Countdown to Level 2 BIM
B/555 Roadmap
Level 2 BIM Timeline
Action List
Your checklist to be ready
History of Mandate
Government Construction Strategy - May 2011

2011 2012 2013 2014 2015 2016


History of Mandate
Government Construction Strategy - May 2011
Now = March 2015

You are Here

2011 2012 2013 2014 2015 2016


History of Mandate
Government Construction Strategy - May 2011
Now = March 2015
Level 2 BIM by early 2016

You are Here

2011 2012 2013 2014 2015 2016


B/555 Roadmap
B/555 Roadmap
B/555 Roadmap
Level 2 BIM Timeline
Government Construction Strategy

Now

2011 2012 2013 2014 2015 2016


1192 Standards
BS 1192:2007
Collaborative production of architectural,
engineering and construction information.
Code of practice

Now

2011 2012 2013 2014 2015 2016


1192 Standards
PAS 1192-2:2013
Specification for information management
for the capital/delivery phase of
construction projects using building
information modelling

Now

2011 2012 2013 2014 2015 2016


1192 Standards
PAS 1192-3:2014
Specification for information management
for the operational phase of assets using
building information modelling

Now

2011 2012 2013 2014 2015 2016


1192 Standards
BS 1192-4:2014
Fulfilling employers information exchange
requirements using COBie
Code of practice

Now

2011 2012 2013 2014 2015 2016


1192 Standards
PAS 1192-5:Draft PAS 1192-5
Specification for security-minded building
information modelling, digital built environments DRAFT
and smart asset management.

Now
PAS 1192-5

DRAFT

2011 2012 2013 2014 2015 2016


8541 Standards
BS 8541-1:2012
Library objects for architecture, engineering and
construction - Identification and classification.

Now
PAS 1192-5

DRAFT

2011 2012 2013 2014 2015 2016


8541 Standards
BS 8541-2:2011
Library objects for architecture, engineering and
construction – Recommended 2D symbols of
building elements for use in Building Information
Modelling.

Now
PAS 1192-5

DRAFT

2011 2012 2013 2014 2015 2016


8541 Standards
BS 8541-3:2012
Library objects for architecture, engineering and
construction – Shape and measurement

Now
PAS 1192-5

DRAFT

2011 2012 2013 2014 2015 2016


8541 Standards
BS 8541-4:2012
Library objects for architecture,
engineering and construction –
Attributes for specification and
assessment

Now
PAS 1192-5

DRAFT

2011 2012 2013 2014 2015 2016


8541 Standards
BS 8541-5:TBD BS 8541-5
Library objects for architecture, engineering and
construction – Assemblies TBD

Now
PAS
PAS
1192-5
1192-5

DRAFT
TBD

2011 2012 2013 2014 2015 2016


8541 Standards
BS 8541-6:TBD BS 8541-6
Library objects for architecture, engineering and
construction – Product Declarations TBD

Now
PAS
PAS
1192-5
1192-5
PAS 1192-6

DRAFT
TBD TBD

2011 2012 2013 2014 2015 2016


7000 Standards
BS 7000-4:2013
Design Management Systems:
Guide to managing design in construction

Now
PAS
PAS
1192-5
1192-5
PAS 1192-6

DRAFT
TBD TBD

2011 2012 2013 2014 2015 2016


BIP 2207 Guide
BIP 2207
Building Information Management – A standard
framework and guide to BS 1192

Now
PAS
PAS
1192-5
1192-5
PAS 1192-6

DRAFT
TBD TBD

2011 2012 2013 2014 2015 2016


Uniclass Classification
1
Uniclass 1 & 1.4 & 2 & TBD
Classification system for structuring
construction information.

Now
PAS
PAS
1192-5
Uniclass
1192-5
PAS 1192-6

2 TBD DRAFT
TBD
TBD TBD

2011 2012 2013 2014 2015 2016


Method of Measurement
1
NRM 1
Order of Cost Estimating and Cost Planning for
Capital Building Works

Now
PAS
PAS
1192-5
Uniclass
1192-5
PAS 1192-6

2 TBD DRAFT
TBD
TBD TBD

2011 2012 2013 2014 2015 2016


Method of Measurement
1
NRM 2
Detailed Measurement for Building Works

Now
PAS
PAS
1192-5
Uniclass
1192-5
PAS 1192-6

2 TBD DRAFT
TBD
TBD TBD

2011 2012 2013 2014 2015 2016


Method of Measurement
1
NRM 3
Order of cost estimating and cost planning for
building maintenance works

Now
PAS
PAS
1192-5
Uniclass
1192-5
PAS 1192-6

2 TBD DRAFT
TBD
TBD TBD

2011 2012 2013 2014 2015 2016


Method of Measurement
1
CESMM4
Civil Engineering Standard Method of
Measurement 4th edition

Now
PAS
PAS
1192-5
Uniclass
1192-5
PAS 1192-6

2 TBD DRAFT
TBD
TBD TBD

2011 2012 2013 2014 2015 2016


Delivery
1
DPoW
Digital Plan of Work

Now
PAS
PAS
1192-5
Uniclass
1192-5
PAS 1192-6

2 TBD DRAFT
TBD
TBD TBD

2011 2012 2013 2014 2015 2016


Action List
PAS 91
Pre-Qualification Questionnaire

Be able to respond to the 4 BIM


questions that form table 8 of PAS
91.
Action List
EIR
Employer’s Information Requirements

Be able to prepare, contribute to or


respond to EIRs.
Action List
BEP
BIM Execution Plan

Be able to prepare or contribute to


pre and post contract BEPs.
Action List
BIM Protocol
CIC BIM Protocol

Aware of implications of, and have


willingness and ability to append BIM
Protocol to contracts and PI
insurances.
Action List
CDE
Common Data Environment

Able to work within a CDE that is


capable of achieving the processes
outlined within 1192 suite of
documents.
Action List
Producing BIM Data

Able to produce graphical and / or


information BIM data in the format
required by all project participants,
including IFC and COBie.
Action List
Interrogating BIM Data

Able to interrogate the BIM data


produced by all project participants,
using findings to inform decisions.
Action List
BIM Uses

Able to produce or contribute to BIM


uses required for project: Clash
resolution; programme analysis; cost
analysis; etc
Action List
DPoW
Digital Plan of Works

Use the Digital Plan of Works to be


able to define, manage and interact
with the management processes
and Levels of Development required
for the project.
Action List
 PAS 91  Producing BIM Data
 EIR  Interrogating BIM Data
 BEP  BIM Uses
 BIM Protocol  DPoW
 CDE