Critical Vendor Audit GE Updated.
Critical Vendor Audit GE Updated.
Revision
30.0
Date Oilfield Inspection Services
1/1/2023
Page
EHS AT
1 of 6
OIS ACTION TRACKING
Action
Action Item Target Date Status
Party
Specific HSE Plan for GE scope of
No records of management visits to
work shall be developed to include
GE scope of work.
OIS CEO & MSV plan.
No specific plan for site visit in NDT
CEO & MSV shall be adequately
department covering GE scope of
and properly documented to
work.
capture agenda & crew
CEO planned visit only for 2 times
1 engagement specific. CEO/HSE 15/01/2024 Closed.
in a year for PDO contract.
OIS HSE plan engagement shall be
NDT Ops Manager visits couldn’t be
captured, this shall be excluding
evident during the audit.
the review & approval
No records of Senior Management
acknowledgment.
participation in HSE Plan
development
Refer OIS HSE Plan 2024.
All, pending OIS Supervisors shall
undergo FLS. The same shall be 30/05/2024.
2 OIS Supervisors attended FLS OIS HR Open
captured in the OIS Training Tgt Revised.
Matrix.
3 OIS HSE Plan is developed based Specific annual HSE Plan for GE HSE/ 15/01/2024 Closed.
on the PDO WE HSE Plan 2023 scope of work shall be developed in Base
However no specific HSE Plan line with GE requirements, and Supervis
developed for NDT department to shall include GE focus areas & or
cover GE scope of work subsequent bridging document.
The HSE plan shall be endorsed by
Effective
Revision
30.0
Date Oilfield Inspection Services
1/1/2023
Page
EHS AT
2 of 6
OIS ACTION TRACKING
GE HSE Manager.
Page
EHS AT
3 of 6
OIS ACTION TRACKING
Page
EHS AT
4 of 6
OIS ACTION TRACKING
Page
EHS AT
5 of 6
OIS ACTION TRACKING
Page
EHS AT
6 of 6
OIS ACTION TRACKING