COMPANY SPECIFICATION
FACILITIES
COMMISSIONING SPECIFICATION
27952.ICO.AVV.SDS
Rev. 0 - November 2011
FOREWORD
INDEX
2. REFERENCE DOCUMENTS................................................................................................... 7
7. COMMISSIONING PERSONNEL.......................................................................................... 14
17. ATTACHMENTS.................................................................................................................... 57
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 5 of 62
17.1 RFSU CERTIFICATE, BLIND LIST, MASTER PUNCH LIST, PRELIMINARY CHECKS ... 57
17.2 FUNCTIONAL TESTS ........................................................................................................... 58
17.2.1 Electrical................................................................................................................................. 58
17.2.2 Instrument & Automation........................................................................................................ 59
17.2.3 Telecommunication ................................................................................................................ 60
17.3 PRE-START UP ACTIVITIES................................................................................................ 61
17.4 EDITABLE FILES .................................................................................................................. 62
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 6 of 62
This document outlines Commissioning and Start Up activities to be carried out by CONTRACTOR
after achievement of Mechanical Completion, in order to allow a smooth turnover of a facility to
production operations.
CONTRACTOR shall carry out and be fully accountable and responsible for commissioning of all
utilities, safety and process systems before Well hydrocarbons introduction into the process facilities,
soon after Mechanical Completion and up to “Ready for Start Up” status achievement. This shall
include:
- Preliminary checks and cross verifications carried out to re-validate Mechanical Completion
Certificates and Dossiers;
- Functional verification of each electrical, instrument or telecommunication component. Typical
examples of such tests are electrical motors uncoupled runs, instrument loop tests, electrical
breakers operation. This include the complete energization of the electrical distribution network;
- Operational tests of the plant utilities (power generation, electrical, integrated control and safety
systems, air, HVAC, water, cranes etc) and of the process systems in closed loop with inert fluids;
- Preparatory activities to production hydrocarbon introduction: these include piping drying out and
chemical cleaning as required, lube oil flushing, process lines leak testing and inerting, loading
chemicals into chemical injection equipment, loading foam cartridges into firefighting equipment. It
shall also include preservation of all equipment and re-execution of functional tests (called
“recommissioning”) in case hydrocarbon introduction is not performed immediately after
operational tests
After “Ready for Start Up”, CONTRACTOR shall carry out and be accountable for the following
activities under COMPANY responsibility, up to the facilities “Performance Test” execution:
1. Production Start-Up, consisting of gradual introduction of Well hydrocarbons into the
processing facilities. It begins with the final safety checks, and is performed according to the
approved start up procedure, which encompasses all the activities to be carried out in the
frame between the opening of the first well and the bringing into operations of the process
facilities;
2. Commissioning of process systems with process fluid, carried out after the introduction of
hydrocarbon into the production train (after Start Up) and relevant implementation of the start
up procedure, including:
o Operational tests of the process equipment with production hydrocarbons;
o On line tests (including vibration monitoring) and fine tuning of the process systems and
utilities;
o Preparatory activities for “Performance Test” execution.
Commissioning activities will comply with COMPANY engineering standards, Project Specifications,
applicable International Codes and Local Regulatory Authority requirements, as referenced in the
contractual documentation.
CONTRACTOR shall review the content of the present specification and will adapt or amend all
activities and related test sheets and report forms as required by project documentation and Local
Regulatory Authority. Furthermore CONTRACTOR shall be responsible to develop any necessary
additional test sheets, report forms, and procedures whenever relevant documents are not available
in this specification.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 7 of 62
2. REFERENCE DOCUMENTS
MC Mechanical Completion
FAT Factory Acceptance Test
EFAT Extended Factory Acceptance Test
SAT Site Acceptance Test
SIT System Integration Test
HAZID Hazards Identification
JSA Job Safety Analysis
PTWS Permit To Work System
HC Hydrocarbons
PL Punch List
FPSO Floating Production Storage Offloading
SURF Subsea, Umbilical, Riser and Flowlines
HVAC Heat, Ventilation and Air Conditioning
RFSU Ready For Start Up
PF Productivity Factor
QC Quality Control
QCP Quality Control Plan
ITP Inspection and Test Plan
ITR Inspection and Test Report
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 9 of 62
4. HSE PRINCIPLES
All commissioning activities must be in accordance with all eni HSE standards and procedures, and
with all statutory requirements as applicable.
5. COMMISSIONING APPROACH
The commissioning phase of a new plant is a critical process. Not all parts of the process facilities
reach the same degree of mechanical completion at the same time, therefore some areas or units
may be available while others are not.
Therefore, while construction work progress is essentially planned by areas, sub-areas and
disciplines, the commissioning phase is controlled by systems and sub-systems.
A System is a substantial portion of a plant, which performs a major and well identified operational
function, being either process or utilities. The system includes all various items, equipment, packages
and sub-systems necessary to operate. For example, an instrument air system provides
compressed/instrument air to the plant, and it is composed by air compressors, dryers, tanks,
distribution sub-system.
The systems shall be defined into logical discrete parts of the plant which can be pre-commissioned
and commissioned independently from the remaining ongoing construction scope.
A Subsystem is a further subdivision of a system, that performs a partial operational function to the
system, with no or little interference from the other subsystems. Several equipment with the same
function in the system and/or main packages are typical examples of subsystems.
Each subsystems is characterized by tag-items, wich represent the minimum discrete portions of the
plant, and which are associated to particular quality control activities and functional tests. For non tag
items (e.g. piping) a level of material and processes traceability shall be defined and relevant plan
prepared and implemented (e.g. welding book).
While construction, commissioning and start up activities are carried out, all non conformities,
missing items, discrepancies shall be recorded and integrated per sub-system in the Master Punch
List (MPL).
One item is considered as a stop point for concerned sub-system:
- If it challenges the safety or operational aspect of the following activity to be carried out on the
system;
- If integrity of the system is non ensured, with risk of damage;
- If it does not satisfy requirements due to particular local rules and regulations.
Each “Mechanical Completion” Certificate shall be supported by “B” and “C” punch list.
Each “Ready For Start Up” Certificate shall be supported by “C” punch list.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 12 of 62
CONTRACTOR shall prepare commissioning activities as early as possible with regards to Project
Schedule, and in accordance with contract documents, COMPANY and Local Regulatory Authority
requirements. All documents issued by CONTRACTOR shall be for COMPANY and/or Local
Regulatory Authority approval.
As key preparation task, CONTRACTOR shall part the plant into systems and sub-systems in
accordance to COMPANY engineering standards & project documentation, with particular reference
to the following documents:
- P&ID’s;
- One Line Diagrams;
- 06215.DOC.GEN.SDS Rev.4 – Facilities Functional Units;
This needs to be done at the early stages of the execution phase, according to the defined start up
strategy and commissioning plan and sequence. Therefore CONTRACTOR shall:
- Produce task register and commissioning schedule;
- Produce manpower histograms;
- Ensure an integrate planning, particularly when the project is split into several sub-projects and
sub-contracts;
7. COMMISSIONING PERSONNEL
CONTRACTOR shall perform commissioning activities preparation and execution with properly
specialized, trained and experienced personnel.
CONTRACTOR shall issue its proposed organization chart and curriculum vitae of all personnel, for
COMPANY/Local Regulatory Authority, properly in advance with respect to beginning of
commissioning activities preparation and execution and in accordance to contract requirements.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 15 of 62
CONTRACTOR shall make sure its Commissioning personnel shall witness all critical pre-
commissioning activities, at least those listed hereafter:
- Setting of pressure safety valves;
- Piping flushing and drying;
- Machinery cold alignments;
- Electrical protection relays setting;
- Random instrument calibrations (percentage to be decided on a risk based assessment).
Moreover, before starting commissioning activities, CONTRACTOR shall perform preliminary checks
consisting of:
- Revalidation of each Mechanical Completion Certificates: this will be achieved by a thorough
review of the inspection and testing records, check lists and test sheets included in the MC
Dossier.
- The review of the "As-built" drawings;
- The physical cross verification of sub-systems.
Since the inspection is visual, no dismantling will usually be required. However, in some cases, e.g.
the verification of the quality of a gasket, some elementary dismantling may be necessary.
Once the preliminary checks have been carried out, CONTRACTOR shall re-validate MC certificates
and Master Punch List, integrating any anomaly, non conformance and missing part.
Follow-up inspections will later be required to ensure all deficiencies have been corrected.
8.1 PIPING
The following is a list of points that will be systematically addressed during this site survey for a
subsystem:
- All valves
- Sample connections
- Pump suction strainers
- Spectacle blinds
- Piping low points, high points and slopes
- Pipe supports
- Stream traps
- Insulation
- Earthing
- Gaskets and joints
In the case that spectacle blinds and other blinds need to remain in position at the time of start-up,
CONTRACTOR shall issue a battery limits blind list and attach it to the “Ready for Start Up”
Certificate of relevant system, to allow proper control of blinds status.
The blind list will contain the following information:
- Line number (ex.: P&ID), size and service
o Blind number
o Blind size and rating, i.e., 150, 300, etc.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 16 of 62
NOTES - Blinds are sometimes installed during Construction for hydrostatic tests, flushing, etc., and
these are frequently forgotten if not correctly listed. It also happens that blinds without tags (handles)
are installed; in this case it is extremely difficult to tell the difference between a blind and the edge of
spiral wound metal gasket.
Therefore, blinds will always have a tag or handle clearly labeled for easy identification.
8.2 VESSELS
For the purpose of commissioning, the following items of equipment are considered as vessels:
- Towers: distillation columns, splitters, strippers, absorbers, etc.
- Drums: overhead receivers, HP and LP separators, oil/gas separators, knock-out drums, surge
drums, flash drums, balance drums, instrument air driers, molecular sieves, settling drums,
contactor drums (i.e. "Merox" process), desalters
- Boilers, Steam generators: all types
- Furnaces: all types including combustion type Inert Gas generators, Klaus process sulphur
recovery units, etc.
- Storage tanks: floating roof tanks, cone roof/flat roof tanks
- Underground tanks/sumps: all types, steel or concrete
- Oily water separators
- Heat exchangers: shell and tube, kettle type, plate exchangers, vaporizers
- Pig receivers and launchers
- Desalination units.
- Re-boiler baffles
As a general rule the vessels will be opened for inspection and closed by CONTRACTOR
immediately after the completion of the preliminary checks.
Before entering any vessel, CONTRACTOR personnel shall obtain a vessel entry permit which will
include an atmospheric analysis and the verification that suitable means of entry and exit are
provided. Vessels which may contain toxic vapors, i.e., following the application of an internal lining
medium such as epoxy resin, should be given special consideration.
If the vessel is in any way physically connected to a "live" system, it must be suitably blinded and
relevant blind list provided.
CONTRACTOR personnel entering a vessel for inspection or rectification work may require the
following items:
- Measuring tape
- Spirit level to check tray levels, etc.
- Intrinsically-safe low voltage lighting or flashlight
- Tools
- Notebook, pen, paint-pen or chalk to tag defects.
Once the physical checks have been successfully performed, the vessels closure (manholes, access
doors) will be re-carried-out by CONTRACTOR.
CONTRACTOR shall issue a certificate of “Vessel closure” and obtain all required signatures
according to the corresponding implemented PTW system.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 17 of 62
Other facilities that shall be verified during the subsystem-based site survey are:
- Safety showers and Eye Baths;
- Hose Reel/ Dual Agent Hose Reels and Firewater/Firefoam Monitors;
- Portable Fire Extinguisher;
- Deluge/Extinguisher Skid;
8.5 ELECTRICAL
Electrical preliminary checks will be carried out essentially on the following equipment:
- Motors
- Transformers
- Switchboards
- Generators/alternators
- Lighting
- Other equipment
- Control valves and shut off valves equipped with actuators (complete with associated tubing,
solenoid valves quick exhausts, boosters and positioners) shall be tested for full-stroke time.
- Fire & gas detectors / devices are correctly installed.
- Junction Boxes are correctly installed.
- Local Control Panels are correctly installed.
- Each instrument / equipment has enough accessibility and visibility for maintenance purpose.
- Each instrument / equipment is suitable for the relevant hazardous area a/o pipeline.
- Each tray is adequate for the relevant cables or tubing that is carrying.
- Each support is properly installed.
- Pneumatic a/o Hydraulic assembling is completed.
- Electrical wiring is completed.
- The identification labels are properly located on the relevant instruments, valves, panels, junction
boxes, trays, tubing, cables, terminals, etc.
- Review of Documentation – CONTRACTOR shall review the instrumentation pre-commissioning
activities reported in the MC dossier. In particular the following shall be checked:
o Instrument List
o All involved layouts and other project documents.
o The instrument calibration records.
o Hydraulic and Pneumatic test records
o Electrical test records.
o “A” punch list has been cleared.
8.7 TELECOMMUNICATION
Telecom preliminary checks will be carried out essentially on the following equipment:
- Telecom cables
- Fiber Optic Cables-FO
- P.A.B.X. telephones
- P.A.B.X. Flashing lights
- Public address loudspeaker
- Miscellaneous telecommunication equipment
- Radios, Antenna, TV
- Public Address and Alarm Flashing Lights
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 20 of 62
9. FUNCTIONAL TESTS
9.1 INTRODUCTION
9.1.1 Purpose of functional tests
Functional tests consist of dynamic checking of each elementary electrical, instrument, and
telecommunication function included in the plant, to make sure it performs properly.
CONTRACTOR shall conduct the functional testing activities in a planned, safe, and logical manner,
according to the requirements set up in this specification.
9.1.2 Principles
9.1.2.1 Basic functions
An item or group of items that performs an elementary function of the plant is defined "Basic
Function". A basic function is therefore the smallest equipment, or part of equipment, which may be
considered independent from the following two points of view:
- Running in normal operation
- Electrical feeding
Typical basic functions are listed and defined in the present specification, by relevant discipline, i.e.
electrical, instrument, and telecommunication.
continuity of the circuits shall be visually checked as well as proper connection to earth before
energization.
A specific Commissioning functional test sheet has been designed for each appropriate equipment
type. The completion of the test sheets requires equipment tests, checks, calibrations, etc., after
which the equipment is ready either for operational testing or bringing into service, whichever is
applicable.
Commissioning of Integrated Control and Safety Systems is not covered by standard test procedures
and forms, as it is specific to the type of system and relevant architecture selected for the Project.
Vendor procedures and relevant test reports will therefore be strictly implemented.
Redundancy checks:
- Simulate the CPU module failure and verify control take over by the back up module. Verify the
primary to back up switching and vice versa.
- The redundancy (where applicable) of each serial communication link can be tested disconnecting
one of the two cables and checking that the communication is continuous through the other port.
- The redundancy of power supply units can be tested disconnecting the modules one by one and
checking that the system remains healthy and uninterrupted.
Miscellaneous checks:
- Diagnostic checks are performed verifying the relevant alarm messages (such as power failure,
loss of an I/O card, loss of processor card, etc.) on the operator station.
- Verify the proper operating of the peripheral devices such as printer, screens, servers, etc.
- Verify that all tags for each functional unit have been configured on the operator console and a
dedicated display.
I/O signals interconnection and functionality test: The aim is to verify the installation versus the
design functional purpose. The test will ensure that all components (field instruments, I/O cards, etc.)
are connected and working correctly, and their relevant functions (from input to the output) can be
checked through control schemes and operator displays. The various alarm systems should be
energized and the “test”, “accept” and “reset” buttons will be operated in order to ensure that all
display windows are functional and that the alarm sequence is working. Functional checking of all
open and close loops, either locally mounted or in a control room, and other instruments such as
indicators and recorders in separate control panels with field-mounted transmitters and switches,
etc., is normally carried out by checking the instruments in a series of systems or loops.
It has to be noted that the complete loops shall be tested including primary device, controlling
equipment, final elements and associated alarms and trip functions. Complex digital safeguarding or
sequencing functions may be tested separately in this case, properly prepared test schedules shall
be available. At least the following will be checked:
- Each input and output shall be tested from the relevant field instrument to the marshalling panel
- Each input and output shall be tested from the marshalling panel to the operator displays through
the DCS system.
- Each input and output shall be tested from the relevant field instrument to the operator displays
through the relevant marshalling panel / DCS system.
- The performance of the instruments shall be observed; the zero indication shall be checked under
operating pressure for any transmitter.
- Control loops shall be commissioned in close cooperation with plant operations, and any
abnormal behaviour of the instruments (or process) shall be corrected. Controller settings for
proportional, integral and derivative actions shall be optimized and recorded as soon as possible.
o Secondly, activate primary elements with terminals closed and check the complete system
through to final element(s).
The purpose of the operational tests is therefore to prove that all main equipment works as per
design requirements. In other words operational tests shall demonstrate that:
- Utilities, safety systems and other systems are ready for normal operations;
- Process systems are ready for safe Hydrocarbon introduction.
CONTRACTOR shall be responsible for the set up of relevant procedures, tests preparation and
execution, engineering of temporary facilities wherever required, organization and supply of all
required means and coordination/assistance of Vendors.
Should Operational Test enlighten any required modifications with respect to basis of design
requirements, CONTRACTOR shall liaise with COMPANY and/or Local Regulatory Authority for
implementation of such modifications through proper contractual channels.
Should a step of an operational test be unsuccessful, CONTRACTOR will repeat the test, after the
fault has been fixed by whichever Party is contractually in charge until the test requirements are fully
satisfied. Any minor systems/subsystems/component modification have to approved by
COMPANY/Local Regulatory Authority and relevant Vendor.
10.3 PRINCIPLES
Typical main upstream process systems and utilities which include main mechanical rotating
equipment and which perform a vital function for the plant will be subject to an operational test.
Operational Tests will be carried-out in accordance with operational test procedures issued by
CONTRACTOR during the commissioning preparation phase.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 25 of 62
For the specific case of gas-driven (non bi-fuel) equipment such as power generation gas-turbines,
operational tests must be carried out with dry gas.
In a way to perform operational test before well HC introduction and fuel gas system commissioning,
dry-gas may be back flown from commercial gas networks into the Facilities’ fences.
In this case CONTRACTOR shall be technically accountable to perform the tests under COMPANY
responsibility and relevant applicable PTW system governance.
10.3.5 Demonstration
Operational test demonstration phase shall prove that the subsystem is ready for normal operation.
These stages will always witnessed by at least a COMPANY representative.
Demonstration phase will be performed in accordance with a step by step procedure in accordance
with Vendor prescriptions, that will include the typical following verifications (wherever relevant for the
concerned equipment):
- Dynamic verifications that all sequences and interlocks of the main equipment, of its auxiliaries,
and of the whole subsystem (or subsystems, if they are interlocked), perform properly:
o Start/stop normal sequences
o Hot/cold start
o Emergency shutdown
o Depressurization
o Air/motor/battery/hydraulic starts
o Automatic/manual modes
o Remote/local modes
o Duty/stand-by modes
o Auxiliaries changeover
o Synchronization.
- Dynamic verifications that the control system of the main equipment and the whole subsystem
performs properly, including proper communication between equipment control system and ICSS:
o Pressure/speed/level/flow/temperature controls
o Data gathering
o Remote/local controls.
For generators: load sharing.
For compressors: anti surge.
- Verifications that the main equipment is mechanically sound, by taking all required readings
during several hours after stabilization:
o Noise
o Equipment, bearings & gearbox vibrations
o Lube oil/coolant flows, temperatures, pressures
o combustion chambers & exhaust temperatures
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 27 of 62
For major equipment, it is not recommended to perform numerous shutdowns and restarts, as it
affects the lifetime of the equipment.
Only critical protections will be tested with actual equipment shutdown, all other protections will be
tested with the trip action by-passed.
The configuration of the system, the logic part of it essentially, is specific to the installation. The main
configuration cases are:
- Master/slave
- Coincidence
- Two out of three voting system.
ESD systems are designed so that they include a hierarchy of effects. Assuming the highest ESD
level (total plant shutdown and depressurization) is named level 1, each of levels 2, 3 and 4 will affect
less equipment that the respective higher levels.
Considering the system architecture, these operational tests will be organized as follows:
Nitrogen production
Chemical Injection
Gas Compression
power generation
Gas Dehydration
Compressed Air
and unloading
generation
Seawater
Fuel gas
HVAC
UPS
Start/ stop normal sequences X X X X X X X X X X X X
Sequences & Interlocks dynamic verifications
Emergency shutdown X X X X X X X
Depressurization X X X X X X X X
Air/motor/battery/Hydraulic starts X X X X X X X
Automatic/Manual modes X X X X X X X X X
Remote/Local modes X X X X X X X X X X X X
Duty/stand-by modes X X X X X X X X X
Auxiliaries changeover X X
Syncronization X X
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 30 of 62
Nitrogen production
Chemical Injection
Gas Compression
power generation
Gas Dehydration
Compressed Air
and unloading
generation
Seawater
Fuel gas
HVAC
UPS
Pressure controls X X X X X X X X X X
Speed controls X X X X X X X X
Control system dynamic verifications
Level controls X X X X X X X X
Flow controls X X X X X X X X X X X
Temperature controls X X X X X X X X X X X X X
Data gathering X X X X X X X X X
Remote/Local controls X X X X X X X X X X X X X X
Load sharing X X
Anti surge X X X
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 31 of 62
Nitrogen production
Chemical Injection
Gas Compression
power generation
Gas Dehydration
Compressed Air
and unloading
generation
Seawater
Fuel gas
HVAC
UPS
Noise X X X X X X X X X X
Seals integrity X X X X X X X X X X X
Piping vibrations X X X X X X X X X
Oil consumption X X X
Nitrogen production
Chemical Injection
Gas Compression
power generation
Gas Dehydration
Compressed Air
and unloading
generation
Seawater
Fuel gas
HVAC
UPS
Process and electrical readings at various load
Equip. perform
X X X X X X X X X
verification
EDS pushbuttons X X X X X X X
Alarm & trips verification
F&G detection X X X X X X X X X X
High/Low level X X X X X X X X
High/Low pressure X X X X X X X X X X
High/Low temperatures X X X X X X X X X X X X X
Overspeed X X X X X
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 33 of 62
11.1 INTRODUCTION
CONTRACTOR shall carry out pre-start up activities on process pipework and vessels after
completion and sign off of operational tests wherever applicable, as follows.
Should any pre-start up activity be unsuccessful, CONTRACTOR shall repeat it (after the fault has
been fixed by whichever party is contractually responsible) until the specification requirements are
fully satisfied.
11.1.3 Dry-out
It consists of removal of liquid water and moisture from facilities and achievement of a given dew-
point of the atmosphere inside the facility.
Drying-out is performed on all equipment internally protected by refractories and plant section
designed to run at low temperatures, to avoid hydrates formation during the start-up phase.
11.1.5 Inerting
It is the removal of oxygen from all pipework and vessels to provide safe hydrocarbons introduction.
Leak tests must also establish that any equipment associated with the system, which may have been
previously dismantled for any reason, has been correctly reinstalled.
At last, leak tests will also allow to detect passing valves.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 34 of 62
11.2.1.1.2 Exceptions
Flares stacks and vents, heaters casings, sprinklers, halon piping and deluge network downstream
the control valves, atmospheric storage vessels, ancillaries of packages previously run at the
Vendors.
11.2.1.2.2 Exceptions
- Pumps will be isolated and tested at their maximum suction operating pressure.
- Centrifugal compressors will be isolated and tested at the compressor shutdown balance
pressure.
- Systems working under vacuum will be leak tested at 10% below the set point of the pressure
safety valves.
11.2.1.3.3 Case of process gases with more than 100 ppm H2S
The accepted fall in pressure will be reduced to 0.03 bar/hr (indicative).
The achievement of the tightness criterion will be in any case complemented by a visual search of
leaks by the soapy water method. If a leak detection system by measurement of helium traced in
nitrogen has been used, then the tightness criterion will be as follows: every tested point will have a
leakage rate <50 SCF/year (indicative).
11.2.1.4.2 Exceptions
The subsystem may be divided into portions, in the case where the size of the subsystem makes the
leaks search unmanageable.
The test limits will take into account the different levels of operating pressure inside a sub-system,
hence there will be at least one test by level of operating pressure.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 35 of 62
It may be practicable to carry out a single test encompassing two or several subsystems, when those
are of limited size, and operated at the same pressure.
Test subdivisions will be planned in such a way that no flanged joint is disturbed following the leak
test.
As limit valves cannot be relied upon to be bubble tight, the installation of blinds will be preferred
wherever possible. These system limits isolation blinds will have the appropriate thickness.
These procedure will include in particular the specific points addressed hereafter.
It is however acceptable that the systems having a maximum operating pressure of less than 10 bar
may be also tested at the instrument air pressure (i.e. even if the maximum operating pressure is not
reached).
The test will be performed as follows:
- Line up the system to be tested (i.e. all system isolations fitted, all parts of the system connected,
safety valves operational, all instrument valves opened, drain valves closed, etc.).
- All necessary safety precautions must be carried out prior to the introduction of test gas. The test
area must be clearly cordoned off using bunting and warning signs displayed, all unauthorized
persons prohibited according to applicable PTW system. Safety during pressurization is of utmost
importance to ensure the total safety of plant and equipment and the system under test.
- Pressurize the system to its maximum operating pressure and place a new recorder chart on the
pressure recorder. Ensure the chart is turning. The chart will be marked with the system number,
date, and time of test start.
- Commence checking flanges, valve gland packing, vent plugs, etc., for leaks using soap solution.
Pull-up flange bolts, etc., as required. If necessary, change gaskets or packing (after
depressurizing the system).
- When a stable pressure indication is achieved, mark the recorder chart. The test will be continued
for at least 4 hours, preferably during daytime when ambient temperatures are relatively steady.
- Following a successful test, depressurize the system and attach the pressure recording chart to
the commissioning records. Remove limit blinds as required and delete them from the blind list.
The opportunity will be taken to re-use the nitrogen for the following nitrogen leak test, and to inert
the leak tested system.
With respect to inerting, the target for oil/gas production installations is to reach an O2 content of less
than 2%.
Following a pressure test carried out with nitrogen at 20 barg, the O2 content will be around 1% (and
lower for high pressures). Therefore the N2 high pressure leak test should normally be sufficient for
inerting purposes.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 37 of 62
However if very low O2 contents are necessary (this is often the case with catalysts where O2≤0.2%
is required) it may be necessary to inert partially the system before leak testing. A very simple
calculation will give the O2 concentration to be reached before starting the leak test.
Typical procedure
If considered necessary, install a barometric seal leg to protect the system from overpressure and
isolate vacuum pressure gauges and transmitters.
Pressurize the system to the desired positive pressure using instrument air. Soap test flange joints,
valves, etc., and rectify leaks as necessary.
Following leak rectification, carry out a four-hour hold-test using a suitably calibrated pressure gauge.
If hold-test fails, the leaks must be found and rectified. If successful, depressurize the system,
remove the barometric seal leg and disconnect the air pressurization line, de-isolate pressure gauges
and transmitters.
If a portable vacuum recorder is available it should be connected at this time. If not, it may be
possible to use the systems normal instrumentation to record the vacuum test. If neither of them are
available, a calibrated vacuum gauge must be installed at a suitable point in the system.
Ensure that the vacuum equipment for the system has been correctly commissioned and is ready for
use. Following the normal operating procedures, start up the equipment after lining-up the system
correctly (condensers must be also in line).
(Note: this equipment could be liquid ring pumps, reciprocating vacuum pumps or steam/air ejectors
or a combination of this equipment).
Pull a vacuum on the system which is equal to the normal operating vacuum. Shut down the vacuum
producing equipment and isolate completely. Allow the vacuum to stabilize for one hour.
At the end of one hour, start recording the vacuum in the system, either by means of a recorder chart
or by pressure gauge and graph. If the latter method is employed, readings must be taken every 15
minutes.
Whilst recording the vacuum, pay close attention to leak checking. Flange leaks are normally easy to
find due to a high pitched squealing noise created by the air flowing into the system.
Pinpoint leaks with shaving foam. Valve packing should be rigorously controlled for leaks.
During a vacuum test of four hours, and following rectification of leaks the loss of vacuum recorded
must not exceed 15 mm Hg or 0.02 bar per hour.
Always endeavor to carry out the test when the air temperature is stable.
When test is satisfactorily completed, attach all relevant test documentation to the commissioning
dossier. In certain cases the vacuum may have to be "broken" with dry inert gas, process gas or dry
air to maintain a positive pressure, thus preventing the ingress of wet air until start-up time. Special
procedures will be issued in all cases.
11.2.3 Reports
11.2.3.1 General rule
The leak tests will be organized by subsystems, hence all test drawings and reports related to the
leak testing of a given subsystem will be filed in the commissioning dossier supporting system RFSU
certificates. The reports will also be complemented by a commissioning leak test form (see
attachment PA01).
11.2.3.2 Exception
The leak test may be organized by levels of pressure, which will not exactly match the subsystem
limit. In such a case, a copy of relevant Leak Test Report shall be included in each Commissioning
Dossier supporting involved systems RFSU certificates.
11.3.2.1 General
Degreasing, pickling and neutralization, passivation operations shall be carried by immersing parts to
be cleaned in a tank containing the chemical solution or by filling them with the chemical solution with
or without closed circulation. Generally, pipes are totally disconnected from equipment and
assembled together to form one single loop (with intermediate connection spools if necessary).
All accessories such as collars, pumps, filters, tanks, etc., shall not be chemically treated.
Chemical cleaning is applicable only to carbon steel and stainless steel pipes. Copper or brass parts,
if any, have to be removed or isolated.
In all cases, a corrosion specialist will be consulted in order to check that the equipment being
cleaned will not be subject to corrosion risks, and to obtain recommendation of corrosion inhibitors if
deemed required.
The static method is useful where only short runs of pipe are concerned and consist merely of filling
the pipe, or immersing short sections in a tank, and leaving it to stand for approximately 10 hours.
The circulation method is employed where long awkward pipe runs are encountered and requires a
reservoir, a small circulation pump capable of handling mildly corrosive liquids and some lengths of
flexible hosing of suitable diameter. The various piping items are bolted up to form a closed loop and
the solution is pumped through the loop and recirculated on the reservoir. This method is much more
efficient than the static method due to the constant movement of the solution through the pipes. It
also allows several systems, i.e. the lube and seal oil piping from three identical compressors, to be
cleaned at the same time.
11.3.2.2.3 Rinsing
Rinsing is performed with clean potable or preferably demineralized water (in any case, even if no
degreasing has taken place). Water pH minimum 7.0.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 40 of 62
Pour the solution onto the piping. For static cleaning, stand for three hours; for circulation, two hours
cleaning should be adequate.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 41 of 62
11.3.2.6 Reassembly
After cleaning operations, the reassembly of piping, fragile equipment, etc. is required. Great care
must be exercised in order not to re-introduce dirt into the equipment.
The construction specifications have to be followed but particular attention should be paid to the
following points:
- Gaskets, ring joints and other seals should be checked for conformity and cleanliness.
- Spring hangers, slippers pads, etc. have to be replaced according to the construction drawings
and released when the reassembly is completed.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 42 of 62
- Threads on screwed piping, plugs and so on, must be checked and the items replaced using
PTFE tape where required.
- Valve packing and pump gland packing will be changed if necessary.
- Check no undue stresses are placed on pump and compressor flanges.
- Verify that check valves and glove valves are installed with their flow arrows in the correct
direction.
- In-line instruments such as flow orifices, restriction orifices, rotameters are to be replaced by
instrument specialists.
- Expansion bellows are freed according to the VENDOR'S instructions.
In case of splashing in the eyes, use a 10 g/l boric acid solution. In all cases, seek immediate
medical aid.
11.3.4 Reports
CONTRACTOR shall issue chemical cleaning procedures, with support drawings and sketches. All
reports and results will be filed in the relevant Commissioning Dossier (see attachment PA02).
11.4 DRY-OUT
At Mechanical Completion, and following commissioning tasks such as operational tests, water will
always be present in petroleum processing equipment.
Whenever this water may subsequently lead to an operational problem (such as hydrates formation),
or if equipment may be damaged, it is necessary to perform a drying-out operation.
There are several different reasons for drying-out depending upon the type of equipment and its
normal service: removal of moisture from the lining of heaters and vessels, prevention of hydrates
formation in process equipment, prevention of corrosion in sealines, etc.
Methanol Swabbing consists of charging methanol into the pipeline at the production end (i.e.
offshore platform) pig launcher. Nitrogen shall be injected in the pipeline prior to methanol swabbing,
to prevent the formation of explosive mixtures. Methanol batches are charged between cupped pigs
and slowly propelled through the pipeline, normally at not more than 10 km/hr and 7 bar pressure,
thus absorbing residual water. At the pipeline reception point the methanol/water mixture arrives at
the terminal pig receiver from which it is routed to temporary storage tanks. Samples of the received
mixture shall indicate whether the procedure has been successful or not.
Depending upon the situation, methanol swabbing slugs may be followed by process gas to complete
a "gas in" operation. Otherwise the pipeline is generally left pressurized with nitrogen ready for a safe
start-up when required.
Operating conditions
The quantity of water removed for a determined drying air volume depends on:
- The initial air water dew point. The lower the dew point, the greater the amount of water removed
- The air temperature. The higher the temperature, the higher the amount of water in saturated air
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 44 of 62
- The pressure. The lower the air pressure, the higher the amount of water in saturated air
- The flow. The quantity of water removed increases with the air flow.
The air water dew point that can be obtained depends on the initial dew point of the drying air, and
on the time spent for drying.
Therefore, for successful dry-out, the following conditions are required:
- The dew point of the air used for drying-out must be as low as possible
- The temperature of this air must be as high as possible
- The pressure must be as low as possible
- The air flow must be as high as possible.
Operating procedure
Determine the dry air source. If the system to be dried has a high volume, the possibility of using a
temporary heating system may be studied.
Carefully drain all free water from the system at all low point drains.
Line up the system so that all dead ends are included in the dry-out.
Commence dry air injection, venting the exhaust air from drains, bleeds, etc. Start by using vent
points as close as possible to the air injection point, progressively moving to vents further along the
system (there is little point in sweeping with saturated air). Do not forget dead ends, control valve
bypass lines, etc.
Dry-out is considered complete when the air water dew point reaches its target at all sample points
(dew point target to be decided upon depending on the type of installation).
The water dew point that can be obtained with this method will depend on the dried air water dew
point. With normal instrument air, a water dew point of -15°C is possible (if air dryers are in
operation).
CONTRACTOR shall first ensure that the system/subsystem is completely blinded and/or isolated
from related systems. This will prevent any damage to equipment which is not designed for vacuum
operations. In all cases CONTRACTOR shall ensure the equipment of the system involved is
designed to withstand vacuum.
As a preliminary, a thorough leak test will take place before the drying-out.
The operation generally falls into three phases:
- 1st phase: Vacuum is generated within the system; when vacuum pressure is sufficient, any free
water in the system will start boiling.
- 2nd phase: Vacuum pressure is held constant until the water has completely evaporated. This is
known as the "hold" phase.
- 3rd phase: The maximum possible vacuum pressure is achieved thus ensuring complete removal
of water vapour. Dry gas is then "backed-in" and the vacuum is broken. This gas may be process
gas, dry inert gas, or dry air. Air will obviously not be used where the risk of forming an explosive
mixture is prevalent. In all cases a positive pressure is to be maintained in the system to prevent
the ingress of humid air.
They all need a drying-out operation achieved by progressively heating the lining with the heater
burners, in accordance with dry-out temperature curves.
11.4.4 Reports
Drying-out results and relevant records (see attachment PA03) will be part of the relevant
Commissioning Dossier.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 46 of 62
As a general rule, free fall in the vessel of the material to be loaded is forbidden. It will be accepted
only if requested by the Vendor representative or if clearly specified in the Vendor procedures.
Their content will be dropped into the funnel. The personnel inside the vessel will control the flow of
the product (on the sock) to avoid free fall and spray by moving the sock around.
The sock will be shortened regularly according to the level increase, but always with no excessive
drop of material. This is an effective method for loading as experience shows that several tons or m3
can be loaded per hour.
11.5.4 Reports
Chemical loading results and relevant records (see attachment PA04) will be part of the relevant
Commissioning Dossier.
11.6.1.3 Steam
Steam is commonly used in the petroleum industry for purging air from lines and vessels.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 48 of 62
Steam has the advantage of being easy to produce with relatively simple equipment and may often
be logistically chapter than inert gas generators or other sources of inert gas. Temporary steam
producing units with various output rates are readily available.
Important notes
- This method must not be used for critical equipment requiring very low O2 results. It is normally
suitable when criteria are not severe (i.e. O2 maximum content 2%).
- A secondary problem with this method is that it may prove to be somewhat wasteful of inert gas
and where logistical problems arise the following method may be preferable, even for relatively
small system.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 49 of 62
Notes:
- It is better to pressurize/depressurize 5 times up to 1 or 2 barg each time, than to
pressurize/depressurize once up to 5 barg. In the first case the theoretical final oxygen content is
25 = 32 times less than the original one. In the second case the theoretical final oxygen content is
only 5 + 1 = 6 times less.
- Purging can be quicker by pulling a vacuum on the system before pressurizing. However,
attention must be paid to the equipment design before this operation may be considered.
- Under no circumstances should a vacuum be applied to equipment without first checking that the
equipment is capable to withstand vacuum conditions.
- Connect the inert gas supply to the highest point or points on the system. Check that the unit
drain system can dispose of the volume of water to be dumped. Begin inert gas injection whilst
simultaneously open one low point drain.
- Gradually increase the inert gas injection rate and draining rate. When water draining ceases and
inert gas begins to issue from the drains, close all drains and allow the system pressure to build
up to at least 0.2 to 0.3 b g then stop nitrogen injection.
- Analyze the system atmosphere for O2 content. Normally this should be very low if the procedure
has been correctly followed.
Warning
The flow of inert gas into the system and the flow of water out of the system must be regulated so
that the system/sub-system is always under a positive pressure.
11.6.2.5 Steam-out
The use of steam for purging petroleum processing equipment is widely accepted due to its overall
economy and ease of operation.
In some processing installations certain vessels and systems may be provided with permanent
steam-out lines and this greatly assists in purging operations.
Petroleum processing facilities do not always have steam raising facilities and in this case temporary
steam generators will be used. Notwithstanding this, the general procedure is identical. No specific
procedure is given herein but the following points will be noted by the commissioning team if steam is
to be used for purging:
- Steam is obviously unsuitable for purging equipment which must remain "dry".
- Following steam-out, the system is normally "gassed up" by backing in process gas or fuel gas.
Inert gas could equally be used. In all cases it is most important to ensure an adequate supply of
gas is available during cooling, otherwise the system may be pulled under a vacuum and damage
to the equipment may result.
- Steam injection lines will preferably be in suitably-rated screwed piping. If flexible hoses are used,
ensure they are adequately armored and passed for steam service. Air and water hoses must not
be used.
- Always ensure the system equipment is capable of withstanding the steam temperature.
- Personnel must always be adequately clothed when working in the proximity of steam lines.
Shorts and tee-shirts will be forbidden.
11.6.5 Reports
Inert gas purging results and relevant records (see attachment PA05) will be part of the relevant
Commissioning Dossier.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 52 of 62
CONTRACTOR shall group all signed-off commissioning records in specific commissioning dossiers
arranged by systems.
Such dossier shall contain all the information required to demonstrate that each system has reached
the "Ready for start up" (RFSU) status, which means:
- for utilities, safety systems and other systems, that all commissioning activities are complete, and
the system is fully operational;
- for process systems, that all commissioning activities are complete as far as practicable prior to
wells HC introduction: dynamic tests, operational tests in closed loops with inert fluids, pre-start
up activities.
CONTRACTOR shall issue RFSU certificates for COMPANY and Local Regulatory Contractor
approval as required.
CONTRACTOR shall perform start up and commissioning activities of process systems with wells
hydrocarbon under COMPANY responsibility, according to approved start up and test procedures
and in full compliance with applicable PTW system.
Before start up procedure implementation and wells HC introduction into the facilities, RFSU
certificates of all required systems shall be reviewed by both CONTRACTOR and COMPANY to
check for inconsistencies. Physical check shall be carried out on field, and blind lists shall be
revalidated, according to COMPANY HSE requirements and applicable PTW system. Utilities and
Safety systems shall prove to be fully operational.
The facilities’ operations in transient conditions begins during Start Up and finishes with the reaching
of nominal operating conditions under constant conditions, required to allow the execution of the
Performance Test. In such a time frame, CONTRACTOR shall perform and be accountable for
commissioning activities of process systems with wells hydrocarbons under COMPANY
responsibility, including:
- Operational tests of the process equipment with production hydrocarbon;
- On line tests (including vibration monitoring) and Fine tuning of the production train process and
utilities facilities;
- Preparatory activities for “Performance Test” execution.
CONTRACTOR shall prepare, execute and record all operational and online tests by system.
Relevant records shall be approved by COMPANY.
When all testing and preparatory activities are complete, a “Performance Test” shall be carried out in
accordance to the applicable contractual terms and conditions, to verify that:
- the global throughput of the facilities, and related systems, corresponds to the design
requirements, and;
- the facilities can be safely and satisfactorily operated in all design conditions.
After “Performance Test” completion with positive results, proper Test Report shall be issued by
CONTRACTOR according to relevant contractual terms and conditions, and approved by
COMPANY.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 54 of 62
Prior to start up (wells HC introduction into the facilities), CONTRACTOR shall carry out and be fully
responsible for commissioning activities.
Therefore COMPANY/Local Regulatory Authority may witness at its own convenience any
commissioning activities performed by CONTRACTOR. Witnessing scheme is defined according to
the following 4 levels:
HOLD (H) points: COMPANY/Local Regulatory Authority witnessing and approval of testing
activity performed by CONTRACTOR is mandatory prior to proceed.
WITNESS (W) points: CONTRACTOR must notify when testing activity is performed in due
time to allow COMPANY/Local Regulatory Authority to witness. COMPANY/Local Regulatory
Authority may decide not to witness the activity allowing CONTRACTOR to proceed.
After “Ready for Start Up”, CONTRACTOR shall carry out start up and commissioning activities
under COMPANY responsibility. Therefore COMPANY/Local Regulatory Authority shall control and
approve each and any testing activity performed by CONTRACTOR.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 55 of 62
CONTRACTOR shall regularly upload all records relevant to commissioning activities, updated
master punch list and RFSU certificates into its dedicated software aided information tool named
Integrated Completion Database, for reporting and RFSU progress control purposes.
This database shall be organized per systems and subsystems, in a way to guarantee that each
critical document and certificate can be easily collected, retrieved and relevant system completion
progress checked accordingly.
Maximum integration between CONTRACTOR Integrated Completion Database and COMPANY
document management system shall have to be maintained.
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 57 of 62
17. ATTACHMENTS
17.1 RFSU CERTIFICATE, BLIND LIST, MASTER PUNCH LIST, PRELIMINARY CHECKS
SYSTEM
READY FOR START-UP
CERTIFICATE
COMPANY/PROJECT: SHEET /
SYSTEM: COMPILED BY
DESCRIPTION DATE.
NOTES
LINE IN OUT
BLIND NUMBER SIZE/RATING
NUMBER DATE SIGN DATE SIGN
Master Punch List
Item Type
Item Number System SubSystem Tag No Description Discipline Item Status Created Date Created By Cleared Date Cleared By Materials Remarks
(A,B,C)
NAME
DATE
COMMISSIONING PRELIMINARY
PROJECT
CHECKS REPORT
SUBSYSTEM: DISCIPLINE:
Carried- out
ACTIVITY Date Signature
by
Review of Mechanical Completion
dossier
REMARKS:
No N. Page : 1/3
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference:
Rated
Full Load Current
Voltage/Frequency
Fault level Power Rating
No N. Page : 2/3
COMMISSIONING
10 Liaise with Instrument Dept and test all ICSS interface I/O's
No N. Page : 3/3
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/3
COMMISSIONING
EL-2A-BATTERIES
Equipment
Description
Sub-System
Description
Initial /
No. Result Punch list item
Description of Check / Action to be made Signatur
s No.
e
1 Vendor Test Documentation Complete / Available
No N. Page : 2/3
COMMISSIONING
EL-2A-BATTERIES
Confirm tests were conducted in accordance with design
9
requirements and manufacturers data
Recharge battery bank over 12 hour period and record final open
11
circuit terminal voltage and cell surface temperature
Cell No Cell Volts Cell No Cell Volts Cell No Cell Volts Cell No Cell Volts Cell No Cell Volts
Logo Company : Project : Contractor : Logo
No N. Page : 3/3
COMMISSIONING
EL-2A-BATTERIES
Discharge
Current
Terminal
Voltage
Ambient Temperature
Cell Surface Temperature Deg C
Deg C
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/4
COMMISSIONING
Initial /
Punch list item
No. Signatur
Description of Check / Action to be made Results No.
e
Carry out alarm and trip function tests as per design (record on
9
sheet 2))
Logo Company : Project : Contractor : Logo
No N. Page : 2/4
COMMISSIONING
No N. Page : 3/4
COMMISSIONING
Device Alarm Setting Trip Setting Device Alarm Setting Trip Setting
Energise Inverter and load test in accordance with manufacturers recommendations and record the following values:-
Load kW
DC Volts in
DC Amps in
AC Volts out
AC Amps out
Hz out
Distortion mV
No N. Page : 4/4
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/3
COMMISSIONING
EL-3A-HV SWITCHBOARD-MCC
Equipment
Description
Sub-System
Description
Location/Layout Module Detail
Drawing
Drawing Date Printed
Reference
Rated Voltage Full Load Current
Fault level Power Rating
Punch
Initial /
No.
Description of Check / Action to be made Results list item
Signature
No.
1 Vendor Test Documentation Complete / Available
3 Confirm the busbar jointing bolts have been correctly torqued and
ductored
5 Confirm fuse links, MCB ratings and protection settings are as design
9 Test all protection relays for each incomer and bus section circuit
breaker (CB)
10 Function check main switchboard CBs and check electrical interlocks
No N. Page : 2/3
COMMISSIONING
EL-3A-HV SWITCHBOARD-MCC
HV Pressure Test Results
Insulation Resistance Test (BEFORE HV pressure test ):- use 5000V Megger (DC)
IR - MΩ
Leakage mA
Duration
Mins
Insulation Resistance Test (AFTER HV pressure test):- use 5000V Megger (DC)
Between L1 - L2,L3,E L2 - L1,L3,E L3 - L1,L2,E L1,L2,L3 - N N-E
IR - MΩ
Test Equipment Used
Manufacturer/Model Serial No Expiry Date
Manufacturer/Model Serial No Expiry Date
Manufacturer/Model Serial No Expiry Date
Remarks/Comments:
Logo Company : Project : Contractor : Logo
No N. Page : 3/3
COMMISSIONING
EL-3A-HV SWITCHBOARD-MCC
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/3
COMMISSIONING
Equipment
Description
Sub-System
Description
Location/Layout Module Detail
Drawing
Drawing Date Printed
Reference
Rated Voltage Full Load Current
Fault level Power Rating
5 Confirm fuse links, MCB ratings and protection settings are as design
9 Test all protection relays for each incomer and bus section circuit breaker
(CB)
No N. Page : 2/3
COMMISSIONING
IR - MΩ
Leakage mA
Duration
Mins
Insulation Resistance Test (AFTER HV pressure test):- use 1000V Megger (DC)
Between L1 - L2,L3,E L2 - L1,L3,E L3 - L1,L2,E L1,L2,L3 - N N-E
IR - MΩ
No N. Page : 3/3
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/6
COMMISSIONING
EL-4-POWER TRANSFORMER
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference:
Carry out IR test on MV/LV cable and secondary winding - record val
4
8 Liaise with Instrument Dept and test all DCS interface I/O's
Logo Company : Project : Contractor : Logo
No N. Page : 2/6
COMMISSIONING
EL-4-POWER TRANSFORMER
9 Confirm all transformer protection devices have been tested and set
Energise transformer and check O/C volts at all tap positions - record
12
below
Function check VCB control circuits and verify intertrips and protection
17
trips
No N. Page : 3/6
COMMISSIONING
EL-4-POWER TRANSFORMER
Energisation Tests – (By Injection)
Logo Company : Project : Contractor : Logo
No N. Page : 4/6
COMMISSIONING
EL-4-POWER TRANSFORMER
Primary Volts
Secondary Volts
No N. Page : 5/6
COMMISSIONING
EL-4-POWER TRANSFORMER
Energisation Tests – (Open Circuit)
Primary Volts
Secondary Volts
No N. Page : 6/6
COMMISSIONING
EL-4-POWER TRANSFORMER
Remarks/Comments:
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
EL-5A-DISTRIBUTION PANEL
Equipment
Description
Sub-System
Description
No N. Page : 2/2
COMMISSIONING
EL-5A-DISTRIBUTION PANEL
10 Confirm voltage level and phase rotation is correct
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed
Reference
Punch
Initial /
No. Description of Check / Action to be made Results list item
Signature
No.
1 Confirm Vendor Test Documentation Complete / Available
4 Confirm local indicators operate correctly and lamps are correctly rated
No N. Page : 2/2
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/4
COMMISSIONING
EL-6-HV-LV MOTOR
Equipment
Description
Sub-System
Description
Drawing
Date Printed
Reference
* Electrical Engineer to liase with Mechanical Engineer to perform load run test
Punch
Initial / list
No
Description of Check / Action to be made Results Signature item
No.
Confirm vendor documentation applicable to motor cubicle/starter, and
1
associated protection/safety equipment Complete / Available
No N. Page : 2/4
COMMISSIONING
EL-6-HV-LV MOTOR
12 Confirm all remote / local control facilities operate satisfactorily
13 Confirm anti-condensation heater operates satisfactorily
Liase with Instrument Engineer and confirm that
Inst Tech
all instrumentation protection has been function Date
Initial
14 checked
17 Confirm and record run-up time and starting current ( record on sheet 2 )
18 Stop motor using local control station and record run-down time Secs
Carry out no-load run for a min period of 30 mins until temperature
19 readings stabilise. Monitor and record the following test results see sheet
2 of 2 for readings/running log:
Current Amps
(average)
Bearing
Temp Deg C
(NDE)
Bearing Deg C
Temp (DE)
Motor
Frame Deg C
Temp
Winding
Temp (U) Deg C
L1
Logo Company : Project : Contractor : Logo
No N. Page : 3/4
COMMISSIONING
EL-6-HV-LV MOTOR
Winding
Temp (V) Deg C
L2
Winding
Temp (W) Deg C
L3
Run-up time Secs Run-down time Secs
Starting current
Rotation viewed from NDE CCW CW
Amps
Punch
No Initial /
Description of Check / Action to be made Results list item
. Signature
No.
Mechanical technician to record motor vibration noise level readings.
20
( attach results )
No N. Page : 4/4
COMMISSIONING
EL-6-HV-LV MOTOR
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
EL-7-NAVIGATION AIDS
Equipment
Description
Sub-System
Description
Area
Circuit Rating
Classification/IP
rating
Punch
Initial /
No Description of Check / Action to be made Results list item
Signature
No.
1 Vendor Test Documentation Complete / Available
Carry out energised operational checks and prove that all internal
6 logic and interlocks function as per design philosophy ( Vendor
attendance )
No N. Page : 2/2
COMMISSIONING
EL-7-NAVIGATION AIDS
12 By simulation, verify operation of the fog detector
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Location/Layout Module Detail
Drawing
Drawing
Date Printed
Reference
5 Carry out live circuit earth loop impedance test at each socket
For 230V circuits, connect RCCD tester at each socket and confirm
6 RCCD trip times as per manufacturers data
Record below
For welding outlets, simulate earth fault at each socket and confirm
8
satisfactory operation of earth leakage device
DB
Circuit MCB RCCD No of Polarity E/loop RCCD/EFR
Circuit
Description Rating Rating Sockets Check Impedance Trip Results
No
A mA Ω mS
mA
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/4
COMMISSIONING
EL-9-ELECTRIC HEATER
Equipment
Description
Sub-System
Description
3 Check the integrity of all cable terminations and idents are correct
Carry out IR and continuity tests on heater element and associated
4
circuits. Record on sheet 2
No N. Page : 2/4
COMMISSIONING
EL-9-ELECTRIC HEATER
Confirm heater response is satisfactory over temperature control
range
11
Record results:
14 Check all covers and guards are installed and no bolts missing
No N. Page : 3/4
COMMISSIONING
EL-9-ELECTRIC HEATER
Test Results
No N. Page : 4/4
COMMISSIONING
EL-9-ELECTRIC HEATER
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
EL-10-MISCELLANEUS EQUIPMENT
Equipment
Description
Sub-System
Description
Carry out energised operational checks and prove that internal logic
8
and interlocks function as per design philosophy
No N. Page : 2/2
COMMISSIONING
EL-10-MISCELLANEUS EQUIPMENT
Test Equipment Used
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/4
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed
Reference
Punch
Initial /
No. Description of Check / Action to be made Results list item
Signature
No.
Ω
MΩ
Lighting circuit – Energise circuit, confirm polarity and that all fittings
are illuminated.
3
Record load current
Amps
Check end of Lighting circuit voltage and confirm volt drop is not
greater than 2 % of supply volts at panel.
4
Record volt drop
Logo Company : Project : Contractor : Logo
No N. Page : 2/4
COMMISSIONING
Amps
For single phase Small Power circuit – Energise circuit and confirm
voltage and polarity are correct at consumer.
Record voltage
6 Volts
Amps
Check all light fittings with self contained battery packs are charging
7
correctly
No N. Page : 3/4
COMMISSIONING
NOTE: Illumination levels and battery duration tests are carried out during commissioning
No N. Page : 4/4
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/3
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed
Reference
Punch
Initial /
No Description of Check / Action to be made Results list item
Signature
No.
1 Confirm cladding installation is complete
8 Disconnect circuit, close MCB and confirm RCCD test button trips MCB
10 Carry out ‘live’ circuit earth loop impedance test at circuit extremities
Connect RCCD tester at circuit extremities and confirm RCCD trip times
11
as per manufacturers data
No N. Page : 2/3
COMMISSIONING
Remarks/Comments:
Logo Company : Project : Contractor : Logo
No N. Page : 3/3
COMMISSIONING
Test Results
RCC
MCB Post
D Element Earth loop RCCD Load Current Tape
cladding
Ratin
Ratin Continuity Impedance trip time Amps Temp deg C
g IR
g
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed
Reference
Punch
Initial /
No. Description of Check / Action to be made Results list item
Signature
No.
No N. Page : 2/2
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/4
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed
Reference
Switchboard
Voltage Rating
No/Cubicle No
Initial / Punch
No Result
Description of Check / Action to be made Signatur list item
. s
e No.
1. For Current Transformers
Confirm relevant vendor factory tests are complete and
1.1
documentation available
1.2 Confirm all connection are correct, secure and CT mounted correctly
Prove CT polarity ( Flick Test ) if applicable and carry out ratio checks to
1.6
confirm CT tolerance
1.7 Confirm all secondary wiring is connected and there no open circuits
Logo Company : Project : Contractor : Logo
No N. Page : 2/4
COMMISSIONING
HV - LV,E M LV - HV,E M
3.2 Confirm all connection are correct, secure and there are no open circuits
Confirm relay type and settings are correct to latest revision of design
3.4
schedule
On completion of tests, confirm that all wiring has been re-instated, all
3.6
overrides/links removed and relay settings re-set to design schedule
3.7 Confirm all relay front covers have been re-instated and seals attached
4
Punch List Raised
5
Compile Test Data as per table below
Logo Company : Project : Contractor : Logo
No N. Page : 3/4
COMMISSIONING
Over Current
Earth Fault
Restricted
Earth Fault
Differential
Reverse
Power
Negative
Phase
Sequence
Rotor Earth
Fault
Over Voltage
Under Voltage
Lockout
Timer
Multifunction
Thermal
No N. Page : 4/4
COMMISSIONING
Company
Signature
Date
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 59 of 62
COMMISSIONING
IN-1-A INSTRUMENT LOOP FUNCTION CHECKS
Location:
Loop No:
Initial / Punch List
No. Description of Check / Action to be made Results
Signature (Y/N)
1 Confirm all relevant inspection and calibration checks complete.
2 For I.S. circuits conform installation is in accordance with loop diagram(s) and vendor data sheet(s)
5 Confirm that all valve stroke times are all acceptable and as per data sheet.
Function test all instrumentation associated with the complete loop and ensure signal and control output to associated Systems are also
6
function checked.
7 Compile for the Instrument Loop all the required data and measurements as listed on sheet 2 of 2 of this form.
8 Record any additional checks that may have been performed as requested within the system TCP procedure.
Following successful completion of all above checks and any relevant TCP procedure checks together with any functional testing of the unit,
9
carry out a final Punchlist for the installed equipment, and roll-up all outstanding items into one composite list for System TCP Acceptance.
10 Update latest issue of design drawings for "As Built" Information.
Logo Company : Project : Contractor : Logo
COMMISSIONING
IN-1-A INSTRUMENT LOOP FUNCTION CHECKS
Remarks / Comments:
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/1
COMMISSIONING
Loop No.
Detector type? (HC gas, H2s, MAC, Smoke, Heat, Flame etc…
Visual check for damage OK N N/A Verify correct device location Y N N/A
Open/short circuit
List loop device tags below Device tested ok?
test ok?
EOL resistor fitted?
Verify DCS point display Y N N/A Verify alarm recording & text Y N N/A
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/1
COMMISSIONING
Location:
LoopNo.
Loop Description
Relevant individual ICSS / ESD/F&G loops have been checked and test sheets completed Y N NA
Control function
Loop Components System (ICSS/ESD/F&G) Signal Type (DI/DO/AI/AO)
OK
Y N NA
Y N NA
Y N NA
Y N NA
Automatic / Manual function is tested and OK? Y N NA
Action of output to valve is correct for purpose (direct or reverse) Y N NA
Motor/Pump starts and stops at correct set-points. (Enter set points below) Y N NA
SP1: SP2: SP3: SP4:
DCS displays and alarms are correct and conform to control functions. Y N N/A
Remarks:
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/1
COMMISSIONING
Location:
Drawing Reference
Verify operating of local control panel, manual override and partial stroke (when required) Y N
Valve Failure Action On Loss Of Air supply: Fail Open Fail Closed Stay put
Valve Failure Action On Loss Of Elec. Signal: Fail Open Fail Closed Stay put
Verify ‘Open’ Limit Switch: Y N N/A Verify ‘Closed’ Limit Switch: Y N N/A
Validate Loop Against P&ID: Y N N/A Verify Travel Fault Alarm : Y N N/A
Verify DCS graphic display Y N N/A Verify ESD graphic display Y N N/A
Verify DCS point display Y N N/A Verify alarm recording & text Y N N/A
Remarks:
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Location:
Drawing Reference
No N. Page : 2/2
COMMISSIONING
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/1
COMMISSIONING
Location:
Drawing Reference
Air Supply Setting BarG
Rising % Falling %
0 25 50 75 100 75 50 25 0
DCS Output
Valve Position
Valve Stroke: mm
Valve Failure Action FO FC SP Time to Open: sec. Time to Close: sec.
Confirm operation of valve ancillaries Y N N/A
Verify DCS graphic display Y N N/A Verify ESD graphic display Y N N/A
Verify DCS point display Y N N/A Verify alarm recording & text Y N N/A
Remarks:
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/1
COMMISSIONING
Location:
Drawing Reference
Loop No.
Model No
System DCS ESD Visual check for damage Y N N/A
Input Check
Switch 1 Tag No Switch 2 Tag No
Switch Contacts N/O N/C N/A Switch Contacts N/O N/C N/A
Setting (units) Switch Cont. Setting (units) Switch Cont.
Switch. Inc. / Dec. Open / Closed Switch. Inc. / Dec. Open / Closed
Reset Open / Closed Reset Open / Closed
Output Check
Output Signal On Off Field Device / LCP / etc signal received Y N
Verify DCS graphic display Y N N/A Verify ESD graphic display Y N N/A
Verify DCS point display Y N N/A Verify Alarm recording & text Y N N/A
Drawings, documents are as-built and attached Y N N/A
Test Equipment Used Serial Number Certificate Number Dated
Remarks
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Sub-System Description
Location:
Loop No.
Model No
Verify DCS point display Y N N/A Verify alarm recording & text Y N N/A
Remarks:
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/1
COMMISSIONING
Item Description
Sub-System Description
Drawing Reference
Initial / Punch
Description of Check / Action to be made Result
Signature List (Y/N)
Communication and synchronization between DCS and package works
properly
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Sub-System Description
Location: :
Drawing Reference
Electrical Schematic
Verify DCS point display Y N N/A Verify alarm recording & text Y N N/A
Remarks:
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/1
COMMISSIONING
Sub-System Description
Location:
Drawing Reference
Electrical Schematic
MCC unit should be in TEST position, field emergency stops out and field local/remote switch in remote
Signal From Signal To
I/O Type
Tag Number Function Description (ICSS, ESD, (ICSS, ESD, Check OK
(DI, DO, S)
MCC) MCC)
Y N NA
Y N NA
Y N NA
Y N NA
Y N NA
Y N NA
Y N NA
Y N NA
Verify ICSS graphic display Y N N/A Verify ESD graphic display Y N N/A
Verify ICSS point display Y N N/A Verify alarm recording & text Y N N/A
Remarks:
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Item Description
Sub-System Description
Location:
Drawing Reference
Punch
Initial /
Description of Check / Action to be made Result List
Signature
(Y/N)
Package Equipment is free from damage
Power supplies and grounding are in accordance with project specification
Package Control and Safety loops have been checked and test sheets
completed
Package controls have been checked in accordance with vendor
commissioning instructions
Package instruments have been checked in accordance with vendor
commissioning instructions
Package Site Acceptance Test (SAT) has been completed in accordance with
vendor SAT procedure
Remarks:
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Remarks:
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Data Sheet
Equipment Description
Sub-System Description
Location:
Drawing Reference
1. Required Data
Function Range
Manufacturer
Test fluid
Test pressure
2. Calibration Results
0% FC
25%
50%
75%
100%
No N. Page : 2/2
COMMISSIONING
3.Test equipment
Serial Expiry
Make Model
No date
Remarks:
Company
Signature
Date
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 60 of 62
17.2.3 Telecommunication
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 Ensure coverage of the dedicated area is udible
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 To check relay box AC power protection is adequate, confirmation and
testing of the dedicated circuit breaker is required.
2 Check MDF line fuse protection is adequate.
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 Check power supply voltage.
3 By pressing one by one the "zone select" pushbuttons, check the right
zone or group of zones are properly addressed.
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 Test power supplies and protectors.
5 Verify input levels of override and control units (remote and local).
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 Telephone sockets. Loop resistance will be checked on a random basis
(1/10) and compared with pre-commissioning figures.
2 Telephone instruments. To ensure each DTMF dial is operating
satisfactorily:
3 Check class of service against restriction access plan.
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 check power supply voltage and protection
ensure all station features (keys, led) are working properly: "Busy",
"Clear" leds
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 check power supply voltage and protection
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 check power supply voltage and protection
3 confirm sound powered broadcasts is possible when the stations are de-
energized.
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1
Selective Calling Units directly linked to MUX (Multiplexer)
2
measure RX and TX AF levels
3
measure Power supply voltage and protection
4
check earthing
5
Selective Calling Unit linked to MUX via Bridges and Attenuator
6 Pads
measure Power supply and protection for each type of equipment
7
check earthing
8 measure for each port Rx and TX AF levels from Selective Calling
Unit input to Attenuator Pads output
9
check monitoring facilities on the Attenuator Pads
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/3
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
check implementation is done in accordance with installation
1 pocedures and
VENDOR documentation.
2
check and measure the power supplies and outputs of converter
3
initiate Main Processor Self-test
4 insert Main Control Sub-system cards
program:
6 - System configuration
- Circuit option
- Access codes.
Logo Company : Project : Contractor : Logo
No N. Page : 2/3
COMMISSIONING
7 - Hunt group
- Pick up group
- Telephone directory
- Call re-routing.
8 check call handling facilities, functions of the operator keys.
9
check monitoring facilities on the Attenuator Pads
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Logo Company : Project : Contractor : Logo
No N. Page : 3/3
COMMISSIONING
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 Measure audio input and output levels.
2 Verify controls and command features (signalling).
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1
check the power supplies
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 check power supply and protection
2 check earthing
TX Frequency
check all front panel functions
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 check power supply and protection
2 check earthing
TX output power
3
TX Frequency
TX Deviation
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 check power supply and protection
2 check earthing
TX reflected power for two channels only (the lowest and the highest
frequencies)
Deviation
Spurious
RX Audio power.
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 check power supply and protection
2 check earthing
TX power/frequency
TX reflected
Deviation
Spurious
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1 check power supply and protection
2 check earthing
TX output power/frequency
TX reflected power
3
TC deviation
TX Spurious
RX sensitivity
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
Check RX sensitivity, squelch, operation
1
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
check check
1
- The power supply voltage and protection
3 Display format
6 Transmission modes
7 Editing controls
10 Control panels
11 Port facilities
- Terminal check
12 - Routing
Telex handling
-Telex addressing
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment Description
Sub-System Description
perform:
check:
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment Description
Sub-System
Description
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment Description
Sub-System
Description
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment Description
Sub-System Description
1
check operation of the recorder
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment Description
Sub-System Description
1
check operation of the remote transmission.
2
adjust the different parameters.
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment Description
Sub-System Description
1
Display selected function.
3
Verify levels on the input/output of the modem.
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment Description
Sub-System Description
3
perform simulated input tests
5
verify Meteorological Data Recording
6
test the waves processor and display
Logo Company : Project : Contractor : Logo
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment Description
Sub-System Description
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment
Description
Sub-System
Description
Drawing
Date Printed:
Reference
Description of Check / Action to be made Results Initial / Punch list
No.
Signature item No.
1
Physical inspection, wiring, enclosures, fixing supports.
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
Logo Company : Project : Contractor : Logo
No N. Page : 1/2
COMMISSIONING
Equipment Description
Sub-System
Description
2
check earthinghis transformer
No N. Page : 2/2
COMMISSIONING
Insert tag numbers for each item of equipment tested on this ITR form (Note use separate sheet if
required)
** Tag
Description
Number
Remarks / Comments :
Company
Signature
Date
eni spa 27952.ICO.AVV.SDS
Rev. 0 - November 2011
exploration & production division
Page 61 of 62
Subsystem/Circuit: Location:
P&ID Nb : Date:
Attachments:
Company
Signature
Print name
Date of signing
PA02
CHEMICAL CLEANING REPORT
Subsystem : Location:
P&ID Nb : Date:
OPERATION DESCRIPTION:
Effluent disposal:
Temporary equipment:
Procedure attached (Y/N):
SAFETY PRECAUTIONS:
Company
Signature
Print name
Date of signing
PA03
DRY OUT REPORT
Subsystem : Location:
P&ID Nb : Date:
OPERATION DESCRIPTION:
Temporary means:
ATTACHMENTS:
SAFETY PRECAUTIONS:
Company
Signature
Print name
Date of signing
PA04
VESSELS CHEMICAL LOADING
Subsystem : Location:
P&ID Nb : Date:
MATERIAL TO LOAD
Type:
Product reference:
Wheight to load:
Volume to load
Support material 1: Quantity:
Support material 2: Quantity:
Samples (Y/N):
LOADING PROCEDURE:
Temporary means:
ATTACHMENTS:
SAFETY PRECAUTIONS:
Company
Signature
Print name
Date of signing
PA05
PROJECT
INERTING REPORT
Subsystem: Location:
Equipment Nb: Sketch Nb:
P&ID Nb: Date:
INERTING METHOD:
Fluid:
Criterion:
Volume:
OPERATION DESCRIPTION:
ATTACHMENTS:
Procedure (Y/N):
Sketches & Drawings (Y/N):
RESULTS
Location O2 Content Location O2 Content
COMMENTS: