REQUEST FOR OWNER SUPPLIED MATERIALS (OSM

Date Requested September 5, 2019 Ref. No. QAT/YLF-CP


Date Needed November 18, 2019 Project : CP08 - Verano Greenhill
Contractor Quest-Air Technology Phil., Inc. Work Trade : FIRE-PROTECTION
Deliver To Verano Greenhills Area of Materials : BASEMENT-3
Item P R O D U C T
U/M B-3 B-2
No. CODE DESCRIPTION
A B.I. PIPES and FITTINGS
A.1 B.I Pipes, Schedule 40
FIRE PROTECTION SYSTEM
150 mmØ x 6M lgt/s 31 3
100 mmØ x 6M lgt/s 4 1
80 mmØ x 6M lgt/s 10 10
65 mmØ x 6M lgt/s 1 1
50 mmØ x 6M lgt/s 5 1
40 mmØ x 6M lgt/s 3 5
32 mmØ x 6M lgt/s 9 10
25 mmØ x 6M lgt/s 51 69
A.2 G.I Fittings, Schedule 40
Tee/Equal
50 mmØ pc/s 11 5
40 mmØ pc/s 1 5
32 mmØ pc/s 2
25 mmØ pc/s 30 24
Tee/Reducer
50 mmØ x 32 mmØ pc/s 1 1
40 mmØ x 25 mmØ pc/s 7 3
32 mmØ x 25 mmØ pc/s 18 22
Elbow, 90⁰
50 mmØ pc/s 14
40 mmØ pc/s 6 6
32 mmØ pc/s 3 3
25 mmØ pc/s 64 64
Reducer
50 mmØ x 40 mmØ pc/s 7 3
50 mmØ x 32 mmØ pc/s 9 8
50 mmØ x 25 mmØ pc/s 8 3
40 mmØ x 32 mmØ pc/s 9 12
40 mmØ x 25 mmØ pc/s 7 2
32 mmØ x 25 mmØ pc/s 20 21
25 mmØ x 13 mmØ pc/s 68 81
Union Patente
32 mmØ pc/s 1 1
25 mmØ pc/s 1 1
Slip-On Flange
150 mmØ pc/s 5 1
100 mmØ pc/s 11 6
80 mmØ pc/s 10 10
65 mmØ pc/s 8
Blind Flange
150 mmØ pc/s 1 1
A.3 Mechanical
MechanicalGroove Fittings
Tee, Female Threaded
Outlet
150 mmØ x 65 mmØ pc/s 2 2
80 mmØ x 50 mmØ pc/s 13 10
80 mmØ x 40 mmØ pc/s 4 7
80 mmØ x 32 mmØ pc/s 4
Tee/Equal, Grooved End
150 mmØ pc/s 4
100 mmØ pc/s 3 1
80 mmØ pc/s 4
Tee/Reducer, Grooved End
150 mmØ x 100 mmØ pc/s 1 1
150 mmØ x 65 mmØ pc/s 2 2
Elbow, 90⁰, Grooved End
150 mmØ pc/s 20
100 mmØ pc/s 1
80 mmØ pc/s 2
65 mmØ pc/s 2 2
Elbow, 45⁰, Grooved End
150 mmØ pc/s 1 1
Reducer, Grooved End
100 mmØ x 80 mmØ pc/s 4 2
Eccentric Reducer, Grooved End
80 mmØ x 32 mmØ pc/s 4 4
Checked by : Checked by :

Contractor's P.I.C / QS Engineer YLFCCSI - Rep

Approved by: Approved by:

Contractor's Project Manager YLFCCSI - Proj


ER SUPPLIED MATERIALS (OSM)
QAT/YLF-CP08-OSM-FP-001
Project : CP08 - Verano Greenhills
Work Trade : FIRE-PROTECTION
Area of Materials : BASEMENT-3 TO GROUND FLOOR

B-1 GF REMARKS

Superior/Supreme

5 3
1 1
16 16
1 1
1 1
5 6
10 11
69 63
Superior/Supreme

7 5
7 10
4
28 32

1 1
9 6
20 13

1
7 1
7 3
64 194

4 2
8
3 8
10 12
11 8
17 22
83 88

1 1
1 1

1 1
6 6
14 14

1 1
Victaulic

2 2
14 11
7 6
3

1 1
2 2

1 1
2 2

2
2 2

1 1

2 2

4 4
Checked by :

YLFCCSI - Representative

Approved by:

YLFCCSI - Project Manager