Roof 1d 03-Feb-15 03-Feb-15 03-Feb-1
E .R .M1120 External 1d 03-Feb-15 03-Feb-15 External
Finishing 85d 05-Nov-14 11-Feb-15 11-Feb-
Ground Floor 2d 05-Nov-14 06-Nov-14 06-Nov-14, Grou
Calm Shell 2d 05-Nov-14 06-Nov-14 06-Nov-14, Calm
E.Ch .G.1 External 2d 05-Nov-14 06-Nov-14 External
External Ele
Electrical 0d
First Floor 2d 27-Nov-14 29-Nov-14 29-Nov-14, Fir
Calm Shell 2d 27-Nov-14 29-Nov-14 29-Nov-14, Ca
E .ch .st11 External 2d 27-Nov-14 29-Nov-14 External
External Ele
Electrical 0d
Second Floor 2d 20-Dec-14 21-Dec-14 21-Dec-14, S
Calm Shell 2d 20-Dec-14 21-Dec-14 21-Dec-14, C
E.ch .nd11 External 2d 20-Dec-14 21-Dec-14 External
External Ele
Electrical 0d
Third Floor 2d 11-Jan-15 12-Jan-15 12-Jan-15,
Calm Shell 2d 11-Jan-15 12-Jan-15 12-Jan-15,
E.ch. rd11 External 2d 11-Jan-15 12-Jan-15 External
External Ele
Electrical 0d
Fourth Floor 2d 01-Feb-15 02-Feb-15 02-Feb-1
Calm Shell 2d 01-Feb-15 02-Feb-15 02-Feb-1
E.ch .th112 External 2d 01-Feb-15 02-Feb-15 External
External Ele
Electrical 0d
Roof 1d 04-Feb-15 04-Feb-15 04-Feb-1
Calm Shell 1d 04-Feb-15 04-Feb-15 04-Feb-1
E.ch .r1120 External 1d 04-Feb-15 04-Feb-15 External
External Ele
Electrical 0d
Painting Cond. 6d 05-Feb-15 11-Feb-15 11-Feb-
Ex. Paint1120 External Painting 6d 05-Feb-15 11-Feb-15 External
Marbling 5d 05-Feb-15 10-Feb-15 10-Feb-
E.M.F1120 Entrance 4d 05-Feb-15 09-Feb-15 Entrance
S.M.F1120 Stairs 5d 05-Feb-15 10-Feb-15 Stairs
Condonminium Appartments-49
App 177d 09-Jan-14 09-Aug-14 09-Aug-14, Condonminiu
A5470 start of cond. 0d 09-Jan-14 start of cond.
A5460 finish of cond. 0d 09-Aug-14 finish of cond.
Mobilization 1d 09-Jan-14 09-Jan-14 09-Jan-14, Mobilization
M.Sur.1150 Site Surveying 1d 09-Jan-14 09-Jan-14 Site Surveying
Earth Work 47d 11-Jan-14 05-Mar-14 05-Mar-14, Earth Work
Ex.1150 Excavation 7d 11-Jan-14 18-Jan-14 Excavation
B.F1150 BackFill 2d 04-Mar-14 05-Mar-14 BackFill
Civil Work 157d 19-Jan-14 21-Jul-14 21-Jul-14, Civil Work
Foundation 30d 19-Jan-14 22-Feb-14 22-Feb-14, Foundation
Footing 30d 19-Jan-14 22-Feb-14 22-Feb-14, Footing
Plain Concrete
Con 10d 19-Jan-14 29-Jan-14 29-Jan-14, Plain Concrete
FW.PC Form Work 7d 19-Jan-14 26-Jan-14 Form Work
Pour.Pc Pouring Concrete 1d 27-Jan-14 27-Jan-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 29-Jan-14 29-Jan-14 Remove Formwork

Actual Work Critical Remaining Work Summary Page 94 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

270
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Reinforce Concrete & Semels
Reinforced 20d 30-Jan-14 22-Feb-14 22-Feb-14, Reinforced Concrete & Sem
FW.Rc& Form Work 8d 30-Jan-14 08-Feb-14 Form Work
R.F.T.R R.F.T 6d 09-Feb-14 15-Feb-14 R.F.T
Pour.Rc Pouring Concrete 1d 16-Feb-14 16-Feb-14 Pouring Concrete
R.Fw.R Remove Formwork 1d 18-Feb-14 18-Feb-14 Remove Formwork
InsRc& Insulting 3d 19-Feb-14 22-Feb-14 Insulting
Basement 26d 23-Feb-14 24-Mar-14 24-Mar-14, Basement
Slab On Grade
Gra 16d 06-Mar-14 24-Mar-14 24-Mar-14, Slab On Grade
FW.SOG1 Form Work 5d 06-Mar-14 11-Mar-14 Form Work
R.F.T.SOG R.F.T 4d 12-Mar-14 16-Mar-14 R.F.T
Pour.SOG Pouring Concrete 1d 17-Mar-14 17-Mar-14 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 24-Mar-14 24-Mar-14 Remove Formwork
Columns 8d 23-Feb-14 03-Mar-14 03-Mar-14, Columns
FW.Col.B1 Form Work 2d 23-Feb-14 24-Feb-14 Form Work
R.F.T.Col. R.F.T 3d 25-Feb-14 27-Feb-14 R.F.T
Pour.Col.B Pouring Concrete 1d 01-Mar-14 01-Mar-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Mar-14 03-Mar-14 Remove Formwork
Ground Floor 24d 06-Mar-14 02-Apr-14 02-Apr-14, Ground Floor
Beam and s
slab 13d 06-Mar-14 20-Mar-14 20-Mar-14, Beam and slab
FW.B&S.G Form Work 5d 06-Mar-14 11-Mar-14 Form Work
R.F.T.B&S R.F.T 5d 06-Mar-14 11-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 12-Mar-14 12-Mar-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 20-Mar-14 20-Mar-14 Remove Formwork
Columns 8d 25-Mar-14 02-Apr-14 02-Apr-14, Columns
FW.Col.G Form Work 2d 25-Mar-14 26-Mar-14 Form Work
R.F.T.Col. R.F.T 3d 27-Mar-14 30-Mar-14 R.F.T
Pour..Col.G Pouring Concrete 1d 31-Mar-14 31-Mar-14 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 02-Apr-14 02-Apr-14 Remove Formwork
First Floor 19d 03-Apr-14 24-Apr-14 24-Apr-14, First Floor
Beams and slab 18d 03-Apr-14 23-Apr-14 23-Apr-14, Beams and slab
FW.B&S.s Form Work 5d 03-Apr-14 08-Apr-14 Form Work
R.F.T.B&S R.F.T 5d 09-Apr-14 14-Apr-14 R.F.T
Pour.B&S. Pouring Concrete 1d 15-Apr-14 15-Apr-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 23-Apr-14 23-Apr-14 Remove Formwork
Columns 8d 16-Apr-14 24-Apr-14 24-Apr-14, Columns
FW.Col.st Form Work 2d 16-Apr-14 17-Apr-14 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-14 21-Apr-14 R.F.T
Pour.Col.s Pouring Concrete 1d 22-Apr-14 22-Apr-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 24-Apr-14 24-Apr-14 Remove Formwork
Second Floor 19d 26-Apr-14 18-May-14 18-May-14, Second Floor
Beams and slab 18d 26-Apr-14 17-May-14 17-May-14, Beams and slab
FW.B&S.n Form Work 5d 26-Apr-14 30-Apr-14 Form Work
R.F.T.B&S R.F.T 5d 03-May-14 07-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 08-May-14 08-May-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 17-May-14 17-May-14 Remove Formwork
Columns 8d 10-May-14 18-May-14 18-May-14, Columns
FW.Col.nd Form Work 2d 10-May-14 11-May-14 Form Work
R.F.T.Col. R.F.T 3d 12-May-14 14-May-14 R.F.T
Pour.Col.n Pouring Concrete 1d 15-May-14 15-May-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 18-May-14 18-May-14 Remove Formwork
Third Floor 19d 19-May-14 09-Jun-14 09-Jun-14, Third Floor
Beams and slab 18d 19-May-14 08-Jun-14 08-Jun-14, Beams and slab
FW.B&S.r Form Work 5d 19-May-14 24-May-14 Form Work
R.F.T.B&S R.F.T 5d 25-May-14 29-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 31-May-14 31-May-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Jun-14 08-Jun-14 Remove Formwork
Columns 8d 01-Jun-14 09-Jun-14 09-Jun-14, Columns
FW.Col.rd Form Work 2d 01-Jun-14 02-Jun-14 Form Work
R.F.T.Col. R.F.T 3d 03-Jun-14 05-Jun-14 R.F.T
Pour.col.rd Pouring Concrete 1d 07-Jun-14 07-Jun-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Jun-14 09-Jun-14 Remove Formwork
Fourth Floor 19d 10-Jun-14 01-Jul-14 01-Jul-14, Fourth Floor
Beams and slab 18d 10-Jun-14 30-Jun-14 30-Jun-14, Beams and slab
FW.B&S.th Form Work 5d 10-Jun-14 15-Jun-14 Form Work
R.F.T.B&S R.F.T 5d 16-Jun-14 21-Jun-14 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Jun-14 22-Jun-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 30-Jun-14 30-Jun-14 Remove Formwork
Columns 8d 23-Jun-14 01-Jul-14 01-Jul-14, Columns
FW.Col.th Form Work 2d 23-Jun-14 24-Jun-14 Form Work
R.F.T.Col. R.F.T 3d 25-Jun-14 28-Jun-14 R.F.T
Pour.Col.th Pouring Concrete 1d 29-Jun-14 29-Jun-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Jul-14 01-Jul-14 Remove Formwork
Roof 17d 02-Jul-14 21-Jul-14 21-Jul-14, Roof
Beams and slab 17d 02-Jul-14 21-Jul-14 21-Jul-14, Beams and slab
FW.B&S.R Form Work 5d 02-Jul-14 07-Jul-14 Form Work
R.F.T.B&S R.F.T 5d 08-Jul-14 13-Jul-14 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Jul-14 14-Jul-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Jul-14 21-Jul-14 Remove Formwork
Mansonary 109d 22-Mar-14 31-Jul-14 31-Jul-14, Mansonary

Actual Work Critical Remaining Work Summary Page 95 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

271
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Basement 2d 22-Mar-14 23-Mar-14 23-Mar-14, Basement
E.B.M1150 External 2d 22-Mar-14 23-Mar-14 External
Ground Floor 4d 24-Apr-14 28-Apr-14 28-Apr-14, Ground Floor
I.G.M1150 Internal 4d 24-Apr-14 28-Apr-14 Internal
E.G.M1150 External 2d 24-Apr-14 26-Apr-14 External
First Floor 4d 18-May-14 21-May-14 21-May-14, First Floor
I.st .M1150 Internal 4d 18-May-14 21-May-14 Internal
E.st .M1150 External 2d 18-May-14 19-May-14 External
Second Floor 4d 09-Jun-14 12-Jun-14 12-Jun-14, Second Floor
I . nd .M1150 Internal 4d 09-Jun-14 12-Jun-14 Internal
E. nd .M1150 External 2d 09-Jun-14 10-Jun-14 External
Third Floor 4d 01-Jul-14 05-Jul-14 05-Jul-14, Third Floor
I . rd .M1150 Internal 4d 01-Jul-14 05-Jul-14 Internal
E . rd .M1150 External 2d 01-Jul-14 02-Jul-14 External
Fourth Floor 4d 22-Jul-14 26-Jul-14 26-Jul-14, Fourth Floor
I .th .M1150 Internal 4d 22-Jul-14 26-Jul-14 Internal
E. th .M1150 External 2d 22-Jul-14 23-Jul-14 External
Roof 1d 31-Jul-14 31-Jul-14 31-Jul-14, Roof
E .R .M1150 External 1d 31-Jul-14 31-Jul-14 External
Finishing 85d 27-Apr-14 09-Aug-14 09-Aug-14, Finishing
Ground Floor 2d 27-Apr-14 28-Apr-14 28-Apr-14, Ground Floor
Calm Shell 2d 27-Apr-14 28-Apr-14 28-Apr-14, Calm Shell
E.Ch .G.1 External 2d 27-Apr-14 28-Apr-14 External
External Ele
Electrical 0d
First Floor 2d 20-May-14 21-May-14 21-May-14, First Floor
Calm Shell 2d 20-May-14 21-May-14 21-May-14, Calm Shell
E .ch .st11 External 2d 20-May-14 21-May-14 External
External Ele
Electrical 0d
Second Floor 2d 11-Jun-14 12-Jun-14 12-Jun-14, Second Floor
Calm Shell 2d 11-Jun-14 12-Jun-14 12-Jun-14, Calm Shell
E.ch .nd11 External 2d 11-Jun-14 12-Jun-14 External
External Ele
Electrical 0d
Third Floor 2d 03-Jul-14 05-Jul-14 05-Jul-14, Third Floor
Calm Shell 2d 03-Jul-14 05-Jul-14 05-Jul-14, Calm Shell
E.ch. rd11 External 2d 03-Jul-14 05-Jul-14 External
External Ele
Electrical 0d
Fourth Floor 2d 24-Jul-14 26-Jul-14 26-Jul-14, Fourth Floor
Calm Shell 2d 24-Jul-14 26-Jul-14 26-Jul-14, Calm Shell
E.ch .th115 External 2d 24-Jul-14 26-Jul-14 External
External Ele
Electrical 0d
Roof 1d 02-Aug-14 02-Aug-14 02-Aug-14, Roof
Calm Shell 1d 02-Aug-14 02-Aug-14 02-Aug-14, Calm Shell
E.ch .r1150 External 1d 02-Aug-14 02-Aug-14 External
External Ele
Electrical 0d
Painting Cond. 6d 03-Aug-14 09-Aug-14 09-Aug-14, Painting Con
Ex. Paint1150 External Painting 6d 03-Aug-14 09-Aug-14 External Painting
Marbling 5d 03-Aug-14 07-Aug-14 07-Aug-14, Marbling
E.M.F1150 Entrance 4d 03-Aug-14 06-Aug-14 Entrance
S.M.F1150 Stairs 5d 03-Aug-14 07-Aug-14 Stairs
Condonminium Appartments-50
App 334d 09-Jan-14 11-Feb-15 11-Feb-
A5450 start of cond. 0d 09-Jan-14 start of cond.
A5440 finish of cond. 0d 11-Feb-15 finish of
Mobilization 1d 11-Jan-14 11-Jan-14 11-Jan-14, Mobilization
M.Sur.1140 Site Surveying 1d 11-Jan-14 11-Jan-14 Site Surveying
Earth Work 197d 19-Jan-14 10-Sep-14 10-Sep-14, Earth Wo
Ex.1140 Excavation 7d 19-Jan-14 26-Jan-14 Excavation
B.F1140 BackFill 2d 09-Sep-14 10-Sep-14 BackFill
Civil Work 157d 22-Jul-14 28-Jan-15 28-Jan-15
Foundation 30d 22-Jul-14 30-Aug-14 30-Aug-14, Foundation
Footing 30d 22-Jul-14 30-Aug-14 30-Aug-14, Footing
Plain Concrete
Con 10d 22-Jul-14 06-Aug-14 06-Aug-14, Plain Concre
FW.PC Form Work 7d 22-Jul-14 03-Aug-14 Form Work
Pour.Pc Pouring Concrete 1d 04-Aug-14 04-Aug-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 06-Aug-14 06-Aug-14 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 07-Aug-14 30-Aug-14 30-Aug-14, Reinforced
FW.Rc& Form Work 8d 07-Aug-14 16-Aug-14 Form Work
R.F.T.R R.F.T 6d 17-Aug-14 23-Aug-14 R.F.T
Pour.Rc Pouring Concrete 1d 24-Aug-14 24-Aug-14 Pouring Concrete
R.Fw.R Remove Formwork 1d 26-Aug-14 26-Aug-14 Remove Formwork
InsRc& Insulting 3d 27-Aug-14 30-Aug-14 Insulting
Basement 26d 31-Aug-14 29-Sep-14 29-Sep-14, Baseme
Slab On Grade
Gra 16d 11-Sep-14 29-Sep-14 29-Sep-14, Slab On
FW.SOG1 Form Work 5d 11-Sep-14 16-Sep-14 Form Work
R.F.T.SOG R.F.T 4d 17-Sep-14 21-Sep-14 R.F.T
Pour.SOG Pouring Concrete 1d 22-Sep-14 22-Sep-14 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 29-Sep-14 29-Sep-14 Remove Formwork
Columns 8d 31-Aug-14 08-Sep-14 08-Sep-14, Columns
FW.Col.B1 Form Work 2d 31-Aug-14 01-Sep-14 Form Work
R.F.T.Col. R.F.T 3d 02-Sep-14 04-Sep-14 R.F.T
Pour.Col.B Pouring Concrete 1d 06-Sep-14 06-Sep-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-Sep-14 08-Sep-14 Remove Formwork

Actual Work Critical Remaining Work Summary Page 96 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

272
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ground Floor 24d 11-Sep-14 12-Oct-14 12-Oct-14, Ground
Beam and s
slab 13d 11-Sep-14 25-Sep-14 25-Sep-14, Beam an
FW.B&S.G Form Work 5d 11-Sep-14 16-Sep-14 Form Work
R.F.T.B&S R.F.T 5d 11-Sep-14 16-Sep-14 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Sep-14 17-Sep-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Sep-14 25-Sep-14 Remove Formwork
Columns 8d 30-Sep-14 12-Oct-14 12-Oct-14, Column
FW.Col.G Form Work 2d 30-Sep-14 01-Oct-14 Form Work
R.F.T.Col. R.F.T 3d 02-Oct-14 08-Oct-14 R.F.T
Pour..Col.G Pouring Concrete 1d 09-Oct-14 09-Oct-14 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 12-Oct-14 12-Oct-14 Remove Formwork
First Floor 19d 13-Oct-14 03-Nov-14 03-Nov-14, First
Beams and slab 18d 13-Oct-14 02-Nov-14 02-Nov-14, Beam
FW.B&S.s Form Work 5d 13-Oct-14 18-Oct-14 Form Work
R.F.T.B&S R.F.T 5d 19-Oct-14 23-Oct-14 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Oct-14 25-Oct-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Nov-14 02-Nov-14 Remove Formwo
Columns 8d 26-Oct-14 03-Nov-14 03-Nov-14, Colum
FW.Col.st Form Work 2d 26-Oct-14 27-Oct-14 Form Work
R.F.T.Col. R.F.T 3d 28-Oct-14 30-Oct-14 R.F.T
Pour.Col.s Pouring Concrete 1d 01-Nov-14 01-Nov-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Nov-14 03-Nov-14 Remove Formwo
Second Floor 19d 04-Nov-14 25-Nov-14 25-Nov-14, Sec
Beams and slab 18d 04-Nov-14 24-Nov-14 24-Nov-14, Bea
FW.B&S.n Form Work 5d 04-Nov-14 09-Nov-14 Form Work
R.F.T.B&S R.F.T 5d 10-Nov-14 15-Nov-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-14 16-Nov-14 Pouring Concre
R.FW.B&S Remove Formwork 1d 24-Nov-14 24-Nov-14 Remove Formw
Columns 8d 17-Nov-14 25-Nov-14 25-Nov-14, Co
FW.Col.nd Form Work 2d 17-Nov-14 18-Nov-14 Form Work
R.F.T.Col. R.F.T 3d 19-Nov-14 22-Nov-14 R.F.T
Pour.Col.n Pouring Concrete 1d 23-Nov-14 23-Nov-14 Pouring Concre
R.FW.Col. Remove Formwork 1d 25-Nov-14 25-Nov-14 Remove Formw
Third Floor 19d 26-Nov-14 17-Dec-14 17-Dec-14, T
Beams and slab 18d 26-Nov-14 16-Dec-14 16-Dec-14, B
FW.B&S.r Form Work 5d 26-Nov-14 01-Dec-14 Form Work
R.F.T.B&S R.F.T 5d 02-Dec-14 07-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Dec-14 08-Dec-14 Pouring Concr
R.FW.B&S Remove Formwork 1d 16-Dec-14 16-Dec-14 Remove Form
Columns 8d 09-Dec-14 17-Dec-14 17-Dec-14, C
FW.Col.rd Form Work 2d 09-Dec-14 10-Dec-14 Form Work
R.F.T.Col. R.F.T 3d 11-Dec-14 14-Dec-14 R.F.T
Pour.col.rd Pouring Concrete 1d 15-Dec-14 15-Dec-14 Pouring Conc
R.FW.Col. Remove Formwork 1d 17-Dec-14 17-Dec-14 Remove Form
Fourth Floor 19d 18-Dec-14 08-Jan-15 08-Jan-15,
Beams and slab 18d 18-Dec-14 07-Jan-15 07-Jan-15,
FW.B&S.th Form Work 5d 18-Dec-14 23-Dec-14 Form Work
R.F.T.B&S R.F.T 5d 24-Dec-14 29-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Dec-14 30-Dec-14 Pouring Con
R.FW.B&S Remove Formwork 1d 07-Jan-15 07-Jan-15 Remove Fo
Columns 8d 31-Dec-14 08-Jan-15 08-Jan-15,
FW.Col.th Form Work 2d 31-Dec-14 01-Jan-15 Form Work
R.F.T.Col. R.F.T 3d 03-Jan-15 05-Jan-15 R.F.T
Pour.Col.th Pouring Concrete 1d 06-Jan-15 06-Jan-15 Pouring Co
R.FW.Col. Remove Formwork 1d 08-Jan-15 08-Jan-15 Remove Fo
Roof 17d 10-Jan-15 28-Jan-15 28-Jan-15
Beams and slab 17d 10-Jan-15 28-Jan-15 28-Jan-15
FW.B&S.R Form Work 5d 10-Jan-15 14-Jan-15 Form Work
R.F.T.B&S R.F.T 5d 15-Jan-15 20-Jan-15 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Jan-15 21-Jan-15 Pouring C
R.FW.B&S Remove Formwork 1d 28-Jan-15 28-Jan-15 Remove F
Mansonary 109d 27-Sep-14 03-Feb-15 03-Feb-1
Basement 2d 27-Sep-14 28-Sep-14 28-Sep-14, Baseme
E.B.M1140 External 2d 27-Sep-14 28-Sep-14 External
Ground Floor 4d 03-Nov-14 06-Nov-14 06-Nov-14, Grou
I.G.M1140 Internal 4d 03-Nov-14 06-Nov-14 Internal
E.G.M1140 External 2d 03-Nov-14 04-Nov-14 External
First Floor 4d 25-Nov-14 29-Nov-14 29-Nov-14, Fir
I.st .M1140 Internal 4d 25-Nov-14 29-Nov-14 Internal
E.st .M1140 External 2d 25-Nov-14 26-Nov-14 External
Second Floor 4d 17-Dec-14 21-Dec-14 21-Dec-14, S
I . nd .M1140 Internal 4d 17-Dec-14 21-Dec-14 Internal
E. nd .M1140 External 2d 17-Dec-14 18-Dec-14 External
Third Floor 4d 08-Jan-15 12-Jan-15 12-Jan-15,
I . rd .M1140 Internal 4d 08-Jan-15 12-Jan-15 Internal
E . rd .M1140 External 2d 08-Jan-15 10-Jan-15 External
Fourth Floor 4d 29-Jan-15 02-Feb-15 02-Feb-1
I .th .M1140 Internal 4d 29-Jan-15 02-Feb-15 Internal
E. th .M1140 External 2d 29-Jan-15 31-Jan-15 External

Actual Work Critical Remaining Work Summary Page 97 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

273
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Roof 1d 03-Feb-15 03-Feb-15 03-Feb-1
E .R .M1140 External 1d 03-Feb-15 03-Feb-15 External
Finishing 85d 05-Nov-14 11-Feb-15 11-Feb-
Ground Floor 2d 05-Nov-14 06-Nov-14 06-Nov-14, Grou
Calm Shell 2d 05-Nov-14 06-Nov-14 06-Nov-14, Calm
E.Ch .G.1 External 2d 05-Nov-14 06-Nov-14 External
External Ele
Electrical 0d
First Floor 2d 27-Nov-14 29-Nov-14 29-Nov-14, Fir
Calm Shell 2d 27-Nov-14 29-Nov-14 29-Nov-14, Ca
E .ch .st11 External 2d 27-Nov-14 29-Nov-14 External
External Ele
Electrical 0d
Second Floor 2d 20-Dec-14 21-Dec-14 21-Dec-14, S
Calm Shell 2d 20-Dec-14 21-Dec-14 21-Dec-14, C
E.ch .nd11 External 2d 20-Dec-14 21-Dec-14 External
External Ele
Electrical 0d
Third Floor 2d 11-Jan-15 12-Jan-15 12-Jan-15,
Calm Shell 2d 11-Jan-15 12-Jan-15 12-Jan-15,
E.ch. rd11 External 2d 11-Jan-15 12-Jan-15 External
External Ele
Electrical 0d
Fourth Floor 2d 01-Feb-15 02-Feb-15 02-Feb-1
Calm Shell 2d 01-Feb-15 02-Feb-15 02-Feb-1
E.ch .th114 External 2d 01-Feb-15 02-Feb-15 External
External Ele
Electrical 0d
Roof 1d 04-Feb-15 04-Feb-15 04-Feb-1
Calm Shell 1d 04-Feb-15 04-Feb-15 04-Feb-1
E.ch .r1140 External 1d 04-Feb-15 04-Feb-15 External
External Ele
Electrical 0d
Painting Cond. 6d 05-Feb-15 11-Feb-15 11-Feb-
Ex. Paint1140 External Painting 6d 05-Feb-15 11-Feb-15 External
Marbling 5d 05-Feb-15 10-Feb-15 10-Feb-
E.M.F1140 Entrance 4d 05-Feb-15 09-Feb-15 Entrance
S.M.F1140 Stairs 5d 05-Feb-15 10-Feb-15 Stairs
Condonminium Appartments-51
App 177d 09-Jan-14 09-Aug-14 09-Aug-14, Condonminiu
A5510 start of cond. 0d 09-Jan-14 start of cond.
A5500 finish of cond. 0d 09-Aug-14 finish of cond.
Mobilization 1d 09-Jan-14 09-Jan-14 09-Jan-14, Mobilization
M.Sur.1170 Site Surveying 1d 09-Jan-14 09-Jan-14 Site Surveying
Earth Work 47d 11-Jan-14 05-Mar-14 05-Mar-14, Earth Work
Ex.1170 Excavation 7d 11-Jan-14 18-Jan-14 Excavation
B.F1170 BackFill 2d 04-Mar-14 05-Mar-14 BackFill
Civil Work 157d 19-Jan-14 21-Jul-14 21-Jul-14, Civil Work
Foundation 30d 19-Jan-14 22-Feb-14 22-Feb-14, Foundation
Footing 30d 19-Jan-14 22-Feb-14 22-Feb-14, Footing
Plain Concrete
Con 10d 19-Jan-14 29-Jan-14 29-Jan-14, Plain Concrete
FW.PC Form Work 7d 19-Jan-14 26-Jan-14 Form Work
Pour.Pc Pouring Concrete 1d 27-Jan-14 27-Jan-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 29-Jan-14 29-Jan-14 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 30-Jan-14 22-Feb-14 22-Feb-14, Reinforced Concrete & Sem
FW.Rc& Form Work 8d 30-Jan-14 08-Feb-14 Form Work
R.F.T.R R.F.T 6d 09-Feb-14 15-Feb-14 R.F.T
Pour.Rc Pouring Concrete 1d 16-Feb-14 16-Feb-14 Pouring Concrete
R.Fw.R Remove Formwork 1d 18-Feb-14 18-Feb-14 Remove Formwork
InsRc& Insulting 3d 19-Feb-14 22-Feb-14 Insulting
Basement 26d 23-Feb-14 24-Mar-14 24-Mar-14, Basement
Slab On Grade
Gra 16d 06-Mar-14 24-Mar-14 24-Mar-14, Slab On Grade
FW.SOG1 Form Work 5d 06-Mar-14 11-Mar-14 Form Work
R.F.T.SOG R.F.T 4d 12-Mar-14 16-Mar-14 R.F.T
Pour.SOG Pouring Concrete 1d 17-Mar-14 17-Mar-14 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 24-Mar-14 24-Mar-14 Remove Formwork
Columns 8d 23-Feb-14 03-Mar-14 03-Mar-14, Columns
FW.Col.B1 Form Work 2d 23-Feb-14 24-Feb-14 Form Work
R.F.T.Col. R.F.T 3d 25-Feb-14 27-Feb-14 R.F.T
Pour.Col.B Pouring Concrete 1d 01-Mar-14 01-Mar-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Mar-14 03-Mar-14 Remove Formwork
Ground Floor 24d 06-Mar-14 02-Apr-14 02-Apr-14, Ground Floor
Beam and s
slab 13d 06-Mar-14 20-Mar-14 20-Mar-14, Beam and slab
FW.B&S.G Form Work 5d 06-Mar-14 11-Mar-14 Form Work
R.F.T.B&S R.F.T 5d 06-Mar-14 11-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 12-Mar-14 12-Mar-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 20-Mar-14 20-Mar-14 Remove Formwork
Columns 8d 25-Mar-14 02-Apr-14 02-Apr-14, Columns
FW.Col.G Form Work 2d 25-Mar-14 26-Mar-14 Form Work
R.F.T.Col. R.F.T 3d 27-Mar-14 30-Mar-14 R.F.T
Pour..Col.G Pouring Concrete 1d 31-Mar-14 31-Mar-14 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 02-Apr-14 02-Apr-14 Remove Formwork
First Floor 19d 03-Apr-14 24-Apr-14 24-Apr-14, First Floor
Beams and slab 18d 03-Apr-14 23-Apr-14 23-Apr-14, Beams and slab
FW.B&S.s Form Work 5d 03-Apr-14 08-Apr-14 Form Work
R.F.T.B&S R.F.T 5d 09-Apr-14 14-Apr-14 R.F.T
Pour.B&S. Pouring Concrete 1d 15-Apr-14 15-Apr-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 23-Apr-14 23-Apr-14 Remove Formwork

Actual Work Critical Remaining Work Summary Page 98 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

274
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Columns 8d 16-Apr-14 24-Apr-14 24-Apr-14, Columns
FW.Col.st Form Work 2d 16-Apr-14 17-Apr-14 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-14 21-Apr-14 R.F.T
Pour.Col.s Pouring Concrete 1d 22-Apr-14 22-Apr-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 24-Apr-14 24-Apr-14 Remove Formwork
Second Floor 19d 26-Apr-14 18-May-14 18-May-14, Second Floor
Beams and slab 18d 26-Apr-14 17-May-14 17-May-14, Beams and slab
FW.B&S.n Form Work 5d 26-Apr-14 30-Apr-14 Form Work
R.F.T.B&S R.F.T 5d 03-May-14 07-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 08-May-14 08-May-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 17-May-14 17-May-14 Remove Formwork
Columns 8d 10-May-14 18-May-14 18-May-14, Columns
FW.Col.nd Form Work 2d 10-May-14 11-May-14 Form Work
R.F.T.Col. R.F.T 3d 12-May-14 14-May-14 R.F.T
Pour.Col.n Pouring Concrete 1d 15-May-14 15-May-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 18-May-14 18-May-14 Remove Formwork
Third Floor 19d 19-May-14 09-Jun-14 09-Jun-14, Third Floor
Beams and slab 18d 19-May-14 08-Jun-14 08-Jun-14, Beams and slab
FW.B&S.r Form Work 5d 19-May-14 24-May-14 Form Work
R.F.T.B&S R.F.T 5d 25-May-14 29-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 31-May-14 31-May-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Jun-14 08-Jun-14 Remove Formwork
Columns 8d 01-Jun-14 09-Jun-14 09-Jun-14, Columns
FW.Col.rd Form Work 2d 01-Jun-14 02-Jun-14 Form Work
R.F.T.Col. R.F.T 3d 03-Jun-14 05-Jun-14 R.F.T
Pour.col.rd Pouring Concrete 1d 07-Jun-14 07-Jun-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Jun-14 09-Jun-14 Remove Formwork
Fourth Floor 19d 10-Jun-14 01-Jul-14 01-Jul-14, Fourth Floor
Beams and slab 18d 10-Jun-14 30-Jun-14 30-Jun-14, Beams and slab
FW.B&S.th Form Work 5d 10-Jun-14 15-Jun-14 Form Work
R.F.T.B&S R.F.T 5d 16-Jun-14 21-Jun-14 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Jun-14 22-Jun-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 30-Jun-14 30-Jun-14 Remove Formwork
Columns 8d 23-Jun-14 01-Jul-14 01-Jul-14, Columns
FW.Col.th Form Work 2d 23-Jun-14 24-Jun-14 Form Work
R.F.T.Col. R.F.T 3d 25-Jun-14 28-Jun-14 R.F.T
Pour.Col.th Pouring Concrete 1d 29-Jun-14 29-Jun-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Jul-14 01-Jul-14 Remove Formwork
Roof 17d 02-Jul-14 21-Jul-14 21-Jul-14, Roof
Beams and slab 17d 02-Jul-14 21-Jul-14 21-Jul-14, Beams and slab
FW.B&S.R Form Work 5d 02-Jul-14 07-Jul-14 Form Work
R.F.T.B&S R.F.T 5d 08-Jul-14 13-Jul-14 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Jul-14 14-Jul-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Jul-14 21-Jul-14 Remove Formwork
Mansonary 109d 22-Mar-14 31-Jul-14 31-Jul-14, Mansonary
Basement 2d 22-Mar-14 23-Mar-14 23-Mar-14, Basement
E.B.M1170 External 2d 22-Mar-14 23-Mar-14 External
Ground Floor 4d 24-Apr-14 28-Apr-14 28-Apr-14, Ground Floor
I.G.M1170 Internal 4d 24-Apr-14 28-Apr-14 Internal
E.G.M1170 External 2d 24-Apr-14 26-Apr-14 External
First Floor 4d 18-May-14 21-May-14 21-May-14, First Floor
I.st .M1170 Internal 4d 18-May-14 21-May-14 Internal
E.st .M1170 External 2d 18-May-14 19-May-14 External
Second Floor 4d 09-Jun-14 12-Jun-14 12-Jun-14, Second Floor
I . nd .M1170 Internal 4d 09-Jun-14 12-Jun-14 Internal
E. nd .M1170 External 2d 09-Jun-14 10-Jun-14 External
Third Floor 4d 01-Jul-14 05-Jul-14 05-Jul-14, Third Floor
I . rd .M1170 Internal 4d 01-Jul-14 05-Jul-14 Internal
E . rd .M1170 External 2d 01-Jul-14 02-Jul-14 External
Fourth Floor 4d 22-Jul-14 26-Jul-14 26-Jul-14, Fourth Floor
I .th .M1170 Internal 4d 22-Jul-14 26-Jul-14 Internal
E. th .M1170 External 2d 22-Jul-14 23-Jul-14 External
Roof 1d 31-Jul-14 31-Jul-14 31-Jul-14, Roof
E .R .M1170 External 1d 31-Jul-14 31-Jul-14 External
Finishing 85d 27-Apr-14 09-Aug-14 09-Aug-14, Finishing
Ground Floor 2d 27-Apr-14 28-Apr-14 28-Apr-14, Ground Floor
Calm Shell 2d 27-Apr-14 28-Apr-14 28-Apr-14, Calm Shell
E.Ch .G.1 External 2d 27-Apr-14 28-Apr-14 External
External Ele
Electrical 0d
First Floor 2d 20-May-14 21-May-14 21-May-14, First Floor
Calm Shell 2d 20-May-14 21-May-14 21-May-14, Calm Shell
E .ch .st11 External 2d 20-May-14 21-May-14 External
External Ele
Electrical 0d
Second Floor 2d 11-Jun-14 12-Jun-14 12-Jun-14, Second Floor
Calm Shell 2d 11-Jun-14 12-Jun-14 12-Jun-14, Calm Shell
E.ch .nd11 External 2d 11-Jun-14 12-Jun-14 External
External Ele
Electrical 0d
Third Floor 2d 03-Jul-14 05-Jul-14 05-Jul-14, Third Floor
Calm Shell 2d 03-Jul-14 05-Jul-14 05-Jul-14, Calm Shell
E.ch. rd11 External 2d 03-Jul-14 05-Jul-14 External

Actual Work Critical Remaining Work Summary Page 99 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

275
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
External Ele
Electrical 0d
Fourth Floor 2d 24-Jul-14 26-Jul-14 26-Jul-14, Fourth Floor
Calm Shell 2d 24-Jul-14 26-Jul-14 26-Jul-14, Calm Shell
E.ch .th117 External 2d 24-Jul-14 26-Jul-14 External
External Ele
Electrical 0d
Roof 1d 02-Aug-14 02-Aug-14 02-Aug-14, Roof
Calm Shell 1d 02-Aug-14 02-Aug-14 02-Aug-14, Calm Shell
E.ch .r1170 External 1d 02-Aug-14 02-Aug-14 External
External Ele
Electrical 0d
Painting Cond. 6d 03-Aug-14 09-Aug-14 09-Aug-14, Painting Con
Ex. Paint1170 External Painting 6d 03-Aug-14 09-Aug-14 External Painting
Marbling 5d 03-Aug-14 07-Aug-14 07-Aug-14, Marbling
E.M.F1170 Entrance 4d 03-Aug-14 06-Aug-14 Entrance
S.M.F1170 Stairs 5d 03-Aug-14 07-Aug-14 Stairs
Condonminium Appartments-52
App 334d 09-Jan-14 11-Feb-15 11-Feb-
A5490 start of cond. 0d 09-Jan-14 start of cond.
A5480 finish of cond. 0d 11-Feb-15 finish of
Mobilization 1d 11-Jan-14 11-Jan-14 11-Jan-14, Mobilization
M.Sur.1160 Site Surveying 1d 11-Jan-14 11-Jan-14 Site Surveying
Earth Work 197d 19-Jan-14 10-Sep-14 10-Sep-14, Earth Wo
Ex.1160 Excavation 7d 19-Jan-14 26-Jan-14 Excavation
B.F1160 BackFill 2d 09-Sep-14 10-Sep-14 BackFill
Civil Work 157d 22-Jul-14 28-Jan-15 28-Jan-15
Foundation 30d 22-Jul-14 30-Aug-14 30-Aug-14, Foundation
Footing 30d 22-Jul-14 30-Aug-14 30-Aug-14, Footing
Plain Concrete
Con 10d 22-Jul-14 06-Aug-14 06-Aug-14, Plain Concre
FW.PC Form Work 7d 22-Jul-14 03-Aug-14 Form Work
Pour.Pc Pouring Concrete 1d 04-Aug-14 04-Aug-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 06-Aug-14 06-Aug-14 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 07-Aug-14 30-Aug-14 30-Aug-14, Reinforced
FW.Rc& Form Work 8d 07-Aug-14 16-Aug-14 Form Work
R.F.T.R R.F.T 6d 17-Aug-14 23-Aug-14 R.F.T
Pour.Rc Pouring Concrete 1d 24-Aug-14 24-Aug-14 Pouring Concrete
R.Fw.R Remove Formwork 1d 26-Aug-14 26-Aug-14 Remove Formwork
InsRc& Insulting 3d 27-Aug-14 30-Aug-14 Insulting
Basement 26d 31-Aug-14 29-Sep-14 29-Sep-14, Baseme
Slab On Grade
Gra 16d 11-Sep-14 29-Sep-14 29-Sep-14, Slab On
FW.SOG1 Form Work 5d 11-Sep-14 16-Sep-14 Form Work
R.F.T.SOG R.F.T 4d 17-Sep-14 21-Sep-14 R.F.T
Pour.SOG Pouring Concrete 1d 22-Sep-14 22-Sep-14 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 29-Sep-14 29-Sep-14 Remove Formwork
Columns 8d 31-Aug-14 08-Sep-14 08-Sep-14, Columns
FW.Col.B1 Form Work 2d 31-Aug-14 01-Sep-14 Form Work
R.F.T.Col. R.F.T 3d 02-Sep-14 04-Sep-14 R.F.T
Pour.Col.B Pouring Concrete 1d 06-Sep-14 06-Sep-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-Sep-14 08-Sep-14 Remove Formwork
Ground Floor 24d 11-Sep-14 12-Oct-14 12-Oct-14, Ground
Beam and s
slab 13d 11-Sep-14 25-Sep-14 25-Sep-14, Beam an
FW.B&S.G Form Work 5d 11-Sep-14 16-Sep-14 Form Work
R.F.T.B&S R.F.T 5d 11-Sep-14 16-Sep-14 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Sep-14 17-Sep-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 25-Sep-14 25-Sep-14 Remove Formwork
Columns 8d 30-Sep-14 12-Oct-14 12-Oct-14, Column
FW.Col.G Form Work 2d 30-Sep-14 01-Oct-14 Form Work
R.F.T.Col. R.F.T 3d 02-Oct-14 08-Oct-14 R.F.T
Pour..Col.G Pouring Concrete 1d 09-Oct-14 09-Oct-14 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 12-Oct-14 12-Oct-14 Remove Formwork
First Floor 19d 13-Oct-14 03-Nov-14 03-Nov-14, First
Beams and slab 18d 13-Oct-14 02-Nov-14 02-Nov-14, Beam
FW.B&S.s Form Work 5d 13-Oct-14 18-Oct-14 Form Work
R.F.T.B&S R.F.T 5d 19-Oct-14 23-Oct-14 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Oct-14 25-Oct-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 02-Nov-14 02-Nov-14 Remove Formwo
Columns 8d 26-Oct-14 03-Nov-14 03-Nov-14, Colum
FW.Col.st Form Work 2d 26-Oct-14 27-Oct-14 Form Work
R.F.T.Col. R.F.T 3d 28-Oct-14 30-Oct-14 R.F.T
Pour.Col.s Pouring Concrete 1d 01-Nov-14 01-Nov-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Nov-14 03-Nov-14 Remove Formwo
Second Floor 19d 04-Nov-14 25-Nov-14 25-Nov-14, Sec
Beams and slab 18d 04-Nov-14 24-Nov-14 24-Nov-14, Bea
FW.B&S.n Form Work 5d 04-Nov-14 09-Nov-14 Form Work
R.F.T.B&S R.F.T 5d 10-Nov-14 15-Nov-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-14 16-Nov-14 Pouring Concre
R.FW.B&S Remove Formwork 1d 24-Nov-14 24-Nov-14 Remove Formw
Columns 8d 17-Nov-14 25-Nov-14 25-Nov-14, Co
FW.Col.nd Form Work 2d 17-Nov-14 18-Nov-14 Form Work
R.F.T.Col. R.F.T 3d 19-Nov-14 22-Nov-14 R.F.T
Pour.Col.n Pouring Concrete 1d 23-Nov-14 23-Nov-14 Pouring Concre
R.FW.Col. Remove Formwork 1d 25-Nov-14 25-Nov-14 Remove Formw
Third Floor 19d 26-Nov-14 17-Dec-14 17-Dec-14, T

Actual Work Critical Remaining Work Summary Page 100 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

276
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Beams and slab 18d 26-Nov-14 16-Dec-14 16-Dec-14, B
FW.B&S.r Form Work 5d 26-Nov-14 01-Dec-14 Form Work
R.F.T.B&S R.F.T 5d 02-Dec-14 07-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Dec-14 08-Dec-14 Pouring Concr
R.FW.B&S Remove Formwork 1d 16-Dec-14 16-Dec-14 Remove Form
Columns 8d 09-Dec-14 17-Dec-14 17-Dec-14, C
FW.Col.rd Form Work 2d 09-Dec-14 10-Dec-14 Form Work
R.F.T.Col. R.F.T 3d 11-Dec-14 14-Dec-14 R.F.T
Pour.col.rd Pouring Concrete 1d 15-Dec-14 15-Dec-14 Pouring Conc
R.FW.Col. Remove Formwork 1d 17-Dec-14 17-Dec-14 Remove Form
Fourth Floor 19d 18-Dec-14 08-Jan-15 08-Jan-15,
Beams and slab 18d 18-Dec-14 07-Jan-15 07-Jan-15,
FW.B&S.th Form Work 5d 18-Dec-14 23-Dec-14 Form Work
R.F.T.B&S R.F.T 5d 24-Dec-14 29-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Dec-14 30-Dec-14 Pouring Con
R.FW.B&S Remove Formwork 1d 07-Jan-15 07-Jan-15 Remove Fo
Columns 8d 31-Dec-14 08-Jan-15 08-Jan-15,
FW.Col.th Form Work 2d 31-Dec-14 01-Jan-15 Form Work
R.F.T.Col. R.F.T 3d 03-Jan-15 05-Jan-15 R.F.T
Pour.Col.th Pouring Concrete 1d 06-Jan-15 06-Jan-15 Pouring Co
R.FW.Col. Remove Formwork 1d 08-Jan-15 08-Jan-15 Remove Fo
Roof 17d 10-Jan-15 28-Jan-15 28-Jan-15
Beams and slab 17d 10-Jan-15 28-Jan-15 28-Jan-15
FW.B&S.R Form Work 5d 10-Jan-15 14-Jan-15 Form Work
R.F.T.B&S R.F.T 5d 15-Jan-15 20-Jan-15 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Jan-15 21-Jan-15 Pouring C
R.FW.B&S Remove Formwork 1d 28-Jan-15 28-Jan-15 Remove F
Mansonary 109d 27-Sep-14 03-Feb-15 03-Feb-1
Basement 2d 27-Sep-14 28-Sep-14 28-Sep-14, Baseme
E.B.M1160 External 2d 27-Sep-14 28-Sep-14 External
Ground Floor 4d 03-Nov-14 06-Nov-14 06-Nov-14, Grou
I.G.M1160 Internal 4d 03-Nov-14 06-Nov-14 Internal
E.G.M1160 External 2d 03-Nov-14 04-Nov-14 External
First Floor 4d 25-Nov-14 29-Nov-14 29-Nov-14, Fir
I.st .M1160 Internal 4d 25-Nov-14 29-Nov-14 Internal
E.st .M1160 External 2d 25-Nov-14 26-Nov-14 External
Second Floor 4d 17-Dec-14 21-Dec-14 21-Dec-14, S
I . nd .M1160 Internal 4d 17-Dec-14 21-Dec-14 Internal
E. nd .M1160 External 2d 17-Dec-14 18-Dec-14 External
Third Floor 4d 08-Jan-15 12-Jan-15 12-Jan-15,
I . rd .M1160 Internal 4d 08-Jan-15 12-Jan-15 Internal
E . rd .M1160 External 2d 08-Jan-15 10-Jan-15 External
Fourth Floor 4d 29-Jan-15 02-Feb-15 02-Feb-1
I .th .M1160 Internal 4d 29-Jan-15 02-Feb-15 Internal
E. th .M1160 External 2d 29-Jan-15 31-Jan-15 External
Roof 1d 03-Feb-15 03-Feb-15 03-Feb-1
E .R .M1160 External 1d 03-Feb-15 03-Feb-15 External
Finishing 85d 05-Nov-14 11-Feb-15 11-Feb-
Ground Floor 2d 05-Nov-14 06-Nov-14 06-Nov-14, Grou
Calm Shell 2d 05-Nov-14 06-Nov-14 06-Nov-14, Calm
E.Ch .G.1 External 2d 05-Nov-14 06-Nov-14 External
External Ele
Electrical 0d
First Floor 2d 27-Nov-14 29-Nov-14 29-Nov-14, Fir
Calm Shell 2d 27-Nov-14 29-Nov-14 29-Nov-14, Ca
E .ch .st11 External 2d 27-Nov-14 29-Nov-14 External
External Ele
Electrical 0d
Second Floor 2d 20-Dec-14 21-Dec-14 21-Dec-14, S
Calm Shell 2d 20-Dec-14 21-Dec-14 21-Dec-14, C
E.ch .nd11 External 2d 20-Dec-14 21-Dec-14 External
External Ele
Electrical 0d
Third Floor 2d 11-Jan-15 12-Jan-15 12-Jan-15,
Calm Shell 2d 11-Jan-15 12-Jan-15 12-Jan-15,
E.ch. rd11 External 2d 11-Jan-15 12-Jan-15 External
External Ele
Electrical 0d
Fourth Floor 2d 01-Feb-15 02-Feb-15 02-Feb-1
Calm Shell 2d 01-Feb-15 02-Feb-15 02-Feb-1
E.ch .th116 External 2d 01-Feb-15 02-Feb-15 External
External Ele
Electrical 0d
Roof 1d 04-Feb-15 04-Feb-15 04-Feb-1
Calm Shell 1d 04-Feb-15 04-Feb-15 04-Feb-1
E.ch .r1160 External 1d 04-Feb-15 04-Feb-15 External
External Ele
Electrical 0d
Painting Cond. 6d 05-Feb-15 11-Feb-15 11-Feb-
Ex. Paint1160 External Painting 6d 05-Feb-15 11-Feb-15 External
Marbling 5d 05-Feb-15 10-Feb-15 10-Feb-
E.M.F1160 Entrance 4d 05-Feb-15 09-Feb-15 Entrance
S.M.F1160 Stairs 5d 05-Feb-15 10-Feb-15 Stairs
Condonminium Appartments-53
App 177d 09-Jan-14 09-Aug-14 09-Aug-14, Condonminiu
A5530 start of cond. 0d 09-Jan-14 start of cond.
A5520 finish of cond. 0d 09-Aug-14 finish of cond.
Mobilization 1d 09-Jan-14 09-Jan-14 09-Jan-14, Mobilization

Actual Work Critical Remaining Work Summary Page 101 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

277
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
M.Sur.1180 Site Surveying 1d 09-Jan-14 09-Jan-14 Site Surveying
Earth Work 47d 11-Jan-14 05-Mar-14 05-Mar-14, Earth Work
Ex.1180 Excavation 7d 11-Jan-14 18-Jan-14 Excavation
B.F1180 BackFill 2d 04-Mar-14 05-Mar-14 BackFill
Civil Work 157d 19-Jan-14 21-Jul-14 21-Jul-14, Civil Work
Foundation 30d 19-Jan-14 22-Feb-14 22-Feb-14, Foundation
Footing 30d 19-Jan-14 22-Feb-14 22-Feb-14, Footing
Plain Concrete
Con 10d 19-Jan-14 29-Jan-14 29-Jan-14, Plain Concrete
FW.PC Form Work 7d 19-Jan-14 26-Jan-14 Form Work
Pour.Pc Pouring Concrete 1d 27-Jan-14 27-Jan-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 29-Jan-14 29-Jan-14 Remove Formwork
Reinforce Concrete & Semels
Reinforced 20d 30-Jan-14 22-Feb-14 22-Feb-14, Reinforced Concrete & Sem
FW.Rc& Form Work 8d 30-Jan-14 08-Feb-14 Form Work
R.F.T.R R.F.T 6d 09-Feb-14 15-Feb-14 R.F.T
Pour.Rc Pouring Concrete 1d 16-Feb-14 16-Feb-14 Pouring Concrete
R.Fw.R Remove Formwork 1d 18-Feb-14 18-Feb-14 Remove Formwork
InsRc& Insulting 3d 19-Feb-14 22-Feb-14 Insulting
Basement 26d 23-Feb-14 24-Mar-14 24-Mar-14, Basement
Slab On Grade
Gra 16d 06-Mar-14 24-Mar-14 24-Mar-14, Slab On Grade
FW.SOG1 Form Work 5d 06-Mar-14 11-Mar-14 Form Work
R.F.T.SOG R.F.T 4d 12-Mar-14 16-Mar-14 R.F.T
Pour.SOG Pouring Concrete 1d 17-Mar-14 17-Mar-14 Pouring Concrete
R.Fw.SOG Remove Formwork 1d 24-Mar-14 24-Mar-14 Remove Formwork
Columns 8d 23-Feb-14 03-Mar-14 03-Mar-14, Columns
FW.Col.B1 Form Work 2d 23-Feb-14 24-Feb-14 Form Work
R.F.T.Col. R.F.T 3d 25-Feb-14 27-Feb-14 R.F.T
Pour.Col.B Pouring Concrete 1d 01-Mar-14 01-Mar-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 03-Mar-14 03-Mar-14 Remove Formwork
Ground Floor 24d 06-Mar-14 02-Apr-14 02-Apr-14, Ground Floor
Beam and s
slab 13d 06-Mar-14 20-Mar-14 20-Mar-14, Beam and slab
FW.B&S.G Form Work 5d 06-Mar-14 11-Mar-14 Form Work
R.F.T.B&S R.F.T 5d 06-Mar-14 11-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 12-Mar-14 12-Mar-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 20-Mar-14 20-Mar-14 Remove Formwork
Columns 8d 25-Mar-14 02-Apr-14 02-Apr-14, Columns
FW.Col.G Form Work 2d 25-Mar-14 26-Mar-14 Form Work
R.F.T.Col. R.F.T 3d 27-Mar-14 30-Mar-14 R.F.T
Pour..Col.G Pouring Concrete 1d 31-Mar-14 31-Mar-14 Pouring Concrete
R.Fw.Col.G Remove Formwork 1d 02-Apr-14 02-Apr-14 Remove Formwork
First Floor 19d 03-Apr-14 24-Apr-14 24-Apr-14, First Floor
Beams and slab 18d 03-Apr-14 23-Apr-14 23-Apr-14, Beams and slab
FW.B&S.s Form Work 5d 03-Apr-14 08-Apr-14 Form Work
R.F.T.B&S R.F.T 5d 09-Apr-14 14-Apr-14 R.F.T
Pour.B&S. Pouring Concrete 1d 15-Apr-14 15-Apr-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 23-Apr-14 23-Apr-14 Remove Formwork
Columns 8d 16-Apr-14 24-Apr-14 24-Apr-14, Columns
FW.Col.st Form Work 2d 16-Apr-14 17-Apr-14 Form Work
R.F.T.Col. R.F.T 3d 19-Apr-14 21-Apr-14 R.F.T
Pour.Col.s Pouring Concrete 1d 22-Apr-14 22-Apr-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 24-Apr-14 24-Apr-14 Remove Formwork
Second Floor 19d 26-Apr-14 18-May-14 18-May-14, Second Floor
Beams and slab 18d 26-Apr-14 17-May-14 17-May-14, Beams and slab
FW.B&S.n Form Work 5d 26-Apr-14 30-Apr-14 Form Work
R.F.T.B&S R.F.T 5d 03-May-14 07-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 08-May-14 08-May-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 17-May-14 17-May-14 Remove Formwork
Columns 8d 10-May-14 18-May-14 18-May-14, Columns
FW.Col.nd Form Work 2d 10-May-14 11-May-14 Form Work
R.F.T.Col. R.F.T 3d 12-May-14 14-May-14 R.F.T
Pour.Col.n Pouring Concrete 1d 15-May-14 15-May-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 18-May-14 18-May-14 Remove Formwork
Third Floor 19d 19-May-14 09-Jun-14 09-Jun-14, Third Floor
Beams and slab 18d 19-May-14 08-Jun-14 08-Jun-14, Beams and slab
FW.B&S.r Form Work 5d 19-May-14 24-May-14 Form Work
R.F.T.B&S R.F.T 5d 25-May-14 29-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 31-May-14 31-May-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Jun-14 08-Jun-14 Remove Formwork
Columns 8d 01-Jun-14 09-Jun-14 09-Jun-14, Columns
FW.Col.rd Form Work 2d 01-Jun-14 02-Jun-14 Form Work
R.F.T.Col. R.F.T 3d 03-Jun-14 05-Jun-14 R.F.T
Pour.col.rd Pouring Concrete 1d 07-Jun-14 07-Jun-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Jun-14 09-Jun-14 Remove Formwork
Fourth Floor 19d 10-Jun-14 01-Jul-14 01-Jul-14, Fourth Floor
Beams and slab 18d 10-Jun-14 30-Jun-14 30-Jun-14, Beams and slab
FW.B&S.th Form Work 5d 10-Jun-14 15-Jun-14 Form Work
R.F.T.B&S R.F.T 5d 16-Jun-14 21-Jun-14 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Jun-14 22-Jun-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 30-Jun-14 30-Jun-14 Remove Formwork
Columns 8d 23-Jun-14 01-Jul-14 01-Jul-14, Columns

Actual Work Critical Remaining Work Summary Page 102 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

278
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.Col.th Form Work 2d 23-Jun-14 24-Jun-14 Form Work
R.F.T.Col. R.F.T 3d 25-Jun-14 28-Jun-14 R.F.T
Pour.Col.th Pouring Concrete 1d 29-Jun-14 29-Jun-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 01-Jul-14 01-Jul-14 Remove Formwork
Roof 17d 02-Jul-14 21-Jul-14 21-Jul-14, Roof
Beams and slab 17d 02-Jul-14 21-Jul-14 21-Jul-14, Beams and slab
FW.B&S.R Form Work 5d 02-Jul-14 07-Jul-14 Form Work
R.F.T.B&S R.F.T 5d 08-Jul-14 13-Jul-14 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Jul-14 14-Jul-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 21-Jul-14 21-Jul-14 Remove Formwork
Mansonary 109d 22-Mar-14 31-Jul-14 31-Jul-14, Mansonary
Basement 2d 22-Mar-14 23-Mar-14 23-Mar-14, Basement
E.B.M1180 External 2d 22-Mar-14 23-Mar-14 External
Ground Floor 4d 24-Apr-14 28-Apr-14 28-Apr-14, Ground Floor
I.G.M1180 Internal 4d 24-Apr-14 28-Apr-14 Internal
E.G.M1180 External 2d 24-Apr-14 26-Apr-14 External
First Floor 4d 18-May-14 21-May-14 21-May-14, First Floor
I.st .M1180 Internal 4d 18-May-14 21-May-14 Internal
E.st .M1180 External 2d 18-May-14 19-May-14 External
Second Floor 4d 09-Jun-14 12-Jun-14 12-Jun-14, Second Floor
I . nd .M1180 Internal 4d 09-Jun-14 12-Jun-14 Internal
E. nd .M1180 External 2d 09-Jun-14 10-Jun-14 External
Third Floor 4d 01-Jul-14 05-Jul-14 05-Jul-14, Third Floor
I . rd .M1180 Internal 4d 01-Jul-14 05-Jul-14 Internal
E . rd .M1180 External 2d 01-Jul-14 02-Jul-14 External
Fourth Floor 4d 22-Jul-14 26-Jul-14 26-Jul-14, Fourth Floor
I .th .M1180 Internal 4d 22-Jul-14 26-Jul-14 Internal
E. th .M1180 External 2d 22-Jul-14 23-Jul-14 External
Roof 1d 31-Jul-14 31-Jul-14 31-Jul-14, Roof
E .R .M1180 External 1d 31-Jul-14 31-Jul-14 External
Finishing 85d 27-Apr-14 09-Aug-14 09-Aug-14, Finishing
Ground Floor 2d 27-Apr-14 28-Apr-14 28-Apr-14, Ground Floor
Calm Shell 2d 27-Apr-14 28-Apr-14 28-Apr-14, Calm Shell
E.Ch .G.1 External 2d 27-Apr-14 28-Apr-14 External
External Ele
Electrical 0d
First Floor 2d 20-May-14 21-May-14 21-May-14, First Floor
Calm Shell 2d 20-May-14 21-May-14 21-May-14, Calm Shell
E .ch .st11 External 2d 20-May-14 21-May-14 External
External Ele
Electrical 0d
Second Floor 2d 11-Jun-14 12-Jun-14 12-Jun-14, Second Floor
Calm Shell 2d 11-Jun-14 12-Jun-14 12-Jun-14, Calm Shell
E.ch .nd11 External 2d 11-Jun-14 12-Jun-14 External
External Ele
Electrical 0d
Third Floor 2d 03-Jul-14 05-Jul-14 05-Jul-14, Third Floor
Calm Shell 2d 03-Jul-14 05-Jul-14 05-Jul-14, Calm Shell
E.ch. rd11 External 2d 03-Jul-14 05-Jul-14 External
External Ele
Electrical 0d
Fourth Floor 2d 24-Jul-14 26-Jul-14 26-Jul-14, Fourth Floor
Calm Shell 2d 24-Jul-14 26-Jul-14 26-Jul-14, Calm Shell
E.ch .th118 External 2d 24-Jul-14 26-Jul-14 External
External Ele
Electrical 0d
Roof 1d 02-Aug-14 02-Aug-14 02-Aug-14, Roof
Calm Shell 1d 02-Aug-14 02-Aug-14 02-Aug-14, Calm Shell
E.ch .r1180 External 1d 02-Aug-14 02-Aug-14 External
External Ele
Electrical 0d
Painting Cond. 6d 03-Aug-14 09-Aug-14 09-Aug-14, Painting Con
Ex. Paint1180 External Painting 6d 03-Aug-14 09-Aug-14 External Painting
Marbling 5d 03-Aug-14 07-Aug-14 07-Aug-14, Marbling
E.M.F1180 Entrance 4d 03-Aug-14 06-Aug-14 Entrance
S.M.F1180 Stairs 5d 03-Aug-14 07-Aug-14 Stairs

Zone 3 961d 01-Nov-11 25-Dec-14 25-Dec-14, Z


A7440 start of zone 3 0d 01-Nov-11 start of zone 3
A7450 finish of zone 3 0d 25-Dec-14 finish of zone
Stage 1 323d 01-Nov-11 24-Nov-12 24-Nov-12, Stage 1
A6280 start of stage 1 0d 01-Nov-11 start of stage 1
A6290 finish of stage 1 0d 24-Nov-12 finish of stage 1
Stand alone Villa type
typ 1 87d 01-Nov-11 14-Feb-12 14-Feb-12, Stand alone Villa type 1
A5680 start Villa 0d 01-Nov-11 start Villa
A5690 Finish Villa 0d 14-Feb-12 Finish Villa
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M. Sur.v661 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 26d 02-Nov-11 06-Dec-11 06-Dec-11, Earth Work
Ex.v671 Excavation 2d 02-Nov-11 03-Nov-11 Excavation
B.F.v671 BackFill 2d 05-Dec-11 06-Dec-11 BackFill
Civil Work 76d 05-Nov-11 05-Feb-12 05-Feb-12, Civil Work
Foundation 15d 05-Nov-11 26-Nov-11 26-Nov-11, Foundation
Footing 15d 05-Nov-11 26-Nov-11 26-Nov-11, Footing
Plain Concrete
Con 5d 05-Nov-11 14-Nov-11 14-Nov-11, Plain Concrete
F.W.Pc Form Work 2d 05-Nov-11 10-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 12-Nov-11 12-Nov-11 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 103 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

279
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.Fw.P Remove Formwork 1d 14-Nov-11 14-Nov-11 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 15-Nov-11 26-Nov-11 26-Nov-11, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 15-Nov-11 19-Nov-11 Form Work
R.F.T.R R.F.T 2d 20-Nov-11 21-Nov-11 R.F.T
Pour.Rc Pouring Concrete 1d 22-Nov-11 22-Nov-11 Pouring Concrete
R.Fw.R Remove formwork 1d 24-Nov-11 24-Nov-11 Remove formwork
Ins.Rc& Insulting 1d 26-Nov-11 26-Nov-11 Insulting
Ground Floor 25d 27-Nov-11 25-Dec-11 25-Dec-11, Ground Floor
Slab on grade
grad 16d 07-Dec-11 25-Dec-11 25-Dec-11, Slab on grade
FW.SOG. Form Work 4d 07-Dec-11 11-Dec-11 Form Work
R.F.T.SOG R.F.T 3d 12-Dec-11 14-Dec-11 R.F.T
Pour.SOG Pouring Concrete 1d 15-Dec-11 15-Dec-11 Pouring Concrete
R.FW.SOG Remove formwork 1d 25-Dec-11 25-Dec-11 Remove formwork
Columns 7d 27-Nov-11 04-Dec-11 04-Dec-11, Columns
FW.Col.G Form Work 2d 27-Nov-11 28-Nov-11 Form Work
R.F.T.Col. R.F.T 2d 29-Nov-11 30-Nov-11 R.F.T
Pour.Col.G Pouring Concrete 1d 01-Dec-11 01-Dec-11 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-Dec-11 04-Dec-11 Remove formwork
First Floor 18d 26-Dec-11 15-Jan-12 15-Jan-12, First Floor
Beams and slab 18d 26-Dec-11 15-Jan-12 15-Jan-12, Beams and slab
FW.B&S.s Form Work 6d 26-Dec-11 01-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 02-Jan-12 04-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Jan-12 05-Jan-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Columns 8d 07-Jan-12 15-Jan-12 15-Jan-12, Columns
FW.Col.st. Form Work 3d 07-Jan-12 09-Jan-12 Form Work
R.F.T.Col. R.F.T 2d 10-Jan-12 11-Jan-12 R.F.T
Pour.Col.s Pouring Concrete 1d 12-Jan-12 12-Jan-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Roof 18d 16-Jan-12 05-Feb-12 05-Feb-12, Roof
Beams and slab 18d 16-Jan-12 05-Feb-12 05-Feb-12, Beams and slab
FW.B&S.n Form Work 6d 16-Jan-12 22-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 23-Jan-12 25-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Jan-12 26-Jan-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Feb-12 05-Feb-12 Remove Form Work
Mansonary 22d 16-Jan-12 09-Feb-12 09-Feb-12, Mansonary
Ground Floor 2d 16-Jan-12 17-Jan-12 17-Jan-12, Ground Floor
I.G..M.v661 Internal 2d 16-Jan-12 17-Jan-12 Internal
E.G.M.v671 External 2d 16-Jan-12 17-Jan-12 External
First Floor 2d 06-Feb-12 07-Feb-12 07-Feb-12, First Floor
I.F.M.v661 Internal 2d 06-Feb-12 07-Feb-12 Internal
E.F.M.v661 External 2d 06-Feb-12 07-Feb-12 External
Roof 2d 08-Feb-12 09-Feb-12 09-Feb-12, Roof
E.R.M.v671 External 2d 08-Feb-12 09-Feb-12 External
Finishing 24d 18-Jan-12 14-Feb-12 14-Feb-12, Finishing
Ground Floor 2d 18-Jan-12 19-Jan-12 19-Jan-12, Ground Floor
Calm Shell 2d 18-Jan-12 19-Jan-12 19-Jan-12, Calm Shell
E.Ch.G.v6 External 2d 18-Jan-12 19-Jan-12 External
External Ele
Electrical 0d
First Floor 2d 08-Feb-12 09-Feb-12 09-Feb-12, First Floor
Calm Shell 2d 08-Feb-12 09-Feb-12 09-Feb-12, Calm Shell
E.ch.st.v67 External 2d 08-Feb-12 09-Feb-12 External
External Ele
Electrical 0d
Roof 1d 11-Feb-12 11-Feb-12 11-Feb-12, Roof
Calm Shell 1d 11-Feb-12 11-Feb-12 11-Feb-12, Calm Shell
E.ch.r.v671 External 1d 11-Feb-12 11-Feb-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-Feb-12 14-Feb-12 14-Feb-12, Paint Villa 1
Ex Paint660 External Painting 3d 12-Feb-12 14-Feb-12 External Painting
Stand alone Villa type
typ 2 163d 01-Nov-11 14-May-12 14-May-12, Stand alone Villa type 2
A5660 start Villa 0d 01-Nov-11 start Villa
A5670 Finish Villa 0d 14-May-12 Finish Villa
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M. Sur.v671 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 100d 05-Nov-11 04-Mar-12 04-Mar-12, Earth Work
Ex.v681 Excavation 2d 05-Nov-11 10-Nov-11 Excavation
B.F.v681 BackFill 2d 03-Mar-12 04-Mar-12 BackFill
Civil Work 76d 06-Feb-12 05-May-12 05-May-12, Civil Work
Foundation 15d 06-Feb-12 22-Feb-12 22-Feb-12, Foundation
Footing 15d 06-Feb-12 22-Feb-12 22-Feb-12, Footing
Plain Concrete
Con 5d 06-Feb-12 11-Feb-12 11-Feb-12, Plain Concrete
F.W.Pc Form Work 2d 06-Feb-12 07-Feb-12 Form Work
Pour.Pc Pouring Concrete 1d 08-Feb-12 08-Feb-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 11-Feb-12 11-Feb-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 12-Feb-12 22-Feb-12 22-Feb-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 12-Feb-12 15-Feb-12 Form Work

Actual Work Critical Remaining Work Summary Page 104 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

280
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.R R.F.T 2d 16-Feb-12 18-Feb-12 R.F.T
Pour.Rc Pouring Concrete 1d 19-Feb-12 19-Feb-12 Pouring Concrete
R.Fw.R Remove formwork 1d 21-Feb-12 21-Feb-12 Remove formwork
Ins.Rc& Insulting 1d 22-Feb-12 22-Feb-12 Insulting
Ground Floor 25d 23-Feb-12 22-Mar-12 22-Mar-12, Ground Floor
Slab on grade
grad 16d 05-Mar-12 22-Mar-12 22-Mar-12, Slab on grade
FW.SOG. Form Work 4d 05-Mar-12 08-Mar-12 Form Work
R.F.T.SOG R.F.T 3d 10-Mar-12 12-Mar-12 R.F.T
Pour.SOG Pouring Concrete 1d 13-Mar-12 13-Mar-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 22-Mar-12 22-Mar-12 Remove formwork
Columns 7d 23-Feb-12 01-Mar-12 01-Mar-12, Columns
FW.Col.G Form Work 2d 23-Feb-12 25-Feb-12 Form Work
R.F.T.Col. R.F.T 2d 26-Feb-12 27-Feb-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-Feb-12 28-Feb-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 01-Mar-12 01-Mar-12 Remove formwork
First Floor 18d 24-Mar-12 12-Apr-12 12-Apr-12, First Floor
Beams and slab 18d 24-Mar-12 12-Apr-12 12-Apr-12, Beams and slab
FW.B&S.s Form Work 6d 24-Mar-12 29-Mar-12 Form Work
R.F.T.B&S R.F.T 3d 31-Mar-12 02-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Apr-12 03-Apr-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 12-Apr-12 12-Apr-12 Remove formwork
Columns 8d 04-Apr-12 12-Apr-12 12-Apr-12, Columns
FW.Col.st. Form Work 3d 04-Apr-12 07-Apr-12 Form Work
R.F.T.Col. R.F.T 2d 08-Apr-12 09-Apr-12 R.F.T
Pour.Col.s Pouring Concrete 1d 10-Apr-12 10-Apr-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 12-Apr-12 12-Apr-12 Remove formwork
Roof 18d 14-Apr-12 05-May-12 05-May-12, Roof
Beams and slab 18d 14-Apr-12 05-May-12 05-May-12, Beams and slab
FW.B&S.n Form Work 6d 14-Apr-12 19-Apr-12 Form Work
R.F.T.B&S R.F.T 3d 21-Apr-12 23-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 24-Apr-12 24-Apr-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-May-12 05-May-12 Remove Form Work
Mansonary 22d 14-Apr-12 09-May-12 09-May-12, Mansonary
Ground Floor 2d 14-Apr-12 15-Apr-12 15-Apr-12, Ground Floor
I.G..M.v671 Internal 2d 14-Apr-12 15-Apr-12 Internal
E.G.M.v681 External 2d 14-Apr-12 15-Apr-12 External
First Floor 2d 06-May-12 07-May-12 07-May-12, First Floor
I.F.M.v671 Internal 2d 06-May-12 07-May-12 Internal
E.F.M.v671 External 2d 06-May-12 07-May-12 External
Roof 2d 08-May-12 09-May-12 09-May-12, Roof
E.R.M.v681 External 2d 08-May-12 09-May-12 External
Finishing 24d 16-Apr-12 14-May-12 14-May-12, Finishing
Ground Floor 2d 16-Apr-12 17-Apr-12 17-Apr-12, Ground Floor
Calm Shell 2d 16-Apr-12 17-Apr-12 17-Apr-12, Calm Shell
E.Ch.G.v6 External 2d 16-Apr-12 17-Apr-12 External
External Ele
Electrical 0d
First Floor 2d 08-May-12 09-May-12 09-May-12, First Floor
Calm Shell 2d 08-May-12 09-May-12 09-May-12, Calm Shell
E.ch.st.v68 External 2d 08-May-12 09-May-12 External
External Ele
Electrical 0d
Roof 1d 10-May-12 10-May-12 10-May-12, Roof
Calm Shell 1d 10-May-12 10-May-12 10-May-12, Calm Shell
E.ch.r.v681 External 1d 10-May-12 10-May-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-May-12 14-May-12 14-May-12, Paint Villa 1
Ex Paint670 External Painting 3d 12-May-12 14-May-12 External Painting
Stand alone Villa type
typ 3 239d 01-Nov-11 11-Aug-12 11-Aug-12, Stand alone Villa type 3
A5640 start Villa 0d 01-Nov-11 start Villa
A5650 Finish Villa 0d 11-Aug-12 Finish Villa
Mobilization 1d 03-Nov-11 03-Nov-11 03-Nov-11, Mobilization
M. Sur.v681 Site Surveying 1d 03-Nov-11 03-Nov-11 Site Surveying
Earth Work 174d 12-Nov-11 02-Jun-12 02-Jun-12, Earth Work
Ex.v691 Excavation 2d 12-Nov-11 13-Nov-11 Excavation
B.F.v691 BackFill 2d 31-May-12 02-Jun-12 BackFill
Civil Work 76d 06-May-12 01-Aug-12 01-Aug-12, Civil Work
Foundation 15d 06-May-12 22-May-12 22-May-12, Foundation
Footing 15d 06-May-12 22-May-12 22-May-12, Footing
Plain Concrete
Con 5d 06-May-12 10-May-12 10-May-12, Plain Concrete
F.W.Pc Form Work 2d 06-May-12 07-May-12 Form Work
Pour.Pc Pouring Concrete 1d 08-May-12 08-May-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 10-May-12 10-May-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 12-May-12 22-May-12 22-May-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 12-May-12 15-May-12 Form Work
R.F.T.R R.F.T 2d 16-May-12 17-May-12 R.F.T
Pour.Rc Pouring Concrete 1d 19-May-12 19-May-12 Pouring Concrete
R.Fw.R Remove formwork 1d 21-May-12 21-May-12 Remove formwork

Actual Work Critical Remaining Work Summary Page 105 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

281
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ins.Rc& Insulting 1d 22-May-12 22-May-12 Insulting
Ground Floor 25d 23-May-12 20-Jun-12 20-Jun-12, Ground Floor
Slab on grade
grad 16d 03-Jun-12 20-Jun-12 20-Jun-12, Slab on grade
FW.SOG. Form Work 4d 03-Jun-12 06-Jun-12 Form Work
R.F.T.SOG R.F.T 3d 07-Jun-12 10-Jun-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jun-12 11-Jun-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 20-Jun-12 20-Jun-12 Remove formwork
Columns 7d 23-May-12 30-May-12 30-May-12, Columns
FW.Col.G Form Work 2d 23-May-12 24-May-12 Form Work
R.F.T.Col. R.F.T 2d 26-May-12 27-May-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-May-12 28-May-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 30-May-12 30-May-12 Remove formwork
First Floor 18d 21-Jun-12 11-Jul-12 11-Jul-12, First Floor
Beams and slab 18d 21-Jun-12 11-Jul-12 11-Jul-12, Beams and slab
FW.B&S.s Form Work 6d 21-Jun-12 27-Jun-12 Form Work
R.F.T.B&S R.F.T 3d 28-Jun-12 01-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 02-Jul-12 02-Jul-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 11-Jul-12 11-Jul-12 Remove formwork
Columns 8d 03-Jul-12 11-Jul-12 11-Jul-12, Columns
FW.Col.st. Form Work 3d 03-Jul-12 05-Jul-12 Form Work
R.F.T.Col. R.F.T 2d 07-Jul-12 08-Jul-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-Jul-12 09-Jul-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 11-Jul-12 11-Jul-12 Remove formwork
Roof 18d 12-Jul-12 01-Aug-12 01-Aug-12, Roof
Beams and slab 18d 12-Jul-12 01-Aug-12 01-Aug-12, Beams and slab
FW.B&S.n Form Work 6d 12-Jul-12 18-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 19-Jul-12 22-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Jul-12 23-Jul-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 01-Aug-12 01-Aug-12 Remove Form Work
Mansonary 22d 12-Jul-12 06-Aug-12 06-Aug-12, Mansonary
Ground Floor 2d 12-Jul-12 14-Jul-12 14-Jul-12, Ground Floor
I.G..M.v681 Internal 2d 12-Jul-12 14-Jul-12 Internal
E.G.M.v691 External 2d 12-Jul-12 14-Jul-12 External
First Floor 2d 02-Aug-12 04-Aug-12 04-Aug-12, First Floor
I.F.M.v681 Internal 2d 02-Aug-12 04-Aug-12 Internal
E.F.M.v681 External 2d 02-Aug-12 04-Aug-12 External
Roof 2d 05-Aug-12 06-Aug-12 06-Aug-12, Roof
E.R.M.v691 External 2d 05-Aug-12 06-Aug-12 External
Finishing 24d 15-Jul-12 11-Aug-12 11-Aug-12, Finishing
Ground Floor 2d 15-Jul-12 16-Jul-12 16-Jul-12, Ground Floor
Calm Shell 2d 15-Jul-12 16-Jul-12 16-Jul-12, Calm Shell
E.Ch.G.v6 External 2d 15-Jul-12 16-Jul-12 External
External Ele
Electrical 0d
First Floor 2d 05-Aug-12 06-Aug-12 06-Aug-12, First Floor
Calm Shell 2d 05-Aug-12 06-Aug-12 06-Aug-12, Calm Shell
E.ch.st.v69 External 2d 05-Aug-12 06-Aug-12 External
External Ele
Electrical 0d
Roof 1d 07-Aug-12 07-Aug-12 07-Aug-12, Roof
Calm Shell 1d 07-Aug-12 07-Aug-12 07-Aug-12, Calm Shell
E.ch.r.v691 External 1d 07-Aug-12 07-Aug-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 08-Aug-12 11-Aug-12 11-Aug-12, Paint Villa 1
Ex Paint680 External Painting 3d 08-Aug-12 11-Aug-12 External Painting
Stand alone Villa type
typ 4 315d 01-Nov-11 14-Nov-12 14-Nov-12, Stand alone Villa type 4
A5620 start Villa 0d 01-Nov-11 start Villa
A5630 Finish Villa 0d 14-Nov-12 Finish Villa
Mobilization 1d 05-Nov-11 05-Nov-11 05-Nov-11, Mobilization
M. Sur.v691 Site Surveying 1d 05-Nov-11 05-Nov-11 Site Surveying
Earth Work 248d 14-Nov-11 02-Sep-12 02-Sep-12, Earth Work
Ex.v701 Excavation 2d 14-Nov-11 15-Nov-11 Excavation
B.F.v701 BackFill 2d 01-Sep-12 02-Sep-12 BackFill
Civil Work 76d 02-Aug-12 05-Nov-12 05-Nov-12, Civil Work
Foundation 15d 02-Aug-12 22-Aug-12 22-Aug-12, Foundation
Footing 15d 02-Aug-12 22-Aug-12 22-Aug-12, Footing
Plain Concrete
Con 5d 02-Aug-12 07-Aug-12 07-Aug-12, Plain Concrete
F.W.Pc Form Work 2d 02-Aug-12 04-Aug-12 Form Work
Pour.Pc Pouring Concrete 1d 05-Aug-12 05-Aug-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 07-Aug-12 07-Aug-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 08-Aug-12 22-Aug-12 22-Aug-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 08-Aug-12 12-Aug-12 Form Work
R.F.T.R R.F.T 2d 13-Aug-12 14-Aug-12 R.F.T
Pour.Rc Pouring Concrete 1d 15-Aug-12 15-Aug-12 Pouring Concrete
R.Fw.R Remove formwork 1d 18-Aug-12 18-Aug-12 Remove formwork
Ins.Rc& Insulting 1d 22-Aug-12 22-Aug-12 Insulting
Ground Floor 25d 23-Aug-12 20-Sep-12 20-Sep-12, Ground Floor
Slab on grade
grad 16d 03-Sep-12 20-Sep-12 20-Sep-12, Slab on grade

Actual Work Critical Remaining Work Summary Page 106 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

282
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.SOG. Form Work 4d 03-Sep-12 06-Sep-12 Form Work
R.F.T.SOG R.F.T 3d 08-Sep-12 10-Sep-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Sep-12 11-Sep-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 20-Sep-12 20-Sep-12 Remove formwork
Columns 7d 23-Aug-12 30-Aug-12 30-Aug-12, Columns
FW.Col.G Form Work 2d 23-Aug-12 25-Aug-12 Form Work
R.F.T.Col. R.F.T 2d 26-Aug-12 27-Aug-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-Aug-12 28-Aug-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 30-Aug-12 30-Aug-12 Remove formwork
First Floor 18d 22-Sep-12 11-Oct-12 11-Oct-12, First Floor
Beams and slab 18d 22-Sep-12 11-Oct-12 11-Oct-12, Beams and slab
FW.B&S.s Form Work 6d 22-Sep-12 27-Sep-12 Form Work
R.F.T.B&S R.F.T 3d 29-Sep-12 01-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 02-Oct-12 02-Oct-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 11-Oct-12 11-Oct-12 Remove formwork
Columns 8d 03-Oct-12 11-Oct-12 11-Oct-12, Columns
FW.Col.st. Form Work 3d 03-Oct-12 06-Oct-12 Form Work
R.F.T.Col. R.F.T 2d 07-Oct-12 08-Oct-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-Oct-12 09-Oct-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 11-Oct-12 11-Oct-12 Remove formwork
Roof 18d 13-Oct-12 05-Nov-12 05-Nov-12, Roof
Beams and slab 18d 13-Oct-12 05-Nov-12 05-Nov-12, Beams and slab
FW.B&S.n Form Work 6d 13-Oct-12 18-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 20-Oct-12 22-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Oct-12 23-Oct-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Nov-12 05-Nov-12 Remove Form Work
Mansonary 22d 13-Oct-12 10-Nov-12 10-Nov-12, Mansonary
Ground Floor 2d 13-Oct-12 14-Oct-12 14-Oct-12, Ground Floor
I.G..M.v691 Internal 2d 13-Oct-12 14-Oct-12 Internal
E.G.M.v701 External 2d 13-Oct-12 14-Oct-12 External
First Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, First Floor
I.F.M.v691 Internal 2d 06-Nov-12 07-Nov-12 Internal
E.F.M.v691 External 2d 06-Nov-12 07-Nov-12 External
Roof 2d 08-Nov-12 10-Nov-12 10-Nov-12, Roof
E.R.M.v701 External 2d 08-Nov-12 10-Nov-12 External
Finishing 24d 15-Oct-12 14-Nov-12 14-Nov-12, Finishing
Ground Floor 2d 15-Oct-12 16-Oct-12 16-Oct-12, Ground Floor
Calm Shell 2d 15-Oct-12 16-Oct-12 16-Oct-12, Calm Shell
E.Ch.G.v6 External 2d 15-Oct-12 16-Oct-12 External
External Ele
Electrical 0d
First Floor 2d 08-Nov-12 10-Nov-12 10-Nov-12, First Floor
Calm Shell 2d 08-Nov-12 10-Nov-12 10-Nov-12, Calm Shell
E.ch.st.v70 External 2d 08-Nov-12 10-Nov-12 External
External Ele
Electrical 0d
Roof 1d 11-Nov-12 11-Nov-12 11-Nov-12, Roof
Calm Shell 1d 11-Nov-12 11-Nov-12 11-Nov-12, Calm Shell
E.ch.r.v701 External 1d 11-Nov-12 11-Nov-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-Nov-12 14-Nov-12 14-Nov-12, Paint Villa 1
Ex Paint690 External Painting 3d 12-Nov-12 14-Nov-12 External Painting
Stand alone Villa type
typ 5 87d 01-Nov-11 14-Feb-12 14-Feb-12, Stand alone Villa type 5
A6440 start Villa 0d 01-Nov-11 start Villa
A6450 Finish Villa 0d 14-Feb-12 Finish Villa
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M. Sur.v701 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 26d 02-Nov-11 06-Dec-11 06-Dec-11, Earth Work
Ex.v711 Excavation 2d 02-Nov-11 03-Nov-11 Excavation
B.F.v711 BackFill 2d 05-Dec-11 06-Dec-11 BackFill
Civil Work 76d 05-Nov-11 05-Feb-12 05-Feb-12, Civil Work
Foundation 15d 05-Nov-11 26-Nov-11 26-Nov-11, Foundation
Footing 15d 05-Nov-11 26-Nov-11 26-Nov-11, Footing
Plain Concrete
Con 5d 05-Nov-11 14-Nov-11 14-Nov-11, Plain Concrete
F.W.Pc Form Work 2d 05-Nov-11 10-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 12-Nov-11 12-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 14-Nov-11 14-Nov-11 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 15-Nov-11 26-Nov-11 26-Nov-11, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 15-Nov-11 19-Nov-11 Form Work
R.F.T.R R.F.T 2d 20-Nov-11 21-Nov-11 R.F.T
Pour.Rc Pouring Concrete 1d 22-Nov-11 22-Nov-11 Pouring Concrete
R.Fw.R Remove formwork 1d 24-Nov-11 24-Nov-11 Remove formwork
Ins.Rc& Insulting 1d 26-Nov-11 26-Nov-11 Insulting
Ground Floor 25d 27-Nov-11 25-Dec-11 25-Dec-11, Ground Floor
Slab on grade
grad 16d 07-Dec-11 25-Dec-11 25-Dec-11, Slab on grade
FW.SOG. Form Work 4d 07-Dec-11 11-Dec-11 Form Work
R.F.T.SOG R.F.T 3d 12-Dec-11 14-Dec-11 R.F.T
Pour.SOG Pouring Concrete 1d 15-Dec-11 15-Dec-11 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 107 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

283
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.SOG Remove formwork 1d 25-Dec-11 25-Dec-11 Remove formwork
Columns 7d 27-Nov-11 04-Dec-11 04-Dec-11, Columns
FW.Col.G Form Work 2d 27-Nov-11 28-Nov-11 Form Work
R.F.T.Col. R.F.T 2d 29-Nov-11 30-Nov-11 R.F.T
Pour.Col.G Pouring Concrete 1d 01-Dec-11 01-Dec-11 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-Dec-11 04-Dec-11 Remove formwork
First Floor 18d 26-Dec-11 15-Jan-12 15-Jan-12, First Floor
Beams and slab 18d 26-Dec-11 15-Jan-12 15-Jan-12, Beams and slab
FW.B&S.s Form Work 6d 26-Dec-11 01-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 02-Jan-12 04-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Jan-12 05-Jan-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Columns 8d 07-Jan-12 15-Jan-12 15-Jan-12, Columns
FW.Col.st. Form Work 3d 07-Jan-12 09-Jan-12 Form Work
R.F.T.Col. R.F.T 2d 10-Jan-12 11-Jan-12 R.F.T
Pour.Col.s Pouring Concrete 1d 12-Jan-12 12-Jan-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Roof 18d 16-Jan-12 05-Feb-12 05-Feb-12, Roof
Beams and slab 18d 16-Jan-12 05-Feb-12 05-Feb-12, Beams and slab
FW.B&S.n Form Work 6d 16-Jan-12 22-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 23-Jan-12 25-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Jan-12 26-Jan-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Feb-12 05-Feb-12 Remove Form Work
Mansonary 22d 16-Jan-12 09-Feb-12 09-Feb-12, Mansonary
Ground Floor 2d 16-Jan-12 17-Jan-12 17-Jan-12, Ground Floor
I.G..M.v701 Internal 2d 16-Jan-12 17-Jan-12 Internal
E.G.M.v711 External 2d 16-Jan-12 17-Jan-12 External
First Floor 2d 06-Feb-12 07-Feb-12 07-Feb-12, First Floor
I.F.M.v701 Internal 2d 06-Feb-12 07-Feb-12 Internal
E.F.M.v701 External 2d 06-Feb-12 07-Feb-12 External
Roof 2d 08-Feb-12 09-Feb-12 09-Feb-12, Roof
E.R.M.v711 External 2d 08-Feb-12 09-Feb-12 External
Finishing 24d 18-Jan-12 14-Feb-12 14-Feb-12, Finishing
Ground Floor 2d 18-Jan-12 19-Jan-12 19-Jan-12, Ground Floor
Calm Shell 2d 18-Jan-12 19-Jan-12 19-Jan-12, Calm Shell
E.Ch.G.v7 External 2d 18-Jan-12 19-Jan-12 External
External Ele
Electrical 0d
First Floor 2d 08-Feb-12 09-Feb-12 09-Feb-12, First Floor
Calm Shell 2d 08-Feb-12 09-Feb-12 09-Feb-12, Calm Shell
E.ch.st.v7 External 2d 08-Feb-12 09-Feb-12 External
External Ele
Electrical 0d
Roof 1d 11-Feb-12 11-Feb-12 11-Feb-12, Roof
Calm Shell 1d 11-Feb-12 11-Feb-12 11-Feb-12, Calm Shell
E.ch.r.v711 External 1d 11-Feb-12 11-Feb-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-Feb-12 14-Feb-12 14-Feb-12, Paint Villa 1
Ex Paint700 External Painting 3d 12-Feb-12 14-Feb-12 External Painting
Stand alone Villa type
typ 6 163d 01-Nov-11 14-May-12 14-May-12, Stand alone Villa type 6
A6420 start Villa 0d 01-Nov-11 start Villa
A6430 Finish Villa 0d 14-May-12 Finish Villa
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M. Sur.v711 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 100d 05-Nov-11 04-Mar-12 04-Mar-12, Earth Work
Ex.v721 Excavation 2d 05-Nov-11 10-Nov-11 Excavation
B.F.v721 BackFill 2d 03-Mar-12 04-Mar-12 BackFill
Civil Work 76d 06-Feb-12 05-May-12 05-May-12, Civil Work
Foundation 15d 06-Feb-12 22-Feb-12 22-Feb-12, Foundation
Footing 15d 06-Feb-12 22-Feb-12 22-Feb-12, Footing
Plain Concrete
Con 5d 06-Feb-12 11-Feb-12 11-Feb-12, Plain Concrete
F.W.Pc Form Work 2d 06-Feb-12 07-Feb-12 Form Work
Pour.Pc Pouring Concrete 1d 08-Feb-12 08-Feb-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 11-Feb-12 11-Feb-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 12-Feb-12 22-Feb-12 22-Feb-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 12-Feb-12 15-Feb-12 Form Work
R.F.T.R R.F.T 2d 16-Feb-12 18-Feb-12 R.F.T
Pour.Rc Pouring Concrete 1d 19-Feb-12 19-Feb-12 Pouring Concrete
R.Fw.R Remove formwork 1d 21-Feb-12 21-Feb-12 Remove formwork
Ins.Rc& Insulting 1d 22-Feb-12 22-Feb-12 Insulting
Ground Floor 25d 23-Feb-12 22-Mar-12 22-Mar-12, Ground Floor
Slab on grade
grad 16d 05-Mar-12 22-Mar-12 22-Mar-12, Slab on grade
FW.SOG. Form Work 4d 05-Mar-12 08-Mar-12 Form Work
R.F.T.SOG R.F.T 3d 10-Mar-12 12-Mar-12 R.F.T
Pour.SOG Pouring Concrete 1d 13-Mar-12 13-Mar-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 22-Mar-12 22-Mar-12 Remove formwork
Columns 7d 23-Feb-12 01-Mar-12 01-Mar-12, Columns
FW.Col.G Form Work 2d 23-Feb-12 25-Feb-12 Form Work

Actual Work Critical Remaining Work Summary Page 108 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

284
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.Col. R.F.T 2d 26-Feb-12 27-Feb-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-Feb-12 28-Feb-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 01-Mar-12 01-Mar-12 Remove formwork
First Floor 18d 24-Mar-12 12-Apr-12 12-Apr-12, First Floor
Beams and slab 18d 24-Mar-12 12-Apr-12 12-Apr-12, Beams and slab
FW.B&S.s Form Work 6d 24-Mar-12 29-Mar-12 Form Work
R.F.T.B&S R.F.T 3d 31-Mar-12 02-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Apr-12 03-Apr-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 12-Apr-12 12-Apr-12 Remove formwork
Columns 8d 04-Apr-12 12-Apr-12 12-Apr-12, Columns
FW.Col.st. Form Work 3d 04-Apr-12 07-Apr-12 Form Work
R.F.T.Col. R.F.T 2d 08-Apr-12 09-Apr-12 R.F.T
Pour.Col.s Pouring Concrete 1d 10-Apr-12 10-Apr-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 12-Apr-12 12-Apr-12 Remove formwork
Roof 18d 14-Apr-12 05-May-12 05-May-12, Roof
Beams and slab 18d 14-Apr-12 05-May-12 05-May-12, Beams and slab
FW.B&S.n Form Work 6d 14-Apr-12 19-Apr-12 Form Work
R.F.T.B&S R.F.T 3d 21-Apr-12 23-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 24-Apr-12 24-Apr-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-May-12 05-May-12 Remove Form Work
Mansonary 22d 14-Apr-12 09-May-12 09-May-12, Mansonary
Ground Floor 2d 14-Apr-12 15-Apr-12 15-Apr-12, Ground Floor
I.G..M.v711 Internal 2d 14-Apr-12 15-Apr-12 Internal
E.G.M.v721 External 2d 14-Apr-12 15-Apr-12 External
First Floor 2d 06-May-12 07-May-12 07-May-12, First Floor
I.F.M.v711 Internal 2d 06-May-12 07-May-12 Internal
E.F.M.v711 External 2d 06-May-12 07-May-12 External
Roof 2d 08-May-12 09-May-12 09-May-12, Roof
E.R.M.v721 External 2d 08-May-12 09-May-12 External
Finishing 24d 16-Apr-12 14-May-12 14-May-12, Finishing
Ground Floor 2d 16-Apr-12 17-Apr-12 17-Apr-12, Ground Floor
Calm Shell 2d 16-Apr-12 17-Apr-12 17-Apr-12, Calm Shell
E.Ch.G.v7 External 2d 16-Apr-12 17-Apr-12 External
External Ele
Electrical 0d
First Floor 2d 08-May-12 09-May-12 09-May-12, First Floor
Calm Shell 2d 08-May-12 09-May-12 09-May-12, Calm Shell
E.ch.st.v72 External 2d 08-May-12 09-May-12 External
External Ele
Electrical 0d
Roof 1d 10-May-12 10-May-12 10-May-12, Roof
Calm Shell 1d 10-May-12 10-May-12 10-May-12, Calm Shell
E.ch.r.v721 External 1d 10-May-12 10-May-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-May-12 14-May-12 14-May-12, Paint Villa 1
Ex Paint710 External Painting 3d 12-May-12 14-May-12 External Painting
Stand alone Villa type
typ 7 239d 01-Nov-11 11-Aug-12 11-Aug-12, Stand alone Villa type 7
A6460 start Villa 0d 01-Nov-11 start Villa
A6470 Finish Villa 0d 11-Aug-12 Finish Villa
Mobilization 1d 03-Nov-11 03-Nov-11 03-Nov-11, Mobilization
M. Sur.v721 Site Surveying 1d 03-Nov-11 03-Nov-11 Site Surveying
Earth Work 174d 12-Nov-11 02-Jun-12 02-Jun-12, Earth Work
Ex.v731 Excavation 2d 12-Nov-11 13-Nov-11 Excavation
B.F.v731 BackFill 2d 31-May-12 02-Jun-12 BackFill
Civil Work 76d 06-May-12 01-Aug-12 01-Aug-12, Civil Work
Foundation 15d 06-May-12 22-May-12 22-May-12, Foundation
Footing 15d 06-May-12 22-May-12 22-May-12, Footing
Plain Concrete
Con 5d 06-May-12 10-May-12 10-May-12, Plain Concrete
F.W.Pc Form Work 2d 06-May-12 07-May-12 Form Work
Pour.Pc Pouring Concrete 1d 08-May-12 08-May-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 10-May-12 10-May-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 12-May-12 22-May-12 22-May-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 12-May-12 15-May-12 Form Work
R.F.T.R R.F.T 2d 16-May-12 17-May-12 R.F.T
Pour.Rc Pouring Concrete 1d 19-May-12 19-May-12 Pouring Concrete
R.Fw.R Remove formwork 1d 21-May-12 21-May-12 Remove formwork
Ins.Rc& Insulting 1d 22-May-12 22-May-12 Insulting
Ground Floor 25d 23-May-12 20-Jun-12 20-Jun-12, Ground Floor
Slab on grade
grad 16d 03-Jun-12 20-Jun-12 20-Jun-12, Slab on grade
FW.SOG. Form Work 4d 03-Jun-12 06-Jun-12 Form Work
R.F.T.SOG R.F.T 3d 07-Jun-12 10-Jun-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jun-12 11-Jun-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 20-Jun-12 20-Jun-12 Remove formwork
Columns 7d 23-May-12 30-May-12 30-May-12, Columns
FW.Col.G Form Work 2d 23-May-12 24-May-12 Form Work
R.F.T.Col. R.F.T 2d 26-May-12 27-May-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-May-12 28-May-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 30-May-12 30-May-12 Remove formwork

Actual Work Critical Remaining Work Summary Page 109 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

285
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
First Floor 18d 21-Jun-12 11-Jul-12 11-Jul-12, First Floor
Beams and slab 18d 21-Jun-12 11-Jul-12 11-Jul-12, Beams and slab
FW.B&S.s Form Work 6d 21-Jun-12 27-Jun-12 Form Work
R.F.T.B&S R.F.T 3d 28-Jun-12 01-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 02-Jul-12 02-Jul-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 11-Jul-12 11-Jul-12 Remove formwork
Columns 8d 03-Jul-12 11-Jul-12 11-Jul-12, Columns
FW.Col.st. Form Work 3d 03-Jul-12 05-Jul-12 Form Work
R.F.T.Col. R.F.T 2d 07-Jul-12 08-Jul-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-Jul-12 09-Jul-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 11-Jul-12 11-Jul-12 Remove formwork
Roof 18d 12-Jul-12 01-Aug-12 01-Aug-12, Roof
Beams and slab 18d 12-Jul-12 01-Aug-12 01-Aug-12, Beams and slab
FW.B&S.n Form Work 6d 12-Jul-12 18-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 19-Jul-12 22-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Jul-12 23-Jul-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 01-Aug-12 01-Aug-12 Remove Form Work
Mansonary 22d 12-Jul-12 06-Aug-12 06-Aug-12, Mansonary
Ground Floor 2d 12-Jul-12 14-Jul-12 14-Jul-12, Ground Floor
I.G..M.v721 Internal 2d 12-Jul-12 14-Jul-12 Internal
E.G.M.v731 External 2d 12-Jul-12 14-Jul-12 External
First Floor 2d 02-Aug-12 04-Aug-12 04-Aug-12, First Floor
I.F.M.v721 Internal 2d 02-Aug-12 04-Aug-12 Internal
E.F.M.v721 External 2d 02-Aug-12 04-Aug-12 External
Roof 2d 05-Aug-12 06-Aug-12 06-Aug-12, Roof
E.R.M.v731 External 2d 05-Aug-12 06-Aug-12 External
Finishing 24d 15-Jul-12 11-Aug-12 11-Aug-12, Finishing
Ground Floor 2d 15-Jul-12 16-Jul-12 16-Jul-12, Ground Floor
Calm Shell 2d 15-Jul-12 16-Jul-12 16-Jul-12, Calm Shell
E.Ch.G.v7 External 2d 15-Jul-12 16-Jul-12 External
External Ele
Electrical 0d
First Floor 2d 05-Aug-12 06-Aug-12 06-Aug-12, First Floor
Calm Shell 2d 05-Aug-12 06-Aug-12 06-Aug-12, Calm Shell
E.ch.st.v73 External 2d 05-Aug-12 06-Aug-12 External
External Ele
Electrical 0d
Roof 1d 07-Aug-12 07-Aug-12 07-Aug-12, Roof
Calm Shell 1d 07-Aug-12 07-Aug-12 07-Aug-12, Calm Shell
E.ch.r.v731 External 1d 07-Aug-12 07-Aug-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 08-Aug-12 11-Aug-12 11-Aug-12, Paint Villa 1
Ex Paint720 External Painting 3d 08-Aug-12 11-Aug-12 External Painting
Stand alone Villa type
typ 8 315d 01-Nov-11 14-Nov-12 14-Nov-12, Stand alone Villa type 8
A6360 start Villa 0d 01-Nov-11 start Villa
A6370 Finish Villa 0d 14-Nov-12 Finish Villa
Mobilization 1d 05-Nov-11 05-Nov-11 05-Nov-11, Mobilization
M. Sur.v731 Site Surveying 1d 05-Nov-11 05-Nov-11 Site Surveying
Earth Work 248d 14-Nov-11 02-Sep-12 02-Sep-12, Earth Work
Ex.v741 Excavation 2d 14-Nov-11 15-Nov-11 Excavation
B.F.v741 BackFill 2d 01-Sep-12 02-Sep-12 BackFill
Civil Work 76d 02-Aug-12 05-Nov-12 05-Nov-12, Civil Work
Foundation 15d 02-Aug-12 22-Aug-12 22-Aug-12, Foundation
Footing 15d 02-Aug-12 22-Aug-12 22-Aug-12, Footing
Plain Concrete
Con 5d 02-Aug-12 07-Aug-12 07-Aug-12, Plain Concrete
F.W.Pc Form Work 2d 02-Aug-12 04-Aug-12 Form Work
Pour.Pc Pouring Concrete 1d 05-Aug-12 05-Aug-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 07-Aug-12 07-Aug-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 08-Aug-12 22-Aug-12 22-Aug-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 08-Aug-12 12-Aug-12 Form Work
R.F.T.R R.F.T 2d 13-Aug-12 14-Aug-12 R.F.T
Pour.Rc Pouring Concrete 1d 15-Aug-12 15-Aug-12 Pouring Concrete
R.Fw.R Remove formwork 1d 18-Aug-12 18-Aug-12 Remove formwork
Ins.Rc& Insulting 1d 22-Aug-12 22-Aug-12 Insulting
Ground Floor 25d 23-Aug-12 20-Sep-12 20-Sep-12, Ground Floor
Slab on grade
grad 16d 03-Sep-12 20-Sep-12 20-Sep-12, Slab on grade
FW.SOG. Form Work 4d 03-Sep-12 06-Sep-12 Form Work
R.F.T.SOG R.F.T 3d 08-Sep-12 10-Sep-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Sep-12 11-Sep-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 20-Sep-12 20-Sep-12 Remove formwork
Columns 7d 23-Aug-12 30-Aug-12 30-Aug-12, Columns
FW.Col.G Form Work 2d 23-Aug-12 25-Aug-12 Form Work
R.F.T.Col. R.F.T 2d 26-Aug-12 27-Aug-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-Aug-12 28-Aug-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 30-Aug-12 30-Aug-12 Remove formwork
First Floor 18d 22-Sep-12 11-Oct-12 11-Oct-12, First Floor
Beams and slab 18d 22-Sep-12 11-Oct-12 11-Oct-12, Beams and slab
FW.B&S.s Form Work 6d 22-Sep-12 27-Sep-12 Form Work

Actual Work Critical Remaining Work Summary Page 110 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

286
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.B&S R.F.T 3d 29-Sep-12 01-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 02-Oct-12 02-Oct-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 11-Oct-12 11-Oct-12 Remove formwork
Columns 8d 03-Oct-12 11-Oct-12 11-Oct-12, Columns
FW.Col.st. Form Work 3d 03-Oct-12 06-Oct-12 Form Work
R.F.T.Col. R.F.T 2d 07-Oct-12 08-Oct-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-Oct-12 09-Oct-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 11-Oct-12 11-Oct-12 Remove formwork
Roof 18d 13-Oct-12 05-Nov-12 05-Nov-12, Roof
Beams and slab 18d 13-Oct-12 05-Nov-12 05-Nov-12, Beams and slab
FW.B&S.n Form Work 6d 13-Oct-12 18-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 20-Oct-12 22-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Oct-12 23-Oct-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Nov-12 05-Nov-12 Remove Form Work
Mansonary 22d 13-Oct-12 10-Nov-12 10-Nov-12, Mansonary
Ground Floor 2d 13-Oct-12 14-Oct-12 14-Oct-12, Ground Floor
I.G..M.v731 Internal 2d 13-Oct-12 14-Oct-12 Internal
E.G.M.v741 External 2d 13-Oct-12 14-Oct-12 External
First Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, First Floor
I.F.M.v731 Internal 2d 06-Nov-12 07-Nov-12 Internal
E.F.M.v731 External 2d 06-Nov-12 07-Nov-12 External
Roof 2d 08-Nov-12 10-Nov-12 10-Nov-12, Roof
E.R.M.v741 External 2d 08-Nov-12 10-Nov-12 External
Finishing 24d 15-Oct-12 14-Nov-12 14-Nov-12, Finishing
Ground Floor 2d 15-Oct-12 16-Oct-12 16-Oct-12, Ground Floor
Calm Shell 2d 15-Oct-12 16-Oct-12 16-Oct-12, Calm Shell
E.Ch.G.v7 External 2d 15-Oct-12 16-Oct-12 External
External Ele
Electrical 0d
First Floor 2d 08-Nov-12 10-Nov-12 10-Nov-12, First Floor
Calm Shell 2d 08-Nov-12 10-Nov-12 10-Nov-12, Calm Shell
E.ch.st.v74 External 2d 08-Nov-12 10-Nov-12 External
External Ele
Electrical 0d
Roof 1d 11-Nov-12 11-Nov-12 11-Nov-12, Roof
Calm Shell 1d 11-Nov-12 11-Nov-12 11-Nov-12, Calm Shell
E.ch.r.v741 External 1d 11-Nov-12 11-Nov-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-Nov-12 14-Nov-12 14-Nov-12, Paint Villa 1
Ex Paint730 External Painting 3d 12-Nov-12 14-Nov-12 External Painting
Stand alone Villa type
typ 9 87d 01-Nov-11 14-Feb-12 14-Feb-12, Stand alone Villa type 9
A6380 start Villa 0d 01-Nov-11 start Villa
A6390 Finish Villa 0d 14-Feb-12 Finish Villa
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M. Sur.v741 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 26d 02-Nov-11 06-Dec-11 06-Dec-11, Earth Work
Ex.v751 Excavation 2d 02-Nov-11 03-Nov-11 Excavation
B.F.v751 BackFill 2d 05-Dec-11 06-Dec-11 BackFill
Civil Work 76d 05-Nov-11 05-Feb-12 05-Feb-12, Civil Work
Foundation 15d 05-Nov-11 26-Nov-11 26-Nov-11, Foundation
Footing 15d 05-Nov-11 26-Nov-11 26-Nov-11, Footing
Plain Concrete
Con 5d 05-Nov-11 14-Nov-11 14-Nov-11, Plain Concrete
F.W.Pc Form Work 2d 05-Nov-11 10-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 12-Nov-11 12-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 14-Nov-11 14-Nov-11 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 15-Nov-11 26-Nov-11 26-Nov-11, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 15-Nov-11 19-Nov-11 Form Work
R.F.T.R R.F.T 2d 20-Nov-11 21-Nov-11 R.F.T
Pour.Rc Pouring Concrete 1d 22-Nov-11 22-Nov-11 Pouring Concrete
R.Fw.R Remove formwork 1d 24-Nov-11 24-Nov-11 Remove formwork
Ins.Rc& Insulting 1d 26-Nov-11 26-Nov-11 Insulting
Ground Floor 25d 27-Nov-11 25-Dec-11 25-Dec-11, Ground Floor
Slab on grade
grad 16d 07-Dec-11 25-Dec-11 25-Dec-11, Slab on grade
FW.SOG. Form Work 4d 07-Dec-11 11-Dec-11 Form Work
R.F.T.SOG R.F.T 3d 12-Dec-11 14-Dec-11 R.F.T
Pour.SOG Pouring Concrete 1d 15-Dec-11 15-Dec-11 Pouring Concrete
R.FW.SOG Remove formwork 1d 25-Dec-11 25-Dec-11 Remove formwork
Columns 7d 27-Nov-11 04-Dec-11 04-Dec-11, Columns
FW.Col.G Form Work 2d 27-Nov-11 28-Nov-11 Form Work
R.F.T.Col. R.F.T 2d 29-Nov-11 30-Nov-11 R.F.T
Pour.Col.G Pouring Concrete 1d 01-Dec-11 01-Dec-11 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-Dec-11 04-Dec-11 Remove formwork
First Floor 18d 26-Dec-11 15-Jan-12 15-Jan-12, First Floor
Beams and slab 18d 26-Dec-11 15-Jan-12 15-Jan-12, Beams and slab
FW.B&S.s Form Work 6d 26-Dec-11 01-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 02-Jan-12 04-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Jan-12 05-Jan-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork

Actual Work Critical Remaining Work Summary Page 111 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

287
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Columns 8d 07-Jan-12 15-Jan-12 15-Jan-12, Columns
FW.Col.st. Form Work 3d 07-Jan-12 09-Jan-12 Form Work
R.F.T.Col. R.F.T 2d 10-Jan-12 11-Jan-12 R.F.T
Pour.Col.s Pouring Concrete 1d 12-Jan-12 12-Jan-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Roof 18d 16-Jan-12 05-Feb-12 05-Feb-12, Roof
Beams and slab 18d 16-Jan-12 05-Feb-12 05-Feb-12, Beams and slab
FW.B&S.n Form Work 6d 16-Jan-12 22-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 23-Jan-12 25-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Jan-12 26-Jan-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Feb-12 05-Feb-12 Remove Form Work
Mansonary 22d 16-Jan-12 09-Feb-12 09-Feb-12, Mansonary
Ground Floor 2d 16-Jan-12 17-Jan-12 17-Jan-12, Ground Floor
I.G..M.v741 Internal 2d 16-Jan-12 17-Jan-12 Internal
E.G.M.v751 External 2d 16-Jan-12 17-Jan-12 External
First Floor 2d 06-Feb-12 07-Feb-12 07-Feb-12, First Floor
I.F.M.v741 Internal 2d 06-Feb-12 07-Feb-12 Internal
E.F.M.v741 External 2d 06-Feb-12 07-Feb-12 External
Roof 2d 08-Feb-12 09-Feb-12 09-Feb-12, Roof
E.R.M.v751 External 2d 08-Feb-12 09-Feb-12 External
Finishing 24d 18-Jan-12 14-Feb-12 14-Feb-12, Finishing
Ground Floor 2d 18-Jan-12 19-Jan-12 19-Jan-12, Ground Floor
Calm Shell 2d 18-Jan-12 19-Jan-12 19-Jan-12, Calm Shell
E.Ch.G.v7 External 2d 18-Jan-12 19-Jan-12 External
External Ele
Electrical 0d
First Floor 2d 08-Feb-12 09-Feb-12 09-Feb-12, First Floor
Calm Shell 2d 08-Feb-12 09-Feb-12 09-Feb-12, Calm Shell
E.ch.st.v75 External 2d 08-Feb-12 09-Feb-12 External
External Ele
Electrical 0d
Roof 1d 11-Feb-12 11-Feb-12 11-Feb-12, Roof
Calm Shell 1d 11-Feb-12 11-Feb-12 11-Feb-12, Calm Shell
E.ch.r.v751 External 1d 11-Feb-12 11-Feb-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-Feb-12 14-Feb-12 14-Feb-12, Paint Villa 1
Ex Paint740 External Painting 3d 12-Feb-12 14-Feb-12 External Painting
Stand alone Villa typ
type 10 163d 01-Nov-11 14-May-12 14-May-12, Stand alone Villa type 10
A6400 start Villa 0d 01-Nov-11 start Villa
A6410 Finish Villa 0d 14-May-12 Finish Villa
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M. Sur.v751 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 100d 05-Nov-11 04-Mar-12 04-Mar-12, Earth Work
Ex.v761 Excavation 2d 05-Nov-11 10-Nov-11 Excavation
B.F.v761 BackFill 2d 03-Mar-12 04-Mar-12 BackFill
Civil Work 76d 06-Feb-12 05-May-12 05-May-12, Civil Work
Foundation 15d 06-Feb-12 22-Feb-12 22-Feb-12, Foundation
Footing 15d 06-Feb-12 22-Feb-12 22-Feb-12, Footing
Plain Concrete
Con 5d 06-Feb-12 11-Feb-12 11-Feb-12, Plain Concrete
F.W.Pc Form Work 2d 06-Feb-12 07-Feb-12 Form Work
Pour.Pc Pouring Concrete 1d 08-Feb-12 08-Feb-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 11-Feb-12 11-Feb-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 12-Feb-12 22-Feb-12 22-Feb-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 12-Feb-12 15-Feb-12 Form Work
R.F.T.R R.F.T 2d 16-Feb-12 18-Feb-12 R.F.T
Pour.Rc Pouring Concrete 1d 19-Feb-12 19-Feb-12 Pouring Concrete
R.Fw.R Remove formwork 1d 21-Feb-12 21-Feb-12 Remove formwork
Ins.Rc& Insulting 1d 22-Feb-12 22-Feb-12 Insulting
Ground Floor 25d 23-Feb-12 22-Mar-12 22-Mar-12, Ground Floor
Slab on grade
grad 16d 05-Mar-12 22-Mar-12 22-Mar-12, Slab on grade
FW.SOG. Form Work 4d 05-Mar-12 08-Mar-12 Form Work
R.F.T.SOG R.F.T 3d 10-Mar-12 12-Mar-12 R.F.T
Pour.SOG Pouring Concrete 1d 13-Mar-12 13-Mar-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 22-Mar-12 22-Mar-12 Remove formwork
Columns 7d 23-Feb-12 01-Mar-12 01-Mar-12, Columns
FW.Col.G Form Work 2d 23-Feb-12 25-Feb-12 Form Work
R.F.T.Col. R.F.T 2d 26-Feb-12 27-Feb-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-Feb-12 28-Feb-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 01-Mar-12 01-Mar-12 Remove formwork
First Floor 18d 24-Mar-12 12-Apr-12 12-Apr-12, First Floor
Beams and slab 18d 24-Mar-12 12-Apr-12 12-Apr-12, Beams and slab
FW.B&S.s Form Work 6d 24-Mar-12 29-Mar-12 Form Work
R.F.T.B&S R.F.T 3d 31-Mar-12 02-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Apr-12 03-Apr-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 12-Apr-12 12-Apr-12 Remove formwork
Columns 8d 04-Apr-12 12-Apr-12 12-Apr-12, Columns
FW.Col.st. Form Work 3d 04-Apr-12 07-Apr-12 Form Work
R.F.T.Col. R.F.T 2d 08-Apr-12 09-Apr-12 R.F.T

Actual Work Critical Remaining Work Summary Page 112 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

288
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.Col.s Pouring Concrete 1d 10-Apr-12 10-Apr-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 12-Apr-12 12-Apr-12 Remove formwork
Roof 18d 14-Apr-12 05-May-12 05-May-12, Roof
Beams and slab 18d 14-Apr-12 05-May-12 05-May-12, Beams and slab
FW.B&S.n Form Work 6d 14-Apr-12 19-Apr-12 Form Work
R.F.T.B&S R.F.T 3d 21-Apr-12 23-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 24-Apr-12 24-Apr-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-May-12 05-May-12 Remove Form Work
Mansonary 22d 14-Apr-12 09-May-12 09-May-12, Mansonary
Ground Floor 2d 14-Apr-12 15-Apr-12 15-Apr-12, Ground Floor
I.G..M.v751 Internal 2d 14-Apr-12 15-Apr-12 Internal
E.G.M.v761 External 2d 14-Apr-12 15-Apr-12 External
First Floor 2d 06-May-12 07-May-12 07-May-12, First Floor
I.F.M.v751 Internal 2d 06-May-12 07-May-12 Internal
E.F.M.v751 External 2d 06-May-12 07-May-12 External
Roof 2d 08-May-12 09-May-12 09-May-12, Roof
E.R.M.v761 External 2d 08-May-12 09-May-12 External
Finishing 24d 16-Apr-12 14-May-12 14-May-12, Finishing
Ground Floor 2d 16-Apr-12 17-Apr-12 17-Apr-12, Ground Floor
Calm Shell 2d 16-Apr-12 17-Apr-12 17-Apr-12, Calm Shell
E.Ch.G.v7 External 2d 16-Apr-12 17-Apr-12 External
External Ele
Electrical 0d
First Floor 2d 08-May-12 09-May-12 09-May-12, First Floor
Calm Shell 2d 08-May-12 09-May-12 09-May-12, Calm Shell
E.ch.st.v76 External 2d 08-May-12 09-May-12 External
External Ele
Electrical 0d
Roof 1d 10-May-12 10-May-12 10-May-12, Roof
Calm Shell 1d 10-May-12 10-May-12 10-May-12, Calm Shell
E.ch.r.v761 External 1d 10-May-12 10-May-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-May-12 14-May-12 14-May-12, Paint Villa 1
Ex Paint750 External Painting 3d 12-May-12 14-May-12 External Painting
Stand alone Villa type
typ 11 239d 01-Nov-11 11-Aug-12 11-Aug-12, Stand alone Villa type 11
A6340 start Villa 0d 01-Nov-11 start Villa
A6350 Finish Villa 0d 11-Aug-12 Finish Villa
Mobilization 1d 03-Nov-11 03-Nov-11 03-Nov-11, Mobilization
M. Sur.v761 Site Surveying 1d 03-Nov-11 03-Nov-11 Site Surveying
Earth Work 174d 12-Nov-11 02-Jun-12 02-Jun-12, Earth Work
Ex.v771 Excavation 2d 12-Nov-11 13-Nov-11 Excavation
B.F.v771 BackFill 2d 31-May-12 02-Jun-12 BackFill
Civil Work 76d 06-May-12 01-Aug-12 01-Aug-12, Civil Work
Foundation 15d 06-May-12 22-May-12 22-May-12, Foundation
Footing 15d 06-May-12 22-May-12 22-May-12, Footing
Plain Concrete
Con 5d 06-May-12 10-May-12 10-May-12, Plain Concrete
F.W.Pc Form Work 2d 06-May-12 07-May-12 Form Work
Pour.Pc Pouring Concrete 1d 08-May-12 08-May-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 10-May-12 10-May-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 12-May-12 22-May-12 22-May-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 12-May-12 15-May-12 Form Work
R.F.T.R R.F.T 2d 16-May-12 17-May-12 R.F.T
Pour.Rc Pouring Concrete 1d 19-May-12 19-May-12 Pouring Concrete
R.Fw.R Remove formwork 1d 21-May-12 21-May-12 Remove formwork
Ins.Rc& Insulting 1d 22-May-12 22-May-12 Insulting
Ground Floor 25d 23-May-12 20-Jun-12 20-Jun-12, Ground Floor
Slab on grade
grad 16d 03-Jun-12 20-Jun-12 20-Jun-12, Slab on grade
FW.SOG. Form Work 4d 03-Jun-12 06-Jun-12 Form Work
R.F.T.SOG R.F.T 3d 07-Jun-12 10-Jun-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jun-12 11-Jun-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 20-Jun-12 20-Jun-12 Remove formwork
Columns 7d 23-May-12 30-May-12 30-May-12, Columns
FW.Col.G Form Work 2d 23-May-12 24-May-12 Form Work
R.F.T.Col. R.F.T 2d 26-May-12 27-May-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-May-12 28-May-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 30-May-12 30-May-12 Remove formwork
First Floor 18d 21-Jun-12 11-Jul-12 11-Jul-12, First Floor
Beams and slab 18d 21-Jun-12 11-Jul-12 11-Jul-12, Beams and slab
FW.B&S.s Form Work 6d 21-Jun-12 27-Jun-12 Form Work
R.F.T.B&S R.F.T 3d 28-Jun-12 01-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 02-Jul-12 02-Jul-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 11-Jul-12 11-Jul-12 Remove formwork
Columns 8d 03-Jul-12 11-Jul-12 11-Jul-12, Columns
FW.Col.st. Form Work 3d 03-Jul-12 05-Jul-12 Form Work
R.F.T.Col. R.F.T 2d 07-Jul-12 08-Jul-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-Jul-12 09-Jul-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 11-Jul-12 11-Jul-12 Remove formwork
Roof 18d 12-Jul-12 01-Aug-12 01-Aug-12, Roof

Actual Work Critical Remaining Work Summary Page 113 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

289
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Beams and slab 18d 12-Jul-12 01-Aug-12 01-Aug-12, Beams and slab
FW.B&S.n Form Work 6d 12-Jul-12 18-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 19-Jul-12 22-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Jul-12 23-Jul-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 01-Aug-12 01-Aug-12 Remove Form Work
Mansonary 22d 12-Jul-12 06-Aug-12 06-Aug-12, Mansonary
Ground Floor 2d 12-Jul-12 14-Jul-12 14-Jul-12, Ground Floor
I.G..M.v761 Internal 2d 12-Jul-12 14-Jul-12 Internal
E.G.M.v771 External 2d 12-Jul-12 14-Jul-12 External
First Floor 2d 02-Aug-12 04-Aug-12 04-Aug-12, First Floor
I.F.M.v761 Internal 2d 02-Aug-12 04-Aug-12 Internal
E.F.M.v761 External 2d 02-Aug-12 04-Aug-12 External
Roof 2d 05-Aug-12 06-Aug-12 06-Aug-12, Roof
E.R.M.v771 External 2d 05-Aug-12 06-Aug-12 External
Finishing 24d 15-Jul-12 11-Aug-12 11-Aug-12, Finishing
Ground Floor 2d 15-Jul-12 16-Jul-12 16-Jul-12, Ground Floor
Calm Shell 2d 15-Jul-12 16-Jul-12 16-Jul-12, Calm Shell
E.Ch.G.v7 External 2d 15-Jul-12 16-Jul-12 External
External Ele
Electrical 0d
First Floor 2d 05-Aug-12 06-Aug-12 06-Aug-12, First Floor
Calm Shell 2d 05-Aug-12 06-Aug-12 06-Aug-12, Calm Shell
E.ch.st.v77 External 2d 05-Aug-12 06-Aug-12 External
External Ele
Electrical 0d
Roof 1d 07-Aug-12 07-Aug-12 07-Aug-12, Roof
Calm Shell 1d 07-Aug-12 07-Aug-12 07-Aug-12, Calm Shell
E.ch.r.v771 External 1d 07-Aug-12 07-Aug-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 08-Aug-12 11-Aug-12 11-Aug-12, Paint Villa 1
Ex Paint760 External Painting 3d 08-Aug-12 11-Aug-12 External Painting
Stand alone Villa typ
type 12 315d 01-Nov-11 14-Nov-12 14-Nov-12, Stand alone Villa type 12
A6320 start Villa 0d 01-Nov-11 start Villa
A6330 Finish Villa 0d 14-Nov-12 Finish Villa
Mobilization 1d 05-Nov-11 05-Nov-11 05-Nov-11, Mobilization
M. Sur.v771 Site Surveying 1d 05-Nov-11 05-Nov-11 Site Surveying
Earth Work 248d 14-Nov-11 02-Sep-12 02-Sep-12, Earth Work
Ex.v781 Excavation 2d 14-Nov-11 15-Nov-11 Excavation
B.F.v781 BackFill 2d 01-Sep-12 02-Sep-12 BackFill
Civil Work 76d 02-Aug-12 05-Nov-12 05-Nov-12, Civil Work
Foundation 15d 02-Aug-12 22-Aug-12 22-Aug-12, Foundation
Footing 15d 02-Aug-12 22-Aug-12 22-Aug-12, Footing
Plain Concrete
Con 5d 02-Aug-12 07-Aug-12 07-Aug-12, Plain Concrete
F.W.Pc Form Work 2d 02-Aug-12 04-Aug-12 Form Work
Pour.Pc Pouring Concrete 1d 05-Aug-12 05-Aug-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 07-Aug-12 07-Aug-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 08-Aug-12 22-Aug-12 22-Aug-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 08-Aug-12 12-Aug-12 Form Work
R.F.T.R R.F.T 2d 13-Aug-12 14-Aug-12 R.F.T
Pour.Rc Pouring Concrete 1d 15-Aug-12 15-Aug-12 Pouring Concrete
R.Fw.R Remove formwork 1d 18-Aug-12 18-Aug-12 Remove formwork
Ins.Rc& Insulting 1d 22-Aug-12 22-Aug-12 Insulting
Ground Floor 25d 23-Aug-12 20-Sep-12 20-Sep-12, Ground Floor
Slab on grade
grad 16d 03-Sep-12 20-Sep-12 20-Sep-12, Slab on grade
FW.SOG. Form Work 4d 03-Sep-12 06-Sep-12 Form Work
R.F.T.SOG R.F.T 3d 08-Sep-12 10-Sep-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Sep-12 11-Sep-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 20-Sep-12 20-Sep-12 Remove formwork
Columns 7d 23-Aug-12 30-Aug-12 30-Aug-12, Columns
FW.Col.G Form Work 2d 23-Aug-12 25-Aug-12 Form Work
R.F.T.Col. R.F.T 2d 26-Aug-12 27-Aug-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-Aug-12 28-Aug-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 30-Aug-12 30-Aug-12 Remove formwork
First Floor 18d 22-Sep-12 11-Oct-12 11-Oct-12, First Floor
Beams and slab 18d 22-Sep-12 11-Oct-12 11-Oct-12, Beams and slab
FW.B&S.s Form Work 6d 22-Sep-12 27-Sep-12 Form Work
R.F.T.B&S R.F.T 3d 29-Sep-12 01-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 02-Oct-12 02-Oct-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 11-Oct-12 11-Oct-12 Remove formwork
Columns 8d 03-Oct-12 11-Oct-12 11-Oct-12, Columns
FW.Col.st. Form Work 3d 03-Oct-12 06-Oct-12 Form Work
R.F.T.Col. R.F.T 2d 07-Oct-12 08-Oct-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-Oct-12 09-Oct-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 11-Oct-12 11-Oct-12 Remove formwork
Roof 18d 13-Oct-12 05-Nov-12 05-Nov-12, Roof
Beams and slab 18d 13-Oct-12 05-Nov-12 05-Nov-12, Beams and slab
FW.B&S.n Form Work 6d 13-Oct-12 18-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 20-Oct-12 22-Oct-12 R.F.T

Actual Work Critical Remaining Work Summary Page 114 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

290
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.B&S. Pouring Concrete 1d 23-Oct-12 23-Oct-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Nov-12 05-Nov-12 Remove Form Work
Mansonary 22d 13-Oct-12 10-Nov-12 10-Nov-12, Mansonary
Ground Floor 2d 13-Oct-12 14-Oct-12 14-Oct-12, Ground Floor
I.G..M.v771 Internal 2d 13-Oct-12 14-Oct-12 Internal
E.G.M.v781 External 2d 13-Oct-12 14-Oct-12 External
First Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, First Floor
I.F.M.v771 Internal 2d 06-Nov-12 07-Nov-12 Internal
E.F.M.v771 External 2d 06-Nov-12 07-Nov-12 External
Roof 2d 08-Nov-12 10-Nov-12 10-Nov-12, Roof
E.R.M.v781 External 2d 08-Nov-12 10-Nov-12 External
Finishing 24d 15-Oct-12 14-Nov-12 14-Nov-12, Finishing
Ground Floor 2d 15-Oct-12 16-Oct-12 16-Oct-12, Ground Floor
Calm Shell 2d 15-Oct-12 16-Oct-12 16-Oct-12, Calm Shell
E.Ch.G.v7 External 2d 15-Oct-12 16-Oct-12 External
External Ele
Electrical 0d
First Floor 2d 08-Nov-12 10-Nov-12 10-Nov-12, First Floor
Calm Shell 2d 08-Nov-12 10-Nov-12 10-Nov-12, Calm Shell
E.ch.st.v78 External 2d 08-Nov-12 10-Nov-12 External
External Ele
Electrical 0d
Roof 1d 11-Nov-12 11-Nov-12 11-Nov-12, Roof
Calm Shell 1d 11-Nov-12 11-Nov-12 11-Nov-12, Calm Shell
E.ch.r.v781 External 1d 11-Nov-12 11-Nov-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-Nov-12 14-Nov-12 14-Nov-12, Paint Villa 1
Ex Paint770 External Painting 3d 12-Nov-12 14-Nov-12 External Painting
Stand alone Villa typ
type 13 87d 01-Nov-11 14-Feb-12 14-Feb-12, Stand alone Villa type 13
A6300 start Villa 0d 01-Nov-11 start Villa
A6310 Finish Villa 0d 14-Feb-12 Finish Villa
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M. Sur.v781 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 26d 02-Nov-11 06-Dec-11 06-Dec-11, Earth Work
Ex.v791 Excavation 2d 02-Nov-11 03-Nov-11 Excavation
B.F.v791 BackFill 2d 05-Dec-11 06-Dec-11 BackFill
Civil Work 76d 05-Nov-11 05-Feb-12 05-Feb-12, Civil Work
Foundation 15d 05-Nov-11 26-Nov-11 26-Nov-11, Foundation
Footing 15d 05-Nov-11 26-Nov-11 26-Nov-11, Footing
Plain Concrete
Con 5d 05-Nov-11 14-Nov-11 14-Nov-11, Plain Concrete
F.W.Pc Form Work 2d 05-Nov-11 10-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 12-Nov-11 12-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 14-Nov-11 14-Nov-11 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 15-Nov-11 26-Nov-11 26-Nov-11, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 15-Nov-11 19-Nov-11 Form Work
R.F.T.R R.F.T 2d 20-Nov-11 21-Nov-11 R.F.T
Pour.Rc Pouring Concrete 1d 22-Nov-11 22-Nov-11 Pouring Concrete
R.Fw.R Remove formwork 1d 24-Nov-11 24-Nov-11 Remove formwork
Ins.Rc& Insulting 1d 26-Nov-11 26-Nov-11 Insulting
Ground Floor 25d 27-Nov-11 25-Dec-11 25-Dec-11, Ground Floor
Slab on grade
grad 16d 07-Dec-11 25-Dec-11 25-Dec-11, Slab on grade
FW.SOG. Form Work 4d 07-Dec-11 11-Dec-11 Form Work
R.F.T.SOG R.F.T 3d 12-Dec-11 14-Dec-11 R.F.T
Pour.SOG Pouring Concrete 1d 15-Dec-11 15-Dec-11 Pouring Concrete
R.FW.SOG Remove formwork 1d 25-Dec-11 25-Dec-11 Remove formwork
Columns 7d 27-Nov-11 04-Dec-11 04-Dec-11, Columns
FW.Col.G Form Work 2d 27-Nov-11 28-Nov-11 Form Work
R.F.T.Col. R.F.T 2d 29-Nov-11 30-Nov-11 R.F.T
Pour.Col.G Pouring Concrete 1d 01-Dec-11 01-Dec-11 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-Dec-11 04-Dec-11 Remove formwork
First Floor 18d 26-Dec-11 15-Jan-12 15-Jan-12, First Floor
Beams and slab 18d 26-Dec-11 15-Jan-12 15-Jan-12, Beams and slab
FW.B&S.s Form Work 6d 26-Dec-11 01-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 02-Jan-12 04-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Jan-12 05-Jan-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Columns 8d 07-Jan-12 15-Jan-12 15-Jan-12, Columns
FW.Col.st. Form Work 3d 07-Jan-12 09-Jan-12 Form Work
R.F.T.Col. R.F.T 2d 10-Jan-12 11-Jan-12 R.F.T
Pour.Col.s Pouring Concrete 1d 12-Jan-12 12-Jan-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Roof 18d 16-Jan-12 05-Feb-12 05-Feb-12, Roof
Beams and slab 18d 16-Jan-12 05-Feb-12 05-Feb-12, Beams and slab
FW.B&S.n Form Work 6d 16-Jan-12 22-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 23-Jan-12 25-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Jan-12 26-Jan-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Feb-12 05-Feb-12 Remove Form Work
Mansonary 22d 16-Jan-12 09-Feb-12 09-Feb-12, Mansonary

Actual Work Critical Remaining Work Summary Page 115 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

291
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ground Floor 2d 16-Jan-12 17-Jan-12 17-Jan-12, Ground Floor
I.G..M.v781 Internal 2d 16-Jan-12 17-Jan-12 Internal
E.G.M.v791 External 2d 16-Jan-12 17-Jan-12 External
First Floor 2d 06-Feb-12 07-Feb-12 07-Feb-12, First Floor
I.F.M.v781 Internal 2d 06-Feb-12 07-Feb-12 Internal
E.F.M.v781 External 2d 06-Feb-12 07-Feb-12 External
Roof 2d 08-Feb-12 09-Feb-12 09-Feb-12, Roof
E.R.M.v791 External 2d 08-Feb-12 09-Feb-12 External
Finishing 24d 18-Jan-12 14-Feb-12 14-Feb-12, Finishing
Ground Floor 2d 18-Jan-12 19-Jan-12 19-Jan-12, Ground Floor
Calm Shell 2d 18-Jan-12 19-Jan-12 19-Jan-12, Calm Shell
E.Ch.G.v7 External 2d 18-Jan-12 19-Jan-12 External
External Ele
Electrical 0d
First Floor 2d 08-Feb-12 09-Feb-12 09-Feb-12, First Floor
Calm Shell 2d 08-Feb-12 09-Feb-12 09-Feb-12, Calm Shell
E.ch.st.v79 External 2d 08-Feb-12 09-Feb-12 External
External Ele
Electrical 0d
Roof 1d 11-Feb-12 11-Feb-12 11-Feb-12, Roof
Calm Shell 1d 11-Feb-12 11-Feb-12 11-Feb-12, Calm Shell
E.ch.r.v791 External 1d 11-Feb-12 11-Feb-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-Feb-12 14-Feb-12 14-Feb-12, Paint Villa 1
Ex Paint780 External Painting 3d 12-Feb-12 14-Feb-12 External Painting
Stand alone Villa typ
type 14 163d 01-Nov-11 14-May-12 14-May-12, Stand alone Villa type 14
A6720 start Villa 0d 01-Nov-11 start Villa
A6730 Finish Villa 0d 14-May-12 Finish Villa
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M. Sur.v791 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 100d 05-Nov-11 04-Mar-12 04-Mar-12, Earth Work
Ex.v801 Excavation 2d 05-Nov-11 10-Nov-11 Excavation
B.F.v801 BackFill 2d 03-Mar-12 04-Mar-12 BackFill
Civil Work 76d 06-Feb-12 05-May-12 05-May-12, Civil Work
Foundation 15d 06-Feb-12 22-Feb-12 22-Feb-12, Foundation
Footing 15d 06-Feb-12 22-Feb-12 22-Feb-12, Footing
Plain Concrete
Con 5d 06-Feb-12 11-Feb-12 11-Feb-12, Plain Concrete
F.W.Pc Form Work 2d 06-Feb-12 07-Feb-12 Form Work
Pour.Pc Pouring Concrete 1d 08-Feb-12 08-Feb-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 11-Feb-12 11-Feb-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 12-Feb-12 22-Feb-12 22-Feb-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 12-Feb-12 15-Feb-12 Form Work
R.F.T.R R.F.T 2d 16-Feb-12 18-Feb-12 R.F.T
Pour.Rc Pouring Concrete 1d 19-Feb-12 19-Feb-12 Pouring Concrete
R.Fw.R Remove formwork 1d 21-Feb-12 21-Feb-12 Remove formwork
Ins.Rc& Insulting 1d 22-Feb-12 22-Feb-12 Insulting
Ground Floor 25d 23-Feb-12 22-Mar-12 22-Mar-12, Ground Floor
Slab on grade
grad 16d 05-Mar-12 22-Mar-12 22-Mar-12, Slab on grade
FW.SOG. Form Work 4d 05-Mar-12 08-Mar-12 Form Work
R.F.T.SOG R.F.T 3d 10-Mar-12 12-Mar-12 R.F.T
Pour.SOG Pouring Concrete 1d 13-Mar-12 13-Mar-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 22-Mar-12 22-Mar-12 Remove formwork
Columns 7d 23-Feb-12 01-Mar-12 01-Mar-12, Columns
FW.Col.G Form Work 2d 23-Feb-12 25-Feb-12 Form Work
R.F.T.Col. R.F.T 2d 26-Feb-12 27-Feb-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-Feb-12 28-Feb-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 01-Mar-12 01-Mar-12 Remove formwork
First Floor 18d 24-Mar-12 12-Apr-12 12-Apr-12, First Floor
Beams and slab 18d 24-Mar-12 12-Apr-12 12-Apr-12, Beams and slab
FW.B&S.s Form Work 6d 24-Mar-12 29-Mar-12 Form Work
R.F.T.B&S R.F.T 3d 31-Mar-12 02-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Apr-12 03-Apr-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 12-Apr-12 12-Apr-12 Remove formwork
Columns 8d 04-Apr-12 12-Apr-12 12-Apr-12, Columns
FW.Col.st. Form Work 3d 04-Apr-12 07-Apr-12 Form Work
R.F.T.Col. R.F.T 2d 08-Apr-12 09-Apr-12 R.F.T
Pour.Col.s Pouring Concrete 1d 10-Apr-12 10-Apr-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 12-Apr-12 12-Apr-12 Remove formwork
Roof 18d 14-Apr-12 05-May-12 05-May-12, Roof
Beams and slab 18d 14-Apr-12 05-May-12 05-May-12, Beams and slab
FW.B&S.n Form Work 6d 14-Apr-12 19-Apr-12 Form Work
R.F.T.B&S R.F.T 3d 21-Apr-12 23-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 24-Apr-12 24-Apr-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-May-12 05-May-12 Remove Form Work
Mansonary 22d 14-Apr-12 09-May-12 09-May-12, Mansonary
Ground Floor 2d 14-Apr-12 15-Apr-12 15-Apr-12, Ground Floor
I.G..M.v791 Internal 2d 14-Apr-12 15-Apr-12 Internal
E.G.M.v801 External 2d 14-Apr-12 15-Apr-12 External

Actual Work Critical Remaining Work Summary Page 116 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

292
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
First Floor 2d 06-May-12 07-May-12 07-May-12, First Floor
I.F.M.v791 Internal 2d 06-May-12 07-May-12 Internal
E.F.M.v791 External 2d 06-May-12 07-May-12 External
Roof 2d 08-May-12 09-May-12 09-May-12, Roof
E.R.M.v801 External 2d 08-May-12 09-May-12 External
Finishing 24d 16-Apr-12 14-May-12 14-May-12, Finishing
Ground Floor 2d 16-Apr-12 17-Apr-12 17-Apr-12, Ground Floor
Calm Shell 2d 16-Apr-12 17-Apr-12 17-Apr-12, Calm Shell
E.Ch.G.v7 External 2d 16-Apr-12 17-Apr-12 External
External Ele
Electrical 0d
First Floor 2d 08-May-12 09-May-12 09-May-12, First Floor
Calm Shell 2d 08-May-12 09-May-12 09-May-12, Calm Shell
E.ch.st.v80 External 2d 08-May-12 09-May-12 External
External Ele
Electrical 0d
Roof 1d 10-May-12 10-May-12 10-May-12, Roof
Calm Shell 1d 10-May-12 10-May-12 10-May-12, Calm Shell
E.ch.r.v801 External 1d 10-May-12 10-May-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-May-12 14-May-12 14-May-12, Paint Villa 1
Ex Paint790 External Painting 3d 12-May-12 14-May-12 External Painting
Stand alone Villa typ
type 15 239d 01-Nov-11 11-Aug-12 11-Aug-12, Stand alone Villa type 15
A6700 start Villa 0d 01-Nov-11 start Villa
A6710 Finish Villa 0d 11-Aug-12 Finish Villa
Mobilization 1d 03-Nov-11 03-Nov-11 03-Nov-11, Mobilization
M. Sur.v801 Site Surveying 1d 03-Nov-11 03-Nov-11 Site Surveying
Earth Work 174d 12-Nov-11 02-Jun-12 02-Jun-12, Earth Work
Ex.v811 Excavation 2d 12-Nov-11 13-Nov-11 Excavation
B.F.v811 BackFill 2d 31-May-12 02-Jun-12 BackFill
Civil Work 76d 06-May-12 01-Aug-12 01-Aug-12, Civil Work
Foundation 15d 06-May-12 22-May-12 22-May-12, Foundation
Footing 15d 06-May-12 22-May-12 22-May-12, Footing
Plain Concrete
Con 5d 06-May-12 10-May-12 10-May-12, Plain Concrete
F.W.Pc Form Work 2d 06-May-12 07-May-12 Form Work
Pour.Pc Pouring Concrete 1d 08-May-12 08-May-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 10-May-12 10-May-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 12-May-12 22-May-12 22-May-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 12-May-12 15-May-12 Form Work
R.F.T.R R.F.T 2d 16-May-12 17-May-12 R.F.T
Pour.Rc Pouring Concrete 1d 19-May-12 19-May-12 Pouring Concrete
R.Fw.R Remove formwork 1d 21-May-12 21-May-12 Remove formwork
Ins.Rc& Insulting 1d 22-May-12 22-May-12 Insulting
Ground Floor 25d 23-May-12 20-Jun-12 20-Jun-12, Ground Floor
Slab on grade
grad 16d 03-Jun-12 20-Jun-12 20-Jun-12, Slab on grade
FW.SOG. Form Work 4d 03-Jun-12 06-Jun-12 Form Work
R.F.T.SOG R.F.T 3d 07-Jun-12 10-Jun-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jun-12 11-Jun-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 20-Jun-12 20-Jun-12 Remove formwork
Columns 7d 23-May-12 30-May-12 30-May-12, Columns
FW.Col.G Form Work 2d 23-May-12 24-May-12 Form Work
R.F.T.Col. R.F.T 2d 26-May-12 27-May-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-May-12 28-May-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 30-May-12 30-May-12 Remove formwork
First Floor 18d 21-Jun-12 11-Jul-12 11-Jul-12, First Floor
Beams and slab 18d 21-Jun-12 11-Jul-12 11-Jul-12, Beams and slab
FW.B&S.s Form Work 6d 21-Jun-12 27-Jun-12 Form Work
R.F.T.B&S R.F.T 3d 28-Jun-12 01-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 02-Jul-12 02-Jul-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 11-Jul-12 11-Jul-12 Remove formwork
Columns 8d 03-Jul-12 11-Jul-12 11-Jul-12, Columns
FW.Col.st. Form Work 3d 03-Jul-12 05-Jul-12 Form Work
R.F.T.Col. R.F.T 2d 07-Jul-12 08-Jul-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-Jul-12 09-Jul-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 11-Jul-12 11-Jul-12 Remove formwork
Roof 18d 12-Jul-12 01-Aug-12 01-Aug-12, Roof
Beams and slab 18d 12-Jul-12 01-Aug-12 01-Aug-12, Beams and slab
FW.B&S.n Form Work 6d 12-Jul-12 18-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 19-Jul-12 22-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Jul-12 23-Jul-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 01-Aug-12 01-Aug-12 Remove Form Work
Mansonary 22d 12-Jul-12 06-Aug-12 06-Aug-12, Mansonary
Ground Floor 2d 12-Jul-12 14-Jul-12 14-Jul-12, Ground Floor
I.G..M.v801 Internal 2d 12-Jul-12 14-Jul-12 Internal
E.G.M.v811 External 2d 12-Jul-12 14-Jul-12 External
First Floor 2d 02-Aug-12 04-Aug-12 04-Aug-12, First Floor
I.F.M.v801 Internal 2d 02-Aug-12 04-Aug-12 Internal
E.F.M.v801 External 2d 02-Aug-12 04-Aug-12 External

Actual Work Critical Remaining Work Summary Page 117 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

293
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Roof 2d 05-Aug-12 06-Aug-12 06-Aug-12, Roof
E.R.M.v811 External 2d 05-Aug-12 06-Aug-12 External
Finishing 24d 15-Jul-12 11-Aug-12 11-Aug-12, Finishing
Ground Floor 2d 15-Jul-12 16-Jul-12 16-Jul-12, Ground Floor
Calm Shell 2d 15-Jul-12 16-Jul-12 16-Jul-12, Calm Shell
E.Ch.G.v8 External 2d 15-Jul-12 16-Jul-12 External
External Ele
Electrical 0d
First Floor 2d 05-Aug-12 06-Aug-12 06-Aug-12, First Floor
Calm Shell 2d 05-Aug-12 06-Aug-12 06-Aug-12, Calm Shell
E.ch.st.v8 External 2d 05-Aug-12 06-Aug-12 External
External Ele
Electrical 0d
Roof 1d 07-Aug-12 07-Aug-12 07-Aug-12, Roof
Calm Shell 1d 07-Aug-12 07-Aug-12 07-Aug-12, Calm Shell
E.ch.r.v811 External 1d 07-Aug-12 07-Aug-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 08-Aug-12 11-Aug-12 11-Aug-12, Paint Villa 1
Ex Paint800 External Painting 3d 08-Aug-12 11-Aug-12 External Painting
Stand alone Villa typ
type 16 315d 01-Nov-11 14-Nov-12 14-Nov-12, Stand alone Villa type 16
A6660 start Villa 0d 01-Nov-11 start Villa
A6670 Finish Villa 0d 14-Nov-12 Finish Villa
Mobilization 1d 05-Nov-11 05-Nov-11 05-Nov-11, Mobilization
M. Sur.v811 Site Surveying 1d 05-Nov-11 05-Nov-11 Site Surveying
Earth Work 248d 14-Nov-11 02-Sep-12 02-Sep-12, Earth Work
Ex.v821 Excavation 2d 14-Nov-11 15-Nov-11 Excavation
B.F.v821 BackFill 2d 01-Sep-12 02-Sep-12 BackFill
Civil Work 76d 02-Aug-12 05-Nov-12 05-Nov-12, Civil Work
Foundation 15d 02-Aug-12 22-Aug-12 22-Aug-12, Foundation
Footing 15d 02-Aug-12 22-Aug-12 22-Aug-12, Footing
Plain Concrete
Con 5d 02-Aug-12 07-Aug-12 07-Aug-12, Plain Concrete
F.W.Pc Form Work 2d 02-Aug-12 04-Aug-12 Form Work
Pour.Pc Pouring Concrete 1d 05-Aug-12 05-Aug-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 07-Aug-12 07-Aug-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 08-Aug-12 22-Aug-12 22-Aug-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 08-Aug-12 12-Aug-12 Form Work
R.F.T.R R.F.T 2d 13-Aug-12 14-Aug-12 R.F.T
Pour.Rc Pouring Concrete 1d 15-Aug-12 15-Aug-12 Pouring Concrete
R.Fw.R Remove formwork 1d 18-Aug-12 18-Aug-12 Remove formwork
Ins.Rc& Insulting 1d 22-Aug-12 22-Aug-12 Insulting
Ground Floor 25d 23-Aug-12 20-Sep-12 20-Sep-12, Ground Floor
Slab on grade
grad 16d 03-Sep-12 20-Sep-12 20-Sep-12, Slab on grade
FW.SOG. Form Work 4d 03-Sep-12 06-Sep-12 Form Work
R.F.T.SOG R.F.T 3d 08-Sep-12 10-Sep-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Sep-12 11-Sep-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 20-Sep-12 20-Sep-12 Remove formwork
Columns 7d 23-Aug-12 30-Aug-12 30-Aug-12, Columns
FW.Col.G Form Work 2d 23-Aug-12 25-Aug-12 Form Work
R.F.T.Col. R.F.T 2d 26-Aug-12 27-Aug-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-Aug-12 28-Aug-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 30-Aug-12 30-Aug-12 Remove formwork
First Floor 18d 22-Sep-12 11-Oct-12 11-Oct-12, First Floor
Beams and slab 18d 22-Sep-12 11-Oct-12 11-Oct-12, Beams and slab
FW.B&S.s Form Work 6d 22-Sep-12 27-Sep-12 Form Work
R.F.T.B&S R.F.T 3d 29-Sep-12 01-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 02-Oct-12 02-Oct-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 11-Oct-12 11-Oct-12 Remove formwork
Columns 8d 03-Oct-12 11-Oct-12 11-Oct-12, Columns
FW.Col.st. Form Work 3d 03-Oct-12 06-Oct-12 Form Work
R.F.T.Col. R.F.T 2d 07-Oct-12 08-Oct-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-Oct-12 09-Oct-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 11-Oct-12 11-Oct-12 Remove formwork
Roof 18d 13-Oct-12 05-Nov-12 05-Nov-12, Roof
Beams and slab 18d 13-Oct-12 05-Nov-12 05-Nov-12, Beams and slab
FW.B&S.n Form Work 6d 13-Oct-12 18-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 20-Oct-12 22-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Oct-12 23-Oct-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Nov-12 05-Nov-12 Remove Form Work
Mansonary 22d 13-Oct-12 10-Nov-12 10-Nov-12, Mansonary
Ground Floor 2d 13-Oct-12 14-Oct-12 14-Oct-12, Ground Floor
I.G..M.v811 Internal 2d 13-Oct-12 14-Oct-12 Internal
E.G.M.v821 External 2d 13-Oct-12 14-Oct-12 External
First Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, First Floor
I.F.M.v811 Internal 2d 06-Nov-12 07-Nov-12 Internal
E.F.M.v811 External 2d 06-Nov-12 07-Nov-12 External
Roof 2d 08-Nov-12 10-Nov-12 10-Nov-12, Roof
E.R.M.v821 External 2d 08-Nov-12 10-Nov-12 External
Finishing 24d 15-Oct-12 14-Nov-12 14-Nov-12, Finishing

Actual Work Critical Remaining Work Summary Page 118 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

294
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ground Floor 2d 15-Oct-12 16-Oct-12 16-Oct-12, Ground Floor
Calm Shell 2d 15-Oct-12 16-Oct-12 16-Oct-12, Calm Shell
E.Ch.G.v8 External 2d 15-Oct-12 16-Oct-12 External
External Ele
Electrical 0d
First Floor 2d 08-Nov-12 10-Nov-12 10-Nov-12, First Floor
Calm Shell 2d 08-Nov-12 10-Nov-12 10-Nov-12, Calm Shell
E.ch.st.v82 External 2d 08-Nov-12 10-Nov-12 External
External Ele
Electrical 0d
Roof 1d 11-Nov-12 11-Nov-12 11-Nov-12, Roof
Calm Shell 1d 11-Nov-12 11-Nov-12 11-Nov-12, Calm Shell
E.ch.r.v821 External 1d 11-Nov-12 11-Nov-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-Nov-12 14-Nov-12 14-Nov-12, Paint Villa 1
Ex Paint810 External Painting 3d 12-Nov-12 14-Nov-12 External Painting
Stand alone Villa typ
type 17 87d 01-Nov-11 14-Feb-12 14-Feb-12, Stand alone Villa type 17
A6760 start Villa 0d 01-Nov-11 start Villa
A6770 Finish Villa 0d 14-Feb-12 Finish Villa
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M. Sur.v821 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 26d 02-Nov-11 06-Dec-11 06-Dec-11, Earth Work
Ex.v831 Excavation 2d 02-Nov-11 03-Nov-11 Excavation
B.F.v831 BackFill 2d 05-Dec-11 06-Dec-11 BackFill
Civil Work 76d 05-Nov-11 05-Feb-12 05-Feb-12, Civil Work
Foundation 15d 05-Nov-11 26-Nov-11 26-Nov-11, Foundation
Footing 15d 05-Nov-11 26-Nov-11 26-Nov-11, Footing
Plain Concrete
Con 5d 05-Nov-11 14-Nov-11 14-Nov-11, Plain Concrete
F.W.Pc Form Work 2d 05-Nov-11 10-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 12-Nov-11 12-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 14-Nov-11 14-Nov-11 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 15-Nov-11 26-Nov-11 26-Nov-11, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 15-Nov-11 19-Nov-11 Form Work
R.F.T.R R.F.T 2d 20-Nov-11 21-Nov-11 R.F.T
Pour.Rc Pouring Concrete 1d 22-Nov-11 22-Nov-11 Pouring Concrete
R.Fw.R Remove formwork 1d 24-Nov-11 24-Nov-11 Remove formwork
Ins.Rc& Insulting 1d 26-Nov-11 26-Nov-11 Insulting
Ground Floor 25d 27-Nov-11 25-Dec-11 25-Dec-11, Ground Floor
Slab on grade
grad 16d 07-Dec-11 25-Dec-11 25-Dec-11, Slab on grade
FW.SOG. Form Work 4d 07-Dec-11 11-Dec-11 Form Work
R.F.T.SOG R.F.T 3d 12-Dec-11 14-Dec-11 R.F.T
Pour.SOG Pouring Concrete 1d 15-Dec-11 15-Dec-11 Pouring Concrete
R.FW.SOG Remove formwork 1d 25-Dec-11 25-Dec-11 Remove formwork
Columns 7d 27-Nov-11 04-Dec-11 04-Dec-11, Columns
FW.Col.G Form Work 2d 27-Nov-11 28-Nov-11 Form Work
R.F.T.Col. R.F.T 2d 29-Nov-11 30-Nov-11 R.F.T
Pour.Col.G Pouring Concrete 1d 01-Dec-11 01-Dec-11 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-Dec-11 04-Dec-11 Remove formwork
First Floor 18d 26-Dec-11 15-Jan-12 15-Jan-12, First Floor
Beams and slab 18d 26-Dec-11 15-Jan-12 15-Jan-12, Beams and slab
FW.B&S.s Form Work 6d 26-Dec-11 01-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 02-Jan-12 04-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Jan-12 05-Jan-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Columns 8d 07-Jan-12 15-Jan-12 15-Jan-12, Columns
FW.Col.st. Form Work 3d 07-Jan-12 09-Jan-12 Form Work
R.F.T.Col. R.F.T 2d 10-Jan-12 11-Jan-12 R.F.T
Pour.Col.s Pouring Concrete 1d 12-Jan-12 12-Jan-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Roof 18d 16-Jan-12 05-Feb-12 05-Feb-12, Roof
Beams and slab 18d 16-Jan-12 05-Feb-12 05-Feb-12, Beams and slab
FW.B&S.n Form Work 6d 16-Jan-12 22-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 23-Jan-12 25-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Jan-12 26-Jan-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Feb-12 05-Feb-12 Remove Form Work
Mansonary 22d 16-Jan-12 09-Feb-12 09-Feb-12, Mansonary
Ground Floor 2d 16-Jan-12 17-Jan-12 17-Jan-12, Ground Floor
I.G..M.v821 Internal 2d 16-Jan-12 17-Jan-12 Internal
E.G.M.v831 External 2d 16-Jan-12 17-Jan-12 External
First Floor 2d 06-Feb-12 07-Feb-12 07-Feb-12, First Floor
I.F.M.v821 Internal 2d 06-Feb-12 07-Feb-12 Internal
E.F.M.v821 External 2d 06-Feb-12 07-Feb-12 External
Roof 2d 08-Feb-12 09-Feb-12 09-Feb-12, Roof
E.R.M.v831 External 2d 08-Feb-12 09-Feb-12 External
Finishing 24d 18-Jan-12 14-Feb-12 14-Feb-12, Finishing
Ground Floor 2d 18-Jan-12 19-Jan-12 19-Jan-12, Ground Floor
Calm Shell 2d 18-Jan-12 19-Jan-12 19-Jan-12, Calm Shell
E.Ch.G.v8 External 2d 18-Jan-12 19-Jan-12 External

Actual Work Critical Remaining Work Summary Page 119 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

295
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
External Ele
Electrical 0d
First Floor 2d 08-Feb-12 09-Feb-12 09-Feb-12, First Floor
Calm Shell 2d 08-Feb-12 09-Feb-12 09-Feb-12, Calm Shell
E.ch.st.v83 External 2d 08-Feb-12 09-Feb-12 External
External Ele
Electrical 0d
Roof 1d 11-Feb-12 11-Feb-12 11-Feb-12, Roof
Calm Shell 1d 11-Feb-12 11-Feb-12 11-Feb-12, Calm Shell
E.ch.r.v831 External 1d 11-Feb-12 11-Feb-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-Feb-12 14-Feb-12 14-Feb-12, Paint Villa 1
Ex Paint820 External Painting 3d 12-Feb-12 14-Feb-12 External Painting
Stand alone Villa typ
type 18 163d 01-Nov-11 14-May-12 14-May-12, Stand alone Villa type 18
A6740 start Villa 0d 01-Nov-11 start Villa
A6750 Finish Villa 0d 14-May-12 Finish Villa
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M. Sur.v831 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 100d 05-Nov-11 04-Mar-12 04-Mar-12, Earth Work
Ex.v841 Excavation 2d 05-Nov-11 10-Nov-11 Excavation
B.F.v841 BackFill 2d 03-Mar-12 04-Mar-12 BackFill
Civil Work 76d 06-Feb-12 05-May-12 05-May-12, Civil Work
Foundation 15d 06-Feb-12 22-Feb-12 22-Feb-12, Foundation
Footing 15d 06-Feb-12 22-Feb-12 22-Feb-12, Footing
Plain Concrete
Con 5d 06-Feb-12 11-Feb-12 11-Feb-12, Plain Concrete
F.W.Pc Form Work 2d 06-Feb-12 07-Feb-12 Form Work
Pour.Pc Pouring Concrete 1d 08-Feb-12 08-Feb-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 11-Feb-12 11-Feb-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 12-Feb-12 22-Feb-12 22-Feb-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 12-Feb-12 15-Feb-12 Form Work
R.F.T.R R.F.T 2d 16-Feb-12 18-Feb-12 R.F.T
Pour.Rc Pouring Concrete 1d 19-Feb-12 19-Feb-12 Pouring Concrete
R.Fw.R Remove formwork 1d 21-Feb-12 21-Feb-12 Remove formwork
Ins.Rc& Insulting 1d 22-Feb-12 22-Feb-12 Insulting
Ground Floor 25d 23-Feb-12 22-Mar-12 22-Mar-12, Ground Floor
Slab on grade
grad 16d 05-Mar-12 22-Mar-12 22-Mar-12, Slab on grade
FW.SOG. Form Work 4d 05-Mar-12 08-Mar-12 Form Work
R.F.T.SOG R.F.T 3d 10-Mar-12 12-Mar-12 R.F.T
Pour.SOG Pouring Concrete 1d 13-Mar-12 13-Mar-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 22-Mar-12 22-Mar-12 Remove formwork
Columns 7d 23-Feb-12 01-Mar-12 01-Mar-12, Columns
FW.Col.G Form Work 2d 23-Feb-12 25-Feb-12 Form Work
R.F.T.Col. R.F.T 2d 26-Feb-12 27-Feb-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-Feb-12 28-Feb-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 01-Mar-12 01-Mar-12 Remove formwork
First Floor 18d 24-Mar-12 12-Apr-12 12-Apr-12, First Floor
Beams and slab 18d 24-Mar-12 12-Apr-12 12-Apr-12, Beams and slab
FW.B&S.s Form Work 6d 24-Mar-12 29-Mar-12 Form Work
R.F.T.B&S R.F.T 3d 31-Mar-12 02-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Apr-12 03-Apr-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 12-Apr-12 12-Apr-12 Remove formwork
Columns 8d 04-Apr-12 12-Apr-12 12-Apr-12, Columns
FW.Col.st. Form Work 3d 04-Apr-12 07-Apr-12 Form Work
R.F.T.Col. R.F.T 2d 08-Apr-12 09-Apr-12 R.F.T
Pour.Col.s Pouring Concrete 1d 10-Apr-12 10-Apr-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 12-Apr-12 12-Apr-12 Remove formwork
Roof 18d 14-Apr-12 05-May-12 05-May-12, Roof
Beams and slab 18d 14-Apr-12 05-May-12 05-May-12, Beams and slab
FW.B&S.n Form Work 6d 14-Apr-12 19-Apr-12 Form Work
R.F.T.B&S R.F.T 3d 21-Apr-12 23-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 24-Apr-12 24-Apr-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-May-12 05-May-12 Remove Form Work
Mansonary 22d 14-Apr-12 09-May-12 09-May-12, Mansonary
Ground Floor 2d 14-Apr-12 15-Apr-12 15-Apr-12, Ground Floor
I.G..M.v831 Internal 2d 14-Apr-12 15-Apr-12 Internal
E.G.M.v841 External 2d 14-Apr-12 15-Apr-12 External
First Floor 2d 06-May-12 07-May-12 07-May-12, First Floor
I.F.M.v831 Internal 2d 06-May-12 07-May-12 Internal
E.F.M.v831 External 2d 06-May-12 07-May-12 External
Roof 2d 08-May-12 09-May-12 09-May-12, Roof
E.R.M.v841 External 2d 08-May-12 09-May-12 External
Finishing 24d 16-Apr-12 14-May-12 14-May-12, Finishing
Ground Floor 2d 16-Apr-12 17-Apr-12 17-Apr-12, Ground Floor
Calm Shell 2d 16-Apr-12 17-Apr-12 17-Apr-12, Calm Shell
E.Ch.G.v8 External 2d 16-Apr-12 17-Apr-12 External
External Ele
Electrical 0d
First Floor 2d 08-May-12 09-May-12 09-May-12, First Floor
Calm Shell 2d 08-May-12 09-May-12 09-May-12, Calm Shell

Actual Work Critical Remaining Work Summary Page 120 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

296
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.ch.st.v84 External 2d 08-May-12 09-May-12 External
External Ele
Electrical 0d
Roof 1d 10-May-12 10-May-12 10-May-12, Roof
Calm Shell 1d 10-May-12 10-May-12 10-May-12, Calm Shell
E.ch.r.v841 External 1d 10-May-12 10-May-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-May-12 14-May-12 14-May-12, Paint Villa 1
Ex Paint830 External Painting 3d 12-May-12 14-May-12 External Painting
Stand alone Villa typ
type 19 239d 01-Nov-11 11-Aug-12 11-Aug-12, Stand alone Villa type 19
A6860 start Villa 0d 01-Nov-11 start Villa
A6870 Finish Villa 0d 11-Aug-12 Finish Villa
Mobilization 1d 03-Nov-11 03-Nov-11 03-Nov-11, Mobilization
M. Sur.v841 Site Surveying 1d 03-Nov-11 03-Nov-11 Site Surveying
Earth Work 174d 12-Nov-11 02-Jun-12 02-Jun-12, Earth Work
Ex.v851 Excavation 2d 12-Nov-11 13-Nov-11 Excavation
B.F.v851 BackFill 2d 31-May-12 02-Jun-12 BackFill
Civil Work 76d 06-May-12 01-Aug-12 01-Aug-12, Civil Work
Foundation 15d 06-May-12 22-May-12 22-May-12, Foundation
Footing 15d 06-May-12 22-May-12 22-May-12, Footing
Plain Concrete
Con 5d 06-May-12 10-May-12 10-May-12, Plain Concrete
F.W.Pc Form Work 2d 06-May-12 07-May-12 Form Work
Pour.Pc Pouring Concrete 1d 08-May-12 08-May-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 10-May-12 10-May-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 12-May-12 22-May-12 22-May-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 12-May-12 15-May-12 Form Work
R.F.T.R R.F.T 2d 16-May-12 17-May-12 R.F.T
Pour.Rc Pouring Concrete 1d 19-May-12 19-May-12 Pouring Concrete
R.Fw.R Remove formwork 1d 21-May-12 21-May-12 Remove formwork
Ins.Rc& Insulting 1d 22-May-12 22-May-12 Insulting
Ground Floor 25d 23-May-12 20-Jun-12 20-Jun-12, Ground Floor
Slab on grade
grad 16d 03-Jun-12 20-Jun-12 20-Jun-12, Slab on grade
FW.SOG. Form Work 4d 03-Jun-12 06-Jun-12 Form Work
R.F.T.SOG R.F.T 3d 07-Jun-12 10-Jun-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Jun-12 11-Jun-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 20-Jun-12 20-Jun-12 Remove formwork
Columns 7d 23-May-12 30-May-12 30-May-12, Columns
FW.Col.G Form Work 2d 23-May-12 24-May-12 Form Work
R.F.T.Col. R.F.T 2d 26-May-12 27-May-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-May-12 28-May-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 30-May-12 30-May-12 Remove formwork
First Floor 18d 21-Jun-12 11-Jul-12 11-Jul-12, First Floor
Beams and slab 18d 21-Jun-12 11-Jul-12 11-Jul-12, Beams and slab
FW.B&S.s Form Work 6d 21-Jun-12 27-Jun-12 Form Work
R.F.T.B&S R.F.T 3d 28-Jun-12 01-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 02-Jul-12 02-Jul-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 11-Jul-12 11-Jul-12 Remove formwork
Columns 8d 03-Jul-12 11-Jul-12 11-Jul-12, Columns
FW.Col.st. Form Work 3d 03-Jul-12 05-Jul-12 Form Work
R.F.T.Col. R.F.T 2d 07-Jul-12 08-Jul-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-Jul-12 09-Jul-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 11-Jul-12 11-Jul-12 Remove formwork
Roof 18d 12-Jul-12 01-Aug-12 01-Aug-12, Roof
Beams and slab 18d 12-Jul-12 01-Aug-12 01-Aug-12, Beams and slab
FW.B&S.n Form Work 6d 12-Jul-12 18-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 19-Jul-12 22-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Jul-12 23-Jul-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 01-Aug-12 01-Aug-12 Remove Form Work
Mansonary 22d 12-Jul-12 06-Aug-12 06-Aug-12, Mansonary
Ground Floor 2d 12-Jul-12 14-Jul-12 14-Jul-12, Ground Floor
I.G..M.v841 Internal 2d 12-Jul-12 14-Jul-12 Internal
E.G.M.v851 External 2d 12-Jul-12 14-Jul-12 External
First Floor 2d 02-Aug-12 04-Aug-12 04-Aug-12, First Floor
I.F.M.v841 Internal 2d 02-Aug-12 04-Aug-12 Internal
E.F.M.v841 External 2d 02-Aug-12 04-Aug-12 External
Roof 2d 05-Aug-12 06-Aug-12 06-Aug-12, Roof
E.R.M.v851 External 2d 05-Aug-12 06-Aug-12 External
Finishing 24d 15-Jul-12 11-Aug-12 11-Aug-12, Finishing
Ground Floor 2d 15-Jul-12 16-Jul-12 16-Jul-12, Ground Floor
Calm Shell 2d 15-Jul-12 16-Jul-12 16-Jul-12, Calm Shell
E.Ch.G.v8 External 2d 15-Jul-12 16-Jul-12 External
External Ele
Electrical 0d
First Floor 2d 05-Aug-12 06-Aug-12 06-Aug-12, First Floor
Calm Shell 2d 05-Aug-12 06-Aug-12 06-Aug-12, Calm Shell
E.ch.st.v85 External 2d 05-Aug-12 06-Aug-12 External
External Ele
Electrical 0d
Roof 1d 07-Aug-12 07-Aug-12 07-Aug-12, Roof

Actual Work Critical Remaining Work Summary Page 121 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

297
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Calm Shell 1d 07-Aug-12 07-Aug-12 07-Aug-12, Calm Shell
E.ch.r.v851 External 1d 07-Aug-12 07-Aug-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 08-Aug-12 11-Aug-12 11-Aug-12, Paint Villa 1
Ex Paint840 External Painting 3d 08-Aug-12 11-Aug-12 External Painting
Stand alone Villa typ
type 20 315d 01-Nov-11 14-Nov-12 14-Nov-12, Stand alone Villa type 20
A6960 start Villa 0d 01-Nov-11 start Villa
A6970 Finish Villa 0d 14-Nov-12 Finish Villa
Mobilization 1d 05-Nov-11 05-Nov-11 05-Nov-11, Mobilization
M. Sur.v851 Site Surveying 1d 05-Nov-11 05-Nov-11 Site Surveying
Earth Work 248d 14-Nov-11 02-Sep-12 02-Sep-12, Earth Work
Ex.v861 Excavation 2d 14-Nov-11 15-Nov-11 Excavation
B.F.v861 BackFill 2d 01-Sep-12 02-Sep-12 BackFill
Civil Work 76d 02-Aug-12 05-Nov-12 05-Nov-12, Civil Work
Foundation 15d 02-Aug-12 22-Aug-12 22-Aug-12, Foundation
Footing 15d 02-Aug-12 22-Aug-12 22-Aug-12, Footing
Plain Concrete
Con 5d 02-Aug-12 07-Aug-12 07-Aug-12, Plain Concrete
F.W.Pc Form Work 2d 02-Aug-12 04-Aug-12 Form Work
Pour.Pc Pouring Concrete 1d 05-Aug-12 05-Aug-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 07-Aug-12 07-Aug-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 08-Aug-12 22-Aug-12 22-Aug-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 08-Aug-12 12-Aug-12 Form Work
R.F.T.R R.F.T 2d 13-Aug-12 14-Aug-12 R.F.T
Pour.Rc Pouring Concrete 1d 15-Aug-12 15-Aug-12 Pouring Concrete
R.Fw.R Remove formwork 1d 18-Aug-12 18-Aug-12 Remove formwork
Ins.Rc& Insulting 1d 22-Aug-12 22-Aug-12 Insulting
Ground Floor 25d 23-Aug-12 20-Sep-12 20-Sep-12, Ground Floor
Slab on grade
grad 16d 03-Sep-12 20-Sep-12 20-Sep-12, Slab on grade
FW.SOG. Form Work 4d 03-Sep-12 06-Sep-12 Form Work
R.F.T.SOG R.F.T 3d 08-Sep-12 10-Sep-12 R.F.T
Pour.SOG Pouring Concrete 1d 11-Sep-12 11-Sep-12 Pouring Concrete
R.FW.SOG Remove formwork 1d 20-Sep-12 20-Sep-12 Remove formwork
Columns 7d 23-Aug-12 30-Aug-12 30-Aug-12, Columns
FW.Col.G Form Work 2d 23-Aug-12 25-Aug-12 Form Work
R.F.T.Col. R.F.T 2d 26-Aug-12 27-Aug-12 R.F.T
Pour.Col.G Pouring Concrete 1d 28-Aug-12 28-Aug-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 30-Aug-12 30-Aug-12 Remove formwork
First Floor 18d 22-Sep-12 11-Oct-12 11-Oct-12, First Floor
Beams and slab 18d 22-Sep-12 11-Oct-12 11-Oct-12, Beams and slab
FW.B&S.s Form Work 6d 22-Sep-12 27-Sep-12 Form Work
R.F.T.B&S R.F.T 3d 29-Sep-12 01-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 02-Oct-12 02-Oct-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 11-Oct-12 11-Oct-12 Remove formwork
Columns 8d 03-Oct-12 11-Oct-12 11-Oct-12, Columns
FW.Col.st. Form Work 3d 03-Oct-12 06-Oct-12 Form Work
R.F.T.Col. R.F.T 2d 07-Oct-12 08-Oct-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-Oct-12 09-Oct-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 11-Oct-12 11-Oct-12 Remove formwork
Roof 18d 13-Oct-12 05-Nov-12 05-Nov-12, Roof
Beams and slab 18d 13-Oct-12 05-Nov-12 05-Nov-12, Beams and slab
FW.B&S.n Form Work 6d 13-Oct-12 18-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 20-Oct-12 22-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Oct-12 23-Oct-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Nov-12 05-Nov-12 Remove Form Work
Mansonary 22d 13-Oct-12 10-Nov-12 10-Nov-12, Mansonary
Ground Floor 2d 13-Oct-12 14-Oct-12 14-Oct-12, Ground Floor
I.G..M.v851 Internal 2d 13-Oct-12 14-Oct-12 Internal
E.G.M.v861 External 2d 13-Oct-12 14-Oct-12 External
First Floor 2d 06-Nov-12 07-Nov-12 07-Nov-12, First Floor
I.F.M.v851 Internal 2d 06-Nov-12 07-Nov-12 Internal
E.F.M.v851 External 2d 06-Nov-12 07-Nov-12 External
Roof 2d 08-Nov-12 10-Nov-12 10-Nov-12, Roof
E.R.M.v861 External 2d 08-Nov-12 10-Nov-12 External
Finishing 24d 15-Oct-12 14-Nov-12 14-Nov-12, Finishing
Ground Floor 2d 15-Oct-12 16-Oct-12 16-Oct-12, Ground Floor
Calm Shell 2d 15-Oct-12 16-Oct-12 16-Oct-12, Calm Shell
E.Ch.G.v8 External 2d 15-Oct-12 16-Oct-12 External
External Ele
Electrical 0d
First Floor 2d 08-Nov-12 10-Nov-12 10-Nov-12, First Floor
Calm Shell 2d 08-Nov-12 10-Nov-12 10-Nov-12, Calm Shell
E.ch.st.v86 External 2d 08-Nov-12 10-Nov-12 External
External Ele
Electrical 0d
Roof 1d 11-Nov-12 11-Nov-12 11-Nov-12, Roof
Calm Shell 1d 11-Nov-12 11-Nov-12 11-Nov-12, Calm Shell
E.ch.r.v861 External 1d 11-Nov-12 11-Nov-12 External
External Ele
Electrical 0d

Actual Work Critical Remaining Work Summary Page 122 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

298
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Paint Villa 1 3d 12-Nov-12 14-Nov-12 14-Nov-12, Paint Villa 1
Ex Paint850 External Painting 3d 12-Nov-12 14-Nov-12 External Painting
Stand alone Villa typ
type 21 87d 01-Nov-11 14-Feb-12 14-Feb-12, Stand alone Villa type 21
A7040 start Villa 0d 01-Nov-11 start Villa
A7050 Finish Villa 0d 14-Feb-12 Finish Villa
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M. Sur.v871 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 26d 02-Nov-11 06-Dec-11 06-Dec-11, Earth Work
Ex.v911 Excavation 2d 02-Nov-11 03-Nov-11 Excavation
B.F.v911 BackFill 2d 05-Dec-11 06-Dec-11 BackFill
Civil Work 76d 05-Nov-11 05-Feb-12 05-Feb-12, Civil Work
Foundation 15d 05-Nov-11 26-Nov-11 26-Nov-11, Foundation
Footing 15d 05-Nov-11 26-Nov-11 26-Nov-11, Footing
Plain Concrete
Con 5d 05-Nov-11 14-Nov-11 14-Nov-11, Plain Concrete
F.W.Pc Form Work 2d 05-Nov-11 10-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 12-Nov-11 12-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 14-Nov-11 14-Nov-11 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 15-Nov-11 26-Nov-11 26-Nov-11, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 15-Nov-11 19-Nov-11 Form Work
R.F.T.R R.F.T 2d 20-Nov-11 21-Nov-11 R.F.T
Pour.Rc Pouring Concrete 1d 22-Nov-11 22-Nov-11 Pouring Concrete
R.Fw.R Remove formwork 1d 24-Nov-11 24-Nov-11 Remove formwork
Ins.Rc& Insulting 1d 26-Nov-11 26-Nov-11 Insulting
Ground Floor 25d 27-Nov-11 25-Dec-11 25-Dec-11, Ground Floor
Slab on grade
grad 16d 07-Dec-11 25-Dec-11 25-Dec-11, Slab on grade
FW.SOG. Form Work 4d 07-Dec-11 11-Dec-11 Form Work
R.F.T.SOG R.F.T 3d 12-Dec-11 14-Dec-11 R.F.T
Pour.SOG Pouring Concrete 1d 15-Dec-11 15-Dec-11 Pouring Concrete
R.FW.SOG Remove formwork 1d 25-Dec-11 25-Dec-11 Remove formwork
Columns 7d 27-Nov-11 04-Dec-11 04-Dec-11, Columns
FW.Col.G Form Work 2d 27-Nov-11 28-Nov-11 Form Work
R.F.T.Col. R.F.T 2d 29-Nov-11 30-Nov-11 R.F.T
Pour.Col.G Pouring Concrete 1d 01-Dec-11 01-Dec-11 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-Dec-11 04-Dec-11 Remove formwork
First Floor 18d 26-Dec-11 15-Jan-12 15-Jan-12, First Floor
Beams and slab 18d 26-Dec-11 15-Jan-12 15-Jan-12, Beams and slab
FW.B&S.s Form Work 6d 26-Dec-11 01-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 02-Jan-12 04-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Jan-12 05-Jan-12 Pouring Concrete
R.FW.B&S Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Columns 8d 07-Jan-12 15-Jan-12 15-Jan-12, Columns
FW.Col.st. Form Work 3d 07-Jan-12 09-Jan-12 Form Work
R.F.T.Col. R.F.T 2d 10-Jan-12 11-Jan-12 R.F.T
Pour.Col.s Pouring Concrete 1d 12-Jan-12 12-Jan-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 15-Jan-12 15-Jan-12 Remove formwork
Roof 18d 16-Jan-12 05-Feb-12 05-Feb-12, Roof
Beams and slab 18d 16-Jan-12 05-Feb-12 05-Feb-12, Beams and slab
FW.B&S.n Form Work 6d 16-Jan-12 22-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 23-Jan-12 25-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Jan-12 26-Jan-12 Pouring Concrete
R.FW.B&S Remove Form Work 1d 05-Feb-12 05-Feb-12 Remove Form Work
Mansonary 22d 16-Jan-12 09-Feb-12 09-Feb-12, Mansonary
Ground Floor 2d 16-Jan-12 17-Jan-12 17-Jan-12, Ground Floor
I.G..M.v871 Internal 2d 16-Jan-12 17-Jan-12 Internal
E.G.M.v911 External 2d 16-Jan-12 17-Jan-12 External
First Floor 2d 06-Feb-12 07-Feb-12 07-Feb-12, First Floor
I.F.M.v871 Internal 2d 06-Feb-12 07-Feb-12 Internal
E.F.M.v871 External 2d 06-Feb-12 07-Feb-12 External
Roof 2d 08-Feb-12 09-Feb-12 09-Feb-12, Roof
E.R.M.v911 External 2d 08-Feb-12 09-Feb-12 External
Finishing 24d 18-Jan-12 14-Feb-12 14-Feb-12, Finishing
Ground Floor 2d 18-Jan-12 19-Jan-12 19-Jan-12, Ground Floor
Calm Shell 2d 18-Jan-12 19-Jan-12 19-Jan-12, Calm Shell
E.Ch.G.v8 External 2d 18-Jan-12 19-Jan-12 External
External Ele
Electrical 0d
First Floor 2d 08-Feb-12 09-Feb-12 09-Feb-12, First Floor
Calm Shell 2d 08-Feb-12 09-Feb-12 09-Feb-12, Calm Shell
E.ch.st.v9 External 2d 08-Feb-12 09-Feb-12 External
External Ele
Electrical 0d
Roof 1d 11-Feb-12 11-Feb-12 11-Feb-12, Roof
Calm Shell 1d 11-Feb-12 11-Feb-12 11-Feb-12, Calm Shell
E.ch.r.v911 External 1d 11-Feb-12 11-Feb-12 External
External Ele
Electrical 0d
Paint Villa 1 3d 12-Feb-12 14-Feb-12 14-Feb-12, Paint Villa 1
Ex Paint870 External Painting 3d 12-Feb-12 14-Feb-12 External Painting
Stand alone Villa typ
type 22 165d 01-Nov-11 16-May-12 16-May-12, Stand alone Villa type 22

Actual Work Critical Remaining Work Summary Page 123 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

299
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
A7160 Start Villa 2 0d 01-Nov-11 Start Villa 2
A7170 Finish Villa 2 0d 16-May-12 Finish Villa 2
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M.Sur. v322 Site surveying 1d 02-Nov-11 02-Nov-11 Site surveying
Earth Work 100d 05-Nov-11 04-Mar-12 04-Mar-12, Earth Work
Ex.v921 Excavation 2d 05-Nov-11 10-Nov-11 Excavation
B.F.v921 BackFill 1d 04-Mar-12 04-Mar-12 BackFill
Civil Work 78d 06-Feb-12 07-May-12 07-May-12, Civil Work
Foundation 15d 06-Feb-12 22-Feb-12 22-Feb-12, Foundation
Footing 15d 06-Feb-12 22-Feb-12 22-Feb-12, Footing
Plain Concrete
Con 6d 06-Feb-12 12-Feb-12 12-Feb-12, Plain Concrete
FW.PC Form Work 3d 06-Feb-12 08-Feb-12 Form Work
Pour.PC Pouring Concrete 1d 09-Feb-12 09-Feb-12 Pouring Concrete
R. FW. Remove Formwork 1d 12-Feb-12 12-Feb-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 13-Feb-12 22-Feb-12 22-Feb-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 13-Feb-12 15-Feb-12 Form Work
R.F.T.R R.F.T 2d 16-Feb-12 18-Feb-12 R.F.T
Pour.RC Pouring Concrete 1d 19-Feb-12 19-Feb-12 Pouring Concrete
R.FW.R Remove Formwork 1d 21-Feb-12 21-Feb-12 Remove Formwork
Ins..RC Insulting 1d 22-Feb-12 22-Feb-12 Insulting
Ground Floor 26d 23-Feb-12 24-Mar-12 24-Mar-12, Ground Floor
Slab on grade
grad 17d 05-Mar-12 24-Mar-12 24-Mar-12, Slab on grade
FW.SOG. Form Work 4d 05-Mar-12 08-Mar-12 Form Work
R.F.T.SOG R.F.T 4d 10-Mar-12 13-Mar-12 R.F.T
Pour.SOG Pouring Concrete 1d 14-Mar-12 14-Mar-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 24-Mar-12 24-Mar-12 Remove Formwork
Columns 8d 23-Feb-12 03-Mar-12 03-Mar-12, Columns
FW.Col.G Form Work 3d 23-Feb-12 26-Feb-12 Form Work
R.F.T.Col. R.F.T 2d 27-Feb-12 28-Feb-12 R.F.T
Pour.Col.G Pouring Concrete 1d 29-Feb-12 29-Feb-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 03-Mar-12 03-Mar-12 Remove Formwork
First Floor 19d 25-Mar-12 15-Apr-12 15-Apr-12, First Floor
Beams and Slabs 18d 25-Mar-12 14-Apr-12 14-Apr-12, Beams and Slabs
FW.B&S.s Form Work 6d 25-Mar-12 31-Mar-12 Form Work
R.F.T.B&S R.F.T 3d 01-Apr-12 03-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Apr-12 04-Apr-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 14-Apr-12 14-Apr-12 Remove Formwork
Columns 9d 05-Apr-12 15-Apr-12 15-Apr-12, Columns
FW.Col.st. Form Work 3d 05-Apr-12 08-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 09-Apr-12 11-Apr-12 R.F.T
Pour.Col.s Pouring Concrete 1d 12-Apr-12 12-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 15-Apr-12 15-Apr-12 Remove Formwork
Roof 18d 16-Apr-12 07-May-12 07-May-12, Roof
Beams and Slabs 18d 16-Apr-12 07-May-12 07-May-12, Beams and Slabs
FW.B&S.R Form Work 6d 16-Apr-12 22-Apr-12 Form Work
R.F.T.B&S R.F.T 3d 23-Apr-12 25-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Apr-12 26-Apr-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 07-May-12 07-May-12 Remove Formwork
Mansonary 22d 15-Apr-12 10-May-12 10-May-12, Mansonary
Ground Floor 2d 15-Apr-12 16-Apr-12 16-Apr-12, Ground Floor
I.G.M.v322 Internal 2d 15-Apr-12 16-Apr-12 Internal
E.G.M.v921 External 2d 15-Apr-12 16-Apr-12 External
First Floor 2d 08-May-12 09-May-12 09-May-12, First Floor
I.st.M.v322 Internal 2d 08-May-12 09-May-12 Internal
E.st.M.v322 External 2d 08-May-12 09-May-12 External
Roof 1d 10-May-12 10-May-12 10-May-12, Roof
E.R.M.v921 External 1d 10-May-12 10-May-12 External
Finishing 25d 17-Apr-12 16-May-12 16-May-12, Finishing
Ground Floor 2d 17-Apr-12 18-Apr-12 18-Apr-12, Ground Floor
Calm Shell 2d 17-Apr-12 18-Apr-12 18-Apr-12, Calm Shell
E.Ch.G320 External 2d 17-Apr-12 18-Apr-12 External
External Ele
Electrical 0d
First Floor 2d 10-May-12 12-May-12 12-May-12, First Floor
Calm Shell 2d 10-May-12 12-May-12 12-May-12, Calm Shell
E.ch.st.v92 External 2d 10-May-12 12-May-12 External
External Ele
Electrical 0d
Roof 1d 13-May-12 13-May-12 13-May-12, Roof
Calm Shell 1d 13-May-12 13-May-12 13-May-12, Calm Shell
E.ch.r.v921 External 1d 13-May-12 13-May-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 14-May-12 16-May-12 16-May-12, Paint Villa 2
Ex Paint.320 External Painting 3d 14-May-12 16-May-12 External Painting
Stand alone Villa typ
type 23 243d 01-Nov-11 15-Aug-12 15-Aug-12, Stand alone Villa type 23
A7240 Start Villa 2 0d 01-Nov-11 Start Villa 2
A7250 Finish Villa 2 0d 15-Aug-12 Finish Villa 2
Mobilization 1d 03-Nov-11 03-Nov-11 03-Nov-11, Mobilization

Actual Work Critical Remaining Work Summary Page 124 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

300
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
M.Sur. v332 Site surveying 1d 03-Nov-11 03-Nov-11 Site surveying
Earth Work 176d 12-Nov-11 04-Jun-12 04-Jun-12, Earth Work
Ex.v931 Excavation 2d 12-Nov-11 13-Nov-11 Excavation
B.F.v931 BackFill 1d 04-Jun-12 04-Jun-12 BackFill
Civil Work 78d 08-May-12 06-Aug-12 06-Aug-12, Civil Work
Foundation 15d 08-May-12 24-May-12 24-May-12, Foundation
Footing 15d 08-May-12 24-May-12 24-May-12, Footing
Plain Concrete
Con 6d 08-May-12 14-May-12 14-May-12, Plain Concrete
FW.PC Form Work 3d 08-May-12 10-May-12 Form Work
Pour.PC Pouring Concrete 1d 12-May-12 12-May-12 Pouring Concrete
R. FW. Remove Formwork 1d 14-May-12 14-May-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 15-May-12 24-May-12 24-May-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 15-May-12 17-May-12 Form Work
R.F.T.R R.F.T 2d 19-May-12 20-May-12 R.F.T
Pour.RC Pouring Concrete 1d 21-May-12 21-May-12 Pouring Concrete
R.FW.R Remove Formwork 1d 23-May-12 23-May-12 Remove Formwork
Ins..RC Insulting 1d 24-May-12 24-May-12 Insulting
Ground Floor 26d 26-May-12 24-Jun-12 24-Jun-12, Ground Floor
Slab on grade
grad 17d 05-Jun-12 24-Jun-12 24-Jun-12, Slab on grade
FW.SOG. Form Work 4d 05-Jun-12 09-Jun-12 Form Work
R.F.T.SOG R.F.T 4d 10-Jun-12 13-Jun-12 R.F.T
Pour.SOG Pouring Concrete 1d 14-Jun-12 14-Jun-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 24-Jun-12 24-Jun-12 Remove Formwork
Columns 8d 26-May-12 03-Jun-12 03-Jun-12, Columns
FW.Col.G Form Work 3d 26-May-12 28-May-12 Form Work
R.F.T.Col. R.F.T 2d 29-May-12 30-May-12 R.F.T
Pour.Col.G Pouring Concrete 1d 31-May-12 31-May-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 03-Jun-12 03-Jun-12 Remove Formwork
First Floor 19d 25-Jun-12 16-Jul-12 16-Jul-12, First Floor
Beams and Slabs 18d 25-Jun-12 15-Jul-12 15-Jul-12, Beams and Slabs
FW.B&S.s Form Work 6d 25-Jun-12 01-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 02-Jul-12 04-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Jul-12 05-Jul-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 15-Jul-12 15-Jul-12 Remove Formwork
Columns 9d 07-Jul-12 16-Jul-12 16-Jul-12, Columns
FW.Col.st. Form Work 3d 07-Jul-12 09-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 10-Jul-12 12-Jul-12 R.F.T
Pour.Col.s Pouring Concrete 1d 14-Jul-12 14-Jul-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 16-Jul-12 16-Jul-12 Remove Formwork
Roof 18d 17-Jul-12 06-Aug-12 06-Aug-12, Roof
Beams and Slabs 18d 17-Jul-12 06-Aug-12 06-Aug-12, Beams and Slabs
FW.B&S.R Form Work 6d 17-Jul-12 23-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 24-Jul-12 26-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 28-Jul-12 28-Jul-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 06-Aug-12 06-Aug-12 Remove Formwork
Mansonary 22d 16-Jul-12 09-Aug-12 09-Aug-12, Mansonary
Ground Floor 2d 16-Jul-12 17-Jul-12 17-Jul-12, Ground Floor
I.G.M.v332 Internal 2d 16-Jul-12 17-Jul-12 Internal
E.G.M.v931 External 2d 16-Jul-12 17-Jul-12 External
First Floor 2d 07-Aug-12 08-Aug-12 08-Aug-12, First Floor
I.st.M.v332 Internal 2d 07-Aug-12 08-Aug-12 Internal
E.st.M.v332 External 2d 07-Aug-12 08-Aug-12 External
Roof 1d 09-Aug-12 09-Aug-12 09-Aug-12, Roof
E.R.M.v931 External 1d 09-Aug-12 09-Aug-12 External
Finishing 25d 18-Jul-12 15-Aug-12 15-Aug-12, Finishing
Ground Floor 2d 18-Jul-12 19-Jul-12 19-Jul-12, Ground Floor
Calm Shell 2d 18-Jul-12 19-Jul-12 19-Jul-12, Calm Shell
E.Ch.G330 External 2d 18-Jul-12 19-Jul-12 External
External Ele
Electrical 0d
First Floor 2d 09-Aug-12 11-Aug-12 11-Aug-12, First Floor
Calm Shell 2d 09-Aug-12 11-Aug-12 11-Aug-12, Calm Shell
E.ch.st.v93 External 2d 09-Aug-12 11-Aug-12 External
External Ele
Electrical 0d
Roof 1d 12-Aug-12 12-Aug-12 12-Aug-12, Roof
Calm Shell 1d 12-Aug-12 12-Aug-12 12-Aug-12, Calm Shell
E.ch.r.v931 External 1d 12-Aug-12 12-Aug-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 13-Aug-12 15-Aug-12 15-Aug-12, Paint Villa 2
Ex Paint.330 External Painting 3d 13-Aug-12 15-Aug-12 External Painting
Stand alone Villa typ
type 24 321d 01-Nov-11 21-Nov-12 21-Nov-12, Stand alone Villa type 24
A7360 Start Villa 2 0d 01-Nov-11 Start Villa 2
A7370 Finish Villa 2 0d 21-Nov-12 Finish Villa 2
Mobilization 1d 05-Nov-11 05-Nov-11 05-Nov-11, Mobilization
M.Sur. v342 Site surveying 1d 05-Nov-11 05-Nov-11 Site surveying
Earth Work 252d 14-Nov-11 06-Sep-12 06-Sep-12, Earth Work
Ex.v941 Excavation 2d 14-Nov-11 15-Nov-11 Excavation

Actual Work Critical Remaining Work Summary Page 125 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

301
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
B.F.v941 BackFill 1d 06-Sep-12 06-Sep-12 BackFill
Civil Work 78d 07-Aug-12 12-Nov-12 12-Nov-12, Civil Work
Foundation 15d 07-Aug-12 27-Aug-12 27-Aug-12, Foundation
Footing 15d 07-Aug-12 27-Aug-12 27-Aug-12, Footing
Plain Concrete
Con 6d 07-Aug-12 13-Aug-12 13-Aug-12, Plain Concrete
FW.PC Form Work 3d 07-Aug-12 09-Aug-12 Form Work
Pour.PC Pouring Concrete 1d 11-Aug-12 11-Aug-12 Pouring Concrete
R. FW. Remove Formwork 1d 13-Aug-12 13-Aug-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 14-Aug-12 27-Aug-12 27-Aug-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 14-Aug-12 16-Aug-12 Form Work
R.F.T.R R.F.T 2d 18-Aug-12 22-Aug-12 R.F.T
Pour.RC Pouring Concrete 1d 23-Aug-12 23-Aug-12 Pouring Concrete
R.FW.R Remove Formwork 1d 26-Aug-12 26-Aug-12 Remove Formwork
Ins..RC Insulting 1d 27-Aug-12 27-Aug-12 Insulting
Ground Floor 26d 28-Aug-12 26-Sep-12 26-Sep-12, Ground Floor
Slab on grade
grad 17d 08-Sep-12 26-Sep-12 26-Sep-12, Slab on grade
FW.SOG. Form Work 4d 08-Sep-12 11-Sep-12 Form Work
R.F.T.SOG R.F.T 4d 12-Sep-12 16-Sep-12 R.F.T
Pour.SOG Pouring Concrete 1d 17-Sep-12 17-Sep-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 26-Sep-12 26-Sep-12 Remove Formwork
Columns 8d 28-Aug-12 05-Sep-12 05-Sep-12, Columns
FW.Col.G Form Work 3d 28-Aug-12 30-Aug-12 Form Work
R.F.T.Col. R.F.T 2d 01-Sep-12 02-Sep-12 R.F.T
Pour.Col.G Pouring Concrete 1d 03-Sep-12 03-Sep-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 05-Sep-12 05-Sep-12 Remove Formwork
First Floor 19d 27-Sep-12 18-Oct-12 18-Oct-12, First Floor
Beams and Slabs 18d 27-Sep-12 17-Oct-12 17-Oct-12, Beams and Slabs
FW.B&S.s Form Work 6d 27-Sep-12 03-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 04-Oct-12 07-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Oct-12 08-Oct-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 17-Oct-12 17-Oct-12 Remove Formwork
Columns 9d 09-Oct-12 18-Oct-12 18-Oct-12, Columns
FW.Col.st. Form Work 3d 09-Oct-12 11-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 13-Oct-12 15-Oct-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Oct-12 16-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 18-Oct-12 18-Oct-12 Remove Formwork
Roof 18d 20-Oct-12 12-Nov-12 12-Nov-12, Roof
Beams and Slabs 18d 20-Oct-12 12-Nov-12 12-Nov-12, Beams and Slabs
FW.B&S.R Form Work 6d 20-Oct-12 25-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 30-Oct-12 01-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Nov-12 03-Nov-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 12-Nov-12 12-Nov-12 Remove Formwork
Mansonary 22d 18-Oct-12 15-Nov-12 15-Nov-12, Mansonary
Ground Floor 2d 18-Oct-12 20-Oct-12 20-Oct-12, Ground Floor
I.G.M.v342 Internal 2d 18-Oct-12 20-Oct-12 Internal
E.G.M.v941 External 2d 18-Oct-12 20-Oct-12 External
First Floor 2d 13-Nov-12 14-Nov-12 14-Nov-12, First Floor
I.st.M.v342 Internal 2d 13-Nov-12 14-Nov-12 Internal
E.st.M.v342 External 2d 13-Nov-12 14-Nov-12 External
Roof 1d 15-Nov-12 15-Nov-12 15-Nov-12, Roof
E.R.M.v941 External 1d 15-Nov-12 15-Nov-12 External
Finishing 25d 21-Oct-12 21-Nov-12 21-Nov-12, Finishing
Ground Floor 2d 21-Oct-12 22-Oct-12 22-Oct-12, Ground Floor
Calm Shell 2d 21-Oct-12 22-Oct-12 22-Oct-12, Calm Shell
E.Ch.G340 External 2d 21-Oct-12 22-Oct-12 External
External Ele
Electrical 0d
First Floor 2d 15-Nov-12 17-Nov-12 17-Nov-12, First Floor
Calm Shell 2d 15-Nov-12 17-Nov-12 17-Nov-12, Calm Shell
E.ch.st.v94 External 2d 15-Nov-12 17-Nov-12 External
External Ele
Electrical 0d
Roof 1d 18-Nov-12 18-Nov-12 18-Nov-12, Roof
Calm Shell 1d 18-Nov-12 18-Nov-12 18-Nov-12, Calm Shell
E.ch.r.v941 External 1d 18-Nov-12 18-Nov-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 19-Nov-12 21-Nov-12 21-Nov-12, Paint Villa 2
Ex Paint.340 External Painting 3d 19-Nov-12 21-Nov-12 External Painting
Stand alone Villa typ
type 25 89d 01-Nov-11 16-Feb-12 16-Feb-12, Stand alone Villa type 25
A6800 Start Villa 2 0d 01-Nov-11 Start Villa 2
A6810 Finish Villa 2 0d 16-Feb-12 Finish Villa 2
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur. v392 Site surveying 1d 01-Nov-11 01-Nov-11 Site surveying
Earth Work 26d 02-Nov-11 06-Dec-11 06-Dec-11, Earth Work
Ex.v991 Excavation 2d 02-Nov-11 03-Nov-11 Excavation
B.F.v991 BackFill 1d 06-Dec-11 06-Dec-11 BackFill
Civil Work 78d 05-Nov-11 07-Feb-12 07-Feb-12, Civil Work
Foundation 15d 05-Nov-11 26-Nov-11 26-Nov-11, Foundation

Actual Work Critical Remaining Work Summary Page 126 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

302
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Footing 15d 05-Nov-11 26-Nov-11 26-Nov-11, Footing
Plain Concrete
Con 6d 05-Nov-11 15-Nov-11 15-Nov-11, Plain Concrete
FW.PC Form Work 3d 05-Nov-11 12-Nov-11 Form Work
Pour.PC Pouring Concrete 1d 13-Nov-11 13-Nov-11 Pouring Concrete
R. FW. Remove Formwork 1d 15-Nov-11 15-Nov-11 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 16-Nov-11 26-Nov-11 26-Nov-11, Reinforced Concrete&Semels
FW.RC Form Work 3d 16-Nov-11 19-Nov-11 Form Work
R.F.T.R R.F.T 2d 20-Nov-11 21-Nov-11 R.F.T
Pour.RC Pouring Concrete 1d 22-Nov-11 22-Nov-11 Pouring Concrete
R.FW.R Remove Formwork 1d 24-Nov-11 24-Nov-11 Remove Formwork
Ins..RC Insulting 1d 26-Nov-11 26-Nov-11 Insulting
Ground Floor 26d 27-Nov-11 26-Dec-11 26-Dec-11, Ground Floor
Slab on grade
grad 17d 07-Dec-11 26-Dec-11 26-Dec-11, Slab on grade
FW.SOG. Form Work 4d 07-Dec-11 11-Dec-11 Form Work
R.F.T.SOG R.F.T 4d 12-Dec-11 15-Dec-11 R.F.T
Pour.SOG Pouring Concrete 1d 17-Dec-11 17-Dec-11 Pouring Concrete
R.FW.SOG Remove Formwork 1d 26-Dec-11 26-Dec-11 Remove Formwork
Columns 8d 27-Nov-11 05-Dec-11 05-Dec-11, Columns
FW.Col.G Form Work 3d 27-Nov-11 29-Nov-11 Form Work
R.F.T.Col. R.F.T 2d 30-Nov-11 01-Dec-11 R.F.T
Pour.Col.G Pouring Concrete 1d 03-Dec-11 03-Dec-11 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 05-Dec-11 05-Dec-11 Remove Formwork
First Floor 19d 27-Dec-11 17-Jan-12 17-Jan-12, First Floor
Beams and Slabs 18d 27-Dec-11 16-Jan-12 16-Jan-12, Beams and Slabs
FW.B&S.s Form Work 6d 27-Dec-11 02-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 03-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 16-Jan-12 16-Jan-12 Remove Formwork
Columns 9d 08-Jan-12 17-Jan-12 17-Jan-12, Columns
FW.Col.st. Form Work 3d 08-Jan-12 10-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 11-Jan-12 14-Jan-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Jan-12 15-Jan-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Jan-12 17-Jan-12 Remove Formwork
Roof 18d 18-Jan-12 07-Feb-12 07-Feb-12, Roof
Beams and Slabs 18d 18-Jan-12 07-Feb-12 07-Feb-12, Beams and Slabs
FW.B&S.R Form Work 6d 18-Jan-12 24-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 25-Jan-12 28-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Jan-12 29-Jan-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 07-Feb-12 07-Feb-12 Remove Formwork
Mansonary 22d 17-Jan-12 11-Feb-12 11-Feb-12, Mansonary
Ground Floor 2d 17-Jan-12 18-Jan-12 18-Jan-12, Ground Floor
I.G.M.v392 Internal 2d 17-Jan-12 18-Jan-12 Internal
E.G.M.v991 External 2d 17-Jan-12 18-Jan-12 External
First Floor 2d 08-Feb-12 09-Feb-12 09-Feb-12, First Floor
I.st.M.v392 Internal 2d 08-Feb-12 09-Feb-12 Internal
E.st.M.v392 External 2d 08-Feb-12 09-Feb-12 External
Roof 1d 11-Feb-12 11-Feb-12 11-Feb-12, Roof
E.R.M.v991 External 1d 11-Feb-12 11-Feb-12 External
Finishing 25d 19-Jan-12 16-Feb-12 16-Feb-12, Finishing
Ground Floor 2d 19-Jan-12 21-Jan-12 21-Jan-12, Ground Floor
Calm Shell 2d 19-Jan-12 21-Jan-12 21-Jan-12, Calm Shell
E.Ch.G390 External 2d 19-Jan-12 21-Jan-12 External
External Ele
Electrical 0d
First Floor 2d 11-Feb-12 12-Feb-12 12-Feb-12, First Floor
Calm Shell 2d 11-Feb-12 12-Feb-12 12-Feb-12, Calm Shell
E.ch.st.v99 External 2d 11-Feb-12 12-Feb-12 External
External Ele
Electrical 0d
Roof 1d 13-Feb-12 13-Feb-12 13-Feb-12, Roof
Calm Shell 1d 13-Feb-12 13-Feb-12 13-Feb-12, Calm Shell
E.ch.r.v991 External 1d 13-Feb-12 13-Feb-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 14-Feb-12 16-Feb-12 16-Feb-12, Paint Villa 2
Ex Paint.390 External Painting 3d 14-Feb-12 16-Feb-12 External Painting
Stand alone Villa typ
type 26 167d 01-Nov-11 19-May-12 19-May-12, Stand alone Villa type 26
A6820 Start Villa 2 0d 01-Nov-11 Start Villa 2
A6830 Finish Villa 2 0d 19-May-12 Finish Villa 2
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M.Sur. v362 Site surveying 1d 02-Nov-11 02-Nov-11 Site surveying
Earth Work 102d 05-Nov-11 06-Mar-12 06-Mar-12, Earth Work
Ex.v961 Excavation 2d 05-Nov-11 10-Nov-11 Excavation
B.F.v961 BackFill 1d 06-Mar-12 06-Mar-12 BackFill
Civil Work 78d 08-Feb-12 09-May-12 09-May-12, Civil Work
Foundation 15d 08-Feb-12 25-Feb-12 25-Feb-12, Foundation
Footing 15d 08-Feb-12 25-Feb-12 25-Feb-12, Footing
Plain Concrete
Con 6d 08-Feb-12 14-Feb-12 14-Feb-12, Plain Concrete
FW.PC Form Work 3d 08-Feb-12 11-Feb-12 Form Work

Actual Work Critical Remaining Work Summary Page 127 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

303
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.PC Pouring Concrete 1d 12-Feb-12 12-Feb-12 Pouring Concrete
R. FW. Remove Formwork 1d 14-Feb-12 14-Feb-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 15-Feb-12 25-Feb-12 25-Feb-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 15-Feb-12 18-Feb-12 Form Work
R.F.T.R R.F.T 2d 19-Feb-12 20-Feb-12 R.F.T
Pour.RC Pouring Concrete 1d 21-Feb-12 21-Feb-12 Pouring Concrete
R.FW.R Remove Formwork 1d 23-Feb-12 23-Feb-12 Remove Formwork
Ins..RC Insulting 1d 25-Feb-12 25-Feb-12 Insulting
Ground Floor 26d 26-Feb-12 26-Mar-12 26-Mar-12, Ground Floor
Slab on grade
grad 17d 07-Mar-12 26-Mar-12 26-Mar-12, Slab on grade
FW.SOG. Form Work 4d 07-Mar-12 11-Mar-12 Form Work
R.F.T.SOG R.F.T 4d 12-Mar-12 15-Mar-12 R.F.T
Pour.SOG Pouring Concrete 1d 17-Mar-12 17-Mar-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 26-Mar-12 26-Mar-12 Remove Formwork
Columns 8d 26-Feb-12 05-Mar-12 05-Mar-12, Columns
FW.Col.G Form Work 3d 26-Feb-12 28-Feb-12 Form Work
R.F.T.Col. R.F.T 2d 29-Feb-12 01-Mar-12 R.F.T
Pour.Col.G Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 05-Mar-12 05-Mar-12 Remove Formwork
First Floor 19d 27-Mar-12 17-Apr-12 17-Apr-12, First Floor
Beams and Slabs 18d 27-Mar-12 16-Apr-12 16-Apr-12, Beams and Slabs
FW.B&S.s Form Work 6d 27-Mar-12 02-Apr-12 Form Work
R.F.T.B&S R.F.T 3d 03-Apr-12 05-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Apr-12 07-Apr-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 16-Apr-12 16-Apr-12 Remove Formwork
Columns 9d 08-Apr-12 17-Apr-12 17-Apr-12, Columns
FW.Col.st. Form Work 3d 08-Apr-12 10-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 11-Apr-12 14-Apr-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Apr-12 15-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Apr-12 17-Apr-12 Remove Formwork
Roof 18d 18-Apr-12 09-May-12 09-May-12, Roof
Beams and Slabs 18d 18-Apr-12 09-May-12 09-May-12, Beams and Slabs
FW.B&S.R Form Work 6d 18-Apr-12 24-Apr-12 Form Work
R.F.T.B&S R.F.T 3d 25-Apr-12 28-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Apr-12 29-Apr-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 09-May-12 09-May-12 Remove Formwork
Mansonary 22d 17-Apr-12 13-May-12 13-May-12, Mansonary
Ground Floor 2d 17-Apr-12 18-Apr-12 18-Apr-12, Ground Floor
I.G.M.v362 Internal 2d 17-Apr-12 18-Apr-12 Internal
E.G.M.v961 External 2d 17-Apr-12 18-Apr-12 External
First Floor 2d 10-May-12 12-May-12 12-May-12, First Floor
I.st.M.v362 Internal 2d 10-May-12 12-May-12 Internal
E.st.M.v362 External 2d 10-May-12 12-May-12 External
Roof 1d 13-May-12 13-May-12 13-May-12, Roof
E.R.M.v961 External 1d 13-May-12 13-May-12 External
Finishing 25d 19-Apr-12 19-May-12 19-May-12, Finishing
Ground Floor 2d 19-Apr-12 21-Apr-12 21-Apr-12, Ground Floor
Calm Shell 2d 19-Apr-12 21-Apr-12 21-Apr-12, Calm Shell
E.Ch.G360 External 2d 19-Apr-12 21-Apr-12 External
External Ele
Electrical 0d
First Floor 2d 13-May-12 14-May-12 14-May-12, First Floor
Calm Shell 2d 13-May-12 14-May-12 14-May-12, Calm Shell
E.ch.st.v96 External 2d 13-May-12 14-May-12 External
External Ele
Electrical 0d
Roof 1d 15-May-12 15-May-12 15-May-12, Roof
Calm Shell 1d 15-May-12 15-May-12 15-May-12, Calm Shell
E.ch.r.v961 External 1d 15-May-12 15-May-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 16-May-12 19-May-12 19-May-12, Paint Villa 2
Ex Paint.360 External Painting 3d 16-May-12 19-May-12 External Painting
Stand alone Villa typ
type 27 245d 01-Nov-11 18-Aug-12 18-Aug-12, Stand alone Villa type 27
A6880 Start Villa 2 0d 01-Nov-11 Start Villa 2
A6890 Finish Villa 2 0d 18-Aug-12 Finish Villa 2
Mobilization 1d 03-Nov-11 03-Nov-11 03-Nov-11, Mobilization
M.Sur. v372 Site surveying 1d 03-Nov-11 03-Nov-11 Site surveying
Earth Work 178d 12-Nov-11 06-Jun-12 06-Jun-12, Earth Work
Ex.v971 Excavation 2d 12-Nov-11 13-Nov-11 Excavation
B.F.v971 BackFill 1d 06-Jun-12 06-Jun-12 BackFill
Civil Work 78d 10-May-12 08-Aug-12 08-Aug-12, Civil Work
Foundation 15d 10-May-12 27-May-12 27-May-12, Foundation
Footing 15d 10-May-12 27-May-12 27-May-12, Footing
Plain Concrete
Con 6d 10-May-12 16-May-12 16-May-12, Plain Concrete
FW.PC Form Work 3d 10-May-12 13-May-12 Form Work
Pour.PC Pouring Concrete 1d 14-May-12 14-May-12 Pouring Concrete
R. FW. Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 17-May-12 27-May-12 27-May-12, Reinforced Concrete&Semels

Actual Work Critical Remaining Work Summary Page 128 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

304
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.RC Form Work 3d 17-May-12 20-May-12 Form Work
R.F.T.R R.F.T 2d 21-May-12 22-May-12 R.F.T
Pour.RC Pouring Concrete 1d 23-May-12 23-May-12 Pouring Concrete
R.FW.R Remove Formwork 1d 26-May-12 26-May-12 Remove Formwork
Ins..RC Insulting 1d 27-May-12 27-May-12 Insulting
Ground Floor 26d 28-May-12 26-Jun-12 26-Jun-12, Ground Floor
Slab on grade
grad 17d 07-Jun-12 26-Jun-12 26-Jun-12, Slab on grade
FW.SOG. Form Work 4d 07-Jun-12 11-Jun-12 Form Work
R.F.T.SOG R.F.T 4d 12-Jun-12 16-Jun-12 R.F.T
Pour.SOG Pouring Concrete 1d 17-Jun-12 17-Jun-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 26-Jun-12 26-Jun-12 Remove Formwork
Columns 8d 28-May-12 05-Jun-12 05-Jun-12, Columns
FW.Col.G Form Work 3d 28-May-12 30-May-12 Form Work
R.F.T.Col. R.F.T 2d 31-May-12 02-Jun-12 R.F.T
Pour.Col.G Pouring Concrete 1d 03-Jun-12 03-Jun-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 05-Jun-12 05-Jun-12 Remove Formwork
First Floor 19d 27-Jun-12 18-Jul-12 18-Jul-12, First Floor
Beams and Slabs 18d 27-Jun-12 17-Jul-12 17-Jul-12, Beams and Slabs
FW.B&S.s Form Work 6d 27-Jun-12 03-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 04-Jul-12 07-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Jul-12 08-Jul-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 17-Jul-12 17-Jul-12 Remove Formwork
Columns 9d 09-Jul-12 18-Jul-12 18-Jul-12, Columns
FW.Col.st. Form Work 3d 09-Jul-12 11-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 12-Jul-12 15-Jul-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Jul-12 16-Jul-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 18-Jul-12 18-Jul-12 Remove Formwork
Roof 18d 19-Jul-12 08-Aug-12 08-Aug-12, Roof
Beams and Slabs 18d 19-Jul-12 08-Aug-12 08-Aug-12, Beams and Slabs
FW.B&S.R Form Work 6d 19-Jul-12 25-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 26-Jul-12 29-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Jul-12 30-Jul-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 08-Aug-12 08-Aug-12 Remove Formwork
Mansonary 22d 18-Jul-12 12-Aug-12 12-Aug-12, Mansonary
Ground Floor 2d 18-Jul-12 19-Jul-12 19-Jul-12, Ground Floor
I.G.M.v372 Internal 2d 18-Jul-12 19-Jul-12 Internal
E.G.M.v971 External 2d 18-Jul-12 19-Jul-12 External
First Floor 2d 09-Aug-12 11-Aug-12 11-Aug-12, First Floor
I.st.M.v372 Internal 2d 09-Aug-12 11-Aug-12 Internal
E.st.M.v372 External 2d 09-Aug-12 11-Aug-12 External
Roof 1d 12-Aug-12 12-Aug-12 12-Aug-12, Roof
E.R.M.v971 External 1d 12-Aug-12 12-Aug-12 External
Finishing 25d 21-Jul-12 18-Aug-12 18-Aug-12, Finishing
Ground Floor 2d 21-Jul-12 22-Jul-12 22-Jul-12, Ground Floor
Calm Shell 2d 21-Jul-12 22-Jul-12 22-Jul-12, Calm Shell
E.Ch.G370 External 2d 21-Jul-12 22-Jul-12 External
External Ele
Electrical 0d
First Floor 2d 12-Aug-12 13-Aug-12 13-Aug-12, First Floor
Calm Shell 2d 12-Aug-12 13-Aug-12 13-Aug-12, Calm Shell
E.ch.st.v97 External 2d 12-Aug-12 13-Aug-12 External
External Ele
Electrical 0d
Roof 1d 14-Aug-12 14-Aug-12 14-Aug-12, Roof
Calm Shell 1d 14-Aug-12 14-Aug-12 14-Aug-12, Calm Shell
E.ch.r.v971 External 1d 14-Aug-12 14-Aug-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 15-Aug-12 18-Aug-12 18-Aug-12, Paint Villa 2
Ex Paint.370 External Painting 3d 15-Aug-12 18-Aug-12 External Painting
Stand alone Villa typ
type 28 323d 01-Nov-11 24-Nov-12 24-Nov-12, Stand alone Villa type 28
A6920 Start Villa 2 0d 01-Nov-11 Start Villa 2
A6930 Finish Villa 2 0d 24-Nov-12 Finish Villa 2
Mobilization 1d 05-Nov-11 05-Nov-11 05-Nov-11, Mobilization
M.Sur. v382 Site surveying 1d 05-Nov-11 05-Nov-11 Site surveying
Earth Work 254d 14-Nov-11 09-Sep-12 09-Sep-12, Earth Work
Ex.v981 Excavation 2d 14-Nov-11 15-Nov-11 Excavation
B.F.v981 BackFill 1d 09-Sep-12 09-Sep-12 BackFill
Civil Work 78d 09-Aug-12 14-Nov-12 14-Nov-12, Civil Work
Foundation 15d 09-Aug-12 29-Aug-12 29-Aug-12, Foundation
Footing 15d 09-Aug-12 29-Aug-12 29-Aug-12, Footing
Plain Concrete
Con 6d 09-Aug-12 15-Aug-12 15-Aug-12, Plain Concrete
FW.PC Form Work 3d 09-Aug-12 12-Aug-12 Form Work
Pour.PC Pouring Concrete 1d 13-Aug-12 13-Aug-12 Pouring Concrete
R. FW. Remove Formwork 1d 15-Aug-12 15-Aug-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 16-Aug-12 29-Aug-12 29-Aug-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 16-Aug-12 22-Aug-12 Form Work
R.F.T.R R.F.T 2d 23-Aug-12 25-Aug-12 R.F.T
Pour.RC Pouring Concrete 1d 26-Aug-12 26-Aug-12 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 129 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

305
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.R Remove Formwork 1d 28-Aug-12 28-Aug-12 Remove Formwork
Ins..RC Insulting 1d 29-Aug-12 29-Aug-12 Insulting
Ground Floor 26d 30-Aug-12 29-Sep-12 29-Sep-12, Ground Floor
Slab on grade
grad 17d 10-Sep-12 29-Sep-12 29-Sep-12, Slab on grade
FW.SOG. Form Work 4d 10-Sep-12 13-Sep-12 Form Work
R.F.T.SOG R.F.T 4d 15-Sep-12 18-Sep-12 R.F.T
Pour.SOG Pouring Concrete 1d 19-Sep-12 19-Sep-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 29-Sep-12 29-Sep-12 Remove Formwork
Columns 8d 30-Aug-12 08-Sep-12 08-Sep-12, Columns
FW.Col.G Form Work 3d 30-Aug-12 02-Sep-12 Form Work
R.F.T.Col. R.F.T 2d 03-Sep-12 04-Sep-12 R.F.T
Pour.Col.G Pouring Concrete 1d 05-Sep-12 05-Sep-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 08-Sep-12 08-Sep-12 Remove Formwork
First Floor 19d 30-Sep-12 21-Oct-12 21-Oct-12, First Floor
Beams and Slabs 18d 30-Sep-12 20-Oct-12 20-Oct-12, Beams and Slabs
FW.B&S.s Form Work 6d 30-Sep-12 06-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 07-Oct-12 09-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 10-Oct-12 10-Oct-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 20-Oct-12 20-Oct-12 Remove Formwork
Columns 9d 11-Oct-12 21-Oct-12 21-Oct-12, Columns
FW.Col.st. Form Work 3d 11-Oct-12 14-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 15-Oct-12 17-Oct-12 R.F.T
Pour.Col.s Pouring Concrete 1d 18-Oct-12 18-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 21-Oct-12 21-Oct-12 Remove Formwork
Roof 18d 22-Oct-12 14-Nov-12 14-Nov-12, Roof
Beams and Slabs 18d 22-Oct-12 14-Nov-12 14-Nov-12, Beams and Slabs
FW.B&S.R Form Work 6d 22-Oct-12 31-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 01-Nov-12 04-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Nov-12 05-Nov-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 14-Nov-12 14-Nov-12 Remove Formwork
Mansonary 22d 21-Oct-12 18-Nov-12 18-Nov-12, Mansonary
Ground Floor 2d 21-Oct-12 22-Oct-12 22-Oct-12, Ground Floor
I.G.M.v382 Internal 2d 21-Oct-12 22-Oct-12 Internal
E.G.M.v981 External 2d 21-Oct-12 22-Oct-12 External
First Floor 2d 15-Nov-12 17-Nov-12 17-Nov-12, First Floor
I.st.M.v382 Internal 2d 15-Nov-12 17-Nov-12 Internal
E.st.M.v382 External 2d 15-Nov-12 17-Nov-12 External
Roof 1d 18-Nov-12 18-Nov-12 18-Nov-12, Roof
E.R.M.v981 External 1d 18-Nov-12 18-Nov-12 External
Finishing 25d 23-Oct-12 24-Nov-12 24-Nov-12, Finishing
Ground Floor 2d 23-Oct-12 24-Oct-12 24-Oct-12, Ground Floor
Calm Shell 2d 23-Oct-12 24-Oct-12 24-Oct-12, Calm Shell
E.Ch.G380 External 2d 23-Oct-12 24-Oct-12 External
External Ele
Electrical 0d
First Floor 2d 18-Nov-12 19-Nov-12 19-Nov-12, First Floor
Calm Shell 2d 18-Nov-12 19-Nov-12 19-Nov-12, Calm Shell
E.ch.st.v98 External 2d 18-Nov-12 19-Nov-12 External
External Ele
Electrical 0d
Roof 1d 20-Nov-12 20-Nov-12 20-Nov-12, Roof
Calm Shell 1d 20-Nov-12 20-Nov-12 20-Nov-12, Calm Shell
E.ch.r.v981 External 1d 20-Nov-12 20-Nov-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 21-Nov-12 24-Nov-12 24-Nov-12, Paint Villa 2
Ex Paint.380 External Painting 3d 21-Nov-12 24-Nov-12 External Painting
Stand alone Villa typ
type 29 89d 01-Nov-11 16-Feb-12 16-Feb-12, Stand alone Villa type 29
A6980 Start Villa 2 0d 01-Nov-11 Start Villa 2
A6990 Finish Villa 2 0d 16-Feb-12 Finish Villa 2
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur. v432 Site surveying 1d 01-Nov-11 01-Nov-11 Site surveying
Earth Work 26d 02-Nov-11 06-Dec-11 06-Dec-11, Earth Work
Ex.v1031 Excavation 2d 02-Nov-11 03-Nov-11 Excavation
B.F.v1031 BackFill 1d 06-Dec-11 06-Dec-11 BackFill
Civil Work 78d 05-Nov-11 07-Feb-12 07-Feb-12, Civil Work
Foundation 15d 05-Nov-11 26-Nov-11 26-Nov-11, Foundation
Footing 15d 05-Nov-11 26-Nov-11 26-Nov-11, Footing
Plain Concrete
Con 6d 05-Nov-11 15-Nov-11 15-Nov-11, Plain Concrete
FW.PC Form Work 3d 05-Nov-11 12-Nov-11 Form Work
Pour.PC Pouring Concrete 1d 13-Nov-11 13-Nov-11 Pouring Concrete
R. FW. Remove Formwork 1d 15-Nov-11 15-Nov-11 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 16-Nov-11 26-Nov-11 26-Nov-11, Reinforced Concrete&Semels
FW.RC Form Work 3d 16-Nov-11 19-Nov-11 Form Work
1031 R.F.T 2d 20-Nov-11 21-Nov-11 R.F.T
Pour.RC Pouring Concrete 1d 22-Nov-11 22-Nov-11 Pouring Concrete
R.FW.R Remove Formwork 1d 24-Nov-11 24-Nov-11 Remove Formwork
Ins..RC Insulting 1d 26-Nov-11 26-Nov-11 Insulting
Ground Floor 26d 27-Nov-11 26-Dec-11 26-Dec-11, Ground Floor

Actual Work Critical Remaining Work Summary Page 130 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

306
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Slab on grade
grad 17d 07-Dec-11 26-Dec-11 26-Dec-11, Slab on grade
FW.SOG. Form Work 4d 07-Dec-11 11-Dec-11 Form Work
R.F.T.SOG R.F.T 4d 12-Dec-11 15-Dec-11 R.F.T
Pour.SOG Pouring Concrete 1d 17-Dec-11 17-Dec-11 Pouring Concrete
R.FW.SOG Remove Formwork 1d 26-Dec-11 26-Dec-11 Remove Formwork
Columns 8d 27-Nov-11 05-Dec-11 05-Dec-11, Columns
FW.Col.G Form Work 3d 27-Nov-11 29-Nov-11 Form Work
R.F.T.Col. R.F.T 2d 30-Nov-11 01-Dec-11 R.F.T
Pour.Col.G Pouring Concrete 1d 03-Dec-11 03-Dec-11 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 05-Dec-11 05-Dec-11 Remove Formwork
First Floor 19d 27-Dec-11 17-Jan-12 17-Jan-12, First Floor
Beams and Slabs 18d 27-Dec-11 16-Jan-12 16-Jan-12, Beams and Slabs
FW.B&S.s Form Work 6d 27-Dec-11 02-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 03-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 16-Jan-12 16-Jan-12 Remove Formwork
Columns 9d 08-Jan-12 17-Jan-12 17-Jan-12, Columns
FW.Col.st. Form Work 3d 08-Jan-12 10-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 11-Jan-12 14-Jan-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Jan-12 15-Jan-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Jan-12 17-Jan-12 Remove Formwork
Roof 18d 18-Jan-12 07-Feb-12 07-Feb-12, Roof
Beams and Slabs 18d 18-Jan-12 07-Feb-12 07-Feb-12, Beams and Slabs
FW.B&S.R Form Work 6d 18-Jan-12 24-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 25-Jan-12 28-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Jan-12 29-Jan-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 07-Feb-12 07-Feb-12 Remove Formwork
Mansonary 22d 17-Jan-12 11-Feb-12 11-Feb-12, Mansonary
Ground Floor 2d 17-Jan-12 18-Jan-12 18-Jan-12, Ground Floor
I.G.M.v432 Internal 2d 17-Jan-12 18-Jan-12 Internal
E.G.M.v1031 External 2d 17-Jan-12 18-Jan-12 External
First Floor 2d 08-Feb-12 09-Feb-12 09-Feb-12, First Floor
I.st.M.v432 Internal 2d 08-Feb-12 09-Feb-12 Internal
E.st.M.v432 External 2d 08-Feb-12 09-Feb-12 External
Roof 1d 11-Feb-12 11-Feb-12 11-Feb-12, Roof
E.R.M.v1031 External 1d 11-Feb-12 11-Feb-12 External
Finishing 25d 19-Jan-12 16-Feb-12 16-Feb-12, Finishing
Ground Floor 2d 19-Jan-12 21-Jan-12 21-Jan-12, Ground Floor
Calm Shell 2d 19-Jan-12 21-Jan-12 21-Jan-12, Calm Shell
E.Ch.G430 External 2d 19-Jan-12 21-Jan-12 External
External Ele
Electrical 0d
First Floor 2d 11-Feb-12 12-Feb-12 12-Feb-12, First Floor
Calm Shell 2d 11-Feb-12 12-Feb-12 12-Feb-12, Calm Shell
E.ch.st.v10 External 2d 11-Feb-12 12-Feb-12 External
External Ele
Electrical 0d
Roof 1d 13-Feb-12 13-Feb-12 13-Feb-12, Roof
Calm Shell 1d 13-Feb-12 13-Feb-12 13-Feb-12, Calm Shell
E.ch.r.v10 External 1d 13-Feb-12 13-Feb-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 14-Feb-12 16-Feb-12 16-Feb-12, Paint Villa 2
Ex Paint.430 External Painting 3d 14-Feb-12 16-Feb-12 External Painting
Stand alone Villa typ
type 30 167d 01-Nov-11 19-May-12 19-May-12, Stand alone Villa type 30
A7000 Start Villa 2 0d 01-Nov-11 Start Villa 2
A7010 Finish Villa 2 0d 19-May-12 Finish Villa 2
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M.Sur. v402 Site surveying 1d 02-Nov-11 02-Nov-11 Site surveying
Earth Work 102d 05-Nov-11 06-Mar-12 06-Mar-12, Earth Work
Ex.v1001 Excavation 2d 05-Nov-11 10-Nov-11 Excavation
B.F.v1001 BackFill 1d 06-Mar-12 06-Mar-12 BackFill
Civil Work 78d 08-Feb-12 09-May-12 09-May-12, Civil Work
Foundation 15d 08-Feb-12 25-Feb-12 25-Feb-12, Foundation
Footing 15d 08-Feb-12 25-Feb-12 25-Feb-12, Footing
Plain Concrete
Con 6d 08-Feb-12 14-Feb-12 14-Feb-12, Plain Concrete
FW.PC Form Work 3d 08-Feb-12 11-Feb-12 Form Work
Pour.PC Pouring Concrete 1d 12-Feb-12 12-Feb-12 Pouring Concrete
R. FW. Remove Formwork 1d 14-Feb-12 14-Feb-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 15-Feb-12 25-Feb-12 25-Feb-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 15-Feb-12 18-Feb-12 Form Work
1001 R.F.T 2d 19-Feb-12 20-Feb-12 R.F.T
Pour.RC Pouring Concrete 1d 21-Feb-12 21-Feb-12 Pouring Concrete
R.FW.R Remove Formwork 1d 23-Feb-12 23-Feb-12 Remove Formwork
Ins..RC Insulting 1d 25-Feb-12 25-Feb-12 Insulting
Ground Floor 26d 26-Feb-12 26-Mar-12 26-Mar-12, Ground Floor
Slab on grade
grad 17d 07-Mar-12 26-Mar-12 26-Mar-12, Slab on grade
FW.SOG. Form Work 4d 07-Mar-12 11-Mar-12 Form Work
R.F.T.SOG R.F.T 4d 12-Mar-12 15-Mar-12 R.F.T

Actual Work Critical Remaining Work Summary Page 131 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

307
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:38

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.SOG Pouring Concrete 1d 17-Mar-12 17-Mar-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 26-Mar-12 26-Mar-12 Remove Formwork
Columns 8d 26-Feb-12 05-Mar-12 05-Mar-12, Columns
FW.Col.G Form Work 3d 26-Feb-12 28-Feb-12 Form Work
R.F.T.Col. R.F.T 2d 29-Feb-12 01-Mar-12 R.F.T
Pour.Col.G Pouring Concrete 1d 03-Mar-12 03-Mar-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 05-Mar-12 05-Mar-12 Remove Formwork
First Floor 19d 27-Mar-12 17-Apr-12 17-Apr-12, First Floor
Beams and Slabs 18d 27-Mar-12 16-Apr-12 16-Apr-12, Beams and Slabs
FW.B&S.s Form Work 6d 27-Mar-12 02-Apr-12 Form Work
R.F.T.B&S R.F.T 3d 03-Apr-12 05-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Apr-12 07-Apr-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 16-Apr-12 16-Apr-12 Remove Formwork
Columns 9d 08-Apr-12 17-Apr-12 17-Apr-12, Columns
FW.Col.st. Form Work 3d 08-Apr-12 10-Apr-12 Form Work
R.F.T.Col. R.F.T 3d 11-Apr-12 14-Apr-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Apr-12 15-Apr-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Apr-12 17-Apr-12 Remove Formwork
Roof 18d 18-Apr-12 09-May-12 09-May-12, Roof
Beams and Slabs 18d 18-Apr-12 09-May-12 09-May-12, Beams and Slabs
FW.B&S.R Form Work 6d 18-Apr-12 24-Apr-12 Form Work
R.F.T.B&S R.F.T 3d 25-Apr-12 28-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Apr-12 29-Apr-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 09-May-12 09-May-12 Remove Formwork
Mansonary 22d 17-Apr-12 13-May-12 13-May-12, Mansonary
Ground Floor 2d 17-Apr-12 18-Apr-12 18-Apr-12, Ground Floor
I.G.M.v402 Internal 2d 17-Apr-12 18-Apr-12 Internal
E.G.M.v1001 External 2d 17-Apr-12 18-Apr-12 External
First Floor 2d 10-May-12 12-May-12 12-May-12, First Floor
I.st.M.v402 Internal 2d 10-May-12 12-May-12 Internal
E.st.M.v402 External 2d 10-May-12 12-May-12 External
Roof 1d 13-May-12 13-May-12 13-May-12, Roof
E.R.M.v1001 External 1d 13-May-12 13-May-12 External
Finishing 25d 19-Apr-12 19-May-12 19-May-12, Finishing
Ground Floor 2d 19-Apr-12 21-Apr-12 21-Apr-12, Ground Floor
Calm Shell 2d 19-Apr-12 21-Apr-12 21-Apr-12, Calm Shell
E.Ch.G400 External 2d 19-Apr-12 21-Apr-12 External
External Ele
Electrical 0d
First Floor 2d 13-May-12 14-May-12 14-May-12, First Floor
Calm Shell 2d 13-May-12 14-May-12 14-May-12, Calm Shell
E.ch.st.v10 External 2d 13-May-12 14-May-12 External
External Ele
Electrical 0d
Roof 1d 15-May-12 15-May-12 15-May-12, Roof
Calm Shell 1d 15-May-12 15-May-12 15-May-12, Calm Shell
E.ch.r.v10 External 1d 15-May-12 15-May-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 16-May-12 19-May-12 19-May-12, Paint Villa 2
Ex Paint.400 External Painting 3d 16-May-12 19-May-12 External Painting
Stand alone Villa typ
type 31 245d 01-Nov-11 18-Aug-12 18-Aug-12, Stand alone Villa type 31
A7060 Start Villa 2 0d 01-Nov-11 Start Villa 2
A7070 Finish Villa 2 0d 18-Aug-12 Finish Villa 2
Mobilization 1d 03-Nov-11 03-Nov-11 03-Nov-11, Mobilization
M.Sur. v412 Site surveying 1d 03-Nov-11 03-Nov-11 Site surveying
Earth Work 178d 12-Nov-11 06-Jun-12 06-Jun-12, Earth Work
Ex.v1011 Excavation 2d 12-Nov-11 13-Nov-11 Excavation
B.F.v1011 BackFill 1d 06-Jun-12 06-Jun-12 BackFill
Civil Work 78d 10-May-12 08-Aug-12 08-Aug-12, Civil Work
Foundation 15d 10-May-12 27-May-12 27-May-12, Foundation
Footing 15d 10-May-12 27-May-12 27-May-12, Footing
Plain Concrete
Con 6d 10-May-12 16-May-12 16-May-12, Plain Concrete
FW.PC Form Work 3d 10-May-12 13-May-12 Form Work
Pour.PC Pouring Concrete 1d 14-May-12 14-May-12 Pouring Concrete
R. FW. Remove Formwork 1d 16-May-12 16-May-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 17-May-12 27-May-12 27-May-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 17-May-12 20-May-12 Form Work
1011 R.F.T 2d 21-May-12 22-May-12 R.F.T
Pour.RC Pouring Concrete 1d 23-May-12 23-May-12 Pouring Concrete
R.FW.R Remove Formwork 1d 26-May-12 26-May-12 Remove Formwork
Ins..RC Insulting 1d 27-May-12 27-May-12 Insulting
Ground Floor 26d 28-May-12 26-Jun-12 26-Jun-12, Ground Floor
Slab on grade
grad 17d 07-Jun-12 26-Jun-12 26-Jun-12, Slab on grade
FW.SOG. Form Work 4d 07-Jun-12 11-Jun-12 Form Work
R.F.T.SOG R.F.T 4d 12-Jun-12 16-Jun-12 R.F.T
Pour.SOG Pouring Concrete 1d 17-Jun-12 17-Jun-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 26-Jun-12 26-Jun-12 Remove Formwork
Columns 8d 28-May-12 05-Jun-12 05-Jun-12, Columns

Actual Work Critical Remaining Work Summary Page 132 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

308
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.Col.G Form Work 3d 28-May-12 30-May-12 Form Work
R.F.T.Col. R.F.T 2d 31-May-12 02-Jun-12 R.F.T
Pour.Col.G Pouring Concrete 1d 03-Jun-12 03-Jun-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 05-Jun-12 05-Jun-12 Remove Formwork
First Floor 19d 27-Jun-12 18-Jul-12 18-Jul-12, First Floor
Beams and Slabs 18d 27-Jun-12 17-Jul-12 17-Jul-12, Beams and Slabs
FW.B&S.s Form Work 6d 27-Jun-12 03-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 04-Jul-12 07-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 08-Jul-12 08-Jul-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 17-Jul-12 17-Jul-12 Remove Formwork
Columns 9d 09-Jul-12 18-Jul-12 18-Jul-12, Columns
FW.Col.st. Form Work 3d 09-Jul-12 11-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 12-Jul-12 15-Jul-12 R.F.T
Pour.Col.s Pouring Concrete 1d 16-Jul-12 16-Jul-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 18-Jul-12 18-Jul-12 Remove Formwork
Roof 18d 19-Jul-12 08-Aug-12 08-Aug-12, Roof
Beams and Slabs 18d 19-Jul-12 08-Aug-12 08-Aug-12, Beams and Slabs
FW.B&S.R Form Work 6d 19-Jul-12 25-Jul-12 Form Work
R.F.T.B&S R.F.T 3d 26-Jul-12 29-Jul-12 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Jul-12 30-Jul-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 08-Aug-12 08-Aug-12 Remove Formwork
Mansonary 22d 18-Jul-12 12-Aug-12 12-Aug-12, Mansonary
Ground Floor 2d 18-Jul-12 19-Jul-12 19-Jul-12, Ground Floor
I.G.M.v412 Internal 2d 18-Jul-12 19-Jul-12 Internal
E.G.M.v1011 External 2d 18-Jul-12 19-Jul-12 External
First Floor 2d 09-Aug-12 11-Aug-12 11-Aug-12, First Floor
I.st.M.v412 Internal 2d 09-Aug-12 11-Aug-12 Internal
E.st.M.v412 External 2d 09-Aug-12 11-Aug-12 External
Roof 1d 12-Aug-12 12-Aug-12 12-Aug-12, Roof
E.R.M.v1011 External 1d 12-Aug-12 12-Aug-12 External
Finishing 25d 21-Jul-12 18-Aug-12 18-Aug-12, Finishing
Ground Floor 2d 21-Jul-12 22-Jul-12 22-Jul-12, Ground Floor
Calm Shell 2d 21-Jul-12 22-Jul-12 22-Jul-12, Calm Shell
E.Ch.G410 External 2d 21-Jul-12 22-Jul-12 External
External Ele
Electrical 0d
First Floor 2d 12-Aug-12 13-Aug-12 13-Aug-12, First Floor
Calm Shell 2d 12-Aug-12 13-Aug-12 13-Aug-12, Calm Shell
E.ch.st.v10 External 2d 12-Aug-12 13-Aug-12 External
External Ele
Electrical 0d
Roof 1d 14-Aug-12 14-Aug-12 14-Aug-12, Roof
Calm Shell 1d 14-Aug-12 14-Aug-12 14-Aug-12, Calm Shell
E.ch.r.v10 External 1d 14-Aug-12 14-Aug-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 15-Aug-12 18-Aug-12 18-Aug-12, Paint Villa 2
Ex Paint.410 External Painting 3d 15-Aug-12 18-Aug-12 External Painting
Stand alone Villa typ
type 32 323d 01-Nov-11 24-Nov-12 24-Nov-12, Stand alone Villa type 32
A7080 Start Villa 2 0d 01-Nov-11 Start Villa 2
A7090 Finish Villa 2 0d 24-Nov-12 Finish Villa 2
Mobilization 1d 05-Nov-11 05-Nov-11 05-Nov-11, Mobilization
M.Sur. v422 Site surveying 1d 05-Nov-11 05-Nov-11 Site surveying
Earth Work 254d 14-Nov-11 09-Sep-12 09-Sep-12, Earth Work
Ex.v1021 Excavation 2d 14-Nov-11 15-Nov-11 Excavation
B.F.v1021 BackFill 1d 09-Sep-12 09-Sep-12 BackFill
Civil Work 78d 09-Aug-12 14-Nov-12 14-Nov-12, Civil Work
Foundation 15d 09-Aug-12 29-Aug-12 29-Aug-12, Foundation
Footing 15d 09-Aug-12 29-Aug-12 29-Aug-12, Footing
Plain Concrete
Con 6d 09-Aug-12 15-Aug-12 15-Aug-12, Plain Concrete
FW.PC Form Work 3d 09-Aug-12 12-Aug-12 Form Work
Pour.PC Pouring Concrete 1d 13-Aug-12 13-Aug-12 Pouring Concrete
R. FW. Remove Formwork 1d 15-Aug-12 15-Aug-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 16-Aug-12 29-Aug-12 29-Aug-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 16-Aug-12 22-Aug-12 Form Work
1021 R.F.T 2d 23-Aug-12 25-Aug-12 R.F.T
Pour.RC Pouring Concrete 1d 26-Aug-12 26-Aug-12 Pouring Concrete
R.FW.R Remove Formwork 1d 28-Aug-12 28-Aug-12 Remove Formwork
Ins..RC Insulting 1d 29-Aug-12 29-Aug-12 Insulting
Ground Floor 26d 30-Aug-12 29-Sep-12 29-Sep-12, Ground Floor
Slab on grade
grad 17d 10-Sep-12 29-Sep-12 29-Sep-12, Slab on grade
FW.SOG. Form Work 4d 10-Sep-12 13-Sep-12 Form Work
R.F.T.SOG R.F.T 4d 15-Sep-12 18-Sep-12 R.F.T
Pour.SOG Pouring Concrete 1d 19-Sep-12 19-Sep-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 29-Sep-12 29-Sep-12 Remove Formwork
Columns 8d 30-Aug-12 08-Sep-12 08-Sep-12, Columns
FW.Col.G Form Work 3d 30-Aug-12 02-Sep-12 Form Work
R.F.T.Col. R.F.T 2d 03-Sep-12 04-Sep-12 R.F.T
Pour.Col.G Pouring Concrete 1d 05-Sep-12 05-Sep-12 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 133 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

309
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ins.Col.G. Remove Formwork 1d 08-Sep-12 08-Sep-12 Remove Formwork
First Floor 19d 30-Sep-12 21-Oct-12 21-Oct-12, First Floor
Beams and Slabs 18d 30-Sep-12 20-Oct-12 20-Oct-12, Beams and Slabs
FW.B&S.s Form Work 6d 30-Sep-12 06-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 07-Oct-12 09-Oct-12 R.F.T
Pour.B&S. Pouring Concrete 1d 10-Oct-12 10-Oct-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 20-Oct-12 20-Oct-12 Remove Formwork
Columns 9d 11-Oct-12 21-Oct-12 21-Oct-12, Columns
FW.Col.st. Form Work 3d 11-Oct-12 14-Oct-12 Form Work
R.F.T.Col. R.F.T 3d 15-Oct-12 17-Oct-12 R.F.T
Pour.Col.s Pouring Concrete 1d 18-Oct-12 18-Oct-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 21-Oct-12 21-Oct-12 Remove Formwork
Roof 18d 22-Oct-12 14-Nov-12 14-Nov-12, Roof
Beams and Slabs 18d 22-Oct-12 14-Nov-12 14-Nov-12, Beams and Slabs
FW.B&S.R Form Work 6d 22-Oct-12 31-Oct-12 Form Work
R.F.T.B&S R.F.T 3d 01-Nov-12 04-Nov-12 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Nov-12 05-Nov-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 14-Nov-12 14-Nov-12 Remove Formwork
Mansonary 22d 21-Oct-12 18-Nov-12 18-Nov-12, Mansonary
Ground Floor 2d 21-Oct-12 22-Oct-12 22-Oct-12, Ground Floor
I.G.M.v422 Internal 2d 21-Oct-12 22-Oct-12 Internal
E.G.M.v1021 External 2d 21-Oct-12 22-Oct-12 External
First Floor 2d 15-Nov-12 17-Nov-12 17-Nov-12, First Floor
I.st.M.v422 Internal 2d 15-Nov-12 17-Nov-12 Internal
E.st.M.v422 External 2d 15-Nov-12 17-Nov-12 External
Roof 1d 18-Nov-12 18-Nov-12 18-Nov-12, Roof
E.R.M.v1021 External 1d 18-Nov-12 18-Nov-12 External
Finishing 25d 23-Oct-12 24-Nov-12 24-Nov-12, Finishing
Ground Floor 2d 23-Oct-12 24-Oct-12 24-Oct-12, Ground Floor
Calm Shell 2d 23-Oct-12 24-Oct-12 24-Oct-12, Calm Shell
E.Ch.G420 External 2d 23-Oct-12 24-Oct-12 External
External Ele
Electrical 0d
First Floor 2d 18-Nov-12 19-Nov-12 19-Nov-12, First Floor
Calm Shell 2d 18-Nov-12 19-Nov-12 19-Nov-12, Calm Shell
E.ch.st.v10 External 2d 18-Nov-12 19-Nov-12 External
External Ele
Electrical 0d
Roof 1d 20-Nov-12 20-Nov-12 20-Nov-12, Roof
Calm Shell 1d 20-Nov-12 20-Nov-12 20-Nov-12, Calm Shell
E.ch.r.v10 External 1d 20-Nov-12 20-Nov-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 21-Nov-12 24-Nov-12 24-Nov-12, Paint Villa 2
Ex Paint.420 External Painting 3d 21-Nov-12 24-Nov-12 External Painting
Stand alone Villa typ
type 33 89d 01-Nov-11 16-Feb-12 16-Feb-12, Stand alone Villa type 33
A7140 Start Villa 2 0d 01-Nov-11 Start Villa 2
A7150 Finish Villa 2 0d 16-Feb-12 Finish Villa 2
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.Sur. v452 Site surveying 1d 01-Nov-11 01-Nov-11 Site surveying
Earth Work 26d 02-Nov-11 06-Dec-11 06-Dec-11, Earth Work
Ex.v1051 Excavation 2d 02-Nov-11 03-Nov-11 Excavation
B.F.v1051 BackFill 1d 06-Dec-11 06-Dec-11 BackFill
Civil Work 78d 05-Nov-11 07-Feb-12 07-Feb-12, Civil Work
Foundation 15d 05-Nov-11 26-Nov-11 26-Nov-11, Foundation
Footing 15d 05-Nov-11 26-Nov-11 26-Nov-11, Footing
Plain Concrete
Con 6d 05-Nov-11 15-Nov-11 15-Nov-11, Plain Concrete
FW.PC Form Work 3d 05-Nov-11 12-Nov-11 Form Work
Pour.PC Pouring Concrete 1d 13-Nov-11 13-Nov-11 Pouring Concrete
R. FW. Remove Formwork 1d 15-Nov-11 15-Nov-11 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 16-Nov-11 26-Nov-11 26-Nov-11, Reinforced Concrete&Semels
FW.RC Form Work 3d 16-Nov-11 19-Nov-11 Form Work
1051 R.F.T 2d 20-Nov-11 21-Nov-11 R.F.T
Pour.RC Pouring Concrete 1d 22-Nov-11 22-Nov-11 Pouring Concrete
R.FW.R Remove Formwork 1d 24-Nov-11 24-Nov-11 Remove Formwork
Ins..RC Insulting 1d 26-Nov-11 26-Nov-11 Insulting
Ground Floor 26d 27-Nov-11 26-Dec-11 26-Dec-11, Ground Floor
Slab on grade
grad 17d 07-Dec-11 26-Dec-11 26-Dec-11, Slab on grade
FW.SOG. Form Work 4d 07-Dec-11 11-Dec-11 Form Work
R.F.T.SOG R.F.T 4d 12-Dec-11 15-Dec-11 R.F.T
Pour.SOG Pouring Concrete 1d 17-Dec-11 17-Dec-11 Pouring Concrete
R.FW.SOG Remove Formwork 1d 26-Dec-11 26-Dec-11 Remove Formwork
Columns 8d 27-Nov-11 05-Dec-11 05-Dec-11, Columns
FW.Col.G Form Work 3d 27-Nov-11 29-Nov-11 Form Work
R.F.T.Col. R.F.T 2d 30-Nov-11 01-Dec-11 R.F.T
Pour.Col.G Pouring Concrete 1d 03-Dec-11 03-Dec-11 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 05-Dec-11 05-Dec-11 Remove Formwork
First Floor 19d 27-Dec-11 17-Jan-12 17-Jan-12, First Floor
Beams and Slabs 18d 27-Dec-11 16-Jan-12 16-Jan-12, Beams and Slabs

Actual Work Critical Remaining Work Summary Page 134 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

310
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.B&S.s Form Work 6d 27-Dec-11 02-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 03-Jan-12 05-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Jan-12 07-Jan-12 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 16-Jan-12 16-Jan-12 Remove Formwork
Columns 9d 08-Jan-12 17-Jan-12 17-Jan-12, Columns
FW.Col.st. Form Work 3d 08-Jan-12 10-Jan-12 Form Work
R.F.T.Col. R.F.T 3d 11-Jan-12 14-Jan-12 R.F.T
Pour.Col.s Pouring Concrete 1d 15-Jan-12 15-Jan-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 17-Jan-12 17-Jan-12 Remove Formwork
Roof 18d 18-Jan-12 07-Feb-12 07-Feb-12, Roof
Beams and Slabs 18d 18-Jan-12 07-Feb-12 07-Feb-12, Beams and Slabs
FW.B&S.R Form Work 6d 18-Jan-12 24-Jan-12 Form Work
R.F.T.B&S R.F.T 3d 25-Jan-12 28-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Jan-12 29-Jan-12 Pouring Concrete
R. FW.B& Remove Formwork 1d 07-Feb-12 07-Feb-12 Remove Formwork
Mansonary 22d 17-Jan-12 11-Feb-12 11-Feb-12, Mansonary
Ground Floor 2d 17-Jan-12 18-Jan-12 18-Jan-12, Ground Floor
I.G.M.v452 Internal 2d 17-Jan-12 18-Jan-12 Internal
E.G.M.v1051 External 2d 17-Jan-12 18-Jan-12 External
First Floor 2d 08-Feb-12 09-Feb-12 09-Feb-12, First Floor
I.st.M.v452 Internal 2d 08-Feb-12 09-Feb-12 Internal
E.st.M.v452 External 2d 08-Feb-12 09-Feb-12 External
Roof 1d 11-Feb-12 11-Feb-12 11-Feb-12, Roof
E.R.M.v1051 External 1d 11-Feb-12 11-Feb-12 External
Finishing 25d 19-Jan-12 16-Feb-12 16-Feb-12, Finishing
Ground Floor 2d 19-Jan-12 21-Jan-12 21-Jan-12, Ground Floor
Calm Shell 2d 19-Jan-12 21-Jan-12 21-Jan-12, Calm Shell
E.Ch.G450 External 2d 19-Jan-12 21-Jan-12 External
External Ele
Electrical 0d
First Floor 2d 11-Feb-12 12-Feb-12 12-Feb-12, First Floor
Calm Shell 2d 11-Feb-12 12-Feb-12 12-Feb-12, Calm Shell
E.ch.st.v10 External 2d 11-Feb-12 12-Feb-12 External
External Ele
Electrical 0d
Roof 1d 13-Feb-12 13-Feb-12 13-Feb-12, Roof
Calm Shell 1d 13-Feb-12 13-Feb-12 13-Feb-12, Calm Shell
E.ch.r.v10 External 1d 13-Feb-12 13-Feb-12 External
External Ele
Electrical 0d
Paint Villa 2 3d 14-Feb-12 16-Feb-12 16-Feb-12, Paint Villa 2
Ex Paint.450 External Painting 3d 14-Feb-12 16-Feb-12 External Painting
Twin House 1 200d 01-Nov-11 26-Jun-12 26-Jun-12, Twin House 1
A7180 Start of twin 0d 01-Nov-11 Start of twin
A7190 Finish of twin 0d 26-Jun-12 Finish of twin
Mobilization 1d 02-Nov-11 02-Nov-11 02-Nov-11, Mobilization
M.sur.tw110 Site Surveying 1d 02-Nov-11 02-Nov-11 Site Surveying
Earth Work 115d 05-Nov-11 21-Mar-12 21-Mar-12, Earth Work
Ex.tw110 Excavation 3d 05-Nov-11 12-Nov-11 Excavation
B.F.tw110 BackFill 3d 19-Mar-12 21-Mar-12 BackFill
Civil Work 100d 08-Feb-12 04-Jun-12 04-Jun-12, Civil Work
Foundation 25d 08-Feb-12 07-Mar-12 07-Mar-12, Foundation
Footing 25d 08-Feb-12 07-Mar-12 07-Mar-12, Footing
Plain Concrete
Con 8d 08-Feb-12 16-Feb-12 16-Feb-12, Plain Concrete
F.W.Pc Form Work 5d 08-Feb-12 13-Feb-12 Form Work
Pour.Pc Pouring Concrete 1d 14-Feb-12 14-Feb-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 16-Feb-12 16-Feb-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 17d 18-Feb-12 07-Mar-12 07-Mar-12, Reinforced Concrete&Semels
FW.RC Form Work 5d 18-Feb-12 22-Feb-12 Form Work
110 R.F.T 5d 23-Feb-12 28-Feb-12 R.F.T
Pour.RC Pouring Concrete 1d 29-Feb-12 29-Feb-12 Pouring Concrete
R.FW.R Remove Formwork 1d 03-Mar-12 03-Mar-12 Remove Formwork
Ins.RC& Insulting 4d 04-Mar-12 07-Mar-12 Insulting
Ground Floor 34d 08-Mar-12 16-Apr-12 16-Apr-12, Ground Floor
Slab on grade
grad 22d 22-Mar-12 16-Apr-12 16-Apr-12, Slab on grade
FW.SOG. Form Work 6d 22-Mar-12 28-Mar-12 Form Work
R.F.T.SOG R.F.T 7d 29-Mar-12 05-Apr-12 R.F.T
Pour.SOG Pouring Concrete 1d 07-Apr-12 07-Apr-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 16-Apr-12 16-Apr-12 Remove Formwork
Columns 9d 08-Mar-12 18-Mar-12 18-Mar-12, Columns
FW.Col.G Form Work 3d 08-Mar-12 11-Mar-12 Form Work
R.F.T.Col. R.F.T 3d 12-Mar-12 14-Mar-12 R.F.T
Pour.Col.G Pouring Concrete 1d 15-Mar-12 15-Mar-12 Pouring Concrete
R.FW..Co Remove Formwork 1d 18-Mar-12 18-Mar-12 Remove Formwork
First Floor 21d 17-Apr-12 12-May-12 12-May-12, First Floor
Beams and Slabs 20d 17-Apr-12 10-May-12 10-May-12, Beams and Slabs
FW.B&S.s Form Work 5d 17-Apr-12 22-Apr-12 Form Work
R.F.T.B&S R.F.T 6d 23-Apr-12 29-Apr-12 R.F.T
Pour.B&S. Pouring Concrete 1d 30-Apr-12 30-Apr-12 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 135 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

311
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.B&S Remove Formwork 1d 10-May-12 10-May-12 Remove Formwork
Columns 9d 02-May-12 12-May-12 12-May-12, Columns
FW.Col.st. Form Work 3d 02-May-12 05-May-12 Form Work
R.F.T.Col. R.F.T 3d 06-May-12 08-May-12 R.F.T
Pour.Col.s Pouring Concrete 1d 09-May-12 09-May-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 12-May-12 12-May-12 Remove Formwork
Roof 20d 13-May-12 04-Jun-12 04-Jun-12, Roof
Beams and Slabs 20d 13-May-12 04-Jun-12 04-Jun-12, Beams and Slabs
FW.B&S.R Form Work 5d 13-May-12 17-May-12 Form Work
R.F.T.B&S R.F.T 6d 19-May-12 24-May-12 R.F.T
Pour.B&S. Pouring Concrete 1d 26-May-12 26-May-12 Pouring Concrete
R.Fw.B&S Remove Formwork 1d 04-Jun-12 04-Jun-12 Remove Formwork
Mansonary 32d 12-May-12 17-Jun-12 17-Jun-12, Mansonary
Ground Floor 9d 12-May-12 21-May-12 21-May-12, Ground Floor
I.G.M.tw110 Internal 9d 12-May-12 21-May-12 Internal
E.G.M. tw110 External 3d 12-May-12 14-May-12 External
First Floor 9d 05-Jun-12 14-Jun-12 14-Jun-12, First Floor
I .st .M tw110 Internal 9d 05-Jun-12 14-Jun-12 Internal
E.st.M tw110 External 3d 05-Jun-12 07-Jun-12 External
Roof 2d 16-Jun-12 17-Jun-12 17-Jun-12, Roof
E. R. M tw110 External 2d 16-Jun-12 17-Jun-12 External
Finishing 37d 15-May-12 26-Jun-12 26-Jun-12, Finishing
Ground Floor 2d 15-May-12 16-May-12 16-May-12, Ground Floor
Calm Shell 2d 15-May-12 16-May-12 16-May-12, Calm Shell
E.Ch.G tw External 2d 15-May-12 16-May-12 External
External Ele
Electrical 0d
First Floor 2d 09-Jun-12 10-Jun-12 10-Jun-12, First Floor
Calm Shell 2d 09-Jun-12 10-Jun-12 10-Jun-12, Calm Shell
E.Ch .st.tw External 2d 09-Jun-12 10-Jun-12 External
External Ele
Electrical 0d
Roof 1d 18-Jun-12 18-Jun-12 18-Jun-12, Roof
Calm Shell 1d 18-Jun-12 18-Jun-12 18-Jun-12, Calm Shell
E.Ch .r.tw External 1d 18-Jun-12 18-Jun-12 External
External Ele
Electrical 0d
Paint Twin House
Hou 7d 19-Jun-12 26-Jun-12 26-Jun-12, Paint Twin House
Ex Paint twin External Painting 7d 19-Jun-12 26-Jun-12 External Painting
Twin House 2 300d 01-Nov-11 24-Oct-12 24-Oct-12, Twin House 2
A7220 Start of twin 0d 01-Nov-11 Start of twin
A7230 Finish of twin 0d 24-Oct-12 Finish of twin
Mobilization 1d 03-Nov-11 03-Nov-11 03-Nov-11, Mobilization
M.sur.tw120 Site Surveying 1d 03-Nov-11 03-Nov-11 Site Surveying
Earth Work 212d 13-Nov-11 17-Jul-12 17-Jul-12, Earth Work
Ex.tw120 Excavation 3d 13-Nov-11 15-Nov-11 Excavation
B.F.tw120 BackFill 3d 15-Jul-12 17-Jul-12 BackFill
Civil Work 100d 05-Jun-12 02-Oct-12 02-Oct-12, Civil Work
Foundation 25d 05-Jun-12 03-Jul-12 03-Jul-12, Foundation
Footing 25d 05-Jun-12 03-Jul-12 03-Jul-12, Footing
Plain Concrete
Con 8d 05-Jun-12 13-Jun-12 13-Jun-12, Plain Concrete
F.W.Pc Form Work 5d 05-Jun-12 10-Jun-12 Form Work
Pour.Pc Pouring Concrete 1d 11-Jun-12 11-Jun-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 13-Jun-12 13-Jun-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 17d 14-Jun-12 03-Jul-12 03-Jul-12, Reinforced Concrete&Semels
FW.RC Form Work 5d 14-Jun-12 19-Jun-12 Form Work
1061 R.F.T 5d 20-Jun-12 25-Jun-12 R.F.T
Pour.RC Pouring Concrete 1d 26-Jun-12 26-Jun-12 Pouring Concrete
R.FW.R Remove Formwork 1d 28-Jun-12 28-Jun-12 Remove Formwork
Ins.RC& Insulting 4d 30-Jun-12 03-Jul-12 Insulting
Ground Floor 34d 04-Jul-12 12-Aug-12 12-Aug-12, Ground Floor
Slab on grade
grad 22d 18-Jul-12 12-Aug-12 12-Aug-12, Slab on grade
FW.SOG. Form Work 6d 18-Jul-12 24-Jul-12 Form Work
R.F.T.SOG R.F.T 7d 25-Jul-12 01-Aug-12 R.F.T
Pour.SOG Pouring Concrete 1d 02-Aug-12 02-Aug-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 12-Aug-12 12-Aug-12 Remove Formwork
Columns 9d 04-Jul-12 14-Jul-12 14-Jul-12, Columns
FW.Col.G Form Work 3d 04-Jul-12 07-Jul-12 Form Work
R.F.T.Col. R.F.T 3d 08-Jul-12 10-Jul-12 R.F.T
Pour.Col.G Pouring Concrete 1d 11-Jul-12 11-Jul-12 Pouring Concrete
R.FW..Co Remove Formwork 1d 14-Jul-12 14-Jul-12 Remove Formwork
First Floor 21d 13-Aug-12 09-Sep-12 09-Sep-12, First Floor
Beams and Slabs 20d 13-Aug-12 08-Sep-12 08-Sep-12, Beams and Slabs
FW.B&S.s Form Work 5d 13-Aug-12 18-Aug-12 Form Work
R.F.T.B&S R.F.T 6d 22-Aug-12 28-Aug-12 R.F.T
Pour.B&S. Pouring Concrete 1d 29-Aug-12 29-Aug-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 08-Sep-12 08-Sep-12 Remove Formwork
Columns 9d 30-Aug-12 09-Sep-12 09-Sep-12, Columns
FW.Col.st. Form Work 3d 30-Aug-12 02-Sep-12 Form Work

Actual Work Critical Remaining Work Summary Page 136 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

312
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.Col. R.F.T 3d 03-Sep-12 05-Sep-12 R.F.T
Pour.Col.s Pouring Concrete 1d 06-Sep-12 06-Sep-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 09-Sep-12 09-Sep-12 Remove Formwork
Roof 20d 10-Sep-12 02-Oct-12 02-Oct-12, Roof
Beams and Slabs 20d 10-Sep-12 02-Oct-12 02-Oct-12, Beams and Slabs
FW.B&S.R Form Work 5d 10-Sep-12 15-Sep-12 Form Work
R.F.T.B&S R.F.T 6d 16-Sep-12 22-Sep-12 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Sep-12 23-Sep-12 Pouring Concrete
R.Fw.B&S Remove Formwork 1d 02-Oct-12 02-Oct-12 Remove Formwork
Mansonary 32d 09-Sep-12 15-Oct-12 15-Oct-12, Mansonary
Ground Floor 9d 09-Sep-12 18-Sep-12 18-Sep-12, Ground Floor
I.G.M.tw120 Internal 9d 09-Sep-12 18-Sep-12 Internal
E.G.M. tw120 External 3d 09-Sep-12 11-Sep-12 External
First Floor 9d 03-Oct-12 13-Oct-12 13-Oct-12, First Floor
I .st .M tw120 Internal 9d 03-Oct-12 13-Oct-12 Internal
E.st.M tw120 External 3d 03-Oct-12 06-Oct-12 External
Roof 2d 14-Oct-12 15-Oct-12 15-Oct-12, Roof
E. R. M tw120 External 2d 14-Oct-12 15-Oct-12 External
Finishing 37d 12-Sep-12 24-Oct-12 24-Oct-12, Finishing
Ground Floor 2d 12-Sep-12 13-Sep-12 13-Sep-12, Ground Floor
Calm Shell 2d 12-Sep-12 13-Sep-12 13-Sep-12, Calm Shell
E.Ch.G tw External 2d 12-Sep-12 13-Sep-12 External
External Ele
Electrical 0d
First Floor 2d 07-Oct-12 08-Oct-12 08-Oct-12, First Floor
Calm Shell 2d 07-Oct-12 08-Oct-12 08-Oct-12, Calm Shell
E.Ch .st.tw External 2d 07-Oct-12 08-Oct-12 External
External Ele
Electrical 0d
Roof 1d 16-Oct-12 16-Oct-12 16-Oct-12, Roof
Calm Shell 1d 16-Oct-12 16-Oct-12 16-Oct-12, Calm Shell
E.Ch .r.tw External 1d 16-Oct-12 16-Oct-12 External
External Ele
Electrical 0d
Paint Twin House
Hou 7d 17-Oct-12 24-Oct-12 24-Oct-12, Paint Twin House
Ex Paint twin External Painting 7d 17-Oct-12 24-Oct-12 External Painting
Twin House 4 123d 01-Nov-11 27-Mar-12 27-Mar-12, Twin House 4
A7260 Start of twin 0d 01-Nov-11 Start of twin
A7270 Finish of twin 0d 27-Mar-12 Finish of twin
Mobilization 1d 01-Nov-11 01-Nov-11 01-Nov-11, Mobilization
M.sur.tw130 Site Surveying 1d 01-Nov-11 01-Nov-11 Site Surveying
Earth Work 40d 02-Nov-11 22-Dec-11 22-Dec-11, Earth Work
Ex.tw130 Excavation 3d 02-Nov-11 05-Nov-11 Excavation
B.F.tw130 BackFill 3d 20-Dec-11 22-Dec-11 BackFill
Civil Work 100d 10-Nov-11 05-Mar-12 05-Mar-12, Civil Work
Foundation 25d 10-Nov-11 08-Dec-11 08-Dec-11, Foundation
Footing 25d 10-Nov-11 08-Dec-11 08-Dec-11, Footing
Plain Concrete
Con 8d 10-Nov-11 19-Nov-11 19-Nov-11, Plain Concrete
F.W.Pc Form Work 5d 10-Nov-11 15-Nov-11 Form Work
Pour.Pc Pouring Concrete 1d 16-Nov-11 16-Nov-11 Pouring Concrete
R.Fw.P Remove Formwork 1d 19-Nov-11 19-Nov-11 Remove Formwork
Reinforced Concrete&Semels
Reinforce 17d 20-Nov-11 08-Dec-11 08-Dec-11, Reinforced Concrete&Semels
FW.RC Form Work 5d 20-Nov-11 24-Nov-11 Form Work
120 R.F.T 5d 26-Nov-11 30-Nov-11 R.F.T
Pour.RC Pouring Concrete 1d 01-Dec-11 01-Dec-11 Pouring Concrete
R.FW.R Remove Formwork 1d 04-Dec-11 04-Dec-11 Remove Formwork
Ins.RC& Insulting 4d 05-Dec-11 08-Dec-11 Insulting
Ground Floor 34d 10-Dec-11 17-Jan-12 17-Jan-12, Ground Floor
Slab on grade
grad 22d 24-Dec-11 17-Jan-12 17-Jan-12, Slab on grade
FW.SOG. Form Work 6d 24-Dec-11 29-Dec-11 Form Work
R.F.T.SOG R.F.T 7d 31-Dec-11 07-Jan-12 R.F.T
Pour.SOG Pouring Concrete 1d 08-Jan-12 08-Jan-12 Pouring Concrete
R.FW.SOG Remove Formwork 1d 17-Jan-12 17-Jan-12 Remove Formwork
Columns 9d 10-Dec-11 19-Dec-11 19-Dec-11, Columns
FW.Col.G Form Work 3d 10-Dec-11 12-Dec-11 Form Work
R.F.T.Col. R.F.T 3d 13-Dec-11 15-Dec-11 R.F.T
Pour.Col.G Pouring Concrete 1d 17-Dec-11 17-Dec-11 Pouring Concrete
R.FW..Co Remove Formwork 1d 19-Dec-11 19-Dec-11 Remove Formwork
First Floor 21d 18-Jan-12 11-Feb-12 11-Feb-12, First Floor
Beams and Slabs 20d 18-Jan-12 09-Feb-12 09-Feb-12, Beams and Slabs
FW.B&S.s Form Work 5d 18-Jan-12 23-Jan-12 Form Work
R.F.T.B&S R.F.T 6d 24-Jan-12 30-Jan-12 R.F.T
Pour.B&S. Pouring Concrete 1d 31-Jan-12 31-Jan-12 Pouring Concrete
R.FW.B&S Remove Formwork 1d 09-Feb-12 09-Feb-12 Remove Formwork
Columns 9d 01-Feb-12 11-Feb-12 11-Feb-12, Columns
FW.Col.st. Form Work 3d 01-Feb-12 04-Feb-12 Form Work
R.F.T.Col. R.F.T 3d 05-Feb-12 07-Feb-12 R.F.T
Pour.Col.s Pouring Concrete 1d 08-Feb-12 08-Feb-12 Pouring Concrete
R.FW.Col. Remove Formwork 1d 11-Feb-12 11-Feb-12 Remove Formwork

Actual Work Critical Remaining Work Summary Page 137 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

313
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Roof 20d 12-Feb-12 05-Mar-12 05-Mar-12, Roof
Beams and Slabs 20d 12-Feb-12 05-Mar-12 05-Mar-12, Beams and Slabs
FW.B&S.R Form Work 5d 12-Feb-12 16-Feb-12 Form Work
R.F.T.B&S R.F.T 6d 18-Feb-12 23-Feb-12 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Feb-12 25-Feb-12 Pouring Concrete
R.Fw.B&S Remove Formwork 1d 05-Mar-12 05-Mar-12 Remove Formwork
Mansonary 32d 11-Feb-12 18-Mar-12 18-Mar-12, Mansonary
Ground Floor 9d 11-Feb-12 20-Feb-12 20-Feb-12, Ground Floor
I.G.M.tw130 Internal 9d 11-Feb-12 20-Feb-12 Internal
E.G.M. tw130 External 3d 11-Feb-12 13-Feb-12 External
First Floor 9d 06-Mar-12 15-Mar-12 15-Mar-12, First Floor
I .st .M tw130 Internal 9d 06-Mar-12 15-Mar-12 Internal
E.st.M tw130 External 3d 06-Mar-12 08-Mar-12 External
Roof 2d 17-Mar-12 18-Mar-12 18-Mar-12, Roof
E. R. M tw130 External 2d 17-Mar-12 18-Mar-12 External
Finishing 37d 14-Feb-12 27-Mar-12 27-Mar-12, Finishing
Ground Floor 2d 14-Feb-12 15-Feb-12 15-Feb-12, Ground Floor
Calm Shell 2d 14-Feb-12 15-Feb-12 15-Feb-12, Calm Shell
E.Ch.G tw External 2d 14-Feb-12 15-Feb-12 External
External Ele
Electrical 0d
First Floor 2d 10-Mar-12 11-Mar-12 11-Mar-12, First Floor
Calm Shell 2d 10-Mar-12 11-Mar-12 11-Mar-12, Calm Shell
E.Ch .st.tw External 2d 10-Mar-12 11-Mar-12 External
External Ele
Electrical 0d
Roof 1d 19-Mar-12 19-Mar-12 19-Mar-12, Roof
Calm Shell 1d 19-Mar-12 19-Mar-12 19-Mar-12, Calm Shell
E.Ch .r.tw External 1d 19-Mar-12 19-Mar-12 External
External Ele
Electrical 0d
Paint Twin House
Hou 7d 20-Mar-12 27-Mar-12 27-Mar-12, Paint Twin House
Ex Paint twin External Painting 7d 20-Mar-12 27-Mar-12 External Painting
Stage 2 323d 25-Nov-12 14-Dec-13 14-Dec-13, Stage 2
A7280 start of stage 2 0d 25-Nov-12 start of stage 2
A7290 finish of stage 2 0d 14-Dec-13 finish of stage 2
Stand alone Villa typ
type 34 89d 25-Nov-12 07-Mar-13 07-Mar-13, Stand alone Villa type 34
A7320 Start Villa 2 0d 25-Nov-12 Start Villa 2
A7330 Finish Villa 2 0d 07-Mar-13 Finish Villa 2
Mobilization 1d 25-Nov-12 25-Nov-12 25-Nov-12, Mobilization
M.Sur. v492 Site surveying 1d 25-Nov-12 25-Nov-12 Site surveying
Earth Work 26d 26-Nov-12 25-Dec-12 25-Dec-12, Earth Work
Ex.v1091 Excavation 2d 26-Nov-12 27-Nov-12 Excavation
B.F.v1091 BackFill 1d 25-Dec-12 25-Dec-12 BackFill
Civil Work 78d 28-Nov-12 26-Feb-13 26-Feb-13, Civil Work
Foundation 15d 28-Nov-12 15-Dec-12 15-Dec-12, Foundation
Footing 15d 28-Nov-12 15-Dec-12 15-Dec-12, Footing
Plain Concrete
Con 6d 28-Nov-12 04-Dec-12 04-Dec-12, Plain Concrete
FW.PC Form Work 3d 28-Nov-12 01-Dec-12 Form Work
Pour.PC Pouring Concrete 1d 02-Dec-12 02-Dec-12 Pouring Concrete
R. FW. Remove Formwork 1d 04-Dec-12 04-Dec-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 05-Dec-12 15-Dec-12 15-Dec-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 05-Dec-12 08-Dec-12 Form Work
1101 R.F.T 2d 09-Dec-12 10-Dec-12 R.F.T
Pour.RC Pouring Concrete 1d 11-Dec-12 11-Dec-12 Pouring Concrete
R.FW.R Remove Formwork 1d 13-Dec-12 13-Dec-12 Remove Formwork
Ins..RC Insulting 1d 15-Dec-12 15-Dec-12 Insulting
Ground Floor 26d 16-Dec-12 14-Jan-13 14-Jan-13, Ground Floor
Slab on grade
grad 17d 26-Dec-12 14-Jan-13 14-Jan-13, Slab on grade
FW.SOG. Form Work 4d 26-Dec-12 30-Dec-12 Form Work
R.F.T.SOG R.F.T 4d 31-Dec-12 03-Jan-13 R.F.T
Pour.SOG Pouring Concrete 1d 05-Jan-13 05-Jan-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 14-Jan-13 14-Jan-13 Remove Formwork
Columns 8d 16-Dec-12 24-Dec-12 24-Dec-12, Columns
FW.Col.G Form Work 3d 16-Dec-12 18-Dec-12 Form Work
R.F.T.Col. R.F.T 2d 19-Dec-12 20-Dec-12 R.F.T
Pour.Col.G Pouring Concrete 1d 22-Dec-12 22-Dec-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 24-Dec-12 24-Dec-12 Remove Formwork
First Floor 19d 15-Jan-13 05-Feb-13 05-Feb-13, First Floor
Beams and Slabs 18d 15-Jan-13 04-Feb-13 04-Feb-13, Beams and Slabs
FW.B&S.s Form Work 6d 15-Jan-13 21-Jan-13 Form Work
R.F.T.B&S R.F.T 3d 22-Jan-13 24-Jan-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Jan-13 26-Jan-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 04-Feb-13 04-Feb-13 Remove Formwork
Columns 9d 27-Jan-13 05-Feb-13 05-Feb-13, Columns
FW.Col.st. Form Work 3d 27-Jan-13 29-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 30-Jan-13 02-Feb-13 R.F.T
Pour.Col.s Pouring Concrete 1d 03-Feb-13 03-Feb-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 05-Feb-13 05-Feb-13 Remove Formwork

Actual Work Critical Remaining Work Summary Page 138 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

314
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Roof 18d 06-Feb-13 26-Feb-13 26-Feb-13, Roof
Beams and Slabs 18d 06-Feb-13 26-Feb-13 26-Feb-13, Beams and Slabs
FW.B&S.R Form Work 6d 06-Feb-13 12-Feb-13 Form Work
R.F.T.B&S R.F.T 3d 13-Feb-13 16-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Feb-13 17-Feb-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 26-Feb-13 26-Feb-13 Remove Formwork
Mansonary 22d 05-Feb-13 02-Mar-13 02-Mar-13, Mansonary
Ground Floor 2d 05-Feb-13 06-Feb-13 06-Feb-13, Ground Floor
I.G.M.v492 Internal 2d 05-Feb-13 06-Feb-13 Internal
E.G.M.v1091 External 2d 05-Feb-13 06-Feb-13 External
First Floor 2d 27-Feb-13 28-Feb-13 28-Feb-13, First Floor
I.st.M.v492 Internal 2d 27-Feb-13 28-Feb-13 Internal
E.st.M.v492 External 2d 27-Feb-13 28-Feb-13 External
Roof 1d 02-Mar-13 02-Mar-13 02-Mar-13, Roof
E.R.M.v1091 External 1d 02-Mar-13 02-Mar-13 External
Finishing 25d 07-Feb-13 07-Mar-13 07-Mar-13, Finishing
Ground Floor 2d 07-Feb-13 09-Feb-13 09-Feb-13, Ground Floor
Calm Shell 2d 07-Feb-13 09-Feb-13 09-Feb-13, Calm Shell
E.Ch.G490 External 2d 07-Feb-13 09-Feb-13 External
External Ele
Electrical 0d
First Floor 2d 02-Mar-13 03-Mar-13 03-Mar-13, First Floor
Calm Shell 2d 02-Mar-13 03-Mar-13 03-Mar-13, Calm Shell
E.ch.st.v10 External 2d 02-Mar-13 03-Mar-13 External
External Ele
Electrical 0d
Roof 1d 04-Mar-13 04-Mar-13 04-Mar-13, Roof
Calm Shell 1d 04-Mar-13 04-Mar-13 04-Mar-13, Calm Shell
E.ch.r.v10 External 1d 04-Mar-13 04-Mar-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 05-Mar-13 07-Mar-13 07-Mar-13, Paint Villa 2
Ex Paint.490 External Painting 3d 05-Mar-13 07-Mar-13 External Painting
Stand alone Villa typ
type 35 167d 25-Nov-12 08-Jun-13 08-Jun-13, Stand alone Villa type 35
A7380 Start Villa 2 0d 25-Nov-12 Start Villa 2
A7390 Finish Villa 2 0d 08-Jun-13 Finish Villa 2
Mobilization 1d 26-Nov-12 26-Nov-12 26-Nov-12, Mobilization
M.Sur. v462 Site surveying 1d 26-Nov-12 26-Nov-12 Site surveying
Earth Work 102d 28-Nov-12 26-Mar-13 26-Mar-13, Earth Work
Ex.v1061 Excavation 2d 28-Nov-12 29-Nov-12 Excavation
B.F.v1061 BackFill 1d 26-Mar-13 26-Mar-13 BackFill
Civil Work 78d 27-Feb-13 29-May-13 29-May-13, Civil Work
Foundation 15d 27-Feb-13 16-Mar-13 16-Mar-13, Foundation
Footing 15d 27-Feb-13 16-Mar-13 16-Mar-13, Footing
Plain Concrete
Con 6d 27-Feb-13 05-Mar-13 05-Mar-13, Plain Concrete
FW.PC Form Work 3d 27-Feb-13 02-Mar-13 Form Work
Pour.PC Pouring Concrete 1d 03-Mar-13 03-Mar-13 Pouring Concrete
R. FW. Remove Formwork 1d 05-Mar-13 05-Mar-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 06-Mar-13 16-Mar-13 16-Mar-13, Reinforced Concrete&Semels
FW.RC Form Work 3d 06-Mar-13 09-Mar-13 Form Work
1071 R.F.T 2d 10-Mar-13 11-Mar-13 R.F.T
Pour.RC Pouring Concrete 1d 12-Mar-13 12-Mar-13 Pouring Concrete
R.FW.R Remove Formwork 1d 14-Mar-13 14-Mar-13 Remove Formwork
Ins..RC Insulting 1d 16-Mar-13 16-Mar-13 Insulting
Ground Floor 26d 17-Mar-13 15-Apr-13 15-Apr-13, Ground Floor
Slab on grade
grad 17d 27-Mar-13 15-Apr-13 15-Apr-13, Slab on grade
FW.SOG. Form Work 4d 27-Mar-13 31-Mar-13 Form Work
R.F.T.SOG R.F.T 4d 01-Apr-13 04-Apr-13 R.F.T
Pour.SOG Pouring Concrete 1d 06-Apr-13 06-Apr-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 15-Apr-13 15-Apr-13 Remove Formwork
Columns 8d 17-Mar-13 25-Mar-13 25-Mar-13, Columns
FW.Col.G Form Work 3d 17-Mar-13 19-Mar-13 Form Work
R.F.T.Col. R.F.T 2d 20-Mar-13 21-Mar-13 R.F.T
Pour.Col.G Pouring Concrete 1d 23-Mar-13 23-Mar-13 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 25-Mar-13 25-Mar-13 Remove Formwork
First Floor 19d 16-Apr-13 08-May-13 08-May-13, First Floor
Beams and Slabs 18d 16-Apr-13 07-May-13 07-May-13, Beams and Slabs
FW.B&S.s Form Work 6d 16-Apr-13 22-Apr-13 Form Work
R.F.T.B&S R.F.T 3d 23-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Columns 9d 28-Apr-13 08-May-13 08-May-13, Columns
FW.Col.st. Form Work 3d 28-Apr-13 30-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 02-May-13 05-May-13 R.F.T
Pour.Col.s Pouring Concrete 1d 06-May-13 06-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-May-13 08-May-13 Remove Formwork
Roof 18d 09-May-13 29-May-13 29-May-13, Roof
Beams and Slabs 18d 09-May-13 29-May-13 29-May-13, Beams and Slabs
FW.B&S.R Form Work 6d 09-May-13 15-May-13 Form Work

Actual Work Critical Remaining Work Summary Page 139 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

315
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.B&S R.F.T 3d 16-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Mansonary 22d 08-May-13 02-Jun-13 02-Jun-13, Mansonary
Ground Floor 2d 08-May-13 09-May-13 09-May-13, Ground Floor
I.G.M.v462 Internal 2d 08-May-13 09-May-13 Internal
E.G.M.v1061 External 2d 08-May-13 09-May-13 External
First Floor 2d 30-May-13 01-Jun-13 01-Jun-13, First Floor
I.st.M.v462 Internal 2d 30-May-13 01-Jun-13 Internal
E.st.M.v462 External 2d 30-May-13 01-Jun-13 External
Roof 1d 02-Jun-13 02-Jun-13 02-Jun-13, Roof
E.R.M.v1061 External 1d 02-Jun-13 02-Jun-13 External
Finishing 25d 11-May-13 08-Jun-13 08-Jun-13, Finishing
Ground Floor 2d 11-May-13 12-May-13 12-May-13, Ground Floor
Calm Shell 2d 11-May-13 12-May-13 12-May-13, Calm Shell
E.Ch.G460 External 2d 11-May-13 12-May-13 External
External Ele
Electrical 0d
First Floor 2d 02-Jun-13 03-Jun-13 03-Jun-13, First Floor
Calm Shell 2d 02-Jun-13 03-Jun-13 03-Jun-13, Calm Shell
E.ch.st.v10 External 2d 02-Jun-13 03-Jun-13 External
External Ele
Electrical 0d
Roof 1d 04-Jun-13 04-Jun-13 04-Jun-13, Roof
Calm Shell 1d 04-Jun-13 04-Jun-13 04-Jun-13, Calm Shell
E.ch.r.v10 External 1d 04-Jun-13 04-Jun-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 05-Jun-13 08-Jun-13 08-Jun-13, Paint Villa 2
Ex Paint.460 External Painting 3d 05-Jun-13 08-Jun-13 External Painting
Stand alone Villa typ
type 36 245d 25-Nov-12 09-Sep-13 09-Sep-13, Stand alone Villa type 36
A7400 Start Villa 2 0d 25-Nov-12 Start Villa 2
A7410 Finish Villa 2 0d 09-Sep-13 Finish Villa 2
Mobilization 1d 27-Nov-12 27-Nov-12 27-Nov-12, Mobilization
M.Sur. v472 Site surveying 1d 27-Nov-12 27-Nov-12 Site surveying
Earth Work 178d 01-Dec-12 26-Jun-13 26-Jun-13, Earth Work
Ex.v1071 Excavation 2d 01-Dec-12 02-Dec-12 Excavation
B.F.v1071 BackFill 1d 26-Jun-13 26-Jun-13 BackFill
Civil Work 78d 30-May-13 31-Aug-13 31-Aug-13, Civil Work
Foundation 15d 30-May-13 16-Jun-13 16-Jun-13, Foundation
Footing 15d 30-May-13 16-Jun-13 16-Jun-13, Footing
Plain Concrete
Con 6d 30-May-13 05-Jun-13 05-Jun-13, Plain Concrete
FW.PC Form Work 3d 30-May-13 02-Jun-13 Form Work
Pour.PC Pouring Concrete 1d 03-Jun-13 03-Jun-13 Pouring Concrete
R. FW. Remove Formwork 1d 05-Jun-13 05-Jun-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 06-Jun-13 16-Jun-13 16-Jun-13, Reinforced Concrete&Semels
FW.RC Form Work 3d 06-Jun-13 09-Jun-13 Form Work
1081 R.F.T 2d 10-Jun-13 11-Jun-13 R.F.T
Pour.RC Pouring Concrete 1d 12-Jun-13 12-Jun-13 Pouring Concrete
R.FW.R Remove Formwork 1d 15-Jun-13 15-Jun-13 Remove Formwork
Ins..RC Insulting 1d 16-Jun-13 16-Jun-13 Insulting
Ground Floor 26d 17-Jun-13 16-Jul-13 16-Jul-13, Ground Floor
Slab on grade
grad 17d 27-Jun-13 16-Jul-13 16-Jul-13, Slab on grade
FW.SOG. Form Work 4d 27-Jun-13 01-Jul-13 Form Work
R.F.T.SOG R.F.T 4d 02-Jul-13 06-Jul-13 R.F.T
Pour.SOG Pouring Concrete 1d 07-Jul-13 07-Jul-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 16-Jul-13 16-Jul-13 Remove Formwork
Columns 8d 17-Jun-13 25-Jun-13 25-Jun-13, Columns
FW.Col.G Form Work 3d 17-Jun-13 19-Jun-13 Form Work
R.F.T.Col. R.F.T 2d 20-Jun-13 22-Jun-13 R.F.T
Pour.Col.G Pouring Concrete 1d 23-Jun-13 23-Jun-13 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 25-Jun-13 25-Jun-13 Remove Formwork
First Floor 19d 17-Jul-13 07-Aug-13 07-Aug-13, First Floor
Beams and Slabs 18d 17-Jul-13 06-Aug-13 06-Aug-13, Beams and Slabs
FW.B&S.s Form Work 6d 17-Jul-13 23-Jul-13 Form Work
R.F.T.B&S R.F.T 3d 24-Jul-13 27-Jul-13 R.F.T
Pour.B&S. Pouring Concrete 1d 28-Jul-13 28-Jul-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 06-Aug-13 06-Aug-13 Remove Formwork
Columns 9d 29-Jul-13 07-Aug-13 07-Aug-13, Columns
FW.Col.st. Form Work 3d 29-Jul-13 31-Jul-13 Form Work
R.F.T.Col. R.F.T 3d 01-Aug-13 04-Aug-13 R.F.T
Pour.Col.s Pouring Concrete 1d 05-Aug-13 05-Aug-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-Aug-13 07-Aug-13 Remove Formwork
Roof 18d 11-Aug-13 31-Aug-13 31-Aug-13, Roof
Beams and Slabs 18d 11-Aug-13 31-Aug-13 31-Aug-13, Beams and Slabs
FW.B&S.R Form Work 6d 11-Aug-13 17-Aug-13 Form Work
R.F.T.B&S R.F.T 3d 18-Aug-13 20-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Aug-13 21-Aug-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 31-Aug-13 31-Aug-13 Remove Formwork

Actual Work Critical Remaining Work Summary Page 140 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

316
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Mansonary 22d 07-Aug-13 03-Sep-13 03-Sep-13, Mansonary
Ground Floor 2d 07-Aug-13 11-Aug-13 11-Aug-13, Ground Floor
I.G.M.v472 Internal 2d 07-Aug-13 11-Aug-13 Internal
E.G.M.v1071 External 2d 07-Aug-13 11-Aug-13 External
First Floor 2d 01-Sep-13 02-Sep-13 02-Sep-13, First Floor
I.st.M.v472 Internal 2d 01-Sep-13 02-Sep-13 Internal
E.st.M.v472 External 2d 01-Sep-13 02-Sep-13 External
Roof 1d 03-Sep-13 03-Sep-13 03-Sep-13, Roof
E.R.M.v1071 External 1d 03-Sep-13 03-Sep-13 External
Finishing 25d 12-Aug-13 09-Sep-13 09-Sep-13, Finishing
Ground Floor 2d 12-Aug-13 13-Aug-13 13-Aug-13, Ground Floor
Calm Shell 2d 12-Aug-13 13-Aug-13 13-Aug-13, Calm Shell
E.Ch.G470 External 2d 12-Aug-13 13-Aug-13 External
External Ele
Electrical 0d
First Floor 2d 03-Sep-13 04-Sep-13 04-Sep-13, First Floor
Calm Shell 2d 03-Sep-13 04-Sep-13 04-Sep-13, Calm Shell
E.ch.st.v10 External 2d 03-Sep-13 04-Sep-13 External
External Ele
Electrical 0d
Roof 1d 05-Sep-13 05-Sep-13 05-Sep-13, Roof
Calm Shell 1d 05-Sep-13 05-Sep-13 05-Sep-13, Calm Shell
E.ch.r.v10 External 1d 05-Sep-13 05-Sep-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 07-Sep-13 09-Sep-13 09-Sep-13, Paint Villa 2
Ex Paint.470 External Painting 3d 07-Sep-13 09-Sep-13 External Painting
Stand alone Villa typ
type 37 323d 25-Nov-12 14-Dec-13 14-Dec-13, Stand alone Villa type 37
A6680 Start Villa 2 0d 25-Nov-12 Start Villa 2
A6690 Finish Villa 2 0d 14-Dec-13 Finish Villa 2
Mobilization 1d 28-Nov-12 28-Nov-12 28-Nov-12, Mobilization
M.Sur. v482 Site surveying 1d 28-Nov-12 28-Nov-12 Site surveying
Earth Work 254d 03-Dec-12 28-Sep-13 28-Sep-13, Earth Work
Ex.v1081 Excavation 2d 03-Dec-12 04-Dec-12 Excavation
B.F.v1081 BackFill 1d 28-Sep-13 28-Sep-13 BackFill
Civil Work 78d 01-Sep-13 04-Dec-13 04-Dec-13, Civil Work
Foundation 15d 01-Sep-13 17-Sep-13 17-Sep-13, Foundation
Footing 15d 01-Sep-13 17-Sep-13 17-Sep-13, Footing
Plain Concrete
Con 6d 01-Sep-13 07-Sep-13 07-Sep-13, Plain Concrete
FW.PC Form Work 3d 01-Sep-13 03-Sep-13 Form Work
Pour.PC Pouring Concrete 1d 04-Sep-13 04-Sep-13 Pouring Concrete
R. FW. Remove Formwork 1d 07-Sep-13 07-Sep-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 08-Sep-13 17-Sep-13 17-Sep-13, Reinforced Concrete&Semels
FW.RC Form Work 3d 08-Sep-13 10-Sep-13 Form Work
1091 R.F.T 2d 11-Sep-13 12-Sep-13 R.F.T
Pour.RC Pouring Concrete 1d 14-Sep-13 14-Sep-13 Pouring Concrete
R.FW.R Remove Formwork 1d 16-Sep-13 16-Sep-13 Remove Formwork
Ins..RC Insulting 1d 17-Sep-13 17-Sep-13 Insulting
Ground Floor 26d 18-Sep-13 22-Oct-13 22-Oct-13, Ground Floor
Slab on grade
grad 17d 29-Sep-13 22-Oct-13 22-Oct-13, Slab on grade
FW.SOG. Form Work 4d 29-Sep-13 02-Oct-13 Form Work
R.F.T.SOG R.F.T 4d 03-Oct-13 08-Oct-13 R.F.T
Pour.SOG Pouring Concrete 1d 09-Oct-13 09-Oct-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Columns 8d 18-Sep-13 26-Sep-13 26-Sep-13, Columns
FW.Col.G Form Work 3d 18-Sep-13 21-Sep-13 Form Work
R.F.T.Col. R.F.T 2d 22-Sep-13 23-Sep-13 R.F.T
Pour.Col.G Pouring Concrete 1d 24-Sep-13 24-Sep-13 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 26-Sep-13 26-Sep-13 Remove Formwork
First Floor 19d 23-Oct-13 13-Nov-13 13-Nov-13, First Floor
Beams and Slabs 18d 23-Oct-13 12-Nov-13 12-Nov-13, Beams and Slabs
FW.B&S.s Form Work 6d 23-Oct-13 29-Oct-13 Form Work
R.F.T.B&S R.F.T 3d 30-Oct-13 02-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Nov-13 03-Nov-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 12-Nov-13 12-Nov-13 Remove Formwork
Columns 9d 04-Nov-13 13-Nov-13 13-Nov-13, Columns
FW.Col.st. Form Work 3d 04-Nov-13 06-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 07-Nov-13 10-Nov-13 R.F.T
Pour.Col.s Pouring Concrete 1d 11-Nov-13 11-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Roof 18d 14-Nov-13 04-Dec-13 04-Dec-13, Roof
Beams and Slabs 18d 14-Nov-13 04-Dec-13 04-Dec-13, Beams and Slabs
FW.B&S.R Form Work 6d 14-Nov-13 20-Nov-13 Form Work
R.F.T.B&S R.F.T 3d 21-Nov-13 24-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Nov-13 25-Nov-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 04-Dec-13 04-Dec-13 Remove Formwork
Mansonary 22d 13-Nov-13 08-Dec-13 08-Dec-13, Mansonary
Ground Floor 2d 13-Nov-13 14-Nov-13 14-Nov-13, Ground Floor
I.G.M.v482 Internal 2d 13-Nov-13 14-Nov-13 Internal

Actual Work Critical Remaining Work Summary Page 141 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

317
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.G.M.v1081 External 2d 13-Nov-13 14-Nov-13 External
First Floor 2d 05-Dec-13 07-Dec-13 07-Dec-13, First Floor
I.st.M.v482 Internal 2d 05-Dec-13 07-Dec-13 Internal
E.st.M.v482 External 2d 05-Dec-13 07-Dec-13 External
Roof 1d 08-Dec-13 08-Dec-13 08-Dec-13, Roof
E.R.M.v1081 External 1d 08-Dec-13 08-Dec-13 External
Finishing 25d 16-Nov-13 14-Dec-13 14-Dec-13, Finishing
Ground Floor 2d 16-Nov-13 17-Nov-13 17-Nov-13, Ground Floor
Calm Shell 2d 16-Nov-13 17-Nov-13 17-Nov-13, Calm Shell
E.Ch.G480 External 2d 16-Nov-13 17-Nov-13 External
External Ele
Electrical 0d
First Floor 2d 08-Dec-13 09-Dec-13 09-Dec-13, First Floor
Calm Shell 2d 08-Dec-13 09-Dec-13 09-Dec-13, Calm Shell
E.ch.st.v10 External 2d 08-Dec-13 09-Dec-13 External
External Ele
Electrical 0d
Roof 1d 10-Dec-13 10-Dec-13 10-Dec-13, Roof
Calm Shell 1d 10-Dec-13 10-Dec-13 10-Dec-13, Calm Shell
E.ch.r.v10 External 1d 10-Dec-13 10-Dec-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 11-Dec-13 14-Dec-13 14-Dec-13, Paint Villa 2
Ex Paint.480 External Painting 3d 11-Dec-13 14-Dec-13 External Painting
Stand alone Villa typ
type 38 89d 25-Nov-12 07-Mar-13 07-Mar-13, Stand alone Villa type 38
A6780 Start Villa 2 0d 25-Nov-12 Start Villa 2
A6790 Finish Villa 2 0d 07-Mar-13 Finish Villa 2
Mobilization 1d 25-Nov-12 25-Nov-12 25-Nov-12, Mobilization
M.Sur. v532 Site surveying 1d 25-Nov-12 25-Nov-12 Site surveying
Earth Work 26d 26-Nov-12 25-Dec-12 25-Dec-12, Earth Work
Ex.v1131 Excavation 2d 26-Nov-12 27-Nov-12 Excavation
B.F.v1131 BackFill 1d 25-Dec-12 25-Dec-12 BackFill
Civil Work 78d 28-Nov-12 26-Feb-13 26-Feb-13, Civil Work
Foundation 15d 28-Nov-12 15-Dec-12 15-Dec-12, Foundation
Footing 15d 28-Nov-12 15-Dec-12 15-Dec-12, Footing
Plain Concrete
Con 6d 28-Nov-12 04-Dec-12 04-Dec-12, Plain Concrete
FW.PC Form Work 3d 28-Nov-12 01-Dec-12 Form Work
Pour.PC Pouring Concrete 1d 02-Dec-12 02-Dec-12 Pouring Concrete
R. FW. Remove Formwork 1d 04-Dec-12 04-Dec-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 05-Dec-12 15-Dec-12 15-Dec-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 05-Dec-12 08-Dec-12 Form Work
1141 R.F.T 2d 09-Dec-12 10-Dec-12 R.F.T
Pour.RC Pouring Concrete 1d 11-Dec-12 11-Dec-12 Pouring Concrete
R.FW.R Remove Formwork 1d 13-Dec-12 13-Dec-12 Remove Formwork
Ins..RC Insulting 1d 15-Dec-12 15-Dec-12 Insulting
Ground Floor 26d 16-Dec-12 14-Jan-13 14-Jan-13, Ground Floor
Slab on grade
grad 17d 26-Dec-12 14-Jan-13 14-Jan-13, Slab on grade
FW.SOG. Form Work 4d 26-Dec-12 30-Dec-12 Form Work
R.F.T.SOG R.F.T 4d 31-Dec-12 03-Jan-13 R.F.T
Pour.SOG Pouring Concrete 1d 05-Jan-13 05-Jan-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 14-Jan-13 14-Jan-13 Remove Formwork
Columns 8d 16-Dec-12 24-Dec-12 24-Dec-12, Columns
FW.Col.G Form Work 3d 16-Dec-12 18-Dec-12 Form Work
R.F.T.Col. R.F.T 2d 19-Dec-12 20-Dec-12 R.F.T
Pour.Col.G Pouring Concrete 1d 22-Dec-12 22-Dec-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 24-Dec-12 24-Dec-12 Remove Formwork
First Floor 19d 15-Jan-13 05-Feb-13 05-Feb-13, First Floor
Beams and Slabs 18d 15-Jan-13 04-Feb-13 04-Feb-13, Beams and Slabs
FW.B&S.s Form Work 6d 15-Jan-13 21-Jan-13 Form Work
R.F.T.B&S R.F.T 3d 22-Jan-13 24-Jan-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Jan-13 26-Jan-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 04-Feb-13 04-Feb-13 Remove Formwork
Columns 9d 27-Jan-13 05-Feb-13 05-Feb-13, Columns
FW.Col.st. Form Work 3d 27-Jan-13 29-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 30-Jan-13 02-Feb-13 R.F.T
Pour.Col.s Pouring Concrete 1d 03-Feb-13 03-Feb-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 05-Feb-13 05-Feb-13 Remove Formwork
Roof 18d 06-Feb-13 26-Feb-13 26-Feb-13, Roof
Beams and Slabs 18d 06-Feb-13 26-Feb-13 26-Feb-13, Beams and Slabs
FW.B&S.R Form Work 6d 06-Feb-13 12-Feb-13 Form Work
R.F.T.B&S R.F.T 3d 13-Feb-13 16-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Feb-13 17-Feb-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 26-Feb-13 26-Feb-13 Remove Formwork
Mansonary 22d 05-Feb-13 02-Mar-13 02-Mar-13, Mansonary
Ground Floor 2d 05-Feb-13 06-Feb-13 06-Feb-13, Ground Floor
I.G.M.v532 Internal 2d 05-Feb-13 06-Feb-13 Internal
E.G.M.v1131 External 2d 05-Feb-13 06-Feb-13 External
First Floor 2d 27-Feb-13 28-Feb-13 28-Feb-13, First Floor
I.st.M.v532 Internal 2d 27-Feb-13 28-Feb-13 Internal

Actual Work Critical Remaining Work Summary Page 142 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

318
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.st.M.v532 External 2d 27-Feb-13 28-Feb-13 External
Roof 1d 02-Mar-13 02-Mar-13 02-Mar-13, Roof
E.R.M.v1131 External 1d 02-Mar-13 02-Mar-13 External
Finishing 25d 07-Feb-13 07-Mar-13 07-Mar-13, Finishing
Ground Floor 2d 07-Feb-13 09-Feb-13 09-Feb-13, Ground Floor
Calm Shell 2d 07-Feb-13 09-Feb-13 09-Feb-13, Calm Shell
E.Ch.G530 External 2d 07-Feb-13 09-Feb-13 External
External Ele
Electrical 0d
First Floor 2d 02-Mar-13 03-Mar-13 03-Mar-13, First Floor
Calm Shell 2d 02-Mar-13 03-Mar-13 03-Mar-13, Calm Shell
E.ch.st.v11 External 2d 02-Mar-13 03-Mar-13 External
External Ele
Electrical 0d
Roof 1d 04-Mar-13 04-Mar-13 04-Mar-13, Roof
Calm Shell 1d 04-Mar-13 04-Mar-13 04-Mar-13, Calm Shell
E.ch.r.v11 External 1d 04-Mar-13 04-Mar-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 05-Mar-13 07-Mar-13 07-Mar-13, Paint Villa 2
Ex Paint.530 External Painting 3d 05-Mar-13 07-Mar-13 External Painting
Stand alone Villa typ
type 39 167d 25-Nov-12 08-Jun-13 08-Jun-13, Stand alone Villa type 39
A6900 Start Villa 2 0d 25-Nov-12 Start Villa 2
A6910 Finish Villa 2 0d 08-Jun-13 Finish Villa 2
Mobilization 1d 26-Nov-12 26-Nov-12 26-Nov-12, Mobilization
M.Sur. v502 Site surveying 1d 26-Nov-12 26-Nov-12 Site surveying
Earth Work 102d 28-Nov-12 26-Mar-13 26-Mar-13, Earth Work
Ex.v1101 Excavation 2d 28-Nov-12 29-Nov-12 Excavation
B.F.v1101 BackFill 1d 26-Mar-13 26-Mar-13 BackFill
Civil Work 78d 27-Feb-13 29-May-13 29-May-13, Civil Work
Foundation 15d 27-Feb-13 16-Mar-13 16-Mar-13, Foundation
Footing 15d 27-Feb-13 16-Mar-13 16-Mar-13, Footing
Plain Concrete
Con 6d 27-Feb-13 05-Mar-13 05-Mar-13, Plain Concrete
FW.PC Form Work 3d 27-Feb-13 02-Mar-13 Form Work
Pour.PC Pouring Concrete 1d 03-Mar-13 03-Mar-13 Pouring Concrete
R. FW. Remove Formwork 1d 05-Mar-13 05-Mar-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 06-Mar-13 16-Mar-13 16-Mar-13, Reinforced Concrete&Semels
FW.RC Form Work 3d 06-Mar-13 09-Mar-13 Form Work
1111 R.F.T 2d 10-Mar-13 11-Mar-13 R.F.T
Pour.RC Pouring Concrete 1d 12-Mar-13 12-Mar-13 Pouring Concrete
R.FW.R Remove Formwork 1d 14-Mar-13 14-Mar-13 Remove Formwork
Ins..RC Insulting 1d 16-Mar-13 16-Mar-13 Insulting
Ground Floor 26d 17-Mar-13 15-Apr-13 15-Apr-13, Ground Floor
Slab on grade
grad 17d 27-Mar-13 15-Apr-13 15-Apr-13, Slab on grade
FW.SOG. Form Work 4d 27-Mar-13 31-Mar-13 Form Work
R.F.T.SOG R.F.T 4d 01-Apr-13 04-Apr-13 R.F.T
Pour.SOG Pouring Concrete 1d 06-Apr-13 06-Apr-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 15-Apr-13 15-Apr-13 Remove Formwork
Columns 8d 17-Mar-13 25-Mar-13 25-Mar-13, Columns
FW.Col.G Form Work 3d 17-Mar-13 19-Mar-13 Form Work
R.F.T.Col. R.F.T 2d 20-Mar-13 21-Mar-13 R.F.T
Pour.Col.G Pouring Concrete 1d 23-Mar-13 23-Mar-13 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 25-Mar-13 25-Mar-13 Remove Formwork
First Floor 19d 16-Apr-13 08-May-13 08-May-13, First Floor
Beams and Slabs 18d 16-Apr-13 07-May-13 07-May-13, Beams and Slabs
FW.B&S.s Form Work 6d 16-Apr-13 22-Apr-13 Form Work
R.F.T.B&S R.F.T 3d 23-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Columns 9d 28-Apr-13 08-May-13 08-May-13, Columns
FW.Col.st. Form Work 3d 28-Apr-13 30-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 02-May-13 05-May-13 R.F.T
Pour.Col.s Pouring Concrete 1d 06-May-13 06-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-May-13 08-May-13 Remove Formwork
Roof 18d 09-May-13 29-May-13 29-May-13, Roof
Beams and Slabs 18d 09-May-13 29-May-13 29-May-13, Beams and Slabs
FW.B&S.R Form Work 6d 09-May-13 15-May-13 Form Work
R.F.T.B&S R.F.T 3d 16-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Mansonary 22d 08-May-13 02-Jun-13 02-Jun-13, Mansonary
Ground Floor 2d 08-May-13 09-May-13 09-May-13, Ground Floor
I.G.M.v502 Internal 2d 08-May-13 09-May-13 Internal
E.G.M.v1101 External 2d 08-May-13 09-May-13 External
First Floor 2d 30-May-13 01-Jun-13 01-Jun-13, First Floor
I.st.M.v502 Internal 2d 30-May-13 01-Jun-13 Internal
E.st.M.v502 External 2d 30-May-13 01-Jun-13 External
Roof 1d 02-Jun-13 02-Jun-13 02-Jun-13, Roof
E.R.M.v1101 External 1d 02-Jun-13 02-Jun-13 External

Actual Work Critical Remaining Work Summary Page 143 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

319
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Finishing 25d 11-May-13 08-Jun-13 08-Jun-13, Finishing
Ground Floor 2d 11-May-13 12-May-13 12-May-13, Ground Floor
Calm Shell 2d 11-May-13 12-May-13 12-May-13, Calm Shell
E.Ch.G500 External 2d 11-May-13 12-May-13 External
External Ele
Electrical 0d
First Floor 2d 02-Jun-13 03-Jun-13 03-Jun-13, First Floor
Calm Shell 2d 02-Jun-13 03-Jun-13 03-Jun-13, Calm Shell
E.ch.st.v11 External 2d 02-Jun-13 03-Jun-13 External
External Ele
Electrical 0d
Roof 1d 04-Jun-13 04-Jun-13 04-Jun-13, Roof
Calm Shell 1d 04-Jun-13 04-Jun-13 04-Jun-13, Calm Shell
E.ch.r.v11 External 1d 04-Jun-13 04-Jun-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 05-Jun-13 08-Jun-13 08-Jun-13, Paint Villa 2
Ex Paint.500 External Painting 3d 05-Jun-13 08-Jun-13 External Painting
Stand alone Villa typ
type 40 245d 25-Nov-12 09-Sep-13 09-Sep-13, Stand alone Villa type 40
A7100 Start Villa 2 0d 25-Nov-12 Start Villa 2
A7110 Finish Villa 2 0d 09-Sep-13 Finish Villa 2
Mobilization 1d 27-Nov-12 27-Nov-12 27-Nov-12, Mobilization
M.Sur. v512 Site surveying 1d 27-Nov-12 27-Nov-12 Site surveying
Earth Work 178d 01-Dec-12 26-Jun-13 26-Jun-13, Earth Work
Ex.v1111 Excavation 2d 01-Dec-12 02-Dec-12 Excavation
B.F.v1111 BackFill 1d 26-Jun-13 26-Jun-13 BackFill
Civil Work 78d 30-May-13 31-Aug-13 31-Aug-13, Civil Work
Foundation 15d 30-May-13 16-Jun-13 16-Jun-13, Foundation
Footing 15d 30-May-13 16-Jun-13 16-Jun-13, Footing
Plain Concrete
Con 6d 30-May-13 05-Jun-13 05-Jun-13, Plain Concrete
FW.PC Form Work 3d 30-May-13 02-Jun-13 Form Work
Pour.PC Pouring Concrete 1d 03-Jun-13 03-Jun-13 Pouring Concrete
R. FW. Remove Formwork 1d 05-Jun-13 05-Jun-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 06-Jun-13 16-Jun-13 16-Jun-13, Reinforced Concrete&Semels
FW.RC Form Work 3d 06-Jun-13 09-Jun-13 Form Work
1121 R.F.T 2d 10-Jun-13 11-Jun-13 R.F.T
Pour.RC Pouring Concrete 1d 12-Jun-13 12-Jun-13 Pouring Concrete
R.FW.R Remove Formwork 1d 15-Jun-13 15-Jun-13 Remove Formwork
Ins..RC Insulting 1d 16-Jun-13 16-Jun-13 Insulting
Ground Floor 26d 17-Jun-13 16-Jul-13 16-Jul-13, Ground Floor
Slab on grade
grad 17d 27-Jun-13 16-Jul-13 16-Jul-13, Slab on grade
FW.SOG. Form Work 4d 27-Jun-13 01-Jul-13 Form Work
R.F.T.SOG R.F.T 4d 02-Jul-13 06-Jul-13 R.F.T
Pour.SOG Pouring Concrete 1d 07-Jul-13 07-Jul-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 16-Jul-13 16-Jul-13 Remove Formwork
Columns 8d 17-Jun-13 25-Jun-13 25-Jun-13, Columns
FW.Col.G Form Work 3d 17-Jun-13 19-Jun-13 Form Work
R.F.T.Col. R.F.T 2d 20-Jun-13 22-Jun-13 R.F.T
Pour.Col.G Pouring Concrete 1d 23-Jun-13 23-Jun-13 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 25-Jun-13 25-Jun-13 Remove Formwork
First Floor 19d 17-Jul-13 07-Aug-13 07-Aug-13, First Floor
Beams and Slabs 18d 17-Jul-13 06-Aug-13 06-Aug-13, Beams and Slabs
FW.B&S.s Form Work 6d 17-Jul-13 23-Jul-13 Form Work
R.F.T.B&S R.F.T 3d 24-Jul-13 27-Jul-13 R.F.T
Pour.B&S. Pouring Concrete 1d 28-Jul-13 28-Jul-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 06-Aug-13 06-Aug-13 Remove Formwork
Columns 9d 29-Jul-13 07-Aug-13 07-Aug-13, Columns
FW.Col.st. Form Work 3d 29-Jul-13 31-Jul-13 Form Work
R.F.T.Col. R.F.T 3d 01-Aug-13 04-Aug-13 R.F.T
Pour.Col.s Pouring Concrete 1d 05-Aug-13 05-Aug-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-Aug-13 07-Aug-13 Remove Formwork
Roof 18d 11-Aug-13 31-Aug-13 31-Aug-13, Roof
Beams and Slabs 18d 11-Aug-13 31-Aug-13 31-Aug-13, Beams and Slabs
FW.B&S.R Form Work 6d 11-Aug-13 17-Aug-13 Form Work
R.F.T.B&S R.F.T 3d 18-Aug-13 20-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Aug-13 21-Aug-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 31-Aug-13 31-Aug-13 Remove Formwork
Mansonary 22d 07-Aug-13 03-Sep-13 03-Sep-13, Mansonary
Ground Floor 2d 07-Aug-13 11-Aug-13 11-Aug-13, Ground Floor
I.G.M.v512 Internal 2d 07-Aug-13 11-Aug-13 Internal
E.G.M.v1111 External 2d 07-Aug-13 11-Aug-13 External
First Floor 2d 01-Sep-13 02-Sep-13 02-Sep-13, First Floor
I.st.M.v512 Internal 2d 01-Sep-13 02-Sep-13 Internal
E.st.M.v512 External 2d 01-Sep-13 02-Sep-13 External
Roof 1d 03-Sep-13 03-Sep-13 03-Sep-13, Roof
E.R.M.v1111 External 1d 03-Sep-13 03-Sep-13 External
Finishing 25d 12-Aug-13 09-Sep-13 09-Sep-13, Finishing
Ground Floor 2d 12-Aug-13 13-Aug-13 13-Aug-13, Ground Floor
Calm Shell 2d 12-Aug-13 13-Aug-13 13-Aug-13, Calm Shell

Actual Work Critical Remaining Work Summary Page 144 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

320
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.Ch.G510 External 2d 12-Aug-13 13-Aug-13 External
External Ele
Electrical 0d
First Floor 2d 03-Sep-13 04-Sep-13 04-Sep-13, First Floor
Calm Shell 2d 03-Sep-13 04-Sep-13 04-Sep-13, Calm Shell
E.ch.st.v11 External 2d 03-Sep-13 04-Sep-13 External
External Ele
Electrical 0d
Roof 1d 05-Sep-13 05-Sep-13 05-Sep-13, Roof
Calm Shell 1d 05-Sep-13 05-Sep-13 05-Sep-13, Calm Shell
E.ch.r.v11 External 1d 05-Sep-13 05-Sep-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 07-Sep-13 09-Sep-13 09-Sep-13, Paint Villa 2
Ex Paint.510 External Painting 3d 07-Sep-13 09-Sep-13 External Painting
Stand alone Villa typ
type 41 323d 25-Nov-12 14-Dec-13 14-Dec-13, Stand alone Villa type 41
A7340 Start Villa 2 0d 25-Nov-12 Start Villa 2
A7350 Finish Villa 2 0d 14-Dec-13 Finish Villa 2
Mobilization 1d 28-Nov-12 28-Nov-12 28-Nov-12, Mobilization
M.Sur. v522 Site surveying 1d 28-Nov-12 28-Nov-12 Site surveying
Earth Work 254d 03-Dec-12 28-Sep-13 28-Sep-13, Earth Work
Ex.v1121 Excavation 2d 03-Dec-12 04-Dec-12 Excavation
B.F.v1121 BackFill 1d 28-Sep-13 28-Sep-13 BackFill
Civil Work 78d 01-Sep-13 04-Dec-13 04-Dec-13, Civil Work
Foundation 15d 01-Sep-13 17-Sep-13 17-Sep-13, Foundation
Footing 15d 01-Sep-13 17-Sep-13 17-Sep-13, Footing
Plain Concrete
Con 6d 01-Sep-13 07-Sep-13 07-Sep-13, Plain Concrete
FW.PC Form Work 3d 01-Sep-13 03-Sep-13 Form Work
Pour.PC Pouring Concrete 1d 04-Sep-13 04-Sep-13 Pouring Concrete
R. FW. Remove Formwork 1d 07-Sep-13 07-Sep-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 08-Sep-13 17-Sep-13 17-Sep-13, Reinforced Concrete&Semels
FW.RC Form Work 3d 08-Sep-13 10-Sep-13 Form Work
1131 R.F.T 2d 11-Sep-13 12-Sep-13 R.F.T
Pour.RC Pouring Concrete 1d 14-Sep-13 14-Sep-13 Pouring Concrete
R.FW.R Remove Formwork 1d 16-Sep-13 16-Sep-13 Remove Formwork
Ins..RC Insulting 1d 17-Sep-13 17-Sep-13 Insulting
Ground Floor 26d 18-Sep-13 22-Oct-13 22-Oct-13, Ground Floor
Slab on grade
grad 17d 29-Sep-13 22-Oct-13 22-Oct-13, Slab on grade
FW.SOG. Form Work 4d 29-Sep-13 02-Oct-13 Form Work
R.F.T.SOG R.F.T 4d 03-Oct-13 08-Oct-13 R.F.T
Pour.SOG Pouring Concrete 1d 09-Oct-13 09-Oct-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Columns 8d 18-Sep-13 26-Sep-13 26-Sep-13, Columns
FW.Col.G Form Work 3d 18-Sep-13 21-Sep-13 Form Work
R.F.T.Col. R.F.T 2d 22-Sep-13 23-Sep-13 R.F.T
Pour.Col.G Pouring Concrete 1d 24-Sep-13 24-Sep-13 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 26-Sep-13 26-Sep-13 Remove Formwork
First Floor 19d 23-Oct-13 13-Nov-13 13-Nov-13, First Floor
Beams and Slabs 18d 23-Oct-13 12-Nov-13 12-Nov-13, Beams and Slabs
FW.B&S.s Form Work 6d 23-Oct-13 29-Oct-13 Form Work
R.F.T.B&S R.F.T 3d 30-Oct-13 02-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Nov-13 03-Nov-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 12-Nov-13 12-Nov-13 Remove Formwork
Columns 9d 04-Nov-13 13-Nov-13 13-Nov-13, Columns
FW.Col.st. Form Work 3d 04-Nov-13 06-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 07-Nov-13 10-Nov-13 R.F.T
Pour.Col.s Pouring Concrete 1d 11-Nov-13 11-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Roof 18d 14-Nov-13 04-Dec-13 04-Dec-13, Roof
Beams and Slabs 18d 14-Nov-13 04-Dec-13 04-Dec-13, Beams and Slabs
FW.B&S.R Form Work 6d 14-Nov-13 20-Nov-13 Form Work
R.F.T.B&S R.F.T 3d 21-Nov-13 24-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Nov-13 25-Nov-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 04-Dec-13 04-Dec-13 Remove Formwork
Mansonary 22d 13-Nov-13 08-Dec-13 08-Dec-13, Mansonary
Ground Floor 2d 13-Nov-13 14-Nov-13 14-Nov-13, Ground Floor
I.G.M.v522 Internal 2d 13-Nov-13 14-Nov-13 Internal
E.G.M.v1121 External 2d 13-Nov-13 14-Nov-13 External
First Floor 2d 05-Dec-13 07-Dec-13 07-Dec-13, First Floor
I.st.M.v522 Internal 2d 05-Dec-13 07-Dec-13 Internal
E.st.M.v522 External 2d 05-Dec-13 07-Dec-13 External
Roof 1d 08-Dec-13 08-Dec-13 08-Dec-13, Roof
E.R.M.v1121 External 1d 08-Dec-13 08-Dec-13 External
Finishing 25d 16-Nov-13 14-Dec-13 14-Dec-13, Finishing
Ground Floor 2d 16-Nov-13 17-Nov-13 17-Nov-13, Ground Floor
Calm Shell 2d 16-Nov-13 17-Nov-13 17-Nov-13, Calm Shell
E.Ch.G520 External 2d 16-Nov-13 17-Nov-13 External
External Ele
Electrical 0d
First Floor 2d 08-Dec-13 09-Dec-13 09-Dec-13, First Floor

Actual Work Critical Remaining Work Summary Page 145 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

321
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Calm Shell 2d 08-Dec-13 09-Dec-13 09-Dec-13, Calm Shell
E.ch.st.v11 External 2d 08-Dec-13 09-Dec-13 External
External Ele
Electrical 0d
Roof 1d 10-Dec-13 10-Dec-13 10-Dec-13, Roof
Calm Shell 1d 10-Dec-13 10-Dec-13 10-Dec-13, Calm Shell
E.ch.r.v11 External 1d 10-Dec-13 10-Dec-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 11-Dec-13 14-Dec-13 14-Dec-13, Paint Villa 2
Ex Paint.520 External Painting 3d 11-Dec-13 14-Dec-13 External Painting
Stand alone Villa typ
type 42 89d 25-Nov-12 07-Mar-13 07-Mar-13, Stand alone Villa type 42
A6840 Start Villa 2 0d 25-Nov-12 Start Villa 2
A6850 Finish Villa 2 0d 07-Mar-13 Finish Villa 2
Mobilization 1d 25-Nov-12 25-Nov-12 25-Nov-12, Mobilization
M.Sur. v572 Site surveying 1d 25-Nov-12 25-Nov-12 Site surveying
Earth Work 26d 26-Nov-12 25-Dec-12 25-Dec-12, Earth Work
Ex.v1171 Excavation 2d 26-Nov-12 27-Nov-12 Excavation
B.F.v1171 BackFill 1d 25-Dec-12 25-Dec-12 BackFill
Civil Work 78d 28-Nov-12 26-Feb-13 26-Feb-13, Civil Work
Foundation 15d 28-Nov-12 15-Dec-12 15-Dec-12, Foundation
Footing 15d 28-Nov-12 15-Dec-12 15-Dec-12, Footing
Plain Concrete
Con 6d 28-Nov-12 04-Dec-12 04-Dec-12, Plain Concrete
FW.PC Form Work 3d 28-Nov-12 01-Dec-12 Form Work
Pour.PC Pouring Concrete 1d 02-Dec-12 02-Dec-12 Pouring Concrete
R. FW. Remove Formwork 1d 04-Dec-12 04-Dec-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 05-Dec-12 15-Dec-12 15-Dec-12, Reinforced Concrete&Semels
FW.RC Form Work 3d 05-Dec-12 08-Dec-12 Form Work
1181 R.F.T 2d 09-Dec-12 10-Dec-12 R.F.T
Pour.RC Pouring Concrete 1d 11-Dec-12 11-Dec-12 Pouring Concrete
R.FW.R Remove Formwork 1d 13-Dec-12 13-Dec-12 Remove Formwork
Ins..RC Insulting 1d 15-Dec-12 15-Dec-12 Insulting
Ground Floor 26d 16-Dec-12 14-Jan-13 14-Jan-13, Ground Floor
Slab on grade
grad 17d 26-Dec-12 14-Jan-13 14-Jan-13, Slab on grade
FW.SOG. Form Work 4d 26-Dec-12 30-Dec-12 Form Work
R.F.T.SOG R.F.T 4d 31-Dec-12 03-Jan-13 R.F.T
Pour.SOG Pouring Concrete 1d 05-Jan-13 05-Jan-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 14-Jan-13 14-Jan-13 Remove Formwork
Columns 8d 16-Dec-12 24-Dec-12 24-Dec-12, Columns
FW.Col.G Form Work 3d 16-Dec-12 18-Dec-12 Form Work
R.F.T.Col. R.F.T 2d 19-Dec-12 20-Dec-12 R.F.T
Pour.Col.G Pouring Concrete 1d 22-Dec-12 22-Dec-12 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 24-Dec-12 24-Dec-12 Remove Formwork
First Floor 19d 15-Jan-13 05-Feb-13 05-Feb-13, First Floor
Beams and Slabs 18d 15-Jan-13 04-Feb-13 04-Feb-13, Beams and Slabs
FW.B&S.s Form Work 6d 15-Jan-13 21-Jan-13 Form Work
R.F.T.B&S R.F.T 3d 22-Jan-13 24-Jan-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Jan-13 26-Jan-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 04-Feb-13 04-Feb-13 Remove Formwork
Columns 9d 27-Jan-13 05-Feb-13 05-Feb-13, Columns
FW.Col.st. Form Work 3d 27-Jan-13 29-Jan-13 Form Work
R.F.T.Col. R.F.T 3d 30-Jan-13 02-Feb-13 R.F.T
Pour.Col.s Pouring Concrete 1d 03-Feb-13 03-Feb-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 05-Feb-13 05-Feb-13 Remove Formwork
Roof 18d 06-Feb-13 26-Feb-13 26-Feb-13, Roof
Beams and Slabs 18d 06-Feb-13 26-Feb-13 26-Feb-13, Beams and Slabs
FW.B&S.R Form Work 6d 06-Feb-13 12-Feb-13 Form Work
R.F.T.B&S R.F.T 3d 13-Feb-13 16-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 17-Feb-13 17-Feb-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 26-Feb-13 26-Feb-13 Remove Formwork
Mansonary 22d 05-Feb-13 02-Mar-13 02-Mar-13, Mansonary
Ground Floor 2d 05-Feb-13 06-Feb-13 06-Feb-13, Ground Floor
I.G.M.v572 Internal 2d 05-Feb-13 06-Feb-13 Internal
E.G.M.v1171 External 2d 05-Feb-13 06-Feb-13 External
First Floor 2d 27-Feb-13 28-Feb-13 28-Feb-13, First Floor
I.st.M.v572 Internal 2d 27-Feb-13 28-Feb-13 Internal
E.st.M.v572 External 2d 27-Feb-13 28-Feb-13 External
Roof 1d 02-Mar-13 02-Mar-13 02-Mar-13, Roof
E.R.M.v1171 External 1d 02-Mar-13 02-Mar-13 External
Finishing 25d 07-Feb-13 07-Mar-13 07-Mar-13, Finishing
Ground Floor 2d 07-Feb-13 09-Feb-13 09-Feb-13, Ground Floor
Calm Shell 2d 07-Feb-13 09-Feb-13 09-Feb-13, Calm Shell
E.Ch.G570 External 2d 07-Feb-13 09-Feb-13 External
External Ele
Electrical 0d
First Floor 2d 02-Mar-13 03-Mar-13 03-Mar-13, First Floor
Calm Shell 2d 02-Mar-13 03-Mar-13 03-Mar-13, Calm Shell
E.ch.st.v11 External 2d 02-Mar-13 03-Mar-13 External
External Ele
Electrical 0d

Actual Work Critical Remaining Work Summary Page 146 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

322
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Roof 1d 04-Mar-13 04-Mar-13 04-Mar-13, Roof
Calm Shell 1d 04-Mar-13 04-Mar-13 04-Mar-13, Calm Shell
E.ch.r.v11 External 1d 04-Mar-13 04-Mar-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 05-Mar-13 07-Mar-13 07-Mar-13, Paint Villa 2
Ex Paint.570 External Painting 3d 05-Mar-13 07-Mar-13 External Painting
Stand alone Villa typ
type 43 167d 25-Nov-12 08-Jun-13 08-Jun-13, Stand alone Villa type 43
A6940 Start Villa 2 0d 25-Nov-12 Start Villa 2
A6950 Finish Villa 2 0d 08-Jun-13 Finish Villa 2
Mobilization 1d 26-Nov-12 26-Nov-12 26-Nov-12, Mobilization
M.Sur. v542 Site surveying 1d 26-Nov-12 26-Nov-12 Site surveying
Earth Work 102d 28-Nov-12 26-Mar-13 26-Mar-13, Earth Work
Ex.v1141 Excavation 2d 28-Nov-12 29-Nov-12 Excavation
B.F.v1141 BackFill 1d 26-Mar-13 26-Mar-13 BackFill
Civil Work 78d 27-Feb-13 29-May-13 29-May-13, Civil Work
Foundation 15d 27-Feb-13 16-Mar-13 16-Mar-13, Foundation
Footing 15d 27-Feb-13 16-Mar-13 16-Mar-13, Footing
Plain Concrete
Con 6d 27-Feb-13 05-Mar-13 05-Mar-13, Plain Concrete
FW.PC Form Work 3d 27-Feb-13 02-Mar-13 Form Work
Pour.PC Pouring Concrete 1d 03-Mar-13 03-Mar-13 Pouring Concrete
R. FW. Remove Formwork 1d 05-Mar-13 05-Mar-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 06-Mar-13 16-Mar-13 16-Mar-13, Reinforced Concrete&Semels
FW.RC Form Work 3d 06-Mar-13 09-Mar-13 Form Work
1151 R.F.T 2d 10-Mar-13 11-Mar-13 R.F.T
Pour.RC Pouring Concrete 1d 12-Mar-13 12-Mar-13 Pouring Concrete
R.FW.R Remove Formwork 1d 14-Mar-13 14-Mar-13 Remove Formwork
Ins..RC Insulting 1d 16-Mar-13 16-Mar-13 Insulting
Ground Floor 26d 17-Mar-13 15-Apr-13 15-Apr-13, Ground Floor
Slab on grade
grad 17d 27-Mar-13 15-Apr-13 15-Apr-13, Slab on grade
FW.SOG. Form Work 4d 27-Mar-13 31-Mar-13 Form Work
R.F.T.SOG R.F.T 4d 01-Apr-13 04-Apr-13 R.F.T
Pour.SOG Pouring Concrete 1d 06-Apr-13 06-Apr-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 15-Apr-13 15-Apr-13 Remove Formwork
Columns 8d 17-Mar-13 25-Mar-13 25-Mar-13, Columns
FW.Col.G Form Work 3d 17-Mar-13 19-Mar-13 Form Work
R.F.T.Col. R.F.T 2d 20-Mar-13 21-Mar-13 R.F.T
Pour.Col.G Pouring Concrete 1d 23-Mar-13 23-Mar-13 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 25-Mar-13 25-Mar-13 Remove Formwork
First Floor 19d 16-Apr-13 08-May-13 08-May-13, First Floor
Beams and Slabs 18d 16-Apr-13 07-May-13 07-May-13, Beams and Slabs
FW.B&S.s Form Work 6d 16-Apr-13 22-Apr-13 Form Work
R.F.T.B&S R.F.T 3d 23-Apr-13 25-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 27-Apr-13 27-Apr-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 07-May-13 07-May-13 Remove Formwork
Columns 9d 28-Apr-13 08-May-13 08-May-13, Columns
FW.Col.st. Form Work 3d 28-Apr-13 30-Apr-13 Form Work
R.F.T.Col. R.F.T 3d 02-May-13 05-May-13 R.F.T
Pour.Col.s Pouring Concrete 1d 06-May-13 06-May-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 08-May-13 08-May-13 Remove Formwork
Roof 18d 09-May-13 29-May-13 29-May-13, Roof
Beams and Slabs 18d 09-May-13 29-May-13 29-May-13, Beams and Slabs
FW.B&S.R Form Work 6d 09-May-13 15-May-13 Form Work
R.F.T.B&S R.F.T 3d 16-May-13 19-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 20-May-13 20-May-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 29-May-13 29-May-13 Remove Formwork
Mansonary 22d 08-May-13 02-Jun-13 02-Jun-13, Mansonary
Ground Floor 2d 08-May-13 09-May-13 09-May-13, Ground Floor
I.G.M.v542 Internal 2d 08-May-13 09-May-13 Internal
E.G.M.v1141 External 2d 08-May-13 09-May-13 External
First Floor 2d 30-May-13 01-Jun-13 01-Jun-13, First Floor
I.st.M.v542 Internal 2d 30-May-13 01-Jun-13 Internal
E.st.M.v542 External 2d 30-May-13 01-Jun-13 External
Roof 1d 02-Jun-13 02-Jun-13 02-Jun-13, Roof
E.R.M.v1141 External 1d 02-Jun-13 02-Jun-13 External
Finishing 25d 11-May-13 08-Jun-13 08-Jun-13, Finishing
Ground Floor 2d 11-May-13 12-May-13 12-May-13, Ground Floor
Calm Shell 2d 11-May-13 12-May-13 12-May-13, Calm Shell
E.Ch.G540 External 2d 11-May-13 12-May-13 External
External Ele
Electrical 0d
First Floor 2d 02-Jun-13 03-Jun-13 03-Jun-13, First Floor
Calm Shell 2d 02-Jun-13 03-Jun-13 03-Jun-13, Calm Shell
E.ch.st.v11 External 2d 02-Jun-13 03-Jun-13 External
External Ele
Electrical 0d
Roof 1d 04-Jun-13 04-Jun-13 04-Jun-13, Roof
Calm Shell 1d 04-Jun-13 04-Jun-13 04-Jun-13, Calm Shell
E.ch.r.v11 External 1d 04-Jun-13 04-Jun-13 External

Actual Work Critical Remaining Work Summary Page 147 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

323
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
External Ele
Electrical 0d
Paint Villa 2 3d 05-Jun-13 08-Jun-13 08-Jun-13, Paint Villa 2
Ex Paint.540 External Painting 3d 05-Jun-13 08-Jun-13 External Painting
Stand alone Villa typ
type 44 245d 25-Nov-12 09-Sep-13 09-Sep-13, Stand alone Villa type 44
A7020 Start Villa 2 0d 25-Nov-12 Start Villa 2
A7030 Finish Villa 2 0d 09-Sep-13 Finish Villa 2
Mobilization 1d 27-Nov-12 27-Nov-12 27-Nov-12, Mobilization
M.Sur. v552 Site surveying 1d 27-Nov-12 27-Nov-12 Site surveying
Earth Work 178d 01-Dec-12 26-Jun-13 26-Jun-13, Earth Work
Ex.v1151 Excavation 2d 01-Dec-12 02-Dec-12 Excavation
B.F.v1151 BackFill 1d 26-Jun-13 26-Jun-13 BackFill
Civil Work 78d 30-May-13 31-Aug-13 31-Aug-13, Civil Work
Foundation 15d 30-May-13 16-Jun-13 16-Jun-13, Foundation
Footing 15d 30-May-13 16-Jun-13 16-Jun-13, Footing
Plain Concrete
Con 6d 30-May-13 05-Jun-13 05-Jun-13, Plain Concrete
FW.PC Form Work 3d 30-May-13 02-Jun-13 Form Work
Pour.PC Pouring Concrete 1d 03-Jun-13 03-Jun-13 Pouring Concrete
R. FW. Remove Formwork 1d 05-Jun-13 05-Jun-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 06-Jun-13 16-Jun-13 16-Jun-13, Reinforced Concrete&Semels
FW.RC Form Work 3d 06-Jun-13 09-Jun-13 Form Work
1161 R.F.T 2d 10-Jun-13 11-Jun-13 R.F.T
Pour.RC Pouring Concrete 1d 12-Jun-13 12-Jun-13 Pouring Concrete
R.FW.R Remove Formwork 1d 15-Jun-13 15-Jun-13 Remove Formwork
Ins..RC Insulting 1d 16-Jun-13 16-Jun-13 Insulting
Ground Floor 26d 17-Jun-13 16-Jul-13 16-Jul-13, Ground Floor
Slab on grade
grad 17d 27-Jun-13 16-Jul-13 16-Jul-13, Slab on grade
FW.SOG. Form Work 4d 27-Jun-13 01-Jul-13 Form Work
R.F.T.SOG R.F.T 4d 02-Jul-13 06-Jul-13 R.F.T
Pour.SOG Pouring Concrete 1d 07-Jul-13 07-Jul-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 16-Jul-13 16-Jul-13 Remove Formwork
Columns 8d 17-Jun-13 25-Jun-13 25-Jun-13, Columns
FW.Col.G Form Work 3d 17-Jun-13 19-Jun-13 Form Work
R.F.T.Col. R.F.T 2d 20-Jun-13 22-Jun-13 R.F.T
Pour.Col.G Pouring Concrete 1d 23-Jun-13 23-Jun-13 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 25-Jun-13 25-Jun-13 Remove Formwork
First Floor 19d 17-Jul-13 07-Aug-13 07-Aug-13, First Floor
Beams and Slabs 18d 17-Jul-13 06-Aug-13 06-Aug-13, Beams and Slabs
FW.B&S.s Form Work 6d 17-Jul-13 23-Jul-13 Form Work
R.F.T.B&S R.F.T 3d 24-Jul-13 27-Jul-13 R.F.T
Pour.B&S. Pouring Concrete 1d 28-Jul-13 28-Jul-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 06-Aug-13 06-Aug-13 Remove Formwork
Columns 9d 29-Jul-13 07-Aug-13 07-Aug-13, Columns
FW.Col.st. Form Work 3d 29-Jul-13 31-Jul-13 Form Work
R.F.T.Col. R.F.T 3d 01-Aug-13 04-Aug-13 R.F.T
Pour.Col.s Pouring Concrete 1d 05-Aug-13 05-Aug-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 07-Aug-13 07-Aug-13 Remove Formwork
Roof 18d 11-Aug-13 31-Aug-13 31-Aug-13, Roof
Beams and Slabs 18d 11-Aug-13 31-Aug-13 31-Aug-13, Beams and Slabs
FW.B&S.R Form Work 6d 11-Aug-13 17-Aug-13 Form Work
R.F.T.B&S R.F.T 3d 18-Aug-13 20-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 21-Aug-13 21-Aug-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 31-Aug-13 31-Aug-13 Remove Formwork
Mansonary 22d 07-Aug-13 03-Sep-13 03-Sep-13, Mansonary
Ground Floor 2d 07-Aug-13 11-Aug-13 11-Aug-13, Ground Floor
I.G.M.v552 Internal 2d 07-Aug-13 11-Aug-13 Internal
E.G.M.v1151 External 2d 07-Aug-13 11-Aug-13 External
First Floor 2d 01-Sep-13 02-Sep-13 02-Sep-13, First Floor
I.st.M.v552 Internal 2d 01-Sep-13 02-Sep-13 Internal
E.st.M.v552 External 2d 01-Sep-13 02-Sep-13 External
Roof 1d 03-Sep-13 03-Sep-13 03-Sep-13, Roof
E.R.M.v1151 External 1d 03-Sep-13 03-Sep-13 External
Finishing 25d 12-Aug-13 09-Sep-13 09-Sep-13, Finishing
Ground Floor 2d 12-Aug-13 13-Aug-13 13-Aug-13, Ground Floor
Calm Shell 2d 12-Aug-13 13-Aug-13 13-Aug-13, Calm Shell
E.Ch.G550 External 2d 12-Aug-13 13-Aug-13 External
External Ele
Electrical 0d
First Floor 2d 03-Sep-13 04-Sep-13 04-Sep-13, First Floor
Calm Shell 2d 03-Sep-13 04-Sep-13 04-Sep-13, Calm Shell
E.ch.st.v11 External 2d 03-Sep-13 04-Sep-13 External
External Ele
Electrical 0d
Roof 1d 05-Sep-13 05-Sep-13 05-Sep-13, Roof
Calm Shell 1d 05-Sep-13 05-Sep-13 05-Sep-13, Calm Shell
E.ch.r.v11 External 1d 05-Sep-13 05-Sep-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 07-Sep-13 09-Sep-13 09-Sep-13, Paint Villa 2
Ex Paint.550 External Painting 3d 07-Sep-13 09-Sep-13 External Painting

Actual Work Critical Remaining Work Summary Page 148 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

324
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Stand alone Villa typ
type 45 323d 25-Nov-12 14-Dec-13 14-Dec-13, Stand alone Villa type 45
A7120 Start Villa 2 0d 25-Nov-12 Start Villa 2
A7130 Finish Villa 2 0d 14-Dec-13 Finish Villa 2
Mobilization 1d 28-Nov-12 28-Nov-12 28-Nov-12, Mobilization
M.Sur. v562 Site surveying 1d 28-Nov-12 28-Nov-12 Site surveying
Earth Work 254d 03-Dec-12 28-Sep-13 28-Sep-13, Earth Work
Ex.v1161 Excavation 2d 03-Dec-12 04-Dec-12 Excavation
B.F.v1161 BackFill 1d 28-Sep-13 28-Sep-13 BackFill
Civil Work 78d 01-Sep-13 04-Dec-13 04-Dec-13, Civil Work
Foundation 15d 01-Sep-13 17-Sep-13 17-Sep-13, Foundation
Footing 15d 01-Sep-13 17-Sep-13 17-Sep-13, Footing
Plain Concrete
Con 6d 01-Sep-13 07-Sep-13 07-Sep-13, Plain Concrete
FW.PC Form Work 3d 01-Sep-13 03-Sep-13 Form Work
Pour.PC Pouring Concrete 1d 04-Sep-13 04-Sep-13 Pouring Concrete
R. FW. Remove Formwork 1d 07-Sep-13 07-Sep-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 9d 08-Sep-13 17-Sep-13 17-Sep-13, Reinforced Concrete&Semels
FW.RC Form Work 3d 08-Sep-13 10-Sep-13 Form Work
1171 R.F.T 2d 11-Sep-13 12-Sep-13 R.F.T
Pour.RC Pouring Concrete 1d 14-Sep-13 14-Sep-13 Pouring Concrete
R.FW.R Remove Formwork 1d 16-Sep-13 16-Sep-13 Remove Formwork
Ins..RC Insulting 1d 17-Sep-13 17-Sep-13 Insulting
Ground Floor 26d 18-Sep-13 22-Oct-13 22-Oct-13, Ground Floor
Slab on grade
grad 17d 29-Sep-13 22-Oct-13 22-Oct-13, Slab on grade
FW.SOG. Form Work 4d 29-Sep-13 02-Oct-13 Form Work
R.F.T.SOG R.F.T 4d 03-Oct-13 08-Oct-13 R.F.T
Pour.SOG Pouring Concrete 1d 09-Oct-13 09-Oct-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 22-Oct-13 22-Oct-13 Remove Formwork
Columns 8d 18-Sep-13 26-Sep-13 26-Sep-13, Columns
FW.Col.G Form Work 3d 18-Sep-13 21-Sep-13 Form Work
R.F.T.Col. R.F.T 2d 22-Sep-13 23-Sep-13 R.F.T
Pour.Col.G Pouring Concrete 1d 24-Sep-13 24-Sep-13 Pouring Concrete
Ins.Col.G. Remove Formwork 1d 26-Sep-13 26-Sep-13 Remove Formwork
First Floor 19d 23-Oct-13 13-Nov-13 13-Nov-13, First Floor
Beams and Slabs 18d 23-Oct-13 12-Nov-13 12-Nov-13, Beams and Slabs
FW.B&S.s Form Work 6d 23-Oct-13 29-Oct-13 Form Work
R.F.T.B&S R.F.T 3d 30-Oct-13 02-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 03-Nov-13 03-Nov-13 Pouring Concrete
Ins.B&S.st Remove Formwork 1d 12-Nov-13 12-Nov-13 Remove Formwork
Columns 9d 04-Nov-13 13-Nov-13 13-Nov-13, Columns
FW.Col.st. Form Work 3d 04-Nov-13 06-Nov-13 Form Work
R.F.T.Col. R.F.T 3d 07-Nov-13 10-Nov-13 R.F.T
Pour.Col.s Pouring Concrete 1d 11-Nov-13 11-Nov-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 13-Nov-13 13-Nov-13 Remove Formwork
Roof 18d 14-Nov-13 04-Dec-13 04-Dec-13, Roof
Beams and Slabs 18d 14-Nov-13 04-Dec-13 04-Dec-13, Beams and Slabs
FW.B&S.R Form Work 6d 14-Nov-13 20-Nov-13 Form Work
R.F.T.B&S R.F.T 3d 21-Nov-13 24-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 25-Nov-13 25-Nov-13 Pouring Concrete
R. FW.B& Remove Formwork 1d 04-Dec-13 04-Dec-13 Remove Formwork
Mansonary 22d 13-Nov-13 08-Dec-13 08-Dec-13, Mansonary
Ground Floor 2d 13-Nov-13 14-Nov-13 14-Nov-13, Ground Floor
I.G.M.v562 Internal 2d 13-Nov-13 14-Nov-13 Internal
E.G.M.v1161 External 2d 13-Nov-13 14-Nov-13 External
First Floor 2d 05-Dec-13 07-Dec-13 07-Dec-13, First Floor
I.st.M.v562 Internal 2d 05-Dec-13 07-Dec-13 Internal
E.st.M.v562 External 2d 05-Dec-13 07-Dec-13 External
Roof 1d 08-Dec-13 08-Dec-13 08-Dec-13, Roof
E.R.M.v1161 External 1d 08-Dec-13 08-Dec-13 External
Finishing 25d 16-Nov-13 14-Dec-13 14-Dec-13, Finishing
Ground Floor 2d 16-Nov-13 17-Nov-13 17-Nov-13, Ground Floor
Calm Shell 2d 16-Nov-13 17-Nov-13 17-Nov-13, Calm Shell
E.Ch.G560 External 2d 16-Nov-13 17-Nov-13 External
External Ele
Electrical 0d
First Floor 2d 08-Dec-13 09-Dec-13 09-Dec-13, First Floor
Calm Shell 2d 08-Dec-13 09-Dec-13 09-Dec-13, Calm Shell
E.ch.st.v11 External 2d 08-Dec-13 09-Dec-13 External
External Ele
Electrical 0d
Roof 1d 10-Dec-13 10-Dec-13 10-Dec-13, Roof
Calm Shell 1d 10-Dec-13 10-Dec-13 10-Dec-13, Calm Shell
E.ch.r.v11 External 1d 10-Dec-13 10-Dec-13 External
External Ele
Electrical 0d
Paint Villa 2 3d 11-Dec-13 14-Dec-13 14-Dec-13, Paint Villa 2
Ex Paint.560 External Painting 3d 11-Dec-13 14-Dec-13 External Painting
Stand alone Villa typ
type 46 87d 25-Nov-12 05-Mar-13 05-Mar-13, Stand alone Villa type 46
A7200 start Villa 0d 25-Nov-12 start Villa
A7210 Finish Villa 0d 05-Mar-13 Finish Villa

Actual Work Critical Remaining Work Summary Page 149 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

325
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Mobilization 1d 25-Nov-12 25-Nov-12 25-Nov-12, Mobilization
M. Sur.v881 Site Surveying 1d 25-Nov-12 25-Nov-12 Site Surveying
Earth Work 26d 26-Nov-12 25-Dec-12 25-Dec-12, Earth Work
Ex.v1181 Excavation 2d 26-Nov-12 27-Nov-12 Excavation
B.F.v1181 BackFill 2d 24-Dec-12 25-Dec-12 BackFill
Civil Work 76d 28-Nov-12 24-Feb-13 24-Feb-13, Civil Work
Foundation 15d 28-Nov-12 15-Dec-12 15-Dec-12, Foundation
Footing 15d 28-Nov-12 15-Dec-12 15-Dec-12, Footing
Plain Concrete
Con 5d 28-Nov-12 03-Dec-12 03-Dec-12, Plain Concrete
F.W.Pc Form Work 2d 28-Nov-12 29-Nov-12 Form Work
Pour.Pc Pouring Concrete 1d 01-Dec-12 01-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 03-Dec-12 03-Dec-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 04-Dec-12 15-Dec-12 15-Dec-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 04-Dec-12 08-Dec-12 Form Work
1191 R.F.T 2d 09-Dec-12 10-Dec-12 R.F.T
Pour.Rc Pouring Concrete 1d 11-Dec-12 11-Dec-12 Pouring Concrete
R.Fw.R Remove formwork 1d 13-Dec-12 13-Dec-12 Remove formwork
Ins.Rc& Insulting 1d 15-Dec-12 15-Dec-12 Insulting
Ground Floor 25d 16-Dec-12 13-Jan-13 13-Jan-13, Ground Floor
Slab on grade
grad 16d 26-Dec-12 13-Jan-13 13-Jan-13, Slab on grade
FW.SOG. Form Work 4d 26-Dec-12 30-Dec-12 Form Work
R.F.T.SOG R.F.T 3d 31-Dec-12 02-Jan-13 R.F.T
Pour.SOG Pouring Concrete 1d 03-Jan-13 03-Jan-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 13-Jan-13 13-Jan-13 Remove formwork
Columns 7d 16-Dec-12 23-Dec-12 23-Dec-12, Columns
FW.Col.G Form Work 2d 16-Dec-12 17-Dec-12 Form Work
R.F.T.Col. R.F.T 2d 18-Dec-12 19-Dec-12 R.F.T
Pour.Col.G Pouring Concrete 1d 20-Dec-12 20-Dec-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 23-Dec-12 23-Dec-12 Remove formwork
First Floor 18d 14-Jan-13 03-Feb-13 03-Feb-13, First Floor
Beams and slab 18d 14-Jan-13 03-Feb-13 03-Feb-13, Beams and slab
FW.B&S.s Form Work 6d 14-Jan-13 20-Jan-13 Form Work
R.F.T.B&S R.F.T 3d 21-Jan-13 23-Jan-13 R.F.T
Pour.B&S. Pouring Concrete 1d 24-Jan-13 24-Jan-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 03-Feb-13 03-Feb-13 Remove formwork
Columns 8d 26-Jan-13 03-Feb-13 03-Feb-13, Columns
FW.Col.st. Form Work 3d 26-Jan-13 28-Jan-13 Form Work
R.F.T.Col. R.F.T 2d 29-Jan-13 30-Jan-13 R.F.T
Pour.Col.s Pouring Concrete 1d 31-Jan-13 31-Jan-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 03-Feb-13 03-Feb-13 Remove formwork
Roof 18d 04-Feb-13 24-Feb-13 24-Feb-13, Roof
Beams and slab 18d 04-Feb-13 24-Feb-13 24-Feb-13, Beams and slab
FW.B&S.n Form Work 6d 04-Feb-13 10-Feb-13 Form Work
R.F.T.B&S R.F.T 3d 11-Feb-13 13-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Feb-13 14-Feb-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 24-Feb-13 24-Feb-13 Remove Form Work
Mansonary 22d 04-Feb-13 28-Feb-13 28-Feb-13, Mansonary
Ground Floor 2d 04-Feb-13 05-Feb-13 05-Feb-13, Ground Floor
I.G..M.v881 Internal 2d 04-Feb-13 05-Feb-13 Internal
E.G.M.v1181 External 2d 04-Feb-13 05-Feb-13 External
First Floor 2d 25-Feb-13 26-Feb-13 26-Feb-13, First Floor
I.F.M.v881 Internal 2d 25-Feb-13 26-Feb-13 Internal
E.F.M.v881 External 2d 25-Feb-13 26-Feb-13 External
Roof 2d 27-Feb-13 28-Feb-13 28-Feb-13, Roof
E.R.M.v1181 External 2d 27-Feb-13 28-Feb-13 External
Finishing 24d 06-Feb-13 05-Mar-13 05-Mar-13, Finishing
Ground Floor 2d 06-Feb-13 07-Feb-13 07-Feb-13, Ground Floor
Calm Shell 2d 06-Feb-13 07-Feb-13 07-Feb-13, Calm Shell
E.Ch.G.v8 External 2d 06-Feb-13 07-Feb-13 External
External Ele
Electrical 0d
First Floor 2d 27-Feb-13 28-Feb-13 28-Feb-13, First Floor
Calm Shell 2d 27-Feb-13 28-Feb-13 28-Feb-13, Calm Shell
E.ch.st.v11 External 2d 27-Feb-13 28-Feb-13 External
External Ele
Electrical 0d
Roof 1d 02-Mar-13 02-Mar-13 02-Mar-13, Roof
Calm Shell 1d 02-Mar-13 02-Mar-13 02-Mar-13, Calm Shell
E.ch.r.v11 External 1d 02-Mar-13 02-Mar-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 03-Mar-13 05-Mar-13 05-Mar-13, Paint Villa 1
Ex Paint880 External Painting 3d 03-Mar-13 05-Mar-13 External Painting
Stand alone Villa typ
type 47 163d 25-Nov-12 03-Jun-13 03-Jun-13, Stand alone Villa type 47
A7300 start Villa 0d 25-Nov-12 start Villa
A7310 Finish Villa 0d 03-Jun-13 Finish Villa
Mobilization 1d 26-Nov-12 26-Nov-12 26-Nov-12, Mobilization
M. Sur.v891 Site Surveying 1d 26-Nov-12 26-Nov-12 Site Surveying
Earth Work 100d 28-Nov-12 24-Mar-13 24-Mar-13, Earth Work

Actual Work Critical Remaining Work Summary Page 150 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

326
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ex.v1191 Excavation 2d 28-Nov-12 29-Nov-12 Excavation
B.F.v1191 BackFill 2d 23-Mar-13 24-Mar-13 BackFill
Civil Work 76d 25-Feb-13 25-May-13 25-May-13, Civil Work
Foundation 15d 25-Feb-13 13-Mar-13 13-Mar-13, Foundation
Footing 15d 25-Feb-13 13-Mar-13 13-Mar-13, Footing
Plain Concrete
Con 5d 25-Feb-13 02-Mar-13 02-Mar-13, Plain Concrete
F.W.Pc Form Work 2d 25-Feb-13 26-Feb-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Feb-13 27-Feb-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 02-Mar-13 02-Mar-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 03-Mar-13 13-Mar-13 13-Mar-13, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 03-Mar-13 06-Mar-13 Form Work
1201 R.F.T 2d 07-Mar-13 09-Mar-13 R.F.T
Pour.Rc Pouring Concrete 1d 10-Mar-13 10-Mar-13 Pouring Concrete
R.Fw.R Remove formwork 1d 12-Mar-13 12-Mar-13 Remove formwork
Ins.Rc& Insulting 1d 13-Mar-13 13-Mar-13 Insulting
Ground Floor 25d 14-Mar-13 11-Apr-13 11-Apr-13, Ground Floor
Slab on grade
grad 16d 25-Mar-13 11-Apr-13 11-Apr-13, Slab on grade
FW.SOG. Form Work 4d 25-Mar-13 28-Mar-13 Form Work
R.F.T.SOG R.F.T 3d 30-Mar-13 01-Apr-13 R.F.T
Pour.SOG Pouring Concrete 1d 02-Apr-13 02-Apr-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 11-Apr-13 11-Apr-13 Remove formwork
Columns 7d 14-Mar-13 21-Mar-13 21-Mar-13, Columns
FW.Col.G Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 2d 17-Mar-13 18-Mar-13 R.F.T
Pour.Col.G Pouring Concrete 1d 19-Mar-13 19-Mar-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 21-Mar-13 21-Mar-13 Remove formwork
First Floor 18d 13-Apr-13 04-May-13 04-May-13, First Floor
Beams and slab 18d 13-Apr-13 04-May-13 04-May-13, Beams and slab
FW.B&S.s Form Work 6d 13-Apr-13 18-Apr-13 Form Work
R.F.T.B&S R.F.T 3d 20-Apr-13 22-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Apr-13 23-Apr-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 04-May-13 04-May-13 Remove formwork
Columns 8d 24-Apr-13 04-May-13 04-May-13, Columns
FW.Col.st. Form Work 3d 24-Apr-13 27-Apr-13 Form Work
R.F.T.Col. R.F.T 2d 28-Apr-13 29-Apr-13 R.F.T
Pour.Col.s Pouring Concrete 1d 30-Apr-13 30-Apr-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-May-13 04-May-13 Remove formwork
Roof 18d 05-May-13 25-May-13 25-May-13, Roof
Beams and slab 18d 05-May-13 25-May-13 25-May-13, Beams and slab
FW.B&S.n Form Work 6d 05-May-13 11-May-13 Form Work
R.F.T.B&S R.F.T 3d 12-May-13 14-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 15-May-13 15-May-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 25-May-13 25-May-13 Remove Form Work
Mansonary 22d 05-May-13 29-May-13 29-May-13, Mansonary
Ground Floor 2d 05-May-13 06-May-13 06-May-13, Ground Floor
I.G..M.v891 Internal 2d 05-May-13 06-May-13 Internal
E.G.M.v1191 External 2d 05-May-13 06-May-13 External
First Floor 2d 26-May-13 27-May-13 27-May-13, First Floor
I.F.M.v891 Internal 2d 26-May-13 27-May-13 Internal
E.F.M.v891 External 2d 26-May-13 27-May-13 External
Roof 2d 28-May-13 29-May-13 29-May-13, Roof
E.R.M.v1191 External 2d 28-May-13 29-May-13 External
Finishing 24d 07-May-13 03-Jun-13 03-Jun-13, Finishing
Ground Floor 2d 07-May-13 08-May-13 08-May-13, Ground Floor
Calm Shell 2d 07-May-13 08-May-13 08-May-13, Calm Shell
E.Ch.G.v8 External 2d 07-May-13 08-May-13 External
External Ele
Electrical 0d
First Floor 2d 28-May-13 29-May-13 29-May-13, First Floor
Calm Shell 2d 28-May-13 29-May-13 29-May-13, Calm Shell
E.ch.st.v11 External 2d 28-May-13 29-May-13 External
External Ele
Electrical 0d
Roof 1d 30-May-13 30-May-13 30-May-13, Roof
Calm Shell 1d 30-May-13 30-May-13 30-May-13, Calm Shell
E.ch.r.v11 External 1d 30-May-13 30-May-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 01-Jun-13 03-Jun-13 03-Jun-13, Paint Villa 1
Ex Paint890 External Painting 3d 01-Jun-13 03-Jun-13 External Painting
Stand alone Villa typ
type 48 239d 25-Nov-12 02-Sep-13 02-Sep-13, Stand alone Villa type 48
A7420 start Villa 0d 25-Nov-12 start Villa
A7430 Finish Villa 0d 02-Sep-13 Finish Villa
Mobilization 1d 27-Nov-12 27-Nov-12 27-Nov-12, Mobilization
M. Sur.v901 Site Surveying 1d 27-Nov-12 27-Nov-12 Site Surveying
Earth Work 174d 01-Dec-12 22-Jun-13 22-Jun-13, Earth Work
Ex.v1201 Excavation 2d 01-Dec-12 02-Dec-12 Excavation
B.F.v1201 BackFill 2d 20-Jun-13 22-Jun-13 BackFill
Civil Work 76d 26-May-13 24-Aug-13 24-Aug-13, Civil Work

Actual Work Critical Remaining Work Summary Page 151 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

327
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Foundation 15d 26-May-13 11-Jun-13 11-Jun-13, Foundation
Footing 15d 26-May-13 11-Jun-13 11-Jun-13, Footing
Plain Concrete
Con 5d 26-May-13 30-May-13 30-May-13, Plain Concrete
F.W.Pc Form Work 2d 26-May-13 27-May-13 Form Work
Pour.Pc Pouring Concrete 1d 28-May-13 28-May-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 30-May-13 30-May-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 01-Jun-13 11-Jun-13 11-Jun-13, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 01-Jun-13 04-Jun-13 Form Work
1211 R.F.T 2d 05-Jun-13 06-Jun-13 R.F.T
Pour.Rc Pouring Concrete 1d 08-Jun-13 08-Jun-13 Pouring Concrete
R.Fw.R Remove formwork 1d 10-Jun-13 10-Jun-13 Remove formwork
Ins.Rc& Insulting 1d 11-Jun-13 11-Jun-13 Insulting
Ground Floor 25d 12-Jun-13 10-Jul-13 10-Jul-13, Ground Floor
Slab on grade
grad 16d 23-Jun-13 10-Jul-13 10-Jul-13, Slab on grade
FW.SOG. Form Work 4d 23-Jun-13 26-Jun-13 Form Work
R.F.T.SOG R.F.T 3d 27-Jun-13 30-Jun-13 R.F.T
Pour.SOG Pouring Concrete 1d 01-Jul-13 01-Jul-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 10-Jul-13 10-Jul-13 Remove formwork
Columns 7d 12-Jun-13 19-Jun-13 19-Jun-13, Columns
FW.Col.G Form Work 2d 12-Jun-13 13-Jun-13 Form Work
R.F.T.Col. R.F.T 2d 15-Jun-13 16-Jun-13 R.F.T
Pour.Col.G Pouring Concrete 1d 17-Jun-13 17-Jun-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 19-Jun-13 19-Jun-13 Remove formwork
First Floor 18d 11-Jul-13 31-Jul-13 31-Jul-13, First Floor
Beams and slab 18d 11-Jul-13 31-Jul-13 31-Jul-13, Beams and slab
FW.B&S.s Form Work 6d 11-Jul-13 17-Jul-13 Form Work
R.F.T.B&S R.F.T 3d 18-Jul-13 21-Jul-13 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Jul-13 22-Jul-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 31-Jul-13 31-Jul-13 Remove formwork
Columns 8d 23-Jul-13 31-Jul-13 31-Jul-13, Columns
FW.Col.st. Form Work 3d 23-Jul-13 25-Jul-13 Form Work
R.F.T.Col. R.F.T 2d 27-Jul-13 28-Jul-13 R.F.T
Pour.Col.s Pouring Concrete 1d 29-Jul-13 29-Jul-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 31-Jul-13 31-Jul-13 Remove formwork
Roof 18d 01-Aug-13 24-Aug-13 24-Aug-13, Roof
Beams and slab 18d 01-Aug-13 24-Aug-13 24-Aug-13, Beams and slab
FW.B&S.n Form Work 6d 01-Aug-13 07-Aug-13 Form Work
R.F.T.B&S R.F.T 3d 11-Aug-13 13-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Aug-13 14-Aug-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 24-Aug-13 24-Aug-13 Remove Form Work
Mansonary 22d 01-Aug-13 28-Aug-13 28-Aug-13, Mansonary
Ground Floor 2d 01-Aug-13 03-Aug-13 03-Aug-13, Ground Floor
I.G..M.v901 Internal 2d 01-Aug-13 03-Aug-13 Internal
E.G.M.v1201 External 2d 01-Aug-13 03-Aug-13 External
First Floor 2d 25-Aug-13 26-Aug-13 26-Aug-13, First Floor
I.F.M.v901 Internal 2d 25-Aug-13 26-Aug-13 Internal
E.F.M.v901 External 2d 25-Aug-13 26-Aug-13 External
Roof 2d 27-Aug-13 28-Aug-13 28-Aug-13, Roof
E.R.M.v1201 External 2d 27-Aug-13 28-Aug-13 External
Finishing 24d 04-Aug-13 02-Sep-13 02-Sep-13, Finishing
Ground Floor 2d 04-Aug-13 05-Aug-13 05-Aug-13, Ground Floor
Calm Shell 2d 04-Aug-13 05-Aug-13 05-Aug-13, Calm Shell
E.Ch.G.v9 External 2d 04-Aug-13 05-Aug-13 External
External Ele
Electrical 0d
First Floor 2d 27-Aug-13 28-Aug-13 28-Aug-13, First Floor
Calm Shell 2d 27-Aug-13 28-Aug-13 28-Aug-13, Calm Shell
E.ch.st.v12 External 2d 27-Aug-13 28-Aug-13 External
External Ele
Electrical 0d
Roof 1d 29-Aug-13 29-Aug-13 29-Aug-13, Roof
Calm Shell 1d 29-Aug-13 29-Aug-13 29-Aug-13, Calm Shell
E.ch.r.v12 External 1d 29-Aug-13 29-Aug-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 31-Aug-13 02-Sep-13 02-Sep-13, Paint Villa 1
Ex Paint900 External Painting 3d 31-Aug-13 02-Sep-13 External Painting
Stand alone Villa typ
type 49 315d 25-Nov-12 04-Dec-13 04-Dec-13, Stand alone Villa type 49
A6640 start Villa 0d 25-Nov-12 start Villa
A6650 Finish Villa 0d 04-Dec-13 Finish Villa
Mobilization 1d 28-Nov-12 28-Nov-12 28-Nov-12, Mobilization
M. Sur.v911 Site Surveying 1d 28-Nov-12 28-Nov-12 Site Surveying
Earth Work 248d 03-Dec-12 21-Sep-13 21-Sep-13, Earth Work
Ex.v1211 Excavation 2d 03-Dec-12 04-Dec-12 Excavation
B.F.v1211 BackFill 2d 19-Sep-13 21-Sep-13 BackFill
Civil Work 76d 25-Aug-13 25-Nov-13 25-Nov-13, Civil Work
Foundation 15d 25-Aug-13 10-Sep-13 10-Sep-13, Foundation
Footing 15d 25-Aug-13 10-Sep-13 10-Sep-13, Footing
Plain Concrete
Con 5d 25-Aug-13 29-Aug-13 29-Aug-13, Plain Concrete

Actual Work Critical Remaining Work Summary Page 152 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

328
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
F.W.Pc Form Work 2d 25-Aug-13 26-Aug-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Aug-13 27-Aug-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 29-Aug-13 29-Aug-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 31-Aug-13 10-Sep-13 10-Sep-13, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 31-Aug-13 03-Sep-13 Form Work
1221 R.F.T 2d 04-Sep-13 05-Sep-13 R.F.T
Pour.Rc Pouring Concrete 1d 07-Sep-13 07-Sep-13 Pouring Concrete
R.Fw.R Remove formwork 1d 09-Sep-13 09-Sep-13 Remove formwork
Ins.Rc& Insulting 1d 10-Sep-13 10-Sep-13 Insulting
Ground Floor 25d 11-Sep-13 10-Oct-13 10-Oct-13, Ground Floor
Slab on grade
grad 16d 22-Sep-13 10-Oct-13 10-Oct-13, Slab on grade
FW.SOG. Form Work 4d 22-Sep-13 25-Sep-13 Form Work
R.F.T.SOG R.F.T 3d 26-Sep-13 29-Sep-13 R.F.T
Pour.SOG Pouring Concrete 1d 30-Sep-13 30-Sep-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 10-Oct-13 10-Oct-13 Remove formwork
Columns 7d 11-Sep-13 18-Sep-13 18-Sep-13, Columns
FW.Col.G Form Work 2d 11-Sep-13 12-Sep-13 Form Work
R.F.T.Col. R.F.T 2d 14-Sep-13 15-Sep-13 R.F.T
Pour.Col.G Pouring Concrete 1d 16-Sep-13 16-Sep-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 18-Sep-13 18-Sep-13 Remove formwork
First Floor 18d 12-Oct-13 04-Nov-13 04-Nov-13, First Floor
Beams and slab 18d 12-Oct-13 04-Nov-13 04-Nov-13, Beams and slab
FW.B&S.s Form Work 6d 12-Oct-13 21-Oct-13 Form Work
R.F.T.B&S R.F.T 3d 22-Oct-13 24-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Oct-13 26-Oct-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 04-Nov-13 04-Nov-13 Remove formwork
Columns 8d 27-Oct-13 04-Nov-13 04-Nov-13, Columns
FW.Col.st. Form Work 3d 27-Oct-13 29-Oct-13 Form Work
R.F.T.Col. R.F.T 2d 30-Oct-13 31-Oct-13 R.F.T
Pour.Col.s Pouring Concrete 1d 02-Nov-13 02-Nov-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-Nov-13 04-Nov-13 Remove formwork
Roof 18d 05-Nov-13 25-Nov-13 25-Nov-13, Roof
Beams and slab 18d 05-Nov-13 25-Nov-13 25-Nov-13, Beams and slab
FW.B&S.n Form Work 6d 05-Nov-13 11-Nov-13 Form Work
R.F.T.B&S R.F.T 3d 12-Nov-13 14-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-13 16-Nov-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 25-Nov-13 25-Nov-13 Remove Form Work
Mansonary 22d 05-Nov-13 30-Nov-13 30-Nov-13, Mansonary
Ground Floor 2d 05-Nov-13 06-Nov-13 06-Nov-13, Ground Floor
I.G..M.v911 Internal 2d 05-Nov-13 06-Nov-13 Internal
E.G.M.v1211 External 2d 05-Nov-13 06-Nov-13 External
First Floor 2d 26-Nov-13 27-Nov-13 27-Nov-13, First Floor
I.F.M.v911 Internal 2d 26-Nov-13 27-Nov-13 Internal
E.F.M.v911 External 2d 26-Nov-13 27-Nov-13 External
Roof 2d 28-Nov-13 30-Nov-13 30-Nov-13, Roof
E.R.M.v1211 External 2d 28-Nov-13 30-Nov-13 External
Finishing 24d 07-Nov-13 04-Dec-13 04-Dec-13, Finishing
Ground Floor 2d 07-Nov-13 09-Nov-13 09-Nov-13, Ground Floor
Calm Shell 2d 07-Nov-13 09-Nov-13 09-Nov-13, Calm Shell
E.Ch.G.v9 External 2d 07-Nov-13 09-Nov-13 External
External Ele
Electrical 0d
First Floor 2d 28-Nov-13 30-Nov-13 30-Nov-13, First Floor
Calm Shell 2d 28-Nov-13 30-Nov-13 30-Nov-13, Calm Shell
E.ch.st.v12 External 2d 28-Nov-13 30-Nov-13 External
External Ele
Electrical 0d
Roof 1d 01-Dec-13 01-Dec-13 01-Dec-13, Roof
Calm Shell 1d 01-Dec-13 01-Dec-13 01-Dec-13, Calm Shell
E.ch.r.v12 External 1d 01-Dec-13 01-Dec-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 02-Dec-13 04-Dec-13 04-Dec-13, Paint Villa 1
Ex Paint910 External Painting 3d 02-Dec-13 04-Dec-13 External Painting
Stand alone Villa typ
type 50 87d 25-Nov-12 05-Mar-13 05-Mar-13, Stand alone Villa type 50
A6620 start Villa 0d 25-Nov-12 start Villa
A6630 Finish Villa 0d 05-Mar-13 Finish Villa
Mobilization 1d 25-Nov-12 25-Nov-12 25-Nov-12, Mobilization
M. Sur.v921 Site Surveying 1d 25-Nov-12 25-Nov-12 Site Surveying
Earth Work 26d 26-Nov-12 25-Dec-12 25-Dec-12, Earth Work
Ex.v1221 Excavation 2d 26-Nov-12 27-Nov-12 Excavation
B.F.v1221 BackFill 2d 24-Dec-12 25-Dec-12 BackFill
Civil Work 76d 28-Nov-12 24-Feb-13 24-Feb-13, Civil Work
Foundation 15d 28-Nov-12 15-Dec-12 15-Dec-12, Foundation
Footing 15d 28-Nov-12 15-Dec-12 15-Dec-12, Footing
Plain Concrete
Con 5d 28-Nov-12 03-Dec-12 03-Dec-12, Plain Concrete
F.W.Pc Form Work 2d 28-Nov-12 29-Nov-12 Form Work
Pour.Pc Pouring Concrete 1d 01-Dec-12 01-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 03-Dec-12 03-Dec-12 Remove Formwork

Actual Work Critical Remaining Work Summary Page 153 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

329
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Reinforced Concrete&Smeles
Reinforce 10d 04-Dec-12 15-Dec-12 15-Dec-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 04-Dec-12 08-Dec-12 Form Work
1231 R.F.T 2d 09-Dec-12 10-Dec-12 R.F.T
Pour.Rc Pouring Concrete 1d 11-Dec-12 11-Dec-12 Pouring Concrete
R.Fw.R Remove formwork 1d 13-Dec-12 13-Dec-12 Remove formwork
Ins.Rc& Insulting 1d 15-Dec-12 15-Dec-12 Insulting
Ground Floor 25d 16-Dec-12 13-Jan-13 13-Jan-13, Ground Floor
Slab on grade
grad 16d 26-Dec-12 13-Jan-13 13-Jan-13, Slab on grade
FW.SOG. Form Work 4d 26-Dec-12 30-Dec-12 Form Work
R.F.T.SOG R.F.T 3d 31-Dec-12 02-Jan-13 R.F.T
Pour.SOG Pouring Concrete 1d 03-Jan-13 03-Jan-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 13-Jan-13 13-Jan-13 Remove formwork
Columns 7d 16-Dec-12 23-Dec-12 23-Dec-12, Columns
FW.Col.G Form Work 2d 16-Dec-12 17-Dec-12 Form Work
R.F.T.Col. R.F.T 2d 18-Dec-12 19-Dec-12 R.F.T
Pour.Col.G Pouring Concrete 1d 20-Dec-12 20-Dec-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 23-Dec-12 23-Dec-12 Remove formwork
First Floor 18d 14-Jan-13 03-Feb-13 03-Feb-13, First Floor
Beams and slab 18d 14-Jan-13 03-Feb-13 03-Feb-13, Beams and slab
FW.B&S.s Form Work 6d 14-Jan-13 20-Jan-13 Form Work
R.F.T.B&S R.F.T 3d 21-Jan-13 23-Jan-13 R.F.T
Pour.B&S. Pouring Concrete 1d 24-Jan-13 24-Jan-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 03-Feb-13 03-Feb-13 Remove formwork
Columns 8d 26-Jan-13 03-Feb-13 03-Feb-13, Columns
FW.Col.st. Form Work 3d 26-Jan-13 28-Jan-13 Form Work
R.F.T.Col. R.F.T 2d 29-Jan-13 30-Jan-13 R.F.T
Pour.Col.s Pouring Concrete 1d 31-Jan-13 31-Jan-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 03-Feb-13 03-Feb-13 Remove formwork
Roof 18d 04-Feb-13 24-Feb-13 24-Feb-13, Roof
Beams and slab 18d 04-Feb-13 24-Feb-13 24-Feb-13, Beams and slab
FW.B&S.n Form Work 6d 04-Feb-13 10-Feb-13 Form Work
R.F.T.B&S R.F.T 3d 11-Feb-13 13-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Feb-13 14-Feb-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 24-Feb-13 24-Feb-13 Remove Form Work
Mansonary 22d 04-Feb-13 28-Feb-13 28-Feb-13, Mansonary
Ground Floor 2d 04-Feb-13 05-Feb-13 05-Feb-13, Ground Floor
I.G..M.v921 Internal 2d 04-Feb-13 05-Feb-13 Internal
E.G.M.v1221 External 2d 04-Feb-13 05-Feb-13 External
First Floor 2d 25-Feb-13 26-Feb-13 26-Feb-13, First Floor
I.F.M.v921 Internal 2d 25-Feb-13 26-Feb-13 Internal
E.F.M.v921 External 2d 25-Feb-13 26-Feb-13 External
Roof 2d 27-Feb-13 28-Feb-13 28-Feb-13, Roof
E.R.M.v1221 External 2d 27-Feb-13 28-Feb-13 External
Finishing 24d 06-Feb-13 05-Mar-13 05-Mar-13, Finishing
Ground Floor 2d 06-Feb-13 07-Feb-13 07-Feb-13, Ground Floor
Calm Shell 2d 06-Feb-13 07-Feb-13 07-Feb-13, Calm Shell
E.Ch.G.v9 External 2d 06-Feb-13 07-Feb-13 External
External Ele
Electrical 0d
First Floor 2d 27-Feb-13 28-Feb-13 28-Feb-13, First Floor
Calm Shell 2d 27-Feb-13 28-Feb-13 28-Feb-13, Calm Shell
E.ch.st.v12 External 2d 27-Feb-13 28-Feb-13 External
External Ele
Electrical 0d
Roof 1d 02-Mar-13 02-Mar-13 02-Mar-13, Roof
Calm Shell 1d 02-Mar-13 02-Mar-13 02-Mar-13, Calm Shell
E.ch.r.v12 External 1d 02-Mar-13 02-Mar-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 03-Mar-13 05-Mar-13 05-Mar-13, Paint Villa 1
Ex Paint920 External Painting 3d 03-Mar-13 05-Mar-13 External Painting
Stand alone Villa typ
type 51 163d 25-Nov-12 03-Jun-13 03-Jun-13, Stand alone Villa type 51
A6600 start Villa 0d 25-Nov-12 start Villa
A6610 Finish Villa 0d 03-Jun-13 Finish Villa
Mobilization 1d 26-Nov-12 26-Nov-12 26-Nov-12, Mobilization
M. Sur.v931 Site Surveying 1d 26-Nov-12 26-Nov-12 Site Surveying
Earth Work 100d 28-Nov-12 24-Mar-13 24-Mar-13, Earth Work
Ex.v1231 Excavation 2d 28-Nov-12 29-Nov-12 Excavation
B.F.v1231 BackFill 2d 23-Mar-13 24-Mar-13 BackFill
Civil Work 76d 25-Feb-13 25-May-13 25-May-13, Civil Work
Foundation 15d 25-Feb-13 13-Mar-13 13-Mar-13, Foundation
Footing 15d 25-Feb-13 13-Mar-13 13-Mar-13, Footing
Plain Concrete
Con 5d 25-Feb-13 02-Mar-13 02-Mar-13, Plain Concrete
F.W.Pc Form Work 2d 25-Feb-13 26-Feb-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Feb-13 27-Feb-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 02-Mar-13 02-Mar-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 03-Mar-13 13-Mar-13 13-Mar-13, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 03-Mar-13 06-Mar-13 Form Work
1241 R.F.T 2d 07-Mar-13 09-Mar-13 R.F.T

Actual Work Critical Remaining Work Summary Page 154 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

330
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.Rc Pouring Concrete 1d 10-Mar-13 10-Mar-13 Pouring Concrete
R.Fw.R Remove formwork 1d 12-Mar-13 12-Mar-13 Remove formwork
Ins.Rc& Insulting 1d 13-Mar-13 13-Mar-13 Insulting
Ground Floor 25d 14-Mar-13 11-Apr-13 11-Apr-13, Ground Floor
Slab on grade
grad 16d 25-Mar-13 11-Apr-13 11-Apr-13, Slab on grade
FW.SOG. Form Work 4d 25-Mar-13 28-Mar-13 Form Work
R.F.T.SOG R.F.T 3d 30-Mar-13 01-Apr-13 R.F.T
Pour.SOG Pouring Concrete 1d 02-Apr-13 02-Apr-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 11-Apr-13 11-Apr-13 Remove formwork
Columns 7d 14-Mar-13 21-Mar-13 21-Mar-13, Columns
FW.Col.G Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 2d 17-Mar-13 18-Mar-13 R.F.T
Pour.Col.G Pouring Concrete 1d 19-Mar-13 19-Mar-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 21-Mar-13 21-Mar-13 Remove formwork
First Floor 18d 13-Apr-13 04-May-13 04-May-13, First Floor
Beams and slab 18d 13-Apr-13 04-May-13 04-May-13, Beams and slab
FW.B&S.s Form Work 6d 13-Apr-13 18-Apr-13 Form Work
R.F.T.B&S R.F.T 3d 20-Apr-13 22-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Apr-13 23-Apr-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 04-May-13 04-May-13 Remove formwork
Columns 8d 24-Apr-13 04-May-13 04-May-13, Columns
FW.Col.st. Form Work 3d 24-Apr-13 27-Apr-13 Form Work
R.F.T.Col. R.F.T 2d 28-Apr-13 29-Apr-13 R.F.T
Pour.Col.s Pouring Concrete 1d 30-Apr-13 30-Apr-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-May-13 04-May-13 Remove formwork
Roof 18d 05-May-13 25-May-13 25-May-13, Roof
Beams and slab 18d 05-May-13 25-May-13 25-May-13, Beams and slab
FW.B&S.n Form Work 6d 05-May-13 11-May-13 Form Work
R.F.T.B&S R.F.T 3d 12-May-13 14-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 15-May-13 15-May-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 25-May-13 25-May-13 Remove Form Work
Mansonary 22d 05-May-13 29-May-13 29-May-13, Mansonary
Ground Floor 2d 05-May-13 06-May-13 06-May-13, Ground Floor
I.G..M.v931 Internal 2d 05-May-13 06-May-13 Internal
E.G.M.v1231 External 2d 05-May-13 06-May-13 External
First Floor 2d 26-May-13 27-May-13 27-May-13, First Floor
I.F.M.v931 Internal 2d 26-May-13 27-May-13 Internal
E.F.M.v931 External 2d 26-May-13 27-May-13 External
Roof 2d 28-May-13 29-May-13 29-May-13, Roof
E.R.M.v1231 External 2d 28-May-13 29-May-13 External
Finishing 24d 07-May-13 03-Jun-13 03-Jun-13, Finishing
Ground Floor 2d 07-May-13 08-May-13 08-May-13, Ground Floor
Calm Shell 2d 07-May-13 08-May-13 08-May-13, Calm Shell
E.Ch.G.v9 External 2d 07-May-13 08-May-13 External
External Ele
Electrical 0d
First Floor 2d 28-May-13 29-May-13 29-May-13, First Floor
Calm Shell 2d 28-May-13 29-May-13 29-May-13, Calm Shell
E.ch.st.v12 External 2d 28-May-13 29-May-13 External
External Ele
Electrical 0d
Roof 1d 30-May-13 30-May-13 30-May-13, Roof
Calm Shell 1d 30-May-13 30-May-13 30-May-13, Calm Shell
E.ch.r.v12 External 1d 30-May-13 30-May-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 01-Jun-13 03-Jun-13 03-Jun-13, Paint Villa 1
Ex Paint930 External Painting 3d 01-Jun-13 03-Jun-13 External Painting
Stand alone Villa typ
type 52 239d 25-Nov-12 02-Sep-13 02-Sep-13, Stand alone Villa type 52
A6580 start Villa 0d 25-Nov-12 start Villa
A6590 Finish Villa 0d 02-Sep-13 Finish Villa
Mobilization 1d 27-Nov-12 27-Nov-12 27-Nov-12, Mobilization
M. Sur.v941 Site Surveying 1d 27-Nov-12 27-Nov-12 Site Surveying
Earth Work 174d 01-Dec-12 22-Jun-13 22-Jun-13, Earth Work
Ex.v1241 Excavation 2d 01-Dec-12 02-Dec-12 Excavation
B.F.v1241 BackFill 2d 20-Jun-13 22-Jun-13 BackFill
Civil Work 76d 26-May-13 24-Aug-13 24-Aug-13, Civil Work
Foundation 15d 26-May-13 11-Jun-13 11-Jun-13, Foundation
Footing 15d 26-May-13 11-Jun-13 11-Jun-13, Footing
Plain Concrete
Con 5d 26-May-13 30-May-13 30-May-13, Plain Concrete
F.W.Pc Form Work 2d 26-May-13 27-May-13 Form Work
Pour.Pc Pouring Concrete 1d 28-May-13 28-May-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 30-May-13 30-May-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 01-Jun-13 11-Jun-13 11-Jun-13, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 01-Jun-13 04-Jun-13 Form Work
1251 R.F.T 2d 05-Jun-13 06-Jun-13 R.F.T
Pour.Rc Pouring Concrete 1d 08-Jun-13 08-Jun-13 Pouring Concrete
R.Fw.R Remove formwork 1d 10-Jun-13 10-Jun-13 Remove formwork
Ins.Rc& Insulting 1d 11-Jun-13 11-Jun-13 Insulting

Actual Work Critical Remaining Work Summary Page 155 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

331
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ground Floor 25d 12-Jun-13 10-Jul-13 10-Jul-13, Ground Floor
Slab on grade
grad 16d 23-Jun-13 10-Jul-13 10-Jul-13, Slab on grade
FW.SOG. Form Work 4d 23-Jun-13 26-Jun-13 Form Work
R.F.T.SOG R.F.T 3d 27-Jun-13 30-Jun-13 R.F.T
Pour.SOG Pouring Concrete 1d 01-Jul-13 01-Jul-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 10-Jul-13 10-Jul-13 Remove formwork
Columns 7d 12-Jun-13 19-Jun-13 19-Jun-13, Columns
FW.Col.G Form Work 2d 12-Jun-13 13-Jun-13 Form Work
R.F.T.Col. R.F.T 2d 15-Jun-13 16-Jun-13 R.F.T
Pour.Col.G Pouring Concrete 1d 17-Jun-13 17-Jun-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 19-Jun-13 19-Jun-13 Remove formwork
First Floor 18d 11-Jul-13 31-Jul-13 31-Jul-13, First Floor
Beams and slab 18d 11-Jul-13 31-Jul-13 31-Jul-13, Beams and slab
FW.B&S.s Form Work 6d 11-Jul-13 17-Jul-13 Form Work
R.F.T.B&S R.F.T 3d 18-Jul-13 21-Jul-13 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Jul-13 22-Jul-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 31-Jul-13 31-Jul-13 Remove formwork
Columns 8d 23-Jul-13 31-Jul-13 31-Jul-13, Columns
FW.Col.st. Form Work 3d 23-Jul-13 25-Jul-13 Form Work
R.F.T.Col. R.F.T 2d 27-Jul-13 28-Jul-13 R.F.T
Pour.Col.s Pouring Concrete 1d 29-Jul-13 29-Jul-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 31-Jul-13 31-Jul-13 Remove formwork
Roof 18d 01-Aug-13 24-Aug-13 24-Aug-13, Roof
Beams and slab 18d 01-Aug-13 24-Aug-13 24-Aug-13, Beams and slab
FW.B&S.n Form Work 6d 01-Aug-13 07-Aug-13 Form Work
R.F.T.B&S R.F.T 3d 11-Aug-13 13-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Aug-13 14-Aug-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 24-Aug-13 24-Aug-13 Remove Form Work
Mansonary 22d 01-Aug-13 28-Aug-13 28-Aug-13, Mansonary
Ground Floor 2d 01-Aug-13 03-Aug-13 03-Aug-13, Ground Floor
I.G..M.v941 Internal 2d 01-Aug-13 03-Aug-13 Internal
E.G.M.v1241 External 2d 01-Aug-13 03-Aug-13 External
First Floor 2d 25-Aug-13 26-Aug-13 26-Aug-13, First Floor
I.F.M.v941 Internal 2d 25-Aug-13 26-Aug-13 Internal
E.F.M.v941 External 2d 25-Aug-13 26-Aug-13 External
Roof 2d 27-Aug-13 28-Aug-13 28-Aug-13, Roof
E.R.M.v1241 External 2d 27-Aug-13 28-Aug-13 External
Finishing 24d 04-Aug-13 02-Sep-13 02-Sep-13, Finishing
Ground Floor 2d 04-Aug-13 05-Aug-13 05-Aug-13, Ground Floor
Calm Shell 2d 04-Aug-13 05-Aug-13 05-Aug-13, Calm Shell
E.Ch.G.v9 External 2d 04-Aug-13 05-Aug-13 External
External Ele
Electrical 0d
First Floor 2d 27-Aug-13 28-Aug-13 28-Aug-13, First Floor
Calm Shell 2d 27-Aug-13 28-Aug-13 28-Aug-13, Calm Shell
E.ch.st.v12 External 2d 27-Aug-13 28-Aug-13 External
External Ele
Electrical 0d
Roof 1d 29-Aug-13 29-Aug-13 29-Aug-13, Roof
Calm Shell 1d 29-Aug-13 29-Aug-13 29-Aug-13, Calm Shell
E.ch.r.v12 External 1d 29-Aug-13 29-Aug-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 31-Aug-13 02-Sep-13 02-Sep-13, Paint Villa 1
Ex Paint940 External Painting 3d 31-Aug-13 02-Sep-13 External Painting
Stand alone Villa typ
type 53 315d 25-Nov-12 04-Dec-13 04-Dec-13, Stand alone Villa type 53
A6560 start Villa 0d 25-Nov-12 start Villa
A6570 Finish Villa 0d 04-Dec-13 Finish Villa
Mobilization 1d 28-Nov-12 28-Nov-12 28-Nov-12, Mobilization
M. Sur.v951 Site Surveying 1d 28-Nov-12 28-Nov-12 Site Surveying
Earth Work 248d 03-Dec-12 21-Sep-13 21-Sep-13, Earth Work
Ex.v1251 Excavation 2d 03-Dec-12 04-Dec-12 Excavation
B.F.v1251 BackFill 2d 19-Sep-13 21-Sep-13 BackFill
Civil Work 76d 25-Aug-13 25-Nov-13 25-Nov-13, Civil Work
Foundation 15d 25-Aug-13 10-Sep-13 10-Sep-13, Foundation
Footing 15d 25-Aug-13 10-Sep-13 10-Sep-13, Footing
Plain Concrete
Con 5d 25-Aug-13 29-Aug-13 29-Aug-13, Plain Concrete
F.W.Pc Form Work 2d 25-Aug-13 26-Aug-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Aug-13 27-Aug-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 29-Aug-13 29-Aug-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 31-Aug-13 10-Sep-13 10-Sep-13, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 31-Aug-13 03-Sep-13 Form Work
1261 R.F.T 2d 04-Sep-13 05-Sep-13 R.F.T
Pour.Rc Pouring Concrete 1d 07-Sep-13 07-Sep-13 Pouring Concrete
R.Fw.R Remove formwork 1d 09-Sep-13 09-Sep-13 Remove formwork
Ins.Rc& Insulting 1d 10-Sep-13 10-Sep-13 Insulting
Ground Floor 25d 11-Sep-13 10-Oct-13 10-Oct-13, Ground Floor
Slab on grade
grad 16d 22-Sep-13 10-Oct-13 10-Oct-13, Slab on grade
FW.SOG. Form Work 4d 22-Sep-13 25-Sep-13 Form Work

Actual Work Critical Remaining Work Summary Page 156 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

332
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.SOG R.F.T 3d 26-Sep-13 29-Sep-13 R.F.T
Pour.SOG Pouring Concrete 1d 30-Sep-13 30-Sep-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 10-Oct-13 10-Oct-13 Remove formwork
Columns 7d 11-Sep-13 18-Sep-13 18-Sep-13, Columns
FW.Col.G Form Work 2d 11-Sep-13 12-Sep-13 Form Work
R.F.T.Col. R.F.T 2d 14-Sep-13 15-Sep-13 R.F.T
Pour.Col.G Pouring Concrete 1d 16-Sep-13 16-Sep-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 18-Sep-13 18-Sep-13 Remove formwork
First Floor 18d 12-Oct-13 04-Nov-13 04-Nov-13, First Floor
Beams and slab 18d 12-Oct-13 04-Nov-13 04-Nov-13, Beams and slab
FW.B&S.s Form Work 6d 12-Oct-13 21-Oct-13 Form Work
R.F.T.B&S R.F.T 3d 22-Oct-13 24-Oct-13 R.F.T
Pour.B&S. Pouring Concrete 1d 26-Oct-13 26-Oct-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 04-Nov-13 04-Nov-13 Remove formwork
Columns 8d 27-Oct-13 04-Nov-13 04-Nov-13, Columns
FW.Col.st. Form Work 3d 27-Oct-13 29-Oct-13 Form Work
R.F.T.Col. R.F.T 2d 30-Oct-13 31-Oct-13 R.F.T
Pour.Col.s Pouring Concrete 1d 02-Nov-13 02-Nov-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-Nov-13 04-Nov-13 Remove formwork
Roof 18d 05-Nov-13 25-Nov-13 25-Nov-13, Roof
Beams and slab 18d 05-Nov-13 25-Nov-13 25-Nov-13, Beams and slab
FW.B&S.n Form Work 6d 05-Nov-13 11-Nov-13 Form Work
R.F.T.B&S R.F.T 3d 12-Nov-13 14-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-13 16-Nov-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 25-Nov-13 25-Nov-13 Remove Form Work
Mansonary 22d 05-Nov-13 30-Nov-13 30-Nov-13, Mansonary
Ground Floor 2d 05-Nov-13 06-Nov-13 06-Nov-13, Ground Floor
I.G..M.v951 Internal 2d 05-Nov-13 06-Nov-13 Internal
E.G.M.v1251 External 2d 05-Nov-13 06-Nov-13 External
First Floor 2d 26-Nov-13 27-Nov-13 27-Nov-13, First Floor
I.F.M.v951 Internal 2d 26-Nov-13 27-Nov-13 Internal
E.F.M.v951 External 2d 26-Nov-13 27-Nov-13 External
Roof 2d 28-Nov-13 30-Nov-13 30-Nov-13, Roof
E.R.M.v1251 External 2d 28-Nov-13 30-Nov-13 External
Finishing 24d 07-Nov-13 04-Dec-13 04-Dec-13, Finishing
Ground Floor 2d 07-Nov-13 09-Nov-13 09-Nov-13, Ground Floor
Calm Shell 2d 07-Nov-13 09-Nov-13 09-Nov-13, Calm Shell
E.Ch.G.v9 External 2d 07-Nov-13 09-Nov-13 External
External Ele
Electrical 0d
First Floor 2d 28-Nov-13 30-Nov-13 30-Nov-13, First Floor
Calm Shell 2d 28-Nov-13 30-Nov-13 30-Nov-13, Calm Shell
E.ch.st.v12 External 2d 28-Nov-13 30-Nov-13 External
External Ele
Electrical 0d
Roof 1d 01-Dec-13 01-Dec-13 01-Dec-13, Roof
Calm Shell 1d 01-Dec-13 01-Dec-13 01-Dec-13, Calm Shell
E.ch.r.v12 External 1d 01-Dec-13 01-Dec-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 02-Dec-13 04-Dec-13 04-Dec-13, Paint Villa 1
Ex Paint950 External Painting 3d 02-Dec-13 04-Dec-13 External Painting
Stand alone Villa typ
type 54 87d 25-Nov-12 05-Mar-13 05-Mar-13, Stand alone Villa type 54
A6540 start Villa 0d 25-Nov-12 start Villa
A6550 Finish Villa 0d 05-Mar-13 Finish Villa
Mobilization 1d 25-Nov-12 25-Nov-12 25-Nov-12, Mobilization
M. Sur.v961 Site Surveying 1d 25-Nov-12 25-Nov-12 Site Surveying
Earth Work 26d 26-Nov-12 25-Dec-12 25-Dec-12, Earth Work
Ex.v1261 Excavation 2d 26-Nov-12 27-Nov-12 Excavation
B.F.v1261 BackFill 2d 24-Dec-12 25-Dec-12 BackFill
Civil Work 76d 28-Nov-12 24-Feb-13 24-Feb-13, Civil Work
Foundation 15d 28-Nov-12 15-Dec-12 15-Dec-12, Foundation
Footing 15d 28-Nov-12 15-Dec-12 15-Dec-12, Footing
Plain Concrete
Con 5d 28-Nov-12 03-Dec-12 03-Dec-12, Plain Concrete
F.W.Pc Form Work 2d 28-Nov-12 29-Nov-12 Form Work
Pour.Pc Pouring Concrete 1d 01-Dec-12 01-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 03-Dec-12 03-Dec-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 04-Dec-12 15-Dec-12 15-Dec-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 04-Dec-12 08-Dec-12 Form Work
1271 R.F.T 2d 09-Dec-12 10-Dec-12 R.F.T
Pour.Rc Pouring Concrete 1d 11-Dec-12 11-Dec-12 Pouring Concrete
R.Fw.R Remove formwork 1d 13-Dec-12 13-Dec-12 Remove formwork
Ins.Rc& Insulting 1d 15-Dec-12 15-Dec-12 Insulting
Ground Floor 25d 16-Dec-12 13-Jan-13 13-Jan-13, Ground Floor
Slab on grade
grad 16d 26-Dec-12 13-Jan-13 13-Jan-13, Slab on grade
FW.SOG. Form Work 4d 26-Dec-12 30-Dec-12 Form Work
R.F.T.SOG R.F.T 3d 31-Dec-12 02-Jan-13 R.F.T
Pour.SOG Pouring Concrete 1d 03-Jan-13 03-Jan-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 13-Jan-13 13-Jan-13 Remove formwork

Actual Work Critical Remaining Work Summary Page 157 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

333
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Columns 7d 16-Dec-12 23-Dec-12 23-Dec-12, Columns
FW.Col.G Form Work 2d 16-Dec-12 17-Dec-12 Form Work
R.F.T.Col. R.F.T 2d 18-Dec-12 19-Dec-12 R.F.T
Pour.Col.G Pouring Concrete 1d 20-Dec-12 20-Dec-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 23-Dec-12 23-Dec-12 Remove formwork
First Floor 18d 14-Jan-13 03-Feb-13 03-Feb-13, First Floor
Beams and slab 18d 14-Jan-13 03-Feb-13 03-Feb-13, Beams and slab
FW.B&S.s Form Work 6d 14-Jan-13 20-Jan-13 Form Work
R.F.T.B&S R.F.T 3d 21-Jan-13 23-Jan-13 R.F.T
Pour.B&S. Pouring Concrete 1d 24-Jan-13 24-Jan-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 03-Feb-13 03-Feb-13 Remove formwork
Columns 8d 26-Jan-13 03-Feb-13 03-Feb-13, Columns
FW.Col.st. Form Work 3d 26-Jan-13 28-Jan-13 Form Work
R.F.T.Col. R.F.T 2d 29-Jan-13 30-Jan-13 R.F.T
Pour.Col.s Pouring Concrete 1d 31-Jan-13 31-Jan-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 03-Feb-13 03-Feb-13 Remove formwork
Roof 18d 04-Feb-13 24-Feb-13 24-Feb-13, Roof
Beams and slab 18d 04-Feb-13 24-Feb-13 24-Feb-13, Beams and slab
FW.B&S.n Form Work 6d 04-Feb-13 10-Feb-13 Form Work
R.F.T.B&S R.F.T 3d 11-Feb-13 13-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Feb-13 14-Feb-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 24-Feb-13 24-Feb-13 Remove Form Work
Mansonary 22d 04-Feb-13 28-Feb-13 28-Feb-13, Mansonary
Ground Floor 2d 04-Feb-13 05-Feb-13 05-Feb-13, Ground Floor
I.G..M.v961 Internal 2d 04-Feb-13 05-Feb-13 Internal
E.G.M.v1261 External 2d 04-Feb-13 05-Feb-13 External
First Floor 2d 25-Feb-13 26-Feb-13 26-Feb-13, First Floor
I.F.M.v961 Internal 2d 25-Feb-13 26-Feb-13 Internal
E.F.M.v961 External 2d 25-Feb-13 26-Feb-13 External
Roof 2d 27-Feb-13 28-Feb-13 28-Feb-13, Roof
E.R.M.v1261 External 2d 27-Feb-13 28-Feb-13 External
Finishing 24d 06-Feb-13 05-Mar-13 05-Mar-13, Finishing
Ground Floor 2d 06-Feb-13 07-Feb-13 07-Feb-13, Ground Floor
Calm Shell 2d 06-Feb-13 07-Feb-13 07-Feb-13, Calm Shell
E.Ch.G.v9 External 2d 06-Feb-13 07-Feb-13 External
External Ele
Electrical 0d
First Floor 2d 27-Feb-13 28-Feb-13 28-Feb-13, First Floor
Calm Shell 2d 27-Feb-13 28-Feb-13 28-Feb-13, Calm Shell
E.ch.st.v12 External 2d 27-Feb-13 28-Feb-13 External
External Ele
Electrical 0d
Roof 1d 02-Mar-13 02-Mar-13 02-Mar-13, Roof
Calm Shell 1d 02-Mar-13 02-Mar-13 02-Mar-13, Calm Shell
E.ch.r.v12 External 1d 02-Mar-13 02-Mar-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 03-Mar-13 05-Mar-13 05-Mar-13, Paint Villa 1
Ex Paint960 External Painting 3d 03-Mar-13 05-Mar-13 External Painting
Stand alone Villa typ
type 55 163d 25-Nov-12 03-Jun-13 03-Jun-13, Stand alone Villa type 55
A6520 start Villa 0d 25-Nov-12 start Villa
A6530 Finish Villa 0d 03-Jun-13 Finish Villa
Mobilization 1d 26-Nov-12 26-Nov-12 26-Nov-12, Mobilization
M. Sur.v971 Site Surveying 1d 26-Nov-12 26-Nov-12 Site Surveying
Earth Work 100d 28-Nov-12 24-Mar-13 24-Mar-13, Earth Work
Ex.v1271 Excavation 2d 28-Nov-12 29-Nov-12 Excavation
B.F.v1271 BackFill 2d 23-Mar-13 24-Mar-13 BackFill
Civil Work 76d 25-Feb-13 25-May-13 25-May-13, Civil Work
Foundation 15d 25-Feb-13 13-Mar-13 13-Mar-13, Foundation
Footing 15d 25-Feb-13 13-Mar-13 13-Mar-13, Footing
Plain Concrete
Con 5d 25-Feb-13 02-Mar-13 02-Mar-13, Plain Concrete
F.W.Pc Form Work 2d 25-Feb-13 26-Feb-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Feb-13 27-Feb-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 02-Mar-13 02-Mar-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 03-Mar-13 13-Mar-13 13-Mar-13, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 03-Mar-13 06-Mar-13 Form Work
1281 R.F.T 2d 07-Mar-13 09-Mar-13 R.F.T
Pour.Rc Pouring Concrete 1d 10-Mar-13 10-Mar-13 Pouring Concrete
R.Fw.R Remove formwork 1d 12-Mar-13 12-Mar-13 Remove formwork
Ins.Rc& Insulting 1d 13-Mar-13 13-Mar-13 Insulting
Ground Floor 25d 14-Mar-13 11-Apr-13 11-Apr-13, Ground Floor
Slab on grade
grad 16d 25-Mar-13 11-Apr-13 11-Apr-13, Slab on grade
FW.SOG. Form Work 4d 25-Mar-13 28-Mar-13 Form Work
R.F.T.SOG R.F.T 3d 30-Mar-13 01-Apr-13 R.F.T
Pour.SOG Pouring Concrete 1d 02-Apr-13 02-Apr-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 11-Apr-13 11-Apr-13 Remove formwork
Columns 7d 14-Mar-13 21-Mar-13 21-Mar-13, Columns
FW.Col.G Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 2d 17-Mar-13 18-Mar-13 R.F.T

Actual Work Critical Remaining Work Summary Page 158 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

334
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.Col.G Pouring Concrete 1d 19-Mar-13 19-Mar-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 21-Mar-13 21-Mar-13 Remove formwork
First Floor 18d 13-Apr-13 04-May-13 04-May-13, First Floor
Beams and slab 18d 13-Apr-13 04-May-13 04-May-13, Beams and slab
FW.B&S.s Form Work 6d 13-Apr-13 18-Apr-13 Form Work
R.F.T.B&S R.F.T 3d 20-Apr-13 22-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Apr-13 23-Apr-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 04-May-13 04-May-13 Remove formwork
Columns 8d 24-Apr-13 04-May-13 04-May-13, Columns
FW.Col.st. Form Work 3d 24-Apr-13 27-Apr-13 Form Work
R.F.T.Col. R.F.T 2d 28-Apr-13 29-Apr-13 R.F.T
Pour.Col.s Pouring Concrete 1d 30-Apr-13 30-Apr-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-May-13 04-May-13 Remove formwork
Roof 18d 05-May-13 25-May-13 25-May-13, Roof
Beams and slab 18d 05-May-13 25-May-13 25-May-13, Beams and slab
FW.B&S.n Form Work 6d 05-May-13 11-May-13 Form Work
R.F.T.B&S R.F.T 3d 12-May-13 14-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 15-May-13 15-May-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 25-May-13 25-May-13 Remove Form Work
Mansonary 22d 05-May-13 29-May-13 29-May-13, Mansonary
Ground Floor 2d 05-May-13 06-May-13 06-May-13, Ground Floor
I.G..M.v971 Internal 2d 05-May-13 06-May-13 Internal
E.G.M.v1271 External 2d 05-May-13 06-May-13 External
First Floor 2d 26-May-13 27-May-13 27-May-13, First Floor
I.F.M.v971 Internal 2d 26-May-13 27-May-13 Internal
E.F.M.v971 External 2d 26-May-13 27-May-13 External
Roof 2d 28-May-13 29-May-13 29-May-13, Roof
E.R.M.v1271 External 2d 28-May-13 29-May-13 External
Finishing 24d 07-May-13 03-Jun-13 03-Jun-13, Finishing
Ground Floor 2d 07-May-13 08-May-13 08-May-13, Ground Floor
Calm Shell 2d 07-May-13 08-May-13 08-May-13, Calm Shell
E.Ch.G.v9 External 2d 07-May-13 08-May-13 External
External Ele
Electrical 0d
First Floor 2d 28-May-13 29-May-13 29-May-13, First Floor
Calm Shell 2d 28-May-13 29-May-13 29-May-13, Calm Shell
E.ch.st.v12 External 2d 28-May-13 29-May-13 External
External Ele
Electrical 0d
Roof 1d 30-May-13 30-May-13 30-May-13, Roof
Calm Shell 1d 30-May-13 30-May-13 30-May-13, Calm Shell
E.ch.r.v12 External 1d 30-May-13 30-May-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 01-Jun-13 03-Jun-13 03-Jun-13, Paint Villa 1
Ex Paint970 External Painting 3d 01-Jun-13 03-Jun-13 External Painting
Stand alone Villa typ
type 56 239d 25-Nov-12 02-Sep-13 02-Sep-13, Stand alone Villa type 56
A6500 start Villa 0d 25-Nov-12 start Villa
A6510 Finish Villa 0d 02-Sep-13 Finish Villa
Mobilization 1d 27-Nov-12 27-Nov-12 27-Nov-12, Mobilization
M. Sur.v981 Site Surveying 1d 27-Nov-12 27-Nov-12 Site Surveying
Earth Work 174d 01-Dec-12 22-Jun-13 22-Jun-13, Earth Work
Ex.v1281 Excavation 2d 01-Dec-12 02-Dec-12 Excavation
B.F.v1281 BackFill 2d 20-Jun-13 22-Jun-13 BackFill
Civil Work 76d 26-May-13 24-Aug-13 24-Aug-13, Civil Work
Foundation 15d 26-May-13 11-Jun-13 11-Jun-13, Foundation
Footing 15d 26-May-13 11-Jun-13 11-Jun-13, Footing
Plain Concrete
Con 5d 26-May-13 30-May-13 30-May-13, Plain Concrete
F.W.Pc Form Work 2d 26-May-13 27-May-13 Form Work
Pour.Pc Pouring Concrete 1d 28-May-13 28-May-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 30-May-13 30-May-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 01-Jun-13 11-Jun-13 11-Jun-13, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 01-Jun-13 04-Jun-13 Form Work
1291 R.F.T 2d 05-Jun-13 06-Jun-13 R.F.T
Pour.Rc Pouring Concrete 1d 08-Jun-13 08-Jun-13 Pouring Concrete
R.Fw.R Remove formwork 1d 10-Jun-13 10-Jun-13 Remove formwork
Ins.Rc& Insulting 1d 11-Jun-13 11-Jun-13 Insulting
Ground Floor 25d 12-Jun-13 10-Jul-13 10-Jul-13, Ground Floor
Slab on grade
grad 16d 23-Jun-13 10-Jul-13 10-Jul-13, Slab on grade
FW.SOG. Form Work 4d 23-Jun-13 26-Jun-13 Form Work
R.F.T.SOG R.F.T 3d 27-Jun-13 30-Jun-13 R.F.T
Pour.SOG Pouring Concrete 1d 01-Jul-13 01-Jul-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 10-Jul-13 10-Jul-13 Remove formwork
Columns 7d 12-Jun-13 19-Jun-13 19-Jun-13, Columns
FW.Col.G Form Work 2d 12-Jun-13 13-Jun-13 Form Work
R.F.T.Col. R.F.T 2d 15-Jun-13 16-Jun-13 R.F.T
Pour.Col.G Pouring Concrete 1d 17-Jun-13 17-Jun-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 19-Jun-13 19-Jun-13 Remove formwork
First Floor 18d 11-Jul-13 31-Jul-13 31-Jul-13, First Floor

Actual Work Critical Remaining Work Summary Page 159 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

335
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Beams and slab 18d 11-Jul-13 31-Jul-13 31-Jul-13, Beams and slab
FW.B&S.s Form Work 6d 11-Jul-13 17-Jul-13 Form Work
R.F.T.B&S R.F.T 3d 18-Jul-13 21-Jul-13 R.F.T
Pour.B&S. Pouring Concrete 1d 22-Jul-13 22-Jul-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 31-Jul-13 31-Jul-13 Remove formwork
Columns 8d 23-Jul-13 31-Jul-13 31-Jul-13, Columns
FW.Col.st. Form Work 3d 23-Jul-13 25-Jul-13 Form Work
R.F.T.Col. R.F.T 2d 27-Jul-13 28-Jul-13 R.F.T
Pour.Col.s Pouring Concrete 1d 29-Jul-13 29-Jul-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 31-Jul-13 31-Jul-13 Remove formwork
Roof 18d 01-Aug-13 24-Aug-13 24-Aug-13, Roof
Beams and slab 18d 01-Aug-13 24-Aug-13 24-Aug-13, Beams and slab
FW.B&S.n Form Work 6d 01-Aug-13 07-Aug-13 Form Work
R.F.T.B&S R.F.T 3d 11-Aug-13 13-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Aug-13 14-Aug-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 24-Aug-13 24-Aug-13 Remove Form Work
Mansonary 22d 01-Aug-13 28-Aug-13 28-Aug-13, Mansonary
Ground Floor 2d 01-Aug-13 03-Aug-13 03-Aug-13, Ground Floor
I.G..M.v981 Internal 2d 01-Aug-13 03-Aug-13 Internal
E.G.M.v1281 External 2d 01-Aug-13 03-Aug-13 External
First Floor 2d 25-Aug-13 26-Aug-13 26-Aug-13, First Floor
I.F.M.v981 Internal 2d 25-Aug-13 26-Aug-13 Internal
E.F.M.v981 External 2d 25-Aug-13 26-Aug-13 External
Roof 2d 27-Aug-13 28-Aug-13 28-Aug-13, Roof
E.R.M.v1281 External 2d 27-Aug-13 28-Aug-13 External
Finishing 24d 04-Aug-13 02-Sep-13 02-Sep-13, Finishing
Ground Floor 2d 04-Aug-13 05-Aug-13 05-Aug-13, Ground Floor
Calm Shell 2d 04-Aug-13 05-Aug-13 05-Aug-13, Calm Shell
E.Ch.G.v9 External 2d 04-Aug-13 05-Aug-13 External
External Ele
Electrical 0d
First Floor 2d 27-Aug-13 28-Aug-13 28-Aug-13, First Floor
Calm Shell 2d 27-Aug-13 28-Aug-13 28-Aug-13, Calm Shell
E.ch.st.v12 External 2d 27-Aug-13 28-Aug-13 External
External Ele
Electrical 0d
Roof 1d 29-Aug-13 29-Aug-13 29-Aug-13, Roof
Calm Shell 1d 29-Aug-13 29-Aug-13 29-Aug-13, Calm Shell
E.ch.r.v12 External 1d 29-Aug-13 29-Aug-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 31-Aug-13 02-Sep-13 02-Sep-13, Paint Villa 1
Ex Paint980 External Painting 3d 31-Aug-13 02-Sep-13 External Painting
Stand alone Villa typ
type 57 315d 25-Nov-12 04-Dec-13 04-Dec-13, Stand alone Villa type 57
A5700 start Villa 0d 25-Nov-12 start Villa
A5710 Finish Villa 0d 04-Dec-13 Finish Villa
Mobilization 1d 28-Nov-12 28-Nov-12 28-Nov-12, Mobilization
M. Sur.v991 Site Surveying 1d 28-Nov-12 28-Nov-12 Site Surveying
Earth Work 248d 03-Dec-12 21-Sep-13 21-Sep-13, Earth Work
Ex.v1291 Excavation 2d 03-Dec-12 04-Dec-12 Excavation
B.F.v1291 BackFill 2d 19-Sep-13 21-Sep-13 BackFill
Civil Work 76d 25-Aug-13 25-Nov-13 25-Nov-13, Civil Work
Foundation 15d 25-Aug-13 10-Sep-13 10-Sep-13, Foundation
Footing 15d 25-Aug-13 10-Sep-13 10-Sep-13, Footing
Plain Concrete
Con 5d 25-Aug-13 29-Aug-13 29-Aug-13, Plain Concrete
F.W.Pc Form Work 2d 25-Aug-13 26-Aug-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Aug-13 27-Aug-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 29-Aug-13 29-Aug-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 31-Aug-13 10-Sep-13 10-Sep-13, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 31-Aug-13 03-Sep-13 Form Work
1301 R.F.T 2d 04-Sep-13 05-Sep-13 R.F.T
Pour.Rc Pouring Concrete 1d 07-Sep-13 07-Sep-13 Pouring Concrete
R.Fw.R Remove formwork 1d 09-Sep-13 09-Sep-13 Remove formwork
Ins.Rc& Insulting 1d 10-Sep-13 10-Sep-13 Insulting
Ground Floor 25d 11-Sep-13 10-Oct-13 10-Oct-13, Ground Floor
Slab on grade
grad 16d 22-Sep-13 10-Oct-13 10-Oct-13, Slab on grade
FW.SOG. Form Work 4d 22-Sep-13 25-Sep-13 Form Work
R.F.T.SOG R.F.T 3d 26-Sep-13 29-Sep-13 R.F.T
Pour.SOG Pouring Concrete 1d 30-Sep-13 30-Sep-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 10-Oct-13 10-Oct-13 Remove formwork
Columns 7d 11-Sep-13 18-Sep-13 18-Sep-13, Columns
FW.Col.G Form Work 2d 11-Sep-13 12-Sep-13 Form Work
R.F.T.Col. R.F.T 2d 14-Sep-13 15-Sep-13 R.F.T
Pour.Col.G Pouring Concrete 1d 16-Sep-13 16-Sep-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 18-Sep-13 18-Sep-13 Remove formwork
First Floor 18d 12-Oct-13 04-Nov-13 04-Nov-13, First Floor
Beams and slab 18d 12-Oct-13 04-Nov-13 04-Nov-13, Beams and slab
FW.B&S.s Form Work 6d 12-Oct-13 21-Oct-13 Form Work
R.F.T.B&S R.F.T 3d 22-Oct-13 24-Oct-13 R.F.T

Actual Work Critical Remaining Work Summary Page 160 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

336
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Pour.B&S. Pouring Concrete 1d 26-Oct-13 26-Oct-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 04-Nov-13 04-Nov-13 Remove formwork
Columns 8d 27-Oct-13 04-Nov-13 04-Nov-13, Columns
FW.Col.st. Form Work 3d 27-Oct-13 29-Oct-13 Form Work
R.F.T.Col. R.F.T 2d 30-Oct-13 31-Oct-13 R.F.T
Pour.Col.s Pouring Concrete 1d 02-Nov-13 02-Nov-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 04-Nov-13 04-Nov-13 Remove formwork
Roof 18d 05-Nov-13 25-Nov-13 25-Nov-13, Roof
Beams and slab 18d 05-Nov-13 25-Nov-13 25-Nov-13, Beams and slab
FW.B&S.n Form Work 6d 05-Nov-13 11-Nov-13 Form Work
R.F.T.B&S R.F.T 3d 12-Nov-13 14-Nov-13 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-13 16-Nov-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 25-Nov-13 25-Nov-13 Remove Form Work
Mansonary 22d 05-Nov-13 30-Nov-13 30-Nov-13, Mansonary
Ground Floor 2d 05-Nov-13 06-Nov-13 06-Nov-13, Ground Floor
I.G..M.v991 Internal 2d 05-Nov-13 06-Nov-13 Internal
E.G.M.v1291 External 2d 05-Nov-13 06-Nov-13 External
First Floor 2d 26-Nov-13 27-Nov-13 27-Nov-13, First Floor
I.F.M.v991 Internal 2d 26-Nov-13 27-Nov-13 Internal
E.F.M.v991 External 2d 26-Nov-13 27-Nov-13 External
Roof 2d 28-Nov-13 30-Nov-13 30-Nov-13, Roof
E.R.M.v1291 External 2d 28-Nov-13 30-Nov-13 External
Finishing 24d 07-Nov-13 04-Dec-13 04-Dec-13, Finishing
Ground Floor 2d 07-Nov-13 09-Nov-13 09-Nov-13, Ground Floor
Calm Shell 2d 07-Nov-13 09-Nov-13 09-Nov-13, Calm Shell
E.Ch.G.v9 External 2d 07-Nov-13 09-Nov-13 External
External Ele
Electrical 0d
First Floor 2d 28-Nov-13 30-Nov-13 30-Nov-13, First Floor
Calm Shell 2d 28-Nov-13 30-Nov-13 30-Nov-13, Calm Shell
E.ch.st.v12 External 2d 28-Nov-13 30-Nov-13 External
External Ele
Electrical 0d
Roof 1d 01-Dec-13 01-Dec-13 01-Dec-13, Roof
Calm Shell 1d 01-Dec-13 01-Dec-13 01-Dec-13, Calm Shell
E.ch.r.v12 External 1d 01-Dec-13 01-Dec-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 02-Dec-13 04-Dec-13 04-Dec-13, Paint Villa 1
Ex Paint990 External Painting 3d 02-Dec-13 04-Dec-13 External Painting
Stand alone Villa typ
type 58 87d 25-Nov-12 05-Mar-13 05-Mar-13, Stand alone Villa type 58
A5780 start Villa 0d 25-Nov-12 start Villa
A5790 Finish Villa 0d 05-Mar-13 Finish Villa
Mobilization 1d 25-Nov-12 25-Nov-12 25-Nov-12, Mobilization
M. Sur.v1021 Site Surveying 1d 25-Nov-12 25-Nov-12 Site Surveying
Earth Work 26d 26-Nov-12 25-Dec-12 25-Dec-12, Earth Work
Ex.v1321 Excavation 2d 26-Nov-12 27-Nov-12 Excavation
B.F.v1321 BackFill 2d 24-Dec-12 25-Dec-12 BackFill
Civil Work 76d 28-Nov-12 24-Feb-13 24-Feb-13, Civil Work
Foundation 15d 28-Nov-12 15-Dec-12 15-Dec-12, Foundation
Footing 15d 28-Nov-12 15-Dec-12 15-Dec-12, Footing
Plain Concrete
Con 5d 28-Nov-12 03-Dec-12 03-Dec-12, Plain Concrete
F.W.Pc Form Work 2d 28-Nov-12 29-Nov-12 Form Work
Pour.Pc Pouring Concrete 1d 01-Dec-12 01-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 03-Dec-12 03-Dec-12 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 04-Dec-12 15-Dec-12 15-Dec-12, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 04-Dec-12 08-Dec-12 Form Work
1331 R.F.T 2d 09-Dec-12 10-Dec-12 R.F.T
Pour.Rc Pouring Concrete 1d 11-Dec-12 11-Dec-12 Pouring Concrete
R.Fw.R Remove formwork 1d 13-Dec-12 13-Dec-12 Remove formwork
Ins.Rc& Insulting 1d 15-Dec-12 15-Dec-12 Insulting
Ground Floor 25d 16-Dec-12 13-Jan-13 13-Jan-13, Ground Floor
Slab on grade
grad 16d 26-Dec-12 13-Jan-13 13-Jan-13, Slab on grade
FW.SOG. Form Work 4d 26-Dec-12 30-Dec-12 Form Work
R.F.T.SOG R.F.T 3d 31-Dec-12 02-Jan-13 R.F.T
Pour.SOG Pouring Concrete 1d 03-Jan-13 03-Jan-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 13-Jan-13 13-Jan-13 Remove formwork
Columns 7d 16-Dec-12 23-Dec-12 23-Dec-12, Columns
FW.Col.G Form Work 2d 16-Dec-12 17-Dec-12 Form Work
R.F.T.Col. R.F.T 2d 18-Dec-12 19-Dec-12 R.F.T
Pour.Col.G Pouring Concrete 1d 20-Dec-12 20-Dec-12 Pouring Concrete
R.FW.Col. Remove formwork 1d 23-Dec-12 23-Dec-12 Remove formwork
First Floor 18d 14-Jan-13 03-Feb-13 03-Feb-13, First Floor
Beams and slab 18d 14-Jan-13 03-Feb-13 03-Feb-13, Beams and slab
FW.B&S.s Form Work 6d 14-Jan-13 20-Jan-13 Form Work
R.F.T.B&S R.F.T 3d 21-Jan-13 23-Jan-13 R.F.T
Pour.B&S. Pouring Concrete 1d 24-Jan-13 24-Jan-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 03-Feb-13 03-Feb-13 Remove formwork
Columns 8d 26-Jan-13 03-Feb-13 03-Feb-13, Columns

Actual Work Critical Remaining Work Summary Page 161 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

337
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.Col.st. Form Work 3d 26-Jan-13 28-Jan-13 Form Work
R.F.T.Col. R.F.T 2d 29-Jan-13 30-Jan-13 R.F.T
Pour.Col.s Pouring Concrete 1d 31-Jan-13 31-Jan-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 03-Feb-13 03-Feb-13 Remove formwork
Roof 18d 04-Feb-13 24-Feb-13 24-Feb-13, Roof
Beams and slab 18d 04-Feb-13 24-Feb-13 24-Feb-13, Beams and slab
FW.B&S.n Form Work 6d 04-Feb-13 10-Feb-13 Form Work
R.F.T.B&S R.F.T 3d 11-Feb-13 13-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 14-Feb-13 14-Feb-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 24-Feb-13 24-Feb-13 Remove Form Work
Mansonary 22d 04-Feb-13 28-Feb-13 28-Feb-13, Mansonary
Ground Floor 2d 04-Feb-13 05-Feb-13 05-Feb-13, Ground Floor
I.G..M.v1021 Internal 2d 04-Feb-13 05-Feb-13 Internal
E.G.M.v1321 External 2d 04-Feb-13 05-Feb-13 External
First Floor 2d 25-Feb-13 26-Feb-13 26-Feb-13, First Floor
I.F.M.v1021 Internal 2d 25-Feb-13 26-Feb-13 Internal
E.F.M.v1021 External 2d 25-Feb-13 26-Feb-13 External
Roof 2d 27-Feb-13 28-Feb-13 28-Feb-13, Roof
E.R.M.v1321 External 2d 27-Feb-13 28-Feb-13 External
Finishing 24d 06-Feb-13 05-Mar-13 05-Mar-13, Finishing
Ground Floor 2d 06-Feb-13 07-Feb-13 07-Feb-13, Ground Floor
Calm Shell 2d 06-Feb-13 07-Feb-13 07-Feb-13, Calm Shell
E.Ch.G.v1 External 2d 06-Feb-13 07-Feb-13 External
External Ele
Electrical 0d
First Floor 2d 27-Feb-13 28-Feb-13 28-Feb-13, First Floor
Calm Shell 2d 27-Feb-13 28-Feb-13 28-Feb-13, Calm Shell
E.ch.st.v13 External 2d 27-Feb-13 28-Feb-13 External
External Ele
Electrical 0d
Roof 1d 02-Mar-13 02-Mar-13 02-Mar-13, Roof
Calm Shell 1d 02-Mar-13 02-Mar-13 02-Mar-13, Calm Shell
E.ch.r.v13 External 1d 02-Mar-13 02-Mar-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 03-Mar-13 05-Mar-13 05-Mar-13, Paint Villa 1
Ex Paint1020 External Painting 3d 03-Mar-13 05-Mar-13 External Painting
Stand alone Villa typ
type 59 163d 25-Nov-12 03-Jun-13 03-Jun-13, Stand alone Villa type 59
A5800 start Villa 0d 25-Nov-12 start Villa
A5810 Finish Villa 0d 03-Jun-13 Finish Villa
Mobilization 1d 26-Nov-12 26-Nov-12 26-Nov-12, Mobilization
M. Sur.v1031 Site Surveying 1d 26-Nov-12 26-Nov-12 Site Surveying
Earth Work 100d 28-Nov-12 24-Mar-13 24-Mar-13, Earth Work
Ex.v1331 Excavation 2d 28-Nov-12 29-Nov-12 Excavation
B.F.v1331 BackFill 2d 23-Mar-13 24-Mar-13 BackFill
Civil Work 76d 25-Feb-13 25-May-13 25-May-13, Civil Work
Foundation 15d 25-Feb-13 13-Mar-13 13-Mar-13, Foundation
Footing 15d 25-Feb-13 13-Mar-13 13-Mar-13, Footing
Plain Concrete
Con 5d 25-Feb-13 02-Mar-13 02-Mar-13, Plain Concrete
F.W.Pc Form Work 2d 25-Feb-13 26-Feb-13 Form Work
Pour.Pc Pouring Concrete 1d 27-Feb-13 27-Feb-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 02-Mar-13 02-Mar-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 03-Mar-13 13-Mar-13 13-Mar-13, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 03-Mar-13 06-Mar-13 Form Work
1341 R.F.T 2d 07-Mar-13 09-Mar-13 R.F.T
Pour.Rc Pouring Concrete 1d 10-Mar-13 10-Mar-13 Pouring Concrete
R.Fw.R Remove formwork 1d 12-Mar-13 12-Mar-13 Remove formwork
Ins.Rc& Insulting 1d 13-Mar-13 13-Mar-13 Insulting
Ground Floor 25d 14-Mar-13 11-Apr-13 11-Apr-13, Ground Floor
Slab on grade
grad 16d 25-Mar-13 11-Apr-13 11-Apr-13, Slab on grade
FW.SOG. Form Work 4d 25-Mar-13 28-Mar-13 Form Work
R.F.T.SOG R.F.T 3d 30-Mar-13 01-Apr-13 R.F.T
Pour.SOG Pouring Concrete 1d 02-Apr-13 02-Apr-13 Pouring Concrete
R.FW.SOG Remove formwork 1d 11-Apr-13 11-Apr-13 Remove formwork
Columns 7d 14-Mar-13 21-Mar-13 21-Mar-13, Columns
FW.Col.G Form Work 2d 14-Mar-13 16-Mar-13 Form Work
R.F.T.Col. R.F.T 2d 17-Mar-13 18-Mar-13 R.F.T
Pour.Col.G Pouring Concrete 1d 19-Mar-13 19-Mar-13 Pouring Concrete
R.FW.Col. Remove formwork 1d 21-Mar-13 21-Mar-13 Remove formwork
First Floor 18d 13-Apr-13 04-May-13 04-May-13, First Floor
Beams and slab 18d 13-Apr-13 04-May-13 04-May-13, Beams and slab
FW.B&S.s Form Work 6d 13-Apr-13 18-Apr-13 Form Work
R.F.T.B&S R.F.T 3d 20-Apr-13 22-Apr-13 R.F.T
Pour.B&S. Pouring Concrete 1d 23-Apr-13 23-Apr-13 Pouring Concrete
R.FW.B&S Remove formwork 1d 04-May-13 04-May-13 Remove formwork
Columns 8d 24-Apr-13 04-May-13 04-May-13, Columns
FW.Col.st. Form Work 3d 24-Apr-13 27-Apr-13 Form Work
R.F.T.Col. R.F.T 2d 28-Apr-13 29-Apr-13 R.F.T
Pour.Col.s Pouring Concrete 1d 30-Apr-13 30-Apr-13 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 162 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

338
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.Col. Remove formwork 1d 04-May-13 04-May-13 Remove formwork
Roof 18d 05-May-13 25-May-13 25-May-13, Roof
Beams and slab 18d 05-May-13 25-May-13 25-May-13, Beams and slab
FW.B&S.n Form Work 6d 05-May-13 11-May-13 Form Work
R.F.T.B&S R.F.T 3d 12-May-13 14-May-13 R.F.T
Pour.B&S. Pouring Concrete 1d 15-May-13 15-May-13 Pouring Concrete
R.FW.B&S Remove Form Work 1d 25-May-13 25-May-13 Remove Form Work
Mansonary 22d 05-May-13 29-May-13 29-May-13, Mansonary
Ground Floor 2d 05-May-13 06-May-13 06-May-13, Ground Floor
I.G..M.v1031 Internal 2d 05-May-13 06-May-13 Internal
E.G.M.v1331 External 2d 05-May-13 06-May-13 External
First Floor 2d 26-May-13 27-May-13 27-May-13, First Floor
I.F.M.v1031 Internal 2d 26-May-13 27-May-13 Internal
E.F.M.v1031 External 2d 26-May-13 27-May-13 External
Roof 2d 28-May-13 29-May-13 29-May-13, Roof
E.R.M.v1331 External 2d 28-May-13 29-May-13 External
Finishing 24d 07-May-13 03-Jun-13 03-Jun-13, Finishing
Ground Floor 2d 07-May-13 08-May-13 08-May-13, Ground Floor
Calm Shell 2d 07-May-13 08-May-13 08-May-13, Calm Shell
E.Ch.G.v1 External 2d 07-May-13 08-May-13 External
External Ele
Electrical 0d
First Floor 2d 28-May-13 29-May-13 29-May-13, First Floor
Calm Shell 2d 28-May-13 29-May-13 29-May-13, Calm Shell
E.ch.st.v13 External 2d 28-May-13 29-May-13 External
External Ele
Electrical 0d
Roof 1d 30-May-13 30-May-13 30-May-13, Roof
Calm Shell 1d 30-May-13 30-May-13 30-May-13, Calm Shell
E.ch.r.v13 External 1d 30-May-13 30-May-13 External
External Ele
Electrical 0d
Paint Villa 1 3d 01-Jun-13 03-Jun-13 03-Jun-13, Paint Villa 1
Ex Paint1030 External Painting 3d 01-Jun-13 03-Jun-13 External Painting
Twin House 3 274d 25-Nov-12 14-Oct-13 14-Oct-13, Twin House 3
A5820 Start of twin 0d 25-Nov-12 Start of twin
A5830 Finish of twin 0d 14-Oct-13 Finish of twin
Mobilization 1d 27-Nov-12 27-Nov-12 27-Nov-12, Mobilization
M.sur.tw150 Site Surveying 1d 27-Nov-12 27-Nov-12 Site Surveying
Earth Work 187d 01-Dec-12 07-Jul-13 07-Jul-13, Earth Work
Ex.tw150 Excavation 3d 01-Dec-12 03-Dec-12 Excavation
B.F.tw150 BackFill 3d 04-Jul-13 07-Jul-13 BackFill
Civil Work 100d 26-May-13 21-Sep-13 21-Sep-13, Civil Work
Foundation 25d 26-May-13 23-Jun-13 23-Jun-13, Foundation
Footing 25d 26-May-13 23-Jun-13 23-Jun-13, Footing
Plain Concrete
Con 8d 26-May-13 03-Jun-13 03-Jun-13, Plain Concrete
F.W.Pc Form Work 5d 26-May-13 30-May-13 Form Work
Pour.Pc Pouring Concrete 1d 01-Jun-13 01-Jun-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 03-Jun-13 03-Jun-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 17d 04-Jun-13 23-Jun-13 23-Jun-13, Reinforced Concrete&Semels
FW.RC Form Work 5d 04-Jun-13 09-Jun-13 Form Work
1351 R.F.T 5d 10-Jun-13 15-Jun-13 R.F.T
Pour.RC Pouring Concrete 1d 16-Jun-13 16-Jun-13 Pouring Concrete
R.FW.R Remove Formwork 1d 18-Jun-13 18-Jun-13 Remove Formwork
Ins.RC& Insulting 4d 19-Jun-13 23-Jun-13 Insulting
Ground Floor 34d 24-Jun-13 01-Aug-13 01-Aug-13, Ground Floor
Slab on grade
grad 22d 08-Jul-13 01-Aug-13 01-Aug-13, Slab on grade
FW.SOG. Form Work 6d 08-Jul-13 14-Jul-13 Form Work
R.F.T.SOG R.F.T 7d 15-Jul-13 22-Jul-13 R.F.T
Pour.SOG Pouring Concrete 1d 23-Jul-13 23-Jul-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 01-Aug-13 01-Aug-13 Remove Formwork
Columns 9d 24-Jun-13 03-Jul-13 03-Jul-13, Columns
FW.Col.G Form Work 3d 24-Jun-13 26-Jun-13 Form Work
R.F.T.Col. R.F.T 3d 27-Jun-13 30-Jun-13 R.F.T
Pour.Col.G Pouring Concrete 1d 01-Jul-13 01-Jul-13 Pouring Concrete
R.FW..Co Remove Formwork 1d 03-Jul-13 03-Jul-13 Remove Formwork
First Floor 21d 03-Aug-13 28-Aug-13 28-Aug-13, First Floor
Beams and Slabs 20d 03-Aug-13 27-Aug-13 27-Aug-13, Beams and Slabs
FW.B&S.s Form Work 5d 03-Aug-13 07-Aug-13 Form Work
R.F.T.B&S R.F.T 6d 11-Aug-13 17-Aug-13 R.F.T
Pour.B&S. Pouring Concrete 1d 18-Aug-13 18-Aug-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 27-Aug-13 27-Aug-13 Remove Formwork
Columns 9d 19-Aug-13 28-Aug-13 28-Aug-13, Columns
FW.Col.st. Form Work 3d 19-Aug-13 21-Aug-13 Form Work
R.F.T.Col. R.F.T 3d 22-Aug-13 25-Aug-13 R.F.T
Pour.Col.s Pouring Concrete 1d 26-Aug-13 26-Aug-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 28-Aug-13 28-Aug-13 Remove Formwork
Roof 20d 29-Aug-13 21-Sep-13 21-Sep-13, Roof
Beams and Slabs 20d 29-Aug-13 21-Sep-13 21-Sep-13, Beams and Slabs

Actual Work Critical Remaining Work Summary Page 163 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

339
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:39

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.B&S.R Form Work 5d 29-Aug-13 03-Sep-13 Form Work
R.F.T.B&S R.F.T 6d 04-Sep-13 10-Sep-13 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Sep-13 11-Sep-13 Pouring Concrete
R.Fw.B&S Remove Formwork 1d 21-Sep-13 21-Sep-13 Remove Formwork
Mansonary 32d 28-Aug-13 03-Oct-13 03-Oct-13, Mansonary
Ground Floor 9d 28-Aug-13 07-Sep-13 07-Sep-13, Ground Floor
I.G.M.tw150 Internal 9d 28-Aug-13 07-Sep-13 Internal
E.G.M. tw150 External 3d 28-Aug-13 31-Aug-13 External
First Floor 9d 22-Sep-13 01-Oct-13 01-Oct-13, First Floor
I .st .M tw150 Internal 9d 22-Sep-13 01-Oct-13 Internal
E.st.M tw150 External 3d 22-Sep-13 24-Sep-13 External
Roof 2d 02-Oct-13 03-Oct-13 03-Oct-13, Roof
E. R. M tw150 External 2d 02-Oct-13 03-Oct-13 External
Finishing 37d 01-Sep-13 14-Oct-13 14-Oct-13, Finishing
Ground Floor 2d 01-Sep-13 02-Sep-13 02-Sep-13, Ground Floor
Calm Shell 2d 01-Sep-13 02-Sep-13 02-Sep-13, Calm Shell
E.Ch.G tw External 2d 01-Sep-13 02-Sep-13 External
External Ele
Electrical 0d
First Floor 2d 25-Sep-13 26-Sep-13 26-Sep-13, First Floor
Calm Shell 2d 25-Sep-13 26-Sep-13 26-Sep-13, Calm Shell
E.Ch .st.tw External 2d 25-Sep-13 26-Sep-13 External
External Ele
Electrical 0d
Roof 1d 05-Oct-13 05-Oct-13 05-Oct-13, Roof
Calm Shell 1d 05-Oct-13 05-Oct-13 05-Oct-13, Calm Shell
E.Ch .r.tw External 1d 05-Oct-13 05-Oct-13 External
External Ele
Electrical 0d
Paint Twin House
Hou 7d 07-Oct-13 14-Oct-13 14-Oct-13, Paint Twin House
Ex Paint twin External Painting 7d 07-Oct-13 14-Oct-13 External Painting
Twin House 5 123d 25-Nov-12 16-Apr-13 16-Apr-13, Twin House 5
A5840 Start of twin 0d 25-Nov-12 Start of twin
A5850 Finish of twin 0d 16-Apr-13 Finish of twin
Mobilization 1d 25-Nov-12 25-Nov-12 25-Nov-12, Mobilization
M.sur.tw160 Site Surveying 1d 25-Nov-12 25-Nov-12 Site Surveying
Earth Work 40d 26-Nov-12 10-Jan-13 10-Jan-13, Earth Work
Ex.tw160 Excavation 3d 26-Nov-12 28-Nov-12 Excavation
B.F.tw160 BackFill 3d 08-Jan-13 10-Jan-13 BackFill
Civil Work 100d 29-Nov-12 25-Mar-13 25-Mar-13, Civil Work
Foundation 25d 29-Nov-12 27-Dec-12 27-Dec-12, Foundation
Footing 25d 29-Nov-12 27-Dec-12 27-Dec-12, Footing
Plain Concrete
Con 8d 29-Nov-12 08-Dec-12 08-Dec-12, Plain Concrete
F.W.Pc Form Work 5d 29-Nov-12 04-Dec-12 Form Work
Pour.Pc Pouring Concrete 1d 05-Dec-12 05-Dec-12 Pouring Concrete
R.Fw.P Remove Formwork 1d 08-Dec-12 08-Dec-12 Remove Formwork
Reinforced Concrete&Semels
Reinforce 17d 09-Dec-12 27-Dec-12 27-Dec-12, Reinforced Concrete&Semels
FW.RC Form Work 5d 09-Dec-12 13-Dec-12 Form Work
140 R.F.T 5d 15-Dec-12 19-Dec-12 R.F.T
Pour.RC Pouring Concrete 1d 20-Dec-12 20-Dec-12 Pouring Concrete
R.FW.R Remove Formwork 1d 23-Dec-12 23-Dec-12 Remove Formwork
Ins.RC& Insulting 4d 24-Dec-12 27-Dec-12 Insulting
Ground Floor 34d 29-Dec-12 05-Feb-13 05-Feb-13, Ground Floor
Slab on grade
grad 22d 12-Jan-13 05-Feb-13 05-Feb-13, Slab on grade
FW.SOG. Form Work 6d 12-Jan-13 17-Jan-13 Form Work
R.F.T.SOG R.F.T 7d 19-Jan-13 26-Jan-13 R.F.T
Pour.SOG Pouring Concrete 1d 27-Jan-13 27-Jan-13 Pouring Concrete
R.FW.SOG Remove Formwork 1d 05-Feb-13 05-Feb-13 Remove Formwork
Columns 9d 29-Dec-12 07-Jan-13 07-Jan-13, Columns
FW.Col.G Form Work 3d 29-Dec-12 31-Dec-12 Form Work
R.F.T.Col. R.F.T 3d 01-Jan-13 03-Jan-13 R.F.T
Pour.Col.G Pouring Concrete 1d 05-Jan-13 05-Jan-13 Pouring Concrete
R.FW..Co Remove Formwork 1d 07-Jan-13 07-Jan-13 Remove Formwork
First Floor 21d 06-Feb-13 02-Mar-13 02-Mar-13, First Floor
Beams and Slabs 20d 06-Feb-13 28-Feb-13 28-Feb-13, Beams and Slabs
FW.B&S.s Form Work 5d 06-Feb-13 11-Feb-13 Form Work
R.F.T.B&S R.F.T 6d 12-Feb-13 18-Feb-13 R.F.T
Pour.B&S. Pouring Concrete 1d 19-Feb-13 19-Feb-13 Pouring Concrete
R.FW.B&S Remove Formwork 1d 28-Feb-13 28-Feb-13 Remove Formwork
Columns 9d 20-Feb-13 02-Mar-13 02-Mar-13, Columns
FW.Col.st. Form Work 3d 20-Feb-13 23-Feb-13 Form Work
R.F.T.Col. R.F.T 3d 24-Feb-13 26-Feb-13 R.F.T
Pour.Col.s Pouring Concrete 1d 27-Feb-13 27-Feb-13 Pouring Concrete
R.FW.Col. Remove Formwork 1d 02-Mar-13 02-Mar-13 Remove Formwork
Roof 20d 03-Mar-13 25-Mar-13 25-Mar-13, Roof
Beams and Slabs 20d 03-Mar-13 25-Mar-13 25-Mar-13, Beams and Slabs
FW.B&S.R Form Work 5d 03-Mar-13 07-Mar-13 Form Work
R.F.T.B&S R.F.T 6d 09-Mar-13 14-Mar-13 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Mar-13 16-Mar-13 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 164 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

340
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.Fw.B&S Remove Formwork 1d 25-Mar-13 25-Mar-13 Remove Formwork
Mansonary 32d 02-Mar-13 07-Apr-13 07-Apr-13, Mansonary
Ground Floor 9d 02-Mar-13 11-Mar-13 11-Mar-13, Ground Floor
I.G.M.tw160 Internal 9d 02-Mar-13 11-Mar-13 Internal
E.G.M. tw160 External 3d 02-Mar-13 04-Mar-13 External
First Floor 9d 26-Mar-13 04-Apr-13 04-Apr-13, First Floor
I .st .M tw160 Internal 9d 26-Mar-13 04-Apr-13 Internal
E.st.M tw160 External 3d 26-Mar-13 28-Mar-13 External
Roof 2d 06-Apr-13 07-Apr-13 07-Apr-13, Roof
E. R. M tw160 External 2d 06-Apr-13 07-Apr-13 External
Finishing 37d 05-Mar-13 16-Apr-13 16-Apr-13, Finishing
Ground Floor 2d 05-Mar-13 06-Mar-13 06-Mar-13, Ground Floor
Calm Shell 2d 05-Mar-13 06-Mar-13 06-Mar-13, Calm Shell
E.Ch.G tw External 2d 05-Mar-13 06-Mar-13 External
External Ele
Electrical 0d
First Floor 2d 30-Mar-13 31-Mar-13 31-Mar-13, First Floor
Calm Shell 2d 30-Mar-13 31-Mar-13 31-Mar-13, Calm Shell
E.Ch .st.tw External 2d 30-Mar-13 31-Mar-13 External
External Ele
Electrical 0d
Roof 1d 08-Apr-13 08-Apr-13 08-Apr-13, Roof
Calm Shell 1d 08-Apr-13 08-Apr-13 08-Apr-13, Calm Shell
E.Ch .r.tw External 1d 08-Apr-13 08-Apr-13 External
External Ele
Electrical 0d
Paint Twin House
Hou 7d 09-Apr-13 16-Apr-13 16-Apr-13, Paint Twin House
Ex Paint twin External Painting 7d 09-Apr-13 16-Apr-13 External Painting
Stage 3 315d 15-Dec-13 25-Dec-14 25-Dec-14, S
A6480 start of stage 3 0d 15-Dec-13 start of stage 3
A6490 finish of stage 3 0d 25-Dec-14 finish of stag
Stand alone Villa typ
type 60 87d 15-Dec-13 25-Mar-14 25-Mar-14, Stand alone Villa type 60
A5860 start Villa 0d 15-Dec-13 start Villa
A5870 Finish Villa 0d 25-Mar-14 Finish Villa
Mobilization 1d 15-Dec-13 15-Dec-13 15-Dec-13, Mobilization
M. Sur.v1041 Site Surveying 1d 15-Dec-13 15-Dec-13 Site Surveying
Earth Work 26d 16-Dec-13 14-Jan-14 14-Jan-14, Earth Work
Ex.v1341 Excavation 2d 16-Dec-13 17-Dec-13 Excavation
B.F.v1341 BackFill 2d 13-Jan-14 14-Jan-14 BackFill
Civil Work 76d 18-Dec-13 16-Mar-14 16-Mar-14, Civil Work
Foundation 15d 18-Dec-13 04-Jan-14 04-Jan-14, Foundation
Footing 15d 18-Dec-13 04-Jan-14 04-Jan-14, Footing
Plain Concrete
Con 5d 18-Dec-13 23-Dec-13 23-Dec-13, Plain Concrete
F.W.Pc Form Work 2d 18-Dec-13 19-Dec-13 Form Work
Pour.Pc Pouring Concrete 1d 21-Dec-13 21-Dec-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Dec-13 23-Dec-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 24-Dec-13 04-Jan-14 04-Jan-14, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 24-Dec-13 28-Dec-13 Form Work
1041 R.F.T 2d 29-Dec-13 30-Dec-13 R.F.T
Pour.Rc Pouring Concrete 1d 31-Dec-13 31-Dec-13 Pouring Concrete
R.Fw.R Remove formwork 1d 02-Jan-14 02-Jan-14 Remove formwork
Ins.Rc& Insulting 1d 04-Jan-14 04-Jan-14 Insulting
Ground Floor 25d 05-Jan-14 02-Feb-14 02-Feb-14, Ground Floor
Slab on grade
grad 16d 15-Jan-14 02-Feb-14 02-Feb-14, Slab on grade
FW.SOG. Form Work 4d 15-Jan-14 19-Jan-14 Form Work
R.F.T.SOG R.F.T 3d 20-Jan-14 22-Jan-14 R.F.T
Pour.SOG Pouring Concrete 1d 23-Jan-14 23-Jan-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 02-Feb-14 02-Feb-14 Remove formwork
Columns 7d 05-Jan-14 12-Jan-14 12-Jan-14, Columns
FW.Col.G Form Work 2d 05-Jan-14 06-Jan-14 Form Work
R.F.T.Col. R.F.T 2d 07-Jan-14 08-Jan-14 R.F.T
Pour.Col.G Pouring Concrete 1d 09-Jan-14 09-Jan-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 12-Jan-14 12-Jan-14 Remove formwork
First Floor 18d 03-Feb-14 23-Feb-14 23-Feb-14, First Floor
Beams and slab 18d 03-Feb-14 23-Feb-14 23-Feb-14, Beams and slab
FW.B&S.s Form Work 6d 03-Feb-14 09-Feb-14 Form Work
R.F.T.B&S R.F.T 3d 10-Feb-14 12-Feb-14 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Feb-14 13-Feb-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 23-Feb-14 23-Feb-14 Remove formwork
Columns 8d 15-Feb-14 23-Feb-14 23-Feb-14, Columns
FW.Col.st. Form Work 3d 15-Feb-14 17-Feb-14 Form Work
R.F.T.Col. R.F.T 2d 18-Feb-14 19-Feb-14 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Feb-14 20-Feb-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 23-Feb-14 23-Feb-14 Remove formwork
Roof 18d 24-Feb-14 16-Mar-14 16-Mar-14, Roof
Beams and slab 18d 24-Feb-14 16-Mar-14 16-Mar-14, Beams and slab
FW.B&S.n Form Work 6d 24-Feb-14 02-Mar-14 Form Work
R.F.T.B&S R.F.T 3d 03-Mar-14 05-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Mar-14 06-Mar-14 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 165 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

341
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.B&S Remove Form Work 1d 16-Mar-14 16-Mar-14 Remove Form Work
Mansonary 22d 24-Feb-14 20-Mar-14 20-Mar-14, Mansonary
Ground Floor 2d 24-Feb-14 25-Feb-14 25-Feb-14, Ground Floor
I.G..M.v1041 Internal 2d 24-Feb-14 25-Feb-14 Internal
E.G.M.v1341 External 2d 24-Feb-14 25-Feb-14 External
First Floor 2d 17-Mar-14 18-Mar-14 18-Mar-14, First Floor
I.F.M.v1041 Internal 2d 17-Mar-14 18-Mar-14 Internal
E.F.M.v1041 External 2d 17-Mar-14 18-Mar-14 External
Roof 2d 19-Mar-14 20-Mar-14 20-Mar-14, Roof
E.R.M.v1341 External 2d 19-Mar-14 20-Mar-14 External
Finishing 24d 26-Feb-14 25-Mar-14 25-Mar-14, Finishing
Ground Floor 2d 26-Feb-14 27-Feb-14 27-Feb-14, Ground Floor
Calm Shell 2d 26-Feb-14 27-Feb-14 27-Feb-14, Calm Shell
E.Ch.G.v1 External 2d 26-Feb-14 27-Feb-14 External
External Ele
Electrical 0d
First Floor 2d 19-Mar-14 20-Mar-14 20-Mar-14, First Floor
Calm Shell 2d 19-Mar-14 20-Mar-14 20-Mar-14, Calm Shell
E.ch.st.v13 External 2d 19-Mar-14 20-Mar-14 External
External Ele
Electrical 0d
Roof 1d 22-Mar-14 22-Mar-14 22-Mar-14, Roof
Calm Shell 1d 22-Mar-14 22-Mar-14 22-Mar-14, Calm Shell
E.ch.r.v13 External 1d 22-Mar-14 22-Mar-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 23-Mar-14 25-Mar-14 25-Mar-14, Paint Villa 1
Ex Paint1040 External Painting 3d 23-Mar-14 25-Mar-14 External Painting
Stand alone Villa typ
type 61 163d 15-Dec-13 23-Jun-14 23-Jun-14, Stand alone Villa
A5880 start Villa 0d 15-Dec-13 start Villa
A5890 Finish Villa 0d 23-Jun-14 Finish Villa
Mobilization 1d 16-Dec-13 16-Dec-13 16-Dec-13, Mobilization
M. Sur.v1051 Site Surveying 1d 16-Dec-13 16-Dec-13 Site Surveying
Earth Work 100d 18-Dec-13 13-Apr-14 13-Apr-14, Earth Work
Ex.v1351 Excavation 2d 18-Dec-13 19-Dec-13 Excavation
B.F.v1351 BackFill 2d 12-Apr-14 13-Apr-14 BackFill
Civil Work 76d 17-Mar-14 14-Jun-14 14-Jun-14, Civil Work
Foundation 15d 17-Mar-14 02-Apr-14 02-Apr-14, Foundation
Footing 15d 17-Mar-14 02-Apr-14 02-Apr-14, Footing
Plain Concrete
Con 5d 17-Mar-14 22-Mar-14 22-Mar-14, Plain Concrete
F.W.Pc Form Work 2d 17-Mar-14 18-Mar-14 Form Work
Pour.Pc Pouring Concrete 1d 19-Mar-14 19-Mar-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 22-Mar-14 22-Mar-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 23-Mar-14 02-Apr-14 02-Apr-14, Reinforced Concrete&Sm
FW.Rc& Form Work 4d 23-Mar-14 26-Mar-14 Form Work
1311 R.F.T 2d 27-Mar-14 29-Mar-14 R.F.T
Pour.Rc Pouring Concrete 1d 30-Mar-14 30-Mar-14 Pouring Concrete
R.Fw.R Remove formwork 1d 01-Apr-14 01-Apr-14 Remove formwork
Ins.Rc& Insulting 1d 02-Apr-14 02-Apr-14 Insulting
Ground Floor 25d 03-Apr-14 03-May-14 03-May-14, Ground Floor
Slab on grade
grad 16d 14-Apr-14 03-May-14 03-May-14, Slab on grade
FW.SOG. Form Work 4d 14-Apr-14 17-Apr-14 Form Work
R.F.T.SOG R.F.T 3d 19-Apr-14 21-Apr-14 R.F.T
Pour.SOG Pouring Concrete 1d 22-Apr-14 22-Apr-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 03-May-14 03-May-14 Remove formwork
Columns 7d 03-Apr-14 10-Apr-14 10-Apr-14, Columns
FW.Col.G Form Work 2d 03-Apr-14 05-Apr-14 Form Work
R.F.T.Col. R.F.T 2d 06-Apr-14 07-Apr-14 R.F.T
Pour.Col.G Pouring Concrete 1d 08-Apr-14 08-Apr-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 10-Apr-14 10-Apr-14 Remove formwork
First Floor 18d 04-May-14 24-May-14 24-May-14, First Floor
Beams and slab 18d 04-May-14 24-May-14 24-May-14, Beams and slab
FW.B&S.s Form Work 6d 04-May-14 10-May-14 Form Work
R.F.T.B&S R.F.T 3d 11-May-14 13-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 14-May-14 14-May-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 24-May-14 24-May-14 Remove formwork
Columns 8d 15-May-14 24-May-14 24-May-14, Columns
FW.Col.st. Form Work 3d 15-May-14 18-May-14 Form Work
R.F.T.Col. R.F.T 2d 19-May-14 20-May-14 R.F.T
Pour.Col.s Pouring Concrete 1d 21-May-14 21-May-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 24-May-14 24-May-14 Remove formwork
Roof 18d 25-May-14 14-Jun-14 14-Jun-14, Roof
Beams and slab 18d 25-May-14 14-Jun-14 14-Jun-14, Beams and slab
FW.B&S.n Form Work 6d 25-May-14 31-May-14 Form Work
R.F.T.B&S R.F.T 3d 01-Jun-14 03-Jun-14 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Jun-14 04-Jun-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 14-Jun-14 14-Jun-14 Remove Form Work
Mansonary 22d 25-May-14 18-Jun-14 18-Jun-14, Mansonary
Ground Floor 2d 25-May-14 26-May-14 26-May-14, Ground Floor

Actual Work Critical Remaining Work Summary Page 166 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

342
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
I.G..M.v1051 Internal 2d 25-May-14 26-May-14 Internal
E.G.M.v1351 External 2d 25-May-14 26-May-14 External
First Floor 2d 15-Jun-14 16-Jun-14 16-Jun-14, First Floor
I.F.M.v1051 Internal 2d 15-Jun-14 16-Jun-14 Internal
E.F.M.v1051 External 2d 15-Jun-14 16-Jun-14 External
Roof 2d 17-Jun-14 18-Jun-14 18-Jun-14, Roof
E.R.M.v1351 External 2d 17-Jun-14 18-Jun-14 External
Finishing 24d 27-May-14 23-Jun-14 23-Jun-14, Finishing
Ground Floor 2d 27-May-14 28-May-14 28-May-14, Ground Floor
Calm Shell 2d 27-May-14 28-May-14 28-May-14, Calm Shell
E.Ch.G.v1 External 2d 27-May-14 28-May-14 External
External Ele
Electrical 0d
First Floor 2d 17-Jun-14 18-Jun-14 18-Jun-14, First Floor
Calm Shell 2d 17-Jun-14 18-Jun-14 18-Jun-14, Calm Shell
E.ch.st.v13 External 2d 17-Jun-14 18-Jun-14 External
External Ele
Electrical 0d
Roof 1d 19-Jun-14 19-Jun-14 19-Jun-14, Roof
Calm Shell 1d 19-Jun-14 19-Jun-14 19-Jun-14, Calm Shell
E.ch.r.v13 External 1d 19-Jun-14 19-Jun-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 21-Jun-14 23-Jun-14 23-Jun-14, Paint Villa 1
Ex Paint1050 External Painting 3d 21-Jun-14 23-Jun-14 External Painting
Stand alone Villa typ
type 62 239d 15-Dec-13 24-Sep-14 24-Sep-14, Stand alo
A5900 start Villa 0d 15-Dec-13 start Villa
A5910 Finish Villa 0d 24-Sep-14 Finish Villa
Mobilization 1d 17-Dec-13 17-Dec-13 17-Dec-13, Mobilization
M. Sur.v1061 Site Surveying 1d 17-Dec-13 17-Dec-13 Site Surveying
Earth Work 174d 21-Dec-13 12-Jul-14 12-Jul-14, Earth Work
Ex.v1361 Excavation 2d 21-Dec-13 22-Dec-13 Excavation
B.F.v1361 BackFill 2d 10-Jul-14 12-Jul-14 BackFill
Civil Work 76d 15-Jun-14 15-Sep-14 15-Sep-14, Civil Wor
Foundation 15d 15-Jun-14 01-Jul-14 01-Jul-14, Foundation
Footing 15d 15-Jun-14 01-Jul-14 01-Jul-14, Footing
Plain Concrete
Con 5d 15-Jun-14 19-Jun-14 19-Jun-14, Plain Concrete
F.W.Pc Form Work 2d 15-Jun-14 16-Jun-14 Form Work
Pour.Pc Pouring Concrete 1d 17-Jun-14 17-Jun-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 19-Jun-14 19-Jun-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 21-Jun-14 01-Jul-14 01-Jul-14, Reinforced Concr
FW.Rc& Form Work 4d 21-Jun-14 24-Jun-14 Form Work
1321 R.F.T 2d 25-Jun-14 26-Jun-14 R.F.T
Pour.Rc Pouring Concrete 1d 28-Jun-14 28-Jun-14 Pouring Concrete
R.Fw.R Remove formwork 1d 30-Jun-14 30-Jun-14 Remove formwork
Ins.Rc& Insulting 1d 01-Jul-14 01-Jul-14 Insulting
Ground Floor 25d 02-Jul-14 04-Aug-14 04-Aug-14, Ground Floor
Slab on grade
grad 16d 13-Jul-14 04-Aug-14 04-Aug-14, Slab on grade
FW.SOG. Form Work 4d 13-Jul-14 16-Jul-14 Form Work
R.F.T.SOG R.F.T 3d 17-Jul-14 20-Jul-14 R.F.T
Pour.SOG Pouring Concrete 1d 21-Jul-14 21-Jul-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 04-Aug-14 04-Aug-14 Remove formwork
Columns 7d 02-Jul-14 09-Jul-14 09-Jul-14, Columns
FW.Col.G Form Work 2d 02-Jul-14 03-Jul-14 Form Work
R.F.T.Col. R.F.T 2d 05-Jul-14 06-Jul-14 R.F.T
Pour.Col.G Pouring Concrete 1d 07-Jul-14 07-Jul-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 09-Jul-14 09-Jul-14 Remove formwork
First Floor 18d 05-Aug-14 25-Aug-14 25-Aug-14, First Floor
Beams and slab 18d 05-Aug-14 25-Aug-14 25-Aug-14, Beams and
FW.B&S.s Form Work 6d 05-Aug-14 11-Aug-14 Form Work
R.F.T.B&S R.F.T 3d 12-Aug-14 14-Aug-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Aug-14 16-Aug-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 25-Aug-14 25-Aug-14 Remove formwork
Columns 8d 17-Aug-14 25-Aug-14 25-Aug-14, Columns
FW.Col.st. Form Work 3d 17-Aug-14 19-Aug-14 Form Work
R.F.T.Col. R.F.T 2d 20-Aug-14 21-Aug-14 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Aug-14 23-Aug-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 25-Aug-14 25-Aug-14 Remove formwork
Roof 18d 26-Aug-14 15-Sep-14 15-Sep-14, Roof
Beams and slab 18d 26-Aug-14 15-Sep-14 15-Sep-14, Beams an
FW.B&S.n Form Work 6d 26-Aug-14 01-Sep-14 Form Work
R.F.T.B&S R.F.T 3d 02-Sep-14 04-Sep-14 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Sep-14 06-Sep-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 15-Sep-14 15-Sep-14 Remove Form Work
Mansonary 22d 26-Aug-14 20-Sep-14 20-Sep-14, Mansona
Ground Floor 2d 26-Aug-14 27-Aug-14 27-Aug-14, Ground Flo
I.G..M.v1061 Internal 2d 26-Aug-14 27-Aug-14 Internal
E.G.M.v1361 External 2d 26-Aug-14 27-Aug-14 External
First Floor 2d 16-Sep-14 17-Sep-14 17-Sep-14, First Floo

Actual Work Critical Remaining Work Summary Page 167 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

343
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
I.F.M.v1061 Internal 2d 16-Sep-14 17-Sep-14 Internal
E.F.M.v1061 External 2d 16-Sep-14 17-Sep-14 External
Roof 2d 18-Sep-14 20-Sep-14 20-Sep-14, Roof
E.R.M.v1361 External 2d 18-Sep-14 20-Sep-14 External
Finishing 24d 28-Aug-14 24-Sep-14 24-Sep-14, Finishing
Ground Floor 2d 28-Aug-14 30-Aug-14 30-Aug-14, Ground Flo
Calm Shell 2d 28-Aug-14 30-Aug-14 30-Aug-14, Calm Shell
E.Ch.G.v1 External 2d 28-Aug-14 30-Aug-14 External
External Ele
Electrical 0d
First Floor 2d 18-Sep-14 20-Sep-14 20-Sep-14, First Floo
Calm Shell 2d 18-Sep-14 20-Sep-14 20-Sep-14, Calm She
E.ch.st.v13 External 2d 18-Sep-14 20-Sep-14 External
External Ele
Electrical 0d
Roof 1d 21-Sep-14 21-Sep-14 21-Sep-14, Roof
Calm Shell 1d 21-Sep-14 21-Sep-14 21-Sep-14, Calm She
E.ch.r.v13 External 1d 21-Sep-14 21-Sep-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 22-Sep-14 24-Sep-14 24-Sep-14, Paint Villa
Ex Paint1060 External Painting 3d 22-Sep-14 24-Sep-14 External Painting
Stand alone Villa typ
type 63 315d 15-Dec-13 25-Dec-14 25-Dec-14, S
A5920 start Villa 0d 15-Dec-13 start Villa
A5930 Finish Villa 0d 25-Dec-14 Finish Villa
Mobilization 1d 18-Dec-13 18-Dec-13 18-Dec-13, Mobilization
M. Sur.v1071 Site Surveying 1d 18-Dec-13 18-Dec-13 Site Surveying
Earth Work 248d 23-Dec-13 16-Oct-14 16-Oct-14, Earth W
Ex.v1371 Excavation 2d 23-Dec-13 24-Dec-13 Excavation
B.F.v1371 BackFill 2d 15-Oct-14 16-Oct-14 BackFill
Civil Work 76d 16-Sep-14 16-Dec-14 16-Dec-14, C
Foundation 15d 16-Sep-14 02-Oct-14 02-Oct-14, Foundat
Footing 15d 16-Sep-14 02-Oct-14 02-Oct-14, Footing
Plain Concrete
Con 5d 16-Sep-14 21-Sep-14 21-Sep-14, Plain Con
F.W.Pc Form Work 2d 16-Sep-14 17-Sep-14 Form Work
Pour.Pc Pouring Concrete 1d 18-Sep-14 18-Sep-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 21-Sep-14 21-Sep-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 22-Sep-14 02-Oct-14 02-Oct-14, Reinforc
FW.Rc& Form Work 4d 22-Sep-14 25-Sep-14 Form Work
1361 R.F.T 2d 27-Sep-14 28-Sep-14 R.F.T
Pour.Rc Pouring Concrete 1d 29-Sep-14 29-Sep-14 Pouring Concrete
R.Fw.R Remove formwork 1d 01-Oct-14 01-Oct-14 Remove formwork
Ins.Rc& Insulting 1d 02-Oct-14 02-Oct-14 Insulting
Ground Floor 25d 04-Oct-14 04-Nov-14 04-Nov-14, Grou
Slab on grade
grad 16d 18-Oct-14 04-Nov-14 04-Nov-14, Slab
FW.SOG. Form Work 4d 18-Oct-14 21-Oct-14 Form Work
R.F.T.SOG R.F.T 3d 22-Oct-14 25-Oct-14 R.F.T
Pour.SOG Pouring Concrete 1d 26-Oct-14 26-Oct-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 04-Nov-14 04-Nov-14 Remove formwo
Columns 7d 04-Oct-14 14-Oct-14 14-Oct-14, Column
FW.Col.G Form Work 2d 04-Oct-14 08-Oct-14 Form Work
R.F.T.Col. R.F.T 2d 09-Oct-14 11-Oct-14 R.F.T
Pour.Col.G Pouring Concrete 1d 12-Oct-14 12-Oct-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 14-Oct-14 14-Oct-14 Remove formwork
First Floor 18d 05-Nov-14 25-Nov-14 25-Nov-14, Firs
Beams and slab 18d 05-Nov-14 25-Nov-14 25-Nov-14, Bea
FW.B&S.s Form Work 6d 05-Nov-14 11-Nov-14 Form Work
R.F.T.B&S R.F.T 3d 12-Nov-14 15-Nov-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-14 16-Nov-14 Pouring Concre
R.FW.B&S Remove formwork 1d 25-Nov-14 25-Nov-14 Remove formw
Columns 8d 17-Nov-14 25-Nov-14 25-Nov-14, Co
FW.Col.st. Form Work 3d 17-Nov-14 19-Nov-14 Form Work
R.F.T.Col. R.F.T 2d 20-Nov-14 22-Nov-14 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Nov-14 23-Nov-14 Pouring Concre
R.FW.Col. Remove formwork 1d 25-Nov-14 25-Nov-14 Remove formw
Roof 18d 26-Nov-14 16-Dec-14 16-Dec-14, R
Beams and slab 18d 26-Nov-14 16-Dec-14 16-Dec-14, B
FW.B&S.n Form Work 6d 26-Nov-14 02-Dec-14 Form Work
R.F.T.B&S R.F.T 3d 03-Dec-14 06-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Dec-14 07-Dec-14 Pouring Concr
R.FW.B&S Remove Form Work 1d 16-Dec-14 16-Dec-14 Remove Form
Mansonary 22d 26-Nov-14 21-Dec-14 21-Dec-14, M
Ground Floor 2d 26-Nov-14 27-Nov-14 27-Nov-14, Gr
I.G..M.v1071 Internal 2d 26-Nov-14 27-Nov-14 Internal
E.G.M.v1371 External 2d 26-Nov-14 27-Nov-14 External
First Floor 2d 17-Dec-14 18-Dec-14 18-Dec-14, F
I.F.M.v1071 Internal 2d 17-Dec-14 18-Dec-14 Internal
E.F.M.v1071 External 2d 17-Dec-14 18-Dec-14 External
Roof 2d 20-Dec-14 21-Dec-14 21-Dec-14, R

Actual Work Critical Remaining Work Summary Page 168 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

344
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.R.M.v1371 External 2d 20-Dec-14 21-Dec-14 External
Finishing 24d 29-Nov-14 25-Dec-14 25-Dec-14, F
Ground Floor 2d 29-Nov-14 30-Nov-14 30-Nov-14, Gr
Calm Shell 2d 29-Nov-14 30-Nov-14 30-Nov-14, Ca
E.Ch.G.v1 External 2d 29-Nov-14 30-Nov-14 External
External Ele
Electrical 0d
First Floor 2d 20-Dec-14 21-Dec-14 21-Dec-14, F
Calm Shell 2d 20-Dec-14 21-Dec-14 21-Dec-14, C
E.ch.st.v13 External 2d 20-Dec-14 21-Dec-14 External
External Ele
Electrical 0d
Roof 1d 22-Dec-14 22-Dec-14 22-Dec-14, R
Calm Shell 1d 22-Dec-14 22-Dec-14 22-Dec-14, C
E.ch.r.v13 External 1d 22-Dec-14 22-Dec-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 23-Dec-14 25-Dec-14 25-Dec-14, P
Ex Paint1070 External Painting 3d 23-Dec-14 25-Dec-14 External Pain
Stand alone Villa typ
type 64 87d 15-Dec-13 25-Mar-14 25-Mar-14, Stand alone Villa type 64
A5940 start Villa 0d 15-Dec-13 start Villa
A5950 Finish Villa 0d 25-Mar-14 Finish Villa
Mobilization 1d 15-Dec-13 15-Dec-13 15-Dec-13, Mobilization
M. Sur.v1081 Site Surveying 1d 15-Dec-13 15-Dec-13 Site Surveying
Earth Work 26d 16-Dec-13 14-Jan-14 14-Jan-14, Earth Work
Ex.v1381 Excavation 2d 16-Dec-13 17-Dec-13 Excavation
B.F.v1381 BackFill 2d 13-Jan-14 14-Jan-14 BackFill
Civil Work 76d 18-Dec-13 16-Mar-14 16-Mar-14, Civil Work
Foundation 15d 18-Dec-13 04-Jan-14 04-Jan-14, Foundation
Footing 15d 18-Dec-13 04-Jan-14 04-Jan-14, Footing
Plain Concrete
Con 5d 18-Dec-13 23-Dec-13 23-Dec-13, Plain Concrete
F.W.Pc Form Work 2d 18-Dec-13 19-Dec-13 Form Work
Pour.Pc Pouring Concrete 1d 21-Dec-13 21-Dec-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Dec-13 23-Dec-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 24-Dec-13 04-Jan-14 04-Jan-14, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 24-Dec-13 28-Dec-13 Form Work
1371 R.F.T 2d 29-Dec-13 30-Dec-13 R.F.T
Pour.Rc Pouring Concrete 1d 31-Dec-13 31-Dec-13 Pouring Concrete
R.Fw.R Remove formwork 1d 02-Jan-14 02-Jan-14 Remove formwork
Ins.Rc& Insulting 1d 04-Jan-14 04-Jan-14 Insulting
Ground Floor 25d 05-Jan-14 02-Feb-14 02-Feb-14, Ground Floor
Slab on grade
grad 16d 15-Jan-14 02-Feb-14 02-Feb-14, Slab on grade
FW.SOG. Form Work 4d 15-Jan-14 19-Jan-14 Form Work
R.F.T.SOG R.F.T 3d 20-Jan-14 22-Jan-14 R.F.T
Pour.SOG Pouring Concrete 1d 23-Jan-14 23-Jan-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 02-Feb-14 02-Feb-14 Remove formwork
Columns 7d 05-Jan-14 12-Jan-14 12-Jan-14, Columns
FW.Col.G Form Work 2d 05-Jan-14 06-Jan-14 Form Work
R.F.T.Col. R.F.T 2d 07-Jan-14 08-Jan-14 R.F.T
Pour.Col.G Pouring Concrete 1d 09-Jan-14 09-Jan-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 12-Jan-14 12-Jan-14 Remove formwork
First Floor 18d 03-Feb-14 23-Feb-14 23-Feb-14, First Floor
Beams and slab 18d 03-Feb-14 23-Feb-14 23-Feb-14, Beams and slab
FW.B&S.s Form Work 6d 03-Feb-14 09-Feb-14 Form Work
R.F.T.B&S R.F.T 3d 10-Feb-14 12-Feb-14 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Feb-14 13-Feb-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 23-Feb-14 23-Feb-14 Remove formwork
Columns 8d 15-Feb-14 23-Feb-14 23-Feb-14, Columns
FW.Col.st. Form Work 3d 15-Feb-14 17-Feb-14 Form Work
R.F.T.Col. R.F.T 2d 18-Feb-14 19-Feb-14 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Feb-14 20-Feb-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 23-Feb-14 23-Feb-14 Remove formwork
Roof 18d 24-Feb-14 16-Mar-14 16-Mar-14, Roof
Beams and slab 18d 24-Feb-14 16-Mar-14 16-Mar-14, Beams and slab
FW.B&S.n Form Work 6d 24-Feb-14 02-Mar-14 Form Work
R.F.T.B&S R.F.T 3d 03-Mar-14 05-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Mar-14 06-Mar-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 16-Mar-14 16-Mar-14 Remove Form Work
Mansonary 22d 24-Feb-14 20-Mar-14 20-Mar-14, Mansonary
Ground Floor 2d 24-Feb-14 25-Feb-14 25-Feb-14, Ground Floor
I.G..M.v1081 Internal 2d 24-Feb-14 25-Feb-14 Internal
E.G.M.v1381 External 2d 24-Feb-14 25-Feb-14 External
First Floor 2d 17-Mar-14 18-Mar-14 18-Mar-14, First Floor
I.F.M.v1081 Internal 2d 17-Mar-14 18-Mar-14 Internal
E.F.M.v1081 External 2d 17-Mar-14 18-Mar-14 External
Roof 2d 19-Mar-14 20-Mar-14 20-Mar-14, Roof
E.R.M.v1381 External 2d 19-Mar-14 20-Mar-14 External
Finishing 24d 26-Feb-14 25-Mar-14 25-Mar-14, Finishing
Ground Floor 2d 26-Feb-14 27-Feb-14 27-Feb-14, Ground Floor

Actual Work Critical Remaining Work Summary Page 169 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

345
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Calm Shell 2d 26-Feb-14 27-Feb-14 27-Feb-14, Calm Shell
E.Ch.G.v1 External 2d 26-Feb-14 27-Feb-14 External
External Ele
Electrical 0d
First Floor 2d 19-Mar-14 20-Mar-14 20-Mar-14, First Floor
Calm Shell 2d 19-Mar-14 20-Mar-14 20-Mar-14, Calm Shell
E.ch.st.v13 External 2d 19-Mar-14 20-Mar-14 External
External Ele
Electrical 0d
Roof 1d 22-Mar-14 22-Mar-14 22-Mar-14, Roof
Calm Shell 1d 22-Mar-14 22-Mar-14 22-Mar-14, Calm Shell
E.ch.r.v13 External 1d 22-Mar-14 22-Mar-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 23-Mar-14 25-Mar-14 25-Mar-14, Paint Villa 1
Ex Paint1080 External Painting 3d 23-Mar-14 25-Mar-14 External Painting
Stand alone Villa typ
type 65 163d 15-Dec-13 23-Jun-14 23-Jun-14, Stand alone Villa
A5960 start Villa 0d 15-Dec-13 start Villa
A5970 Finish Villa 0d 23-Jun-14 Finish Villa
Mobilization 1d 16-Dec-13 16-Dec-13 16-Dec-13, Mobilization
M. Sur.v1091 Site Surveying 1d 16-Dec-13 16-Dec-13 Site Surveying
Earth Work 100d 18-Dec-13 13-Apr-14 13-Apr-14, Earth Work
Ex.v1391 Excavation 2d 18-Dec-13 19-Dec-13 Excavation
B.F.v1391 BackFill 2d 12-Apr-14 13-Apr-14 BackFill
Civil Work 76d 17-Mar-14 14-Jun-14 14-Jun-14, Civil Work
Foundation 15d 17-Mar-14 02-Apr-14 02-Apr-14, Foundation
Footing 15d 17-Mar-14 02-Apr-14 02-Apr-14, Footing
Plain Concrete
Con 5d 17-Mar-14 22-Mar-14 22-Mar-14, Plain Concrete
F.W.Pc Form Work 2d 17-Mar-14 18-Mar-14 Form Work
Pour.Pc Pouring Concrete 1d 19-Mar-14 19-Mar-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 22-Mar-14 22-Mar-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 23-Mar-14 02-Apr-14 02-Apr-14, Reinforced Concrete&Sm
FW.Rc& Form Work 4d 23-Mar-14 26-Mar-14 Form Work
1381 R.F.T 2d 27-Mar-14 29-Mar-14 R.F.T
Pour.Rc Pouring Concrete 1d 30-Mar-14 30-Mar-14 Pouring Concrete
R.Fw.R Remove formwork 1d 01-Apr-14 01-Apr-14 Remove formwork
Ins.Rc& Insulting 1d 02-Apr-14 02-Apr-14 Insulting
Ground Floor 25d 03-Apr-14 03-May-14 03-May-14, Ground Floor
Slab on grade
grad 16d 14-Apr-14 03-May-14 03-May-14, Slab on grade
FW.SOG. Form Work 4d 14-Apr-14 17-Apr-14 Form Work
R.F.T.SOG R.F.T 3d 19-Apr-14 21-Apr-14 R.F.T
Pour.SOG Pouring Concrete 1d 22-Apr-14 22-Apr-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 03-May-14 03-May-14 Remove formwork
Columns 7d 03-Apr-14 10-Apr-14 10-Apr-14, Columns
FW.Col.G Form Work 2d 03-Apr-14 05-Apr-14 Form Work
R.F.T.Col. R.F.T 2d 06-Apr-14 07-Apr-14 R.F.T
Pour.Col.G Pouring Concrete 1d 08-Apr-14 08-Apr-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 10-Apr-14 10-Apr-14 Remove formwork
First Floor 18d 04-May-14 24-May-14 24-May-14, First Floor
Beams and slab 18d 04-May-14 24-May-14 24-May-14, Beams and slab
FW.B&S.s Form Work 6d 04-May-14 10-May-14 Form Work
R.F.T.B&S R.F.T 3d 11-May-14 13-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 14-May-14 14-May-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 24-May-14 24-May-14 Remove formwork
Columns 8d 15-May-14 24-May-14 24-May-14, Columns
FW.Col.st. Form Work 3d 15-May-14 18-May-14 Form Work
R.F.T.Col. R.F.T 2d 19-May-14 20-May-14 R.F.T
Pour.Col.s Pouring Concrete 1d 21-May-14 21-May-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 24-May-14 24-May-14 Remove formwork
Roof 18d 25-May-14 14-Jun-14 14-Jun-14, Roof
Beams and slab 18d 25-May-14 14-Jun-14 14-Jun-14, Beams and slab
FW.B&S.n Form Work 6d 25-May-14 31-May-14 Form Work
R.F.T.B&S R.F.T 3d 01-Jun-14 03-Jun-14 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Jun-14 04-Jun-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 14-Jun-14 14-Jun-14 Remove Form Work
Mansonary 22d 25-May-14 18-Jun-14 18-Jun-14, Mansonary
Ground Floor 2d 25-May-14 26-May-14 26-May-14, Ground Floor
I.G..M.v1091 Internal 2d 25-May-14 26-May-14 Internal
E.G.M.v1391 External 2d 25-May-14 26-May-14 External
First Floor 2d 15-Jun-14 16-Jun-14 16-Jun-14, First Floor
I.F.M.v1091 Internal 2d 15-Jun-14 16-Jun-14 Internal
E.F.M.v1091 External 2d 15-Jun-14 16-Jun-14 External
Roof 2d 17-Jun-14 18-Jun-14 18-Jun-14, Roof
E.R.M.v1391 External 2d 17-Jun-14 18-Jun-14 External
Finishing 24d 27-May-14 23-Jun-14 23-Jun-14, Finishing
Ground Floor 2d 27-May-14 28-May-14 28-May-14, Ground Floor
Calm Shell 2d 27-May-14 28-May-14 28-May-14, Calm Shell
E.Ch.G.v1 External 2d 27-May-14 28-May-14 External
External Ele
Electrical 0d

Actual Work Critical Remaining Work Summary Page 170 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

346
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
First Floor 2d 17-Jun-14 18-Jun-14 18-Jun-14, First Floor
Calm Shell 2d 17-Jun-14 18-Jun-14 18-Jun-14, Calm Shell
E.ch.st.v13 External 2d 17-Jun-14 18-Jun-14 External
External Ele
Electrical 0d
Roof 1d 19-Jun-14 19-Jun-14 19-Jun-14, Roof
Calm Shell 1d 19-Jun-14 19-Jun-14 19-Jun-14, Calm Shell
E.ch.r.v13 External 1d 19-Jun-14 19-Jun-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 21-Jun-14 23-Jun-14 23-Jun-14, Paint Villa 1
Ex Paint1090 External Painting 3d 21-Jun-14 23-Jun-14 External Painting
Stand alone Villa typ
type 66 239d 15-Dec-13 24-Sep-14 24-Sep-14, Stand alo
A5980 start Villa 0d 15-Dec-13 start Villa
A5990 Finish Villa 0d 24-Sep-14 Finish Villa
Mobilization 1d 17-Dec-13 17-Dec-13 17-Dec-13, Mobilization
M. Sur.v1101 Site Surveying 1d 17-Dec-13 17-Dec-13 Site Surveying
Earth Work 174d 21-Dec-13 12-Jul-14 12-Jul-14, Earth Work
Ex.v1401 Excavation 2d 21-Dec-13 22-Dec-13 Excavation
B.F.v1401 BackFill 2d 10-Jul-14 12-Jul-14 BackFill
Civil Work 76d 15-Jun-14 15-Sep-14 15-Sep-14, Civil Wor
Foundation 15d 15-Jun-14 01-Jul-14 01-Jul-14, Foundation
Footing 15d 15-Jun-14 01-Jul-14 01-Jul-14, Footing
Plain Concrete
Con 5d 15-Jun-14 19-Jun-14 19-Jun-14, Plain Concrete
F.W.Pc Form Work 2d 15-Jun-14 16-Jun-14 Form Work
Pour.Pc Pouring Concrete 1d 17-Jun-14 17-Jun-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 19-Jun-14 19-Jun-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 21-Jun-14 01-Jul-14 01-Jul-14, Reinforced Concr
FW.Rc& Form Work 4d 21-Jun-14 24-Jun-14 Form Work
1391 R.F.T 2d 25-Jun-14 26-Jun-14 R.F.T
Pour.Rc Pouring Concrete 1d 28-Jun-14 28-Jun-14 Pouring Concrete
R.Fw.R Remove formwork 1d 30-Jun-14 30-Jun-14 Remove formwork
Ins.Rc& Insulting 1d 01-Jul-14 01-Jul-14 Insulting
Ground Floor 25d 02-Jul-14 04-Aug-14 04-Aug-14, Ground Floor
Slab on grade
grad 16d 13-Jul-14 04-Aug-14 04-Aug-14, Slab on grade
FW.SOG. Form Work 4d 13-Jul-14 16-Jul-14 Form Work
R.F.T.SOG R.F.T 3d 17-Jul-14 20-Jul-14 R.F.T
Pour.SOG Pouring Concrete 1d 21-Jul-14 21-Jul-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 04-Aug-14 04-Aug-14 Remove formwork
Columns 7d 02-Jul-14 09-Jul-14 09-Jul-14, Columns
FW.Col.G Form Work 2d 02-Jul-14 03-Jul-14 Form Work
R.F.T.Col. R.F.T 2d 05-Jul-14 06-Jul-14 R.F.T
Pour.Col.G Pouring Concrete 1d 07-Jul-14 07-Jul-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 09-Jul-14 09-Jul-14 Remove formwork
First Floor 18d 05-Aug-14 25-Aug-14 25-Aug-14, First Floor
Beams and slab 18d 05-Aug-14 25-Aug-14 25-Aug-14, Beams and
FW.B&S.s Form Work 6d 05-Aug-14 11-Aug-14 Form Work
R.F.T.B&S R.F.T 3d 12-Aug-14 14-Aug-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Aug-14 16-Aug-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 25-Aug-14 25-Aug-14 Remove formwork
Columns 8d 17-Aug-14 25-Aug-14 25-Aug-14, Columns
FW.Col.st. Form Work 3d 17-Aug-14 19-Aug-14 Form Work
R.F.T.Col. R.F.T 2d 20-Aug-14 21-Aug-14 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Aug-14 23-Aug-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 25-Aug-14 25-Aug-14 Remove formwork
Roof 18d 26-Aug-14 15-Sep-14 15-Sep-14, Roof
Beams and slab 18d 26-Aug-14 15-Sep-14 15-Sep-14, Beams an
FW.B&S.n Form Work 6d 26-Aug-14 01-Sep-14 Form Work
R.F.T.B&S R.F.T 3d 02-Sep-14 04-Sep-14 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Sep-14 06-Sep-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 15-Sep-14 15-Sep-14 Remove Form Work
Mansonary 22d 26-Aug-14 20-Sep-14 20-Sep-14, Mansona
Ground Floor 2d 26-Aug-14 27-Aug-14 27-Aug-14, Ground Flo
I.G..M.v1101 Internal 2d 26-Aug-14 27-Aug-14 Internal
E.G.M.v1401 External 2d 26-Aug-14 27-Aug-14 External
First Floor 2d 16-Sep-14 17-Sep-14 17-Sep-14, First Floo
I.F.M.v1101 Internal 2d 16-Sep-14 17-Sep-14 Internal
E.F.M.v1101 External 2d 16-Sep-14 17-Sep-14 External
Roof 2d 18-Sep-14 20-Sep-14 20-Sep-14, Roof
E.R.M.v1401 External 2d 18-Sep-14 20-Sep-14 External
Finishing 24d 28-Aug-14 24-Sep-14 24-Sep-14, Finishing
Ground Floor 2d 28-Aug-14 30-Aug-14 30-Aug-14, Ground Flo
Calm Shell 2d 28-Aug-14 30-Aug-14 30-Aug-14, Calm Shell
E.Ch.G.v1 External 2d 28-Aug-14 30-Aug-14 External
External Ele
Electrical 0d
First Floor 2d 18-Sep-14 20-Sep-14 20-Sep-14, First Floo
Calm Shell 2d 18-Sep-14 20-Sep-14 20-Sep-14, Calm She
E.ch.st.v14 External 2d 18-Sep-14 20-Sep-14 External

Actual Work Critical Remaining Work Summary Page 171 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

347
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
External Ele
Electrical 0d
Roof 1d 21-Sep-14 21-Sep-14 21-Sep-14, Roof
Calm Shell 1d 21-Sep-14 21-Sep-14 21-Sep-14, Calm She
E.ch.r.v14 External 1d 21-Sep-14 21-Sep-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 22-Sep-14 24-Sep-14 24-Sep-14, Paint Villa
Ex Paint1100 External Painting 3d 22-Sep-14 24-Sep-14 External Painting
Stand alone Villa typ
type 67 315d 15-Dec-13 25-Dec-14 25-Dec-14, S
A6000 start Villa 0d 15-Dec-13 start Villa
A6010 Finish Villa 0d 25-Dec-14 Finish Villa
Mobilization 1d 18-Dec-13 18-Dec-13 18-Dec-13, Mobilization
M. Sur.v1111 Site Surveying 1d 18-Dec-13 18-Dec-13 Site Surveying
Earth Work 248d 23-Dec-13 16-Oct-14 16-Oct-14, Earth W
Ex.v1411 Excavation 2d 23-Dec-13 24-Dec-13 Excavation
B.F.v1411 BackFill 2d 15-Oct-14 16-Oct-14 BackFill
Civil Work 76d 16-Sep-14 16-Dec-14 16-Dec-14, C
Foundation 15d 16-Sep-14 02-Oct-14 02-Oct-14, Foundat
Footing 15d 16-Sep-14 02-Oct-14 02-Oct-14, Footing
Plain Concrete
Con 5d 16-Sep-14 21-Sep-14 21-Sep-14, Plain Con
F.W.Pc Form Work 2d 16-Sep-14 17-Sep-14 Form Work
Pour.Pc Pouring Concrete 1d 18-Sep-14 18-Sep-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 21-Sep-14 21-Sep-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 22-Sep-14 02-Oct-14 02-Oct-14, Reinforc
FW.Rc& Form Work 4d 22-Sep-14 25-Sep-14 Form Work
1401 R.F.T 2d 27-Sep-14 28-Sep-14 R.F.T
Pour.Rc Pouring Concrete 1d 29-Sep-14 29-Sep-14 Pouring Concrete
R.Fw.R Remove formwork 1d 01-Oct-14 01-Oct-14 Remove formwork
Ins.Rc& Insulting 1d 02-Oct-14 02-Oct-14 Insulting
Ground Floor 25d 04-Oct-14 04-Nov-14 04-Nov-14, Grou
Slab on grade
grad 16d 18-Oct-14 04-Nov-14 04-Nov-14, Slab
FW.SOG. Form Work 4d 18-Oct-14 21-Oct-14 Form Work
R.F.T.SOG R.F.T 3d 22-Oct-14 25-Oct-14 R.F.T
Pour.SOG Pouring Concrete 1d 26-Oct-14 26-Oct-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 04-Nov-14 04-Nov-14 Remove formwo
Columns 7d 04-Oct-14 14-Oct-14 14-Oct-14, Column
FW.Col.G Form Work 2d 04-Oct-14 08-Oct-14 Form Work
R.F.T.Col. R.F.T 2d 09-Oct-14 11-Oct-14 R.F.T
Pour.Col.G Pouring Concrete 1d 12-Oct-14 12-Oct-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 14-Oct-14 14-Oct-14 Remove formwork
First Floor 18d 05-Nov-14 25-Nov-14 25-Nov-14, Firs
Beams and slab 18d 05-Nov-14 25-Nov-14 25-Nov-14, Bea
FW.B&S.s Form Work 6d 05-Nov-14 11-Nov-14 Form Work
R.F.T.B&S R.F.T 3d 12-Nov-14 15-Nov-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-14 16-Nov-14 Pouring Concre
R.FW.B&S Remove formwork 1d 25-Nov-14 25-Nov-14 Remove formw
Columns 8d 17-Nov-14 25-Nov-14 25-Nov-14, Co
FW.Col.st. Form Work 3d 17-Nov-14 19-Nov-14 Form Work
R.F.T.Col. R.F.T 2d 20-Nov-14 22-Nov-14 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Nov-14 23-Nov-14 Pouring Concre
R.FW.Col. Remove formwork 1d 25-Nov-14 25-Nov-14 Remove formw
Roof 18d 26-Nov-14 16-Dec-14 16-Dec-14, R
Beams and slab 18d 26-Nov-14 16-Dec-14 16-Dec-14, B
FW.B&S.n Form Work 6d 26-Nov-14 02-Dec-14 Form Work
R.F.T.B&S R.F.T 3d 03-Dec-14 06-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Dec-14 07-Dec-14 Pouring Concr
R.FW.B&S Remove Form Work 1d 16-Dec-14 16-Dec-14 Remove Form
Mansonary 22d 26-Nov-14 21-Dec-14 21-Dec-14, M
Ground Floor 2d 26-Nov-14 27-Nov-14 27-Nov-14, Gr
I.G..M.v1111 Internal 2d 26-Nov-14 27-Nov-14 Internal
E.G.M.v1411 External 2d 26-Nov-14 27-Nov-14 External
First Floor 2d 17-Dec-14 18-Dec-14 18-Dec-14, F
I.F.M.v1111 Internal 2d 17-Dec-14 18-Dec-14 Internal
E.F.M.v1111 External 2d 17-Dec-14 18-Dec-14 External
Roof 2d 20-Dec-14 21-Dec-14 21-Dec-14, R
E.R.M.v1411 External 2d 20-Dec-14 21-Dec-14 External
Finishing 24d 29-Nov-14 25-Dec-14 25-Dec-14, F
Ground Floor 2d 29-Nov-14 30-Nov-14 30-Nov-14, Gr
Calm Shell 2d 29-Nov-14 30-Nov-14 30-Nov-14, Ca
E.Ch.G.v1 External 2d 29-Nov-14 30-Nov-14 External
External Ele
Electrical 0d
First Floor 2d 20-Dec-14 21-Dec-14 21-Dec-14, F
Calm Shell 2d 20-Dec-14 21-Dec-14 21-Dec-14, C
E.ch.st.v14 External 2d 20-Dec-14 21-Dec-14 External
External Ele
Electrical 0d
Roof 1d 22-Dec-14 22-Dec-14 22-Dec-14, R
Calm Shell 1d 22-Dec-14 22-Dec-14 22-Dec-14, C

Actual Work Critical Remaining Work Summary Page 172 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

348
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
E.ch.r.v14 External 1d 22-Dec-14 22-Dec-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 23-Dec-14 25-Dec-14 25-Dec-14, P
Ex Paint1110 External Painting 3d 23-Dec-14 25-Dec-14 External Pain
Stand alone Villa typ
type 68 87d 15-Dec-13 25-Mar-14 25-Mar-14, Stand alone Villa type 68
A6020 start Villa 0d 15-Dec-13 start Villa
A6030 Finish Villa 0d 25-Mar-14 Finish Villa
Mobilization 1d 15-Dec-13 15-Dec-13 15-Dec-13, Mobilization
M. Sur.v1121 Site Surveying 1d 15-Dec-13 15-Dec-13 Site Surveying
Earth Work 26d 16-Dec-13 14-Jan-14 14-Jan-14, Earth Work
Ex.v1421 Excavation 2d 16-Dec-13 17-Dec-13 Excavation
B.F.v1421 BackFill 2d 13-Jan-14 14-Jan-14 BackFill
Civil Work 76d 18-Dec-13 16-Mar-14 16-Mar-14, Civil Work
Foundation 15d 18-Dec-13 04-Jan-14 04-Jan-14, Foundation
Footing 15d 18-Dec-13 04-Jan-14 04-Jan-14, Footing
Plain Concrete
Con 5d 18-Dec-13 23-Dec-13 23-Dec-13, Plain Concrete
F.W.Pc Form Work 2d 18-Dec-13 19-Dec-13 Form Work
Pour.Pc Pouring Concrete 1d 21-Dec-13 21-Dec-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Dec-13 23-Dec-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 24-Dec-13 04-Jan-14 04-Jan-14, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 24-Dec-13 28-Dec-13 Form Work
1411 R.F.T 2d 29-Dec-13 30-Dec-13 R.F.T
Pour.Rc Pouring Concrete 1d 31-Dec-13 31-Dec-13 Pouring Concrete
R.Fw.R Remove formwork 1d 02-Jan-14 02-Jan-14 Remove formwork
Ins.Rc& Insulting 1d 04-Jan-14 04-Jan-14 Insulting
Ground Floor 25d 05-Jan-14 02-Feb-14 02-Feb-14, Ground Floor
Slab on grade
grad 16d 15-Jan-14 02-Feb-14 02-Feb-14, Slab on grade
FW.SOG. Form Work 4d 15-Jan-14 19-Jan-14 Form Work
R.F.T.SOG R.F.T 3d 20-Jan-14 22-Jan-14 R.F.T
Pour.SOG Pouring Concrete 1d 23-Jan-14 23-Jan-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 02-Feb-14 02-Feb-14 Remove formwork
Columns 7d 05-Jan-14 12-Jan-14 12-Jan-14, Columns
FW.Col.G Form Work 2d 05-Jan-14 06-Jan-14 Form Work
R.F.T.Col. R.F.T 2d 07-Jan-14 08-Jan-14 R.F.T
Pour.Col.G Pouring Concrete 1d 09-Jan-14 09-Jan-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 12-Jan-14 12-Jan-14 Remove formwork
First Floor 18d 03-Feb-14 23-Feb-14 23-Feb-14, First Floor
Beams and slab 18d 03-Feb-14 23-Feb-14 23-Feb-14, Beams and slab
FW.B&S.s Form Work 6d 03-Feb-14 09-Feb-14 Form Work
R.F.T.B&S R.F.T 3d 10-Feb-14 12-Feb-14 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Feb-14 13-Feb-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 23-Feb-14 23-Feb-14 Remove formwork
Columns 8d 15-Feb-14 23-Feb-14 23-Feb-14, Columns
FW.Col.st. Form Work 3d 15-Feb-14 17-Feb-14 Form Work
R.F.T.Col. R.F.T 2d 18-Feb-14 19-Feb-14 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Feb-14 20-Feb-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 23-Feb-14 23-Feb-14 Remove formwork
Roof 18d 24-Feb-14 16-Mar-14 16-Mar-14, Roof
Beams and slab 18d 24-Feb-14 16-Mar-14 16-Mar-14, Beams and slab
FW.B&S.n Form Work 6d 24-Feb-14 02-Mar-14 Form Work
R.F.T.B&S R.F.T 3d 03-Mar-14 05-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Mar-14 06-Mar-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 16-Mar-14 16-Mar-14 Remove Form Work
Mansonary 22d 24-Feb-14 20-Mar-14 20-Mar-14, Mansonary
Ground Floor 2d 24-Feb-14 25-Feb-14 25-Feb-14, Ground Floor
I.G..M.v1121 Internal 2d 24-Feb-14 25-Feb-14 Internal
E.G.M.v1421 External 2d 24-Feb-14 25-Feb-14 External
First Floor 2d 17-Mar-14 18-Mar-14 18-Mar-14, First Floor
I.F.M.v1121 Internal 2d 17-Mar-14 18-Mar-14 Internal
E.F.M.v1121 External 2d 17-Mar-14 18-Mar-14 External
Roof 2d 19-Mar-14 20-Mar-14 20-Mar-14, Roof
E.R.M.v1421 External 2d 19-Mar-14 20-Mar-14 External
Finishing 24d 26-Feb-14 25-Mar-14 25-Mar-14, Finishing
Ground Floor 2d 26-Feb-14 27-Feb-14 27-Feb-14, Ground Floor
Calm Shell 2d 26-Feb-14 27-Feb-14 27-Feb-14, Calm Shell
E.Ch.G.v1 External 2d 26-Feb-14 27-Feb-14 External
External Ele
Electrical 0d
First Floor 2d 19-Mar-14 20-Mar-14 20-Mar-14, First Floor
Calm Shell 2d 19-Mar-14 20-Mar-14 20-Mar-14, Calm Shell
E.ch.st.v14 External 2d 19-Mar-14 20-Mar-14 External
External Ele
Electrical 0d
Roof 1d 22-Mar-14 22-Mar-14 22-Mar-14, Roof
Calm Shell 1d 22-Mar-14 22-Mar-14 22-Mar-14, Calm Shell
E.ch.r.v14 External 1d 22-Mar-14 22-Mar-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 23-Mar-14 25-Mar-14 25-Mar-14, Paint Villa 1

Actual Work Critical Remaining Work Summary Page 173 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

349
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ex Paint1120 External Painting 3d 23-Mar-14 25-Mar-14 External Painting
Stand alone Villa typ
type 69 163d 15-Dec-13 23-Jun-14 23-Jun-14, Stand alone Villa
A6040 start Villa 0d 15-Dec-13 start Villa
A6050 Finish Villa 0d 23-Jun-14 Finish Villa
Mobilization 1d 16-Dec-13 16-Dec-13 16-Dec-13, Mobilization
M. Sur.v1131 Site Surveying 1d 16-Dec-13 16-Dec-13 Site Surveying
Earth Work 100d 18-Dec-13 13-Apr-14 13-Apr-14, Earth Work
Ex.v1431 Excavation 2d 18-Dec-13 19-Dec-13 Excavation
B.F.v1431 BackFill 2d 12-Apr-14 13-Apr-14 BackFill
Civil Work 76d 17-Mar-14 14-Jun-14 14-Jun-14, Civil Work
Foundation 15d 17-Mar-14 02-Apr-14 02-Apr-14, Foundation
Footing 15d 17-Mar-14 02-Apr-14 02-Apr-14, Footing
Plain Concrete
Con 5d 17-Mar-14 22-Mar-14 22-Mar-14, Plain Concrete
F.W.Pc Form Work 2d 17-Mar-14 18-Mar-14 Form Work
Pour.Pc Pouring Concrete 1d 19-Mar-14 19-Mar-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 22-Mar-14 22-Mar-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 23-Mar-14 02-Apr-14 02-Apr-14, Reinforced Concrete&Sm
FW.Rc& Form Work 4d 23-Mar-14 26-Mar-14 Form Work
1421 R.F.T 2d 27-Mar-14 29-Mar-14 R.F.T
Pour.Rc Pouring Concrete 1d 30-Mar-14 30-Mar-14 Pouring Concrete
R.Fw.R Remove formwork 1d 01-Apr-14 01-Apr-14 Remove formwork
Ins.Rc& Insulting 1d 02-Apr-14 02-Apr-14 Insulting
Ground Floor 25d 03-Apr-14 03-May-14 03-May-14, Ground Floor
Slab on grade
grad 16d 14-Apr-14 03-May-14 03-May-14, Slab on grade
FW.SOG. Form Work 4d 14-Apr-14 17-Apr-14 Form Work
R.F.T.SOG R.F.T 3d 19-Apr-14 21-Apr-14 R.F.T
Pour.SOG Pouring Concrete 1d 22-Apr-14 22-Apr-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 03-May-14 03-May-14 Remove formwork
Columns 7d 03-Apr-14 10-Apr-14 10-Apr-14, Columns
FW.Col.G Form Work 2d 03-Apr-14 05-Apr-14 Form Work
R.F.T.Col. R.F.T 2d 06-Apr-14 07-Apr-14 R.F.T
Pour.Col.G Pouring Concrete 1d 08-Apr-14 08-Apr-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 10-Apr-14 10-Apr-14 Remove formwork
First Floor 18d 04-May-14 24-May-14 24-May-14, First Floor
Beams and slab 18d 04-May-14 24-May-14 24-May-14, Beams and slab
FW.B&S.s Form Work 6d 04-May-14 10-May-14 Form Work
R.F.T.B&S R.F.T 3d 11-May-14 13-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 14-May-14 14-May-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 24-May-14 24-May-14 Remove formwork
Columns 8d 15-May-14 24-May-14 24-May-14, Columns
FW.Col.st. Form Work 3d 15-May-14 18-May-14 Form Work
R.F.T.Col. R.F.T 2d 19-May-14 20-May-14 R.F.T
Pour.Col.s Pouring Concrete 1d 21-May-14 21-May-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 24-May-14 24-May-14 Remove formwork
Roof 18d 25-May-14 14-Jun-14 14-Jun-14, Roof
Beams and slab 18d 25-May-14 14-Jun-14 14-Jun-14, Beams and slab
FW.B&S.n Form Work 6d 25-May-14 31-May-14 Form Work
R.F.T.B&S R.F.T 3d 01-Jun-14 03-Jun-14 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Jun-14 04-Jun-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 14-Jun-14 14-Jun-14 Remove Form Work
Mansonary 22d 25-May-14 18-Jun-14 18-Jun-14, Mansonary
Ground Floor 2d 25-May-14 26-May-14 26-May-14, Ground Floor
I.G..M.v1131 Internal 2d 25-May-14 26-May-14 Internal
E.G.M.v1431 External 2d 25-May-14 26-May-14 External
First Floor 2d 15-Jun-14 16-Jun-14 16-Jun-14, First Floor
I.F.M.v1131 Internal 2d 15-Jun-14 16-Jun-14 Internal
E.F.M.v1131 External 2d 15-Jun-14 16-Jun-14 External
Roof 2d 17-Jun-14 18-Jun-14 18-Jun-14, Roof
E.R.M.v1431 External 2d 17-Jun-14 18-Jun-14 External
Finishing 24d 27-May-14 23-Jun-14 23-Jun-14, Finishing
Ground Floor 2d 27-May-14 28-May-14 28-May-14, Ground Floor
Calm Shell 2d 27-May-14 28-May-14 28-May-14, Calm Shell
E.Ch.G.v1 External 2d 27-May-14 28-May-14 External
External Ele
Electrical 0d
First Floor 2d 17-Jun-14 18-Jun-14 18-Jun-14, First Floor
Calm Shell 2d 17-Jun-14 18-Jun-14 18-Jun-14, Calm Shell
E.ch.st.v14 External 2d 17-Jun-14 18-Jun-14 External
External Ele
Electrical 0d
Roof 1d 19-Jun-14 19-Jun-14 19-Jun-14, Roof
Calm Shell 1d 19-Jun-14 19-Jun-14 19-Jun-14, Calm Shell
E.ch.r.v14 External 1d 19-Jun-14 19-Jun-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 21-Jun-14 23-Jun-14 23-Jun-14, Paint Villa 1
Ex Paint1130 External Painting 3d 21-Jun-14 23-Jun-14 External Painting
Stand alone Villa typ
type 70 239d 15-Dec-13 24-Sep-14 24-Sep-14, Stand alo
A6060 start Villa 0d 15-Dec-13 start Villa

Actual Work Critical Remaining Work Summary Page 174 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

350
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
A6070 Finish Villa 0d 24-Sep-14 Finish Villa
Mobilization 1d 17-Dec-13 17-Dec-13 17-Dec-13, Mobilization
M. Sur.v1141 Site Surveying 1d 17-Dec-13 17-Dec-13 Site Surveying
Earth Work 174d 21-Dec-13 12-Jul-14 12-Jul-14, Earth Work
Ex.v1441 Excavation 2d 21-Dec-13 22-Dec-13 Excavation
B.F.v1441 BackFill 2d 10-Jul-14 12-Jul-14 BackFill
Civil Work 76d 15-Jun-14 15-Sep-14 15-Sep-14, Civil Wor
Foundation 15d 15-Jun-14 01-Jul-14 01-Jul-14, Foundation
Footing 15d 15-Jun-14 01-Jul-14 01-Jul-14, Footing
Plain Concrete
Con 5d 15-Jun-14 19-Jun-14 19-Jun-14, Plain Concrete
F.W.Pc Form Work 2d 15-Jun-14 16-Jun-14 Form Work
Pour.Pc Pouring Concrete 1d 17-Jun-14 17-Jun-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 19-Jun-14 19-Jun-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 21-Jun-14 01-Jul-14 01-Jul-14, Reinforced Concr
FW.Rc& Form Work 4d 21-Jun-14 24-Jun-14 Form Work
1431 R.F.T 2d 25-Jun-14 26-Jun-14 R.F.T
Pour.Rc Pouring Concrete 1d 28-Jun-14 28-Jun-14 Pouring Concrete
R.Fw.R Remove formwork 1d 30-Jun-14 30-Jun-14 Remove formwork
Ins.Rc& Insulting 1d 01-Jul-14 01-Jul-14 Insulting
Ground Floor 25d 02-Jul-14 04-Aug-14 04-Aug-14, Ground Floor
Slab on grade
grad 16d 13-Jul-14 04-Aug-14 04-Aug-14, Slab on grade
FW.SOG. Form Work 4d 13-Jul-14 16-Jul-14 Form Work
R.F.T.SOG R.F.T 3d 17-Jul-14 20-Jul-14 R.F.T
Pour.SOG Pouring Concrete 1d 21-Jul-14 21-Jul-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 04-Aug-14 04-Aug-14 Remove formwork
Columns 7d 02-Jul-14 09-Jul-14 09-Jul-14, Columns
FW.Col.G Form Work 2d 02-Jul-14 03-Jul-14 Form Work
R.F.T.Col. R.F.T 2d 05-Jul-14 06-Jul-14 R.F.T
Pour.Col.G Pouring Concrete 1d 07-Jul-14 07-Jul-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 09-Jul-14 09-Jul-14 Remove formwork
First Floor 18d 05-Aug-14 25-Aug-14 25-Aug-14, First Floor
Beams and slab 18d 05-Aug-14 25-Aug-14 25-Aug-14, Beams and
FW.B&S.s Form Work 6d 05-Aug-14 11-Aug-14 Form Work
R.F.T.B&S R.F.T 3d 12-Aug-14 14-Aug-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Aug-14 16-Aug-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 25-Aug-14 25-Aug-14 Remove formwork
Columns 8d 17-Aug-14 25-Aug-14 25-Aug-14, Columns
FW.Col.st. Form Work 3d 17-Aug-14 19-Aug-14 Form Work
R.F.T.Col. R.F.T 2d 20-Aug-14 21-Aug-14 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Aug-14 23-Aug-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 25-Aug-14 25-Aug-14 Remove formwork
Roof 18d 26-Aug-14 15-Sep-14 15-Sep-14, Roof
Beams and slab 18d 26-Aug-14 15-Sep-14 15-Sep-14, Beams an
FW.B&S.n Form Work 6d 26-Aug-14 01-Sep-14 Form Work
R.F.T.B&S R.F.T 3d 02-Sep-14 04-Sep-14 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Sep-14 06-Sep-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 15-Sep-14 15-Sep-14 Remove Form Work
Mansonary 22d 26-Aug-14 20-Sep-14 20-Sep-14, Mansona
Ground Floor 2d 26-Aug-14 27-Aug-14 27-Aug-14, Ground Flo
I.G..M.v1141 Internal 2d 26-Aug-14 27-Aug-14 Internal
E.G.M.v1441 External 2d 26-Aug-14 27-Aug-14 External
First Floor 2d 16-Sep-14 17-Sep-14 17-Sep-14, First Floo
I.F.M.v1141 Internal 2d 16-Sep-14 17-Sep-14 Internal
E.F.M.v1141 External 2d 16-Sep-14 17-Sep-14 External
Roof 2d 18-Sep-14 20-Sep-14 20-Sep-14, Roof
E.R.M.v1441 External 2d 18-Sep-14 20-Sep-14 External
Finishing 24d 28-Aug-14 24-Sep-14 24-Sep-14, Finishing
Ground Floor 2d 28-Aug-14 30-Aug-14 30-Aug-14, Ground Flo
Calm Shell 2d 28-Aug-14 30-Aug-14 30-Aug-14, Calm Shell
E.Ch.G.v1 External 2d 28-Aug-14 30-Aug-14 External
External Ele
Electrical 0d
First Floor 2d 18-Sep-14 20-Sep-14 20-Sep-14, First Floo
Calm Shell 2d 18-Sep-14 20-Sep-14 20-Sep-14, Calm She
E.ch.st.v14 External 2d 18-Sep-14 20-Sep-14 External
External Ele
Electrical 0d
Roof 1d 21-Sep-14 21-Sep-14 21-Sep-14, Roof
Calm Shell 1d 21-Sep-14 21-Sep-14 21-Sep-14, Calm She
E.ch.r.v14 External 1d 21-Sep-14 21-Sep-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 22-Sep-14 24-Sep-14 24-Sep-14, Paint Villa
Ex Paint1140 External Painting 3d 22-Sep-14 24-Sep-14 External Painting
Stand alone Villa typ
type 71 315d 15-Dec-13 25-Dec-14 25-Dec-14, S
A6080 start Villa 0d 15-Dec-13 start Villa
A6090 Finish Villa 0d 25-Dec-14 Finish Villa
Mobilization 1d 18-Dec-13 18-Dec-13 18-Dec-13, Mobilization
M. Sur.v1151 Site Surveying 1d 18-Dec-13 18-Dec-13 Site Surveying

Actual Work Critical Remaining Work Summary Page 175 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

351
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Earth Work 248d 23-Dec-13 16-Oct-14 16-Oct-14, Earth W
Ex.v1451 Excavation 2d 23-Dec-13 24-Dec-13 Excavation
B.F.v1451 BackFill 2d 15-Oct-14 16-Oct-14 BackFill
Civil Work 76d 16-Sep-14 16-Dec-14 16-Dec-14, C
Foundation 15d 16-Sep-14 02-Oct-14 02-Oct-14, Foundat
Footing 15d 16-Sep-14 02-Oct-14 02-Oct-14, Footing
Plain Concrete
Con 5d 16-Sep-14 21-Sep-14 21-Sep-14, Plain Con
F.W.Pc Form Work 2d 16-Sep-14 17-Sep-14 Form Work
Pour.Pc Pouring Concrete 1d 18-Sep-14 18-Sep-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 21-Sep-14 21-Sep-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 22-Sep-14 02-Oct-14 02-Oct-14, Reinforc
FW.Rc& Form Work 4d 22-Sep-14 25-Sep-14 Form Work
1441 R.F.T 2d 27-Sep-14 28-Sep-14 R.F.T
Pour.Rc Pouring Concrete 1d 29-Sep-14 29-Sep-14 Pouring Concrete
R.Fw.R Remove formwork 1d 01-Oct-14 01-Oct-14 Remove formwork
Ins.Rc& Insulting 1d 02-Oct-14 02-Oct-14 Insulting
Ground Floor 25d 04-Oct-14 04-Nov-14 04-Nov-14, Grou
Slab on grade
grad 16d 18-Oct-14 04-Nov-14 04-Nov-14, Slab
FW.SOG. Form Work 4d 18-Oct-14 21-Oct-14 Form Work
R.F.T.SOG R.F.T 3d 22-Oct-14 25-Oct-14 R.F.T
Pour.SOG Pouring Concrete 1d 26-Oct-14 26-Oct-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 04-Nov-14 04-Nov-14 Remove formwo
Columns 7d 04-Oct-14 14-Oct-14 14-Oct-14, Column
FW.Col.G Form Work 2d 04-Oct-14 08-Oct-14 Form Work
R.F.T.Col. R.F.T 2d 09-Oct-14 11-Oct-14 R.F.T
Pour.Col.G Pouring Concrete 1d 12-Oct-14 12-Oct-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 14-Oct-14 14-Oct-14 Remove formwork
First Floor 18d 05-Nov-14 25-Nov-14 25-Nov-14, Firs
Beams and slab 18d 05-Nov-14 25-Nov-14 25-Nov-14, Bea
FW.B&S.s Form Work 6d 05-Nov-14 11-Nov-14 Form Work
R.F.T.B&S R.F.T 3d 12-Nov-14 15-Nov-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-14 16-Nov-14 Pouring Concre
R.FW.B&S Remove formwork 1d 25-Nov-14 25-Nov-14 Remove formw
Columns 8d 17-Nov-14 25-Nov-14 25-Nov-14, Co
FW.Col.st. Form Work 3d 17-Nov-14 19-Nov-14 Form Work
R.F.T.Col. R.F.T 2d 20-Nov-14 22-Nov-14 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Nov-14 23-Nov-14 Pouring Concre
R.FW.Col. Remove formwork 1d 25-Nov-14 25-Nov-14 Remove formw
Roof 18d 26-Nov-14 16-Dec-14 16-Dec-14, R
Beams and slab 18d 26-Nov-14 16-Dec-14 16-Dec-14, B
FW.B&S.n Form Work 6d 26-Nov-14 02-Dec-14 Form Work
R.F.T.B&S R.F.T 3d 03-Dec-14 06-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Dec-14 07-Dec-14 Pouring Concr
R.FW.B&S Remove Form Work 1d 16-Dec-14 16-Dec-14 Remove Form
Mansonary 22d 26-Nov-14 21-Dec-14 21-Dec-14, M
Ground Floor 2d 26-Nov-14 27-Nov-14 27-Nov-14, Gr
I.G..M.v1151 Internal 2d 26-Nov-14 27-Nov-14 Internal
E.G.M.v1451 External 2d 26-Nov-14 27-Nov-14 External
First Floor 2d 17-Dec-14 18-Dec-14 18-Dec-14, F
I.F.M.v1151 Internal 2d 17-Dec-14 18-Dec-14 Internal
E.F.M.v1151 External 2d 17-Dec-14 18-Dec-14 External
Roof 2d 20-Dec-14 21-Dec-14 21-Dec-14, R
E.R.M.v1451 External 2d 20-Dec-14 21-Dec-14 External
Finishing 24d 29-Nov-14 25-Dec-14 25-Dec-14, F
Ground Floor 2d 29-Nov-14 30-Nov-14 30-Nov-14, Gr
Calm Shell 2d 29-Nov-14 30-Nov-14 30-Nov-14, Ca
E.Ch.G.v1 External 2d 29-Nov-14 30-Nov-14 External
External Ele
Electrical 0d
First Floor 2d 20-Dec-14 21-Dec-14 21-Dec-14, F
Calm Shell 2d 20-Dec-14 21-Dec-14 21-Dec-14, C
E.ch.st.v14 External 2d 20-Dec-14 21-Dec-14 External
External Ele
Electrical 0d
Roof 1d 22-Dec-14 22-Dec-14 22-Dec-14, R
Calm Shell 1d 22-Dec-14 22-Dec-14 22-Dec-14, C
E.ch.r.v14 External 1d 22-Dec-14 22-Dec-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 23-Dec-14 25-Dec-14 25-Dec-14, P
Ex Paint1150 External Painting 3d 23-Dec-14 25-Dec-14 External Pain
Stand alone Villa typ
type 72 87d 15-Dec-13 25-Mar-14 25-Mar-14, Stand alone Villa type 72
A6100 start Villa 0d 15-Dec-13 start Villa
A6110 Finish Villa 0d 25-Mar-14 Finish Villa
Mobilization 1d 15-Dec-13 15-Dec-13 15-Dec-13, Mobilization
M. Sur.v1161 Site Surveying 1d 15-Dec-13 15-Dec-13 Site Surveying
Earth Work 26d 16-Dec-13 14-Jan-14 14-Jan-14, Earth Work
Ex.v1461 Excavation 2d 16-Dec-13 17-Dec-13 Excavation
B.F.v1461 BackFill 2d 13-Jan-14 14-Jan-14 BackFill

Actual Work Critical Remaining Work Summary Page 176 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

352
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Civil Work 76d 18-Dec-13 16-Mar-14 16-Mar-14, Civil Work
Foundation 15d 18-Dec-13 04-Jan-14 04-Jan-14, Foundation
Footing 15d 18-Dec-13 04-Jan-14 04-Jan-14, Footing
Plain Concrete
Con 5d 18-Dec-13 23-Dec-13 23-Dec-13, Plain Concrete
F.W.Pc Form Work 2d 18-Dec-13 19-Dec-13 Form Work
Pour.Pc Pouring Concrete 1d 21-Dec-13 21-Dec-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Dec-13 23-Dec-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 24-Dec-13 04-Jan-14 04-Jan-14, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 24-Dec-13 28-Dec-13 Form Work
1451 R.F.T 2d 29-Dec-13 30-Dec-13 R.F.T
Pour.Rc Pouring Concrete 1d 31-Dec-13 31-Dec-13 Pouring Concrete
R.Fw.R Remove formwork 1d 02-Jan-14 02-Jan-14 Remove formwork
Ins.Rc& Insulting 1d 04-Jan-14 04-Jan-14 Insulting
Ground Floor 25d 05-Jan-14 02-Feb-14 02-Feb-14, Ground Floor
Slab on grade
grad 16d 15-Jan-14 02-Feb-14 02-Feb-14, Slab on grade
FW.SOG. Form Work 4d 15-Jan-14 19-Jan-14 Form Work
R.F.T.SOG R.F.T 3d 20-Jan-14 22-Jan-14 R.F.T
Pour.SOG Pouring Concrete 1d 23-Jan-14 23-Jan-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 02-Feb-14 02-Feb-14 Remove formwork
Columns 7d 05-Jan-14 12-Jan-14 12-Jan-14, Columns
FW.Col.G Form Work 2d 05-Jan-14 06-Jan-14 Form Work
R.F.T.Col. R.F.T 2d 07-Jan-14 08-Jan-14 R.F.T
Pour.Col.G Pouring Concrete 1d 09-Jan-14 09-Jan-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 12-Jan-14 12-Jan-14 Remove formwork
First Floor 18d 03-Feb-14 23-Feb-14 23-Feb-14, First Floor
Beams and slab 18d 03-Feb-14 23-Feb-14 23-Feb-14, Beams and slab
FW.B&S.s Form Work 6d 03-Feb-14 09-Feb-14 Form Work
R.F.T.B&S R.F.T 3d 10-Feb-14 12-Feb-14 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Feb-14 13-Feb-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 23-Feb-14 23-Feb-14 Remove formwork
Columns 8d 15-Feb-14 23-Feb-14 23-Feb-14, Columns
FW.Col.st. Form Work 3d 15-Feb-14 17-Feb-14 Form Work
R.F.T.Col. R.F.T 2d 18-Feb-14 19-Feb-14 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Feb-14 20-Feb-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 23-Feb-14 23-Feb-14 Remove formwork
Roof 18d 24-Feb-14 16-Mar-14 16-Mar-14, Roof
Beams and slab 18d 24-Feb-14 16-Mar-14 16-Mar-14, Beams and slab
FW.B&S.n Form Work 6d 24-Feb-14 02-Mar-14 Form Work
R.F.T.B&S R.F.T 3d 03-Mar-14 05-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Mar-14 06-Mar-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 16-Mar-14 16-Mar-14 Remove Form Work
Mansonary 22d 24-Feb-14 20-Mar-14 20-Mar-14, Mansonary
Ground Floor 2d 24-Feb-14 25-Feb-14 25-Feb-14, Ground Floor
I.G..M.v1161 Internal 2d 24-Feb-14 25-Feb-14 Internal
E.G.M.v1461 External 2d 24-Feb-14 25-Feb-14 External
First Floor 2d 17-Mar-14 18-Mar-14 18-Mar-14, First Floor
I.F.M.v1161 Internal 2d 17-Mar-14 18-Mar-14 Internal
E.F.M.v1161 External 2d 17-Mar-14 18-Mar-14 External
Roof 2d 19-Mar-14 20-Mar-14 20-Mar-14, Roof
E.R.M.v1461 External 2d 19-Mar-14 20-Mar-14 External
Finishing 24d 26-Feb-14 25-Mar-14 25-Mar-14, Finishing
Ground Floor 2d 26-Feb-14 27-Feb-14 27-Feb-14, Ground Floor
Calm Shell 2d 26-Feb-14 27-Feb-14 27-Feb-14, Calm Shell
E.Ch.G.v1 External 2d 26-Feb-14 27-Feb-14 External
External Ele
Electrical 0d
First Floor 2d 19-Mar-14 20-Mar-14 20-Mar-14, First Floor
Calm Shell 2d 19-Mar-14 20-Mar-14 20-Mar-14, Calm Shell
E.ch.st.v14 External 2d 19-Mar-14 20-Mar-14 External
External Ele
Electrical 0d
Roof 1d 22-Mar-14 22-Mar-14 22-Mar-14, Roof
Calm Shell 1d 22-Mar-14 22-Mar-14 22-Mar-14, Calm Shell
E.ch.r.v14 External 1d 22-Mar-14 22-Mar-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 23-Mar-14 25-Mar-14 25-Mar-14, Paint Villa 1
Ex Paint1160 External Painting 3d 23-Mar-14 25-Mar-14 External Painting
Stand alone Villa typ
type 73 163d 15-Dec-13 23-Jun-14 23-Jun-14, Stand alone Villa
A6120 start Villa 0d 15-Dec-13 start Villa
A6130 Finish Villa 0d 23-Jun-14 Finish Villa
Mobilization 1d 16-Dec-13 16-Dec-13 16-Dec-13, Mobilization
M. Sur.v1171 Site Surveying 1d 16-Dec-13 16-Dec-13 Site Surveying
Earth Work 100d 18-Dec-13 13-Apr-14 13-Apr-14, Earth Work
Ex.v1471 Excavation 2d 18-Dec-13 19-Dec-13 Excavation
B.F.v1471 BackFill 2d 12-Apr-14 13-Apr-14 BackFill
Civil Work 76d 17-Mar-14 14-Jun-14 14-Jun-14, Civil Work
Foundation 15d 17-Mar-14 02-Apr-14 02-Apr-14, Foundation
Footing 15d 17-Mar-14 02-Apr-14 02-Apr-14, Footing

Actual Work Critical Remaining Work Summary Page 177 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

353
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Plain Concrete
Con 5d 17-Mar-14 22-Mar-14 22-Mar-14, Plain Concrete
F.W.Pc Form Work 2d 17-Mar-14 18-Mar-14 Form Work
Pour.Pc Pouring Concrete 1d 19-Mar-14 19-Mar-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 22-Mar-14 22-Mar-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 23-Mar-14 02-Apr-14 02-Apr-14, Reinforced Concrete&Sm
FW.Rc& Form Work 4d 23-Mar-14 26-Mar-14 Form Work
1461 R.F.T 2d 27-Mar-14 29-Mar-14 R.F.T
Pour.Rc Pouring Concrete 1d 30-Mar-14 30-Mar-14 Pouring Concrete
R.Fw.R Remove formwork 1d 01-Apr-14 01-Apr-14 Remove formwork
Ins.Rc& Insulting 1d 02-Apr-14 02-Apr-14 Insulting
Ground Floor 25d 03-Apr-14 03-May-14 03-May-14, Ground Floor
Slab on grade
grad 16d 14-Apr-14 03-May-14 03-May-14, Slab on grade
FW.SOG. Form Work 4d 14-Apr-14 17-Apr-14 Form Work
R.F.T.SOG R.F.T 3d 19-Apr-14 21-Apr-14 R.F.T
Pour.SOG Pouring Concrete 1d 22-Apr-14 22-Apr-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 03-May-14 03-May-14 Remove formwork
Columns 7d 03-Apr-14 10-Apr-14 10-Apr-14, Columns
FW.Col.G Form Work 2d 03-Apr-14 05-Apr-14 Form Work
R.F.T.Col. R.F.T 2d 06-Apr-14 07-Apr-14 R.F.T
Pour.Col.G Pouring Concrete 1d 08-Apr-14 08-Apr-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 10-Apr-14 10-Apr-14 Remove formwork
First Floor 18d 04-May-14 24-May-14 24-May-14, First Floor
Beams and slab 18d 04-May-14 24-May-14 24-May-14, Beams and slab
FW.B&S.s Form Work 6d 04-May-14 10-May-14 Form Work
R.F.T.B&S R.F.T 3d 11-May-14 13-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 14-May-14 14-May-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 24-May-14 24-May-14 Remove formwork
Columns 8d 15-May-14 24-May-14 24-May-14, Columns
FW.Col.st. Form Work 3d 15-May-14 18-May-14 Form Work
R.F.T.Col. R.F.T 2d 19-May-14 20-May-14 R.F.T
Pour.Col.s Pouring Concrete 1d 21-May-14 21-May-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 24-May-14 24-May-14 Remove formwork
Roof 18d 25-May-14 14-Jun-14 14-Jun-14, Roof
Beams and slab 18d 25-May-14 14-Jun-14 14-Jun-14, Beams and slab
FW.B&S.n Form Work 6d 25-May-14 31-May-14 Form Work
R.F.T.B&S R.F.T 3d 01-Jun-14 03-Jun-14 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Jun-14 04-Jun-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 14-Jun-14 14-Jun-14 Remove Form Work
Mansonary 22d 25-May-14 18-Jun-14 18-Jun-14, Mansonary
Ground Floor 2d 25-May-14 26-May-14 26-May-14, Ground Floor
I.G..M.v1171 Internal 2d 25-May-14 26-May-14 Internal
E.G.M.v1471 External 2d 25-May-14 26-May-14 External
First Floor 2d 15-Jun-14 16-Jun-14 16-Jun-14, First Floor
I.F.M.v1171 Internal 2d 15-Jun-14 16-Jun-14 Internal
E.F.M.v1171 External 2d 15-Jun-14 16-Jun-14 External
Roof 2d 17-Jun-14 18-Jun-14 18-Jun-14, Roof
E.R.M.v1471 External 2d 17-Jun-14 18-Jun-14 External
Finishing 24d 27-May-14 23-Jun-14 23-Jun-14, Finishing
Ground Floor 2d 27-May-14 28-May-14 28-May-14, Ground Floor
Calm Shell 2d 27-May-14 28-May-14 28-May-14, Calm Shell
E.Ch.G.v1 External 2d 27-May-14 28-May-14 External
External Ele
Electrical 0d
First Floor 2d 17-Jun-14 18-Jun-14 18-Jun-14, First Floor
Calm Shell 2d 17-Jun-14 18-Jun-14 18-Jun-14, Calm Shell
E.ch.st.v14 External 2d 17-Jun-14 18-Jun-14 External
External Ele
Electrical 0d
Roof 1d 19-Jun-14 19-Jun-14 19-Jun-14, Roof
Calm Shell 1d 19-Jun-14 19-Jun-14 19-Jun-14, Calm Shell
E.ch.r.v14 External 1d 19-Jun-14 19-Jun-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 21-Jun-14 23-Jun-14 23-Jun-14, Paint Villa 1
Ex Paint1170 External Painting 3d 21-Jun-14 23-Jun-14 External Painting
Stand alone Villa typ
type 74 239d 15-Dec-13 24-Sep-14 24-Sep-14, Stand alo
A6140 start Villa 0d 15-Dec-13 start Villa
A6150 Finish Villa 0d 24-Sep-14 Finish Villa
Mobilization 1d 17-Dec-13 17-Dec-13 17-Dec-13, Mobilization
M. Sur.v1181 Site Surveying 1d 17-Dec-13 17-Dec-13 Site Surveying
Earth Work 174d 21-Dec-13 12-Jul-14 12-Jul-14, Earth Work
Ex.v1481 Excavation 2d 21-Dec-13 22-Dec-13 Excavation
B.F.v1481 BackFill 2d 10-Jul-14 12-Jul-14 BackFill
Civil Work 76d 15-Jun-14 15-Sep-14 15-Sep-14, Civil Wor
Foundation 15d 15-Jun-14 01-Jul-14 01-Jul-14, Foundation
Footing 15d 15-Jun-14 01-Jul-14 01-Jul-14, Footing
Plain Concrete
Con 5d 15-Jun-14 19-Jun-14 19-Jun-14, Plain Concrete
F.W.Pc Form Work 2d 15-Jun-14 16-Jun-14 Form Work
Pour.Pc Pouring Concrete 1d 17-Jun-14 17-Jun-14 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 178 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

354
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.Fw.P Remove Formwork 1d 19-Jun-14 19-Jun-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 21-Jun-14 01-Jul-14 01-Jul-14, Reinforced Concr
FW.Rc& Form Work 4d 21-Jun-14 24-Jun-14 Form Work
1471 R.F.T 2d 25-Jun-14 26-Jun-14 R.F.T
Pour.Rc Pouring Concrete 1d 28-Jun-14 28-Jun-14 Pouring Concrete
R.Fw.R Remove formwork 1d 30-Jun-14 30-Jun-14 Remove formwork
Ins.Rc& Insulting 1d 01-Jul-14 01-Jul-14 Insulting
Ground Floor 25d 02-Jul-14 04-Aug-14 04-Aug-14, Ground Floor
Slab on grade
grad 16d 13-Jul-14 04-Aug-14 04-Aug-14, Slab on grade
FW.SOG. Form Work 4d 13-Jul-14 16-Jul-14 Form Work
R.F.T.SOG R.F.T 3d 17-Jul-14 20-Jul-14 R.F.T
Pour.SOG Pouring Concrete 1d 21-Jul-14 21-Jul-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 04-Aug-14 04-Aug-14 Remove formwork
Columns 7d 02-Jul-14 09-Jul-14 09-Jul-14, Columns
FW.Col.G Form Work 2d 02-Jul-14 03-Jul-14 Form Work
R.F.T.Col. R.F.T 2d 05-Jul-14 06-Jul-14 R.F.T
Pour.Col.G Pouring Concrete 1d 07-Jul-14 07-Jul-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 09-Jul-14 09-Jul-14 Remove formwork
First Floor 18d 05-Aug-14 25-Aug-14 25-Aug-14, First Floor
Beams and slab 18d 05-Aug-14 25-Aug-14 25-Aug-14, Beams and
FW.B&S.s Form Work 6d 05-Aug-14 11-Aug-14 Form Work
R.F.T.B&S R.F.T 3d 12-Aug-14 14-Aug-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Aug-14 16-Aug-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 25-Aug-14 25-Aug-14 Remove formwork
Columns 8d 17-Aug-14 25-Aug-14 25-Aug-14, Columns
FW.Col.st. Form Work 3d 17-Aug-14 19-Aug-14 Form Work
R.F.T.Col. R.F.T 2d 20-Aug-14 21-Aug-14 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Aug-14 23-Aug-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 25-Aug-14 25-Aug-14 Remove formwork
Roof 18d 26-Aug-14 15-Sep-14 15-Sep-14, Roof
Beams and slab 18d 26-Aug-14 15-Sep-14 15-Sep-14, Beams an
FW.B&S.n Form Work 6d 26-Aug-14 01-Sep-14 Form Work
R.F.T.B&S R.F.T 3d 02-Sep-14 04-Sep-14 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Sep-14 06-Sep-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 15-Sep-14 15-Sep-14 Remove Form Work
Mansonary 22d 26-Aug-14 20-Sep-14 20-Sep-14, Mansona
Ground Floor 2d 26-Aug-14 27-Aug-14 27-Aug-14, Ground Flo
I.G..M.v1181 Internal 2d 26-Aug-14 27-Aug-14 Internal
E.G.M.v1481 External 2d 26-Aug-14 27-Aug-14 External
First Floor 2d 16-Sep-14 17-Sep-14 17-Sep-14, First Floo
I.F.M.v1181 Internal 2d 16-Sep-14 17-Sep-14 Internal
E.F.M.v1181 External 2d 16-Sep-14 17-Sep-14 External
Roof 2d 18-Sep-14 20-Sep-14 20-Sep-14, Roof
E.R.M.v1481 External 2d 18-Sep-14 20-Sep-14 External
Finishing 24d 28-Aug-14 24-Sep-14 24-Sep-14, Finishing
Ground Floor 2d 28-Aug-14 30-Aug-14 30-Aug-14, Ground Flo
Calm Shell 2d 28-Aug-14 30-Aug-14 30-Aug-14, Calm Shell
E.Ch.G.v1 External 2d 28-Aug-14 30-Aug-14 External
External Ele
Electrical 0d
First Floor 2d 18-Sep-14 20-Sep-14 20-Sep-14, First Floo
Calm Shell 2d 18-Sep-14 20-Sep-14 20-Sep-14, Calm She
E.ch.st.v14 External 2d 18-Sep-14 20-Sep-14 External
External Ele
Electrical 0d
Roof 1d 21-Sep-14 21-Sep-14 21-Sep-14, Roof
Calm Shell 1d 21-Sep-14 21-Sep-14 21-Sep-14, Calm She
E.ch.r.v14 External 1d 21-Sep-14 21-Sep-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 22-Sep-14 24-Sep-14 24-Sep-14, Paint Villa
Ex Paint1180 External Painting 3d 22-Sep-14 24-Sep-14 External Painting
Stand alone Villa typ
type 75 315d 15-Dec-13 25-Dec-14 25-Dec-14, S
A6160 start Villa 0d 15-Dec-13 start Villa
A6170 Finish Villa 0d 25-Dec-14 Finish Villa
Mobilization 1d 18-Dec-13 18-Dec-13 18-Dec-13, Mobilization
M. Sur.v1191 Site Surveying 1d 18-Dec-13 18-Dec-13 Site Surveying
Earth Work 248d 23-Dec-13 16-Oct-14 16-Oct-14, Earth W
Ex.v1491 Excavation 2d 23-Dec-13 24-Dec-13 Excavation
B.F.v1491 BackFill 2d 15-Oct-14 16-Oct-14 BackFill
Civil Work 76d 16-Sep-14 16-Dec-14 16-Dec-14, C
Foundation 15d 16-Sep-14 02-Oct-14 02-Oct-14, Foundat
Footing 15d 16-Sep-14 02-Oct-14 02-Oct-14, Footing
Plain Concrete
Con 5d 16-Sep-14 21-Sep-14 21-Sep-14, Plain Con
F.W.Pc Form Work 2d 16-Sep-14 17-Sep-14 Form Work
Pour.Pc Pouring Concrete 1d 18-Sep-14 18-Sep-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 21-Sep-14 21-Sep-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 22-Sep-14 02-Oct-14 02-Oct-14, Reinforc
FW.Rc& Form Work 4d 22-Sep-14 25-Sep-14 Form Work

Actual Work Critical Remaining Work Summary Page 179 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

355
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
1481 R.F.T 2d 27-Sep-14 28-Sep-14 R.F.T
Pour.Rc Pouring Concrete 1d 29-Sep-14 29-Sep-14 Pouring Concrete
R.Fw.R Remove formwork 1d 01-Oct-14 01-Oct-14 Remove formwork
Ins.Rc& Insulting 1d 02-Oct-14 02-Oct-14 Insulting
Ground Floor 25d 04-Oct-14 04-Nov-14 04-Nov-14, Grou
Slab on grade
grad 16d 18-Oct-14 04-Nov-14 04-Nov-14, Slab
FW.SOG. Form Work 4d 18-Oct-14 21-Oct-14 Form Work
R.F.T.SOG R.F.T 3d 22-Oct-14 25-Oct-14 R.F.T
Pour.SOG Pouring Concrete 1d 26-Oct-14 26-Oct-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 04-Nov-14 04-Nov-14 Remove formwo
Columns 7d 04-Oct-14 14-Oct-14 14-Oct-14, Column
FW.Col.G Form Work 2d 04-Oct-14 08-Oct-14 Form Work
R.F.T.Col. R.F.T 2d 09-Oct-14 11-Oct-14 R.F.T
Pour.Col.G Pouring Concrete 1d 12-Oct-14 12-Oct-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 14-Oct-14 14-Oct-14 Remove formwork
First Floor 18d 05-Nov-14 25-Nov-14 25-Nov-14, Firs
Beams and slab 18d 05-Nov-14 25-Nov-14 25-Nov-14, Bea
FW.B&S.s Form Work 6d 05-Nov-14 11-Nov-14 Form Work
R.F.T.B&S R.F.T 3d 12-Nov-14 15-Nov-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-14 16-Nov-14 Pouring Concre
R.FW.B&S Remove formwork 1d 25-Nov-14 25-Nov-14 Remove formw
Columns 8d 17-Nov-14 25-Nov-14 25-Nov-14, Co
FW.Col.st. Form Work 3d 17-Nov-14 19-Nov-14 Form Work
R.F.T.Col. R.F.T 2d 20-Nov-14 22-Nov-14 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Nov-14 23-Nov-14 Pouring Concre
R.FW.Col. Remove formwork 1d 25-Nov-14 25-Nov-14 Remove formw
Roof 18d 26-Nov-14 16-Dec-14 16-Dec-14, R
Beams and slab 18d 26-Nov-14 16-Dec-14 16-Dec-14, B
FW.B&S.n Form Work 6d 26-Nov-14 02-Dec-14 Form Work
R.F.T.B&S R.F.T 3d 03-Dec-14 06-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Dec-14 07-Dec-14 Pouring Concr
R.FW.B&S Remove Form Work 1d 16-Dec-14 16-Dec-14 Remove Form
Mansonary 22d 26-Nov-14 21-Dec-14 21-Dec-14, M
Ground Floor 2d 26-Nov-14 27-Nov-14 27-Nov-14, Gr
I.G..M.v1191 Internal 2d 26-Nov-14 27-Nov-14 Internal
E.G.M.v1491 External 2d 26-Nov-14 27-Nov-14 External
First Floor 2d 17-Dec-14 18-Dec-14 18-Dec-14, F
I.F.M.v1191 Internal 2d 17-Dec-14 18-Dec-14 Internal
E.F.M.v1191 External 2d 17-Dec-14 18-Dec-14 External
Roof 2d 20-Dec-14 21-Dec-14 21-Dec-14, R
E.R.M.v1491 External 2d 20-Dec-14 21-Dec-14 External
Finishing 24d 29-Nov-14 25-Dec-14 25-Dec-14, F
Ground Floor 2d 29-Nov-14 30-Nov-14 30-Nov-14, Gr
Calm Shell 2d 29-Nov-14 30-Nov-14 30-Nov-14, Ca
E.Ch.G.v1 External 2d 29-Nov-14 30-Nov-14 External
External Ele
Electrical 0d
First Floor 2d 20-Dec-14 21-Dec-14 21-Dec-14, F
Calm Shell 2d 20-Dec-14 21-Dec-14 21-Dec-14, C
E.ch.st.v14 External 2d 20-Dec-14 21-Dec-14 External
External Ele
Electrical 0d
Roof 1d 22-Dec-14 22-Dec-14 22-Dec-14, R
Calm Shell 1d 22-Dec-14 22-Dec-14 22-Dec-14, C
E.ch.r.v14 External 1d 22-Dec-14 22-Dec-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 23-Dec-14 25-Dec-14 25-Dec-14, P
Ex Paint1190 External Painting 3d 23-Dec-14 25-Dec-14 External Pain
Stand alone Villa typ
type 76 87d 15-Dec-13 25-Mar-14 25-Mar-14, Stand alone Villa type 76
A6180 start Villa 0d 15-Dec-13 start Villa
A6190 Finish Villa 0d 25-Mar-14 Finish Villa
Mobilization 1d 15-Dec-13 15-Dec-13 15-Dec-13, Mobilization
M. Sur.v1201 Site Surveying 1d 15-Dec-13 15-Dec-13 Site Surveying
Earth Work 26d 16-Dec-13 14-Jan-14 14-Jan-14, Earth Work
Ex.v1501 Excavation 2d 16-Dec-13 17-Dec-13 Excavation
B.F.v1501 BackFill 2d 13-Jan-14 14-Jan-14 BackFill
Civil Work 76d 18-Dec-13 16-Mar-14 16-Mar-14, Civil Work
Foundation 15d 18-Dec-13 04-Jan-14 04-Jan-14, Foundation
Footing 15d 18-Dec-13 04-Jan-14 04-Jan-14, Footing
Plain Concrete
Con 5d 18-Dec-13 23-Dec-13 23-Dec-13, Plain Concrete
F.W.Pc Form Work 2d 18-Dec-13 19-Dec-13 Form Work
Pour.Pc Pouring Concrete 1d 21-Dec-13 21-Dec-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 23-Dec-13 23-Dec-13 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 24-Dec-13 04-Jan-14 04-Jan-14, Reinforced Concrete&Smeles
FW.Rc& Form Work 4d 24-Dec-13 28-Dec-13 Form Work
1491 R.F.T 2d 29-Dec-13 30-Dec-13 R.F.T
Pour.Rc Pouring Concrete 1d 31-Dec-13 31-Dec-13 Pouring Concrete
R.Fw.R Remove formwork 1d 02-Jan-14 02-Jan-14 Remove formwork

Actual Work Critical Remaining Work Summary Page 180 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

356
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
Ins.Rc& Insulting 1d 04-Jan-14 04-Jan-14 Insulting
Ground Floor 25d 05-Jan-14 02-Feb-14 02-Feb-14, Ground Floor
Slab on grade
grad 16d 15-Jan-14 02-Feb-14 02-Feb-14, Slab on grade
FW.SOG. Form Work 4d 15-Jan-14 19-Jan-14 Form Work
R.F.T.SOG R.F.T 3d 20-Jan-14 22-Jan-14 R.F.T
Pour.SOG Pouring Concrete 1d 23-Jan-14 23-Jan-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 02-Feb-14 02-Feb-14 Remove formwork
Columns 7d 05-Jan-14 12-Jan-14 12-Jan-14, Columns
FW.Col.G Form Work 2d 05-Jan-14 06-Jan-14 Form Work
R.F.T.Col. R.F.T 2d 07-Jan-14 08-Jan-14 R.F.T
Pour.Col.G Pouring Concrete 1d 09-Jan-14 09-Jan-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 12-Jan-14 12-Jan-14 Remove formwork
First Floor 18d 03-Feb-14 23-Feb-14 23-Feb-14, First Floor
Beams and slab 18d 03-Feb-14 23-Feb-14 23-Feb-14, Beams and slab
FW.B&S.s Form Work 6d 03-Feb-14 09-Feb-14 Form Work
R.F.T.B&S R.F.T 3d 10-Feb-14 12-Feb-14 R.F.T
Pour.B&S. Pouring Concrete 1d 13-Feb-14 13-Feb-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 23-Feb-14 23-Feb-14 Remove formwork
Columns 8d 15-Feb-14 23-Feb-14 23-Feb-14, Columns
FW.Col.st. Form Work 3d 15-Feb-14 17-Feb-14 Form Work
R.F.T.Col. R.F.T 2d 18-Feb-14 19-Feb-14 R.F.T
Pour.Col.s Pouring Concrete 1d 20-Feb-14 20-Feb-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 23-Feb-14 23-Feb-14 Remove formwork
Roof 18d 24-Feb-14 16-Mar-14 16-Mar-14, Roof
Beams and slab 18d 24-Feb-14 16-Mar-14 16-Mar-14, Beams and slab
FW.B&S.n Form Work 6d 24-Feb-14 02-Mar-14 Form Work
R.F.T.B&S R.F.T 3d 03-Mar-14 05-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Mar-14 06-Mar-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 16-Mar-14 16-Mar-14 Remove Form Work
Mansonary 22d 24-Feb-14 20-Mar-14 20-Mar-14, Mansonary
Ground Floor 2d 24-Feb-14 25-Feb-14 25-Feb-14, Ground Floor
I.G..M.v1201 Internal 2d 24-Feb-14 25-Feb-14 Internal
E.G.M.v1501 External 2d 24-Feb-14 25-Feb-14 External
First Floor 2d 17-Mar-14 18-Mar-14 18-Mar-14, First Floor
I.F.M.v1201 Internal 2d 17-Mar-14 18-Mar-14 Internal
E.F.M.v1201 External 2d 17-Mar-14 18-Mar-14 External
Roof 2d 19-Mar-14 20-Mar-14 20-Mar-14, Roof
E.R.M.v1501 External 2d 19-Mar-14 20-Mar-14 External
Finishing 24d 26-Feb-14 25-Mar-14 25-Mar-14, Finishing
Ground Floor 2d 26-Feb-14 27-Feb-14 27-Feb-14, Ground Floor
Calm Shell 2d 26-Feb-14 27-Feb-14 27-Feb-14, Calm Shell
E.Ch.G.v1 External 2d 26-Feb-14 27-Feb-14 External
External Ele
Electrical 0d
First Floor 2d 19-Mar-14 20-Mar-14 20-Mar-14, First Floor
Calm Shell 2d 19-Mar-14 20-Mar-14 20-Mar-14, Calm Shell
E.ch.st.v15 External 2d 19-Mar-14 20-Mar-14 External
External Ele
Electrical 0d
Roof 1d 22-Mar-14 22-Mar-14 22-Mar-14, Roof
Calm Shell 1d 22-Mar-14 22-Mar-14 22-Mar-14, Calm Shell
E.ch.r.v15 External 1d 22-Mar-14 22-Mar-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 23-Mar-14 25-Mar-14 25-Mar-14, Paint Villa 1
Ex Paint1200 External Painting 3d 23-Mar-14 25-Mar-14 External Painting
Stand alone Villa typ
type 77 163d 15-Dec-13 23-Jun-14 23-Jun-14, Stand alone Villa
A6200 start Villa 0d 15-Dec-13 start Villa
A6210 Finish Villa 0d 23-Jun-14 Finish Villa
Mobilization 1d 16-Dec-13 16-Dec-13 16-Dec-13, Mobilization
M. Sur.v1211 Site Surveying 1d 16-Dec-13 16-Dec-13 Site Surveying
Earth Work 100d 18-Dec-13 13-Apr-14 13-Apr-14, Earth Work
Ex.v1511 Excavation 2d 18-Dec-13 19-Dec-13 Excavation
B.F.v1511 BackFill 2d 12-Apr-14 13-Apr-14 BackFill
Civil Work 76d 17-Mar-14 14-Jun-14 14-Jun-14, Civil Work
Foundation 15d 17-Mar-14 02-Apr-14 02-Apr-14, Foundation
Footing 15d 17-Mar-14 02-Apr-14 02-Apr-14, Footing
Plain Concrete
Con 5d 17-Mar-14 22-Mar-14 22-Mar-14, Plain Concrete
F.W.Pc Form Work 2d 17-Mar-14 18-Mar-14 Form Work
Pour.Pc Pouring Concrete 1d 19-Mar-14 19-Mar-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 22-Mar-14 22-Mar-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 23-Mar-14 02-Apr-14 02-Apr-14, Reinforced Concrete&Sm
FW.Rc& Form Work 4d 23-Mar-14 26-Mar-14 Form Work
1501 R.F.T 2d 27-Mar-14 29-Mar-14 R.F.T
Pour.Rc Pouring Concrete 1d 30-Mar-14 30-Mar-14 Pouring Concrete
R.Fw.R Remove formwork 1d 01-Apr-14 01-Apr-14 Remove formwork
Ins.Rc& Insulting 1d 02-Apr-14 02-Apr-14 Insulting
Ground Floor 25d 03-Apr-14 03-May-14 03-May-14, Ground Floor
Slab on grade
grad 16d 14-Apr-14 03-May-14 03-May-14, Slab on grade

Actual Work Critical Remaining Work Summary Page 181 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

357
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
FW.SOG. Form Work 4d 14-Apr-14 17-Apr-14 Form Work
R.F.T.SOG R.F.T 3d 19-Apr-14 21-Apr-14 R.F.T
Pour.SOG Pouring Concrete 1d 22-Apr-14 22-Apr-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 03-May-14 03-May-14 Remove formwork
Columns 7d 03-Apr-14 10-Apr-14 10-Apr-14, Columns
FW.Col.G Form Work 2d 03-Apr-14 05-Apr-14 Form Work
R.F.T.Col. R.F.T 2d 06-Apr-14 07-Apr-14 R.F.T
Pour.Col.G Pouring Concrete 1d 08-Apr-14 08-Apr-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 10-Apr-14 10-Apr-14 Remove formwork
First Floor 18d 04-May-14 24-May-14 24-May-14, First Floor
Beams and slab 18d 04-May-14 24-May-14 24-May-14, Beams and slab
FW.B&S.s Form Work 6d 04-May-14 10-May-14 Form Work
R.F.T.B&S R.F.T 3d 11-May-14 13-May-14 R.F.T
Pour.B&S. Pouring Concrete 1d 14-May-14 14-May-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 24-May-14 24-May-14 Remove formwork
Columns 8d 15-May-14 24-May-14 24-May-14, Columns
FW.Col.st. Form Work 3d 15-May-14 18-May-14 Form Work
R.F.T.Col. R.F.T 2d 19-May-14 20-May-14 R.F.T
Pour.Col.s Pouring Concrete 1d 21-May-14 21-May-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 24-May-14 24-May-14 Remove formwork
Roof 18d 25-May-14 14-Jun-14 14-Jun-14, Roof
Beams and slab 18d 25-May-14 14-Jun-14 14-Jun-14, Beams and slab
FW.B&S.n Form Work 6d 25-May-14 31-May-14 Form Work
R.F.T.B&S R.F.T 3d 01-Jun-14 03-Jun-14 R.F.T
Pour.B&S. Pouring Concrete 1d 04-Jun-14 04-Jun-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 14-Jun-14 14-Jun-14 Remove Form Work
Mansonary 22d 25-May-14 18-Jun-14 18-Jun-14, Mansonary
Ground Floor 2d 25-May-14 26-May-14 26-May-14, Ground Floor
I.G..M.v1211 Internal 2d 25-May-14 26-May-14 Internal
E.G.M.v1511 External 2d 25-May-14 26-May-14 External
First Floor 2d 15-Jun-14 16-Jun-14 16-Jun-14, First Floor
I.F.M.v1211 Internal 2d 15-Jun-14 16-Jun-14 Internal
E.F.M.v1211 External 2d 15-Jun-14 16-Jun-14 External
Roof 2d 17-Jun-14 18-Jun-14 18-Jun-14, Roof
E.R.M.v1511 External 2d 17-Jun-14 18-Jun-14 External
Finishing 24d 27-May-14 23-Jun-14 23-Jun-14, Finishing
Ground Floor 2d 27-May-14 28-May-14 28-May-14, Ground Floor
Calm Shell 2d 27-May-14 28-May-14 28-May-14, Calm Shell
E.Ch.G.v1 External 2d 27-May-14 28-May-14 External
External Ele
Electrical 0d
First Floor 2d 17-Jun-14 18-Jun-14 18-Jun-14, First Floor
Calm Shell 2d 17-Jun-14 18-Jun-14 18-Jun-14, Calm Shell
E.ch.st.v15 External 2d 17-Jun-14 18-Jun-14 External
External Ele
Electrical 0d
Roof 1d 19-Jun-14 19-Jun-14 19-Jun-14, Roof
Calm Shell 1d 19-Jun-14 19-Jun-14 19-Jun-14, Calm Shell
E.ch.r.v15 External 1d 19-Jun-14 19-Jun-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 21-Jun-14 23-Jun-14 23-Jun-14, Paint Villa 1
Ex Paint1210 External Painting 3d 21-Jun-14 23-Jun-14 External Painting
Stand alone Villa typ
type 78 239d 15-Dec-13 24-Sep-14 24-Sep-14, Stand alo
A6220 start Villa 0d 15-Dec-13 start Villa
A6230 Finish Villa 0d 24-Sep-14 Finish Villa
Mobilization 1d 17-Dec-13 17-Dec-13 17-Dec-13, Mobilization
M. Sur.v1221 Site Surveying 1d 17-Dec-13 17-Dec-13 Site Surveying
Earth Work 174d 21-Dec-13 12-Jul-14 12-Jul-14, Earth Work
Ex.v1521 Excavation 2d 21-Dec-13 22-Dec-13 Excavation
B.F.v1521 BackFill 2d 10-Jul-14 12-Jul-14 BackFill
Civil Work 76d 15-Jun-14 15-Sep-14 15-Sep-14, Civil Wor
Foundation 15d 15-Jun-14 01-Jul-14 01-Jul-14, Foundation
Footing 15d 15-Jun-14 01-Jul-14 01-Jul-14, Footing
Plain Concrete
Con 5d 15-Jun-14 19-Jun-14 19-Jun-14, Plain Concrete
F.W.Pc Form Work 2d 15-Jun-14 16-Jun-14 Form Work
Pour.Pc Pouring Concrete 1d 17-Jun-14 17-Jun-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 19-Jun-14 19-Jun-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 21-Jun-14 01-Jul-14 01-Jul-14, Reinforced Concr
FW.Rc& Form Work 4d 21-Jun-14 24-Jun-14 Form Work
1511 R.F.T 2d 25-Jun-14 26-Jun-14 R.F.T
Pour.Rc Pouring Concrete 1d 28-Jun-14 28-Jun-14 Pouring Concrete
R.Fw.R Remove formwork 1d 30-Jun-14 30-Jun-14 Remove formwork
Ins.Rc& Insulting 1d 01-Jul-14 01-Jul-14 Insulting
Ground Floor 25d 02-Jul-14 04-Aug-14 04-Aug-14, Ground Floor
Slab on grade
grad 16d 13-Jul-14 04-Aug-14 04-Aug-14, Slab on grade
FW.SOG. Form Work 4d 13-Jul-14 16-Jul-14 Form Work
R.F.T.SOG R.F.T 3d 17-Jul-14 20-Jul-14 R.F.T
Pour.SOG Pouring Concrete 1d 21-Jul-14 21-Jul-14 Pouring Concrete

Actual Work Critical Remaining Work Summary Page 182 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

358
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.FW.SOG Remove formwork 1d 04-Aug-14 04-Aug-14 Remove formwork
Columns 7d 02-Jul-14 09-Jul-14 09-Jul-14, Columns
FW.Col.G Form Work 2d 02-Jul-14 03-Jul-14 Form Work
R.F.T.Col. R.F.T 2d 05-Jul-14 06-Jul-14 R.F.T
Pour.Col.G Pouring Concrete 1d 07-Jul-14 07-Jul-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 09-Jul-14 09-Jul-14 Remove formwork
First Floor 18d 05-Aug-14 25-Aug-14 25-Aug-14, First Floor
Beams and slab 18d 05-Aug-14 25-Aug-14 25-Aug-14, Beams and
FW.B&S.s Form Work 6d 05-Aug-14 11-Aug-14 Form Work
R.F.T.B&S R.F.T 3d 12-Aug-14 14-Aug-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Aug-14 16-Aug-14 Pouring Concrete
R.FW.B&S Remove formwork 1d 25-Aug-14 25-Aug-14 Remove formwork
Columns 8d 17-Aug-14 25-Aug-14 25-Aug-14, Columns
FW.Col.st. Form Work 3d 17-Aug-14 19-Aug-14 Form Work
R.F.T.Col. R.F.T 2d 20-Aug-14 21-Aug-14 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Aug-14 23-Aug-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 25-Aug-14 25-Aug-14 Remove formwork
Roof 18d 26-Aug-14 15-Sep-14 15-Sep-14, Roof
Beams and slab 18d 26-Aug-14 15-Sep-14 15-Sep-14, Beams an
FW.B&S.n Form Work 6d 26-Aug-14 01-Sep-14 Form Work
R.F.T.B&S R.F.T 3d 02-Sep-14 04-Sep-14 R.F.T
Pour.B&S. Pouring Concrete 1d 06-Sep-14 06-Sep-14 Pouring Concrete
R.FW.B&S Remove Form Work 1d 15-Sep-14 15-Sep-14 Remove Form Work
Mansonary 22d 26-Aug-14 20-Sep-14 20-Sep-14, Mansona
Ground Floor 2d 26-Aug-14 27-Aug-14 27-Aug-14, Ground Flo
I.G..M.v1221 Internal 2d 26-Aug-14 27-Aug-14 Internal
E.G.M.v1521 External 2d 26-Aug-14 27-Aug-14 External
First Floor 2d 16-Sep-14 17-Sep-14 17-Sep-14, First Floo
I.F.M.v1221 Internal 2d 16-Sep-14 17-Sep-14 Internal
E.F.M.v1221 External 2d 16-Sep-14 17-Sep-14 External
Roof 2d 18-Sep-14 20-Sep-14 20-Sep-14, Roof
E.R.M.v1521 External 2d 18-Sep-14 20-Sep-14 External
Finishing 24d 28-Aug-14 24-Sep-14 24-Sep-14, Finishing
Ground Floor 2d 28-Aug-14 30-Aug-14 30-Aug-14, Ground Flo
Calm Shell 2d 28-Aug-14 30-Aug-14 30-Aug-14, Calm Shell
E.Ch.G.v1 External 2d 28-Aug-14 30-Aug-14 External
External Ele
Electrical 0d
First Floor 2d 18-Sep-14 20-Sep-14 20-Sep-14, First Floo
Calm Shell 2d 18-Sep-14 20-Sep-14 20-Sep-14, Calm She
E.ch.st.v15 External 2d 18-Sep-14 20-Sep-14 External
External Ele
Electrical 0d
Roof 1d 21-Sep-14 21-Sep-14 21-Sep-14, Roof
Calm Shell 1d 21-Sep-14 21-Sep-14 21-Sep-14, Calm She
E.ch.r.v15 External 1d 21-Sep-14 21-Sep-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 22-Sep-14 24-Sep-14 24-Sep-14, Paint Villa
Ex Paint1220 External Painting 3d 22-Sep-14 24-Sep-14 External Painting
Stand alone Villa typ
type 79 315d 15-Dec-13 25-Dec-14 25-Dec-14, S
A6240 start Villa 0d 15-Dec-13 start Villa
A6250 Finish Villa 0d 25-Dec-14 Finish Villa
Mobilization 1d 18-Dec-13 18-Dec-13 18-Dec-13, Mobilization
M. Sur.v1231 Site Surveying 1d 18-Dec-13 18-Dec-13 Site Surveying
Earth Work 248d 23-Dec-13 16-Oct-14 16-Oct-14, Earth W
Ex.v1531 Excavation 2d 23-Dec-13 24-Dec-13 Excavation
B.F.v1531 BackFill 2d 15-Oct-14 16-Oct-14 BackFill
Civil Work 76d 16-Sep-14 16-Dec-14 16-Dec-14, C
Foundation 15d 16-Sep-14 02-Oct-14 02-Oct-14, Foundat
Footing 15d 16-Sep-14 02-Oct-14 02-Oct-14, Footing
Plain Concrete
Con 5d 16-Sep-14 21-Sep-14 21-Sep-14, Plain Con
F.W.Pc Form Work 2d 16-Sep-14 17-Sep-14 Form Work
Pour.Pc Pouring Concrete 1d 18-Sep-14 18-Sep-14 Pouring Concrete
R.Fw.P Remove Formwork 1d 21-Sep-14 21-Sep-14 Remove Formwork
Reinforced Concrete&Smeles
Reinforce 10d 22-Sep-14 02-Oct-14 02-Oct-14, Reinforc
FW.Rc& Form Work 4d 22-Sep-14 25-Sep-14 Form Work
1521 R.F.T 2d 27-Sep-14 28-Sep-14 R.F.T
Pour.Rc Pouring Concrete 1d 29-Sep-14 29-Sep-14 Pouring Concrete
R.Fw.R Remove formwork 1d 01-Oct-14 01-Oct-14 Remove formwork
Ins.Rc& Insulting 1d 02-Oct-14 02-Oct-14 Insulting
Ground Floor 25d 04-Oct-14 04-Nov-14 04-Nov-14, Grou
Slab on grade
grad 16d 18-Oct-14 04-Nov-14 04-Nov-14, Slab
FW.SOG. Form Work 4d 18-Oct-14 21-Oct-14 Form Work
R.F.T.SOG R.F.T 3d 22-Oct-14 25-Oct-14 R.F.T
Pour.SOG Pouring Concrete 1d 26-Oct-14 26-Oct-14 Pouring Concrete
R.FW.SOG Remove formwork 1d 04-Nov-14 04-Nov-14 Remove formwo
Columns 7d 04-Oct-14 14-Oct-14 14-Oct-14, Column
FW.Col.G Form Work 2d 04-Oct-14 08-Oct-14 Form Work

Actual Work Critical Remaining Work Summary Page 183 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

359
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
R.F.T.Col. R.F.T 2d 09-Oct-14 11-Oct-14 R.F.T
Pour.Col.G Pouring Concrete 1d 12-Oct-14 12-Oct-14 Pouring Concrete
R.FW.Col. Remove formwork 1d 14-Oct-14 14-Oct-14 Remove formwork
First Floor 18d 05-Nov-14 25-Nov-14 25-Nov-14, Firs
Beams and slab 18d 05-Nov-14 25-Nov-14 25-Nov-14, Bea
FW.B&S.s Form Work 6d 05-Nov-14 11-Nov-14 Form Work
R.F.T.B&S R.F.T 3d 12-Nov-14 15-Nov-14 R.F.T
Pour.B&S. Pouring Concrete 1d 16-Nov-14 16-Nov-14 Pouring Concre
R.FW.B&S Remove formwork 1d 25-Nov-14 25-Nov-14 Remove formw
Columns 8d 17-Nov-14 25-Nov-14 25-Nov-14, Co
FW.Col.st. Form Work 3d 17-Nov-14 19-Nov-14 Form Work
R.F.T.Col. R.F.T 2d 20-Nov-14 22-Nov-14 R.F.T
Pour.Col.s Pouring Concrete 1d 23-Nov-14 23-Nov-14 Pouring Concre
R.FW.Col. Remove formwork 1d 25-Nov-14 25-Nov-14 Remove formw
Roof 18d 26-Nov-14 16-Dec-14 16-Dec-14, R
Beams and slab 18d 26-Nov-14 16-Dec-14 16-Dec-14, B
FW.B&S.n Form Work 6d 26-Nov-14 02-Dec-14 Form Work
R.F.T.B&S R.F.T 3d 03-Dec-14 06-Dec-14 R.F.T
Pour.B&S. Pouring Concrete 1d 07-Dec-14 07-Dec-14 Pouring Concr
R.FW.B&S Remove Form Work 1d 16-Dec-14 16-Dec-14 Remove Form
Mansonary 22d 26-Nov-14 21-Dec-14 21-Dec-14, M
Ground Floor 2d 26-Nov-14 27-Nov-14 27-Nov-14, Gr
I.G..M.v1231 Internal 2d 26-Nov-14 27-Nov-14 Internal
E.G.M.v1531 External 2d 26-Nov-14 27-Nov-14 External
First Floor 2d 17-Dec-14 18-Dec-14 18-Dec-14, F
I.F.M.v1231 Internal 2d 17-Dec-14 18-Dec-14 Internal
E.F.M.v1231 External 2d 17-Dec-14 18-Dec-14 External
Roof 2d 20-Dec-14 21-Dec-14 21-Dec-14, R
E.R.M.v1531 External 2d 20-Dec-14 21-Dec-14 External
Finishing 24d 29-Nov-14 25-Dec-14 25-Dec-14, F
Ground Floor 2d 29-Nov-14 30-Nov-14 30-Nov-14, Gr
Calm Shell 2d 29-Nov-14 30-Nov-14 30-Nov-14, Ca
E.Ch.G.v1 External 2d 29-Nov-14 30-Nov-14 External
External Ele
Electrical 0d
First Floor 2d 20-Dec-14 21-Dec-14 21-Dec-14, F
Calm Shell 2d 20-Dec-14 21-Dec-14 21-Dec-14, C
E.ch.st.v15 External 2d 20-Dec-14 21-Dec-14 External
External Ele
Electrical 0d
Roof 1d 22-Dec-14 22-Dec-14 22-Dec-14, R
Calm Shell 1d 22-Dec-14 22-Dec-14 22-Dec-14, C
E.ch.r.v15 External 1d 22-Dec-14 22-Dec-14 External
External Ele
Electrical 0d
Paint Villa 1 3d 23-Dec-14 25-Dec-14 25-Dec-14, P
Ex Paint1230 External Painting 3d 23-Dec-14 25-Dec-14 External Pain
Twin House 6 123d 15-Dec-13 07-May-14 07-May-14, Twin House 6
A6260 Start of twin 0d 15-Dec-13 Start of twin
A6270 Finish of twin 0d 07-May-14 Finish of twin
Mobilization 1d 15-Dec-13 15-Dec-13 15-Dec-13, Mobilization
M.sur.tw170 Site Surveying 1d 15-Dec-13 15-Dec-13 Site Surveying
Earth Work 40d 16-Dec-13 30-Jan-14 30-Jan-14, Earth Work
Ex.tw170 Excavation 3d 16-Dec-13 18-Dec-13 Excavation
B.F.tw170 BackFill 3d 28-Jan-14 30-Jan-14 BackFill
Civil Work 100d 19-Dec-13 14-Apr-14 14-Apr-14, Civil Work
Foundation 25d 19-Dec-13 16-Jan-14 16-Jan-14, Foundation
Footing 25d 19-Dec-13 16-Jan-14 16-Jan-14, Footing
Plain Concrete
Con 8d 19-Dec-13 28-Dec-13 28-Dec-13, Plain Concrete
F.W.Pc Form Work 5d 19-Dec-13 24-Dec-13 Form Work
Pour.Pc Pouring Concrete 1d 25-Dec-13 25-Dec-13 Pouring Concrete
R.Fw.P Remove Formwork 1d 28-Dec-13 28-Dec-13 Remove Formwork
Reinforced Concrete&Semels
Reinforce 17d 29-Dec-13 16-Jan-14 16-Jan-14, Reinforced Concrete&Semels
FW.RC Form Work 5d 29-Dec-13 02-Jan-14 Form Work
R.F.T.R R.F.T 5d 04-Jan-14 08-Jan-14 R.F.T
Pour.RC Pouring Concrete 1d 09-Jan-14 09-Jan-14 Pouring Concrete
R.FW.R Remove Formwork 1d 12-Jan-14 12-Jan-14 Remove Formwork
Ins.RC& Insulting 4d 13-Jan-14 16-Jan-14 Insulting
Ground Floor 34d 18-Jan-14 25-Feb-14 25-Feb-14, Ground Floor
Slab on grade
grad 22d 01-Feb-14 25-Feb-14 25-Feb-14, Slab on grade
FW.SOG. Form Work 6d 01-Feb-14 06-Feb-14 Form Work
R.F.T.SOG R.F.T 7d 08-Feb-14 15-Feb-14 R.F.T
Pour.SOG Pouring Concrete 1d 16-Feb-14 16-Feb-14 Pouring Concrete
R.FW.SOG Remove Formwork 1d 25-Feb-14 25-Feb-14 Remove Formwork
Columns 9d 18-Jan-14 27-Jan-14 27-Jan-14, Columns
FW.Col.G Form Work 3d 18-Jan-14 20-Jan-14 Form Work
R.F.T.Col. R.F.T 3d 21-Jan-14 23-Jan-14 R.F.T
Pour.Col.G Pouring Concrete 1d 25-Jan-14 25-Jan-14 Pouring Concrete
R.FW..Co Remove Formwork 1d 27-Jan-14 27-Jan-14 Remove Formwork

Actual Work Critical Remaining Work Summary Page 184 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

360
Computerized Schedule Chapter 10

Katamia Village Garden Classic WBS Layout 08-Jul-14 16:40

Activity ID Activity Name Original Start Finish 2012 2013 2014 2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
First Floor 21d 26-Feb-14 22-Mar-14 22-Mar-14, First Floor
Beams and Slabs 20d 26-Feb-14 20-Mar-14 20-Mar-14, Beams and Slabs
FW.B&S.s Form Work 5d 26-Feb-14 03-Mar-14 Form Work
R.F.T.B&S R.F.T 6d 04-Mar-14 10-Mar-14 R.F.T
Pour.B&S. Pouring Concrete 1d 11-Mar-14 11-Mar-14 Pouring Concrete
R.FW.B&S Remove Formwork 1d 20-Mar-14 20-Mar-14 Remove Formwork
Columns 9d 12-Mar-14 22-Mar-14 22-Mar-14, Columns
FW.Col.st. Form Work 3d 12-Mar-14 15-Mar-14 Form Work
R.F.T.Col. R.F.T 3d 16-Mar-14 18-Mar-14 R.F.T
Pour.Col.s Pouring Concrete 1d 19-Mar-14 19-Mar-14 Pouring Concrete
R.FW.Col. Remove Formwork 1d 22-Mar-14 22-Mar-14 Remove Formwork
Roof 20d 23-Mar-14 14-Apr-14 14-Apr-14, Roof
Beams and Slabs 20d 23-Mar-14 14-Apr-14 14-Apr-14, Beams and Slabs
FW.B&S.R Form Work 5d 23-Mar-14 27-Mar-14 Form Work
R.F.T.B&S R.F.T 6d 29-Mar-14 03-Apr-14 R.F.T
Pour.B&S. Pouring Concrete 1d 05-Apr-14 05-Apr-14 Pouring Concrete
R.Fw.B&S Remove Formwork 1d 14-Apr-14 14-Apr-14 Remove Formwork
Mansonary 32d 22-Mar-14 27-Apr-14 27-Apr-14, Mansonary
Ground Floor 9d 22-Mar-14 31-Mar-14 31-Mar-14, Ground Floor
I.G.M.tw170 Internal 9d 22-Mar-14 31-Mar-14 Internal
E.G.M. tw170 External 3d 22-Mar-14 24-Mar-14 External
First Floor 9d 15-Apr-14 24-Apr-14 24-Apr-14, First Floor
I .st .M tw170 Internal 9d 15-Apr-14 24-Apr-14 Internal
E.st.M tw170 External 3d 15-Apr-14 17-Apr-14 External
Roof 2d 26-Apr-14 27-Apr-14 27-Apr-14, Roof
E. R. M tw170 External 2d 26-Apr-14 27-Apr-14 External
Finishing 37d 25-Mar-14 07-May-14 07-May-14, Finishing
Ground Floor 2d 25-Mar-14 26-Mar-14 26-Mar-14, Ground Floor
Calm Shell 2d 25-Mar-14 26-Mar-14 26-Mar-14, Calm Shell
E.Ch.G tw External 2d 25-Mar-14 26-Mar-14 External
External Ele
Electrical 0d
First Floor 2d 19-Apr-14 20-Apr-14 20-Apr-14, First Floor
Calm Shell 2d 19-Apr-14 20-Apr-14 20-Apr-14, Calm Shell
E.Ch .st.tw External 2d 19-Apr-14 20-Apr-14 External
External Ele
Electrical 0d
Roof 1d 28-Apr-14 28-Apr-14 28-Apr-14, Roof
Calm Shell 1d 28-Apr-14 28-Apr-14 28-Apr-14, Calm Shell
E.Ch .r.tw External 1d 28-Apr-14 28-Apr-14 External
External Ele
Electrical 0d
Paint Twin House
Hou 7d 29-Apr-14 07-May-14 07-May-14, Paint Twin House
Ex Paint twin External Painting 7d 29-Apr-14 07-May-14 External Painting

Actual Work Critical Remaining Work Summary Page 185 of 185 TASK filter: All Activities

Remaining Work Milestone © Primavera Systems, Inc.

361
362
Backfill
30000Cu M
Resource Profile

24000Cu M

18000Cu M

363
12000Cu M

6000Cu M

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Truck
1250d
Resource Profile

1000d

750d

364
500d

250d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Truck Mix
125d
Resource Profile

100d

75d

365
50d

25d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Total Station
56d
Resource Profile

45d

34d

366
23d

11d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Surveyor
56d
Resource Profile

45d

34d

367
23d

11d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Steel Worker
2500d
Resource Profile

2000d

1500d

368
1000d

500d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Backfill
30000Cu M
Resource Profile

24000Cu M

18000Cu M

369
12000Cu M

6000Cu M

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Truck
1250d
Resource Profile

1000d

750d

370
500d

250d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Truck Mix
125d
Resource Profile

100d

75d

371
50d

25d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Total Station
56d
Resource Profile

45d

34d

372
23d

11d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Surveyor
56d
Resource Profile

45d

34d

373
23d

11d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Steel Worker
2500d
Resource Profile

2000d

1500d

374
1000d

500d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Steel Bars
1000Ton
Resource Profile

800Ton

600Ton

375
400Ton

200Ton

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Pump
125d
Resource Profile

100d

75d

376
50d

25d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Painting
25000M2
Resource Profile

20000M2

15000M2

377
10000M2

5000M2

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Painter
1250d
Resource Profile

1000d

750d

378
500d

250d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Mawan
500d
Resource Profile

400d

300d

379
200d

100d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Masonary Internal
10000Sq M
Resource Profile

8000Sq M

6000Sq M

380
4000Sq M

2000Sq M

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Masonary External
3000Cu M
Resource Profile

2400Cu M

1800Cu M

381
1200Cu M

600Cu M

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Marble Worker
188d
Resource Profile

150d

113d

382
75d

38d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Marble Stairs
1500Unit
Resource Profile

1200Unit

900Unit

383
600Unit

300Unit

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Marble Entrance
1000Sq M
Resource Profile

800Sq M

600Sq M

384
400Sq M

200Sq M

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Loader
44d
Resource Profile

35d

26d

385
18d

9d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Insultion
10000Sq M
Resource Profile

8000Sq M

6000Sq M

386
4000Sq M

2000Sq M

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Helper
5625d
Resource Profile

4500d

3375d

387
2250d

1125d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Excavator
375d
Resource Profile

300d

225d

388
150d

75d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Crane
188d
Resource Profile

150d

113d

389
75d

38d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Concrete
10000Cu M
Resource Profile

8000Cu M

6000Cu M

390
4000Cu M

2000Cu M

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Concrete Painter
500d
Resource Profile

400d

300d

391
200d

100d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Carpenter
3125d
Resource Profile

2500d

1875d

392
1250d

625d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


Builder
500d
Resource Profile

400d

300d

393
200d

100d

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan eb
Chapter 11

2012 2013 2014 2015


394
Cash Flow , S-curve Chapter 12

Advanced Payment = 5 Retation = 10%


contract Price=1.3*Total direct cost %
400960105 20048005.25 4009601.05

Month Direct Cost Indirect cost Total cost Cumm. Total Cost Invoice without retantion Invoice with retation& Advance payment

Oct-11 0 0

Nov-11 4,566,202 456620.2 5,022,822 5,022,822 5936062.6 5045653.21

Dec-11 7,115,831 711583.1 7,827,414 12,850,236 9250580.3 7862993.255

Jan-12 8,320,563 832056.3 9,152,619 22,002,856 10816731.9 9194222.115

Feb-12 13,321,340 1332134 14,653,474 36,656,330 17317742 14720080.7

Mar-12 9,897,241 989724.1 10,886,965 47,543,295 12866413.3 10936451.31

Apr-12 13,257,403 1325740.3 14,583,143 62,126,438 17234623.9 14649430.32

May-12 12,869,306 1286930.6 14,156,237 76,282,675 16730097.8 14220583.13

Jun-12 5,782,272 578227.2 6,360,499 82,643,174 7516953.6 6389410.56

Jul-12 8,836,389 883638.9 9,720,028 92,363,202 11487305.7 9764209.845

Aug-12 7,827,208 782720.8 8,609,929 100,973,131 10175370.4 8649064.84

Sep-12 10,072,318 1007231.8 11,079,550 112,052,680 13094013.4 11129911.39

Oct-12 11,958,864 1195886.4 13,154,750 125,207,431 15546523.2 13214544.72

Nov-12 11,030,000 1103000 12,133,000 137,340,431 14339000 12188150

Dec-12 7,657,570 765757 8,423,327 145,763,758 9954841 8461614.85

Jan-13 6,972,854 697285.4 7,670,139 153,433,897 9064710.2 7705003.67

Feb-13 9,907,288 990728.8 10,898,017 164,331,914 12879474.4 10947553.24

Mar-13 10,648,666 1064866.6 11,713,533 176,045,447 13843265.8 11766775.93

Apr-13 9,775,936 977593.6 10,753,530 186,798,976 12708716.8 10802409.28

May-13 12,184,372 1218437.2 13,402,809 200,201,785 15839683.6 13463731.06

Jun-13 11,709,756 1170975.6 12,880,732 213,082,517 15222682.8 12939280.38

Jul-13 4,689,191 468919.1 5,158,110 218,240,627 6095948.3 5181556.055

Aug-13 8,310,551 831055.1 9,141,606 227,382,233 10803716.3 9183158.855

Sep-13 10,461,768 1046176.8 11,507,945 238,890,178 13600298.4 11560253.64

Oct-13 9,619,084 961908.4 10,580,992 249,471,170 12504809.2 10629087.82

Nov-13 10,634,508 1063450.8 11,697,959 261,169,129 13824860.4 11751131.34

Dec-13 11,770,388 1177038.8 12,947,427 274,116,556 15301504.4 13006278.74

Jan-14 7,660,410 766041 8,426,451 282,543,007 9958533 8464753.05

Feb-14 3,022,730 302273 3,325,003 285,868,010 3929549 3340116.65

Mar-14 6,145,394 614539.4 6,759,933 292,627,943 7989012.2 6790660.37

Apr-14 4,723,376 472337.6 5,195,714 297,823,657 6140388.8 5219330.48

May-14 4,718,064 471806.4 5,189,870 303,013,527 6133483.2 5213460.72

Jun-14 6,031,890 603189 6,635,079 309,648,606 7841457 6665238.45

Jul-14 4,809,132 480913.2 5,290,045 314,938,652 6251871.6 5314090.86

Aug-14 2,358,786 235878.6 2,594,665 317,533,316 3066421.8 2606458.53

Sep-14 4,274,272 427427.2 4,701,699 322,235,015 5556553.6 4723070.56

Oct-14 2,839,442 283944.2 3,123,386 325,358,402 3691274.6 3137583.41

Nov-14 4,093,948 409394.8 4,503,343 329,861,744 5322132.4 4523812.54

Dec-14 4,086,728 408672.8 4,495,401 334,357,145 5312746.4 4515834.44

Jan-15 3,801,584 380158.4 4,181,742 338,538,888 4942059.2 4200750.32

Feb-15 668,224 66822.4 735,046 339,273,934 868691.2 738387.52

Mar-15 0 0

Apr-15

May-15

Total 308,430,850 30843085 339,273,935

395
Cash Flow , S-curve Chapter 12

Cash Inflow cumm. Cash Inflow cash outflow cumm. Cash outflow Overdraft
20048005.25 20048005.25 0 0 20048005.25
20048005.25 5,022,822 5,022,822 15025183.05
20048005.25 7,827,414 12,850,236 7197768.95
5045653.21 25093658.46 9,152,619 22,002,856 3090802.86
7862993.255 32956651.72 14,653,474 36,656,330 -3699677.885
9194222.115 42150873.83 10,886,965 47,543,295 -5392420.87
14720080.7 56870954.53 14,583,143 62,126,438 -5255483.47
10936451.31 67807405.84 14,156,237 76,282,675 -8475268.765
14649430.32 82456836.15 6,360,499 82,643,174 -186337.65
14220583.13 96677419.28 9,720,028 92,363,202 4314217.58
6389410.56 103066829.8 8,609,929 100,973,131 2093699.34
9764209.845 112831039.7 11,079,550 112,052,680 778359.385
8649064.84 121480104.5 13,154,750 125,207,431 -3727326.175
11129911.39 132610015.9 12,133,000 137,340,431 -4730414.785
13214544.72 145824560.6 8,423,327 145,763,758 60802.935
12188150 158012710.6 7,670,139 153,433,897 4578813.535
8461614.85 166474325.5 10,898,017 164,331,914 2142411.585
7705003.67 174179329.2 11,713,533 176,045,447 -1866117.345
10947553.24 185126882.4 10,753,530 186,798,976 -1672093.705
11766775.93 196893658.3 13,402,809 200,201,785 -3308126.975
10802409.28 207696067.6 12,880,732 213,082,517 -5386449.295
13463731.06 221159798.7 5,158,110 218,240,627 2919171.665
12939280.38 234099079 9,141,606 227,382,233 6716845.945
5181556.055 239280635.1 11,507,945 238,890,178 390457.2
9183158.855 248463794 10,580,992 249,471,170 -1007376.345
11560253.64 260024047.6 11,697,959 261,169,129 -1145081.505
10629087.82 270653135.4 12,947,427 274,116,556 -3463420.485
11751131.34 282404266.8 8,426,451 282,543,007 -138740.145
13006278.74 295410545.5 3,325,003 285,868,010 9542535.595
8464753.05 303875298.5 6,759,933 292,627,943 11247355.25
3340116.65 307215415.2 5,195,714 297,823,657 9391758.295
6790660.37 314006075.6 5,189,870 303,013,527 10992548.27
5219330.48 319225406 6,635,079 309,648,606 9576799.745
5213460.72 324438866.8 5,290,045 314,938,652 9500215.265
6665238.45 331104105.2 2,594,665 317,533,316 13570789.12
5314090.86 336418196.1 4,701,699 322,235,015 14183180.78
2606458.53 339024654.6 3,123,386 325,358,402 13666253.11
4723070.56 343747725.2 4,503,343 329,861,744 13885980.87
3137583.41 346885308.6 4,495,401 334,357,145 12528163.48
4523812.54 351409121.1 4,181,742 338,538,888 12870233.62
4515834.44 355924955.6 735,046 339,273,934 16651021.66
4200750.32 360125705.9 0 339,273,934 20851771.98
738387.52 360864093.4 0 339,273,934 21590159.5
0 360864093.4 0 339,273,934 21590159.5
400960103.9

396
397
100000000
150000000

-50000000
50000000

0
200000000
250000000
300000000
350000000
400000000

Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13
Jul-13
Aug-13
Sep-13
Oct-13
Nov-13
Dec-13
Jan-14
Feb-14
Mar-14
Apr-14
May-14
Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15

Inflow

outflow

Overdraft
cumm. Cash
cumm. Cash
Chapter 12 Cash Flow , S-curve
Cash Flow , S-curve Chapter 12

Month Direct Cost Cum.Direct cost


Oct-11 0
Nov-11 4,566,202 4,566,202
Dec-11 7,115,831 11,682,033
Jan-12 8,320,563 20,002,596
Feb-12 13,321,340 33,323,936
Mar-12 9,897,241 43,221,177
Apr-12 13,257,403 56,478,580
May-12 12,869,306 69,347,886
Jun-12 5,782,272 75,130,158
Jul-12 8,836,389 83,966,547
Aug-12 7,827,208 91,793,755
Sep-12 10,072,318 101,866,073
Oct-12 11,958,864 113,824,937
Nov-12 11,030,000 124,854,937
Dec-12 7,657,570 132,512,507
Jan-13 6,972,854 139,485,361
Feb-13 9,907,288 149,392,649
Mar-13 10,648,666 160,041,315
Apr-13 9,775,936 169,817,251
May-13 12,184,372 182,001,623
Jun-13 11,709,756 193,711,379
Jul-13 4,689,191 198,400,570
Aug-13 8,310,551 206,711,121
Sep-13 10,461,768 217,172,889
Oct-13 9,619,084 226,791,973
Nov-13 10,634,508 237,426,481
Dec-13 11,770,388 249,196,869
Jan-14 7,660,410 256,857,279
Feb-14 3,022,730 259,880,009
Mar-14 6,145,394 266,025,403
Apr-14 4,723,376 270,748,779
May-14 4,718,064 275,466,843
Jun-14 6,031,890 281,498,733
Jul-14 4,809,132 286,307,865
Aug-14 2,358,786 288,666,651
Sep-14 4,274,272 292,940,923
Oct-14 2,839,442 295,780,365
Nov-14 4,093,948 299,874,313
Dec-14 4,086,728 303,961,041
Jan-15 3,801,584 307,762,625
Feb-15 668,224 308,430,849
Mar-15
Apr-15
May-15
Total 308,430,850

398
350000000
Cum.Direct cost

300000000
Cash Flow , S-curve

250000000

200000000

399
150000000

Cum.Direct cost

100000000

50000000

0
Chapter 12
400
Quality Managment Chapter 13

Project Quality Management

Project Quality Management includes the processes required to ensure the


project satisfaction of the needs for which it was undertaken. It includes all the
activities of the overall management function that determine the quality policy
and responsibilities and implements them by means such as quality planning ,
control assurance and improvement .

Project quality management should address both the procedures and the final
product of the project , failure in meeting quality requirements in either
dimension can have negative consequences for any or all of the porject's
stakeholders.

Types of Quality Management:

Quality Planning:

Quality Planning involves identifying which quality standards are relevant to the
project and determining how to satisfy them. It is one of the most important
processes in the during project planning and should be performed regularly and in
parallel with other planning processes.

401
Quality Managment Chapter 13

Quality Assurance:

the quality system. It involves evaluating overall project performance on a regular


basis to provide confidence that the project will satisfy the relevant quality
standards.

Quality assurance is often provided by a Quality Assurance Dept. or similarly titled


organizational unit.

Quality Control:

Quality control involves monitoring specific project results to determine if they


comply with relevant quality standards and identifying ways to eliminate causes
of unsatisfactory performance.

Project results include both product results such as deliverables and management
results such as cost and schedule performance.

Quality Policy:

Quality policy is the overall intentions and direction of an organization with


regard to quality , as formally expressed by top management.

402
Quality Managment Chapter 13

Quality Improvement:

Quality improvement includes taking action to increase the effectiveness and the
efficiency of the project to provide added benefits to the project stakeholders.

Quality Management Plan:

The quality management plan should describe how the project management
team will implement its quality policy .It should describe the project quality
system which are : " Organizational structure , responsibilities, procedures,
processes, and resources needed to implement quality management.

403
Quality Managment Chapter 13

Authorities and Responsibilities

Authorities:

The Quality Management organization performing quality control and quality


assurance functions shall have sufficient authority and organizational freedom to
identify quality problems and to initiate, recommend , provide and verify
implementation of the solution.

Responsibilities :

Quality Management Organization should be responsible for performing the


following tasks :

 Continuous daily inspection.


 Conduct phased inspections on daily basis.
 Perform all testing required under the technical provisions of the
specifications.
 Prepare daily Quality Control (QC) reports as required in contract.
 Review, Approve and submit all shop drawings, brochures and samples as
required for approval by the Design Consultant.
 Inspect materials as they are delivered to site to ensure compliance with
approved shop drawings and contract requirements.

404
Quality Managment Chapter 13

 Conduct off-site inspection of supplies and materials to be incorporated


into the work.

 Maintain records of all QC activities and submit to the project manager


regularly on established intervals.

The following is a summary of the responsibilities of each member


participating in the project:

Contractor's Responsibilities:

 The contractor is solely responsible for achieving project quality and shall
have overall responsibility for the quality of all construction work.

 The contractor shall conduct quality management activities which include


inspection, materials testing and other activities specifically developed and
chosen by the contractor.

Owner's Responsibilities:

 Oversight of the contractor's quality management activities to ensure


adherence to the construction quality control (CQC) plan and compliance
with the contract documents.

 Notifying the contractor promptly of irregularities or deficiencies observed


in the work.

405
Quality Managment Chapter 13

 Oversight of the contractor's construction management including


scheduling, invoicing, shop drawings review ,etc .

The Project Manager:

 Responsible for overall site performance.


 Review of the tender documents and contract.
 Contact with the client.
 Responsible for quality site work force.
 Responsible for coordination with sub-contractors.
 Document control.
 Approves Quality Control/Quality Plan.

The Quality Manager:

 Responsible for preparing and implementing the Quality Plan.


 Preparation Quality procedures, test plans and inspection sheets.
 Audit and maintain Quality system integrity.
 Quality documents and data control.

406
Quality Managment Chapter 13

Quality Assurance Engineer:

 Responsible for reviewing applicable plans and specifications.


 Responsible for reviewing the CQA plan.
 Responsible for reviewing approved changes to the plans and
specifications.

 Responsible for reviewing and recommending approval or disapproval of


site specific documentation, including contractor submittals,
manufacturer's information and referenced standards.

 Verify that construction is performed in accordance with the plans and


specifications. Inspectors shall be assigned to every major construction
activity being performed and a minimum of one CQA engineer shall be on-
site at all times.

 Attend required meetings.


 Assign CQA inspection personnel to observe all activities requiring
monitoring.

Quality Control Engineer:

 Confirm that QCA tests are properly performed ,recorded and the results
meet specified requirements.

 Operating lab tests and measurements.


 Take Samples.
 Provide testing results

407
Quality Managment Chapter 13

How to Assure Quality:

In order to maintain construction quality:

Field Office:

 During construction temporary jobsite offices will be setup for the field
office. It will have the full support of the home office technical design staff.

 The project designers should be used as much as possible as field


inspectors.

 The home office support will be ready to prepare any major field change
orders.

 The services of the field office will also include the inspection of
construction , documentation of the daily progress of the construction and
the preparation of the periodic field reports for distribution to the owner
consultant, the contractor and the home office.

408
Quality Managment Chapter 13

Preconstruction Meeting:

 Before the start of construction the contractor shall meet with


owner's consultant or his representative in a pre construction
meeting.
 The topic of the pre-construction meeting shall be the
contractor's proposed quality management system.
 During the meeting a mutual understanding of the system details
shall be developed , including the forms for recording the
contractor quality control operations, control activities, offside
work, and the contractor's quality control program.
 Results of the meeting shall be prepared and signed by both the
construction manager and the owner's consultant
 Those results shall be included as a part of the contract files.
 Additional conferences may be called at any time to reconfirm
mutual understandings.

409
Quality Managment Chapter 13

Construction Monitor:

 During construction the QCD will appoint a Construction Monitor


(CM) to keep a daily project log, and to be at the field office on
jobsite everyday to observe construction operations and reports
directly to the QCD.

Weekly Construction Report:

 The CM will generate a weekly report that will describe the construction
progress to the previous week, the results of any material testing and any
unusual occurrences.

Contractor's project schedule:

 The CM will monitor the progress schedule on a weekly basis and determine
the adherence to the project schedule

 QCD personnel are familiar with several CPM software programs and
sometimes create CPM programs for delivery to the contractor as a starting
point for scheduling the work of the contract.

 Architects and engineers are construction oriented and have a good opinion
of the time required for various construction operations.

410
Quality Managment Chapter 13

Material testing :

 Material shall be stored at a clean place faraway from any damage source.
 All materials shall be handled in a safe manner to prevent damage, misuse
or deterioration.

 All handling shall be as recommended by the manufacturer or supplier or in


accordance with accepted procedures of practice.

 To ensure proper handling , suitable equipment shall be provided and


operated by personnel who are trained , competent and licensed.

Sample testing

 The QCD would be responsible for taking concrete and other construction
material samples for testing.

 Local labs will be utilized or any of the project's material consultant will
perform these tests.

Photographs:

 Digital photographs will be taken during all constructions phases.


 QCD will deliver these photographs as a soft copy to the clients for future
reference

 These photographs will fully indicate all concealed utilities and construction
features ,and will minimize demolition required for solutions to future
maintenance problems.

411
Quality Managment Chapter 13

Labor:

 The QCD will be responsible for the labor performance to ensure


accomplishment of tasks meeting the required quality.
 The QCD will prepare qualification training for the new labors and direct
them to the suitable job.
 The QCD will regularly check on the labor that uses machines or equipment
to increase their performance and teach them new techniques.
 The QCD will be responsible for producing monthly reports about labor
productivity.

Equipment:

 The QCD will apply periodic maintenance for all equipments.


 The QCD will periodically check on lifting equipments to prevent any
damage.

 The QCD will employ well experienced operators.

Documentation:

The Contractor shall maintain:

 Daily records of quality control operations.


 Activities and tests performed.
 The work of suppliers and contractors.

412
Quality Managment Chapter 13

These records will be including:

 Type and number of activities and tests involved.


 Results of control activities or tests.
 Proposed remedial action.
 Description of trades working on the project , number of personnel working
and the weather conditions encountered.

Home Support office:

 QCD will have actual designers involved to check the shop drawings and to
be available for consultation.

 Designers will perform on-site inspections and prepare written reports


documenting the progress of construction and any deficiencies that need to
be corrected.

 Any contractor's questions are required to be documented through a RFI


(Request For Information) process.

 The original designers are assigned to reply to those questions presented


through that RFI process.

413
Quality Managment Chapter 13

General Work Conditions

 All tests and experiments shall be performed in a certified laboratory ,the


lab must be having trained labor and equipments essential for these tests.
 Experiments shall be performed under supervision of the engineer.
 Quality control Engineer should inspect the delivered materials to the site to
ensure that they meet the quality specifications of the required materials.
 An approved quality control representative shall be on the job at all times
and maintain continuous inspections during the critical phases of the work.
 The Quality Control Plan shall be adhered to and remain in effect until the
work has been substantially completed with phased inspections which
should function as follows:
1. Preparatory Inspections: Before starting any of the work
segments Drawings ,specs. ,materials , existing conditions and
controls shall be checked.
2. Initial Inspection: Results shall be checked as the initial work
segments have been completed.
3. Follow-up Inspection: Inspections that shall be performed
frequently as required to ensure continued compliance to specified
requirements.
4. Final Inspection: Inspection that should be carried out to correct
any deficient works before requesting formal inspection from
Supervision Consultants.

414
Quality Managment Chapter 13

Specific Work Conditions

Earth Works Package:

All Earthwork activities including Excavation and Backfill with clean soil
shall be performed according to:

 Specifications assigned by the owner' consultant.


 Site Engineer's instructions
 All works must be performed within limits and requirements of the
(Egyptian Code of Soil Mechanics & Foundations )

Concrete Works Package:

the contractor has to install the utilities passing through concrete before casting

the contractor must obtain:

1- the engineer's written approval on all steps taken for casting , including the
used materials in concrete , transportation work , casting , formwork , curing and
tests and this approval doesn't affect the contractor's full responsibility

2-the instructions of the Egyptian code for designing and execution of reinforced
concrete structures must be followed , in addition to the special conditions
mentioned

415
Quality Managment Chapter 13

Materials:

1-Cement:

 the contractor must supply the engineer with a report about the used
cement including its type, source and a certification with its components
and properties
 tests must be carried out to prove it's suitability for work before execution .
 the cement must be delivered in the original closed bags, and it must be
well stored on an elevated wooden floor to protect it from humidity rain
 the site must be provided with the required amount of cement to continue
work without stoppage and assure the continuity of work

2-Aggregates :

 The contractor must supply the engineer with a sufficient report about the
coarse and fine aggregates that he intends to use . This report clarified the
source ,(type and available dimensions.)
 The contractor must supply the engineer with aggregate samples the work
starts, so that the samples' volume is not less than 2m3 to apply the
required tests on it
 It is not allowed to supply or use any type of aggregates before performing
the required tests and taking the engineer's written approval on using it,
and this approval doesn't affect the contractor's full responsibility.

416
Quality Managment Chapter 13

 The major nominal dimensions for aggregates must not :

1-exceed 1/5 the smallest distance between the forms' sides or slab' depth

2- 1/3 the clear distance between reinforcing bars

Aggregates grading must allow the production of concrete with high workability,
so that it could be casted in its positions without segregation and without
increasing its water content

The contractor must carry out the required tests to check the suitability of
aggregates for concrete and its correspondence to the specifications

The tests are done under the supervision of the engineer and according to the
mentioned rate (quality control ) and it must be taken into consideration
especially that the percentage of chlorides represented in the form of ionic
chloride as a percentage of aggregates with doesn't exceed :

 0.04 % for large aggregates


 0.06%for small aggregates

.The sulphur content doesn't exceed

 0.4 for large and small aggregates

417
Quality Managment Chapter 13

3-water:

The water used in mixing and curing must be from a source suitable for drinking
and clear of harmful materials like oils, acids, alkalis ,salts, and organic material

The engineer has the right to ask for chemical analysis considering that the
percentage of salts doesn't exceed the maximum for salt content and harmful
materials in mixing water clarified in section 2-4-1 in the Egyptian code.

4-Admixtures:

 the engineer's approval must be taken on any type of admixtures before


using it
 Used admixtures must correspond to one of the international specifications
and must not affect the fundamental concrete properties .
 The instructions of the factories must be followed for using the required
admixtures , in addition to performing the required experiments to chech
its suitability and effect under the engineer's supervision

5-Reinforced Steel:

 The reinforced steel used for one part of the structure must be from one
resource, and if it's not possible , the each amount of reinforcing steel must
be accompanied by a certified test certificate.
 The reinforcing steel must be clean and clear of oils, separate rust, and
harmful materials and all precautions must be taken to prevent it rust and
corrosion, therefore it must be well stored away from humidity sources.

418
Quality Managment Chapter 13

 reinforcing steel must not be delivered to site before doing the required
experiments and submitting factory's certificate with all mechanical and
chemical properties.

Mixing and transportation:

 The scale used in weighing concrete contents must be accurate to 0.4% of


its total load value and it must be examined before work by standard
methods .
 All precautions should be taken to prevent the component of any mixture
to enter the mixer before the previous component is completely out of it .
 the mixing time for mixtures with volume 1m3 should not be less than two
minutes and the engineer's approval on the mixing time should be taken
 A percentage of water should be added to the mixture before adding
cement and aggregates , such that adding water should continue to 1\4 of
the mixing time , and all contents should be mixed in the remaining 3\4 of
mixing time .
 the mixer must be clean and clear of impurities ,and the mixer fans must be
replaced when the percentage of decrease in its edges reaches 10% of the
original dimensions .
 The concrete must transported from mixer to the casting site, such that not
segregation or reduction in the water percentage occur and generally the
time between adding water to the components and final casting must not
exceed twenty minutes .

419
Quality Managment Chapter 13

Fixing Reinforcement Steel:

 The contractor must supply the engineer before work begins with 3 copies
of detailed lists of reinforcing steel clarifying the shape of bars , their length
,diameter , number and weights.
 Reinforcement steel must be clear of oils , impurities and rust that might
reduce the bonds between steel and concrete.
 Reinforcement steel must be fixed that it doesn't move during casting or
due to any other loads.
 Formation of reinforcing steel and joints must fulfill the Egyptian
Specifications of Reinforced Concrete structures

Curing:

 Concrete must be kept without losing its water in a relatively constant


temperature for the time required for its setting.
 Concrete must be cured for 10 days and this period can be reduced if flash
setting cement is used.

420
Quality Managment Chapter 13

Testing Program
An independent laboratory should be dealt with to perform the required on and
off-site tests.

Test reports will include specification requirements ,test data and a statement of
recommended corrective action should the test fail to meet specified criteria.

Tests and inspection reports should include the date and the time of the activity
,its exact location and other pertained information.

All tests and inspection reports prepared by the testing laboratory should be
submitted along with daily reports.

The following are some examples of the tests that should be


performed:

 Field Determination of Maximum Dry Density & soil's OMC using one point
Procter method
 Compressibility Test.
 Particle grading tests for aggregates , relative weight and impurities every
40 m³ for fine soils and 75 m³ for coarse soils.
 Cement tests according to specifications including initial and final setting ,
resistance and softness.
 Reinforcing steel tests according to the specifications including tension ,
cold bending and chemical analysis.

421
422
Safety Plan Chapter 14

Introduction

This manual is intended to serve as the basis for an employer integrated safety
and health management program. Implementation of this safety program
satisfies the requirements of the division of safety, The essential elements of this
program include:

 Top management's commitment and involvement.


 The establishment and operation of safety committees.
 Provisions for safety and health training.
 First aid procedures.
 Accident investigation.
 Record keeping of injuries.
 Workplace safety rules.

This manual should be continuously improved by the employer. Any section of


this manual can be modified to accommodate actual operations and work
practices , provided that the original intent of that section is not lost.

423
Safety Plan Chapter 14

Benefits of Safety Planning

 Reduced expenses related to injuries and illnesses.


 Improve Workers attendance.
 Decrease employees complaints.
 Improve employee's morale .
 Reduced insurance costs.

Health, Safety and Environmental Policy(HSE).

It is the policy to take all possible steps to ensure the health and safety of all
employees and other persons engaged in work for the organization and any third
parties who come in contact with the business.

It is the duty of each employee to comply with the safety policy and to cooperate
with the management of the company to ensure that the work place remains as
safe as possible.

If any person is unsure of the safety of anything they must assume that it is
unsafe until further guidance has been given by their manager of by the safety
manager.

The managing Director of the organization is fully responsible of maintaining safe


systems of work and fully recognize their overall responsibility for safety in the
workplace.

424
Safety Plan Chapter 14

Safety Control

1. Engineering Controls:

Where feasible and appropriate the first and best strategy is to control hazard at
its source. Engineering controls unlike other controls which are generally focused
on the employee exposed to the hazard rather than its origin.

Working Environment and the job itself should be designed to eliminate hazards
or at least reduce them.

2. Administrative Controls:

It includes exercise breaks and rotation of workers .These types of controls are
usually used in conjunction with other controls.

425
Safety Plan Chapter 14

Responsibilities

Project Superintendents:

 Shall enforce compliance with project safety program specific standards


and all other State and local safety codes and regulations.
 Shall assist all contractor and their subcontractors in pre-planning their
operations to prevent personal injury and property damage.
 Shall monitor and expedite activities related to the monthly safety
meetings minutes and reporting functions.
 Shall issue safety bulletins pertinent to the project as often as it is
necessary.
 Shall receive all safety related correspondence and copies of all accident
reports.
 Shall regularly inspect the project for safety compliance.
 Shall approve the contractor safety coordinators who will assist the
contractor or subcontractors.

Contractor Safety Coordinators:

 Shall make a minimum of one complete project safety inspection per week
with a written report to the responsible Project Superintendents.
 Shall implement immediate corrective action regarding non-compliance
with project safety program and/or state and local codes and regulations.

426
Safety Plan Chapter 14

 Shall check with contractor and sub-contractor safety representatives on


disposition of safety related matters.
 Shall render assistance at contractor and subcontractor Tool box Talks if
requested.
 Shall investigate all accidents per superintendent instructions.
 Shall distribute and post all safety meeting minutes, safety bulletins and
other safety related items.

 Contractor/Sub-contractor's Safety Representatives :


 Shall foster safety awareness in all employees.
 Shall attend monthly Project Safety Meetings.
 Shall chair as necessary tool box talks with a written report and copies to
the respective safety coordinator.
 Shall advise and direct employees to perform their activities in safe manner
and increase the ability to recognize dangers and other hazards.
 Shall report safety related matters to Project Superintendents and
respective coordinator.

Other Staff members and Employees:

 Shall follow safety precautions to prevent accidents happening to their


fellow workers or themselves.
 Shall attend Tool Box Talks.
 Shall alert their foremen of hazards and unsafe acts.

427
Safety Plan Chapter 14

Crane operations responsibilities:

Many parties are involved in crane operations and they share different
responsibilities considering the safety of these operations and they include:

 Crane Manufacturers:

They must design the crane such that it will be capable of being safely operated
by an adequately trained crane operator that meet all applicable safety and
design standards, that are easily maintained and that address typical human
factors .Manufacturers should also actively monitor the field performance of their
cranes and it's spare parts.

 Crane Operators:

They have the most direct influence on how safely cranes are operated .it's their
responsibility to operate the crane in a professional way such that it isn't
operated in any way that could compromise mechanical integrity of the crane.

also the contractor and sub-contractor need to have effective crane safety
inspections and notify crane manufacturers if needed.

428
Safety Plan Chapter 14

Safety Instructions for Employees:

When workers are first employed they shall be given instructions regarding the
hazards and safety precautions applicable to the type of work and directed to
read the Code Of Safety Practices.

The employer shall permit only qualified persons to operate equipment and
machinery.

Employee Safety Rights:

Employees have several important rights concerning safety , which are protected
by local laws which are :

 The right to a safe work place free from recognized hazards.


 The right to request information on safety and health hazards in the
workplace , precautions that maybe taken and procedures to be followed if
an employee is injured.
 The right to know about the hazards associated with chemicals at
workplace and the safety procedures to be taken to protect the employee
from those hazards.

429
Safety Plan Chapter 14

Information and Training:

Workers should be adequately and suitably :

 Informed of potential safety and health hazards to which they may be


exposed at their workplace.
 Instructed and trained in the measures available for prevention and control
and protection against those hazards.

Training:

Training is intended to reduce or eliminate the possibility of human factors


related failures and to involve personnel in the selection and use of safety
devices. Employees should receive formal classroom training from qualified and
competent instructors to insure sufficient knowledge of specific activities.

 Training for Safety:

Safety officer must be qualified to have certain certificate of safety from an


authorized institute.

 Training for firefighting:

All safety labors should be trained and have certificate of firefighting from civil
defense organization.

430
Safety Plan Chapter 14

Safety Precautions:

 Contractor and subcontractors should ensure that all of their employees


are fully aware of the site layout and approved routs to and from work-site.
 Contractor Shall notify the details of key persons to be contacted in case of
emergency. such details should include site and home telephone numbers
and other information.
 Contractor must finalize and agree upon with the Supervision Consultant
for the location of temporary site office, material storage lay-down area
and the connecting routes.
 Contractor must store separately the inflammable materials away from
other materials. All high pressure cylinders such as oxygen and acetylene
should be stored upright and away from any inflammable materials.
 Contractor must provide proper sanitary toilets , washing area, clean cool
drinking water and shaded rest area for workers.
 Contractor shall take all feasible precautions to avoid damage to the
existing services such as power lines , sanitary lines and water lines during
mobilization of temporary site office and other site facilities.
 Contractor must ensure that all works are carried out under experienced
and qualified supervision of the site which will be aware of all safety
measures to be implemented and the responsibilities of the work site
emergency.
 Safety officer should coordinate on daily basis with the site foreman on
safety issues and attend safety meetings.

431
Safety Plan Chapter 14

 Safety Officer should perform weekly formal inspections with written


reports to the site foreman and contractor.
 Subcontractor should understand and comply to all site safety rules and
regulations.
 Protective equipment will be provided for specific job for workers which
will include but not limited to:

-Appropriate eye protection.

-Dust mask/ respirator

-Hard Hats

-Safety belts

-Safety boots.

-Gloves and welding approns.

Protective Equipments.

432
Safety Plan Chapter 14

For Vehicles safety measures:

 All lifting operations will be carried out in a safe manner by experienced


and trained personnel.
 No lifting operations are carried out adjacent to building, services , roads
unless the crane is de-rated to 66% of its rated load at operating radius.
 All vehicles should be operated by authorized persons only.
 All drivers of vehicles should have current driving license.
 No vehicle is driven inside the site at speed exceeding 15 km/hr.
 All vehicles including and larger than pick up should have functional backup
alarm.
 All vehicles entering and leaving the work site carrying loads with potential
dust and dirt should be properly secured so that no materials leave the
vehicle.

433
Safety Plan Chapter 14

For Working at heights safety measures:

 Workers at lower levels will be protected from falling tools and


equipments.
 Workers must use safety belts and helmets.
 All tools and equipments used are properly secured to avoid accidental fall.
 All tools and equipments will be brought down after work is interrupted or
completed.
 Proper ladder is used for reaching the working platform.
 Ladders must not be placed near a door or on the way of passengers.
 Workers should use both hands while climbing or descending of the work
platform.
 Hand tool and equipment should be carried by a rope or any other means.

434
Safety Plan Chapter 14

No Safety Belt used

For Electricity safety measures:

 No excavation is carried out in the vicinity of buried cables except under


permit to work.
 All portable hand operated tools shall be suitable for 220 volts supply.
 Heights restriction barriers are installed for the overhead power and
telephone cables.
 All electrical works are carried out as per regulations.
 All works are carried out by authorized personnel only.
 No works are carried out on any energized system other than by permit to
work.

435
Safety Plan Chapter 14

Cleanliness:

Staff working in all areas must regard the following:

 Ensure that loose and worn flooring is reported to supervisor.


 Ensure that all entrances, corridors, walkways and exits are kept clear of
obstructions at all times.
 Close all cabinets , cupboards and drawers after use.
 Never overload shelving or store heavy items above head height except on
load bearing purpose built for racking.
 Never leave a lit cigarette unattended in the designated smoking area.
 Clear away immediately any dangerous substance or spillage dangerous
substance ,they should be marked and defined as toxic , harmful
,flammable ,etc.
 Dust and fumes should not be inhaled , don't perform any activity
producing dust or fumes unless wear appropriate protective gear.
 Equipment must not be left where it might cause tripping hazard.

For Handling hazardous materials:

 All concerned employees should be conservative with materials which are


hazardous in nature and working crew should be trained to deal with those
materials safely.
 Material safety data sheet should specify the actions to be taken in case of
emergency.
 An employee exposure record is maintained.

436
Safety Plan Chapter 14

Gaurding:

 Guard should be present around machines at all times except for times of
cleaning or maintenance.
 Only trained and authorized persons should perform cleaning that require
absence of guard like painting removal or fixing valves.
 Machines under maintenance or cleaning should be electrically isolated and
notice should be fixed on the machine to prevent and accidental switching
the machine on.
 A guard kiosk is installed at the work site which will be the primary location
of the site guard whose job is to keep the idle machines or equipments
from thieves.

Conditions of floors and traffic routes:

 floors and traffic routes must be of a sound construction and have


adequate strength to take into account loads placed upon them .

 Floors shouldn't be overloaded.

437
Safety Plan Chapter 14

 Surfaces of floors and traffic routes should be free from any holes , slopes
or any uneven surface which may cause slipping , tripping or falling of a
person or cause dropping or loss of control of anything or loss of control of
a vehicle.

 Slopes shouldn't be steeper than necessary.

Facilities of rest and eating meals:

 There must be sufficient and suitable rest facilities for workers.


 There must be facilities to eat meals where the food eaten at workplace
would not be contaminated.

 These facilities should include arrangements to protect non-smokers from


other smoking worker's tobacco smoke .

 Provision for any person at work who is pregnant or nursing mother to rest
in.

 Rest rooms that are kept clean and built to a good hygienic standards.

438
Safety Plan Chapter 14

Drinking water:

 An adequate supply of drinking water must be provided for all persons and
this must be readily accessible at suitable places and marked by
appropriate signs.
 Suitable amount of drinking vessels shall be provided for the workers unless
drinking water is in jet form which workers can drink easily.

Scaffolds:

 Scaffolds must be rigid , sound and sufficient to carry its own weight plus
four times intended load without setting or displacement.
 Unstable objects must not be used to support scaffolds.
 They must be equipped with guard rails, mid rails and toe boards.
 Synthetic ropes used in suspension of the scaffold should be protected
from heat producing sources.
 Employees must be instructed from the several hazards when using
scaffold.
 Scaffolds can be accessed by using ladders or stairwells.
 Scaffolds must be at least ten feet away from electric power lines at all
times.

439
Safety Plan Chapter 14

Emergency Medical Services:

 Emergency medical services should be available for each employee at the


worksite.

 One medical program should be established at the worksite.

 Appropriately trained personnel shall be present in a sufficient number and


shall be responsible for providing first aid procedures in case of injury of an
employee or any other emergencies.

 At least one first aid kit shall be provided for each working crew which is
kept in a weatherproof container. The contents of the kit shall be inspected
regularly to ensure that the expired items are promptly replaced, these
contents shall be arranged to be quickly found and remain sanitary.

 First aid dressings shall be kept in an independent and sterile sealed


package for each item.

 Other supplies and equipment provided in accordance with the


documented recommendations of an authorized and licensed physician
depending on the extent and the type of medical emergency care to be
given based on the nature of injury or illness and ability to transport injured
person to medical care.

 Drugs, antiseptics ,eye irrigation solutions and other types of medicines will
not be included in first aid kits unless specifically approved by an authorized
and licensed physician.

 Each employee shall be informed of procedures to follow in case of injury


or illness.

440
Safety Plan Chapter 14

 Proper equipment required to transport injured person to a hospital or a


physician shall be provided, or an effective communication system for
contacting hospitals or other medical facilities.

 Emergency washing facilities where eyes or body of any person exposed to


a dangerous material can be treated and cleaned shall be present and
readily accessible.

Personal Protective Equipment:

Head Protection:

Workers shall wear hard hats when there is a potential risk of any injury to the
head that can be caused by falling object or any other hazards.

Safety helmet

441
Safety Plan Chapter 14

Eye and face Protection:

Safety glasses or face shields are worn at work operations that can cause objects
getting into the eye or harming the face of the employee. These protections are
selected according to the type of activity and its potential hazards.

Different types of face shields Safety Glasses

442
Safety Plan Chapter 14

Foot Protection:

Safety boots should be worn at all times to prevent injuries resulting from
working around heavy machinery and presence of metals or glass on ground of
the site.

Safety boots

443
Safety Plan Chapter 14

Hand Protection:

Workers should wear gloves which are appropriate to their specific jobs.

444
Safety Plan Chapter 14

Safety Signs:

445
Safety Plan Chapter 14

446
Safety Plan Chapter 14

447
Safety Plan Chapter 14

448
Safety Plan Chapter 14

Hand Signals

449
450
What if Scenario Chapter 15

WHAT IF SCENARIO NARRATIVE


Description of problem (1) :-

During construction of the project, a revolution occurred, this revolution


affects the whole country and that reflects on the project.
Working at site suspended for several days (from 30/6/2013 to 31/7/2013)
and that results in delay in the project progress.

Due to that the Owner faced some problems:


The project will be delayed for 31 days and the owner will cost more
expenses due to solve this problem.

Contractual analysis:

Interpretation of the contract in this case according to sub clause ( 19.1 )


the Owner Sustain this problem .

Impacts:

The project will delay to 16 March 2015 because there are critical activities
in the duration of suspension.

So duration of zone1 & zone 2 & zone 3 will increase ( look at Schedule
below )
The total indirect cost increases by 1,096,752.53 LE to become
31,939,837.53 LE

The total cost become 340,370,688 LE ( See the table below ) .

Solution:

1- The Contractor will increase the number of crews to prevent delay


2- The contractor will increase working hours

451
What if Scenario Chapter 15

Month Direct Cost old Indirect old Total cost old Direct new Indirect new Total cost new
Oct-11 0 0 0 0 0 0
Nov-11 4,566,202 456620.2 5,022,822 3,707,268 370726.8 4,077,995
Dec-11 7,115,831 711583.1 7,827,414 6,803,510 680351 7,483,861
Jan-12 8,320,563 832056.3 9,152,619 9,410,762 941076.2 10,351,838
Feb-12 13,321,340 1332134 14,653,474 12,009,068 1200906.8 13,209,975
Mar-12 9,897,241 989724.1 10,886,965 10,866,709 1086670.9 11,953,380
Apr-12 13,257,403 1325740.3 14,583,143 13,373,455 1337345.5 14,710,801
May-12 12,869,306 1286930.6 14,156,237 12,831,472 1283147.2 14,114,619
Jun-12 5,782,272 578227.2 6,360,499 5,149,966 514996.6 5,664,963
Jul-12 8,836,389 883638.9 9,720,028 9,197,209 919720.9 10,116,930
Aug-12 7,827,208 782720.8 8,609,929 8,211,884 821188.4 9,033,072
Sep-12 10,072,318 1007231.8 11,079,550 10,304,770 1030477 11,335,247
Oct-12 11,958,864 1195886.4 13,154,750 9,943,436 994343.6 10,937,780
Nov-12 11,030,000 1103000 12,133,000 11,943,136 1194313.6 13,137,450
Dec-12 7,657,570 765757 8,423,327 11,943,136 1194313.6 13,137,450
Jan-13 6,972,854 697285.4 7,670,139 6,695,154 669515.4 7,364,669
Feb-13 9,907,288 990728.8 10,898,017 9,476,640 947664 10,424,304
Mar-13 10,648,666 1064866.6 11,713,533 10,685,150 1068515 11,753,665
Apr-13 9,775,936 977593.6 10,753,530 10,031,144 1003114.4 11,034,258
May-13 12,184,372 1218437.2 13,402,809 12,674,508 1267450.8 13,941,959
Jun-13 11,709,756 1170975.6 12,880,732 11,302,044 1130204.4 12,432,248
Jul-13 4,689,191 468919.1 5,158,110 0 771077.125 771,077
Aug-13 8,310,551 831055.1 9,141,606 4,590,419 459041.9 5,049,461
Sep-13 10,461,768 1046176.8 11,507,945 8,817,035 881703.5 9,698,739
Oct-13 9,619,084 961908.4 10,580,992 8,525,568 852556.8 9,378,125
Nov-13 10,634,508 1063450.8 11,697,959 10,173,568 1017356.8 11,190,925
Dec-13 11,770,388 1177038.8 12,947,427 11,025,300 1102530 12,127,830
Jan-14 7,660,410 766041 8,426,451 11,002,252 1100225.2 12,102,477
Feb-14 3,022,730 302273 3,325,003 7,936,732 793673.2 8,730,405
Mar-14 6,145,394 614539.4 6,759,933 4,222,029 422202.9 4,644,232
Apr-14 4,723,376 472337.6 5,195,714 5,869,724 586972.4 6,456,696
May-14 4,718,064 471806.4 5,189,870 4,707,762 470776.2 5,178,538
Jun-14 6,031,890 603189 6,635,079 4,781,108 478110.8 5,259,219
Jul-14 4,809,132 480913.2 5,290,045 4,763,580 476358 5,239,938
Aug-14 2,358,786 235878.6 2,594,665 4,947,338 494733.8 5,442,072
Sep-14 4,274,272 427427.2 4,701,699 3,931,420 393142 4,324,562
Oct-14 2,839,442 283944.2 3,123,386 3,615,990 361599 3,977,589
Nov-14 4,093,948 409394.8 4,503,343 2,424,778 242477.8 2,667,256
Dec-14 4,086,728 408672.8 4,495,401 4,859,572 485957.2 5,345,529
Jan-15 3,801,584 380158.4 4,181,742 4,088,416 408841.6 4,497,258
Feb-15 668,224 66822.4 735,046 2,669,200 266920 2,936,120
Mar-15 2,175,392 217539.2 2,392,931
Total 308,430,850 30843085 339,273,935 308,430,850 31939837.53 340,370,688

452
Old Schedule
What if Scenario

WBS Code WBS Name 2012 2013 2014 2015 2016 2017
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
KVG Katamia Village Garden
KVG.Zone 1 Zone 1 01-Feb-14
11-Feb-15
KVG.Zone 2 Zone 2
KVG.Zone 3 Zone 3
11-Feb-15
25-Dec-14

453
New Schedule

WBS Code WBS Name 2012 2013 2014 2015


Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
KVG Katamia Village Garden
16-Mar-15
KVG.Zone 1 Zone 1 05-Mar-14
KVG.Zone 2 Zone 2
16-Mar-15
KVG.Zone 3 Zone 3
27-Jan-15
Chapter 15
What if Scenario Chapter 15

Description of problem (2) :-

During the excavation for Building no: "1" a rock layer was found, so work
stopped .
In this part and more inspection were made for 1 day on the site and 1 day
in the lab . ( delay will be 2 days )
The rock layer extends for 300 m2 of the total area with a depth of 0.7 m.
The contractor can provide two rock breakers .

Contractual analysis:

According to sub-clause ( 41.1 ) in the contract, the contractor is


responsible for this problem .
So the contractor takes full responsibility for this problem and shall fix it at
his own cost.

Impacts:

1- Durations for excavation activities for Building "1" are increased as


shown in calculations

Excavation for foundation in rock


Volume = 210 m3
Productivity = 25*2 = 50 m3/day
Total Duration = 210 / 50 = 5 days
– WHAT IF SCENARIO
- So the total delay = 7 days and the project finish date will 19 feb 2015
( look schedule 2 )
- The cost of rent rock breaker=1600 LE/day * 5days *2breakers=16000 LE
- Cost of crew = 7220 LE/day *5days = 36100 LE
- Increase direct cost= 16000+36100= 52100 LE

2- The contractor will pay delay damage .

Solution:
The contractor will increase working hour to prevent delay

454
Old Schedule
What if Scenario

WBS Code WBS Name 2012 2013 2014 2015 2016 2017
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
KVG Katamia Village Garden
KVG.Zone 1 Zone 1 01-Feb-14
11-Feb-15
KVG.Zone 2 Zone 2
KVG.Zone 3 Zone 3
11-Feb-15
25-Dec-14

455
New Schedule

WBS Code WBS Name 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

KVG Katamia Village Garden


KVG.Zone 1 Zone 1 01-Feb-14
19-Feb-15
KVG.Zone 2 Zone 2
KVG.Zone 3 Zone 3
19-Feb-15
Chapter 15

25-Dec-14
What if Scenario Chapter 15

Description of problem (3) :-


Increase cost of fuel so the operation cost of equipment will increase
The cost of fuel increased from 1.1 LE to 1.8 LE
We will study this problem on the Excavators only

Contractual analysis:
According to sub-clause ( 70.1 ) in the contract, the contractor is
responsible for this problem and it will be included on the risk payment of
the contract .

Impacts:

Cost of Increase fuel of Excavator


= 0.7 LE * 200 Liter * 2 Excavator * 7 days * 56 Cond
+ 0.7 LE * 200 Liter * 1 Excavator * 2 days * 79 Villa
+ 0.7 LE * 200 Liter * 2 Excavator * 3 days * 6 Twin = 136920 LE

So, The total direct cost will increase to 308567770 LE.

Solution :

It will be loaded on risk payment .

456
457
Contract anylsis Chapter 16

Contract analysis

What is a contract?
An agreement to carry out construction operations in exchange of paid
amount.

Legality of a contract:

To be legal the contract must fulfill certain requirements:

1- An Intention: both parties must be wise and intend their bargain to be


enforceable at law.

2- A genuine consent: must not be produced by mistake, force ….. Undue


influence, misrepresentation….

3- Legality of the object: the parties must not agree to something illegal or to
break the law.

Due to participant parties:


- Administrative Contracts.

- Civil Contracts.

– FIDIC.

458
Contract anylsis Chapter 16

Administrative contracts: it's the contract that one of the parties at least
is a governmental agency.

Civil contracts: it's the contract where no one of its parties is governmental
agency
FIDIC contracts: standard formula.

Comparison between Civil & Administrative contracts

Property Civil contract Administrative


contracts
members No one of its parties One of the parties(at
is governmental agency Least) is a governmental
agency
Applicable law Civil law Administrative law
The competent courts Ordinary courts of Administrative courts
justice of justice
Prejudice from Civil responsibility Criminal responsibilities
responsibility of contract

It's valid to put the It's not valid to put the


Arbitration arbitration condition In arbitration condition in
the contract as an asset in the contract without the
approval of competent
minister

Introduction to FIDIC:

FIDIC ( federation internationale des ingenieurs-conseils ) is the international


federation of consulting engineers . The FIDIC organization was founded in
1913 by France, Belgium and Switzerland.

459
Contract anylsis Chapter 16

FIDIC published in 1995 first editions of four new standard forms of contract.

- Red book for construction projects.


- Yellow book for Design-Build projects.
- Green book for short form agreements.
- Silver book for EPC-turnkey projects

Type of FIDIC forms:

Red Book
recommended for buildings or engineering works designed by the employer in
this contract form, the contractor constructs the works in the accordance with
a design provided by the owner.

Yellow Book
recommended for the provision of electrical and/or mechanical plant and for
the design and the execution of building or engineering works.in this type the
contractor design and construct the works in the accordance with the owner.

Green Book
recommended for buildings or engineering works of small capital value.

Silver Book
recommended for the provision on a turnkey basis of a process or power
plant. In this form the contractor is responsible for the design and the
execution of the project (Engineering & procurement engineering) with
little involvement from the employer.

460
Contract anylsis Chapter 16

Definitions & interpretation:


In the contract the following words and expressions shall have the
meanings, except where the context otherwise requires:

1 - Employer: Palm hills

2 - Contractor: The person whose tender has been accepted by the


employer (The general contractor is Orascom Construction Industries)

3 - subcontractor: Any person named in contract as a sub-


contractor for a part of the works or any person to whom a part of
the work has been subcontracted with the consent of the engineer

4 - Engineer: The person appointed by the employer to act


as engineer for the purpose of the contract

5 - Engineer representative: A person appointed by the


engineer from time to time, and should perform any duties
and exercises delegated to him by the engineer.

6 - Contract: Means the conditions, specifications, drawings, the


bill of quantities the tender, the letter of acceptance, the
contract agreement and such further documents as may be
expressly incorporated in the letter of acceptance or contract
agreement.

7- Specification: Specification of the works included in the


contract and any modification thereof or addition thereto made or
submitted by the contractor and approved by the engineer

461
Contract anylsis Chapter 16

8-Drawings: Means all drawings, calculations and technical


information of a like nature provided by the engineer to the
contractor under the contract, and all drawings, calculations,
samples, patterns, models, operation and maintenance
manuals and other technical information of a like nature
submitted by the contractor and approved by the engineer.

9-Bill of quantities: Means the price and complete bill of quantities


forming part of the tender

10-Tender: Means the contractor priced offer to the employer for


execution and completion of the works and the remedying of any
defects therein in accordance with the provisions of the contract,
as accepted by the letter of acceptance

11-letter of acceptance: Means the formal acceptance by the


employer of the tender

12-Appendix to tender: Means the appendix comprised in the


form of tender annexed to those conditions

13-Commencement date: Means the date upon which the


contractor receives the notice to commence issued by the
engineer.

14-Time for completion: Means the time for completing the


execution of and passing the tests on completion of the works or
any section or part thereof as stated in the contract calculated from
the commencement date.

15-Test on completion: Means the tests specified in the


contract or otherwise agreed by the engineer and the contactor
which are to be made by the contractor before the works or any
section or part thereof are taken over by the employer.

16-Taking over certificate: Means a certificate issued after the


.completion of the whole of the works as mentioned in the contract

17-Contract price: Means the sum stated in the letter of


acceptance as payable to the contractor for the execution and
completion of the works and the remedying of any defects therein
in accordance with the provisions of the contract.

462
Contract anylsis Chapter 16

18-Retention money: Means the aggregate of all monies retained


.by the employer

19-Interim payment certificate: Means any certificate of payment


.issued by the engineer other than the final payment certificate

20-Final payment certificate: Means the certificate of payment


issued by the engineer after the delivery of the whole works
.according to the contract.

21-Works: Means the permanent and the temporary works or


. either of them as appropriate

22-Site: Means the places provided by the employer where


the works to be executed and any other places as may be
.specifically designated in contract as forming part of the site

23-Day: Means a calendar day

24-Writing: Means any hand written, type written or printed


.communication including telex, cable and facsimile transmission

463
Contract anylsis Chapter 16

Contract Overview

Contract village garden in katamya

The employer ( first party ) palm hills

The contractor ( second party ) Orascom Construction Industry

The engineer the project director is E.khaled Amen

And project manager is E.Dalia Ramdan

Contract type unit price contract

Contract price 550,000,000 LE

Commencement date 1 nov 2011

Time for completion 11 feb 2015

During of project 3 years & 3 months (calendar day)


Advancend payment 5%

Percentage of retention 10%

Amount of overhead & 30%

profit and risk

464
Contract anylsis Chapter 16

Contract Analysis

Clause Our contract FIDIC Comment


Claims: Claims: It's not stated
Claims ,Disputes (Clause 53.1) (clause 20.1) in our project
Amicable if the contractor if you consider the same any of claims
settlement intends to claim contractor is to extend &arbitration
&Arbitration any additional the period of delivery or but this may
payment Pursuant any additional payment lead to:
to any clause of to send the claim within 1-delay in
these conditions he 28 days from the project
shall give a notice problem's day. 2-disputes bet
of his intention to Contractor &
the employer within Owner.
28 after the event.
Disputes : Disputes &amicable
Clause (67.2) settlement:
the parties shall (Clause 20.5)
attempt to settle is the resolution of
such dispute disputes by the council of
amicably before the the resolution of disputes
arbitration issued a notice of
arbitration may be dissatisfaction, it should
commenced in or be on both sides try to
after 56 days after resolve the dispute
the day which amicably.
notice of intention
to commence
arbitration
Arbitration : Arbitration :
(clause 67.3) (clause 20.6)
Arbitration of the The contract should
international include provisions for the
chamber of resolution by
commerce by one international arbitration of
or more arbitrators any disputes which are
appointed under not resolved amicably.
such roles . The
said arbitrator shall
have full power to
open up , review
and revise any
decision .
465
Contract anylsis Chapter 16

2-the contract -the contract price -The contract price shall The contract
price shall be agreed or be agreed or determined price in our
(clause 14.1) determined by under sub clause 12.3 contract
evaluating all the (evaluation) doesn't
items of the project &be subjected to mentioned
& be subjected to adjustment in that is include
adjustments in accordance with the taxes, duties
accordance with contract and fees or
the contract not
but it shall not
include taxes
-the contractor -the contractor shall pay
shall pay all taxes all taxes, duties and fees And the
,duties and fees required to be paid by contractor
required to be paid him under the contract. who pay the
by him under the taxes.
contract
-contract price shall not
be adjusts for any of
(taxes, duties and fees)
except adjustment for
change in legislation
-Any quantities set out in
the BOQ or the other
schedules are estimated
quantities and are not
being taken as the actual
and the correct quantities

Advanced Advance payment The


3-payments payment (clause 14.2) contractor
The employer shall The employer shall pay take his
pay to the to the contractor interim
contractor payment in
our contract
-advanced -advanced payment within 28 days
payment within but in FIDIC
according to the 42 days after letter of within 56 days
specified value 5% acceptance
of the value of work

Interim payment Interim payment


(clause 60.2) (clause 14.6)
-the engineer shall, -the amount certified in
within 28 days of each interim payment
466
Contract anylsis Chapter 16

receiving such within 56 days after the


statement, deliver engineer receives the
to the employer an statement
interim payment
certificate stating
the amount of
payment to the
contractor
Final payment final payment
(clause 60.8) (clause 14.13)
-Not later than 56 -the amount certified in
days after the issue final payment certificate
of the defects within 56 days after the
liability certificate employer receives this
pursuant , payment certificate
the contractor shall
submit to the
engineer for
consideration six
copies of a draft of
final statement with
supporting
documents
showing in detail

4-the contractor Contractor's Contractor's general


general obligations
obligations : (clause 4.1)
(clause 8.1) -The Contractor shall
the contractor shall design (to the extent
design ,execute specified in the Contract)
and execute and complete
complete the works the works accordance
with remedy any with the contract
defects therein in &engineer's instructions.
accordance with
the provisions of -the contractor shall .
the contractor shall provide the plant
be provide all specified in the contract
superintendence ,other things and
,labor ,materials services whether of a
,plant temporary or permanent
and all other things nature required in design
and execution

467
Contract anylsis Chapter 16

performance performance security:


security: (clause 4.2 )
clause (10.1) the contractor shall
the contractor shall obtain a performance
obtain and provide security for proper
to the employer performance, in the
such security within amount and currencies
28 days after the stated in the Appendix
receipt of the LOA to tender(If an amount
not stated in the
Appendix this sub-clause
shall not supply .

-the contractor shall


delivery the performance
security to the employer
within 28 days after
receiving LOA and shall
send a copy to the
engineer

Unforeseeable unforeseeable physical


physical conditions
conditions clause (4.12 )
clause (12.2) in this sub-clause
during the physical conditions
execution of the means natural physical
works the conditions and man-
contractor made and other physical
encounters obstructions which the
physical contractor encounters at
obstructions or the site when executing
physical conditions the work
,the contractor shall
forthwith give -if the contractor
notice thereof to encounters adverse
the Engineer with physical conditions, the
copy to Employer contractor shall give a
after the Engineer notice to the engineer as
see the notice ,he soon as practicable
decide to extend or
not the time of
completion
468
Contract anylsis Chapter 16

5-increase or (clause 70.1) Clause (13.8)


decrease of cost there shall be The amount payable to Our contract
added to or the contractor shall be is similar to
deducted from the adjusted for rises or falls FIDIC in
contract price such in the cost of labor, condition of
sums in respect of goods and other inputs to increase or
rise or fall in the the works by the addition decrease in
cost of labor or or deduction of the cost and the
materials amounts determined by contract price
or any other the formulae prescribed will be
matters affecting in this sub-clause changed
the cost of the Accepted Contract
execution of the Amount shall be
works deemed to have included
amounts to cover the
contingency of other
rises and falls in costs.

6-Risk & -indemnities Indemnities Our contract


Responsibility (clause 17.1) and FIDIC
the contractor shall the contractor shall insure that the
indemnify & hold indemnify & hold contractor is
harmless the harmless for the responsible
employer, employer , employer's for persons
employer's personnel &their and
personnel & their respective agents against equipments
respective agents damages, losses & and
against damages, expenses in respect of: contractor
losses & expenses a)bodily injury, sickness, who pay the
in respect of: disease or death by the indemnities
a)bodily injury, reason of the contractor's
sickness, disease design
or death by reason b)damage to any
of the contractor's property, real or personal
design
*the employer shall
b)Damage to any indemnify & hold
property, real or harmless to contractor
personal against claims.
Damages,
losses & expenses which
*not stated is attributable to any
negligence ,willful act or
breach of the contract by
469
Contract anylsis Chapter 16

the employer

-contractor's care -contractor's care of


of the work the work
the contractor shall (clause 17.2)
be entitled to the contractor shall take
payment in full responsibility for the
accordance with care of
the contract for any -the work from the
permanent works commencement date
duly executed and until the date stated in a
for any materials or taking over certificate
plant so destroyed
or damaged . -the contractor shall be
liable for any loss or
damage caused by any
action performed by him
after the taking over
certificate has been
issued.

7-insurance of Insurance against Insurance against Our contract


work injury to persons injury to persons and FIDIC
Clause (24.2) (clause 18.3) insure that the
the contractor shall the insuring party shall contractor is
insure against such insure against each responsible
liability and shall party's liability for any for persons
continue such loses ,damage ,death or and
insurance during bodily injury which may equipment
the whole of the occur to any physical
time that any property.
persons employed
by him on the
works

-the contractor
directly responsible
Without interruption
from owner about
any cases of death,
injury or sickness

470
Contract anylsis Chapter 16

insurance for Insurance for works&


works contractor's
&contractor's equipment
equipment (clause 18.2)
clause (21.1) the insurance party shall
the contractor shall insure the works, plant,
insure: materials & documents
-the works to tha for not less than the full
full replacement reinstatement cost
cost (include profit ) including the costs of
-An additional sum demolition
of15% of such -the insurance shall be
replacement cost to effective from the date
cover any by which the evidence
additional is to be submitted until
costs of and the date of issue of
incidental to the taking over certificate for
rectification of loss the work
or damage
including
professional fees
and the cost of
demolishing and
removing any part
of the works

-the contractor's -the insuring party shall


equipment and insure the contractor's
other things equipment for not less
brought onto the than the full replacement
site by the value including delivery
contractor ,for a, to site
sum sufficient to
provide their
replacement at the
site

8-Commencement Commencement Commencement of


delays and of works works (clause 8.1)
suspension (clause41.1) The Engineer shall give
the contractor not less
than 7 days' notice of the
commencement date.
unless otherwise stated
in the particular condition
471
Contract anylsis Chapter 16

the commencement date


As FIDIC shall be within 42days
after the contractor
receives the LOA

Programme Programme
Not stated clause (8.3)
The contractor shall
submit a detailed time
programme to the
Engineer within 28 days
after receiving the notice.
The contractor shall also
submit a received
programme whenever
the previous programme
is inconsistent with actual
progress or with
the contract's obligations

–unless the engineer,


within 21 days after
receiving a programme,
gives notice to contractor
stating to which it does
not comply with the
contract, the contractor
shall proceed in
accordance with the
programme,

-If, At any time, the


Engineer gives notice to
the contractor that a
programme fails to
comply with the contract
or to be consistent with
actual progress and the
contractor's stated
intentions , the contractor
shall submit a received
programme to the
engineer in accordance

472
Contract anylsis Chapter 16

Extension time Extension time for


completion completion
Clause (44.1) (Clause 8.4)
in the event of : the contractor shall be
a)the amount or entitled to an extension
nature of extra or of the time for completion
additional work is or will be delayed by
b)any cause of any of the
delay referred to in following causes:
these conditions a) Variation or other
c)exceptionally substantial change in the
adverse climatic quantity of an item of
conditions work included in the
contract.
b) Exceptionally adverse
climate conditions
c) unforeseeable
shortages in the
availability of persons
and goods

-The Engineer shall


review the previous
determinations and may
increase.

9-Suspension Contractor Contractor Entitlemen


and Termination Entitlement to to suspend work
by contractor suspend work (clause 16.1)
If the Engineer fails to
Not stated certify or the Employer
fails to comply , the
contractor may, after
giving not less than 21
days' notice to the
employer, suspend work
unless the contractor has
received the payment
certificate

473
Contract anylsis Chapter 16

Termination by
contractor
(clause 16.2)
The contractor shall be
entitled to terminate the
contract if
1-The contractor does
not receive the
reasonable evidence
within 42 days after
giving notice
2-the engineer fails within
56 days after receiving a
statement and supporting
documents
3-The contractor does
not receive the amount
due to under an interim
payment certificate within
42 days after the expiry
of the time

474
475
Selected Topic ( Revit Struc. ) Chapter 17

476
Selected Topic ( Revit Struc. ) Chapter 17

477
Selected Topic ( Revit Struc. ) Chapter 17

478
Selected Topic ( Revit Struc. ) Chapter 17

479
Selected Topic ( Revit Struc. ) Chapter 17

480
Selected Topic ( Revit Struc. ) Chapter 17

481
Selected Topic ( Revit Struc. ) Chapter 17

482
Selected Topic ( Revit Struc. ) Chapter 17

483

You might also like