Professional Documents
Culture Documents
NEMA 3R ENCLOSURE
INDELEC
DIGITAL LIGHTNING
FRONT VIEW - LSC COUNTER
SCALE NTS
CADD BY:
Consultant/ Designer Project Owner/Client: JK LOPEZ Sheet Content REVISIONS
E
DESIGNED BY: Republic Act 545
No: Description Date
ENERGYNET PHILIPPINES,
PROPOSED LIGHTNING
PROTECTION SYSTEM CHRIST COMMISSION
JK LOPEZ
CHECKED BY:
MC INSTALLATION
All measurements are to be verified on site by contractor. All
discrepancies are to be immediately reported to Architect
and Project Manager.
5
FOR CCF SCHOOL DRAWING NO:
DETAILS
contractors needed to prepare and submit show drawings to
INCORPORATION FOUNDATION INC. ENI-DSN-264 Architect prior to commencement of work.