CRANE Operator/Forklift Operator
Engagements
UWD LTI 1
Incident type LTI
Date/ time 03.02.19@ 13:45hrs Company Weatherford Drilling
International
Location WPH40 Dept UWO
What happened
While the forklift was performing a reverse maneuver, it tapped on one side of
the tubing causing the other side to fall to the ground and strike the
derrickman’s right foot fracturing the ankle’s joint.
Initial Findings
The worksite area was narrow for the forklift to move freely;
The forklift operator was performing maneuver without signals;
There was no adequate supervision at the time of the incident;
Initial learning
Forklift operations shall always be supported with signals;
Banksman shall ALWAYS be used to ensure safety while working with mobile equipment
Worksite supervisor shall always ensure that control measures are in place prior to authorizing the work
UWD LTI 2
Incident type LTI
Date/ time 15.02.19@ 21:15hrs Company Sea & Land
Location Rig 83 Dept UWOX
What happened
While attempting to pull a snagged line in the crane sheave block a second
crane operator’s hand was trapped when the block dropped suddenly injuring
his finger.
Initial Findings
Line got stuck in the block sheave during previous activity
Crane Operator (IP) left his crane while in operation without
communicating to anyone.
Crane operator (IP) ignored the intervention from crew member.
Initial learning
Always keep your hands/fingers away from crush points and ensure understanding the risk of stored energy;
Always follow proper maintenance and trouble shooting procedures.
When intervened for unsafe act, all personnel are obliged to STOP.
UWD RWC
Incident type RWC
Date/ time 21.02.19@ 18:15hrs Company Gulf Drilling
Location Rig 112 Dept UWO
What happened
Chief Electrician left index finger got trapped between the cable
cover and the ground While trying to insert the electrical cable
cover chains into the forks to flip the cover around the cables.
Some Initial Findings
Chief Electrician place his hand in the line of fire ( crushing point)
Handoff method not been used.
Supervisors involving in the task
Some Initial learning
Stay away from Line Of fire;
Ensure TBT cover 4 Golden Questions on hands & Fingers
Always ensure Handoff method ( Handoff tools) are utilized .
Supervisor should Supervise
CRANE Operator/Forklift Operator Engagements
Engagement with Crane & Forklift Operators
Ensure to have adequate Supervision for the task
Do you feel empowered to STOP the job in case of any unsafe
act/condition?
Do you ensure you have a banks man while reversing crane /forklift at
site?
Do you attend TBT and understand the topics?
Do you check your Crane/Forklift safety features before operating?
Do you Comply with Lifting Plan ?
Ensure to have adequate Supervision for the task
Its your responsibility to STOP work if the work place is unclear/unsafe
from
Personnel or obstructions
Winners Do Things Differently 6