0% found this document useful (0 votes)
62 views1 page

Daily Incoming/Outgoing Report Summary

The daily report shows no pipe was sent or received on the date listed. The quantities of 4 1/2 inch and 3 1/2 inch pipe received and sent were all zero, and the amounts received in good and scrap conditions were both zero as well.

Uploaded by

Dheeraj Menon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views1 page

Daily Incoming/Outgoing Report Summary

The daily report shows no pipe was sent or received on the date listed. The quantities of 4 1/2 inch and 3 1/2 inch pipe received and sent were all zero, and the amounts received in good and scrap conditions were both zero as well.

Uploaded by

Dheeraj Menon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Daily Incoming/ Out Going Report

Date:
Quantity Send & Received Condition Received
Well RIG Vehicle No 4 1/2" In 3 1/2" In 4 1/2" Out 3 1/2" Out Good Scrap

Total 0 0 0 0 0 0

You might also like